ADDENDUM NO. 2. Germania Club Renovation Phase 2. Saginaw County Community Mental Health Authority WILLIAM A. KIBBE & ASSOCIATES, INC.

Similar documents
The following information supplements and/or supersedes the bid documents issued on July 10, 2017.

ADDENDUM #1. April 29, 2009

HOENER ASSOCIATES INC. ARCHITECTS

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON

Wayne State University. Prentis Building Renovation. NM Project Number: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009

ADDENDUM NO. 1 November 10, 2016

Addendum. Windsor Hall Renovations Date: October 12, 2017 Addendum No: 3 GENERAL. 1! Addendum #4 will be issued 2:00 PM Tuesday October 17, 2017.

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA

ADDENDA ADDENDUM NO. 1 DATE: MARCH 1, 2016

Company. Signed: Date:

ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI)

RENOVATION OF THE FARMERS MARKET Reference Number:

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS

Specifications: Other: sign in sheet

The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents, Inquiry No. 17-WDI-031.

Montclair, NJ ADDENDUM NO. 1 Issue Date: May 15, 2017

Addendum No.: 001 Date: 3/15/2016. Canyon ISD City View Elementary Additions Project No.:

ADDENDUM #01. PROJECT: Saint Mary s University Student Centre Reorganization PROJECT N o : DATE:

1.01 NOTICE TO BIDDERS

WALKS AND SIDEWALKS REQUIREMENTS:

B. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.

HIA AIR CARGO HAMILTON ADDENDUM #3. Addendum No. A03 (Architectural) o Text 1 page o SK-10a o SK-10b o SK-11

IFB PAINTING AT HAYDON ELEMENTARY ADDENDUM #1

ADDENDUM TO RFP DOCUMENTS

ADDENDUM THREE SPECIFICATIONS. Vincennes University Renovations of the Curtis G. Shake Learning Resources Center

SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5. February 25, 2013

Can you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation web site

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS:

TELEPHONE: (215) Addendum No. 1

Hall of Waters List of Historic Drawings

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions

PLAN SUBMITTAL REQUIREMENTS

DOCUMENT LIST OF DRAWINGS, TABLES AND SCHEDULES

BUILDING PLANS. BUILDING DEPARTMENT

Marshall Truck Station Laboratory Addition Project No. TZ MnDOT

November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA. Y CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT

PROJECT LOCATION BOZEMAN HIGH SCHOOL. ELECTRICAL ENGINEER: Van Dykken Engineering 37 Spanish Peak Drive Bozeman, MT Phone:

Solicitation No. VA B-0155, Building 3: Construct Lab & Outpatient Medical Suites Questions & Answers

E-02 Elev. DS5 E-03. Elev. DS5. S-02 Section DS E-03. Elev.

RFQ Question and Answer List State of Ohio Standard Forms and Documents

FAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services. ADDENDUM #4 December 5, 2014

S T U D I O P C M A R T I N E Z EXISTING SITE PLAN SCALE: 1" = 10' - 0" SET # GENERAL NOTES: Site/Roof Drainage Plan OCTOBER 16, 2015 CHABAD

To the Drawings and/or Specifications for. Board of Education of Harford County Lancaster, PA 17603

ADDENDUM No. 4 Page 1 of 8 (includes attachment)

DOCUMENT SUBMITTAL REQUIREMENTS FOR AN ALTERATION OR ADDITION TO AN EXISTING SINGLE-FAMILY DWELLING OR MULTI-FAMILY DWELLING

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO

BUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT

NIAGARA REGIONAL HOUSING MZE FILE NO

TO: All Recipients Date: March 20, 2015

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM SOTA-AAS HIGH SCHOOL MODERNIZATION ADDENDUM NO. 2

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING

Montclair, NJ ADDENDUM NO. 2 Issue Date: June 18, Request for Proposal # 898 Finley Hall Renovation

COMPILATION OF TENDER DOCUMENTS

CHAPTER 5 ARCHITECTURE

Addendum #1 - Bid Package #

Addendum Number: 1 WT White HS Additions and Renovations, Dallas ISD

ADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION

CHAPMAN GRIFFIN LANIER SUSSENBACH ARCHITECTS, INC. ARCHITECT S ADDENDUM NO. 06

Staff Review Date: May 11, 2016 HDC PID#

CYPRESS FAIRBANKS MEDICAL CENTER HOSPITAL

ADDENDUM NO. 3. Ellis County Elections Building

SECTION INTERIOR SIGNAGE

Request for Information 0026

A1-1 D O R S E T A V E N U E SITE PLAN SITE PLAN

RENOVATION TO STUDENT SERVICES/HOUSING FROM HOSPITAL DAKOTA STATE UNIVERSITY MADISON, SOUTH DAKOTA

Notre Dame High Addition/Renovation Addendum 3 Page 1

Required Supporting Information and Documentation for Historic Preservation Certification Applications

