Playground Assembly Instructions
|
|
- Austin Cain
- 6 years ago
- Views:
Transcription
1 Before You Begin Playground Assembly Instructions Locate the playground set on firm, level ground. Assemble the playground on or close to its permanent location Two people are recommended to assemble the playground. Plastic Crayon Log The plastic log is shaped like a crayon with holes along the entire length. Recommended Tools 3/8 Power Drill #2 Square Drive Bit (included) 1/2 Wrench Hammer or mallet Tape Measure A-1 A-2 A-3 A-4 A-5 A-6 A-7 A-8 B-1 B-2 B-3 B-4 B-5 B-6 B-7 B-8 The log has two sides, an A Side and a B Side (both of which have 8 holes that are 14 inches apart.) The only difference between the A Side and B Side is that they are offset 3 inches from each other. The A Side is the side containing the hole closest to the crayon tip. The B Side is the side containing the hole closest to the bottom. (Hint: B Side has the Bottom hole.) The holes are numbered from the bottom of the log up to the top. So on the A Side, A-1 is on the bottom, and A-8 is at the crayon tip end. On the B Side, B-1 is on the bottom and B-8 is at the crayon tip end. The bottom of the log also shows which side is the A Side and which is the B Side. Make sure you understand which side is which before you begin assembling the playground. Pipe Caps and Collars Caps and Collars are used whenever a metal PIPE pipe intersects a log. It is a special system designed to fasten the metal pipe to the log and then to lock the pipe securely so it cannot move or rotate. A Collar is used on the inside of the log, and a Cap is used on the outside of the log. The Caps and the Collars have an inner lip which fits snugly into the hole in the crayon log. This means you do not have to worry about alignment, COLLAR because alignment is automatic. To attach the Collar, push it into the correct hole in the crayon log, until it fits snugly. Then secure the Collar to the log with two Long Screws (#10 x 1-1/2 ). You may find it easiest to attach all the collars to the logs before assembling the playground. Remember, the Collars go only on the inside of the log wherever a pipe will be used through the log. The outside of the log will take a Cap, which will attach to the end of the pipe and secure it snugly against the crayon log. Collar Detail CAP
2 TIP: Since straight pipes are fed through both crayon logs and anything between them, it is easiest to attach a cap to the end of the straight pipe before feeding it into place. This also provides a comfortable handle to use for positioning the pipe and to be used for pushing the pipe through the logs. To attach a Cap to the first end of the straight pipe, simply slide the cap over the end of the pipe, push it on snugly, and attach the Cap to the pipe by driving a selfdrilling screw through the side of the cap and into the pipe. Do not over-tighten the screw or you will distort the cap. If distorted too much, the cap will no longer fit into its hole in the log. If this occurs, simply back the screw off slightly until it is no longer distorted. When assembling the playground, feed the straight pipes through the logs and other items (such as panels, etc.) as described in the more detailed assembly instructions. The cap on the end of the pipe helps you to feed it through the holes as you assemble the playground. 2. Push cap into log and attach cap to log with regular screws. 1. Feed the pipe through the log and the collar on the opposite side of the same log, then through any other item such as a panel, then through the collar and opposite log. 3. Press Cap on opposite end of pipe, pushing the Cap into the hole in the log. Attach the Cap to the log, then lock the pipe in place by using self-drilling screws through all the caps and collars. Once the first end of the pipe is secured with a cap and attached to a log, slide a cap over the other end of the pipe (which should be protruding slightly through the log), then wiggle the cap as you push it into the log. It should fit in snugly. Attach the cap to the log using 2 regular screws. Then secure the cap to the pipe by driving one self-drilling screw through each side of the cap and collar, and through the pipe. Colors: Each cap and collar typically contrasts the color of the plastic part against which it is attached. Yellow caps and collors are typically used next to parts of every color except yellow. Blue caps and collars are typically used to contrast with yellow parts. If your playground comes with a mixture of colors for the caps and collars, you may choose to attach them without regard to color if you wish.
3 End Caps End Caps are inserted wherever there is an open end of a pipe after the playground has been assembled. (For this model, there will be 4 End Caps, one for each end of the open pipe on the tower support bottom braces, and one for each end of the open pipe on the outside climber support bottom braces.) Tap the End Plug into the open end of the pipe using a hammer or mallet as shown. T-Clamp T-Clamps are used to attach two pipes together at a junction. The two-piece clamp fits around the pipe formint a T-shape and is fastened with a carriage bolt and a nut. When all is positioned, drive four self-drilling screws through the T-Clamp and into each pipe.
4 Assemble the First Tower Side collars A-Side UP B-2 B-4 B-8 collars B-2 B-4 B-8 This is the firepole bar Select two of the crayon logs to use for one side of the tower. Attach a collar at each of the locations shown on the drawing. There should be 3 collars on each log... attached on both logs at locations B-2, B-4 and B-8. Place the two logs flat on the ground, with the A Side facing up. The collars should be facing each other. Feed a 52 pipe through the B-8 hole on both logs. Cap the pipe and lock the pipe in place using self-drilling screws through both caps and both collars. Place the Panel between the logs near the bottom end (see drawing) and slide a 52 pipe through the B-4 hole, then through the top end of the Panel, then through the B-4 hole on the opposite log. Secure the pipe with caps on both ends. On each log, feed a 9-1/2 pipe through B-2 and into the Panel. (You could have already attached the cap on the end of the pipe before feeding it into the hole.) Attach the Cap to the log, then lock the pipe into place through each cap and collar.
