INSTALLATION GUIDE WOOD PIVOTING CIRCLE/ OVAL
|
|
- Isabel Francis
- 5 years ago
- Views:
Transcription
1 WOOD PIVOTING CIRCLE/ OVAL READ SPECIFIC INSTALLATION INSTRUCTIONS COMPLETELY BEFORE STARTING ANY INSTALLATION Failure to install and maintain our product according to these instructions will VOID any warranty, written or implied. The installer is responsible for consulting the contractor, structural engineer, architect, or consumer, for proper installation according to local codes and/or ordinances. WARNING Every assembly and installation is different from Parrett Windows & Doors. Parrett strongly recommends consultation with a Parrett supplier or an experienced contractor, architect, or structural engineer prior to the assembly and installation of any Parrett product. PARRETT HAS NO RESPONSIBILITY IN REGARD TO POST MANUFACTURED ASSEMBLY AND INSTALLATION OF PARRETT PRODUCTS. CAUTION Factory applied exterior Brickmould and casing DO NOT take the place of standard window flashing. Each unit must be properly flashed and sealed with silicone for protection against water and air infiltration. WARNING TO INSTALLER Using ladders and/or scaffolding and working at elevated levels can be very dangerous. Follow the manufacturer s instructions for all equipment used in order for safe operation. Please use extreme caution when working around window or door openings. Falling from opening may result in injury or death. Improper use of hand/power tools could result in injury and/or product damage. Again, follow manufacturer s instructions for safe operation of equipment. ALWAYS WEAR SAFETY GLASSES. Windows and doors can be very heavy and improper lifting techniques can result in serious injury. Use safe lifting techniques and a reasonable number of people with enough strength to lift, carry, and install any Parrett window and door products to avoid injury and/or damage to any product. ITEMS REQUIRED BY INSTALLER Safety Glasses Tape Measure Level Hammer Putty Knife Carpenter s Square Caulk Gun Phillips Screwdriver Power Drill 3/16 Drill Bit Foam Backer Rod UV Resistant Exterior Sealant Shims 9 Adhesive Backed Rubber Membrane Parrett Manufacturing, Inc. 810 Second Ave. East P.O. Box 440 Dorchester, WI (800) [1]
2 1. Jamb Preparation Remove any diagonal bracing or other packaging from unit exterior only. Place unit exterior side down on a clean flat work surface. Remove all remaining bracing and packing from unit making sure to not damage the unit. Remove any loose items. Extension jamb will be factory applied unless ordered loose. Identifying the exterior of the jamb can vary depending on your configuration. Standard units will have a sloping edge on only one side of the sill and any exterior casing applied. This side is your exterior. On designs without the sloping sill other identifiers should be used such as; exterior color/ finish, operation direction/ configuration, metal cladding, or wood species when species differs from interior to exterior. WARNING- DO NOT unlock or open unit until it is secured into the opening. Opening the unit outside uninstalled can twist or otherwise distort the frame resulting in poor performance upon installation. 2. Opening Preparation The side and head rough framing should be at least as wide as the supplied jamb frame. A proper rough opening should provide ½ of unobstructed clearance greater than the overall unit dimensions. The square of the rough opening should be checked before starting to install the unit. Check the square by cross measuring from the lower left corner to the upper right corner then from the upper left corner to the lower right corner. These measurements must be within 1/8 tolerance of each other. Adjustments to the opening should be made at this point to correct any problems. Check to make sure the opening is plumb and level. The sill MUST be level before starting the installation. Parrett Manufacturing, Inc. 810 Second Ave. East P.O. Box 440 Dorchester, WI (800) [2]
3 Special jamb preparation is needed in the rough opening for oval and circle units. Extra diagonal framing should be placed in the corners of a rectangular/ square opening to provide more contact/ mounting surface to properly shim and fasten the units. The exterior sheeting should also extend to cover this area. Be sure the framing and sheeting provide the required ½ of clearance around the unit jamb. CAUTION Factory applied exterior Brickmould and casing DO NOT take the place of standard window flashing. Each unit must be properly flashed and sealed with silicone for protection against water and air infiltration. WARNING- UV resistant exterior sealant must be used and be compatible with all materials it comes in contact with. Follow sealant manufacturer s instructions regarding surface cleaning, preparation, application, and temperature requirements when applying sealant. Failure to do so may result in water infiltration, property or product damage. Cut rubber membrane 12 longer than the width of the opening. Starting 6 from the bottom of the opening at one side, apply the membrane onto the frame face so that at least 4 of the membrane just out to the exterior. Continue along the bottom of the opening until you reach the other side. Then continue 6 up the other side of the opening. Be sure to keep a minimum of 4 sticking to the exterior the entire distance. Starting in the center, fold the membrane down onto the exterior sheeting. Continue to smooth the membrane down as you work towards the sides. Depending on the type of membrane, you may or may not need to make relief cuts or use roofing nails to transition from the bottom to the side. Make sure to fold the membrane on the side to the exterior sheeting as on the bottom. ** A sheet metal sill pan may be used in place of the rubber membrane. Follow local code or instruction provided by the manufacturer. Be sure metal is properly treated/ coated to withstand weather exposure. Apply 3 heavy beads of caulk (½ is sufficient) along the length of the bottom opening. With one bead near the interior edge, one bead on the exterior edge, and one bead down the center. Parrett Manufacturing, Inc. 810 Second Ave. East P.O. Box 440 Dorchester, WI (800) [3]
