1 LICENCE P.691 RELINQUISHMENT REPORT 1. Licence Information Licence Number: P.691 Licence Round: 11, in 1989 Licence Type: Traditional Block Number: 44/17a DECC is free to publish the Report, and all 3rd party ownership rights (on any contained data and/or interpretations) have been considered and appropriately cleared for publication purposes. 2. Licence Synopsis Hawksley was under Fallow Discovery status at the time of partial surrender of Licence P.691. The Licence was awarded to ConocoPhillips U.K. in 1989 with 65% equity and GdF Suez E&P with 35% equity. Below is a history of Licence updates and the corresponding work obligations. I. At the time the Licence was awarded: Carry out not less than 150km of seismic survey work; and Drill four exploration wells, provided that the Licensee will not be obligated to drill a fourth if the Licensee satisfies the Minister that the drilling of such a well is not justifiable. II. Deed of Variation dated 1996, which extended the initial term from six to eight years: Acquire a 3D seismic survey to complete the coverage of the whole block 44/17; Review seismic interpretation with DTI before expiry of 30 September 1996; and Drill one exploration well, provided that the Licensee will not be obligated to drill said well if the Licensee satisfies the Minister that drilling is not justifiable. III. Deed of Variation dated 1998, which extended the initial term from eight to nine years: Drill not less than two exploration wells. IV. In 1998, the Licence entered the second term. V. In 2007, the Licence entered the third term. VI. As of February 28, 2014, partial relinquishment of the area outlined in Figure 1 was complete. 3. Work Programme Summary Work obligations as they relate to the initial term were satisfied, and the Licence was in the third term at the time of surrender.

2 Wells: A wildcat well in the Hawksley area, 44/17a-3, commenced drilling 1 st May 1994 and reached its total depth of 12,840 MD (-12,718 TVDSS) in the Westphalian B on 21 st June Although this well discovered unexpected significant reservoir sands in the Westphalian C/D (WpC/D) and a potential secondary reservoir in the Lower Leman Sandstone, it was permanently abandoned as a dry hole without any well tests. The Hawksley Field was discovered in 1998 by the 44/17a-4 well. Drilling commenced on 19 th December 1997 and reached its total depth of 12,960 MD (-12,631 TVDSS) in the Westphalian B Murdoch Sandstone on 23 rd February 1998 and was temporarily suspended as a gas discovery. The 44/17a-4 well was later permanently abandoned by removing the wellhead on 26 th November 2001, which was confirmed by a DSV Aquamarine survey. The development well, 44/17a-6, was the only planned development well to access gas in the Hawksley accumulation. Drilling commenced on 9 th April 2002 but failed to reach planned TD. The BHA became stuck in the top Leine Halite at 10,792 MD and after pumping freshwater pills and jarring, a fish was left in the hole comprising the bit and motor. No attempt was made to fish the lost BHA, and subsequently, a cement plug was set above the fish and the 44/17a-6 well was sidetracked as 44/17a-6Z from 10,375 MD on 17 th May /17a-6Z also failed to reach planned TD following well control problems. Lost circulation occurred at 12,728 MD in the Silverpit Formation, and lowering the mud weight from 14.5 ppg to 12.7 ppg and spotting LCM pills halted static losses. However, severe dynamic losses continued and were such that a cement plug was required to be set below the 9 5/8 shoe, between 12,728-10,848 MD. Well 44/17a-6Z was inadvertently sidetracked as 44/17a-6Y from a depth of 10,780 MD on 6 th June The 44/17a-6Y well reached a total depth of 14,800 MD (-11,784 TVDSS). This well was completed on 30 th July 2002 as a directional wellbore. It began production in September 2002 at an initial rate of 165mmscf/d and declined steadily until being backed out by production from the Munro field in 2007 after 47.6BCf of production. Problems with a number of well valves led to failed efforts to reinstate the well, and it was subsequently plugged and sealed in The Hawksley Field was developed using subsea technology and is part of the CMSIII Northern Lobe system, which currently also includes the Murdoch K and McAdam subsea manifolds and the Munro satellite platform. It is tied back to the Murdoch complex by gas and methanol pipelines and an electro-hydraulic control umbilical to the subsea manifolds. Seismic: ConocoPhillips acquired the 2D survey C44/ in 1992 (Figure 2), followed by the 3D seismic survey CN953F0001 in 1995; the latter covers the western portion of the Hawksley field as part of the larger region outlined in Figure 3. These data were subsequently merged with the 3D survey AT933F0002 provided by Arco. The merged survey provides full coverage of the Hawksley field determination area and completes coverage of the whole of block 44/17 as per the terms of the 1996 Deed of Variation.

3 4. Database Figures 2 and 3 provide maps of the seismic and well database over the relinquishment area as summarized in Section Prospectivity Update Remaining prospectivity of the surrendered area is very limited. Figures 4 and 5 show the structural closure at the primary producing zone, the Lower Ketch. MBal modeling of the Lower Ketch 2 GIIP yields 51Bcf, which is in line with the mapped GIIP of around 60Bcf. Additional gas support is believed to be from the Lower Leman and Upper Ketch intervals, which together contain a mapped GIIP of 26Bcf but are expected to have a low recovery factor due to poor rock quality. Of the total approximate GIIP of 77Bcf, the field has produced 47Bcf, leaving 30Bcf. A similar recovery factor of ~60% from a follow-up development well would yield 18Bcf, as captured in Table 1. Production to date is from the fault block labelled Polygon A in Figure 4. A small Lower Ketch closure to the south remains untested and is captured as a potential lead in Table Resource Risk Summary Discovery Name Hawksley Hawksley, S Fault Block P L D D Resource and Risk Summary Unrisked Recoverable Stratigraphic Level Resources geological Risked P50 chance of Gas BCF Mmboe success % Low Central High Lower Ketch (with support from Lower Leman and Upper Ketch) L Lower Ketch Table 1. Resource and Risk Summary for relinquishment area. 7. Conclusions The remaining potential over the relinquishment area is not deemed sufficient to justify further development. 8. Clearance Clearance has been granted by all parties in the relinquished area.