5 Assemble the Second Tower Side collars B-3 collars B-1 B-3 B-7 Select two more crayon logs to use for the opposite side of the tower. Attach a collar at each of the locations shown in the diagram below. There should be 3 collars on each log... attached on both logs at locations B-1, B-3 and B-7 Place the two logs flat on the ground, with the A Side facing up. The collars should be facing each other. Feed a 52 pipe through the B-1 and the B-7 holes, and feed a 9-1/2 pipe through the B-3 hole into each side of the panel. Fasten all caps to the logs, then fasten all caps and collars to all pipes.
6 Putting the two sides together A-8 Vertical Climber - 52 pipe (4) A-1 A-3 A-2 A-4 A-1 A-8 A-6 A-8 52 pipe A-8 52 pipe A-6 9-1/2 pipe (2) A-1 52 pipe Lift it up so it stands like a tower Raise it up so it stands upright. Place it where you want it to be located when fully assembled.
7 Deck Assembly Note: There is not enough room to have a collar on the inside of all 4 logs where the deck is to be placed. For this reason, only two (2) collars will be attached to the inside of the logs where the deck pipes will go, and these two collars should be attached to the inside of the B-5 hole on the two logs opposite the mouse hole. This will force the deck snugly against the logs on the side where B-5 the slide is attached. Overview: The easiest way to assemble the deck is to first slide the pipes in place without the deck, then to set the deck on top of the pipes (which then help support the weight of the deck). This allows you to hold the deck by one end (while it is supported at the other end) so you can remove the pipe enough to feed it back through the logs, but this time feeding it through the deck as well. 1. Slide two (2) 52 pipes through the B-5 holes next to the mouse hole, then through the collar on the opposite log and through the log itself. 2. Place the deck across the top of both pipes. 3. Lift one end of the deck (while the other end rests on the top of the other pipe) and slide the pipe out from beneath the deck, then feed it back through. This time, the pipe should be fed through the B-5 hole of the log, then through the deck, then through the collar and the opposite log. 4. Do the same with the second pipe, pulling it back so you can feed it through the deck as well. 5. Use two long screws to attach the first cap on each pipe to its log. 6. Attach a cap to the opposite end of the pipe, fitting it snugly into the hole in the log before attaching it firmly into place using the long screws. 7. Finally, lock the pipe in place using self-drilling screws through both of the designated holes in each of the caps and collars.
8 Attaching the Roof The tower will automatically become should be positioned as a perfect square. To attach the roof, first push it up so the first 2 corners catch on 2 of the crayon logs. This allows you to hang the roof in that position (you can actually release the roof and it should hang in place). Then push the roof up so it lays across the top of all 4 crayon logs. Straighten the roof if necessary, then attach the roof by driving a long screw through the top of the roof and into the top of the crayon log. (It is easiest to do this from a stepladder. You may want to use a flashlight to shine from below so you can see from above where the log touches the roof, or touch the roof from below with your finger so you can see the poisition of the shadow.)
9 J-Handles J-handles can be attached in either of the following two layouts. In the first instance, the J- handles are inverted and attached by pipe clamps to the top step of the vertical climber. In the alternate instance, the J-handles are attached with pipe clamps at the top. (See section on installing Pipe Clamps.) Check the drawing of the specific playground to see which method to use. Your playground may have the handles positioned at a different height, but the diagrams below show which holes are used for the specific configurations shown. Always use collars on the inside of the log, and caps on the outside, as shown in the diagrams below. Be sure to fasten the pipes to the caps and collars with self-drilling screws. A-8 A-7 Collars inside, Caps outside A-4 Pipe T-Clamps A-5 Pipe T-Clamps Collars inside, Caps outside
10 Diagonal Tower Supports Slide two (2) C -Braces through the A-5 holes on the outside as shown, with collars on the outside of the tower, and caps on the inside of the tower. Next, slide two (2) 52 pipes through the B-1 holes as shown, with collars on the outside and caps on the inside. A-5 A-5 Use a T-Clamp to attach the lower end of each C -Brace to the horizontal support pipe. B-1 B-1
TABLE OF CONTENTS REQUIRED TOOLS
TABLE OF CONTENTS SECTION SECTION TITLE PAGE NO. 1 2 3 4 5 Assembling Mounting Structure Installing Bicycle Supports Mounting Rack to Wall Adding Sections Customizing Rack Configuration REQUIRED TOOLS
More informationWork Space Set-up. Slats will level the pipe during bending and help minimize twisting of the bow.