4 At the ends of the bottom opening, apply a patch of caulk the entire depth of the sill at least wide enough to cover the ends of the side jamb, or approximately 2 depending on design. On units with factory applied casing, apply a heavy bead of caulk (½ is sufficient) on the exterior sheeting of the opening approximately ½ from the opening. MASONRY OPENINGS Special opening preparation is needed for masonry openings. Secure a wood buck frame into the opening at least the same depth as the jamb. The buck thickness should be thick enough to be used in the securing of the unit into the frame (standard 2x treated framing is sufficient) and still provide sufficient clearance to install the unit. The framing must be sealed between the framing and the opening and a cap bead of sealant applied to the seam on the exterior. Once this buck framing is installed, continue with installation as instructed here. 3. Jamb Installation WARNING- UV resistant exterior sealant must be used and be compatible with all materials it comes in contact with. Follow sealant manufacturer s instructions regarding surface cleaning, preparation, application, and temperature requirements when applying sealant. Failure to do so may result in water infiltration, property or product damage. NOTE-Metal fasteners and other hardware components may corrode when exposed to preservative treaded or fire retardant lumber. Failure to use appropriate materials for installation may cause component failure resulting in injury, property or product damage. DO NOT install wood products directly in contact with masonry or concrete openings. Apply a proper finish or barrier (i.e. tar paper or ice/ water membrane) between all wood and masonry/ concrete surfaces. Failure to do so may result in water infiltration, property or product damage. Rotate installation clips into position before placing unit into opening. If clips are not applied install clips 4 from jamb ends and 12 on center. Parrett Manufacturing, Inc. 810 Second Ave. East P.O. Box 440 Dorchester, WI (800) [4]
5 On units with factory applied casing or brickmould apply a heavy bead of caulk (3/8 is sufficient) to the back side of the casing near the outer edge. Place ¼ shims at the bottom of the opening near the sides. Units with installation clips should have shims placed as near the clips as possible. Lift jamb into opening. Center the unit in opening side to side. Secure temporarily with clamps to prevent from falling out of opening. Shim along the bottom of the unit as needed to keep the jamb level. Starting on one side, plumb and shim the side jamb. Plumb should be checked both side to side and front to back on the side jamb. DO NOT fully secure the side jamb until the unit is checked for square. Check for square by measuring diagonally from the upper left corner to the lower right corner. Then measure from the lower left corner to the upper right corner. When compared, these two measurements should vary by no more than 1/16. Shimming the top over left or right will adjust if out of square. Once the entire side is plumb and the unit is square, shim into place to hold the position. Shim the head as necessary to keep the head straight and level. WARNING- DO NOT fasten the jamb through any factory applied finish that will have contact with the elements. Installing fasteners through a factory finish will VOID any warranty written or implied on the finish and life of the unit. When fastener must be placed through a factory finish, the holes must be sealed with a compatible weatherproof sealant. 4. Securing Unit into Opening On units with installation clips, bend the clips around to the interior and fasten with a minimum of a #10 x 1 fastener. On units with factory applied casing or brickmould, use a minimum of 3 finishing nails to fasten the unit through the casing to the exterior framing every 12. Recheck unit for square and plumb. Parrett Manufacturing, Inc. 810 Second Ave. East P.O. Box 440 Dorchester, WI (800) [5]
6 NOTE- Parrett recommends the use of both installation clips and exterior casing as a means to secure the unit into the opening. If both are not able to be used, placing fasteners through the jamb is required. Use fasteners long enough to protrude through the jamb and shims with a minimum of 1 ¼ of penetration into the opening framing. Predrill holes 3/16 holes into jamb and place shims at the hole positions so fasteners will go through and hold them in place. 5. Check Operation Operate unit to verify smooth performance. Operating circle and oval units generally do not provide any hardware adjustment. These units are factory pre-fit into the jambs. If any problem exists in the operation of the unit double check the installation. Make sure none of the installation fasteners are interfering with the sash travel, hinges, locking hardware, or weatherstripping. Due to the design of the pivoting hinge, tight pivoting can be experienced when the jamb is shimmed too narrow OR too wide. Measure the width and height to make sure the jamb is shimmed properly. Parrett Manufacturing, Inc. 810 Second Ave. East P.O. Box 440 Dorchester, WI (800) [6]