4 9. Maps and Figures Figure 1. Relinquishment area map. Figure 2. Map of 2D seismic coverage over 44/17.

5 Figure 3. Map of 3D seismic and well database over relinquishment area. Figure 4. Lower Ketch 2 / BPU depth structure map (CI: 100ft, UTM 31 ED50).

6 Figure 5. Hawksley field depth map and cross sections.

7 Figure 6. Illustrative seismic sections.

RELINQUISHMENT REPORT. Centrica North Sea Gas Ltd. Trap Oil Ltd

RELINQUISHMENT REPORT. Centrica North Sea Gas Ltd. Trap Oil Ltd RELINQUISHMENT REPORT SEAWARD PRODUCTION LICENCE P1547 Block 110/3b Centrica North Sea Gas Ltd (Operator - 70% owner) Trap Oil Ltd (30% owner) 1. Introduction and Synopsis Licence P1547 comprising Block

More information

New Field Development Challenges in a Late Life Setting - Cladhan

New Field Development Challenges in a Late Life Setting - Cladhan New Field Development Challenges in a Late Life Setting - Cladhan Billy MacRae - Senior Geologist Acknowledgements: Sterling Resources, MOL 24th May 2017 1 Outline Introduction Cladhan field Appraisal

More information

CELTIC SEA BASINS ASSET PORTFOLIO UPDATE

CELTIC SEA BASINS ASSET PORTFOLIO UPDATE CELTIC SEA BASINS ASSET PORTFOLIO UPDATE BARRYROE OIL FIELD o FARM-OUT UPDATE o UPPER GAS BEARING C-SANDS EVALUATION o REVISED DRILLING COSTS HELVICK/DUNMORE OIL DISCOVERIES o AWARD OF LEASE UNDERTAKING

More information

Comprehensive Plug and Abandonment Systems

Comprehensive Plug and Abandonment Systems Comprehensive Plug and Abandonment Systems Abandon Your Well. Abandon Uncertainty. Complete, single-trip systems for P&A Schlumberger comprehensive plug and abandonment systems bring certainty and rig-time

More information

3/14/2015 Contacted and Solicited bids from construction vendors to build location. (San Jan, Orbit, Sweat, Storm).

3/14/2015 Contacted and Solicited bids from construction vendors to build location. (San Jan, Orbit, Sweat, Storm). Operator Torchlight Energy Page 1 3/12/2015 Mark McCoy, engineer with Mojo, met with University Lands representative, Drew McEachern and the land rancher, John Hunter to discuss access roads to Orogrande

More information

UK EXPLORATION WHERE NEXT? OIL & GAS UK BREAKFAST 8 DECEMBER 2015

UK EXPLORATION WHERE NEXT? OIL & GAS UK BREAKFAST 8 DECEMBER 2015 UK EXPLORATION WHERE NEXT? OIL & GAS UK BREAKFAST 8 DECEMBER 2015 Introduction Phil Kirk MD Chrysaor Co-Chair & Industry Lead MER UK Exploration Board Board member Oil & Gas UK Active member OGIA What

More information

Gannet A Story of Recovery

Gannet A Story of Recovery Gannet A Story of Recovery DEVEX Tuesday 9 th May, Aberdeen AECC Cliff Lovelock Senior Production Geologist, Gannet G: First pull head on pipe lay vessel, March 2017 Hydrocarbon Production boe/cd Gannet

More information

An Introduction to Oil & Gas Drilling and Well Operations

An Introduction to Oil & Gas Drilling and Well Operations An Introduction to Oil & Gas Drilling and Well Operations Educational Material from the IOM 3 Oil and Gas Division The global network for the materials cycle Introduction The Institute of Materials, Minerals

More information

Macquarie Oil & Gas Explorers Conference. 9 January 2012

Macquarie Oil & Gas Explorers Conference. 9 January 2012 Macquarie Oil & Gas Explorers Conference 9 January 2012 Disclaimer Important Notice Nothing in this presentation or in any accompanying management discussion of this presentation (the "Presentation") constitutes,

More information

Further information about the Duhat Prospect is set out in the Appendix attached to this announcement. --Ends--

Further information about the Duhat Prospect is set out in the Appendix attached to this announcement. --Ends-- 1 July 2013 Manager of Company Announcements ASX Limited Level 6, 20 Bridge Street SYDNEY NSW 2000 By E-Lodgement DRILLING TO COMMENCE BY LATE JULY AT THE DUHAT OIL PROSPECT IN SC51 Highlights: Rig mobilisation

More information

PROSPEX. UKCS Exploration & Appraisal Status. Gunther Newcombe Director Operations. December 2016

PROSPEX. UKCS Exploration & Appraisal Status. Gunther Newcombe Director Operations. December 2016 PROSPEX UKCS Exploration & Appraisal Status Gunther Newcombe Director Operations December 2016 OGA OGA became a GOVCO on 1 st October 2016 with additional powers and sanctions Progressive Regulation Role

More information

Gannet A Story of Recovery

Gannet A Story of Recovery Gannet A Story of Recovery SPE Evening Lecture Wednesday 20 th September, Aberdeen Douglas Hotel Cliff Lovelock Senior Production Geologist, Gannet G: First pull head on pipe lay vessel, March 2017 Gannet

