Geoprober Drilling Moving from Ideas To Reality (Status August, 2005)

Size: px
Start display at page:

Download "Geoprober Drilling Moving from Ideas To Reality (Status August, 2005)"

Transcription

1 Geoprober Drilling Moving from Ideas To Reality (Status August, 2005) Reel A 4 OD Reel B 3-1/8 OD Anaconda CT Unit Drilling Rig 27 m derrick, 200 tonnes Heave comp 120 tonnes 4.8m Existing Equipment Refurbishment & Integration Required Workclass ROV Launched over the stern Provides backup Subsea Controls 7-5/8 Drill-in Casing/ Riser DP 3 Vessel Acoustic controls Shut-off system BHA New/Novel Equipment Currently Testing Prototype

2 Shut-off System (Geo-SOS) Seabed Anchor 13-5/8 Double Shear Ram Re-Entry Hub ROV Kill Line Dual Seal Upper Gripper (Casing Hanger) Lower Gripper (Run Geo-SOS) Cuttings Returns ROV Interface Plate Anchor Base Flexible Pipe 13-3/8 casing, Bit

3 Geoprober Drilling Moving from Ideas To Reality August, 2005) Re-Entry Hub 13-5/8 Double Shear Ram ROV Kill Line Dual Seal Upper Gripper (Casing Hanger) ROV Interface Plate Lower Gripper (Run Geo-SOS) Conceptual Design Jan Jun 2004 Detailed Design Aug - Oct 2004 Prototype Jul - Aug 2005

4 Geoprober Drilling Moving from Ideas To Reality (Status August, 2005) Note: Top Flange of Geo-SOS is at base on floor! Prototype Jul - Aug 2005

5 Photo # CIMG 0131 Upper Spring Tubes locked into retracted position for assembly (released once the assembly is made). Upper Spring plate in position. Photo # CIMG 0132 Lower Spring tubes held in place for assembly with locking bolts. Lower Spring Plate in Position Key parts of the new subsea equipment (Geo-SOS) have been machined and assembled and this prototype is currently being tested

6 Anaconda Existing Equipment Transmission Rate 156 kbytes/sec Outer Wear Layer (now has outer pressure barrier) Fiberspar Composite Drillstring Carbon Fibre Strength Layer Copper conductors Thermoplastic liner Equipment will be re-furbished and brought back up to operating condition Geoprober has an agreement for an option to purchase the Anaconda equipment from Halliburton

7 Demonstration of the Use of Composite Coil Tubing to Drill Low Cost Deepwater Wells Once the new equipment has been fabricated and the existing Anaconda equipment refurbished, 3 demonstration wells will be drilled 1. A land well to show the use of the Anaconda equipment (potentially Catoosa) 2. A subsea demonstration of the new equipment (potentially in the Gulf of Mexico) 3. A deepwater demonstration well to confirm the viability of both the anaconda equipment and the new equipment

8 Operability/Applicability of System Geoprober - Water Depth/Drilling Depth (BML) Operability Water Depth (feet) Unable to Circulate (with Returns) Unless Use Dual Gradient or Similar Monohull of Opportunity Enhancements to tensioners/ derrick Use of exotic riser material Q4000/Purpose Built Monohull Capable to +/ ft WD Capability from Current/Typical Monohull of Opportunity Need to Develop Methods to manufacture Composite Coil Reels Longer than 17,000 ft & May have well hydraulic problems May Need true Monobore Drilling Depth (Depth BML - ft) The system is capable of drilling wells in the range shown above and at a cost that is estimated to be 59% less than the cost were a conventional approach used

9 Why Change?

10 Cost Comparison Simple GOM Well Water Depth = 7500 Water Depth = 7500 Air Gap = 80 Air Gap = ft BML 13 3/8 60 ft BML ft BML 7 5/ ft BML 13 5/ ft BRT 5 1/ ft BRT 12 1/ ft BRT 4 3/ ft BRT Conventional Well GOM Semi Geoprober Well GOM Q4000

11 Conventional Cost Breakdown Description Drill & Eval P&A Drill & P&A Misc. Salary $9,000 $0 $9,000 Wellsite Supervision $119,760 $20,000 $139,760 Contractor Services $551,000 $75,000 $626,000 Professional Consulting Engineering $30,000 $0 $30,000 Material Expense $115,500 $35,000 $150,500 Rig Fuel/Oil $285,000 $55,000 $340,000 Transportation Land $100,000 $12,000 $112,000 Transportation Air $320,000 $60,000 $380,000 Transportation Marine $800,000 $220,000 $1,020,000 Rig $160,000/day) $3,662,091 $482,447 $4,144,538 Bits & Mills $90,000 $0 $90,000 Mud/Chems/Compl Fluids/Services $1,700,000 $175,000 $1,875,000 Rentals- Downhole $180,000 $6,000 $186,000 Cement & Services $550,000 $50,000 $600,000 Location Preparation & Maintenance $30,000 $0 $30,000 Fishing Tools $0 $0 $0 Wireline Service $0 $0 $0 Formation Testing $100,000 $0 $100,000 Gravel Packs $0 $0 $0 Shorebase $45,000 $9,000 $54,000 Log - Wireline $900,000 $0 $900,000 Mud Logging $86,000 $0 $86,000 MWD & LWD $325,000 $0 $325,000 Perforating $0 $0 $0 Directional Services $180,000 $0 $180,000 Rentals - Surface $105,000 $18,000 $123,000 Diving/ROV $100,000 $15,000 $115,000 Communications $16,000 $3,000 $19,000 Oilfield Waste Disposal $320,000 $80,000 $400,000 Overhead (2.5% Tangible + Intangible $305,277 $32,886 $338,163 Geoprober Description Drill & Eval P&A Drill & P&A Misc. Salary $9,000 $0 $9,000 Wellsite Supervision $56,400 $7,742 $64,142 Contractor Services $267,079 $29,032 $296,111 Professional Consulting Engineering $30,000 $0 $30,000 Material Expense $115,500 $35,000 $150,500 Rig Fuel/Oil $138,144 $21,290 $159,434 Transportation Land $48,472 $4,645 $53,117 Transportation Air $155,109 $23,226 $178,335 Transportation Marine $290,830 $63,871 $354,701 Rig (@ $100,000/day) $1,210,162 $125,833 $1,335,995 Bits & Mills & Motors $290,000 $0 $290,000 Mud/Chems/Compl Fluids/Services $300,000 $80,000 $380,000 Rentals- Downhole $87,249 $2,323 $89,571 Cement & Services $200,000 $40,000 $240,000 Location Preparation & Maintenance $30,000 $0 $30,000 Fishing Tools $0 $0 $0 Wireline Service $0 $0 $0 Formation Testing $100,000 $0 $100,000 Gravel Packs $0 $0 $0 Shorebase $21,812 $3,484 $25,296 Log - Wireline $350,000 $0 $350,000 Mud Logging $41,686 $0 $41,686 MWD & LWD & Anaconda $387,252 $40,267 $427,518 Perforating $0 $0 $0 Directional Services $0 $0 $0 Rentals - Surface $50,895 $6,968 $57,863 Diving/ROV (incl. w/rig) $0 $0 $0 Communications $7,755 $3,000 $10,755 Oilfield Waste Disposal $74,839 $18,709 $93,548 Overhead (4.0% Tangible + Intangible $200,375 $20,216 $220,591 Tubulars Footage $/ft 36" $222, " $441, /8" $423, Tubulars Footage $/ft 13 3/8" - incl. with base $ /8" $224, /2" $103, Tubular Accessories & Liner Hangers $210,000 Wellhead $195,000 Total Intangibles $1,491,740 Tubular Accessories & Liner Hangers $270,000 Wellhead/BaSE $150,000 Total Intangibles $747,200 Dry Hole Dry Hole Cost Total Cost $13,864,702 Total Cost $5,735,364