READING ARCHITECTURAL PLANS

COUNTY OF NORTHUMBERLAND Addendum No. 3 Request for Quotations To Renovate the Grafton Recreation Centre for a Licensed Child Care Centre

KidsAbility Guelph Hub Renovation ADDENDUM #2 Project No.:

This Addendum forms part of the Bid Documents and modifies the Specifications and is to be acknowledged as part of the Guaranteed Maximum Price.

CS2.0 COVER SHEET VOL. 2

Spec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN

Architectural Design Process

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES

Architect. Architect.

ADDENDUM NO. 2. Furnace Bridge - Installation. Essex County, NY. July 29, 2015

INSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN

Answer: Only to ChurchWoods, LLC.

SPECIFICATIONS DRAWINGS. To: Plans and Specifications for:

COTTAGES AT OVERBROOK THE 'WOODSIDE' 541 LOWNDES HILL ROAD GREENVILLE, SC

ADMINISTRATION DEPARTMENT Plant Management Division. An Inventory of Its State Office Building Drawings

Elite. PLANNING GUIDE builder & architect edition. AmeriGlide Accessibility Solutions RESIDENTIAL ELEVATOR. ASME A17.1, Part V, Section 5.

05BDB ADDENDUM 002. Thomas W. Wathen Business Division Building Renovation GENERAL ITEMS:

OCPS Submittal Register for Product Data and Shop Drawing Reviews

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

12560 W. Cedar Drive Lakewood, CO Barry Himmelman President

Architectural Alliance Incorporated KEYPLAN SCALE:N.T.S. SECOND FLOOR DEMOLITION FLOOR PLAN 2 SCALE:1/4" = 1'-0"

MELROSE ELEMENTARY SCHOOL MODULAR ADDITION STUDY Melrose, Ma.

AVAILABLE FOR LEASE 4717 GOLDEN FOOTHILL PKWY El Dorado Hills, CA 95762


Dimension Below are the critical settings in AutoCAD. Other software should follow the same settings.

ADDENDUM NO. 1 THOROUGHBRED ROOM RENOVATION PHASE II DINING AREA MURRAY STATE UNIVERSITY, MURRAY, KY PROJECT #

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT

THE CHURCH OF J ESUS CHRIST OF LATTER-DAY SAINTS BISHOPS' STOREHOUSE THE CHURCH OF OF LATTER-DAY SAINTS HOME STORAGE CENTER BISHOPS' STOREHOUSE

ADDENDUM #2 September 12, 2018

1.1 The Electronic Word Programs used for the Project Manual shall be Microsoft Word.

MODEL SETUP FOR RENOVATION PROJECTS INSTRUCTIONS AND TUTORIALS

Kankakee Community College

Transcription:

ADDENDUM NO. 2 PROJECT: OWNER: ENGINEER / ARCHITECT: PROJECT LOCATION: Saginaw County Community Mental Health Authority Germania Club Renovation Phase 2 Saginaw County Community Mental Health Authority WILLIAM A. KIBBE & ASSOCIATES, INC. 1 Germania Platz, Saginaw, MI DATE: January 23, 2013 WAK PROJECT NO. 12-0614-0180 A. INSTRUCTIONS: 1. The Construction Documents Issued for Bid dated January 14, 2013 for the above referenced project is modified as noted in this Addendum. 2. All work performed under this document shall be subject to the General Conditions of the Contract and Specifications for similar work in connection with this project. B. CLARIFICATIONS 1. Provide and install five (5) 1 hr. rated, 18 x 18 ceiling access doors with downward opening. Color white, to be installed in gyp. bd. Locations identified by and coordinated with electrical and mechanical trades. Provide unit price in Section 01270-3.1- Schedule of Unit Prices, Item A for additional units to be installed. Enter a unit price for each quantity for supply and installation above the P:\12\0614\0180\PackageB-Ph2\04add\Addm 2 - Phase 2_01-22-2013\Addendum No 2.doc Page 1 of 4