7 6. Finishing Installation Seal the voids between the jamb and opening on the head and sides by inserting backer rod or other insulation. DO NOT use standard expanding foam. Only use LOW expanding foam. Over packing of insulation or the use of standard expanding foam can distort the jamb enough to hamper operation performance. On the exterior side where no casing has been applied, cover the void against the backer with silicone to seal the jamb to the opening. When applying trim and casing make sure all fasteners are of proper length to prevent interference with the unit s operation. All exterior trim, casing, wall, sheeting, or other finishing materials should be properly caulked with a UV safe sealant exterior sealant. WARNING- UV resistant exterior sealant must be used and be compatible with all materials it comes in contact with. Follow sealant manufacturer s instructions regarding surface cleaning, preparation, application, and temperature requirements when applying sealant. Failure to do so may result in water infiltration, property or product damage. Refer to Parrett s Care and Maintenance Instructions for all cleaning and maintenance. For finishing instructions refer to Parrett s Homeowner s Manual at or contact customer service at (800) Parrett will not under any circumstances be responsible for installation, repainting, refinishing, or other similar activities necessary to completing any replacement. It is the customer s responsibility for installation, finishing, cleaning, maintenance, re-painting, refinishing, or other similar activities necessary to maintain the performance of each product. Troubleshooting NOTE- All units have sash factory pre-fitted and adjusted. The hinge hardware provides for some adjustment in the field or during installation. If major adjustment seems to be needed, double check installed jambs for plumb, level, flat, and straightness. Extra shimming may be needed to keep jambs within tolerance. If after verification of these key points you still find the unit operation unsatisfactory please call for assistance at (800) from 8:00 a.m. to 5:00 p.m. Central time or info@parrettwindows.com Parrett Manufacturing, Inc. 810 Second Ave. East P.O. Box 440 Dorchester, WI (800) [7]
FOLDING DOOR - FOR FACTORY ASSEMBLED JAMBS WITH APPLIED SILL
FOLDING DOOR - FOR FACTORY ASSEMBLED JAMBS WITH APPLIED SILL READ SPECIFIC INSTALLATION INSTRUCTIONS COMPLETELY BEFORE STARTING ANY INSTALLATION Failure to install and maintain our product according to
More informationWOOD OUT SWING AWNING, CASEMENT, & HOPPER WINDOW
WOOD OUT SWING AWNING, CASEMENT, & HOPPER WINDOW INSTALLATION GUIDE READ SPECIFIC INSTALLATION INSTRUCTIONS COMPLETELY BEFORE STARTING ANY INSTALLATION Failure to install and maintain our product according
More informationInstallation Guide for Architectural Wood Hinged Windows
Guide for Architectural Wood Hinged Windows Congratulations! You have just purchased one of the many fine Andersen products. Proper assembly, installation and maintenance are essential if the benefits
More informationInstallation Guide for Andersen Architectural Clad Hinged Windows
Guide for Andersen Architectural Clad Hinged Windows Congratulations! You have just purchased one of the many fine Andersen products. Proper assembly, installation and maintenance are essential if the
More informationInstallation Guide for Andersen Architectural Clad Awning Windows
Guide for Andersen Architectural Clad Awning Windows Congratulations! You have just purchased one of the many fine Andersen products. Proper assembly, installation and maintenance are essential if the
More informationInstallation Guide for Andersen Architectural Clad Inswing Entry and Patio Doors
Installation Guide for Andersen Architectural Clad Inswing Entry and Patio Doors Congratulations! You have just purchased one of the many fine Andersen products. Proper assembly, installation and maintenance
More informationInstallation Guide for Andersen 200 Series Tilt-Wash Picture, Transom and Circle Top Windows
for Andersen 200 Series Tilt-Wash Picture, Transom and Circle Top Windows Congratulations! You have just purchased one of the many fine Andersen products. Proper assembly, installation and maintenance
More informationInstallation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows
Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows americancraftsmanwindows.com Project Requirements: Read
More informationInstallation Guide. for E-Series/Eagle Clad Hinged Inswing French Door
Installation Guide for E-Series/Eagle Clad Hinged Inswing French Door Thank you for choosing Andersen. Instructions are for typical, new wood-framed wall construction with weather protection in place.
More informationInstallation Guidelines. Next Dimension. Single Hung / Single Hung Fixed / Double Hung / Sliding Window / Fixed Window
Installation Guidelines Next Dimension Single Hung / Single Hung Fixed / Double Hung / Sliding Window / Fixed Window Windsor Windows & Doors Windsor Windows & Doors 900 S. 19 th St. 2210 Stafford St. Extn
More informationInstallation Guide for Andersen Frenchwood Patio Door Sidelights and Transoms
for Andersen Frenchwood Patio Door Sidelights and Transoms Congratulations! You have just purchased one of the many fine Andersen products. Proper assembly, installation and maintenance are essential if
More informationInstallation Guide for Andersen 400 Series Tilt-Wash Transom and 200 Series Narroline Transom Windows
for Andersen 400 Series Tilt-Wash Transom and 200 Series Narroline Transom Windows Congratulations! You have just purchased one of the many fine Andersen products. Proper assembly, installation and maintenance
More informationInstallation Guide. for Andersen 400 Series Tilt-Wash Picture Windows with Stormwatch Protection (High-Performance Impact Resistant Glass)
for Andersen 400 Series Tilt-Wash Picture Windows with Stormwatch Protection (High-Performance Impact Resistant Glass) Installation Guide Congratulations! You have just purchased one of the many fine Andersen
More informationInstallation Guide for Andersen 400 Series Tilt-Wash Transom Windows with Stormwatch Protection (PG Upgrade) Manufactured After 2006
for Andersen 400 Series Tilt-Wash Transom Windows with Stormwatch Protection (PG Upgrade) Manufactured After 2006 Thank you for choosing Andersen. Instructions are for typical, new wood-framed wall construction
More informationRead guide from beginning to end before starting installation. Read all warnings and cautions during unit installation.