More information

A Step Change in Activity

A Step Change in Activity IGAS ENERGY PLC ( IGas ) Final Results 2010 and Operational Update A Step Change in Activity Disclaimer Certain statements included in this presentation contain forward-looking information concerning IGas's

More information

ANADARKO PETROLEUM CORPORATION

ANADARKO PETROLEUM CORPORATION ANADARKO PETROLEUM CORPORATION May 25, 2016 Agenda P&A Program Summary NPT (Non-Productive Time) Analysis Lessons Learned Analysis Conclusions 2 P&A Program Summary Idle Iron Initiative 27 Deepwater GoM

More information

Oil and Gas Exploration Economic Model Manual. Version Introduction

Oil and Gas Exploration Economic Model Manual. Version Introduction Oil and Gas Exploration Economic Model Manual Version 2.00 Introduction This model is designed to provide screening economics for the evaluation of oil and gas exploration prospects and discoveries on

More information

Relinquishment Report P.1120, P.1320 Ockley

Relinquishment Report P.1120, P.1320 Ockley Relinquishment Report P.1120, P.1320 Ockley April 2017 Contents 1. Licence Information... 3 2. Licence Synopsis... 4 3. Work Programme Summary... 5 4. Database... 7 5. Further Technical Work Undertaken...

More information

Moduels in PetroTrainer. PetroTrainer. How PetroTrainer is used

Moduels in PetroTrainer. PetroTrainer. How PetroTrainer is used PetroTrainer E-Learning for the Petroleum industry PetroTrainer is probably the world s largest and most comprehensive tool made for training purposes in the petroleum industry. The ITC Boreskolen started

More information

Quad 204 Schiehallion Field Restarting a brownfield subsea development

Quad 204 Schiehallion Field Restarting a brownfield subsea development Quad 204 Deepsea Aberdeen: New 6 th Gen semi dual derrick Quad 204 New FPSO, Glen Lyon: biggest in N hemi-sphere Quad 204 Schiehallion Field Restarting a brownfield subsea development Thomas Harpley, Reservoir

More information

Phoenix South-3 drilling update 29 June 2018

Phoenix South-3 drilling update 29 June 2018 Phoenix South-3 drilling update 29 June 2018 Carnarvon Petroleum Limited ( Carnarvon ) (ASX:CVN) is pleased to provide the following update on the drilling of the Phoenix South-3 ( PS-3 ). Progress The

More information

For personal use only

For personal use only 16 September 2013 ASX Announcement MERLINLEIGH DRILLING AND PROJECT UPDATE (ASX: NSE) Highlights New Standard on track to spud Condon-1 at Merlinleigh Project in late 2013 On site civil works are well

More information

Analysis of Non-Productive Time in Geothermal Drilling Operations-A Case Study of Olkaria, Kenya

Analysis of Non-Productive Time in Geothermal Drilling Operations-A Case Study of Olkaria, Kenya PROCEEDINGS, 42nd Workshop on Geothermal Reservoir Engineering Stanford University, Stanford, California, February 13-15, 2017 SGP-TR-212 Analysis of Non-Productive Time in Geothermal Drilling Operations-A

More information

AVOID THE IRRESISTIBLE Daniel Baltar London February, 2015

AVOID THE IRRESISTIBLE Daniel Baltar London February, 2015 AVOID THE IRRESISTIBLE Daniel Baltar London February, 2015 Outline Challenges to exploration performance and value creation Impact of CSEM in exploration uncertainty Performance of CSEM in prospect evaluation

More information

QUARTERLY ACTIVITY REPORT

QUARTERLY ACTIVITY REPORT FOR THE QUARTER ENDING 30 JUNE 2014 Titan Energy Ltd (ASX: TTE) ( Titan or the Company ) is pleased to provide the following report on its operations during the three-month period ending 30 June 2014.

More information

Experience, Role, and Limitations of Relief Wells

Experience, Role, and Limitations of Relief Wells Experience, Role, and Limitations of Relief Wells Introduction This white paper has been developed and issued on behalf of the Joint Industry Task Force on Subsea Well Control and Containment. This group

More information

Block 9 Prospectivity Assessment Identifies Multiple High Impact Exploration Drilling Opportunities

Block 9 Prospectivity Assessment Identifies Multiple High Impact Exploration Drilling Opportunities ASX & Media Release Cuba Update Highlights: Prospectivity assessment confirms Block 9 as one of the world s most exciting onshore exploration opportunities Exploration potential of Block 9 recently upgraded

More information

Case Study: Value in Drilling Derived From Application-Specific Technology Diane Langley, JPT Features Editor

Case Study: Value in Drilling Derived From Application-Specific Technology Diane Langley, JPT Features Editor Case Study: Value in Drilling Derived From Application-Specific Technology Diane Langley, JPT Features Editor Technology is critical to drilling economics. Case studies from around the world now confirm

More information

GWF-1 Development DrillWell

GWF-1 Development DrillWell GWF-1 Development DrillWell Gary Nettleship Completion Engineer 4 th September 2014 DRIMS#9711174 Disclaimer and important notice This presentation contains forward looking statements that are subject

More information

Suspended Subsea Well Monitoring CaTS TM Wireless Technology. Donald Horsfall RPLM (ECIS)

Suspended Subsea Well Monitoring CaTS TM Wireless Technology. Donald Horsfall RPLM (ECIS) Suspended Subsea Well Monitoring CaTS TM Wireless Technology Donald Horsfall RPLM (ECIS) Tuesday 27 th June 2017 Agenda Introduction to CaTS Technology CaTS - Cable-less Telemetry System Industry guidelines