Work Space Set-up Affix pipe bender to end of working surface Slats will level the pipe during bending and help minimize twisting of the bow. Make the slat height equal the distance from your work surface
More informationUser Instructions Multiline Otter Scoreboard Caddy Assembly
List of parts: User Instructions Multiline Otter Scoreboard Caddy Assembly Single Caddy Double Caddy 1 1 Base assembly with attached wheels 2 4 1 1 2 4 4 8 10 20 12 Uprights (60 or 74 aluminum extrusion)
More informationDeck Mount Installation with Bench
Deck Mount Installation with Bench 1. Mark track with square. 2. Cut tracks with saw. 3. Drill ¼ hole (if needed.) 4. Countersink track. 5. Countersink all track 6. File all track ends. ends. 7. Lay out
More informationSunrise Deck Assembly Instructions for Kingston Left
Sunrise Deck Assembly Instructions for Kingston Left It s easiest to build the deck frame first like it will be lying on its back and then after all 4 legs and horizontals are in place, tip the deck toward
More information#11179 Wellington ARBOR
#11179 Wellington ARBOR Assembly INSTRUCTIONS TOOLS NEEDED Tape Measure Variable Speed Drill with #2 Phillips Bit (recommended) or Phillips Screwdriver Hammer or Mallet ARBOR SIDE PANEL ASSEMBLY (Refer
More informationa.k.a. casegoods instructions
a.k.a. casegoods instructions a a.k.a. workwall installation IMPORTANT NOTES Failure to install product according to installation instruction will result in loss of warranty. Tools required for assembly
More informationGeneral Guidelines:
ASSEMBLY INSTRUCTIONS Congratulations on your new Patriot Dock purchase. This manual contains instructions to assemble basic dock configurations for use at typical residential shoreline application. Please
More informationGrade 8 Enriched Math Catapult Project 2012 Step by Step Instructions to building a catapult
Grade 8 Enriched Math Catapult Project 2012 Step by Step Instructions to building a catapult Grade 8 Enriched Math Project INSTRUCTION SHEET FOR CATAPULT Procedures, materials and tools: below is a step-bystep
More informationClearview Railing System Installation Instructions
Clearview Railing System Installation Instructions Disclaimer: AGS Stainless, Inc. has its Clearview Railing Systems designed by a professional engineer to meet the requirements of the latest national
More informationInstallation Instructions - Model V4JSD 1
Installation Instructions - Model V4JSD 1 Support Assemblies: Parts list: (Note see enclosed cut sheet for quantities and dimensional information) A vertical structural member (1 ½ x 1 ½ modular frame)
More informationThe Festival Assembly Instructions
The Festival Assembly Instructions Toll Free: 866.768.8465 Hours: 9-5 Monday-Friday EST www.homeplacestructures.com Package ships as shown CONTACT INFORMATION: HomePlace Structures 301 Commerce Drive New
More informationThis instruction manual is an in-depth look and explanation of how to assemble and install the Murphy Bed properly and efficiently.
This instruction manual is an in-depth look and explanation of how to assemble and install the Murphy Bed properly and efficiently. Don t be put off by the size of the instruction manual as the large diagrams
More informationAssembly Instructions
Selling Station Assembly Instructions View from above without top A B C D Rounded finished corners on A & D Square unfinished 3-sides on B & C Selling Station Components (2) 2' x 6' Side s Have a channel
More informationPO BOX 130 CLEAR LAKE, MN
WWW.WALKSONWATER.COM PO BOX 130 CLEAR LAKE, MN 55319 320-743-3333 PARTS LIST FOR 30115# VERTICAL BOAT LIFT 2-Back Leg Uprights 1 right, 1 left (BL) 1-Front Leg Upright (FL) 1-Winch Leg Upright (WU) 2-Bottom
More informationRead Below! Read Below! Read Below! Read Below! Read Below! Read Below! STOP READ TIPS BELOW TO MAKE ASSEMBLY MUCH EASIER
Read Below! Read Below! Read Below! Read Below! Read Below! Read Below! STOP READ TIPS BELOW TO MAKE ASSEMBLY MUCH EASIER Here are some guidelines to help make assembling your unit much easier: -Read and
More informationGlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)
List of Contents Quantity Description 12 #10 x 1 ½ Flat Head Phillips Screw (see pg. 2) 2 #10 x ½ Pan Head Phillips Screw (see pg. 2) 8 ¼ x 2 ½ Lag Bolt (see pg. 2) 7 ¼ 20 x 5 / 8 Hex Head Bolt (see pg.
