1 Casing Recovery Pre-Job Meeting
2 Make up casing spear assembly and rack back Make up casing cutting assembly RIH with cutting assembly to calculated free point Make first cut, flow check. POOH & lay down cutting assembly RIH with spear/pack-off & engage same Confirm casing is free Displace mud from behind 9 5/8" casing - collect returns Pull 9 5/8" hanger free and Flow check Pull 9 5/8" hanger/casing to surface Release & rack spear Rig up to handle 9 5/8" casing Pull & lay down 9 5/8" casing Rig down casing handling equipment
3 M/u work stand and rack back M/U and RIH with milling BHA. Break circ every 20stds Circ hole to hi-vis bentonite mud and condition same M/U and RIH with milling BHA. Break circ every 20stds Mill casing to 9750' Pull back 1 stand and m / u work stand Work jetting sub and magnets through BOP and wellhead Press Test 13 3/8" casing to 3000psi Displace hole to 11.5ppg salt saturated mud POOH Milling Assy RIH for clean up trip (junk mill), dress stump, circ Dress off 9 5/8" stump, circ clean and condition mud POOH clean up BHA RIH with milling BHA. Break circ every 20stds Mill casing to 10,154' Circ clean, drop carbide and rice bombs POOH Milling Assy
4 1. 43/22-2 Suspension Schematic 9-5/8" MLH E70 RTE /8" MLH MSL " MLH Water Depth Top 30" Seabed ### Seabed 30" Driven 752' MDBRT 20" 1477' MDBRT Plug /8" 2541' MDBRT CASING DETAILS 3802' MDBRT 30", 1/1.5" Wall, X56, RL4 20", 129 lb/ft, X56, RL4S 13-3/8", 72 lb/ft, P110/N80, BTC 9-5/8", 53.5 lb/ft, ST95, New Vam 7", 29 lb/ft, L80, New Vam 9.7ppg Filtered Inhibited NaCl Brine Top Cmt Plug 2060' MDBRT Base 2534' MDBRT 9854' MDBRT 9-5/8" 9354' MDBRT Perforations: 15,412' - 15,542' 15,592' - 15,662' 15,682' - 15,782' 16,032' - 16,062' 14694' MDBRT 16672' MDBRT Plu 2 9.7p pg NaC l Plu Bridge 12214' MDBRT Top Cmt Plug 12322' MDBRT Base 12844' MDBRT 7" T.O.L. Top Cmt Plug 14823' MDBRT Bridge 15321' MDBRT 733' TCP Guns & 38' Wireline LINC Tool LIH Top Guns 15855' MDBMSL. Top LINC tool 15817' if not alongside guns ' MDBRT 7" L/Collar at 16588' MDBRT
5 Objectives Re-enter suspended 43/22-2 well bore to tag and cleanout cement suspension plug #3 at approx. 2,060ft MDBRT and check the 9-5/8 casing for deformation down to bridge plug set at 12,214ft MDBRT. Cut and recover the un-cemented portion of the existing 9-5/8 casing string down to theoretical TOC at 9,354ft MDBRT, as confirmed by USIT logs. Mill the cemented 9-5/8 casing to 10,150ft MDBRT to create a 300ft window below the existing 13-3/8 casing shoe. Confirm the integrity of the existing 13-3/8 casing by pressure testing to 3,000 psi. Set a cement kick-off plug for the well to be sidetracked from just below the 13 3/8 casing shoe at 9,854ft.MDBRT
6 Hazard Possible trapped pressure below suspension plugs. Solution/Comment Tested BOPs and well control procedures in place. Handling recovered joints of casing coated with rust and cement debris. Thorough risk assessment of casing recovery process. Risk Assessment will include required PPE, identify and address any dropped object hazards. Difficulty handling and clearing steel swarf from circulating system at surface. Use of Brandt Swarf Recovery System to minimise physical intervention during milling operations. Implement extensive lessons learned from 43/22a-K1 slot recovery operations. Spontaneous swarf combustion Swarf to be washed down and immediately cooled prior to shipping back to shore. OBM behind 9 5/8 casing Old OBM to circulated out, isolated and shipped back to shore for disposal.
7 Prepare the Swarf Buster extension for installation; Set up a bunded area on main deck where full swarf skips can be washed down with seawater and effluent pumped back to the circulating system using a Wilden pump; Brandt unit has been overhauled and set up as per recorded cat flap settings from K1. Both Brandt centrifugals will have been manifolded together and tied in to system to enable quick change over for impeller cleaning or maintenance; Brandt to provide 100% extra field replaceable parts and spares in anticipation of a lengthy milling job; Ditch magnets will be positioned as follows: 3 sets of EZ-clean magnets will be positioned along the flat bottomed trough in the pit room prior to the mud returning to Pit #1. (Use as active for swarf recovery); 2 sets of Ez-clean plus 2 Stacey ditch magnets to be positioned in the flat bottomed ditch behind the shakers; 1 set of Ez-clean to be positioned in the bevelled ditch on the cantilever; 2 Stacey ditch magnets to be positioned in the flat bottomed shaker ditch system. Mobilise 6 off 1013/16 Barracudas from Smith Red Baron. Also have Weatherford 10 7/8 quickcut cutter on standby. Use mill run #6 parameters (from milling runs in the K1 well).