Installation Guide for E-Series/Eagle High-Performance Mullion Windows with LVL Reinforcement and Installed Using Type B Clips Thank you for choosing Andersen. Instructions are for typical, new wood-framed
More informationInstallation Guide for E-Series/Eagle Clad Mechanically Fastened Windows
Guide for E-Series/Eagle Clad Mechanically Fastened Windows Thank you for choosing Andersen. Instructions are for typical, new wood-framed wall construction with weather protection in place. Instructions
More informationTools required by installer: Materials required by installer:
Installation Guidelines For Quaker Window Products Vinyl product line (Single Hung, Double Hung, Sliding Window, Fixed Window, Casement, Awning, and Hopper) Installer: Read these instructions completely
More informationSteel Reinforced Joining Guide (Horizontal / Vertical)
(Horizontal / Vertical) for Andersen Patio Door and/or Elliptical Top Window Combinations Congratulations! You have just purchased one of the many fine Andersen products. Proper assembly, installation
More informationInstallation Guide for Andersen 400 Series Gliding Windows
for Andersen 400 Series Gliding Windows Congratulations! You have just purchased one of the many fine Andersen products. Proper assembly, installation and maintenance are essential if the benefits of your
More informationSTACKING MULTI-SLIDE DOOR SYSTEM
SMSD STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS READ THESE INSTRUCTIONS COMPLETELY BEFORE STARTING ANY INSTALLATION! CAUTION Lead-based paint may be present in older homes, and the removal
More informationSTACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS
STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS 1290363 Revision 1 12/16 Page 1 Weather Shield Mfg., Inc. NOTICE CAUTION! Failure to install and maintain our product according to these instructions
More informationInstallation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit.
Installation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit. Installer: Read these instructions completely before starting any installation.
More informationRead guide from beginning to end before starting installation. Read and follow all warnings and cautions during unit installation.
Installation Guide for Andersen Clad Outswing Folding Doors with Track-In-Floor Thank you for choosing Andersen. Instructions are for typical, new wood-framed wall construction with weather protection
More informationINSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows without Exterior Trim or Nailing Fin (JII025) ImpOrTaNT INFOrmaTION & GlOssary.
for Wood/Clad Wood Windows without Exterior Trim or Nailing Fin (JII025) Thank you for selecting JELD -WEN products. Attached are JELD-WEN s recommended installation instructions for metal clad wood windows
More informationVISTALUXE CASEMENT, AWNING, & PICTURE WINDOW
VCSMT VISTALUXE CASEMENT, AWNING, & PICTURE WINDOW INSTALLATION INSTRUCTIONS READ THESE INSTRUCTIONS COMPLETELY BEFORE ATTEMPTING ANY INSTALLATION Kolbe & Kolbe Millwork, Co., Inc. 1323 S. 11th Ave. -
More informationTransom Joining. for Andersen Elliptical Windows over Perma-Shield Gliding Patio Door
Transom Joining for Andersen Elliptical Windows over Perma-Shield Gliding Patio Door INSTALLER: Please leave this guide with the building owner to file for future reference. Congratulations! You have just
More informationInstallation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR
www.quakerwindows.comv www.quakercommercialwindows.com PO Box 128 504 Highway 63 South Freeburg, MO 65035 800-347-0438 573-469-4151 (fax) Installation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR
More informationEagle clad double-hung window installation instructions
Eagle clad double-hung window installation instructions These instructions are for typical installation in new typical wood frame wall construction. These instructions and methods are not intended for
More informationfor Andersen Frenchwood Hinged and Outswing Patio Doors, Sidelights, and Transoms
for Andersen Frenchwood Hinged and Outswing Patio Doors, Sidelights, and Transoms Congratulations! You have just purchased one of the many fine Andersen products. Proper assembly, installation and maintenance
More informationFollow instructions from foam, sealant and flashing manufacturer regarding material application and compatibility with this product.
Installation Guide for Andersen Wood Outswing Folding Doors Thank you for choosing Andersen. Instructions are for typical, new wood-framed wall construction with weather protection in place. Instructions
More informationRead guide from beginning to end before starting installation. Read and follow all warnings and cautions during unit installation.
Installation Guide for Andersen Wood Outswing Folding Doors with Track-In-Floor Thank you for choosing Andersen. Instructions are for typical, new wood-framed wall construction with weather protection
More informationNon-Reinforced Joining Guide (2-Way Horizontal and Vertical Joining) for Andersen 200 Series Tilt-Wash Double-Hung and Transom Windows
(2-Way Horizontal and Vertical Joining) for Andersen 200 Series Tilt-Wash Double-Hung and Transom Windows Congratulations! You have just purchased one of the many fine Andersen products. Proper assembly,
More informationSteel Reinforced Joining Thank you for choosing Andersen. Please leave this guide with building owner.