More information

Faroe Petroleum plc ( Faroe, the Company ) Asset swap transaction Maria discovery swapped for Norwegian production assets

Faroe Petroleum plc ( Faroe, the Company ) Asset swap transaction Maria discovery swapped for Norwegian production assets 11 April 2010 Faroe Petroleum plc ( Faroe, the Company ) Asset swap transaction Maria discovery swapped for Norwegian production assets Faroe Petroleum, the independent oil and gas company focusing principally

More information

SOUTHWESTERN ENERGY PROVIDES THIRD QUARTER 2003 OPERATIONAL UPDATE

SOUTHWESTERN ENERGY PROVIDES THIRD QUARTER 2003 OPERATIONAL UPDATE 2350 N. Sam Houston Parkway East Suite 300 Houston, Texas 77032 (281) 618-4700 Fax: (281) 618-4820 NEWS RELEASE SOUTHWESTERN ENERGY PROVIDES THIRD QUARTER 2003 OPERATIONAL UPDATE East Texas Drilling Program

More information

E&P in the Netherlands; challenges and opportunities

E&P in the Netherlands; challenges and opportunities E&P in the Netherlands; challenges and opportunities facts, figures and futures. Harmen Mijnlieff / Berend Scheffers This presentation Dutch oil and gas fields Hydrocarbon Reserves Tax relief for E&P projects

More information

For personal use only

For personal use only ABN 96 009 217 154 15 October 2014 ASX Limited Electronic lodgement ASX Code: XST XSTATE BROKER PRESENTATION Please find attached copy of a broker presentation by Xstate Resources Limited. On behalf of

More information

NTL No N06 Information Requirements for EPs, DPPs and DOCDs on the OCS Effective June 18, 2010

NTL No N06 Information Requirements for EPs, DPPs and DOCDs on the OCS Effective June 18, 2010 NTL No. 2010-N06 Information Requirements for EPs, DPPs and DOCDs on the OCS Effective June 18, 2010 Frequently Asked Questions (FAQ s) Updated July 15, 2010 Updated July 21, 2010 1. Q. What OCS areas

More information

: Unlocking material value in the UK North Sea through development

: Unlocking material value in the UK North Sea through development : Unlocking material value in the UK North Sea through development : CORPORATE UPDATE Q4 2018 i3 ENERGY (LON:i3E) Forward looking statements This presentation contains forward-looking statements and information

More information

ASX ANNOUNCEMENT (ASX: BRU) 4 May 2011

ASX ANNOUNCEMENT (ASX: BRU) 4 May 2011 Buru Energy Limited ABN 71 130 651 437 Level 2, 97 William Street Perth WA 6000 PO Box 7794, Perth Cloisters Square WA 6850 Ph: 61-8 9215 1800 Fax: 61-8 9215 1899 www.buruenergy.com ASX ANNOUNCEMENT (ASX:

More information

Subsea Field Development

Subsea Field Development Subsea Field Development Presented by Oseghale Lucas Okohue BEngr. Msc. CIPMP Course Instructor Name: Oseghale Lucas Okohue Position: Subsea Engineer Consultant Production Systems Drilling Systems Website:

More information

Buffalo field moving closer to production 3 May 2018

Buffalo field moving closer to production 3 May 2018 Buffalo field moving closer to production 3 May 2018 Highlights Preparations underway to drill the Buffalo-10 production well Buffalo-10 will be positioned to confirm attic oil and will be completed as

More information

For personal use only

For personal use only Phoenix South-3 drilling update 24 July 2018 Carnarvon Petroleum Limited ( Carnarvon ) (ASX:CVN) is pleased to provide the following update on the drilling of the Phoenix South-3 ( PS-3 ). Progress The

More information

Analyst / Investor Presentation. Interim Results 28 th March 2011

Analyst / Investor Presentation. Interim Results 28 th March 2011 Analyst / Investor Presentation Interim Results 28 th March 2011 Disclaimer Important Notice Nothing in this presentation or in any accompanying management discussion of this presentation (the "Presentation")

More information

Subsea Intervention: Is It Worth It? Drummond Lawson

Subsea Intervention: Is It Worth It? Drummond Lawson Subsea Intervention: Is It Worth It? Drummond Lawson 1 Subsea Intervention Is It Worth It? Subsea development timeline Why Intervene? What can you achieve? Intervention methods Intervention drivers What

More information

NCS Prospects Conference

NCS Prospects Conference NCS Prospects Conference OGA Strategy & Plans Gunther Newcombe Director Operations November 2016 OGA OGA became a GOVCO on 1 st October 2016 Progressive regulation Role of the OGA OGA Approach MER UK Strategy

More information

Kinsale Area Gas Fields Decommissioning Project Information Leaflet

Kinsale Area Gas Fields Decommissioning Project Information Leaflet Kinsale Area s Decommissioning Project Information Leaflet About Kinsale Energy PSE Kinsale Energy Limited has been operating a number of gas fields in the Celtic Sea, off the County Cork coast, since

More information

MEO Australia Limited ABN ASX & Media Release

MEO Australia Limited ABN ASX & Media Release MEO Australia Limited ABN 43 066 447 952 Level 23 Tel: +61 3 8625 6000 500 Collins Street Fax: +61 3 9614 0660 Melbourne Victoria 3000 Email: admin@meoaustralia.com.au Australia Website: www.meoaustralia.com.au

More information

This presentation (the "Presentation") contains forward-looking information relating to, among other things, (a) the future financial performance and

This presentation (the Presentation) contains forward-looking information relating to, among other things, (a) the future financial performance and This presentation (the "Presentation") contains forward-looking information relating to, among other things, (a) the future financial performance and objectives of Canadian Foresight Group Ltd. (the CFG

More information

Casing and Completion Technologies. Run casing strings & completions without string rotation without wiper trips without risk

Casing and Completion Technologies. Run casing strings & completions without string rotation without wiper trips without risk Casing and Completion Technologies Run casing strings & completions without string rotation without wiper trips without risk Deep Casing Tools 2012 Completion Engineering Applications Objective: Land the

More information

The intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure.

The intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure. 1 The intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure. This document is not intended to override any specific local

More information

THE OFFSHORE PETROLEUM PRODUCTION AND PIPE-LINES (ASSESSMENT OF ENVIRONMENTAL EFFECTS) REGULATIONS 1999 (AS AMENDED) PETROLEUM OPERATIONS NOTICE No.

THE OFFSHORE PETROLEUM PRODUCTION AND PIPE-LINES (ASSESSMENT OF ENVIRONMENTAL EFFECTS) REGULATIONS 1999 (AS AMENDED) PETROLEUM OPERATIONS NOTICE No. THE OFFSHORE PETROLEUM PRODUCTION AND PIPE-LINES (ASSESSMENT OF ENVIRONMENTAL EFFECTS) REGULATIONS 1999 (AS AMENDED) PETROLEUM OPERATIONS NOTICE No.16 APPLICATION FOR CONSENT OF A PROJECT UNDER THE PETROLEUM

More information

Report. Temporary abandoned wells on NCS. Subtitle. Author(s) Nils Totland. SINTEF Petroleum Research Well Integrity

Report. Temporary abandoned wells on NCS. Subtitle. Author(s) Nils Totland. SINTEF Petroleum Research Well Integrity - Unrestricted Report Temporary abandoned wells on NCS Subtitle Author(s) Nils Totland SINTEF Petroleum Research Well Integrity 2011-08-24 SINTEF Petroleumsforskning AS SINTEF Petroleum Research Address:

More information

2009 Interim Results Presentation 23 rd March 2009

2009 Interim Results Presentation 23 rd March 2009 2009 Interim Results Presentation 23 rd March 2009 2 Disclaimer Important Notice Nothing in this presentation or in any accompanying management discussion of this presentation (the "Presentation") constitutes,

More information

12Future developments

12Future developments eng_fakta_2005_kap11_15 12-04-05 15:34 Side 148 12Future developments Subsea template eng_fakta_2005_kap11_15 12-04-05 15:34 Side 149 Discoveries in the planning phase Excludes discoveries included under

More information

Persistence, partnership and the prize

Persistence, partnership and the prize Persistence, partnership and the prize The world s largest oil discovery for 2014 MSGBC Basin summit and exhibition Dakar, Senegal 23-24 November 2016 About FAR Africa focussed oil company Fifth largest

More information

OTTO TO DRILL 400 MILLION BARREL NANUSHUK OIL PROSPECT ON ALASKA NORTH SLOPE IN EARLY 2019

OTTO TO DRILL 400 MILLION BARREL NANUSHUK OIL PROSPECT ON ALASKA NORTH SLOPE IN EARLY 2019 ASX ANNOUNCEMENT 25 June 2018 OTTO TO DRILL 400 MILLION BARREL NANUSHUK OIL PROSPECT ON ALASKA NORTH SLOPE IN EARLY 2019 Otto s technical team has generated a 400 MMbbl gross best estimate prospective

More information

FASTER. SIMPLER. BETTER. P&A AND SLOT RECOVERY; REDEFINED.

FASTER. SIMPLER. BETTER. P&A AND SLOT RECOVERY; REDEFINED. Ardyne develops and supplies specialised technology services to the global energy industry, focusing on dramatically reducing rig time spent on downhole casing removal in slot recovery and plug and abandonment

More information

Canadian Discovery Ltd.

Canadian Discovery Ltd. Canadian Discovery Ltd. Advisors to the Resource Sector... Leading with Ideas! Innovative, client-driven E&P solutions since 1987. Over 300 clients worldwide, from juniors to super-majors 70+ interdisciplinary

More information

Wintershall Production Optimisation Initiative Value Creation through Innovation. Michael Damm Wintershall Noordzee BV

Wintershall Production Optimisation Initiative Value Creation through Innovation. Michael Damm Wintershall Noordzee BV Wintershall Production Optimisation Initiative Value Creation through Innovation Michael Damm Wintershall Noordzee BV Wintershall Noordzee B.V. (WINZ) Subsidiary of Wintershall Holding Operator in NL,

More information

Annex- II MARGINAL/ STRANDED GAS FIELDS- GAS PRICING CRITERIA AND GUIDELINES, 2013 GOVERNMENT OF PAKISTAN MINISTRY OF PETROLEUM & NATURAL RESOURCES

Annex- II MARGINAL/ STRANDED GAS FIELDS- GAS PRICING CRITERIA AND GUIDELINES, 2013 GOVERNMENT OF PAKISTAN MINISTRY OF PETROLEUM & NATURAL RESOURCES Annex- II MARGINAL/ STRANDED GAS FIELDS- GAS PRICING CRITERIA AND GUIDELINES, 2013 GOVERNMENT OF PAKISTAN MINISTRY OF PETROLEUM & NATURAL RESOURCES JANUARY, 2013 A. Introduction Pakistan is facing big

More information

From late-life reservoir management through to final permanent abandonment, we create bespoke solutions to meet your specific well requirements.