More information#11179 Wellington ARBOR
#11179 Wellington ARBOR Assembly INSTRUCTIONS TOOLS NEEDED Tape Measure Variable Speed Drill with #2 Phillips Bit (recommended) or Phillips Screwdriver Hammer or Mallet ARBOR SIDE PANEL ASSEMBLY (Refer
More informationTrack Rack. * Track Racks are not lockable
The Track Rack s unique staggered, sliding hook design creates the greatest parking efficiency while still providing easy access to any particular bike. When adding or removing a bike to the rack, simply
More informationQwik-Fence Installation Instructions
Qwik-Fence Installation Instructions 1 Tools Required The following installation instructions should be used as a guide for installing Folding Guard Qwik-Fence Partitions. Good common sense and appropriate
More informationwoodworkersjournal.com MATERIAL LIST
MATERIAL LIST T x W x L 1 Legs (2) 1 1 2" x 3 1 2" x 36 7 16" 2 End Uprights (2) 1 1 2" x 3 1 2" x 32 1 2" 3 Stringers (4) 1 1 2" x 3 1 2" x 42" 4 Top Cladding, Long (2) 3/4" x 7 1 4" x 65 3 4" 5 Side
More information400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS
12/11/07 PAGE 1 OF 12 400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS Thank you for purchasing our product! *Please read these instructions
More informationOctagon Vinyl Gazebo Assembly Instructions For 10 & 12 Models
Octagon Vinyl Gazebo Assembly Instructions For 10 & 12 Models Toll Free: 866.768.8465 Hours: 9-5 Monday-Friday EST www.homeplacestructures.com Package ships as shown revised 04/29/09 Vinyl Gazebo Assembly
More informationNON-ELECTRIC DOG FENCES
NON-ELECTRIC DOG FENCES Thank you! Thank you for ordering your non-electric dog fence kit from Pet Playgrounds. In less than a day you will have your very own personal dog park installed on your property.
More informationSliding Door Kit
YOU MUST READ THIS DOCUMENT BEFORE YOU BEGIN TO ASSEMBLE THE DOOR KIT. Thank you for purchasing this GrowSpan door kit. When properly assembled and maintained, this product will provide years of reliable
More informationIMPORTANT!!! ASSEMBLY ASSEMBLY INSTRUCTIONS. (Internal Dimensions)
ASSEMBLY ASSEMBLY INSTRUCTIONS (Internal Dimensions) Ent Spec Edition Ltr v-0- Overall dimensions including base: 7. L x 9 W x 0 H cms 97.5" L x 7" W x 8.7" H IMPORTANT!!! Please read these instructions
More informationAssembly Instructions for 12x16 Floating Dock
Assembly Instructions for 12x16 Floating Dock www.rollingbarge.com Congratulations on the purchase of your Floating Dock kit. This kit includes all the aluminum frame parts, and all the fasteners. You
More informationHow To Measure Your Finished Opening
3000 Series Bifold Doors How To Measure Your Finished Opening MEASURE FROM RIGHT TO LEFT 2 PLACES (WIDTH) MEASURE FROM TOP TO BOTTOM 2 PLACES (HEIGHT) Tools Required for Assembly: Tools Needed: Phillips
More informationRead Below! Read Below! Read Below! Read Below! Read Below! Read Below! STOP READ TIPS BELOW TO MAKE ASSEMBLY MUCH EASIER
Read Below! Read Below! Read Below! Read Below! Read Below! Read Below! STOP READ TIPS BELOW TO MAKE ASSEMBLY MUCH EASIER Here are some guidelines to help make assembling your unit much easier: -Read and
More informationOxford Stalls Installation Instructions
Oxford Stalls Installation Instructions RAMM Horse Fencing and Stalls 13150 Airport Hwy. Swanton, OH 43558-9615 1-800-434-8456 Rev. 8/15/17 Before You Start Typical stall sizes are 10 x 10, 12 x 12 or
More information#11178 Providence ARBOR
#11178 Providence ARBOR ASSEMBLY INSTRUCTIONS TOOLS NEEDED Drill with #2 Phillips Bit (recommended) or Phillips Screwdriver Ruler Hammer or Mallet ARBOR TOP ASSEMBLY (Refer to Drawing 1) (Make 2) On clean
More informationLow/High Tunnel Greenhouse Plans
Low/High Tunnel Greenhouse Plans Tools Needed (See the complete list of Greenhouse Tools) Hacksaw or Reciprocating Saw Socket Wrench, Adjustable Wrench or Nut Drivers Electric Drill with Drill Bits Sledge
More informationIndependent Containment System (ICS)
Installing the Independent Containment System (ICS) Complete these instructions to install the Independent Containment System (ICS). Prerequisites This installation requires a team of at least two people.
More informationGREENHOUSE 6'x8' ASSEMBLY INSTRUCTIONS. (Internal Dimensions) Overall Dimensions (Approx.) L 193 W 200 H cms 97.5" L 76" W 78.