Steel Reinforced Joining (Horizontal/Vertical) for Andersen 400 Series Woodwright & Tilt-Wash Double-Hung, Picture, and Transom Windows and 400 Series Double-Hung Half Circle and Flexiframe Specialty Windows
More informationInstallation Guidelines for all Quaker products with nail fins New Construction nail fin installation with a Zip sheathing system.
www.quakerwindows.com www.quakercommercialwindows.com PO Box 128 504 Highway 63 South Freeburg, MO 65035 800-347-0438 573-469-4151 (fax) Installation Guidelines for all Quaker products with nail fins New
More informationWindow with Nail fin (New construction)
Window with Nail fin (New construction) Disclaimer: Improper installation and care may void warranty. These instructions are a basic/general recommendation for installation, but may not be utilized in
More informationInstallation Guide for E-Series/Eagle Ascent 2 or 4 Panel Gliding (Sliding) Patio Doors
Installation Guide for E-Series/Eagle Ascent 2 or 4 Panel Gliding (Sliding) Patio Doors Thank you for choosing Andersen. Instructions are for typical, new wood-framed wall construction with weather protection
More informationSun Windows General Information New Construction Hinged Door Installation Instructions
A G H F H H A. Apply Weather Resistive Barrier B. Apply Bottom Flashing Tape C. Install Sill Pan End Caps & Pan D. Caulk Sides & Top Nailing Surface, Set Door, Fasten E. Apply Side Flashing Tape F. Apply
More informationIntegrity Polygon and Round Top Installation and Finishing Instructions
Integrity Polygon and Round Top Installation and Finishing Instructions 08/20/2004 70852 BEFORE YOU BEGIN IMPORTANT: Read these instructions thoroughly before beginning to install your Integrity Polygon
More informationInstallation Instructions for E-Series 2 or 4-Panel Gliding and French Gliding Patio Doors
Installation Instructions for E-Series 2 or 4-Panel Gliding and French Gliding Patio Doors Thank you for choosing Andersen. Instructions are for typical, new wood-framed wall construction with weather
More informationwindow installation Guide wood FRaMinG New Construction
window installation Guide wood FRaMinG New Construction IMPORTANT NOTICES AND INFORMATION Read these instructions in their entirety prior to installing windows. Any local building code requirements supersede
More informationNon-Reinforced Joining Guide (Horizontal/Vertical)
Non-Reinforced Joining Guide (Horizontal/Vertical) for Andersen Casement, Awning, and Picture Windows Congratulations! You have just purchased one of the many fine Andersen products. Proper assembly, installation
More informationInstallation of Fiberglass Windows
Installation of Fiberglass Windows Before you begin please read and understand these installation instructions. The following installation instructions are recommended by Norwood and failure to follow
More informationINSTALLATION INSTRUCTIONS for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII032)
for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII0) Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for wood and clad wood bay
More informationFlashing Materials. Rough Opening Preparation
Installation Instructions for CertainTeed New Construction Windows Handling vinyl windows CAUTION: Always store vinyl windows and doors in an upright position on a slight angle. Never lay them flat or
More informationNon-Reinforced Joining Guide (1-Way Vertical or Horizontal) for Andersen 200 Series Tilt-Wash Double-Hung Windows and Complementary Products
(1-Way Vertical or Horizontal) for Andersen 200 Series Tilt-Wash Double-Hung Windows and Complementary Products Non-Reinforced Joining Guide Congratulations! You have just purchased one of the many fine
More informationfor Andersen 400 Series Woodwright Transom over 400 Series Woodwright Double-Hung or 400 Series Woodwright Picture Window
for Andersen 400 Series Woodwright Transom over 400 Series Woodwright Double-Hung or 400 Series Woodwright Picture Window Congratulations! You have just purchased one of the many fine Andersen products.
More informationPOCKETING MULTI-SLIDE DOOR SYSTEM
PMSD POCKETING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS READ THESE INSTRUCTIONS COMPLETELY BEFORE STARTING ANY INSTALLATION! CAUTION Lead-based paint may be present in older homes, and the removal
More informationDOOR INSTALLATION GUIDE WOOD FRAMING New Construction
DOOR INSTALLATION GUIDE WOOD FRAMING New Construction IMPORTANT NOTICES AND INFORMATION Read these instructions in their entirety prior to installing doors. Any local building code requirements supersede
More informationAssembled Patio Door Installation Guide 2-Panel Patio Door with Non-Welded Frame
Assembled Patio Door Installation Guide 2-Panel Patio Door with Non-Welded Frame americancraftsmanwindows.com American Craftsman and all other marks where denoted are trademarks of Andersen Corporation
More informationPanel Assembly and Installation
Assembly and Installation Assembly and Installation for Andersen 400 Series Frenchwood, 200 Series Narroline, 200 Series Perma-Shield Gliding Patio Doors and 400 Series Perma-Shield Gliding Patio Doors
More informationI n s t a l l a t i o n I n s t r u c t i o n s
HInged PAtio Door Systems I n s t a l l a t i o n I n s t r u c t i o n s IMPORTANT: Read the instructions and familiarize yourself with the door parts and pieces before beginning assembly and installation.