8 Source alternative PPE for the job gloves, slicker suits. 4 x mud vacs; 1x on rig floor, shakers, main deck, pump room. Casing test before milling out of shoe. (Displace gel mud to Salt Saturated polymer). Isolate trip tank and drains around rotary table. Prehydrate gel cased hole milling fluid and treat to achieve 6OYP. (for openhole milling a salt-saturated polymer mud shall be used at 60 YP. Install shearing device in pits. (Use 3rd mud pump.) Boost BOPs through choke & kill lines 1500 GPM for 5 minutes each ½ stand. N.B. Clear BHA first!! (where possible use 3rd mud pump while milling ahead) Use standpipe bleed-off line and third mud pump to jet through flowline. Plan for a maximum 300 window below 13⅜ casing shoe. Stall torque limit for 18K ft lbs. Increase m/u torque in taper mill sub assembly below. Recommendation for setting down WOB quickly (minimise feathering to minimise type 1 swarf generation). Address in Work Instruction.
9 Swarf type 1 is that produced on the first two milling runs using the following approximate parameters 2-10k WOB, RPM. This is effectively low WOB, high RPM.
10 Swarf type 2 was that initially produced on milling run #3 using 15k WOB and 125 RPM, i.e. high WOB and low RPM (relatively).
11 Swarf type 3 was then produced on milling run #3 using 20k and 125 RPM, i.e. higher WOB still and the same lower RPM.
12 Type 1 is obviously very prone to birds-nesting and has consistently caused problems since the milling operation began. It is not the type of steel cutting we wish to produce, but is often associated with the harder steel (P110) we have here. Its production can also be exacerbated when milling with a motor as it s a by-product of higher RPMs. The lower grade casings (L80) are not likely to produce this. In addition, this fine wool is perfect for blinding off the shakers pretty much regardless of what size mesh they are dressed with and, of course, acts like Velcro to other swarf.
13 Type 2 is a far better thickness, therefore stronger and less pliable and far less likely to birds-nest. However, it is very long to handle effectively and pass through the tighter areas of the surface system without having a tendency to dam itself, i.e. at the flowline entrance tonight (17-18/11/05). It will, however, fall out far easier over any screens, be they in the Brandt unit or over the shakers. These are up to 2ft long and ½ wide.
14 Type 3 is the ideal cutting. It very much resembles well-preserved PDC shale cuttings averaging 2 in length, yet still ½ thick. It will not dam up in the more restricted areas of the surface system and will be easily stripped out over either the screens of the Brandt unit or over the shakers. It s a no-brainer that we need to be producing and handling this type of swarf.
15 Mills run: Junk Mill S/N Taper Mill S/N Casing Mill S/N Footage Hrs BHA RB A14289 RB J BHA 29 RB BHA RB A14289 RB J BHA BHA A14289 RB J BHA 33 RB RB BHA RB J28014 Baker U BHA 35 RB BHA RB J28014 RB RB BHA RB J28014 RB J Av ROP
16
17
18
19
20
21
22
23
24
25
26
27
Comprehensive Plug and Abandonment Systems
Comprehensive Plug and Abandonment Systems Abandon Your Well. Abandon Uncertainty. Complete, single-trip systems for P&A Schlumberger comprehensive plug and abandonment systems bring certainty and rig-time
More information3/14/2015 Contacted and Solicited bids from construction vendors to build location. (San Jan, Orbit, Sweat, Storm).
Operator Torchlight Energy Page 1 3/12/2015 Mark McCoy, engineer with Mojo, met with University Lands representative, Drew McEachern and the land rancher, John Hunter to discuss access roads to Orogrande
More informationCasing while Drilling. Enhanced Casing Installation
Casing while Drilling Enhanced Casing Installation CWD Definition, History & Experience Casing while Drilling means utilizing the casing string as the drill string instead of drill pipe. 1907 Reuben Baker
More informationCasing while Drilling. Advanced Casing Deployment Drillable Casing Technology
Casing while Drilling Advanced Casing Deployment Drillable Casing Technology Why should operators use our Advanced Casing Deployment tools? Well designs that are at the technical limit based on torque
More informationAn Introduction to Oil & Gas Drilling and Well Operations
An Introduction to Oil & Gas Drilling and Well Operations Educational Material from the IOM 3 Oil and Gas Division The global network for the materials cycle Introduction The Institute of Materials, Minerals
More informationMarathon Drilling Indonesia
Marathon Drilling Indonesia Case History of Managed Pressure Drilling in Deepwater Marathon International Petroleum Indonesia Limited Introduction Marathon signed a PSC for Pasangkayu block in Makassar
More informationC o n t a c t U s f o r S p e c i a l C o r p o r a t e R a t e N o w!