ASSEMBLY INSTRUCTIONS GREENHOUSE 'x8' (Internal Dimensions) Overall Dimensions (Approx.) 7. L 9 W 00 H cms 97." L 7" W 78.8" H 0 IMPORTANT You must read these instructions carefully before you start to
More informationTITAN INDUSTRIAL RACK 6-FOOT TALL / 4-SHELF
TITAN INDUSTRIAL RACK 6-FOOT TALL / 4-SHELF DXST10000 IMPORTANT: Please read this manual carefully before assembling this storage rack and save it for reference INSTRUCTION MANUAL 3 TABLE OF CONTENTS
More informationTITAN INDUSTRIAL RACK 4-FOOT TALL / 3-SHELF
TITAN INDUSTRIAL RACK 4-FOOT TALL / 3-SHELF DXST4500 IMPORTANT: Please read this manual carefully before assembling this storage rack and save it for reference INSTRUCTION MANUAL 3 TABLE OF CONTENTS TECHNICAL
More informationINSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS TOOLS REQUIRED Rechargeable, variable speed drill 3/8 diameter drill bit 3 Robertson bits #0, #1 and #2 Slot screwdriver Non marring hammer with 1 head Level Caulk or sealant
More informationStrata. urniture. Adriana Instructions. Parts in the Arm Box: Parts in the Body Box: Watch our assembly videos at
1A Watch our assembly videos at www.strataf.com/videos Parts in the Arm Box: Arm - Outside View Arm - Inside View 1B Parts in the Body Box: Back Deck x 1 Seat Deck x 1 with the Feet attached Back Panel
More informationContractors Rack Assembly and Installation Instructions
Part # 18601 & 16601 Contractors Rack Assembly and Installation Instructions 4751 Littlejohn St. Unit A, Baldwin Park, CA 91706 Page 1 of 12 11/13/08 Thank you for purchasing the Paramount Restyling Contractors
More informationAssembly Aid. One of the packages contains the required bolts, washers and nuts for final assembly
Assembly Aid Open the box and arrange the pieces similar to what you see here. Assembly instructions as well as the list of tools required for assembly are also in the box. One of the packages contains
More informationSentinel Electronic Safe Installation Guide
Sentinel Electronic Safe Installation Guide by Rev 07/12/2004 P/N 100020 Table of Contents 1. OVERVIEW...3 2. SAFE INSTALLATION...3 2.1. TOOLS REQUIRED...3 2.2. SELECTING THE MOUNTING LOCATION...3 2.3.
More informationOctagon Vinyl Gazebo Assembly Instructions
Octagon Vinyl Gazebo Assembly Instructions For 10 & 12 Models Toll Free: 866.768.8465 Hours: 9-5 Monday-Friday EST www.homeplacestructures.com Package ships as shown revised 04/29/09 Vinyl Gazebo Assembly
More informationDura-Lock Roof System
DLR-14 Dura-Lock Roof System Assembly and Installation Instructions Read the instructions before starting the job. They explain the steps required to produce a finished product that will meet factory specifications.
More information3 D Printer Enclosure Assembly Instructions
3 D Printer Enclosure Assembly Instructions Tools Required: 2.5 mm Allen wrench (included) Phillips screwdriver Adjustable Wrench Parts Included: Plexiglas Back with fan and filters installed (29.5 x 35.5
More informationLF Series Assembly Instructions
LF Series Assembly Instructions 1998760 Revision A-10 Complete Series Master Packet 2010 Kimball International, Inc. T 800.482.1818 F 812.482.8300 Footprint Storage and Metal Filing Systems Assembly Instructions
More informationGlideRite Retractable Cover System For Hot Spot Spas (SE & SLX only)
List of Contents Quantity Description 12 #10 x 1 ½ Flat Head Phillips Screw (see pg. 2) 2 #10 x ½ Pan Head Phillips Screw (see pg. 2) 8 ¼ x 2 ½ Lag Bolt (see pg. 2) 7 ¼ 20 x 5 / 8 Hex Head Bolt (see pg.
More informationLCD LIFT Flat Panel Display System Installation Manual. Table of Contents
LCD LIFT Flat Panel Display System Installation Manual Table of Contents Page Installation Overview... 2 Trim Ring Installation... 3 LCD Lift Installation....4 Actuator Switch Installation.5 Top Plate
More informationChapter 23. Garage Construction
Chapter 23. Garage Construction 23.1 ESTABLISHING CHALK LINES 23.2 MEASURING AND CUTTING WALL PLATES 23.3 MARKING WINDOW & DOOR LOCATIONS ON EXTERIOR WALL PLATES 23.4 MARKING STUDS ON EXTERIOR WALL PLATES
More informationAssembly Instructions
InTandem Table System November 20 InTandem Table System - Worksurface #4 x/" 4 wood screw power beam Tools Provided T-0 Extended Torx Driver T-25 Torx Driver Additional Tools Required Soft protective
More informationcompile system INSTALLATION GUIDE Updated January 2019
INSTALLATION GUIDE Updated January 09 compile system Table of Contents Panels 0 Quick Connect Clips 0 Lock Clips 0 Panel Trims 0 Privacy Glass 0 Post Base Covers 04 Electrical 04 Power Distribution Harness