More informationVinyl Windows and Doors Manufactured by Pella Corporation
Vinyl Windows and Doors Manufactured by Pella Corporation Part Number: V981255 2009 Pella Corporation INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACIÓN FOR BOW WINDOWS WITHOUT HEAD AND SEAT BOARD
More information1-Way Vertical Joining (Pages 2-22) 1-Way Horizontal Joining (Pages 23-44)
3/4" LVL Reinforced Joining Guide (1-Way Vertical Joining) or (1-Way Horizontal Joining) 3/4" LVL Reinforced Joining Guide (1-Way Vertical Joining) or (1-Way Horizontal Joining) for Andersen 400 Series
More informationINSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS
2012 Pella Corporation Part Number: 80WH0101 INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS Installation Instructions for Typical Wood Frame Construction.
More informationSash Replacement Guide for Andersen 400 Series Tilt-Wash Transom Windows
for Andersen 400 Series Tilt-Wash Transom Windows Read all instructions carefully before attempting this procedure. If you have any questions about your ability to complete this procedure, call Andersen
More informationAll Window Installation Instruction
1 All Window Installation Instruction Hurd Window Installation Instructions for Nail Fin & Wood Brick Mould Units Nail Fin Windows See Pages 2-11 Wood Brick Mould Windows See Pages 2-6, 8 & 12BM - 14BM
More informationINSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACIÓN FOR CLAD CASEMENT & AWNING WINDOW VENTANA DE DOS HOJAS CON REVESTIMIENTO
2008 Pella Corporation Part Number: 801P0101 INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACIÓN FOR CLAD CASEMENT & AWNING WINDOW VENTANA DE DOS HOJAS CON REVESTIMIENTO Corner Corner Top Fin Corner
More informationSun Windows General Information New Construction Sliding Door Installation Instructions H F
A G B D C H F H E H A. Apply Weather Resistive Barrier B. Apply Bottom Flashing Tape C. Install Sill Pan End Caps & Pan D. Caulk Sides & Top Nailing Surface, Set Door, Fasten E. Apply Side Flashing Tape
More informationSash Replacement Guide for Andersen Impact Resistant Casement Windows
Replacement Guide Replacement Guide for Andersen Impact Resistant Casement Windows Congratulations! You have just purchased one of the many fine Andersen products. Proper assembly, installation and maintenance
More informationFold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE
Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE This instruction guide provides the minimum recommended procedures to correctly prepare the rough opening, install a fold-a-way patio door unit and apply
More informationPicture Window Rough Opening Installation with Sheathing Intact with Brickmould Tools: (Not supplied by manufacturer) Fig. 0-1
Picture Window Rough Opening Installation with Sheathing Intact with Brickmould Tools: (Not supplied by manufacturer) Tape Measure Drill Level Putty Knife Square Foam Gun Utility Knife Caulk Gun Hammer
More informationINSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001)
Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for Vinyl windows with an integral nailing fin. While the use of these installation instructions
More information3/4" LVL Reinforced Joining Guide
(2-Way Horizontal and Vertical Joining) for Andersen 400 Series Tilt-Wash Double-Hung, Picture, and Transom Windows with Stormwatch Protection Congratulations! You have just purchased one of the many fine
More informationHR175 Sash Replacement Kit Installation Instructions
HR175 Sash Replacement Kit Installation Instructions IMPORTANT: Please read before you begin. Weather Shield HR175 Sash Replacement Kits Important: Thoroughly read and follow these instructions, failure
More information(773) INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GL OSSARY ROUGH OPENINGS
Thank you for selecting C l i m a t e G u a r d products. Attached are our recommended installation instructions for Vinyl windows with an integral (2400-02) will not affect application of the ClimateGuard
More informationTARGA 7200 HORIZONTAL ROLLER INSTALLATION INSTRUCTIONS NOTE: Read instructions completely before attempting any installation.
TARGA 7200 HORIZONTAL ROLLER INSTALLATION INSTRUCTIONS NOTE: Read instructions completely before attempting any installation. These instructions are provided as a general guide in the installation of CGI
More informationINSTALLATION INSTRUCTION FOR WOOD DOUBLE-HUNG AND CASEMENT WINDOWS USING WOOD BRICKMOULD OR FLAT CASING
2009 Pella Corporation Part Number: 80DZ0101 INSTALLATION INSTRUCTION FOR WOOD DOUBLE-HUNG AND CASEMENT WINDOWS USING WOOD BRICKMOULD OR FLAT CASING Brickmould/Flat Casing Aluminum Head Flashing Corner
More informationINSTALLATION INSTRUCTIONS FOR FORGENT SLIDING PATIO DOORS RECOMMENDATIONS FOR COMMON INSTALLATION OF SLIDING PATIO DOORS.
INSTALLATION INSTRUCTIONS FOR FORGENT SLIDING PATIO DOORS RECOMMENDATIONS FOR COMMON INSTALLATION OF SLIDING PATIO DOORS. Installer: DO NOT DISCARD Please leave the Installation Guide with the home owner
More informationINSTALLATION INSTRUCTION INSTRUCCIONES DE INSTALACIÓN FOR CLAD HINGED PATIO DOOR PUERTA DE BISAGRA PARA PATIO
2008 Pella Corporation Part Number: 801V0101 INSTALLATION INSTRUCTION INSTRUCCIONES DE INSTALACIÓN FOR CLAD HINGED PATIO DOOR PUERTA DE BISAGRA PARA PATIO REMEMBER TO USE APPROPRIATE PERSONAL PROTECTIVE
More informationINSTALLATION INSTRUCTIONS FOR TEUTONIC ENTRANCE DOOR RECOMMENDATIONS FOR COMMON INSTALLATION OF ENTRANCE DOORS.