From late-life reservoir management through to final permanent abandonment, we create bespoke solutions to meet your specific well requirements. From late-life reservoir management through to final permanent abandonment, we create bespoke solutions to meet your specific well requirements. LATE-LIFE RESERVOIR MANAGEMENT All oil and gas fields will

More information

Dorado-1 drilling commenced 5 June 2018

Dorado-1 drilling commenced 5 June 2018 Dorado-1 drilling commenced 5 June 2018 Highlights Drilling of the Dorado-1 well has now commenced Currently preparing to drill the 17-1/2 section of the hole Significant 125 million barrels of oil equivalent

More information

ATP Oil & Gas Corporation

ATP Oil & Gas Corporation ATP Oil & Gas Corporation Deloitte Dutch North Sea Oil & Gas Conference 22 June 2005 G. Ross Frazer, P.E. Vice President-Engineering & Director, U.K. Projects Ing. Rob Happé General Manager, ATP NL Forward

More information

Annual General Meeting 11 September 2017

Annual General Meeting 11 September 2017 Sacramento Basin Project California Block 29/11 China Annual General Meeting 11 September 2017 Duyung PSC Indonesia Forward-looking statements This presentation may contain forward-looking statements and

More information

Draft Myanmar Environmental Impact Assessment (EIA) Procedures: Comments 1 on aspects relevant to Offshore Oil and Gas Exploration and Production

Draft Myanmar Environmental Impact Assessment (EIA) Procedures: Comments 1 on aspects relevant to Offshore Oil and Gas Exploration and Production Draft Myanmar Environmental Impact Assessment (EIA) Procedures: Comments 1 on aspects relevant to Offshore Oil and Gas Exploration and Production Appropriate EIA phasing for Petroleum E&P Activities According

More information

Phoenix South-3 drilling commenced 17 April 2018

Phoenix South-3 drilling commenced 17 April 2018 Phoenix South-3 drilling commenced 17 April 2018 Highlights Drilling of the Phoenix South-3 well has now commenced Currently preparing to run 36 surface conductor Significant resource being targeted of

More information

For personal use only

For personal use only ASX Release 30 April 2012 Activities Report Period Ending 31 March 2012 Highlights Operational Chorbane Permit, onshore Tunisia - Sidi Dhaher-1 discovery A rig contract with Dietswell SA, for the provision

More information

Preliminary Results 2010 Presentation. oil & gas. 9 November Version 3.4

Preliminary Results 2010 Presentation. oil & gas. 9 November Version 3.4 oil & gas Preliminary Results 2010 Presentation 9 November 2010 Version 3.4 Disclaimer Important Notice Nothing in this presentation or in any accompanying management discussion of this presentation (the

More information

We ll Get You There. Petroxin Petroleum Solutions 2016

We ll Get You There.   Petroxin Petroleum Solutions 2016 We ll Get You There. www.petroxin.org Petroxin Petroleum Solutions 2016 Unlocking the previously thought unreachable resources is Petroxin s priority. We focus on creative exploration and production techniques

More information

Cluff Natural Resources Plc / Index: AIM / Epic: CLNR / Sector: Natural Resources

Cluff Natural Resources Plc / Index: AIM / Epic: CLNR / Sector: Natural Resources 30 August 2018 Cluff Natural Resources Plc / Index: AIM / Epic: CLNR / Sector: Natural Resources Cluff Natural Resources Plc ('CLNR' or 'the Company') Formal Award of Six Licences in the UK's 30 th Offshore

More information

INNOVATIVE CASING DRILLING TECHNOLOGY IMPROVED THE ABILITY TO SET THE CASING DEEPER THROUGH PROBLEMATIC ZONE IN INDONESIA GEOTHERMAL OPERATION

INNOVATIVE CASING DRILLING TECHNOLOGY IMPROVED THE ABILITY TO SET THE CASING DEEPER THROUGH PROBLEMATIC ZONE IN INDONESIA GEOTHERMAL OPERATION INNOVATIVE CASING DRILLING TECHNOLOGY IMPROVED THE ABILITY TO SET THE CASING DEEPER THROUGH PROBLEMATIC ZONE IN INDONESIA GEOTHERMAL OPERATION Schlumberger Bonar, Drilling Product Engineer Hanafi M. Falhum,

More information

Status på Dvalin-prosjektet. Roy Padget, Topside Host Manager

Status på Dvalin-prosjektet. Roy Padget, Topside Host Manager Status på Dvalin-prosjektet Roy Padget, Topside Host Manager Kristiansund, 31. mai 2018 A brief history of DEA in Norway 1973 1979 1980ies 1990 1991 1991 2010 2015 2016 2017 2018 Company established as

More information

Casing while Drilling. Enhanced Casing Installation

Casing while Drilling. Enhanced Casing Installation Casing while Drilling Enhanced Casing Installation CWD Definition, History & Experience Casing while Drilling means utilizing the casing string as the drill string instead of drill pipe. 1907 Reuben Baker

More information

3D Oil Limited Accelerated Growth Strategy

3D Oil Limited Accelerated Growth Strategy 3D Oil Limited Level 5, 164 Flinders Lane Melbourne VIC 3000 Tel: +61 3 9650 9866 Fax: +61 3 9639 1960 www.3doil.com.au ASX Release 3 September 2009 3D Oil Limited Accelerated Growth Strategy 3D Oil Limited

More information

oil & gas Deutsche Bank Conference - 23 September September 2010 Deutsche Bank 10 th Oil & Gas Conference

oil & gas Deutsche Bank Conference - 23 September September 2010 Deutsche Bank 10 th Oil & Gas Conference oil & gas 23 September 2010 Deutsche Bank 10 th Oil & Gas Conference Disclaimer Important Notice Nothing in this presentation or in any accompanying management discussion of this presentation (the "Presentation")

More information

Quarterly Activities Report 31 January 2013

Quarterly Activities Report 31 January 2013 New Hope Corporation Limited ABN 38 010 653 844 Contact Phone: +61 7 3418 0500 Fax: +61 7 3418 0355 Quarterly Activities Report 31 January 2013 Jan 13 ( 000t) Quarter Ended Jan 12 ( 000t) Change (%) Jan

More information

Geosteering Workflow Considerations of How and Why?