12 Depth vs Days Note that drilling below the conductor commences on Day 3 when using the Geoprober system and on Day 12 when using a conventional BOP and riser system 6000 Set Conductor, Riser & BOP Depth (BRT - ft) Seabed Conventional Geoprober Days

13 Phase 1 $1.5M Status of Project Way Forwards Phase 2 $12M Phase 3 $3.5M Now Feb 06 Feb May Aug 07 Existing Prototype Cost: WIP Geo-SOS Controls & Hardware Engineering Stop Build Controls & Hardware Refurbish Surface Equipment Procure Equipment Integration, Test from Tank Tests Vessel Project Management Catoosa Test Well Demonstration Wells Offshore Test Well Contingency Stop Anaconda Engineering Assessment Halliburton Refurbish BHA Contingency Project Management Vessel Integration Vessel Safety Case Update June 2005 The Demonstration Wells form a key activity within the projected overall project plan. At the end of this plan, there will be a system that is ready to drill wells in deepwater.

14 Acknowledgements US DOE Chevron Statoil

June 24, 2010 RPSEA Project 1502 Thomas E. Williams int.com

June 24, 2010 RPSEA Project 1502 Thomas E. Williams  int.com June 24, 2010 RPSEA Project 1502 Thomas E. Williams www.nautilus int.com RPSEA 1502 Coiled Tubing from a Small Vessel June 2010 Update Presentation Topics Background Project Objectives System Configuration

More information

The intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure.

The intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure. 1 The intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure. This document is not intended to override any specific local

More information

Deepwater riserless (RLWI) enablers for increased oil recovery. Bringing shallow water experience to deepwater.

Deepwater riserless (RLWI) enablers for increased oil recovery. Bringing shallow water experience to deepwater. Deepwater riserless (RLWI) enablers for increased oil recovery. Bringing shallow water experience to deepwater. Well Intervention Services Deepwater RLWI success criteria RLWI history Technology Focus

More information

Speaker at the Americas: Decommissioning and Well Abandonment. September 23, 2015

Speaker at the Americas: Decommissioning and Well Abandonment. September 23, 2015 Speaker at the Americas: Decommissioning and Well Abandonment September 23, 2015 TETRA Offshore Services TETRA Offshore Services ISO 9001:2008 Certified 2 Decommissioning Case Study - Agenda A general

More information

Marginal Project Development

Marginal Project Development Marginal Project Development A case study of the MC-66 / OCHRE Project Richard Weser MC66 OCHRE Joint Venture Project OCHRE PROSPECT DEVELOPMENT Mississippi Canyon 66 1 Gas Subsea 7.9-Mile Tieback to Taylor

More information

Emergency Pipeline Repair Systems; A Global Overview of Best Practice

Emergency Pipeline Repair Systems; A Global Overview of Best Practice Emergency Pipeline Repair Systems; A Global Overview of Best Practice Brief Introduction to EPRS EPRS: Key Challenges Worldwide EPRS: Global Approaches to These Challenges Best Practice Comparison James

More information

An Introduction to Oil & Gas Drilling and Well Operations

An Introduction to Oil & Gas Drilling and Well Operations An Introduction to Oil & Gas Drilling and Well Operations Educational Material from the IOM 3 Oil and Gas Division The global network for the materials cycle Introduction The Institute of Materials, Minerals

More information

BP SWOPS Single Well Oil Production System. Sandy Meldrum CEng, MIMechE

BP SWOPS Single Well Oil Production System. Sandy Meldrum CEng, MIMechE Sandy Meldrum CEng, MIMechE Concept A means of producing oil from small offshore fields which would be uneconomic for fixed platforms or other conventional means. System Overview Comprised Production Vessel

More information

AADE-05-NTCE-39. Slender Well Plan for Lower Cost and Improved Safety. Nader Sheshtawy and Adel Sheshtawy, TRI-MAX Industries

