COLD-FORMED METAL FRAMING INSPECTION REPORT SUMMARY

Similar documents
3. Are component and cladding design pressures consistent with ASCE 7 for the wind speed and exposure category (ASCE 7 Fig. 6-3)?

APPLICATION FOR A BUILDING PERMIT

TOLL FREE:(888) FAX:(941) ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL

3.1 General Provisions

Materials. Description Quantity/Size Material Foundation Drainage material. 1.4 cu. yd. Compactible gravel

TYPICAL PATIO COVERS. OWNER: ADDRESS: PHONE:

With Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e H O W B U I L D S H E D.

BUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT

PLAN CEILING FRAMING PLAN CEILING JOIST SCHEDULE. Tenant Improvements. UNLV Police Station Maryland Parkway.

IRC 2015 Code Compliant Wood Framed Residential Details. Incorrect Installations of Connectors with code references and remedies, discussion.

IRC 2012 Code Compliant Wood Framed Residential details. Miss Installed Connectors with code references and remedies, discussion.

CLIPS & CONNECTORS. Phone:

Sections & Details VOCABULARY

Material List for Log Complete Packages

REQUEST FOR INFORMATION

HOW TO BUILD A 12X8 SHED

With Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e Download 12,000 More Shed Plans

2x6. 2x8. 2x10. Size. 2-2x10 8'-5" w/ 2 NJ 7'-3" w/ 2 NJ

GLOSSARY OF TERMS SECTION 8

SECTION: 15 ZONING RULE LOT AREA 6134 S.F S.F. BUILDING AREA (FOOTPRINT) LOT COVERAGE 20.2% 24.86' FRONT YARD SIDE YARD 8.

Standard Detail Index See referenced Technical Bulletins for important information on using specific Standard Details.

RAPID RIVER RUSTIC, INC.

Fastener Schedule. a, b, c. FASTENER Roof 3-8d (2 1 / ) / ) 3-10d. 3-10d ( ) 3-16d box nails. (3 1 2 toe nails on one side

Carpentry/Carpenter CIP Task Grid

T-BRACE / I-BRACE DETAIL WITH 2X BRACE ONLY

Wood Connections. Concepts of Well Designed Connections

Wood Roof Framing Common Design and Construction Defects Concurrent Session #5.3, Friday April 28, 2017, 9:45 AM-10:30 AM

SYNTHEON ACCEL-E INSTALLATION MANUAL

Site Preparation Information for:

BUILDING THE BASIC SHED. Step A: Build the Foundation & Floor Frame

CUTTING, NOTCHING, AND BORING OF WOOD FRAMING MEMBERS (Unless an alternate design is provided by a licensed Engineer or Architect)

table of contents Sliding Door Accessories Page Latches & Snuggers Stay Rollers Brackets & Stops

10x10 Shed Plans and Building Guide

With Illustrations, Blueprints & Step By Step Details Brought To You By ShedPlansz.Com Click Here To Get More Shed Plans

Vertical Offset Base and Safety Rail System Installation Instructions

6x6 Shed Plans and Building Guide

FASTENERS BUILDING DEPARTMENT

BUILDING PLANS. BUILDING DEPARTMENT

8x8 Shed Plans and Building Guide

Unit 9. Wall and Ceiling Framing

Garage Design Guide. October 2018

With Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e Download 12,000 More Shed Plans

STANDARD MSGDET4AC: NOTES TO DESIGNER

Introducing AJSTM INSTALLATION GUIDE USA. 8 th Edition USA

8 x 10 Timber-frame Garden Shed

Fine Homebuilding. Cottage Shed Plans

TECHNICAL DESIGN CATALOG

Entry Level Assessment Blueprint Carpentry

GlasRoc Sheathing Type X

Wood structures Copyright G G Schierle, press Esc to end, for next, for previous slide 1

VERSA-LAM BCI INSTALLATION GUIDE LIMIT STATES DESIGN CANADA

CHAPMAN GRIFFIN LANIER SUSSENBACH ARCHITECTS, INC. ARCHITECT S ADDENDUM NO. 06

12x12 Shed Plans and Building Guide

A Shell construction

Designed for Building Designed for Living

Pryda Timber Connectors

Single-Family Dwelling Submittal Requirements

RFI Transmittal. Junction City SD High School RFI150. RFI #150: Cold Framing Submittal EOR Response - Mid Valley Commercial Construction

Connectors for Cold-Formed Steel Curtain-Wall Construction

Use the Design Properties (100% Load Duration) Table from Page 3 for questions 1-7

