CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017.

Similar documents
December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions

ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI)

ADDENDUM NO. 3, March 14, 2017 A.B.C. No

FAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services. ADDENDUM #4 December 5, 2014

Notre Dame High Addition/Renovation Addendum 3 Page 1

Montclair, NJ ADDENDUM NO. 1 Issue Date: May 15, 2017

ADDENDUM #2 September 12, 2018

ADDENDUM #1. April 29, 2009

Attached is Addendum No. 2 to SEPTA Sealed Bid APES, Install DC Stinger Distribution System - SEPTA Fern Rock Car House.

ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO.

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO.

Addendum #1 - Bid Package #

Stantec Architecture Inc South Flores Street Suite 201 San Antonio TX Tel: (210) Fax: (210)

1.01 NOTICE TO BIDDERS

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA

Answer: Qualification statement should be provided with the bid.

10930 W. Sam Houston Parkway N., Suite 900

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5. February 25, 2013

Company. Signed: Date:

ADDENDUM TO RFQ/P DOCUMENTS PROJECT # ADDENDUM: #01

Lincoln County Tax Appraisal Office Project No. RFB

Commercial Infill Project Guide

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM SOTA-AAS HIGH SCHOOL MODERNIZATION ADDENDUM NO. 2

ADDENDUM NO. 1 November 10, 2016

Residential Room Additions

CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT

Southeastern Pennsylvania Transportation Authority 1234 Market Street Philadelphia, PA

2. The Checklists are to be filled out at each phase and provided with the submittal documents.

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT

CS2.0 COVER SHEET VOL. 2

REVISIONS TO SPECIFICATION SECTIONS: Section Allowances: 12. Replace paragraphs 1.05, A and B with the following:

Wayne State University. Prentis Building Renovation. NM Project Number: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009

Addendum Number: 1 WT White HS Additions and Renovations, Dallas ISD

Specifications: Other: sign in sheet

ADDENDUM NO. 1 REQUEST FOR QUALIFICATIONS (RFQ) AND REQUEST FOR PROPOSALS (RFP) FOR. RFQ/RFP No. 15P40. Campus Center East HVAC Unit Replacement

(Full legal name of business submitting the offer)

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT

ADDENDUM TO RFP DOCUMENTS

Architectural Design Process

TELEPHONE: (215) Addendum No. 1

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS

PROJECT LOCATION BOZEMAN HIGH SCHOOL. ELECTRICAL ENGINEER: Van Dykken Engineering 37 Spanish Peak Drive Bozeman, MT Phone:

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA

Anticipated schedule, Page 2. Change the Contract Term from 635 Days to be 1,127 Days.

SECTION PANELBOARDS

Answer: Only to ChurchWoods, LLC.

HAMMEL ASSOCIATES ARCHITECTS, LLC 2 5 E A S T G R A N T S T R E E T, S U I T E L A N C A S T E R, P E N N S Y L V A N I A

IFB PAINTING AT HAYDON ELEMENTARY ADDENDUM #1

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 2

ADDENDUM No. 1. ITB No Northside Interceptor Condition Assessment. Due: February 1, 2018 at 10:00 A.M. (Local Time)

ID0.1 PALO VERDE 8000 WEST US HIGHWAY 290 AUSTIN, TX SHEET INDEX: CONTACT INFORMATION: DISCLOSURES: DOCUMENT GENERAL NOTES:

James W. Moore, PE / Brandon D. Enevold, PE / Kjersten E. Kuhta, PE Dylan J. Cunningham, PE / Jacob L. Deering, PE / Joel R.

Addendum No. 1 page 1

The CAD Technician s Role in Office Practice and Procedure

Bid No. B14-02 Building 100 HVAC Improvements

SPARTAN DAY CAMP 4814 FREEDOM RING RD

Addendum. Windsor Hall Renovations Date: October 12, 2017 Addendum No: 3 GENERAL. 1! Addendum #4 will be issued 2:00 PM Tuesday October 17, 2017.