AADE-05-NTCE-39. Slender Well Plan for Lower Cost and Improved Safety. Nader Sheshtawy and Adel Sheshtawy, TRI-MAX Industries AADE-05-NTCE-39 Slender Well Plan for Lower Cost and Improved Safety Nader Sheshtawy and Adel Sheshtawy, TRI-MAX Industries This paper was prepared for presentation at the AADE 2005 National Technical

More information

Well Abandonment Services. Plug into a New Approach

Well Abandonment Services. Plug into a New Approach Well Abandonment Services Plug into a New Approach Get it Right the First Time Permanent Solutions to Your Well Abandonment Challenge Thousands of wells await safe and permanent abandonment. It s critical

More information

The Marine Well Containment System. LSU Center for Energy Studies Energy Summit 2010 October 26, 2010

The Marine Well Containment System. LSU Center for Energy Studies Energy Summit 2010 October 26, 2010 The Marine Well Containment System LSU Center for Energy Studies Energy Summit 2010 October 26, 2010 Restoring Confidence in Deepwater Drilling Operations Our initiatives are aligned with Administration

More information

SUBSEA WELL CONTAINMENT. Global Basis. Deepwater & Emerging Technologies Group (DETG) AADE Houston Chapter 25 January 2012

SUBSEA WELL CONTAINMENT. Global Basis. Deepwater & Emerging Technologies Group (DETG) AADE Houston Chapter 25 January 2012 SUBSEA WELL CONTAINMENT Global Basis Deepwater & Emerging Technologies Group (DETG) AADE Houston Chapter 25 January 2012 Bill Mahler Wild Well Control, Inc. Response Components - Plus Many More Components

More information

Moduels in PetroTrainer. PetroTrainer. How PetroTrainer is used

Moduels in PetroTrainer. PetroTrainer. How PetroTrainer is used PetroTrainer E-Learning for the Petroleum industry PetroTrainer is probably the world s largest and most comprehensive tool made for training purposes in the petroleum industry. The ITC Boreskolen started

More information

International Well Control Forum Well Intervention Pressure Control Subsea Syllabus

International Well Control Forum Well Intervention Pressure Control Subsea Syllabus International Well Control Forum Well Intervention Pressure Control Subsea Syllabus November 2017 Version 1.0 IWCF Well Intervention Pressure Control Subsea Syllabus Contents Guidance Notes... 1. Introduction...

More information

Increased Safety & Efficiency from a Dedicated Light Well Intervention Vessel on Deepwater Subsea Wells

Increased Safety & Efficiency from a Dedicated Light Well Intervention Vessel on Deepwater Subsea Wells Increased Safety & Efficiency from a Dedicated Light Well Intervention Vessel on Deepwater Subsea Wells A Truly Integrated Service Delivery 09 August 2017 Agenda Introduction to Light Well Intervention

More information

Marathon Drilling Indonesia

Marathon Drilling Indonesia Marathon Drilling Indonesia Case History of Managed Pressure Drilling in Deepwater Marathon International Petroleum Indonesia Limited Introduction Marathon signed a PSC for Pasangkayu block in Makassar

More information

Single / Dual Barrier HP Drilling Risers

Single / Dual Barrier HP Drilling Risers Single / Dual Barrier HP Drilling Risers Acteon HPHT Subsea Community Breakfast Meeting 23rd March 2011 Tim Eyles Director 2H Offshore Engineering tim.eyles@2hoffshore.com / +44 1483 774908 Agenda Introduction

More information

AADE 01-NC-HO-02. Copyright 2001 AADE National Drilling Technical Conference

AADE 01-NC-HO-02. Copyright 2001 AADE National Drilling Technical Conference AADE 01-NC-HO-02 Using Multi-Function Fishing Tool Strings to Improve Efficiency and Economics of Deepwater Plug and Abandonment Operations David B. Haughton and Walter S. Going, P.E., SPE, Baker Oil Tools

More information

Marine Risers. Capability & Experience

Marine Risers. Capability & Experience Marine Risers Capability & Experience Capability Overview INTECSEA now offers, in a single company, industry leading capability for all marine riser systems including top-tensioned risers (TTRs) for direct

More information

HELIX ENERGY SOLUTIONS

HELIX ENERGY SOLUTIONS HELIX ENERGY SOLUTIONS OFFSHORE CAPABILITIES www.helixesg.com About Us WELL OPERATIONS SUBSEA WELL INTERVENTION PRODUCTION FACILITIES The purpose-built vessels of our Well Operations business units serve

More information

Mærsk Deliverer. Ultra deepwater drilling and development. semi-submersible

Mærsk Deliverer. Ultra deepwater drilling and development. semi-submersible Mærsk Deliverer Ultra deepwater drilling and development semi-submersible Maersk Drilling Mærsk Deliverer TYPE DPS2/M, Column stabilised dynamically positioned semisubmersible drilling rig with capability

More information

Schlumberger and Smith International, Inc. to Merge. March, 2010

Schlumberger and Smith International, Inc. to Merge. March, 2010 Schlumberger and Smith International, Inc. to Merge March, 2010 Forward-Looking Statements This presentation includes forward-looking statements within the meaning of Section 27A of the Securities Act

More information

NOT TO COPY -- NO DISSEMINATE WITHOUT WRITTEN AGREEMENT. Presentation JB AG JCN JR 1

NOT TO COPY -- NO DISSEMINATE WITHOUT WRITTEN AGREEMENT. Presentation JB AG JCN JR 1 Presentation JB AG JCN JR 1 Presentation JB AG JCN JR 2 SUMMARY - INTRODUCTION - ENVIRONMENTAL DATA ACQUISITION & RIG BEHAVIOUR - RIG DRILLING EQUIPMENT - surface equipment - Subsea equipment - R O V -

More information

Comprehensive Plug and Abandonment Systems

Comprehensive Plug and Abandonment Systems Comprehensive Plug and Abandonment Systems Abandon Your Well. Abandon Uncertainty. Complete, single-trip systems for P&A Schlumberger comprehensive plug and abandonment systems bring certainty and rig-time