E-Blueprints. Children s Backyard Playhouse 8 x sq. feet main 32 sq feet porch 2 x 4 Framed Walls 6' Ceiling Height

IDP Entry-Fit Steel Door Frames. Installation Instructions K2A and NK2A Series Frames

Expanding Your Solutions

Entry Level Assessment Blueprint Carpentry

MAT106: Wall Framing. AMERICAN FOREST & PAPER ASSOCIATION American Wood Council Engineered and Traditional Wood Products

(TOLL FREE); 7am 7pm Pacific Time, Monday-Saturday ASSEMBLY INSTRUCTIONS FOR THE ATTACHED GARDEN PERGOLA WITH LEDGER BOARD

Joshua Woodsman

14 Intex Price Guide. Suitable for use in Fire Rated Wall Systems

Shearwall System Installation Guide

F I X I N G B R O C H U R E

Best Barns USA Assembly Book

Index Pipe Hangers and Straps

SECTION R507 DECKS DECKING LEDGER BOARD BEAM. FOOTING BEAM SPAN CANTILEVER For SI: 1 inch = 25.4 mm FIGURE R507.2 DECK CONSTRUCTION

Connectors for Cold-Formed Steel Curtain-Wall Construction

DIVISION: WOOD, PLASTICS AND COMPOSITES SECTION: WOOD, PLASTIC, AND COMPOSITE FASTENINGS REPORT HOLDER: EVALUATION SUBJECT:

Illustration Part Description Base List Weight/ Ft./ Box Number Price/S.L. S.L. S.L. Qty.

PANEL NOTATION (3) D4 D3 D2 D3X2 SHEATHING THICKNESS (IN.) D " NAILS/ SPACING " o.c. SILL BOLT SPACING 1 2 " 36" O.C. 1 2 " Ø

A. Rough carpentry includes but is not limited to the following:

AUXILIARY FRAMING AND ACCESSORIES

SECTION ROUGH CARPENTRY 1.1 DESCRIPTION OF WORK:

Material Description Qty Units Cost Total SQUARE FOOTAGE TOTAL Area 1692 sqft

Typical Deck Details

This specification describes the minimum requirements for structural steel drawings.

Best Barns USA Assembly Book

SAMPLE INSTRUCTIONS. Best Barns USA Assembly Book. the Belmont with pocket doors. Building Size 12'x16' or 12'x20' Revised January 10, 2012

nineteen Wood Construction 1 and design APPLIED ARCHITECTURAL STRUCTURES: DR. ANNE NICHOLS FALL 2016 lecture STRUCTURAL ANALYSIS AND SYSTEMS ARCH 631

Catnic Pontypandy Industrial Estate Caerphilly CF83 3GL T: F: English version

the Greenbriar 12' x 20' Best Barns USA Assembly Book Revised April

IMPORTANT NOTICE TO ALL TERRAMAR PROPERTY OWNERS AND BUILDERS REQUIREMENTS TO BUILD. REVISED July 15, 2017

Appendix B Framing Component Installation Last updated 5/27/2013

Kocked Down with Ends Assembled

Wall and Ceiling Framing

Best Barns USA Assembly Book

Best Barns USA Assembly Book

Sections & Details. WOOD SILL and FLOOR CONSTRUCTION NOTES


Best Barns USA Assembly Book

SECTION ROUGH CARPENTRY

Lateral Support. Decks over 24 above grade require lateral support* *Exceptions to be discussed later

Drywall, Wood and Truss Uplift

Transcription:

COLD-FORMED METAL FRAMING INSPECTION REPORT SUMMARY Inspector: Section 05400 Name: Date: Company: Address: City: State: Zip code: Phone: Fax: E-mail: Project: Project Name: Location: Contractor: Phone: Fax: Web Site: Exterior Non-Axial Load Bearing Wall Section: 1. Stud Section and Thickness - As Designed - Not Acceptable 2. Vertical Deflection @ Structure - As Designed - Not Acceptable 3. Vertical Deflection & Drift @ Structure - As Designed - Not Acceptable 4. Stud Bridging - As Designed - Not Acceptable 5. Stud Attachment Bottom Track - As Designed - Not Acceptable 6. Window / Door Openings - As Designed - Not Acceptable 7. Header & Sill Attachment to Jamb - As Designed - Not Acceptable 8. Jamb Attachment @ Bottom Track - As Designed - Not Acceptable 9. Knee Brace - As Designed - Not Acceptable The STEEL Network, Inc. 2006 Page 1 of 12