ADVANCED FISHING C o n t a c t U s f o r S p e c i a l C o r p o r a t e R a t e N o w! ADVANCED FISHING Course Overview This course has been written for Advanced-level Operator Staff,, Drilling Contractor
More informationMSR/MSB Mechanical Setting Tool
Tech Unit No: 0620000004 Revision: C Approved By: Quality Engineer Date: 201-1-9 MSR/MSB Mechanical Setting Tool FEATURES: Special designed Bow Spring provides positive control and allows one size Mechanical
More informationMSR/MSB Mechanical Setting Tool
Tech Unit No: 0620000004 Revision: B Approved By: Quality Engineer Date: 2014-12-16 MSR/MSB Mechanical Setting Tool FEATURES: Special designed Bow Spring provides positive control and allows one size Mechanical
More informationUnderstanding Complex Well Restrictions. Access assurance for intervention operations
Understanding Complex Well Restrictions Know your well The risks associated with well accessibility are greatly reduced with the aid of advanced 3D modelling of multi-finger caliper data. 2 Contents Well
More informationChapter 02. Casing and Tubing
Chapter 02 Casing and Tubing Table of Contents Introduction 2-4 Topic Areas 2-4 Learning Objectives 2-4 Unit A: Casing and Tubing Uses 2-4 Unit A Quiz 2-5 Unit B: Typical Casing Strings 2-5 Conductor
More informationKS 14 PUNA Geothermal Venture: Flawless Execution of Aerated Mud Drilling with Mud Motor in Hostile Environment
KS 14 PUNA Geothermal Venture: Flawless Execution of Aerated Mud Drilling with Mud Motor in Hostile Environment Bill Rickard 1, Abraham Samuel 1, Chris Lee 2, Paul Spielman 3, Ivan Cuadros 4, Justin Long
More informationDesigning Subsea Wells for Abandonment & Suspension
Designing Subsea Wells for Abandonment & Suspension Graeme Rae Rig Build Project Engineer Chevron Upstream Europe Aberdeen Designing Subsea Wells for Abandonment & Suspension Subsea Well Design Aspects
More informationROTARY STEERABLE SYSTEMS TO REDUCE THE COST AND INCREASE THE ENERGY VALUE OF DRILLING DIRECTIONAL WELLS IN OLKARIA GEOTHERMAL FIELD
ROTARY STEERABLE SYSTEMS TO REDUCE THE COST AND INCREASE THE ENERGY VALUE OF DRILLING DIRECTIONAL WELLS IN OLKARIA GEOTHERMAL FIELD George Karimi Kenya Electricity Generating Company Limited Geothermal
More informationTZ400 Self - elevating Drilling Unit General Specification (Revision: B1)
TZ400 Self - elevating Drilling Unit General Specification (Revision: B1) Name : TZ 400ft Self-elevating Drilling Unit (TZ301-1) Flag/Port of registration : Panama Call sign : T.B.A Built : 2014 Official
More informationGTSC Rig for Hands-on Training
GTSC Rig for Hands-on Training The Rig To meet the high demand of Petroleum Industry, GTSC has launched the Middle East s first fully operational Training Rig & Well in May 2010 at its main building location
More informationCOILED TUBING DESIGN & OPERATIONS
Training Title COILED TUBING DESIGN & OPERATIONS Training Date & Duration Will be held at any 5 star hotel- 5 Days Coiled Tubing Design & Operations 5 days 15-19 December 2013 US $ 4,250 Abu Dhabi Training
More informationSpeaker at the Americas: Decommissioning and Well Abandonment. September 23, 2015
Speaker at the Americas: Decommissioning and Well Abandonment September 23, 2015 TETRA Offshore Services TETRA Offshore Services ISO 9001:2008 Certified 2 Decommissioning Case Study - Agenda A general
More informationTim Cox, Joe Gilbert, Arcadis U.S., Inc.
SELECTION AND IMPLEMENTATION OF A POST-CLOSURE MINE DEWATERING SYSTEM CHEVRON MINING INC, QUESTA MINE, NEW MEXICO Tim Cox, Joe Gilbert, Arcadis U.S., Inc. Mine Design, Operations, and Closure Conference
More information03/31/2012. Site Preparation. Classifying Oil & Gas Operations. Presented By: Sharon Engle NSIPA & IAAW Annual Seminar April 19, 2012 Las Vegas, NV
Classifying Oil & Gas Operations Presented By: Sharon Engle NSIPA & IAAW Annual Seminar April 19, 2012 Las Vegas, NV 1. Catline Boom and Hoist Line 2. Drilling Line 3. Monkeyboard 4. Traveling Block 5.