Chuck Caesar. VIA: /Webposting April 27, 2017

Addendum No.: 001 Date: 3/15/2016. Canyon ISD City View Elementary Additions Project No.:

RFP Architectural Services: Classroom and Laboratory Capacity and Condition Analysis Questions & Answers: February 19 th, 2017

SECTION PROJECT MANAGEMENT AND COORDINATION

Construction Services Architect / Engineers Guidelines

MTJ Outdoor Baggage Claim

TELEPHONE: (215) Addendum No Cooling Plant Replacement SDP Contracts No. B-080C, B-081C and B-082 of 2017/18

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

UNIFIED FACILITIES GUIDE SPECIFICATIONS

ADDENDA ADDENDUM NO. 1 DATE: MARCH 1, 2016

ADDENDUM NO. 3. Ellis County Elections Building

January, 2014 Page 1 of 5

DOCUMENT LIST OF DRAWINGS, TABLES AND SCHEDULES

The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents, Inquiry No. 17-WDI-031.

Procurement Department Bid Office Customer Center 1 st Floor, Room W. Church Street Jacksonville, Florida 32202

Residential Construction Checklist Single and Two Family Construction

BID ADDENDUM NO. 4 ITB/004/16/KL CITY OF WINTER SPRINGS WTP NO. 1 WATER QUALITY IMPROVEMENTS

ADDENDUM 1. This Addendum forms part of and modifies Proposal Documents dated, October 31, 2018, with amendments and additions noted below.

Addendum No. 4 page 1

COVER SHEET A0.1 A0.1 COVER SHEET A1.1 FLOOR PLANS - FOUNDATION & MAIN LEVEL A1.2 FLOOR PLANS - UPPER LEVEL & ROOF A3.1 SECTIONS & INTERIOR ELEVATIONS

Stanford University-Facilities Design Guideline SECTION Plans Review Submission Guidelines

November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA. Y CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT

WTP FILTERS REHABILITATION (FILTERS 1, 2, 3, & 7) CITY OF CARTERSVILLE

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

Merrick Pet Care New Distribution Center Hereford, Texas

DESIGN REVIEW PROCESS AND APPLICATION

B. The designated coverage areas shall include both indoor and outdoor coverage.

RE: Addendum to the project bid documents dated March 5, 2008

KidsAbility Guelph Hub Renovation ADDENDUM #2 Project No.:

Section Meetings Section Material and Equipment. None Required

February 18, Re: Zephyr Lakes Amenity Center Zephyrhills, Florida

PROJECT: ARCHITECT S SUPPLEMENTAL INSTRUCTION NO.: 002 Marquis Newberg 3914 Hayes Street Newberg, Oregon OWNER ARCHITECT X CONSULTANT

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D

Design Deliverables. Summary. A. Expectations for Design Deliverables:

PUBLIC ART PROCUREMENT GUIDELINES

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

CERTIFICATE OF APPROPRIATENESS APPLICATION INSTRUCTIONS AND CHECK LIST

UNIFIED FACILITIES GUIDE SPECIFICATIONS

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS

CITY AND COUNTY OF SAN FRANCISCO PUBLIC UTILITIES COMMISSION WASTEWATER ENTERPRISE

Transcription:

June 15, 2017 GS#108-281 Greene Hall Renovations University of Southern Mississippi Hattiesburg, Mississippi 00.910 ADDENDUM NO 1. This Addendum contains 6 pages and 21 pages of attachments for a total of 27 pages (attachments: Pre-bid meeting minutes, Pre-bid sign in sheet, 1~8.5x11 drawing, 16~24x36 drawings) CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017. 2. See attached sign-in sheet from the Pre-Bid meeting on June 14, 2017. CHANGES TO THE PROJECT MANUAL 1. Section 00300 PROPOSAL FORM a. Change the number of days to complete the project to 455 in lieu of 365, so that it reads as follows: I propose to complete all work in accordance with the Project Manual and Drawings within 455 consecutive calendar days for the sum of: 2. Section 07 52 00 - MODIFIED BITUMEN MEMBRANE ROOFING SYSTEM a. REVISE Part 2.04.A.3 to read as follows: 3. Tapered insulation system, slope per drawings, mop applied. b. REVISE Part 2.04.B.3 to read as follows: 3. Tapered insulation system, slope per drawings, mop applied. 3. Section 12 24 12 - MANUAL AND MOTORIZED ROLLER SHADESa. REVISE Part 2.02.A.1, to read as follows: 1. NOTE: Room Type Manual FlexShade is to be used at all Offices, Work Areas, Small Conference Rooms, Faculty Lounges, and Rooms 108, 149, 152, 211, and 212; Motorized FlexShade shall be used in Rooms-A102, 133, 139, 140, 143, 144, 150, 238,