Interior Non-Axial Load Bearing Wall Section: 1. Stud Section and Thickness - As Designed - Not Acceptable 2. Vertical Deflection @ Structure - As Designed - Not Acceptable 3. Vertical Deflection & Drift @ Structure - As Designed - Not Acceptable 4. Stud Bridging - As Designed - Not Acceptable 5. Stud Attachment Bottom Track - As Designed - Not Acceptable 6. Openings - As Designed - Not Acceptable 7. Header & Sill Attachment to Jamb - As Designed - Not Acceptable 8. Jamb Attachment @ Bottom Track - As Designed - Not Acceptable Axial Load Bearing Wall Section: 1. Stud Section and Thickness - As Designed - Not Acceptable 2. Stud Bridging - As Designed - Not Acceptable 3. Stud Attachment Top & Bottom Track - As Designed - Not Acceptable 4. Window & Door Openings - As Designed - Not Acceptable 5. Header & Sill Attachment to Jamb - As Designed - Not Acceptable 6. Jamb Attachment @ Bottom Track - As Designed - Not Acceptable 7. Jamb Column & Column Attachment - As Designed - Not Acceptable 8. Column Attachment @ Top & Bottom - As Designed - Not Acceptable 9. Wall Ties - As Designed - Not Acceptable 10. Knee Brace - As Designed - Not Acceptable Shear Wall Section: 11. Infill Stud Section and Thickness - As Designed - Not Acceptable 12. Stud Bridging - As Designed - Not Acceptable 13. Stud Attachment Top & Bottom Track - As Designed - Not Acceptable 14. StiffWall Column & Connection @ Ends - As Designed - Not Acceptable 15. StiffWall Strap Track - As Designed - Not Acceptable 16. StiffWall Flat Strap & Connection @ Ends - As Designed - Not Acceptable 17. StiffWall Boot - As Designed - Not Acceptable 18. Anchor Attachment to Deck Above - As Designed - Not Acceptable 19. Anchor Attachment to Deck Below - As Designed - Not Acceptable 20. Through Floor Attachment - As Designed - Not Acceptable The STEEL Network, Inc. 2006 Page 2 of 12

Floor Joist Plan: 1. Joist Section and Thickness - As Designed - Not Acceptable 2. Joist Bearing Length - As Designed - Not Acceptable 3. Joist Bridging - As Designed - Not Acceptable 4. Joist Attachment @ Ends - As Designed - Not Acceptable 5. Openings - As Designed - Not Acceptable 6. Stair Header Attachment to Built-up Joist - As Designed - Not Acceptable 7. Built-up Girder - As Designed - Not Acceptable 8. Joist Plates - As Designed - Not Acceptable Ceiling Joist Plan: 1. Joist Section and Thickness - As Designed - Not Acceptable 2. Joist Bridging - As Designed - Not Acceptable 3. Joist Attachment @ Ends - As Designed - Not Acceptable 4. Openings - As Designed - Not Acceptable 5. Stair Header Attachment to Built-up Joist - As Designed - Not Acceptable 6. Built-up Girder - As Designed - Not Acceptable 7. Joist Plates - As Designed - Not Acceptable Roof Rafter Plan: 1. Rafter Section and Thickness - As Designed - Not Acceptable 2. Rafter Bridging - As Designed - Not Acceptable 3. Rafter Attachment @ Ends - As Designed - Not Acceptable 4. Openings (skylight) - As Designed - Not Acceptable 5. Header Attachment to Built-up Rafter - As Designed - Not Acceptable 6. Built-up Girder - As Designed - Not Acceptable Notes: Signature Stamp The STEEL Network, Inc. 2006 Page 3 of 12

COLD-FORMED METAL FRAMING INSPECTION REPORT WORKSHEET Exterior Non Axial Load Bearing Wall Section: By: Date: Condition: Design Requirement Drawing Reference Inspected As-Built Standard Stud: Stud Spacing: Jamb Section: Shear Wall Column: Vertical Deflection @ Structure - Method - VertiClip /VertiTrack Type - SL / VTX - SLB / SLS / SLT - Clip Fastening to Stud Web #12 Screws - Clip Fastening to Structure #PAF s / in/mm Weld - Clip Fastening at Jambs to Structure #PAF s / in/mm Weld Lateral Drift and Vertical Deflection @ Structure - Method - DriftClip /DriftTrak Type - DSL/DTSL - DSLB/DTSLB/DSLS - Clip Fastening to Stud Web #12 Screws - Clip Fastening to Structure #¼-20 Screws / PAF - Clip Fastening at Jambs To Structure #¼-20 Screws / PAF - DriftTrak to Structure #PAF s / in/mm weld - DriftTrak Fastener Spacing in. o.c. Stud Bridging - Method - BridgeBar Type - BB150 - Cold-Rolled Channel - CRC/FS Thickness / Width - Connection to Stud - Fasteners #10 Screws - Vertical Spacing (max.) ft. o.c. Stud Attachment Bottom Track - Method StiffClip TD/CL/AL/Screws - Anchor to Floor (if req.) - Fasten to Floor #PAF @ in/mm o.c. - Track to Stud w/ (2) Screws The STEEL Network, Inc. 2006 Page 4 of 12