More informationA Wireless Compact Repeat Formation Pressure Tester Tool (MFT) Peter Williams Technology Champion
A Wireless Compact Repeat Formation Pressure Tester Tool (MFT) Peter Williams Technology Champion 2006 Weatherford. All rights reserved. Presentation Outline What Is Wireless Formation Testing? Wireless
More informationSubsea Intervention: Is It Worth It? Drummond Lawson
Subsea Intervention: Is It Worth It? Drummond Lawson 1 Subsea Intervention Is It Worth It? Subsea development timeline Why Intervene? What can you achieve? Intervention methods Intervention drivers What
More informationAADE-05-NTCE-56. New Impregnated Bit Achieves Outstanding Drill Outs Daniel Colléter Halliburton Security DBS Nuno da Silva Halliburton Security DBS
AADE-05-NTCE-56 New Impregnated Bit Achieves Outstanding Drill Outs Daniel Colléter Halliburton Security DBS Nuno da Silva Halliburton Security DBS This paper was prepared for presentation at the AADE
More informationCasing and Completion Technologies. Run casing strings & completions without string rotation without wiper trips without risk
Casing and Completion Technologies Run casing strings & completions without string rotation without wiper trips without risk Deep Casing Tools 2012 Completion Engineering Applications Objective: Land the
More informationECDM System. November, Security Classification: Restricted - Status: Draft
ECDM System November, 2014 Objective Enhance the ability to safely and efficiently drill deep-water wells High uncertainty in pore and fracture pressure gradients Narrow drilling margins Develop system
More informationRight Tool, Right Place, Right Time
NOV Downhole NOV Downhole Right Tool, Right Place, Right Time Snapshot of NOV Today NOV Is One Company, Made Up of 115 Brands NOV Downhole History 1997: Dreco Energy Services Drilling Jars and Shock Tools
More informationRiserless Subsea P&A. Deepwater Decommissioning Workshop 2016 W I L D W E L L C O N T R O L S U B S E A I N T E R V E N T I O N
Riserless Subsea P&A Deepwater Decommissioning Workshop 2016 W I L D W E L L C O N T R O L S U B S E A I N T E R V E N T I O N 7 Series S U B S E A I N T E R V E N T I O N 7 Series Nominal Bore Size 7.375
More informationModuels in PetroTrainer. PetroTrainer. How PetroTrainer is used
PetroTrainer E-Learning for the Petroleum industry PetroTrainer is probably the world s largest and most comprehensive tool made for training purposes in the petroleum industry. The ITC Boreskolen started
More informationMutineer-Exeter Development Drilling & Completions Challenges Darren Greer & Peter Dodd
Mutineer-Exeter Development Drilling & Completions Challenges Darren Greer & Peter Dodd (10 March 2005) 1 Outline 1. Project Overview 2. Wells Overview 3. Drilling Challenges Outcomes 4. Completions Challenges
More informationAADE 01-NC-HO-02. Copyright 2001 AADE National Drilling Technical Conference
AADE 01-NC-HO-02 Using Multi-Function Fishing Tool Strings to Improve Efficiency and Economics of Deepwater Plug and Abandonment Operations David B. Haughton and Walter S. Going, P.E., SPE, Baker Oil Tools
More informationOffshore Drilling Rigs
Offshore Drilling Rigs Drilling Offshore Drilling Rigs Many of the world s potential reserves of hydrocarbons lie beneath the sea, and the hydrocarbon industry has developed techniques suited to conditions
More informationAppendix F Lock-Down Sleeve Decision. Appendix F Lock-Down Sleeve Decision
Appendix F Lock-Down Sleeve Decision Appendix F Lock-Down Sleeve Decision After the production casing has been installed in the well and cemented in place, the operator may elect to run a lock-down sleeve.
More informationContents. iii. 3 Cable-Tool and Rotary Drilling 11 Cable-Tool Drilling 11 Rotary Drilling 14
Figures v Tables xii Preface xiii Units of Measurement xv Metric Conversion Factors xvi 1 Introduction 1 2 History 5 The Drake Well, 1850s 6 California, Late 1800s 8 The Lucas Well, 1901 8 3 Cable-Tool
More informationAppendix B Drilling Methods
Appendix B Drilling Methods B-1. Introduction A brief discussion of available drilling methods is included below. It is not the intent of this manual to include a detailed description of these methods.
More informationLadiz Niroo Company (Joint Stuck) Supplier of Drilling Equipment. Drilling Catalogue
Ladiz Niroo Company (Joint Stuck) Supplier of Drilling quipment Drilling Catalogue LNCO is involved in the field of supplying consumable equipment for Oil & Gas Drilling Industries. 1 :Oil and Gas Drilling
More informationMarginal Project Development
Marginal Project Development A case study of the MC-66 / OCHRE Project Richard Weser MC66 OCHRE Joint Venture Project OCHRE PROSPECT DEVELOPMENT Mississippi Canyon 66 1 Gas Subsea 7.9-Mile Tieback to Taylor
More informationInternational Well Control Forum IWCF. Well Control Training Syllabus. Drilling Level 2. 1 st January 2014 Version 3.0
International Well Control Forum IWCF Well Control Training Drilling Level 2 1 st January 2014 Version.0 Drilling Well Control Written Test Level 2 Surface & Subsea BOP Stack s and Structure Written Test
More informationGeoprober Drilling Moving from Ideas To Reality (Status August, 2005)
Geoprober Drilling Moving from Ideas To Reality (Status August, 2005) Reel A 4 OD Reel B 3-1/8 OD Anaconda CT Unit Drilling Rig 27 m derrick, 200 tonnes Heave comp 120 tonnes 4.8m Existing Equipment Refurbishment
More informationMicronized barite fluid helps Brazilian well walk narrow drilling window
Micronized barite fluid helps Brazilian well walk narrow drilling window Treated oil-based system also increases signal strength for MWD tools during offshore field trial in 8 ½-in. interval By Ramy Mahrous
More informationSubsea Pump System - Optimized for Rapid Deployment & Operation within the Primary Barrier. Brian Piccolo, Technology Development Mgr.
