ADDENDUM #01 PROJECT: Saint Mary s University Student Centre Reorganization PROJECT N o : 2018-04600 DATE: 2018.04.27 This Addendum shall be considered part of the specifications for the construction of this work and shall be read in conjunction with such specifications. All work mentioned herein shall be in addition to and shall supersede the specifications and shall be included in the contractor s tender. This Addendum shall be read in conjunction with drawings and Specifications ssued for Tender on April 09 2018. This Addendum has a total Twenty-Six (26) pages including attachments. 1. SPECFCATONS 1.1. Reference Specification Section 00 21 13 nstructions to Bidders a. Ammend item 1.1 to read as follows: Bids signed, executed and dated will be received before 3:00pm local time as designated by the wall clock at the Facilities Management reception desk, on the 3rd day of May, 2018 at the following address: Saint Mary s University, Facilities Management McNally Building, Room MS011 923 Robie Street Halifax, NS B3H 3C3 1.2. Reference Specification Section 08 71 00 Door Hardware a. Delete Schlage mortise lockset L9485 x indicator 626, and add Best mortise lock 45H-7-H-15S-626-T-T L/C b. Delete on Duprin electric strike 6216 FS - 630, and add Best electric strike ES5- D-DBM(hand) 630 1.3. Reference Specification Section 08 12 16 nterior Aluminum Doors and Frames a. Modify item 2.1.1 to read: Alumicor FlushGlaze 800 b. Finish to be 0.4mil for Class 2 Clear Anodized c. Clarification: No fire ratings are required. Page 1 of 6
1.4. Reference to Section 08 32 13 Sliding Aluminum Framed Glass Doors. a. Delete tem 1.5.3: not required for Engineer stamped & signed shop drawings. b. Refer to attached ASK-04 for details and specified hardware and finishes below. 1.5. Reference to Section 08 44 30 Aluminum Curtain Wall & SSG Assemblies. a. Back Mullions to suit structural requirements. Engineer accordingly as per specification requirements. b. nterior finish: 0.4mil Clear anodized c. Exterior finish: Duranar paint finish to match existing. 1.6. Reference Specification Section 08 80 50 Glass and Glazing a. Add item 2.4.5 Glazing Film as follows: i. Glazing Film: 3M Fasara Glass finishes, selection by architect from full line. Provide samples for selection. 2. DRAWNGS 2.1. Reference Architectural Drawing A1.21 Reflected Ceiling Plan Level 3, issued for tender. a. Remove and reinstate portion of the ceiling in corridor where mechanical work is being completed. Refer to mechanical entilation drawings for extent. 2.2. Reference Architectural Sketches ASK-01 to ASK-03, attached a. nstall Exterior Window in conformance with attached details. 2.3. Reference Architectural Sketch ASK-04, Attached a. nstall Sliding Glass Door in accordance with attached details. b. Door to be Alumicor AlumiGlide Series or approved alternated. c. SLDNG GLASS DOOR i. Door Track: 1. Top and Bottom Track: Top track recessed, bottom track surface mounted, extruded aluminum single track profile: To ASTM B221, 6063 alloy with T6 temper. 2. Side Track: Single recess mounted, extruded aluminum track reinforced to take locking hardware: To ASTM B221, 6063 alloy with T6 temper. ii. Frame: Extruded aluminum with joints machined and fabricated to provide neat hairline joints. iii. Frame Finish: 0.4mil for Class 2 Clear Anodized iv. Glazing: 6 mm clear tempered glass. v. Rollers and guides: 1. Rollers: Ball bearing wheels in stainless steel, rail or stile mount as required. 2. Guides: Bronze and stainless steel, rail or stile mount as required 3. Acceptable material: Alumicor standard. Page 2 of 6