More information

Casing while Drilling. Enhanced Casing Installation

Casing while Drilling. Enhanced Casing Installation Casing while Drilling Enhanced Casing Installation CWD Definition, History & Experience Casing while Drilling means utilizing the casing string as the drill string instead of drill pipe. 1907 Reuben Baker

More information

RPSEA PROJECT STATUS REPORT FEB 2011

RPSEA PROJECT STATUS REPORT FEB 2011 RPSEA PROJECT STATUS REPORT FEB 2011 RPSEA Project 08121-2301-03 Ultra-Deepwater Riserless Intervention System (RIS) & RPSEA Project 09121-3500-07 Ultra-Deepwater Subsea Test Tree (SSTT) and Intervention

More information

Send your directly to

Send your  directly to Welcome to Chess Subsea Production System Training - SPS Subsea production system (SPS) is associated with the overall process and all the equipment involved in drilling, field development, and field operation.

More information

Marine Well Containment Company. Charlie Miller, Chief Technology Officer

Marine Well Containment Company. Charlie Miller, Chief Technology Officer Marine Well Containment Company Charlie Miller, Chief Technology Officer January 25, 2012 Agenda Company Overview Interim Containment System Expanded Containment System 2012 Priorities 2 Agenda Company

More information

Riserless Subsea P&A. Deepwater Decommissioning Workshop 2016 W I L D W E L L C O N T R O L S U B S E A I N T E R V E N T I O N

Riserless Subsea P&A. Deepwater Decommissioning Workshop 2016 W I L D W E L L C O N T R O L S U B S E A I N T E R V E N T I O N Riserless Subsea P&A Deepwater Decommissioning Workshop 2016 W I L D W E L L C O N T R O L S U B S E A I N T E R V E N T I O N 7 Series S U B S E A I N T E R V E N T I O N 7 Series Nominal Bore Size 7.375

More information

july aug HPHT operations pose escalating challenges for operators, suppliers all drilling, all completions, all the time

july aug HPHT operations pose escalating challenges for operators, suppliers all drilling, all completions, all the time Official Magazine of the International Association of Drilling Contractors Drilling c o n t r a c t o r july aug 2007 innovative Drilling HPHT operations pose escalating challenges for operators, suppliers

More information

Rod Larson President, Latin America. Houston, Texas March 9-10, 2011

Rod Larson President, Latin America. Houston, Texas March 9-10, 2011 Rod Larson President, Latin America Houston, Texas March 9-10, 2011 Jan-10 Feb-10 Mar-10 Apr-10 May-10 Jun-10 Jul-10 Aug-10 Sep-10 Oct-10 Nov-10 Dec-10 Jan-11 Feb-11 Gulf of Mexico: Post-Macondo Slowdown

More information

Macondo Blowout Lessons Learned for Prevention and Mitigation

Macondo Blowout Lessons Learned for Prevention and Mitigation Macondo Blowout Lessons Learned for Prevention and Mitigation Lars Herbst, P.E. BSEE Gulf of Mexico Regional Director 05 October 2017 To promote safety, protect the environment and conserve resources offshore

More information

Ultra deep water and ultra deep drilling technologies for 21 st Century Mohole. Engineering Development Advisory Committee J-DESC, JAPAN

Ultra deep water and ultra deep drilling technologies for 21 st Century Mohole. Engineering Development Advisory Committee J-DESC, JAPAN INVEST White Paper Ultra deep water and ultra deep drilling technologies for 21 st Century Mohole Engineering Development Advisory Committee J-DESC, JAPAN Corresponding Author: Yoshiyasu WATANABE, Tokai

More information

Subsea Well Engineering

Subsea Well Engineering Subsea Well Engineering Prof. Marcio Yamamoto UNIVERSITY OF SÃO PAULO Dept. of Mining and Petroleum Engineering December 11th, 2014 Kashiwa, Chiba Subsea Well Engineering Water Depth Petroleum Well Classification

More information

Hunting Manufactures and distributes products that enable the extraction of oil and gas

Hunting Manufactures and distributes products that enable the extraction of oil and gas Hunting Manufactures and distributes products that enable the extraction of oil and gas Hunting PLC Global Footprint 2 2009 Corporate Highlights Completed three acquisitions 47.3m Sale of Hunting Energy

More information

Deepwater well design, construction & drilling operations

Deepwater well design, construction & drilling operations Deepwater well design, construction & drilling operations Training and development 1 Kingdom Drilling Services Ltd Our Mission Deliver a recognized excellence in deepwater industry training, education

More information

ULTRA-DEEPWATER RISERLESS INTERVENTION SYSTEM (RIS)

ULTRA-DEEPWATER RISERLESS INTERVENTION SYSTEM (RIS) RPSEA PROJECT DW 2301 ULTRA-DEEPWATER RISERLESS INTERVENTION SYSTEM (RIS) DTC International, Inc. 5540 Brittmoore Road Houston, Texas 77041 23 March 2010 RIS PROJECT TEAM MEMBERS DTC International, Inc.

More information

Subsea Pump System - Optimized for Rapid Deployment & Operation within the Primary Barrier. Brian Piccolo, Technology Development Mgr.