Subsea Pump System - Optimized for Rapid Deployment & Operation within the Primary Barrier Brian Piccolo, Technology Development Mgr. Agenda Pumped Riser System (PRS) Vision Initial Concept Operational
More informationUNIT 4: (iii) Illustrate the general kinematic system of drilling machine and explain its working principle
UNIT 4: Drilling machines: Classification, constructional features, drilling & related operations, types of drill & drill bit nomenclature, drill materials. Instructional Objectives At the end of this
More informationJune 24, 2010 RPSEA Project 1502 Thomas E. Williams int.com
June 24, 2010 RPSEA Project 1502 Thomas E. Williams www.nautilus int.com RPSEA 1502 Coiled Tubing from a Small Vessel June 2010 Update Presentation Topics Background Project Objectives System Configuration
More informationMeasurement While Drilling! An Overview!
Measurement While Drilling! 13 An Overview! Introduction to Well Engineering - 13 - Measurement While Drilling 1 Contents 1. Introduction 3 2. MWD Systems 4 2.1 Power Sources 7 3. MWD - Directional Tools
More informationWell Abandonment Services. Plug into a New Approach
Well Abandonment Services Plug into a New Approach Get it Right the First Time Permanent Solutions to Your Well Abandonment Challenge Thousands of wells await safe and permanent abandonment. It s critical
More informationAADE-05-NTCE-39. Slender Well Plan for Lower Cost and Improved Safety. Nader Sheshtawy and Adel Sheshtawy, TRI-MAX Industries
AADE-05-NTCE-39 Slender Well Plan for Lower Cost and Improved Safety Nader Sheshtawy and Adel Sheshtawy, TRI-MAX Industries This paper was prepared for presentation at the AADE 2005 National Technical
More informationCJENERGY.COM COMPANY OVERVIEW EXCELLENCE DELIVERED
C O M PA N Y OV E R V I E W COMPANY OVERVIEW C&J Energy Services is one of North America s largest providers of well construction, well completions, well support and other complementary oilfield services.
More informationIADC Dull Grading for PDC Drill Bits
IADC Dull Grading for PDC Drill Bits SPE/IADC 23939 First Revision to the IADC Fixed Cutter Dull Grading System ~ 1992 Version 2.4 How is Dull Grading Useful? Quick and simple way to describe the dull
More informationThe intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure.
1 The intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure. This document is not intended to override any specific local
More information"DRILLING-101: Everything a Geoscientist needs to know about Well Engineering but was afraid to ask"
London Petrophysical Society (a chapter of the SPWLA) One-day Seminar "DRILLING-101: Everything a Geoscientist needs to know about Well Engineering but was afraid to ask" 25th September 2014 The Geological
More informationSPE Ultra Short Radius Drilling Trials in PDO Abdullah Saif Al-Hady/PDO; David LaPrad/Torch International; Anwur Al Sadi/PDO
SPE 81410 Ultra Short Radius Drilling Trials in PDO Abdullah Saif Al-Hady/PDO; David LaPrad/Torch International; Anwur Al Sadi/PDO Copyright 2003, Society of Petroleum Engineers Inc. This paper was prepared
More informationGE Oil & Gas Drilling & Production. VetcoGray subsea wellhead systems. Advanced solutions for extreme conditions
GE Oil & Gas Drilling & Production VetcoGray subsea wellhead systems Advanced solutions for extreme conditions VetcoGray subsea wellhead systems As offshore drilling pushes past 10,000-foot water depths
More informationIdentifying Ways to Reduce Drilling Budgets in the Low Oil Price Environment
Identifying Ways to Reduce Drilling Budgets in the Low Oil Price Environment Lead Analyst: Colleen Kennedy Research Analyst +1 (857) 702-3922 Colleen.Kennedy@luxresearchinc.com Contributors: Brent Giles,
More informationDesign Process for Completions and Workovers Core COPYRIGHT. Design Process. This section will cover the following learning objectives:
Learning Objectives Design Process for Completions and Workovers Core Design Process This section will cover the following learning objectives: Explain the work product of a completions engineer Describe
More informationA marginal field (re-)development using several alternative methodologies 1
Bart Heijermans Helix ESG Chief Operating Officer Company The Phoenix Update Project A marginal field (re-)development using several alternative methodologies 1 Our Mission Helix Producer I Helix Energy
More informationVelocity String Installation & Performance Review VERMILION ENERGY S.W. TUMMERS
Velocity String Installation & Performance Review VERMILION ENERGY S.W. TUMMERS VOGN Overview Entered the Netherlands in 2004 by acquiring TOTAL s onshore assets; Acquisition included ~2 million Nm 3 /day