five units that are to be included in the base bid. List in Schedule of Unit Prices Item A and title cost Provide and install 18 x 18 ceiling access door (each). ADD $ 2. Flooring to be removed for re-construction (Demolition Schedule Note 31) requires shoring for re-installation. Detail 2/A1.2 will also require shoring for the removal of the masonry wall near the existing stairway (Demolition Schedule Note 1) 3. Sheet A6.1 Aluminum Window Frame Types, window Film 1 will be by owner. 4. Sheet A6.1 Door/Window Schedule Remarks. All doors to receive door stops to match hardware. 5. See Sheet S3.0 for lintel location and type. C. CHANGES TO SPECIFICATIONS NA D. CHANGES TO DRAWINGS ARCHITECTURAL: 1. Refer to Drawings A1.0, A1.2 and A0.0: a. Remove existing concrete slab and walk as shown. b. Remove existing door between Mechanical Room and stair, frame to remain. 2. Refer to Drawings A1.1 and A0.0: a. Remove section of existing floor joists. See S2.0 for new framing. b. Remove existing door and frame to janitor closet. 3. Refer to Drawing A1.5: a. Remove existing gypsum board ceilings in existing toilet rooms off main floor hallway. b. The type of existing ceiling demolition was corrected for vestibules, elevator lift and lounge area. c. Revised Ceiling Demolition Schedule. d. Revised notation for existing wood trim on bulkhead to remain in existing dining room. 4. Added New Drawings: a. Sheet A1.6 (Lower Level-Floor Finishes Demolition Plan) for extents of finish flooring removal. P:\12\0614\0180\PackageB-Ph2\04add\Addm 2 - Phase 2_01-22-2013\Addendum No 2.doc Page 2 of 4

b. Sheet A1.7 (Upper Level-Floor Finishes Demolition Plan) for extents of finish flooring removal. 5. Refer to Drawings A2.0, A2.2 and A0.0: a. New concrete slab and walk. (See S1.0 for details.) b. Section number for ramp was revised to 3/S1.0. 6. Refer to Drawing A2.1, A2.3 and A6.1: a. Closet was added to room 112. b. Door 112 was changed to 112A and closet doors 112B (pair) were added. 7. Refer to Drawing A3.1: a. Ceilings in vestibules changed to 5/8 type X gypsum board on resilient channels. (Refer to A5.0) b. Existing gypsum board ceilings in rooms 108 and 109 are to be replaced with suspended acoustical ceilings. c. (Women s Toilet Room Lounge 108 ceiling to remain as is.) 8. Refer to Drawing A5.0: a. Clarification to patching the skylight demolition area and texture of new gypsum board finish. b. Clarification of areas to receive 1 hour rated shaftwall or 5/8 type X gypsum board on resilient channel. 9. Refer to Drawing A6.0: a. Designation added for areas to receive 1 hour rated shaftwall and 5/8 type X gypsum board on resilient channel. b. Existing gypsum board ceilings in rooms 108 and 109 are to be replaced with suspended acoustical ceilings. 10. Refer to Drawing A6.1: a. Doors 106 and111f (existing Elevator doors) and frames are to be removed and replaced by Wheelchair Lift contractor. Door 002 to be supplied and installed by Wheelchair Lift contractor. All elevator doors and frames to be flush mounted as required by Michigan Barrier Free. All doors to receive automatic opening by Wheelchair Lift contractor. All doors rated 45 min. b. Door 153 will be removed and replaced to match original. See revised sheet A6.1. c. Door 035 revised. See revised sheet A6.1. d. Door 112 was changed to 112A. e. Doors (pair) 112B were added. f. Door 153 was added as a new door. P:\12\0614\0180\PackageB-Ph2\04add\Addm 2 - Phase 2_01-22-2013\Addendum No 2.doc Page 3 of 4

STRUCTURAL: 1. Refer to Drawing S1.0: a. Foundation plan revised and a new partial foundation can be found on Sheet S1.1 for the retaining wall and frost slab. b. Detail 2 foundation size revised. c. Previous details 3 and 4 have been relocated to Sheet S1.1. Remaining details have been renumbered. 2. Refer to New Drawing S1.1: New partial foundation plan and frost slab details at west elevation. 3. Refer to Drawing S3.0: Several steel lintel call-outs have been revised. 4. Refer to Drawing S4.0: a. 2x Blocking added to details 2, 3, 5 and 6. b. Details 9 and 12 have revised lintels. c. Revised base plate at detail 15. d. Revised detail 16. e. New detail 17. Located in the music room along the North wall. END OF ADDENDUM P:\12\0614\0180\PackageB-Ph2\04add\Addm 2 - Phase 2_01-22-2013\Addendum No 2.doc Page 4 of 4