Subsea Pump System - Optimized for Rapid Deployment & Operation within the Primary Barrier. Brian Piccolo, Technology Development Mgr. Subsea Pump System - Optimized for Rapid Deployment & Operation within the Primary Barrier Brian Piccolo, Technology Development Mgr. Agenda Pumped Riser System (PRS) Vision Initial Concept Operational

More information

Tore Aarsland. Chairman of the Editorial Revision Committee / Senior Design C6 Technologies. 10-Jan-13

Tore Aarsland. Chairman of the Editorial Revision Committee / Senior Design C6 Technologies. 10-Jan-13 Tore Aarsland Chairman of the Editorial Revision Committee / Senior Design Engineer @ C6 Technologies 10-Jan-13 1. The well barrier philosophy of the standard is harmonised to NORSOK D-010. The use of

More information

Cameron MBO Multi-Bowl Wellhead System

Cameron MBO Multi-Bowl Wellhead System Cameron MBO Multi-Bowl Wellhead System MBO Multi-Bowl Wellhead System The Cameron MBO Multi-Bowl Wellhead System is a compact, unitized wellhead which can be used as an alternative to conventional wellhead

More information

NOIA ANNUAL MEETING CONCERNS/INITIATIVES. BSEE Update. Joe Levine BSEE Washington DC April 11, 2014

NOIA ANNUAL MEETING CONCERNS/INITIATIVES. BSEE Update. Joe Levine BSEE Washington DC April 11, 2014 NOIA ANNUAL MEETING Technology BSEE OCS Policy TECHNOLOGY Committee CONCERNS/INITIATIVES BSEE Update Joe Levine BSEE Washington DC April 11, 2014 Presentation Overview BSEE Research Program Research Drivers

More information

Appendix F Lock-Down Sleeve Decision. Appendix F Lock-Down Sleeve Decision

Appendix F Lock-Down Sleeve Decision. Appendix F Lock-Down Sleeve Decision Appendix F Lock-Down Sleeve Decision Appendix F Lock-Down Sleeve Decision After the production casing has been installed in the well and cemented in place, the operator may elect to run a lock-down sleeve.

More information

Deep Water Definitions

Deep Water Definitions DST in Deep Water Deep Water Definitions Depth of Water (Deepwater >1000ft (300m), Ultra- Deepwater > 5000ft (1500m)) Rig Type - Floaters (Drillships and Semi-Submersibles) Approach and Profile (risk,

More information

GTSC Rig for Hands-on Training

GTSC Rig for Hands-on Training GTSC Rig for Hands-on Training The Rig To meet the high demand of Petroleum Industry, GTSC has launched the Middle East s first fully operational Training Rig & Well in May 2010 at its main building location

More information

Offshore Drilling Rigs

Offshore Drilling Rigs Offshore Drilling Rigs Drilling Offshore Drilling Rigs Many of the world s potential reserves of hydrocarbons lie beneath the sea, and the hydrocarbon industry has developed techniques suited to conditions

More information

When a drilling project is commenced, two goals must be achieved:

When a drilling project is commenced, two goals must be achieved: Technologies Drilling Technologies Oil well drilling is a complex operation and the drilling industry engages the services of personnel and a complicated array of machinery and materials to drill an oil/gas

More information

Hunting PLC Annual Results 2010

Hunting PLC Annual Results 2010 Hunting PLC Annual Results 2010 2010 Highlights Completed acquisition of Innova-Extel - 80.3m New facilities in US (Casper, Conroe and Latrobe) and China (Wuxi) add over 800,000 sq ft of manufacturing

More information

VIRTUS CONNECTION SYSTEMS Advanced Diverless Connection Solutions for any Subsea Field Application

VIRTUS CONNECTION SYSTEMS Advanced Diverless Connection Solutions for any Subsea Field Application VIRTUS CONNECTION SYSTEMS Advanced Diverless Connection Solutions for any Subsea Field Application 2 Virtus Subsea Connectors Delivering Long-Lasting Reliability at Each Subsea Connection Subsea production

More information

2009 Half Year Results Summary

2009 Half Year Results Summary Rig Activity - 2 - 2009 Half Year Results Summary 2009 m 2008 m Change % Revenue 219.8 201.2 +9% EBITDA 30.7 32.1-4% Profit from operations 23.0 24.0-4% Finance income (expense) 3.3 (2.9) Profit before

More information

Doing More With Lightweight. Well Intervention Subsea Europe Drummond Lawson. London, 30 th October Managing Director

Doing More With Lightweight. Well Intervention Subsea Europe Drummond Lawson. London, 30 th October Managing Director Doing More With Lightweight Well Intervention Subsea Europe 2008 London, 30 th October 2008 Drummond Lawson Managing Director What Is It? Lightweight Subsea Well Intervention (LSWI) Re-entering existing

More information

COSL MEXICO OVERVIEW SERVICE LINES IN MEXICO INTEGRATED SERVICES

COSL MEXICO OVERVIEW SERVICE LINES IN MEXICO INTEGRATED SERVICES S COSL MEXICO OVERVIEW SERVICE LINES IN MEXICO INTEGRATED SERVICES COSL MÉXICO OVERVIEW COSL China has operated in Southeast Asia for over 50 years. COSL México is a Mexican company, subsidiary of China

More information

pipeline FSHR and tether for fatigue, stress, and any other abnormal condition (e.g., corrosion) that may negatively impact the riser or tether; and

pipeline FSHR and tether for fatigue, stress, and any other abnormal condition (e.g., corrosion) that may negatively impact the riser or tether; and (3) A description of how you met the design requirements, load cases, and allowable stresses for each load case according to API RP 2RD (as incorporated by reference in 250.198); (4) Detailed information

More information

Industry Response - Post Macondo

Industry Response - Post Macondo Industry Response - Post Macondo Charlie Williams Chief Scientist Well Engineering Shell Energy Resource Company CSIS Energy and National Security Program - future of offshore oil & gas developments in

More information

HPHT operations pose escalating challenges for operators, suppliers

HPHT operations pose escalating challenges for operators, suppliers HPHT operations pose escalating challenges for operators, suppliers Expandables, MWD/LWD tools, completion systems offer potential solutions By Sheila Popov, contributing editor To develop and produce

More information

CASTOR DRILLING SOLUTION AS TAILOR-MADE DRILLING EQUIPMENT, OFFSHORE ENGINEERING SERVICES AND SOLUTIONS.