More informationHeavy-Duty Bypass Track System
Heavy-Duty Bypass Track System Please Note: This track system must be installed with the screws going into a solid surface such as studs or a header. Due to the spacing of the holes on these Brackets,
More informationMantelMount. TM1A Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS
MantelMount TMA Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS TM Thank you for choosing the MantelMount television wall mount. Please read this entire manual before
More informationSwingSafe Swing-Away Mailbox Support Diagram
SwingSafe Swing-Away Mailbox Support Diagram Wood Mounting Plates Top Arm (B) Muffler Clamps (A) Carriage Bolts and Nuts Bottom Arm 4-Foot U-Channel Post USPS Recommended 42-44 Height Ground Slope Hex
More informationTREX REVEAL RAILING Installation Instructions
TREX REVEAL RAILING NoteS:» Reveal railings are designed to be attached with posts installed at a clear span of 6' (.8 m) or 8' (.44 m).» If installing at exact span lengths of 6' (.8 m) or 8' (.44 m),
More informationAustin Standing Seam Awning Assembly and Installation Instructions. Assembly Instructions
Austin Standing Seam Awning Assembly and Installation Instructions Be sure to use safety glasses when assembling and installing the awning. Some metal parts may have sharp edges. Use work gloves to handle
More informationπ H-4408 ALUMINUM BLEACHERS 5-ROW x 15' PARTS uline.com TOOLS NEEDED
π H-4408 1-800-295-5510 uline.com ALUMINUM BLEACHERS 5-ROW x 15' TOOLS NEEDED Square Tape Measure Rivet Gun 3/16" Drill Bit 1/2" Wrench Socket Wrench 1/2" Deep Well Socket #2 Phillips Bit Rubber Mallet
More informationShop Style Miter Saw Stand Kit
Quality Power Tool Accessories OWNER S MANUAL Assembled Unit Shown Without Shelves & Wings Assembled With Shelves & Wings Shop Style Miter Saw Stand Kit Model 2850 IMPORTANT Read and understand all safety
More informationRemoving the Z-Axis lead screw
Page 1 of 8 TITLE: Sabre Z-Axis Lead Screw Replacement Procedure Gerber FastFact #: 5048 Supplied by: Gerber Hardware Support Last Modified: June 14, 2007 Summary: Tools used: The following procedure explains
More informationYour order will be shipped with the supports and rail components packaged inside the ramp package. Each accessory package is labeled.
instructions About Your Order. Your order will be shipped with the supports and rail components packaged inside the ramp package. Each accessory package is labeled. Check the Order Before the Carrier leaves!
More informationIDR assembly instructions:
IDR assembly instructions: Required Tools: 2 X 12mm Open End Wrench 14mm open end wrench #2 Phillips Head Screw Driver (Drill with adjustable torque clutch recommended) 8mm nut driver (Supplied in IDR-AK)
More informationYOUR LIFE. YOUR FIRE. Ortal Curved & Islands Fireplaces Installation Manual. Ortal USA - Version: 1.3 November, 2017 SKU: KPMANCIRISLUS17B
YOUR LIFE. YOUR FIRE. Ortal Curved & Islands Fireplaces Installation Manual Ortal USA - Version: 1.3 November, 2017 SKU: KPMANCIRISLUS17B [THIS ISTALLATION MANUAL INCLUDES ASSEMBLY INSTRUCTIONS FOR THESE
More informationInstallation Instructions
Installation Instructions 000964 Revision F Installation Instructions for PIRIT Read this manual fully prior to starting installation. Call American eating Customer ervice with any questions. What you
More information8.5 Ton Assembly Instructions
8.5 Ton Assembly Instructions Parts list for assembly. 6- Legs 2 1/2 Angle X 92 Long 6- Cone Supports 2 Angle X 60 Long 6-1 1/4 Angle X 27 1/4 Long. 12-1 1/4 Angles X 42 Long 6-1 Flat Straps 23 3/4 Long
More informationAssembly Instructions 10 X 10 Aluminum Roof Support
Assembly Instructions 10 X 10 Aluminum Roof Support Aluminum Roof Support Bolt Package 16-5/16 X 2 ¼ SS Bolt 24-5/16 X 1 SS Bolt 40-5/16 SS Nylon Lock Nuts 16-5/16 SS Flat Washers 28-4 ½ Wood Screws 36-1
More informationHigh Rise Sit-Stand Desk Converter
High Rise Sit-Stand Desk Converter Assembly Instructions for Model DC300 Patent Pending PRE-ASSEMBLY Please read all instructions before beginning assembly. We strongly recommend you watch the video at
More informationFigure A. Figure B. Figure C. Figure D
Xsite 1 Power/Data Tile and Components Tools Required Tape Measure Cordless Drill/Driver #2 Phillips Screw driver bit Rubber Mallet Flat Blade Screwdriver Figure A Hardware Required Provided as shown Installation
More informationEZ BALANCER II. Please note: The hardware and accessories listed may not be the same as shown. We are always improving the product.