243, 245, 247, 330, 335, 336, 339, 343, 346, 348, and 349. b. REVISE Part 2.02.B.5, to read as follows: 5. Material Solar-Optical Properties: a. Manual Shades: 5% Open b. Motorized Shades: 3% Open c. See paragraph 2.02.A for which rooms are to receive motorized or manual shades. CHANGES TO THE DRAWINGS 1. -A1 REPLACE detail 3/A6.05 with Sheet -A1 DETAIL 3/A6.05, attached. 2. Sheet D1.03 ROOF DEMOLITION PLAN DELETE this sheet in its entirety and replace with Sheet D1.03R ROOF DEMOLITION PLAN, attached. Update the sheet index accordingly. Revisions included are below: a. Add notes as clouded on sheet to add to scope of work. 3. Sheet A1.02 FIRST FLOOR PLAN PART A a. ADD detail tag referring to detail 3/A6.05 to column and false column between Room 152-Student Lounge and Room 145-Corridor. 4. Sheet A1.03 FIRST FLOOR PLAN PART C a. REVISE note in Room 166 STORAGE to read as follows: NEW ROOF ACCESS LADDER. SEE DETAIL 4/A6.02R 5. Sheet A1.09 THIRD FLOOR PLAN PART B a. REVISE note in Room 340 MECHANICAL to read as follows: NEW ROOF ACCESS LADDER. SEE DETAIL 4/A6.02R 6. Sheet A1.18 ROOF PLAN AND PART A - DELETE this sheet in its entirety and replace with Sheet A1.18R ROOF PLAN AND PART A, attached. Update the sheet index accordingly. Revisions included are below: a. Add crickets where drawn and clouded on sheet b. Alter notes and add hatch as clouded on sheet to add to scope of work.

7. Sheet A1.19 ROOF PLAN PART B AND DETAILS - DELETE this sheet in its entirety and replace with Sheet A1.19R ROOF PLAN PART B AND DETAILS, attached. Update the sheet index accordingly. Revisions included are below: a. Add crickets where drawn and clouded on sheet b. Alter notes and add hatch as drawn and clouded on sheet to add to scope of work. 8. Sheet A1.20 ROOF PLAN PART C AND DETAILS - DELETE this sheet in its entirety and replace with Sheet A1.20R ROOF PLAN PART C AND DETAILS, attached. Update the sheet index accordingly. Revisions included are below: a. Add crickets where drawn and clouded on sheet. 9. Sheet A5.00 FIRST FLOOR DOOR SCHEDULE a. REVISE the below schedule entry to read as follows (all other entries shall be unchanged): i. Door 115- MATL: GLZ FINISH: - ii. Door 132- FTYPE: B 10. Sheet A5.01 SECOND FLOOR DOOR SCHEDULE a. REVISE the below schedule entries to read as follows (all other entries shall be unchanged): i. Door 216- MATL: GLZ FINISH: - ii. Door 260- FTYPE: G iii. Door 268A- MATL: GLZ FINISH: - 11. Sheet A5.02 THIRD FLOOR DOOR SCHEDULE a. REVISE the below schedule entries to read as follows (all other entries shall be unchanged): i. Door 324- MATL: GLZ FINISH: - ii. Door 350- MATL: GLZ FINISH: - 12. Sheet A5.04 DOOR FRAME AND WINDOW TYPES a. REVISE WINDOW COVERING NOTES to read as follows: NOTES: TYPE 1: 3% open motorized roller shade, located per specifications. TYPE 2: 5% open manual roller shade, located per specifications. 13. Sheet A6.00 ROOF DETAILS - DELETE this sheet in its entirety and replace with Sheet A6.00R ROOF DETAILS,