More informationCase Study: Value in Drilling Derived From Application-Specific Technology Diane Langley, JPT Features Editor
Case Study: Value in Drilling Derived From Application-Specific Technology Diane Langley, JPT Features Editor Technology is critical to drilling economics. Case studies from around the world now confirm
More informationThailand Experience. Kimberly McHugh Drilling and Completions Manager Mid Continent/Alaska. Updated: 28 April Chevron
Thailand Experience Kimberly McHugh Drilling and Completions Manager Mid Continent/Alaska Updated: 28 April 2011 1 We started operating in Thailand in the 1960 s and expanded to a sizable operation 2 Thailand:
More information3 WELL CONSTRUCTION. 3.1 Strategy
3 WELL CONSTRUCTION Since the discovery of the Deep Panuke gas reservoir in 1998, several delineation wells have been drilled. There are four delineation wells that have been suspended for potential future
More informationFundamentals Of Petroleum Engineering DRILLING OPERATIONS
Fundamentals Of Petroleum Engineering DRILLING OPERATIONS Mohd Fauzi Hamid Wan Rosli Wan Sulaiman Department of Petroleum Engineering Faculty of Petroleum & Renewable Engineering Universiti Technologi
More informationSection Nine Rig/Platform Environment. Oil & Gas Training. Oil & Gas Training. Oil & Gas Training. Rig/Platform Environment
Section Nine /Platform Environment /Platform Environment The rig site are broken into basic work areas. These are: Substructure /Platform Environment The rig site are broken into basic work areas. These
More informationDeep Water Definitions
DST in Deep Water Deep Water Definitions Depth of Water (Deepwater >1000ft (300m), Ultra- Deepwater > 5000ft (1500m)) Rig Type - Floaters (Drillships and Semi-Submersibles) Approach and Profile (risk,
More informationDeepwater under-reaming
Deepwater under-reaming Reaming with non conventional drilling assemblies has always been difficult and often problematic. In addition, high down hole and surface torques often accompany drilling operations,
More informationCONTINUOUS SAMPLING SYSTEMS
For over 0 years, Mobile s OVERSHOT WIRELINE CONTINUOUS SAMPLING SYSTEM has been recognized as the leading method for obtaining continuous samples while drilling in cohesive soils - fast, effective, hollow
More informationThe Effect of Technology and Digitalization on the Quality Management System among Omani Oil and Gas Drilling Company
The Effect of Technology and Digitalization on the Quality Management System among Omani Oil and Gas Drilling Company Ali Malik AL Harthy PhD Student at Binary, University, Malaysia. E-mail: Ali.M.Harthy@pdo.co.om
More informationWhen a drilling project is commenced, two goals must be achieved:
Technologies Drilling Technologies Oil well drilling is a complex operation and the drilling industry engages the services of personnel and a complicated array of machinery and materials to drill an oil/gas
More informationSchlumberger and Smith International, Inc. to Merge. March, 2010
Schlumberger and Smith International, Inc. to Merge March, 2010 Forward-Looking Statements This presentation includes forward-looking statements within the meaning of Section 27A of the Securities Act
More informationClaw Bits 7-1. Experience and field test reports have indicated that the MILCLAW bit runs smoother and more efficiently with a ribbed stabilizer.
Claw Bits Mills Machine Company first started manufacturing Claw Bits under an agreement with Kennametal, Inc. in 1978, who owned the original patent for the KENCLAW bit. We were able to improve the original
More informationDeepwater riserless (RLWI) enablers for increased oil recovery. Bringing shallow water experience to deepwater.
Deepwater riserless (RLWI) enablers for increased oil recovery. Bringing shallow water experience to deepwater. Well Intervention Services Deepwater RLWI success criteria RLWI history Technology Focus
More informationPROBABILISTIC ESTIMATES OF DEEPWATER OFFSHORE FIELD ABANDONMENT COST
PROBABILISTIC ESTIMATES OF DEEPWATER OFFSHORE FIELD ABANDONMENT COST Authors Robert C. Byrd, Ph.D., P.E. William H. Speck Disclaimer: Whilst every effort has been made to ensure the accuracy of the information
More informationGun drilled boreholes while drilling
GunDRILL Reamer Gun drilled boreholes while drilling MAKING IT SIMPLE Today s challenging drilling environment demands superior performance from the tools in the BHA especially for 3D, high angle and extended
More informationAUGER TOOLS. www. .com MINERAL EXPLORATION ENVIRONMENTAL GEOTECHNICAL GEOTHERMAL ROTARY SONIC HDD
AUGER TOOLS MINERAL EXPLORATION ENVIRONMENTAL GEOTECHNICAL GEOTHERMAL ROTARY SONIC HDD www..com AUGER TOOLS TABLE OF CONTENTS AUGER OVERVIEW... 3 HOLLOW STEM AUGERS... 4-12 2 1/4" Hollow Stem Augers...