CASTOR DRILLING SOLUTION AS TAILOR-MADE DRILLING EQUIPMENT, OFFSHORE ENGINEERING SERVICES AND SOLUTIONS. CASTOR DRILLING SOLUTION AS TAILOR-MADE DRILLING EQUIPMENT, OFFSHORE ENGINEERING SERVICES AND SOLUTIONS. INNOVATIVE DRILLING TOWER SOLUTION 350T Castor Drilling Tower for Top Hole Drilling, Plug and Abandonment

More information

New Developments in Regulation of U.S. Offshore Oil and Gas Operations

New Developments in Regulation of U.S. Offshore Oil and Gas Operations New Developments in Regulation of U.S. Offshore Oil and Gas Operations Peking University Law School and The University of Texas School of Law Carol Dinkins Partner Vinson & Elkins, LLP August 21, 2012

More information

Hans J Lindland FMC Kongsberg Subsea Innovative Technologies, Creative Solutions

Hans J Lindland FMC Kongsberg Subsea Innovative Technologies, Creative Solutions Lett Brønnintervensjon Hans J Lindland FMC Kongsberg Subsea Why Light Well Intervention? Reservoir recovery is significantly lower (oil) for subsea wells than for platform wells Cost for drilling units

More information

ENSCO 8500 Series. 11 April Mark Burns Senior Vice President Western Hemisphere. David Hensel Vice President North and South America

ENSCO 8500 Series. 11 April Mark Burns Senior Vice President Western Hemisphere. David Hensel Vice President North and South America 8500 Series Mark Burns Senior Vice President Western Hemisphere David Hensel Vice President North and South America 11 April 2012 1 Strategy Addressing Heart of the Deepwater Market Cost-effective design

More information

BT-4000 LIGHT WORKOVER UNIT

BT-4000 LIGHT WORKOVER UNIT BT-4000 LIGHT WORKOVER UNIT BT-4000 LIGHT WORKOVER UNIT DESIGNED TO IMPROVE EFFICIENCY DURING WELL INTERVENTION OPERATIONS The BT-4000 LWO is the new generation DP-3 semi-submersible for efficient light

More information

NTL No N05 Increased Safety Measures for Energy Development on the OCS Effective June 8, 2010

NTL No N05 Increased Safety Measures for Energy Development on the OCS Effective June 8, 2010 NTL No. 2010-N05 Increased Safety Measures for Energy Development on the OCS Effective June 8, 2010 Frequently Asked Questions (FAQ s) Updated July 9, 2010 A. General Questions QA1: With the issuance of

More information

Drilling Courses

Drilling Courses 2017-2018 Drilling Courses Includes Prentice Training Company Courses Taught By: Calvin Barnhill NORTHSTAR TRAINING Northstar Training is very excited to be able to continue to teach the Prentice Training

More information

Global Subsea University Alliance: Subsea education and research programs. Prof Brian Evans Curtin University, Perth Australia

Global Subsea University Alliance: Subsea education and research programs. Prof Brian Evans Curtin University, Perth Australia Global Subsea University Alliance: Subsea education and research programs Prof Brian Evans Curtin University, Perth Australia Subsea GSUA Alliance Showcase, 9 February 2018 Global Subsea University Alliance

More information

Syllabus CH EN 6181 Drilling and Completions Fall 2015

Syllabus CH EN 6181 Drilling and Completions Fall 2015 Faculty Syllabus CH EN 6181 Drilling and Completions Fall 2015 Ian Walton EGI, Suite 300, 423 Wakara Way 801-581- 8497 (office) iwalton@egi.utah.edu Office Hours: Any time or by appointment Meetings Tuesdays

More information

AADE Houston Chapter. Group. 26 January 2011

AADE Houston Chapter. Group. 26 January 2011 AADE Houston Chapter Deepwater and Emerging Technologies Group 26 January 2011 BOEMRE Compliance Guidelines Department of Interior s Increased Safety Measures for Energy Development on the Outer Continental

More information

Marine Well Containment Company. Charlie Miller, Chief Technology Officer

Marine Well Containment Company. Charlie Miller, Chief Technology Officer Marine Well Containment Company Charlie Miller, Chief Technology Officer January 25, 2012 Agenda Company Overview Interim Containment System Expanded Containment System 2012 Priorities 2 Agenda Company

More information

15,000 psi 20,000 psi. BigBore IIe HPHT SUBSEA WELLHEAD SYSTEMS

15,000 psi 20,000 psi. BigBore IIe HPHT SUBSEA WELLHEAD SYSTEMS 15,000 psi 20,000 psi BigBore IIe HPHT SUBSEA WELLHEAD SYSTEMS DXe Gasket Profile DXe Locking Profile BigBore IIe SUBSEA WELLHEAD SYSTEM Mud Stick 18 ¾" BigBore IIe Wellhead Housing The BigBore IIe Subsea

More information

3/14/2015 Contacted and Solicited bids from construction vendors to build location. (San Jan, Orbit, Sweat, Storm).

3/14/2015 Contacted and Solicited bids from construction vendors to build location. (San Jan, Orbit, Sweat, Storm). Operator Torchlight Energy Page 1 3/12/2015 Mark McCoy, engineer with Mojo, met with University Lands representative, Drew McEachern and the land rancher, John Hunter to discuss access roads to Orogrande

More information

Umbilical Manufacturer s Perspective on the Challenges of Deep Water Operations. Presented by: James Young, JDR Engineering Director

Umbilical Manufacturer s Perspective on the Challenges of Deep Water Operations. Presented by: James Young, JDR Engineering Director Umbilical Manufacturer s Perspective on the Challenges of Deep Water Operations Presented by: James Young, JDR Engineering Director 1 MCE DEEPWATER DEVELOPMENT 2015 1. Introduction 2. JDR Cables and Umbilicals

More information

CJENERGY.COM COMPANY OVERVIEW EXCELLENCE DELIVERED

CJENERGY.COM COMPANY OVERVIEW EXCELLENCE DELIVERED C O M PA N Y OV E R V I E W COMPANY OVERVIEW C&J Energy Services is one of North America s largest providers of well construction, well completions, well support and other complementary oilfield services.