Parts List EZ BALANCER II 2ea. Aluminum Angle Base Frame Members. 2ea. 1/2"x1" Aluminum Angle Cross Frame Members. 2ea. Aluminum Uprights. 2ea. Aluminum Cradles. 4ea. Rubber Cradle Guards. 4ea. Rubber
More informationStep by Step Installation Instructions. Poly Shutters. Customer Service or visit us online at smithandnoble.com
Step by Step Installation Instructions Poly Shutters Customer Service 800.248.8888 or visit us online at smithandnoble.com Thank you for purchasing from smith+noble. Your new window treatments have been
More information6' Wide Premium Greenhouse Benches
6' Wide Premium Greenhouse Benches Premium Greenhouse Bench with Stationary Top 2015 FarmTek All Rights Reserved. Reproduction is prohibited without permission. STK# DIMENSIONS 112416S6X08 6' W x 3' H
More informationContinuum Frame Assembly Instructions
Continuum Frame Assembly Instructions Copyright January 1, 2017 Jim M. Bagley, GraceWood, Inc (Reproduction Prohibited) Version 2.2 Table of Contents Continuum Frame Table of Contents... i Warranty...ii
More informationStorage Cabinets 9000 Series Assembly Instructions
Storage Cabinets 9000 Series Assembly Instructions Thank you for selecting Salsbury s storage cabinets. We are confident that the quality and construction of the cabinets will prove to be a good investment.
More informationAssembly Instructions
10' and 12' Octagon Cedar Gazebo Assembly Instructions Toll Free: 866.768.8465 Hours: 9-5 Monday-Friday EST www.homeplacestructures.com Package ships as shown revised 06/20/09 Cedar Gazebo Assembly Instructions
More informationHAPPY CHICKEN TRACTOR
HAPPY CHICKEN TRACTOR www.thelittlechickenfactory.com Consumer Assembly Instructions 2014 Six-foot unit Picture of six-foot unit shade/rain cover not shown NEW HANDLE INSERT INTO FRAME HOLES WHILE ASSEMBLING
More informationLocker Pedestal Installation Instructions
Locker Pedestal Installation Instructions LK-PED-INST-0314r1 Parts List Single Pedestal Back to Back Pedestal Horizontal Support Tube TS-169 Post Flange TS-190 Post Cap Fasteners Provided: #8 x ¾ round
More informationLPR System Installation instructions
Toll LPR System Installation instructions 1 General Information The following installation instructions should be used as a guide for installing Folding Guard LPR System. Good common sense and appropriate
More information96 (Standard Length)
Setbacks 96 (Standard Length) Bike Files may be lined up end to end to fill the available space. A 36 aisle should be left between the ends of bikes in racks facing one another. 36 aisle 50 Installation
More informationINSTALLATION OF THE TRACK FOR THE STRAIGHT SIDE STEEL LADDER
ASSEMBLY OF THE 7180 STRAIGHT SIDE STEEL LADDER TOOLS REQUIRED FOR ASSEMBLY SAFETY GLASSES (2) 1 / 2 WRENCHES OR SOCKETS STEP LADDER OF APPROPRIATE HEIGHT (2) 7 / 16" WRENCHES OR SOCKETS HACKSAW FLAT HEAD
More informationTREX ENHANCE RAILING (Also Applies to Trex Select Railing) Installation Instructions
TREX ENHANCE RAILING (Also Applies to Trex Select Railing) NOTE: All Enhance Railing lengths are manufactured at CLEAR SPAN dimensions (spanning between space of posts): 7" for 6' clear span. Note that
More informationMODEL 1703E THE CHAMBERLAIN ARM TM INSTALLATION INSTRUCTIONS To be used in conjunction with the Lift-Master Garage Door Operator Owner's Manual
MODEL 1703E THE CHAMBERLAIN ARM TM INSTALLATION INSTRUCTIONS To be used in conjunction with the Lift-Master Garage Operator Owner's Before you begin, please read this ENTIRE instruction manual. One- Piece
More informationTRUE TECHNICAL SERVICE MANUAL - ALL MODELS. DOORS/DRAWERS/LIDS
DOORS/DRAWERS/LIDS 55 56 NOTES DOORS/DRAWERS/LIDS Swing s 73 74 NOTES INSTALLATION OF A GDM-SWING DOOR Phillips Head Screwdriver (2) - 1/8" Drift Punches (forged) Top Bracket NOTE: It may be necessary
More informationLedgewood Farm greenhouse. construction
Ledgewood Farm greenhouse How do I Start? construction to I m Finished! Post layout The string will be 7 above the ground and the posts will be driven until the proper drill hole is at the string. Spacing
More informationReal Life Ninja Complete Starter Pack (14ft. Warped Wall) Assembly Instructions
MATERIALS: 3 - Main Sections (Only 2 Sections for 10 ) 8 3 deck screws for joining sections inside of 2 Rock Wall Panels (with pre-installed t-nuts. Top panel comes with ladder mounting block preinstalled.)
More informationFORWARD FUSELAGE SIDES & REAR TOP SKINS
FORWARD FUSELAGE SIDES & REAR TOP SKINS WORK REPORT Step No. Check Parts / Tools Qty Preparations. 1 [ ] 6F5-3 Upper Front Longerons 2 2 [ ] 6F5-5 Heel Support 1 3 [ ] 6F5-2 Front Floor Skin 1 3 [ ] Firewall
More informationSales & Service. JFK - Just For Kids. sasportonline.com. 135 Forestview Road 7879 Will Rogers Blvd.