More informationAdvanced Well Completion Design. 30 Sep - 04 Oct 2018, Dubai. REP logo, PMI & PMP are registered trademarks of Project Management Institute, Inc.
30 Sep - 04 Oct 2018, Dubai Approved Centre REP logo, PMI & PMP are registered trademarks of Project Management Institute, Inc. Introduction Organisational Impact This Glomacs Advanced Well training seminar
More informationUltra deep water and ultra deep drilling technologies for 21 st Century Mohole. Engineering Development Advisory Committee J-DESC, JAPAN
INVEST White Paper Ultra deep water and ultra deep drilling technologies for 21 st Century Mohole Engineering Development Advisory Committee J-DESC, JAPAN Corresponding Author: Yoshiyasu WATANABE, Tokai
More informationEXPERIENCES FROM A VIRTUAL SIMULATOR ENVIRONMENT. Stavanger, October 20 th 2011
EXPERIENCES FROM A VIRTUAL SIMULATOR ENVIRONMENT Stavanger, October 20 th 2011 Overview Objectives: Provide a drilling simulation environment which: Give a trustworthy responsive from the well to actions
More informationNEED HDD TOOLS, PARTS & ACCESSORIES?
NEED HDD TOOLS, PARTS & ACCESSORIES? Visit us on-line at straightlinehdd.com STRAIGHTLINE Produce Profitable Solutions In All Ground Conditions. THE RIGHT REAMER AVAILABLE FOR EVERY DRILL. StraightLine
More informationSiem WIS. Siem WIS AS. Closed Loop Drilling CLD. August Siem WIS AS.
AS Closed Loop Drilling CLD August 2010 2010 AS. Technology summary has secured intellectual property rights (IPR) for all key components of its portfolio: CircSub To drill with constant Mud Circulation
More informationAdvanced Well Completion Design
An Intensive 5 Day Training Course Advanced Well Completion Design 30 Sep - 04 Oct 2018, Dubai 19-OCT-17 This course is Designed, Developed, and will be Delivered under iso Quality standards Advanced Well
More informationExpro Perforation Services
Expro Perforation Services www.exprogroup.com Expro provide reservoir optimised perforation solutions. From modelling, through to design, operations and validation, Expro provide a full package of services
More informationEUOAG Workshop. Workshop on decommissioning of offshore installations Challenges, options and lessons learned PP&A
EUOAG Workshop Workshop on decommissioning of offshore installations Challenges, options and lessons learned PP&A Johnny Gundersen Principal Engineer, PSA Norway Content Requirements for PP&A in Norway
More informationThe Lease Pumper s Handbook. Chapter 4 Understanding the Oil Well. Section B DRILLING OPERATIONS
4B-1 The Lease Pumper s Handbook Chapter 4 Understanding the Oil Well Section B DRILLING OPERATIONS No two wells are alike, even if they are located near each other and are drilled into the same oil-bearing
More informationVIEWING OPTIONS: In Adobe PDF Viewer, from the main toolbar choose View, then Page Display, turn on Two-Up and Show Cover Page During Two-Up
VIEWING OPTIONS: To make our catalog easier to read we recommend using a two page display, as some sections have one page for the exploded view and one for the parts listing. Changing these settings will
More informationNAPESCO FISHING & RENTAL DIVISION. Workshop Facilities
NAPESCO FISHING & RENTAL DIVISION Workshop Facilities NAPESCO is a regional company providing specialized fishing tools, rental tools, wire line and pipe recovery services to International oil and gas
More informationAADE-13-FTCE-29. Abstract
AADE-13-FTCE-29 Innovative Instrumented Motor with Near-bit Gamma and Inclination Improves Geosteering in Thin-bedded Formations Asong Suh, Scientific Drilling International Copyright 2013, AADE This paper
More informationHM-47 - Mill Drill - Geared & Tilting Head with DRO (X) 540mm (Y) 185mm (Z) 410mm Includes Digital Readout, Dovetail Column & Stand
HM-47 - Mill Drill - Geared & Tilting Head with DRO (X) 540mm (Y) 185mm (Z) 410mm Includes Digital Readout, Dovetail Column & Stand Ex GST Inc GST $3,790.00 $3,280.00 $4,358.50 $3,772.00 Special Ends 30/06/2018
More informationSeeing through software
Seeing through software Gefei Liu and Cissy Zhao, Pegasus Vertex Inc., USA, explain how the use of advanced software can help engineers see underground by predicting subsurface conditions. Oil well drilling
More informationCOILED TUBING & E-COIL SERVICES COIL DRILLING TECHNOLOGIES
COILED TUBING & E-COIL SERVICES COIL DRILLING TECHNOLOGIES Applying engineering and ingenuity to create innovative solutions. As well telemetry moves beyond traditional well completions, Cudd Energy Services
More informationIDEAS E-Learning Course
IDEAS E-Learning Course Welcome to IDEAS E-Learning Courses There are many advantages to E-Learning! Key features among them are: You can study in your own time and at your own pace You can repeat sections
More informationPIPING NOMENCLATURE. Header Branch connection Valve Flange Expansion joint Expansion loop Pipe support Reducer Elbow
PIPING COMPONENTS Piping components are mechanical elements suitable for joining or assembly into pressure-tight fluid containing piping systems. Components include pipe, tubing, fittings, flanges, gaskets,
More informationMETAL-TO-METAL FASTENERS QUIKDRILL METAL2METAL METAL2METAL HD. Value through the Roof.