Condition: Design Requirement Drawing Reference Inspected As-Built Window / Door Openings - Standard Jamb Section 1 Built-Up Fasteners @ o.c. - Standard Header Section 2 Built-Up Fasteners @ o.c. - Standard Sill Section 3 Built-Up Fasteners @ o.c. ( 1, 2, 3 required if built-up member is utilized) Header & Sill Attachment to Jamb - Method - Fasten at Web of Jamb - Fasten at Web of Sill - Fasten at Web of Header Jamb Attachment @ Bottom Track - Method - Fasten Track to Floor #PAF / Anchors - Track to Stud w/ (2) Screws ea. Stud Bracing / Reinforcement - Knee Brace Studs ft. o.c. - Joist Plates Notes: The STEEL Network, Inc. 2006 Page 5 of 12

COLD-FORMED METAL FRAMING INSPECTION REPORT WORKSHEET By: Date: Interior Non Axial Load Bearing Wall Section: Condition: Design Requirement Drawing Reference Inspected As-Built Standard Stud: Stud Spacing: Jamb Section: Vertical Deflection @ Structure - Method - Clip Fasten at Web #8 Screws - Fasten to Structure #PAF @ in/mm o.c. - Fasten at Jambs #PAF s Lateral Drift and Vertical Deflection @ Structure - Method DriftClip DSLD - Clip Fasten at Web #12 Screws - Fasten to Structure - Fasten at Jambs #8 Screws Stud Bridging - Method BridgeBar / CRC / FS - BridgeBar Type - ¾ Stud Punchout (BB75) -1 ½ Stud Punchout (BB150) - CRC/FS in/mm - Connection to Stud BridgeClip / Clip Angle - Fasteners #10 Screws - Vertical Spacing (max.) ft. o.c. Stud Attachment Bottom Track - Fasten Track to Floor #PAF@ in/mm o.c. - Track to Stud w/ (2) Dia. Screws Door/Window Openings - Jamb Method Single Section / Built-Up - Header Section Single Section / Built-Up - Fasteners @ o.c.* # Screws - Sill Section Single Section / Built-Up - Fasteners @ o.c.* # Screws * Fasteners required only for a built-up jamb, header, or sill section. The STEEL Network, Inc. 2006 Page 6 of 12

Condition: Design Requirement Drawing Reference Inspected As-Built Header / Sill Attachment to Jamb - Method StiffClip HE / AL - HE Fasten at Web/Jamb* #10 Screws** - AL Fasten at Jamb Web #10 Screws** - AL Fasten at Header/ Sill #10 Screws** Jamb Attachment @ Bottom Track - Fasten Track to Floor #PAF / Anchors - Track to Stud w/ (2) Dia. Screws ea. Stud * StiffClip HE used only with a Built-Up Header ** Symmetrically Placed Screws Notes: The STEEL Network, Inc. 2006 Page 7 of 12

COLD-FORMED METAL FRAMING INSPECTION REPORT WORKSHEET By: Date: Axial Load Bearing Wall Section: Condition: Design Requirement Drawing Reference Inspected As-Built Standard Stud: Stud Spacing: Jamb Section: Shear Wall Column: Stud Bridging - Method - BridgeBar Type - BB150 - Cold-Rolled Channel - CRC/FS Thickness / Width - Solid Blocking Type - Connection to Stud - Fasteners #10 Screws - Vertical Spacing (max.) ft. o.c. Stud Attachment Top & Bottom Track - Method (Select One) StiffClip TD/CL/AL/Screws - Fasten Track to Top #PAF @ in/mm o.c. - Fasten Track to Floor #PAF @ in/mm o.c. - Track to Stud w/ (2) Dia. Screws Window / Door Openings - Standard Jamb Section Built-Up Fasteners @ o.c. 1 - Standard Header Section Built-Up Fasteners @ o.c. 2 - Standard Sill Section Built-Up Fasteners @ o.c. 3 ( 1, 2, 3 required if built-up member is utilized) Header & Sill Attachment to Jamb - Method - Fasten at Web of Jamb - Fasten at Web of Sill - Fasten at Web of Header Jamb Attachment @ Bottom Track - Method StiffClip TD/CL/AL/Screws - Fasten Track to Top #PAF / Anchors - Fasten Track to Floor #PAF / Anchors - Track to Stud w/ (2) Dia. Screws ea. Stud The STEEL Network, Inc. 2006 Page 8 of 12