d. DOOR HARDWARE i. Sliding Door Locks: 1. Hook bolt with two cylinders. 2. Acceptable material: Adams-Rite, MS-1850. 3. Exterior cylinder with thumb turn. 4. Egress door hardware: Deadlock cylinder and thumbturn. 5. Acceptable material: Adams-Rite, MS-1850. 6. Egress door pivot: Centre hung pivot hinges top and bottom. 7. Strike: Armoured strike. 8. Acceptable material: Adams-Rite, MS-4002. 9. Handles: Flush mounted pull handles. 2.4. Refence Architectural Sketches ASK-05 to ASK-07, attached. a. Remove during demolition and reinstate when construction is complete all window coverings as indicated in the attached sketches. b. Supply and install Sun Project Moduline roller shades fully recessed within gypsum bulkhead at locations indicated on above architectural sketches. Supply and install blocking above gypsum bulkhead as required. Roller shade fabric color and opacity to match existing roller shades. Samples of finishes to be submitted to consultants for review. 2.5. Reference Drawing M-3 Level 3 Demolition and New entilation Layout, attached. a. Ad All thermostats shown within the new ventilation layout shall be new thermostats. Remove existing thermostat and extend/modify existing pneumatic tubing as required to suit installation of new thermostat. b. Provide additional transfer ducts as indicated. 2.6. Reference Drawing M-4 Level 4 Demolition and New entilation Layout, attached. a. All thermostats shown within the new ventilation layout shall be new thermostats. Remove existing thermostat and extend/modify existing pneumatic tubing as required to suit installation of new thermostat. b. Provide additional transfer ducts as indicated. c. Extend return ductwork as indicated. 2.7. Reference Drawing M-5 Level 5 Demolition and New entilation Layout, attached. a. All thermostats shown within the new ventilation layout shall be new thermostats. Remove existing thermostat and extend/modify existing pneumatic tubing as required to suit installation of new thermostat. b. Provide additional transfer ducts as indicated. 2.8. Reference Drawing M-6 entilation Details and Schedules, Attached a. All new dual duct boxes shall be complete with pneumatic controls. 2.9. Reference Drawing M-8 Level 4 and 5 New Fire Protection Layout, attached. a. Relocate existing sprinkler heads as indicated. Page 3 of 6
2.10. Reference Drawing E-1 Electrical Legend & Luminaire Schedule a. Reference Luminaire Schedule, add the following luminaries to the specified units: Type 4: Philips Cat. No.: 1FGG-30L-835-4-DS-UN-DM Type 5: Philips Cat. No.: 7705-B-E-A-D04-7-1-E-T Type 6: Philips Cat. No.: EX12-HE-N-835-2-AC48ST-U-OL1-1 Type 7: Philips Cat. No.: EX12-HE-N-835HO-2-AC48ST-U-OL1-1 Type 8: Philips Cat. No.: LSECO16-BRK-8-3500-1000-ANO-0-10 Type 9: Philips Cat. No.: EX12N-HE-N-835HO-2-AC48ST-U-OL1-1 b. Change "Dual Data Outlet, consisting of a square backbox complete with a single gang tile ring, two category 6 RJ-45 Jacks and faceplate, flush wall mounted..." to "Single Data Outlet, consisting of a square backbox complete with a single gang tile ring, two category 6 RJ-45 Jacks and faceplate, flush wall mounted..." c. Change "3 Data and 1 oice Outlet, consisting of a square backbox complete with a single gang tile ring, four category 6 RJ-45 Jacks and faceplate, flush wall mounted..." to "1 Data and 1 oice Outlet, consisting of a square backbox complete with a single gang tile ring, two category 6 RJ-45 Jacks and faceplate, flush wall mounted..." d. Add a new symbol with the following note "3 Data and 1 oice Outlet, consisting of a square backbox complete with a single gang tile ring, four category 6 RJ-45 Jacks and faceplate, installed in raceway system 18 A.F.F." 2.11. Reference Drawing E-3 Level 3,4 & 5 Power and Communications Plan