Geosteering Workflow Considerations of How and Why? Geosteering Workflow Considerations of How and Why? Alan D. Cull and Anand Gupta, P.Geol. Halliburton Sperry Canada Summary This extended abstract addresses key elements of a successful geosteering workflow.

More information

Dussafu Gabon Update January, 2018

Dussafu Gabon Update January, 2018 Dussafu Gabon Update January, 2018 OSE Ticker PEN www.panoroenergy.com Dussafu Gabon Update DISCLAIMER This presentation does not constitute an offer to buy or sell shares or other financial instruments

More information

Cluff Natural Resources Plc / Index: AIM / Epic: CLNR / Sector: Natural Resources. Cluff Natural Resources Plc ('CLNR' or 'the Company')

Cluff Natural Resources Plc / Index: AIM / Epic: CLNR / Sector: Natural Resources. Cluff Natural Resources Plc ('CLNR' or 'the Company') The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 ("MAR"). With the publication

More information

ROTARY STEERABLE SYSTEMS TO REDUCE THE COST AND INCREASE THE ENERGY VALUE OF DRILLING DIRECTIONAL WELLS IN OLKARIA GEOTHERMAL FIELD

ROTARY STEERABLE SYSTEMS TO REDUCE THE COST AND INCREASE THE ENERGY VALUE OF DRILLING DIRECTIONAL WELLS IN OLKARIA GEOTHERMAL FIELD ROTARY STEERABLE SYSTEMS TO REDUCE THE COST AND INCREASE THE ENERGY VALUE OF DRILLING DIRECTIONAL WELLS IN OLKARIA GEOTHERMAL FIELD George Karimi Kenya Electricity Generating Company Limited Geothermal

More information

Marginal Project Development

Marginal Project Development Marginal Project Development A case study of the MC-66 / OCHRE Project Richard Weser MC66 OCHRE Joint Venture Project OCHRE PROSPECT DEVELOPMENT Mississippi Canyon 66 1 Gas Subsea 7.9-Mile Tieback to Taylor

More information

ASX Release. 20 April Dear Shareholder, ADX Dougga Presentation to ETAP and Ministry in Tunisia

ASX Release. 20 April Dear Shareholder, ADX Dougga Presentation to ETAP and Ministry in Tunisia ASX Release 20 April 2018 Dear Shareholder, ADX Dougga Presentation to ETAP and Ministry in Tunisia ADX Energy Ltd (ASX: ADX) are pleased to advise that the Tunisian national oil company ETAP has requested

More information

For personal use only

For personal use only Unit 14, Level 2, 210 Bagot Road, Subiaco, WA 6008 Australia Tel: (08) 9388 2654 E: info@sacgasco.com ABN 83 114 061 433 15 August 2016 SACRAMENTO BASIN FARMOUT CONFIRMS AMI VALUE Farmout of up to 14%

More information

ASX Release NILDE AREA PERMIT FARMOUT OFFSHORE ITALY. Highlights

ASX Release NILDE AREA PERMIT FARMOUT OFFSHORE ITALY. Highlights ASX Release 31 October 2018 NILDE AREA PERMIT FARMOUT OFFSHORE ITALY (The d 363 C.R-.AX Permit containing the Nilde Oil Redevelopment Project) Highlights Drilling and Seismic Work Program Fully Funded

More information

Introducing the UNFC Why classify our resources? David MacDonald, Vice President Segment Reserves 27 September, Mexico City

Introducing the UNFC Why classify our resources? David MacDonald, Vice President Segment Reserves 27 September, Mexico City Introducing the UNFC Why classify our resources? David MacDonald, Vice President Segment Reserves 27 September, Mexico City Outline History of resource classifications Fundamental purpose of resource classification

More information

For personal use only

For personal use only Phoenix South-3 drilling update 31 May 2018 Carnarvon Petroleum Limited ( Carnarvon ) (ASX:CVN) is pleased to provide the following update on the drilling of the Phoenix South-3 well as advised by the

More information

Syllabus CH EN 6181 Drilling and Completions Fall 2015

Syllabus CH EN 6181 Drilling and Completions Fall 2015 Faculty Syllabus CH EN 6181 Drilling and Completions Fall 2015 Ian Walton EGI, Suite 300, 423 Wakara Way 801-581- 8497 (office) iwalton@egi.utah.edu Office Hours: Any time or by appointment Meetings Tuesdays

More information

For personal use only

For personal use only ASX Release 17 February 2016 INDEPENDENT ASSESSMENT OF NILDE DISCOVERY AREA RESULTS IN A 2C CONTINGENT RESOURCE OF 34 MILLION BARRELS OF OIL OFFSHORE ITALY HIGHLIGHTS 34 Million Barrels of 2C Contingent

More information

Forward looking statements

Forward looking statements Exploration Investor Presentation January 2010 Forward looking statements This presentation may contain forward-looking statements and information that both represents management's current expectations

More information

The Directors wish to inform you about recent exploration activities:

The Directors wish to inform you about recent exploration activities: 26 June 2009 Dear Shareholders The Directors wish to inform you about recent exploration activities: MoU was signed with PGS Overseas AS on the Sicily Channel Permits in the Mediterranean Sea and AuDAX

More information

Deepwater riserless (RLWI) enablers for increased oil recovery. Bringing shallow water experience to deepwater.