Sales & Service sasportonline.com SA Sport (Canada) SA Sport (U.S.A.) 135 Forestview Road 7879 Will Rogers Blvd. P.O. Box 40 Fort Worth, Texas Orillia, Ontario USA 76140 Canada L3V 6H9 Telephone: (705)
More informationCHICKEN COOP & CHICKEN RUN. Tools required for assembly (not included)
CHICKEN COOP & CHICKEN RUN ASSEMBLY MANUAL SKU# 6839 Tools required for assembly (not included) Distributed by: TRACTOR SUPPLY COMPANY 0 VIRGINIA WAY, BRENTWOOD, TN 3707 For customer support, call: -888-376-960
More informationSmartView Mounting Frame 3 Wide x 3 Deep Video Wall Display Installation Guide
SmartView Mounting Frame 3 Wide x 3 Deep Video Wall Display Installation Guide WMK-034 This display kit mounts ViewSonic 46 Video Wall displays in a 3 wide by 3 deep landscape configuration. The frame
More informationBEAST THE. Tube and Pipe Notcher Operating Instructions. Notches In Bends Straight Notches. Angled Notches. Offset Notches
Copyright (c) 2007 J D SQUARED INC. www.jd2.com THE BEAST Tube and Pipe Notcher Operating Instructions Notches In Bends Straight Notches Angled Notches PATENT PENDING Offset Notches Assembly After unpacking
More information2010 KIDS CENTER #6 K-06
K-06 INSTALLATION GUIDELINES USER GROUP: 2-5 RECOMMENDED CREW: 2 people TOOLS REQUIRED: Tape measure Level High- speed 3/8 electric drill w/clutch NOTE: Use of any other driver may result in damage to
More informationPost & Rail Crossbuck
Post & Rail Crossbuck 1. Getting Started 6. Crossbuck Be sure to call underground prior to digging Assemble gates (if necessary) and decide where they will be located Stake out the fence line Space and
More informationQuilting with The GraceHoop 2 TM
Quilting with The GraceHoop 2 TM T h e G r a c e H o o p Squared Table of Contents Customer Service Information............................. 2 Care, Finishing and Storage...............................
More informationArtisan Vinyl Pergola
Artisan Vinyl Pergola Assembly Manual Thank you for your purchase of this Pergola. Beefy Vinyl Pergola Assembly Manual This manual is designed to simplify the assembly process, however we recommend having
More informationPRE-ENGINEERED HORSE STALL SYSTEMS SDFD SLIDING DOOR c/w FOLD-DOWN GRILL. & Assembly. Installation Instructions
PRE-ENGINEERED HORSE STALL SYSTEMS 4800 SDFD SLIDING DOOR c/w FOLD-DOWN GRILL & Assembly Installation Instructions 4800 SDFD Sliding Door c/w Fold-Down Grill Components - 1 3 /4" x 2" x 88" channels (2)
More information3 wide x 3 deep Video Wall Display Installation Guide
HoverTrack Series 3 wide x 3 deep Video Wall Display Installation Guide VWD-3X3-X462 This display kit mounts NEC X461UN and X462UNS LCD monitors in a 3 wide by 3 deep landscape configuration. The frame
More information18600 Angular Momentum
18600 Angular Momentum Experiment 1 - Collisions Involving Rotation Setup: Place the kit contents on a laboratory bench or table. Refer to Figure 1, Section A. Tip the angular momentum apparatus base on
More informationTREX REVEAL RAILING Installation Instructions
TREX REVEAL RAILING BRACKET HARDWARE STAIR APPLICATIONS (INCLUDING STAIR SWIVEL BRACKETS, STAIR CROSSOVER BRACKET, AND COMPOUND SWIVEL BRACKETS) FIXED BRACKET Stair HARDWARE AA. Bottom Stair Bracket and
More informationStep by Step Installation Instructions. Poly Shutters. Customer Service or visit us online at smithandnoble.com
Step by Step Installation Instructions Poly Shutters Customer Service 800.248.8888 or visit us online at smithandnoble.com THANK YOU for purchasing from smith+noble. Your new window treatments have been
More informationAssembly Instructions
18' W x 10' H or 12' H Peak Style Frame Assembly Assembly Instructions Before you start: 2+ individuals recommended for assembly, approximate time 3 hours. Recommended tools: Power Drill, Safety Glasses,
More informationTREX SELECT RAILING. Installation Instructions PARTS
RAILING NOTE : All Trex Select Railing lengths are manufactured at ON CENTER dimensions (spanning from center of each post): 67-5/8" (76.8 cm) for 6' (.83 m) on center, and 9-5/8" (35.3 cm) for 8' (.44
More informationStrata. urniture. Addison Instructions. Parts in the Arm Box: Parts in the Body Box: Watch our assembly videos at
1A Watch our assembly videos at www.strataf.com/videos.html Parts in the Arm Box: Arm - Outside View Arm - Inside View Corbels x 4 1B Parts in the Body Box: Back Deck x 1 Seat Deck x 1 Back Panel x 1 with
More informationHigh Rise Sit-Stand Desk Converter
High Rise Sit-Stand Desk Converter Assembly Instructions for Model DC350 Patent No. 9,332,839 PRE-ASSEMBLY Please read all instructions before beginning assembly. We strongly recommend you watch the video
More information