a. Add a new Electrical Note "Note 5: Provide and install in wall A outlets as per new detail 10/E5. Coordinate final location of display screen with Architect/Engineer prior to rough-in." b. Change the electrical note 1's on level 5 to Note 5 (per above). c. Add a new Electrical Note "Note 6: Provide and install new dual channel raceway from the accessible ceiling space equal to DS4000 Series Dual Channel" at computer stations near grid line 4. d. Added two symbols at computer stations to identify data requirements. e. Change Connectrac outlets on partial level 4 to raceway outlets (per above) f. dentified location of communication room in the basement (near grid line E3) g. nclude for Ten (10) total new data drops (5 locations x 2 drops) in the ceiling space for future wireless access points throughout the renovation areas (evenly distributed). Final placement to be determined by SMU TSS. h. Supply & nstall a fully functional nurse call system equivalent to Mircom EC-300 to monitor washrooms SC303 & SC306. i. The system to have a 20 LED annunciator, EC dome light above each washroom doors, EC pull cord c/w LED inside each washroom to be located by the toilets. Bottom of cord to be flush with the top of the toilet seat. ii. Main panel to be located in Fred Smither s Centre, coordinate final location on site with SMU representative. iii. Mircom Nurse Call system to be interconnected with DSC NEO security panel by Stanley Security. Page 4 of 6
iv. Coordinate above work with Stanley Security. (note: security panel will be programmed to alert SMU-Security of a triggered washroom event) 2.12. Reference Drawing E-5 Electrical Details a. Add new Detail 10/E5 for Level 5 T system. b. Name change on detail 7/E5 T System w/ Under carpet 3. CLARFCATONS 3.1. Reference Electrical Power and Communications Drawings a. The data room is in the basement of the Student Centre near grid line E3. All voice and data jacks in the building terminate in this room. 3.2. Reference all nterior Design Drawings a. All surfaces inside and outside the millwork along with shelves are to be plastic laminate. No melamine will be accepted. 3.3. Reference Architectural Door schedule a. There is no fire rated glazing in this project. Page 5 of 6
4. ATTACHMENTS 4.1. ASK-01 Section Detail Exterior Window Head 4.2. ASK-02 Section Detail Exterior Window Sill 4.3. ASK-03 Plan Detail Exterior Window Jamb 4.4. ASK-04 Section Detail Sliding Glass Door 301 4.5. ASK-05 Floor Plan Level 3 Window Blind Locations 4.6. ASK-06 Floor Plan Level 4 Window Blind Locations 4.7. ASK-07 Floor Plan Level 5 Window Blind Locations 4.8. Reference Drawing M-3 Level 3 Demolition and New entilation Layout, issued for Addendum 01. 4.9. Reference Drawing M-4 Level 4 Demolition and New entilation Layout, issued for Addendum 01. 4.10. Reference Drawing M-5 Level 5 Demolition and New entilation Layout, issued for Addendum 01. 4.11. Reference Drawing M-6 entilation Details and Schedules, issued for Addendum 01. 4.12. Drawing M-8 Level 4 and 5 New Fire Protection Layout, issued for Addendum 01. 4.13. Drawing E-1 Electrical Legend & Luminaire Schedule, issued for Addendum 01. 4.14. Drawing E-2 Level 3, 4, & 5 Lighting Plan, issued for Addendum 01. 4.15. Drawing E-3 Level 3, 4, & 5 Power and Communications Plan, issued for Addendum 01. 4.16. Drawing E-4 Panel Schedules, issued for Addendum 01. 4.17. Drawing E-5 Electrical Details, issued for Addendum 01. 4.18. Drawing E-6 Electrical Specifications, issued for Addendum 01. 4.19. Drawing E-7 Electrical Specifications, issued for Addendum 01. 4.20. Drawing ED-1 Level 3, 4, & 5 Demolition Plan, issued for Addendum 01. END OF ADDENDA #01 Page 6 of 6