More information

Industry & Govt Changes Post Macondo. Charlie Williams Chief Scientist Shell Executive Director - Center for Offshore Safety

Industry & Govt Changes Post Macondo. Charlie Williams Chief Scientist Shell Executive Director - Center for Offshore Safety Industry & Govt Changes Post Macondo Charlie Williams Chief Scientist Shell Executive Director - Center for Offshore Safety 1 Deepwater Industry Focus/Approach Joint Industry Task Force Groups Offshore

More information

SUBSEA 101. Find more Subsea 101 case studies online

SUBSEA 101. Find more Subsea 101 case studies online SUBSEA 101 The purpose of this document is to help define some of the rationale behind the selection of a subsea tree configuration in a theoretical field for a project we are calling Project X. This section

More information

Wellhead Control Products, Inc. Hangers

Wellhead Control Products, Inc. Hangers Wellhead Control Products, Inc. Hangers The RH series was designed to be a highly workable coiled tubing hanger with greater reliability and more efficiency than other coiled tubing hanger systems. The

More information

White Paper. Deepwater Exploration and Production Minimizing Risk, Increasing Recovery

White Paper. Deepwater Exploration and Production Minimizing Risk, Increasing Recovery White Paper Deepwater Exploration and Production Minimizing Risk, Increasing Recovery Deepwater exploration, development and production present unique challenges to operators, and minimizing risk and maximizing

More information

Vincent/Enfield Conductor and Flowbase Installation Review. Roy Grant, TSMarine

Vincent/Enfield Conductor and Flowbase Installation Review. Roy Grant, TSMarine Vincent/Enfield Conductor and Flowbase Installation Review Roy Grant, TSMarine Project scope Offshore installation Mobilised in Dampier (KBSB) on 10 October TSMarine scope is onshore project management

More information

NAPESCO FISHING & RENTAL DIVISION. Workshop Facilities

NAPESCO FISHING & RENTAL DIVISION. Workshop Facilities NAPESCO FISHING & RENTAL DIVISION Workshop Facilities NAPESCO is a regional company providing specialized fishing tools, rental tools, wire line and pipe recovery services to International oil and gas

More information

A marginal field (re-)development using several alternative methodologies 1

A marginal field (re-)development using several alternative methodologies 1 Bart Heijermans Helix ESG Chief Operating Officer Company The Phoenix Update Project A marginal field (re-)development using several alternative methodologies 1 Our Mission Helix Producer I Helix Energy

More information

Advancing Global Deepwater Capabilities

Advancing Global Deepwater Capabilities Advancing Global Deepwater Capabilities BP s commitments Determined to accelerate and further deploy the capabilities and practices that enhance safety in our company and the deepwater industry 200+ meetings

More information

NAS Real-Time Monitoring of Offshore Oil and Gas Operations Committee Todd Durkee Director of Deepwater Drilling & Completions

NAS Real-Time Monitoring of Offshore Oil and Gas Operations Committee Todd Durkee Director of Deepwater Drilling & Completions December 5, 2014 NAS Real-Time Monitoring of Offshore Oil and Gas Operations Committee Todd Durkee Director of Deepwater Drilling & Completions Agenda Who is Anadarko Petroleum Corporation? What does Anadarko

More information

DEA Quarterly Meeting 18 November Bill Pike NISC, an IBM Company

DEA Quarterly Meeting 18 November Bill Pike NISC, an IBM Company DEA Quarterly Meeting 18 November 2010 Bill Pike NISC, an IBM Company DISCLAIMER I am an employee of NISC, an IBM company, working under contract in the U.S. Department of Energy s National Energy Technology

More information

Subsea Intervention: Is It Worth It? Drummond Lawson

Subsea Intervention: Is It Worth It? Drummond Lawson Subsea Intervention: Is It Worth It? Drummond Lawson 1 Subsea Intervention Is It Worth It? Subsea development timeline Why Intervene? What can you achieve? Intervention methods Intervention drivers What

More information

Drilling Systems. Cameron Drilling Control Systems Applications. 1 Semi-submersible Platform Applicaton

Drilling Systems. Cameron Drilling Control Systems Applications. 1 Semi-submersible Platform Applicaton 7 Drilling Systems Cameron has designed, manufactured and delivered surface and subsea drilling systems from the wellhead through the manifold to meet a wide variety of customer requirements and drilling

More information

Volve Subsea Removal. Trond Hofseth Subsea Operations Conference. Haugesund

Volve Subsea Removal. Trond Hofseth Subsea Operations Conference. Haugesund Volve Subsea Removal Trond Hofseth Subsea Operations Conference Haugesund 08.08.2018 Recovery and disposal of: STL loading buoy Mid-Water Arch (MWA) 9 off mooring lines Approximately 1.600m of exposed

More information

The Future of Offshore Drilling: Beyond Ultra Deep. Chris Beckett, CEO Pacific Drilling S.A. September 22, 2014

The Future of Offshore Drilling: Beyond Ultra Deep. Chris Beckett, CEO Pacific Drilling S.A. September 22, 2014 The Future of Offshore Drilling: Beyond Ultra Deep Chris Beckett, CEO Pacific Drilling S.A. September 22, 2014 Pacific Drilling: Committed to being the Preferred Ultra Deepwater Driller Only 100% high

More information

GE Oil & Gas Drilling & Production. VetcoGray subsea wellhead systems. Advanced solutions for extreme conditions

GE Oil & Gas Drilling & Production. VetcoGray subsea wellhead systems. Advanced solutions for extreme conditions GE Oil & Gas Drilling & Production VetcoGray subsea wellhead systems Advanced solutions for extreme conditions VetcoGray subsea wellhead systems As offshore drilling pushes past 10,000-foot water depths

More information

Floating Systems. Capability & Experience

Floating Systems. Capability & Experience Floating Systems Capability & Experience Capability Overview INTECSEA has more than 30 years of extensive experience with all types of floating systems: TLPs, spars, monohulls and semi-submersibles. Key