INSTALLATION INSTRUCTIONS FOR TEUTONIC ENTRANCE DOOR RECOMMENDATIONS FOR COMMON INSTALLATION OF ENTRANCE DOORS. Installer: DO NOT DISCARD Please leave the Installation Guide with the owner. Please read
More informationSTERLING DOUBLE HUNG & STUDIO WINDOWS
STDH STERLING DOUBLE HUNG & STUDIO WINDOWS INSTALLATION INSTRUCTIONS READ THESE INSTRUCTIONS COMPLETELY BEFORE ATTEMPTING ANY INSTALLATION CAUTION Lead-based paint may be present in older homes, and the
More informationWood Hinged Patio Door Installation Instructions
Wood Hinged Patio Door Installation Instructions #1029970 / 1029971 / 1182557 (12/05) Rev 4 IMPORTANT: Please read before you begin installation. Wood Hinged Patio Door Door Installation Instructions IMPORTANT:
More informationTHERMO-FIT REPLACEMENT WINDOW INSTALLATION INSTRUCTIONS (BRICKMOULD / NO NAILING FLANGE)
THERMO-FIT REPLACEMENT WINDOW INSTALLATION INSTRUCTIONS (BRICKMOULD / NO NAILING FLANGE) fig.3 Casement, Awning, Fixed Casement, Direct-Set, Double-Hung, Single-Hung & Horizontal Slider Windows Materials
More informationINSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows with Exterior Trim or Nail Fin (JII024)
Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for metal clad wood windows with nailing fin or primed wood windows with exterior trim. While the
More informationFixed Upper Sash Replacement Guide for Andersen 400 Series Woodwright Springline Single-Hung Windows
Fixed Upper Sash Replacement Guide for Andersen 400 Series Woodwright Springline Single-Hung Windows Manufactured Between September 2005 and October 2006 Read all instructions carefully before attempting
More informationWINDOW REPLACEMENT INSTRUCTIONS FOR CASEMENT, DOUBLE-HUNG AND CLAD FRAME WINDOWS USING FRAME SCREWS
WINDOW REPLACEMENT INSTRUCTIONS FOR CASEMENT, DOUBLE-HUNG AND CLAD FRAME WINDOWS USING FRAME SCREWS These instructions were tested developed for replacing windows in wood-frame wall construction systems
More informationINSTALLATION INSTRUCTIONS FOR REPLACEMENT FORGENT WOOD GLASTRA WINDOWS RECOMMENDATIONS FOR COMMON INSTALLATION OF ALL REPLACEMENT WINDOWS.
INSTALLATION INSTRUCTIONS FOR REPLACEMENT FORGENT WOOD GLASTRA WINDOWS RECOMMENDATIONS FOR COMMON INSTALLATION OF ALL REPLACEMENT WINDOWS. Installer: DO NOT DISCARD Please leave the Installation Guide
More informationINSTALLATION INSTRUCTION FOR CLAD BOW WINDOWS WITHOUT HEAD AND SEAT BOARD
2008 Pella Corporation Part Number: 80KG0101 INSTALLATION INSTRUCTION FOR CLAD BOW WINDOWS WITHOUT HEAD AND SEAT BOARD Note: These instructions may be used for all Pella Bow windows that do not have a
More informationINSTALLATION INSTRUCTIONS for Vinyl Projecting Windows with Integral Nailing Fin (JII023)
Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for vinyl bay, bow and garden windows which incorporate an integral nailing fin. While the use of
More informationINSTALLATION INSTRUCTIONS - INSTRUCCIONES DE INSTALACION FOR HURRICANESHIELD IMPACT-RESISTANT DOUBLE-HUNG, SINGLE-HUNG AND SIMULATED-HUNG
2008 Pella Corporation Part Number: 80ED0101 INSTALLATION INSTRUCTIONS - INSTRUCCIONES DE INSTALACION FOR HURRICANESHIELD IMPACT-RESISTANT DOUBLE-HUNG, SINGLE-HUNG AND SIMULATED-HUNG Instrucciones en español
More informationINSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS
2008 Pella Corporation Part Number: 803V0101 INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS Installation Instructions for Typical Wood Frame Construction. These instructions were developed
More informationVinyl Windows and Doors
Vinyl Windows and Doors Manufactured by Pella Corporation WINDOW REPLACEMENT INSTRUCTIONS FOR SINGLE-HUNG AND SLIDING WINDOWS INTO EXISTING CASEMENT FRAME Part Number: V981203 2009 Pella Corporation USING
More informationInstallation Materials Required: Tools Required: 6" self-adhesive flashing. Shims. 3-foot level 6-foot level Tape measure 1/8" drill bit
installation instructions for CUSTOM WOOD & FIBERGLASS EXTERIOR FOLDING DOOR SYSTEMs (JII101) Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for
More informationNorwood Windows Permaglass Fiberglass Products Installation Instruction
Norwood Windows Permaglass Fiberglass Products Installation Instruction Care and storage of fiberglass windows: Fiberglass products purchased from Norwood Windows must be stored in a dry sheltered area
More informationVinyl Windows and Doors
Vinyl Windows and Doors Part Number: V983571 2011 Pella Corporation INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION 350 SERIES WINDOW INTO EXISTING WOOD FRAME WINDOW Lea las instrucciones en español