Deepwater riserless (RLWI) enablers for increased oil recovery. Bringing shallow water experience to deepwater. Deepwater riserless (RLWI) enablers for increased oil recovery. Bringing shallow water experience to deepwater. Well Intervention Services Deepwater RLWI success criteria RLWI history Technology Focus

More information

THE FISHSAFE INFORMATION PROJECT -

THE FISHSAFE INFORMATION PROJECT - Marc Roussel / Total THE FISHSAFE INFORMATION PROJECT - accurate oil & gas infrastructure data in a safety & communication critical role FSIP - CONTENTS Background Introduction Governance Supply of Data

More information

PETROMINERALES ANNOUNCES 2013 CAPITAL PLAN, OPERATIONAL UPDATE AND INCREASED CREDIT FACILITY

PETROMINERALES ANNOUNCES 2013 CAPITAL PLAN, OPERATIONAL UPDATE AND INCREASED CREDIT FACILITY www.petrominerales.com PRESS RELEASE PETROMINERALES ANNOUNCES 2013 CAPITAL PLAN, OPERATIONAL UPDATE AND INCREASED CREDIT FACILITY Calgary, Canada December 20, 2012 Petrominerales is pleased to outline

More information

oil & gas Oilbarrel Conference 9th September 2010 Kevin Hart, Chief Executive

oil & gas Oilbarrel Conference 9th September 2010 Kevin Hart, Chief Executive oil & gas Oilbarrel Conference 9th September 2010 Kevin Hart, Chief Executive 1 Disclaimer Important Notice Nothing in this presentation or in any accompanying management discussion of this presentation

More information

STERLING RESOURCES LTD

STERLING RESOURCES LTD STERLING RESOURCES LTD Operations Update Forward Looking Statement The information in this presentation contains certain forward-looking statements including expectations of future production and capital

More information

June 24, 2010 RPSEA Project 1502 Thomas E. Williams int.com

June 24, 2010 RPSEA Project 1502 Thomas E. Williams  int.com June 24, 2010 RPSEA Project 1502 Thomas E. Williams www.nautilus int.com RPSEA 1502 Coiled Tubing from a Small Vessel June 2010 Update Presentation Topics Background Project Objectives System Configuration

More information

Siem WIS. Siem WIS AS. Closed Loop Drilling CLD. August Siem WIS AS.

Siem WIS. Siem WIS AS. Closed Loop Drilling CLD. August Siem WIS AS. AS Closed Loop Drilling CLD August 2010 2010 AS. Technology summary has secured intellectual property rights (IPR) for all key components of its portfolio: CircSub To drill with constant Mud Circulation

More information

For personal use only

For personal use only 26 February 2018 ASX: MOD MOD Launches Regional Exploration Campaign with T1 Resource Extension Drilling 20-hole resource extension drilling program commences below the high-grade, 100%- owned T1 (Mahumo)

More information

EUOAG Workshop. Workshop on decommissioning of offshore installations Challenges, options and lessons learned PP&A

EUOAG Workshop. Workshop on decommissioning of offshore installations Challenges, options and lessons learned PP&A EUOAG Workshop Workshop on decommissioning of offshore installations Challenges, options and lessons learned PP&A Johnny Gundersen Principal Engineer, PSA Norway Content Requirements for PP&A in Norway

More information

Surveyors in The Oil & Gas Industry. Walter Jardine Lead Surveyor, BP North Sea Region Hydrofest 13 April 2011

Surveyors in The Oil & Gas Industry. Walter Jardine Lead Surveyor, BP North Sea Region Hydrofest 13 April 2011 Surveyors in The Oil & Gas Industry what on earth do those guys do? Walter Jardine Lead Surveyor, BP North Sea Region Hydrofest 13 April 2011 Why Geography Matters in the O&G Industry Around 80% of the

More information

How it works and Stakeholder Benefits

How it works and Stakeholder Benefits UNFC 2009 - Applications in Uranium and Thorium Resources: Focus on Comprehensive Extraction How it works and Stakeholder Benefits David MacDonald Santiago 9-12 July 2013 Stakeholders of our reported resources

More information

NON-EXCLUSIVE AGREEMENT TO EXPLORE MARENGO GAS FIELD GREATER AREA

NON-EXCLUSIVE AGREEMENT TO EXPLORE MARENGO GAS FIELD GREATER AREA 29 May 2018 The Manager The Australian Securities Exchange The Announcements Office Level 4/20 Bridge Street SYDNEY NSW 2000 NON-EXCLUSIVE AGREEMENT TO EXPLORE MARENGO GAS FIELD GREATER AREA Key Petroleum

More information

Europa Oil & Gas plc / Index: AIM / Epic: EOG / Sector: Oil & Gas 02 March 2015 Europa Oil & Gas (Holdings) plc ( Europa' or the Company') Newsletter

Europa Oil & Gas plc / Index: AIM / Epic: EOG / Sector: Oil & Gas 02 March 2015 Europa Oil & Gas (Holdings) plc ( Europa' or the Company') Newsletter Europa Oil & Gas plc / Index: AIM / Epic: EOG / Sector: Oil & Gas 02 March 2015 Europa Oil & Gas (Holdings) plc ( Europa' or the Company') Newsletter Dear Investor The first two months of 2015 have already

More information

Offshore Drilling Rigs

Offshore Drilling Rigs Offshore Drilling Rigs Drilling Offshore Drilling Rigs Many of the world s potential reserves of hydrocarbons lie beneath the sea, and the hydrocarbon industry has developed techniques suited to conditions

More information