More information

7 Briefing. Responsible investor

7 Briefing. Responsible investor Issue Responsible investor 7 Briefing Monday, 5 th October 202 In 200, we accepted all 26 recommendations made by the Bly Report our internal investigation into the Deepwater Horizon incident. BP has committed

More information

PROBABILISTIC ESTIMATES OF DEEPWATER OFFSHORE FIELD ABANDONMENT COST

PROBABILISTIC ESTIMATES OF DEEPWATER OFFSHORE FIELD ABANDONMENT COST PROBABILISTIC ESTIMATES OF DEEPWATER OFFSHORE FIELD ABANDONMENT COST Authors Robert C. Byrd, Ph.D., P.E. William H. Speck Disclaimer: Whilst every effort has been made to ensure the accuracy of the information

More information

Kuala Lumpur 3 October 2012 State of the Industry of Riserless Light Well Interventions (RLWI)

Kuala Lumpur 3 October 2012 State of the Industry of Riserless Light Well Interventions (RLWI) Kuala Lumpur 3 October 2012 State of the Industry of Riserless Light Well Interventions (RLWI) Bevan Morrison, VP Global Subsea Intervention Solutions Agenda Subsea well intervention introduction Economic

More information

NORWAY. Norwegian Industrial Property Office (12) APPLICATION (19) NO (21) (13) A1. (51) Int Cl.

NORWAY. Norwegian Industrial Property Office (12) APPLICATION (19) NO (21) (13) A1. (51) Int Cl. (12) APPLICATION (19) NO (21) 11782 (13) A1 NORWAY (1) Int Cl. E21B 43/00 (06.01) E21B 43/01 (06.01) E21B 43/12 (06.01) Norwegian Industrial Property Office (21) Application nr 11782 (86) Int.application.day

More information

Jim Britton Deepwater Corrosion Services Inc. Houston, TX. UTC 2008 Bergen

Jim Britton Deepwater Corrosion Services Inc. Houston, TX. UTC 2008 Bergen Smart Cathodic Protection Retrofit Methods for ROV Installation Jim Britton Deepwater Corrosion Services Inc. Houston, TX. Presentation Outline Introduction Key Factors to Consider Anode System Tie-Back

More information

COILED TUBING DESIGN & OPERATIONS

COILED TUBING DESIGN & OPERATIONS Training Title COILED TUBING DESIGN & OPERATIONS Training Date & Duration Will be held at any 5 star hotel- 5 Days Coiled Tubing Design & Operations 5 days 15-19 December 2013 US $ 4,250 Abu Dhabi Training

More information

Location. Established in 2015 Office location: Klepp Næringspark, Norway.

Location. Established in 2015 Office location: Klepp Næringspark, Norway. Location Established in 2015 Office location: Klepp Næringspark, Norway. Vision to be leader within On-Site machining & Decommissioning segment with a main focus on mature plants, offshore installations,

More information

Seeing through software

Seeing through software Seeing through software Gefei Liu and Cissy Zhao, Pegasus Vertex Inc., USA, explain how the use of advanced software can help engineers see underground by predicting subsurface conditions. Oil well drilling

More information

Siem WIS. Siem WIS AS. Closed Loop Drilling CLD. August Siem WIS AS.

Siem WIS. Siem WIS AS. Closed Loop Drilling CLD. August Siem WIS AS. AS Closed Loop Drilling CLD August 2010 2010 AS. Technology summary has secured intellectual property rights (IPR) for all key components of its portfolio: CircSub To drill with constant Mud Circulation

More information

Advanced Well Completion Design. 30 Sep - 04 Oct 2018, Dubai. REP logo, PMI & PMP are registered trademarks of Project Management Institute, Inc.

Advanced Well Completion Design. 30 Sep - 04 Oct 2018, Dubai. REP logo, PMI & PMP are registered trademarks of Project Management Institute, Inc. 30 Sep - 04 Oct 2018, Dubai Approved Centre REP logo, PMI & PMP are registered trademarks of Project Management Institute, Inc. Introduction Organisational Impact This Glomacs Advanced Well training seminar

More information

Land wellhead systems & offshore surface wellhead systems

Land wellhead systems & offshore surface wellhead systems Land wellhead systems & offshore surface wellhead systems Presented by Oseghale Lucas Okohue BEngr. Msc. CIPMP Objectives The objective of this chapter is to provide a brief overview of the types of wellhead

More information

Marty Massey, Chief Executive Officer Marine Well Containment Company

Marty Massey, Chief Executive Officer Marine Well Containment Company Marty Massey, Chief Executive Officer Marine Well Containment Company Phil Smith, General Manager Emergency Management and Deepwater Regulatory, Shell Energy Resources Company About MWCC Leading deepwater

More information

Offshore Support Vessels Located in the US Gulf of Mexico in March 2018

Offshore Support Vessels Located in the US Gulf of Mexico in March 2018 Offshore Support Vessels Located in the US Gulf of Mexico in March 18 IMCA March 1, 18 Prepared by IMCA The International Marine Contractors Association (IMCA) is the international trade association representing

More information

Ladiz Niroo Company (Joint Stuck) Supplier of Drilling Equipment. Drilling Catalogue

Ladiz Niroo Company (Joint Stuck) Supplier of Drilling Equipment. Drilling Catalogue Ladiz Niroo Company (Joint Stuck) Supplier of Drilling quipment Drilling Catalogue LNCO is involved in the field of supplying consumable equipment for Oil & Gas Drilling Industries. 1 :Oil and Gas Drilling

More information

"DRILLING-101: Everything a Geoscientist needs to know about Well Engineering but was afraid to ask"

DRILLING-101: Everything a Geoscientist needs to know about Well Engineering but was afraid to ask London Petrophysical Society (a chapter of the SPWLA) One-day Seminar "DRILLING-101: Everything a Geoscientist needs to know about Well Engineering but was afraid to ask" 25th September 2014 The Geological

More information