More informationMetal & Vinyl, Flush Mount and Recessed Fin Windows Recommended Installation Instructions
PO Box 480 Ph: 417-235-7821 Monett, MO 65708 Fax: 417-737-7140 Metal & Vinyl, Flush Mount and Recessed Fin Windows Recommended Installation Instructions These installation instructions are recommendations
More informationCurtain Wall Installation Guide
Curtain Wall Installation Guide Curtain Wall Installation Guide 1 IMPORTANT NOTICES! Important Notices & Information Manufacturer s Notes: The building envelope must be correctly prepared with weather
More informationPocket Door Installation Instructions
Installation Instructions Before getting started: Read instructions thoroughly. Be sure that you have the necessary tools and materials before starting the installation. Consult your local building code
More informationINSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GLOSSARY ROUGH OPENINGS
Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for Vinyl windows with an integral nailing fin. While the use of these installation instructions
More informationINSTALLATION INSTRUCTION SINGLE PANEL, SINGLE PANEL WITH SIDELIGHT COMBINATION AND 20 MINUTE FIRE RATED WOOD FRAME ENTRY DOOR
2011 Pella Corporation Part Number: 818T0101 INSTALLATION INSTRUCTION SINGLE PANEL, SINGLE PANEL WITH SIDELIGHT COMBINATION AND 20 MINUTE FIRE RATED WOOD FRAME ENTRY DOOR Installation Instructions for
More informationHERITAGE CASEMENT BOW & BAY WINDOW
HBB HERITAGE CASEMENT BOW & BAY WINDOW INSTALLATION INSTRUCTIONS READ THESE INSTRUCTIONS COMPLETELY BEFORE STARTING ANY INSTALLATION Kolbe & Kolbe Millwork, Co., Inc. 1323 S. 11th Ave. - Wausau, WI 54401
More informationPhone # La Jolla Doors. Block Frame Installation Manual Aluminum Frame with either Vinyl or Aluminum Panels
Phone # 800-440-8785 www.lajolladoors.com La Jolla Doors Block Frame Installation Manual Aluminum Frame with either Vinyl or Aluminum Panels Thank you for choosing La Jolla Doors In this manual you will
More informationHow To Install Windows: Nail-Fin Application
How To Install Windows: Nail-Fin Application Required Tools & Materials: Materials: 1 3/4" galvanized roofing nails. Nails must penetrate at least 1" into framing For mulled and/or DP50 or above units:
More informationUNIT 5: EXTERIOR DOORS AND WINDOWS
KEY CONCEPTS 1. Identify tools needed for exterior door and window installation 2. Last step to weather proofing the home 3. Steps to installing exterior doors and windows 4. Maintenance and safety of
More informationVINYL WINDOWS (new construction or replacement) page 2. VINYL PATIO DOORS pages WOOD CLAD WINDOWS (new construction).page 5 WOOD CLAD WINDOWS
RECOMMENDED INSTALLATION INSTRUCTIONS Please choose the appropriate instructions for the product(s) you are using. Read the instructions thoroughly before beginning the installation process. All instructions
More informationWINDOW REPLACEMENT INSTRUCTIONS FOR SINGLE-HUNG, DOUBLE-HUNG, CASEMENT, AWNING INTO EXISTING CASEMENT FRAME USING FRAME SCREWS
2009 Pella Corporation Part Number: 80YV0102 WINDOW REPLACEMENT INSTRUCTIONS FOR SINGLE-HUNG, DOUBLE-HUNG,, AWNING INTO EXISTING FRAME USING FRAME SCREWS These instructions were tested and developed for
More informationKinro Metal, Vinyl, Flush Mount and Recessed Fin Windows OEM INSTALLATION MANUAL
Kinro Metal, Vinyl, Flush Mount and Recessed Fin Windows OEM INSTALLATION MANUAL TABLE OF CONTENTS Introduction 2 Safety Requirements 2 Fasteners 3 Preparation 3 Rough Opening Preparation 3 Resources Required
More informationVinyl Windows and Doors Manufactured by VPI Quality Windows
Vinyl Windows and Doors Manufactured by VPI Quality Windows Part Number: 511_Installation ENDURANCE CASEMENT\AWNING\PW INSTALLATION INSTRUCTIONS Installation Instructions for Typical Construction These
More informationVINYL REPLACEMENT WINDOW INSTALLATION STANDARDS
VINYL REPLACEMENT WINDOW INSTALLATION STANDARDS BEFORE you start to remove the existing windows Place clean drop cloths in all work areas. Re-measure the opening to ensure the new window will fit. Remove
More informationINSTALLATION INSTRUCTIONS for Custom and Premium Pocket Windows (JII022) IMPORTANT INFORMATION AND GLOSSARY SAFETY AND HANDLING
Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for pocket (replacement) double-hung, casement, awning, picture or transom windows, designed to
More information