attached. Update the sheet index accordingly. Revisions included are below: a. REVISE details 3 and 4. 14. Sheet A6.01 ROOF DETAILS a. REVISE detail 4/A6.01 to show the same additional scope of work as detail 4/A6.00R. 15. Sheet A6.02 ROOF DETAILS - DELETE this sheet in its entirety and replace with Sheet A6.02R ROOF DETAILS, attached. Update the sheet index accordingly. Revisions included are below: a. REVISE detail 3/A6.02R. b. ADD detail 4/A6.02R. 16. Sheet E0.02 ELECTRICAL DETAILS - DELETE this sheet in its entirety and replace it with Sheet E0.02R ELECTRICAL DETAILS, attached. Update the sheet index accordingly. Revisions included are below: a. Revised detail #5 to show ground bus in all comm and a/v rooms. b. Revised Detail #8 and added Note #1 for this detail requiring fire-rated (painted)plywood backboards in all comm and a/v rooms. 17. Sheet E0.05 ENLARGED LABS POWER DELETE this sheet in its entirety and replace with Sheet E0.05R ENLARGED LABS POWER, attached. Update the sheet index accordingly. Revisions included are below: a. Added power for motorized window shade in Rooms 330, 336, 346, 348, and 349. b. Added keynote #3. 18. Sheet E1.01 FIRST FLOOR POWER PLAN-PART A DELETE this sheet in its entirety and replace it with Sheet E1.01R FIRST FLOOR POWER PLAN-PART A, attached. Update the sheet index accordingly. Revisions included are below: a. Added power for motorized window shade in Room 102. b. Added keynote #3. 19. Sheet E1.02 FIRST FLOOR PLAN POWER-PART B DELETE this sheet in its entirety and replace it with Sheet E1.02R FIRST FLOOR PLAN POWER-PART B, attached. Update the sheet index accordingly. Revisions included are below:

a. Revised power layout in A/V-134 and COMM-151. b. Added power for motorized window shades in rooms 133, 139,140, 143,144 and 150. c. Added keynote #5. 20. Sheet E1.04 SECOND FLOOR PLAN POWER-PART A DELETE this sheet in its entirety and replace it with Sheet E1.04R SECOND FLOOR PLAN POWER-PART A, attached. Update the sheet index accordingly. Revisions included are below: a. Added power for motorized window shades in room 238. b. Added keynote #3. 21. Sheet E1.05 SECOND FLOOR PLAN POWER-PART B DELETE this sheet in its entirety and replace it with Sheet E1.05R SECOND FLOOR PLAN POWER-PART B, attached. Update the sheet index accordingly. Revisions included are below: a. Added power for motorized window shades in room 243, 245, and 247. b. Added keynote #3. 22. Sheet E1.06 THIRD FLOOR PLAN POWER-PART A DELETE this sheet in its entirety and replace it with Sheet E1.06R THIRD FLOOR PLAN POWER-PART A, attached. Update the sheet index accordingly. Revisions included are below: a. Added power for motorized window shades in room 343. b. Added keynote #3. 23. Sheet E1.07 THIRD FLOOR PLAN POWER-PART B DELETE this sheet in its entirety and replace it with Sheet E1.07R THIRD FLOOR PLAN POWER-PART B, attached. Update the sheet index accordingly. Revisions included are below: a. Added power for motorized window shades in room 335. b. Added keynote #5. 24. Sheet E5.02 FIRST FLOOR PLAN A/V RACEWAY-PLAN B - DELETE this sheet in its entirety and replace it with sheet E5.02R FIRST FLOOR PLAN-A/V RACEWAY-PLAN B, attached. Update the sheet index accordingly. Revisions included are below:

a. Changed room names for A/V-134 and COMM-151. 25. Sheet E5.05 FIRST FLOOR PLAN-A/V RACEWAY RCP-PLAN B - DELETE this sheet in its entirety and replace it with sheet E5.05R FIRST FLOOR PLAN RCP-A/V RACEWAY-PLAN B, attached. Update the sheet index accordingly. Revisions included are below: a. Changed room names for A/V-134 and COMM-151 END OF ADDENDUM #1 (Plus 21 pages of attachments)

Location: University of Southern Mississippi Greene Hall Attendees: See attached sign-in sheet. Meeting Minutes 1. Logistics as related to turning in Bids were reviewed and discussed. 2. Bid date for the project is: Thursday, June 29, 2017 at 2 p.m. Sealed bids will be received at the Bureau of Building, Grounds and Real Property Management, 501 North West Street, Suite 1401B, Jackson, Mississippi 39201. 3. Noted Instructions to Bidders, Section 00 of the specifications. All requirements of this section must be followed, including: a. All questions should be directed to the architect in writing via email. Should a bidder find any discrepancies in or omissions from the drawings or project manual, or be in doubt as to their meaning, the bidder should immediately notify the professional. b. Non-resident bidder: If the non-resident bidder's state has a resident bidder preference law, a copy of that law shall be submitted with the proposal form; Or if the state has no such law then a statement indicating this shall be submitted w/ the proposal form. c. Bidders, at the time of bid opening, will be presumed to have inspected the site, read and become thoroughly familiar w/ the drawings and project manual including all addenda. d. Bidder shall fill in all applicable blank spaces on the proposal forms including: base bid proposal, alternates, unit prices, certificate of responsibility numbers (include Mechanical, Plumbing, and Electrical), acknowledgement of all addendums, etc. e. Any addenda to the drawings or project manual issued before or during the time of bidding shall be included in the proposal and become a part of the contract. f. Bids will be publicly opened shortly after the time stated in the advertisement for bids.