COLD-FORMED METAL FRAMING INSPECTION REPORT WORKSHEET By: Date: Shear Wall Section: Condition: Design Requirement Drawing Reference Inspected As-Built Method StiffWall Infill Stud Spacing: in/mm o.c. Infill Stud Designation: Shear Wall Column Designation Built-up Column # of Studs # of Tracks StiffWall Boot Type A / B / C / D / F (Heavy) Anchor thru Floor/Diameter Anchor to Foundation Embedment Depth Diameter Gusset Plate/Strap Track (if required) Flat Strap Width Flat Strap Thickness mils # of Screws (No. 12) Weld (if required) Stud Bridging - Method - BridgeBar Type - BB150 - Cold-Rolled Channel - CRC/FS Thickness / Width - Solid Bridging Type - Connection to Stud - Fasteners #10 Screws - Vertical Spacing (max.) ft. o.c. Stud Attachment Top & Bottom Track - Fasten Track to Top #PAF @ in/mm o.c. - Fasten Track to Floor #PAF @ in/mm o.c. - Track to Stud w/ (2) Dia. Screws Column - Method StiffWall Column - Column Section Studs Track - Fasteners @ 12 o.c.* # Screws (* Required if built-up Member) Column Attachment @ Top & Bottom - Method StiffWall Boot - Boot Type A / B/ C / D / F (Heavy) - Connection @ Top L- - Fasten to Structure # Anchors - Connection @ Floor L- - Fasten to Floor # Anchors The STEEL Network, Inc. 2006 Page 9 of 12

COLD-FORMED METAL FRAMING INSPECTION REPORT WORKSHEET Floor & Ceiling Joist Plan: By: Date: Condition: Design Requirement Drawing Reference Inspected As-Built Standard Joist: Joist Spacing: Girder Section: Joist Bridging - Method FS / Solid (SB) - Spacing Feet o.c. - Connection L- - Fasteners #10 Screws Joist Attachment @ Ends - Fasten to Top #PAF @ in/mm o.c. - Fasten to Floor #PAF @ in/mm o.c. - Track to Joist w/ (2) Dia. Screws - Joist Hanger StiffClip JH - Joist Clip StiffClip JC Stair Openings - Method JamStud / JamStud and Track - Header Section JamStud Track - Fasteners @ 12 o.c. # Screws - Jamb Section JamStud Track - Fasteners @ 12 o.c. # Screws Stair Header Attachment to Built-up Joist - Method StiffClip AL - AL Fasten at Web #12 Screws - AL Fasten at Joist #PAF s / in/mm Weld Built-up Girder - Built-up Girder Section Joist Track - Fasteners @ 12 o.c. # Screws - Angle Conn. @ Ends L- - Fasteners @ 12 o.c. # Screws - Girder Depth: in/mm - Member Flange Width s in/mm - Material Thickness: mils Notes: The STEEL Network, Inc. 2006 Page 10 of 12

COLD-FORMED METAL FRAMING INSPECTION REPORT WORKSHEET Roof Rafter Plan: By: Date: Condition: Design Requirement Drawing Reference Inspected As-Built Standard Joist: Joist Spacing: Girder Section: Rafter Bridging - Method FS / Solid (SB) - Spacing Feet o.c. - Connection L- - Fasteners #10 Screws Rafter Attachment @ Ends - Fasten to Top #PAF @ in/mm o.c. - Fasten to Floor #PAF @ in/mm o.c. - Track to Rafter w/ (2) Dia. Screws Openings (skylight) - Built-up Header Section Rafter Track - Fasteners @ 12 o.c. # Screws - Built-up Rafter Section Rafters Track - Fasteners @ 12 o.c. # Screws Opening Header Attachment to Built-up Rafter - Angle Material L- - Fasteners @ 12 o.c. # Screws Built-up Girder - Built-up Girder Section Rafter Track - Fasteners @ 12 o.c. # Screws - Angle Connection @ Ends L- - Fasteners @ 12 o.c. # Screws - Girder Depth: in/mm - Member Flange Width s in/mm - Material Thickness: mils Notes: The STEEL Network, Inc. 2006 Page 11 of 12

The STEEL Network, Inc. 2006 Page 12 of 12