METAL-TO-METAL FASTENERS QUIKDRILL METAL2METAL METAL2METAL HD Value through the Roof. Reliable Self-Drilling Performance. Superior Marco Value. Value drives everything we do. That s why our exclusive Weather-Tite
More informationLICENCE P.691 RELINQUISHMENT REPORT
LICENCE P.691 RELINQUISHMENT REPORT 1. Licence Information Licence Number: P.691 Licence Round: 11, in 1989 Licence Type: Traditional Block Number: 44/17a DECC is free to publish the Report, and all 3rd
More informationTRAV-L-CUTTER Pipe Cutter
TRAV-L-CUTTER Pipe Cutter Horizontal and vertical c utting Fast and accurate cutting and beveling Add mounting chain sections to fit larger diameters COLD CUTTING, COMPACT DESIGN, EASY SET-UP The Wachs
More informationSUBSEA WELL CONTAINMENT. Global Basis. Deepwater & Emerging Technologies Group (DETG) AADE Houston Chapter 25 January 2012
SUBSEA WELL CONTAINMENT Global Basis Deepwater & Emerging Technologies Group (DETG) AADE Houston Chapter 25 January 2012 Bill Mahler Wild Well Control, Inc. Response Components - Plus Many More Components
More informationFundamentals of Drilling Course Outline. (1)Basics of Rotary Drilling Rotary Operations/Coring
Fundamentals of Drilling Course Outline (1)Basics of Rotary Drilling (2)Rotary (2) Operations/Coring Rotary Operations/Coring (3)Directional -Drilling Drilling (4)Fishing-Roundtrip (5)Casing/Cementing
More informationPRODUCT OVERVIEW NEXT-GENERATION (NXG) SOLUTIONS FOR THE OIL AND GAS INDUSTRY
PRODUCT OVERVIEW NEXT-GENERATION (NXG) SOLUTIONS FOR THE OIL AND GAS INDUSTRY A MULTI ACTIVATION CIRCULATION SUB OILSCO Technologies Multi Activation Circulation Sub - it is a breakthrough technology.
More informationP/N B ProBlue and DuraBlue Thermostat Service Kit - P/N
P/N 1029717B ProBlue and DuraBlue Thermostat Service Kit - P/N 1028321 This instruction sheet provides separate instructions for replacing a thermostat on ProBlue and a DuraBlue adhesive melters. Tools:
More informationTorque Specs - Main Caps 1-5 1/2" bolts 100 ft lbs W / CMD# /2" splayed 100 ft lbs Dart s inner head studs 3/8" 7/16" stepped 50 ft lbs
DART MARK IV Iron Big Block - Technical Notes Deck Height... 9.800" & 10.200" Bore... 4.250", 4.500", 4.560" and 4.600" unfinished Main Bearing Size... Standard BBC Main Caps... All 4 bolt - Steel or Ductile
More informationMasonry Tools Index. Impact Hammer Drills. Percussion Bits. Spline Bits, Impact Hammer. Percussion Core Drills. Masonry Drill & Sets
Index Impact Hammer Drills Type 606 Slot Drive System...... 112 Type 609 Extra Heavy-Duty...... 114 Masonry Drill & Sets Type 214 All-Purpose, HD........ 110 Type 215 Fast Spiral, HD........ 108 Type 216
More informationTOOLS FOR THE SPECIALIST UNDERWATER TOOLS
TOOLS FOR THE SPECIALIST UNDERWATER TOOLS PNEUMATIC TOOLS Performance data at an operating pressure of 6 bar (cont. flow). ANGLE GRINDER This handy angle grinder is particularly usable in tight spaces
More informationBP SWOPS Single Well Oil Production System. Sandy Meldrum CEng, MIMechE
Sandy Meldrum CEng, MIMechE Concept A means of producing oil from small offshore fields which would be uneconomic for fixed platforms or other conventional means. System Overview Comprised Production Vessel
More informationHolemaking Products & Accessories
Holemaking Products & Holemaking Products & Made of top-of-the-line materials for longer lasting performance, Klein's diverse line of drill bits and holemaking products and accessories provide accuracy
More information