g. Any protest must be delivered in writing to the Owner within 24 hours after the bid opening. h. Any claim of error and request for release of bid must be delivered to the Owner within 24 hours after the bid opening. The bidder shall provide sufficient documentation with the written request clearly proving an error was made. i. Bids are to be held good for a period of forty-five (45) days after the bid date. 4. Contract time for the project is 365 calendar days from the issue of Notice to Proceed. There will be $500/day liquidated damages per calendar day beyond that time. 5. The University may request that no work take place on certain days due to football games on campus or other events. The contract time will be adjusted for these occasions as they occur. 6. Base bid includes all work indicated on the drawings and specifications except for the additive alternates as described. Discussed the scope of work in the 3 additive alternates: 1. Provide all labor, material, and equipment necessary to furnish and install the Lecture Hall Fixed Seating per Section 12 65 00 in Auditorium 162 and Fixed Tiered Classroom Seminar Tables per Section 12 61 00, complete as indicated on the drawings and in accordance with the specifications. 2. Provide all labor, material and equipment necessary to construct the new construction at the north end of Seminar 168, including the Commercial Kitchen and Dining Area, complete as indicated on the drawings and in accordance with the specifications. 3. Provide all labor, material and equipment necessary to furnish and install Kitchen Equipment and Casework for the Commercial Kitchen (Rooms A105, A109, A112) complete as indicated on the drawings and in accordance with the specifications. 7. Discussed the Allowances for the project to include: 1. Energy Management and System Control Allowance in the amount of $240,000.00. Refer to Section 230900. 8. Discussed Utilities: Temporary Utilities will be as required in Section 01500 - The Prime General Contractor shall make arrangements for and furnish all water, electricity and other utilities necessary for construction purposes. A written agreement must be reached on how all utilities (water and electricity) will be furnished and the rates the Contractor will be charged. A copy of the final agreement signed by the Contractor and the Institutions or Agency must be forwarded to the Owner. 9. Stated that the building has been designated a Mississippi Landmark by the State of Mississippi through the Department of Archives and History. All work shall be in accordance with the Mississippi Antiquities Law (39-007-Et, al, of the Mississippi Code, 1972 as amended) and the Secretary of the Interior s Standards for the Treatment of Historic Properties. 10. The lay-down area and contractor employee parking area was discussed as being on the project site. The contractor will be required to secure the site. 11. The contractor shall be responsible for any damages to existing landscaping, irrigation systems, etc., and shall restore all damaged areas to their original condition.

12. If the contractor needs to block any campus handicap access, they shall coordinate the requirements with USM, and install temporary alternate access as required. 13. It was stated that there will be zero tolerance for any construction workers fraternizing with students, faculty, or staff. 14. It was clarified that the Owner will pay for third-party structural testing services that are required by IBC and described in the Construction Documents on Sheet S1.01. The balance of all remaining testing that is required in the plans and specs is to be employed and paid for by the Contractor. 15. The Davis-Bacon Act is not a requirement for this project. 16. RFIs that require an addition or change to the drawings or specs will be included to the contract documents by addendum. 17. Any and all RFIs to should be submitted in writing via email to architect's office by end of day Friday, June 23, 2017 so that responses can be incorporated in final addenda to the contract documents if necessary. The final opportunity for an addendum is Monday, June 26, 2017. 18. Anyone requiring access to the building, after this Pre-Bid Conference shall contact and coordinate with Sara Hill (601) 606-7730. 19. It was noted that all Contractor s will need to read and review the Section 01800 University of Southern Mississippi Special Conditions. 20. The successful bidder will be required to obtain USM Parking Permits for all vehicles, or pay the fines. 21. Meeting adjourned to the site for further discussion. NOTE: ALL MECHANICAL, PLUMBING, AND ELECTRICAL SUB-CONTRACTORS MUST BE LISTED ON THE PROPOSAL FORM AT TIME OF BID. THEY MAY NOT BE CHANGED AFTER THE BID OPENING. - End of Minutes

OF S ARCHI TECTURAL

OF S

OF S

OF S

OF S

OF S

OF S

2 E0.02 DEVICE LABELING SCALE: NONE 1 E0.02 INTERACTIVE BOARD RACEWAY DETAIL SCALE: NONE 3 E0.02 LIGHTING CONTROL PANEL "LC" SCALE: NONE 4 E0.02 VOICE / DATA LOW VOLTAGE CABLING FIRE STOP DETAIL SCALE: NONE 5 E0.02 GROUNDING DETAIL SCALE: NONE 6 E0.02 PANEL LABELING SCALE: NONE 2014-29 UNIVERSITY OF SOUTHERN MISSISSIPPI HATTIESBURG CAMPUS 05-19-2017 10 E0.02 DOOR ACCESS DETAIL SCALE: NONE 7 E0.02 GROUNDING TRIAD SCALE: NONE 8 E0.02 AV & DATA RISER SCALE: NONE 9 E0.02 DOOR ACCESS DETAIL SCALE: NONE OF S

ENLARGED 330 LAB POWER ENLARGED 336 AND 339 LAB POWER ENLARGED 346, 348 AND 349 LAB POWER KEYNOTES OF S 2014-29 05-19-2017 UNIVERSITY OF SOUTHERN MISSISSIPPI HATTIESBURG CAMPUS

FIRST FLOOR PLAN - POWER - PART A DEMOLITION NOTES KEYNOTES C A B OF S 2014-29 05-19-2017 GMW JDL UNIVERSITY OF SOUTHERN MISSISSIPPI HATTIESBURG CAMPUS

KEYNOTES DEMOLITION NOTES 2014-29 05-19-2017 GMW JDL UNIVERSITY OF SOUTHERN MISSISSIPPI HATTIESBURG CAMPUS DW C A B FIRST FLOOR PLAN - POWER - PART B OF S

SECOND FLOOR PLAN - POWER - PART A DEMOLITION NOTES KEYNOTES C A B OF S 2014-29 05-19-2017 GMW JDL UNIVERSITY OF SOUTHERN MISSISSIPPI HATTIESBURG CAMPUS

SECOND FLOOR PLAN - POWER - PART B KEYNOTES DEMOLITION NOTES C A B OF S 2014-29 05-19-2017 GMW JDL UNIVERSITY OF SOUTHERN MISSISSIPPI HATTIESBURG CAMPUS

THIRD FLOOR PLAN - POWER - PART A KEYNOTES DEMOLITION NOTES C A B OF S 2014-29 05-19-2017 GMW JDL UNIVERSITY OF SOUTHERN MISSISSIPPI HATTIESBURG CAMPUS

THIRD FLOOR PLAN - POWER - PART B KEYNOTES DEMOLITION NOTES C A B OF S 2014-29 05-19-2017 GMW JDL UNIVERSITY OF SOUTHERN MISSISSIPPI HATTIESBURG CAMPUS

1x 1.5 C. 1x 1.5 C. 2x 1.5 C. DW PHONE: (228) 762-1975 FAX: (228) 769-9545 DEMOLITION NOTES UP TO T6, COMM 134 Configure both boxes on centerline of side wall, typ. 4x 1.5 C. 1x 1.5 C. 1x 1.5 C. 1x 1.5 C. 1x 1.5 C. 1x 1.5 C. Down to AVK, see plan C A B FIRST FLOOR FLOOR PLAN PLAN -- AV AV RACEWAY RACEWAY -- PART FIRST PART B B OF S JDL 05-19-2017 VD 2014-29 1x 1.5 C. GMW Suspend exposed AV cabling in J-hooks as shown. Cooridnate with other trades and ensure access to cable runs for future service. UNIVERSITY OF SOUTHERN MISSISSIPPI HATTIESBURG CAMPUS 2x 1.5 C.

3x 1 C. 2x 1.5 C. 3x 1.5 C. 3x 1 C. 1x 1 C. C A B FIRST PART B B FIRST FLOOR FLOOR PLAN PLAN -- AV AV RACEWAY RACEWAY RCP RCP -- PART OF S JDL 4x 1.5 C. UNIVERSITY OF SOUTHERN MISSISSIPPI HATTIESBURG CAMPUS GMW 1x 1 C. 1x 1 C. 3x 1 C. 05-19-2017 2x 1 C. 3x 1 C. 2014-29 DW PHONE: (228) 762-1975 FAX: (228) 769-9545 DEMOLITION NOTES 4x 1.5 C.