Contents. iii. 3 Cable-Tool and Rotary Drilling 11 Cable-Tool Drilling 11 Rotary Drilling 14

Size: px
Start display at page:

Download "Contents. iii. 3 Cable-Tool and Rotary Drilling 11 Cable-Tool Drilling 11 Rotary Drilling 14"

Transcription

1 Figures v Tables xii Preface xiii Units of Measurement xv Metric Conversion Factors xvi 1 Introduction 1 2 History 5 The Drake Well, 1850s 6 California, Late 1800s 8 The Lucas Well, Cable-Tool and Rotary Drilling 11 Cable-Tool Drilling 11 Rotary Drilling 14 4 Rotary Rig Types 19 Land Rigs 20 Mobile Offshore Rigs 21 5 People and Companies 31 Operating Companies 31 Drilling Contractors 32 Drilling Contracts 32 Service and Supply Companies 34 People 37 6 Oil and Gas: Characteristics and Occurrence 47 Natural Gas 47 Liquefied Petroleum Gas (lpg) 48 Crude Oil 48 Refined Hydrocarbons 48 Oil and Gas Reservoirs 49 Finding Petroleum Traps 54 Types of Wells 57 7 The Drill Site 59 Choosing the Site 59 Preparing the Site 60 Moving Equipment to the Site 67 8 Rigging Up 69 Substructures 69 Rig Floor 72 Raising the Mast or Derrick 73 Rigging Up Additional Equipment 75 Offshore Rig-Up 76 9 Rig Components 77 Power System 77 Hoisting System 83 Contents iii

2 Rotating System 94 Circulating System Normal Drilling Operations 119 Drilling the Surface Hole 119 Tripping Out with a Kelly System 130 Tripping Out with a Top-Drive Unit 133 Tripping Out with a Pipe Racker 134 Running Surface Casing 134 Cementing 140 Tripping In 142 Drilling Ahead 145 Running and Cementing Intermediate Casing 146 Drilling to Final Depth Formation Evaluation 147 Examining Cuttings and Drilling Mud 147 Well Logging 148 Drill Stem Testing 150 Coring Completing the Well 151 Setting Production Casing 151 Perforating 152 Running Tubing and Installing the Christmas Tree 154 Acidizing 156 Fracturing Special Operations 157 Directional and Horizontal Drilling 157 Fishing 159 Well Control Rig Safety and Environmental Concerns 165 Glossary 167 iv

3 1. A drilling rig is big Sometimes, a rig can be seen from a great distance The mast on this rig is 147 feet (45 metres) tall Personal protective equipment (PPE) includes hard hats and safety glasses Steel stairs with handrails lead up to the rig floor The drawworks is a powerful hoist Oil Creek as it looks today 5 8. A replica of the original Drake well; it was built in 1945 on the original site of the well Wall cake stabilizes the hole The Lucas well is estimated to have flowed about 2 million gallons (8,000 cubic metres) of oil per day A cable-tool rig A 6-horsepower (4.5-watt) steamboat engine thought to be similar to Drake s original, powers the Drake well replica A 1920's California standard cable-tool rig A bit for a rotary drilling rig The drill stem puts the bit on bottom to drill Two rotary helpers lift a joint of drill pipe out of the mousehole prior to adding it to the active drill string Components in the rotary table rotate the drill string and bit A powerful motor in the top drive rotates the drill string and bit A downhole motor placed near the bit rotates the bit Two pumps are available on this rig to move drilling fluid down the pipe; normally only one at a time is used A pump circulates drilling mud down the drill pipe, out the bit, and up the hole Drilling mud A land rig An offshore rig An inland barge rig To move a rig, crew members disassemble it and move it piece by piece The first MODU was a posted-barge submersible designed to drill in shallow waters When flooded, the bottles cause a bottle-type submersible to submerge to the seafloor A concrete island drilling system (CIDS) features a reinforced concrete caisson Drilling equipment is placed on the deck of a barge to drill in the shallow waters of bays and estuaries Four boats tow this jackup to its drilling location A jackup rig with four columnar legs This jackup has open-truss legs. 25 Figures v

4 34. The hull of this jackup is raised to clear the highest anticipated waves A semisubmersible rig floats on pontoons The pontoons of this semisubmersible float a few feet (metres) below the water s surface The main deck, or Texas deck, of a semisubmersible is big A drill ship An IADC drilling bid form This computer display shows a well log This member of a casing crew is stabbing one joint of casing into another Personnel on this offshore rig enjoy good food in the galley The driller on this offshore rig works in an environmentally controlled cabin This picture was shot above the derrickman s position on the monkeyboard This derrickman is checking the weight, or density, of the drilling mud Two rotary helpers latch big wrenches (tongs) onto the drill pipe These two floorhands are using power tongs to tighten drill pipe Two rig roustabouts help move casing from a supply boat to the rig A crane operator manipulates controls from a position inside the crane cab A barge engineer monitors a semisubmersible s stability from a work station on board the rig A pore is a small open space in a rock Connected pores give a rock permeability A fault trap and an anticlinal trap Stratigraphic traps A faulted anticline A piercement dome To the right of the tire, a large and heavy plate vibrates against the ground to create sound waves Several special trucks vibrate plates against the ground Stuck into the ground, a geophone (this one is blue) picks up reflected sound waves This seismic display is specially colored to reveal details of earth formations A reserve pit A concrete pad surrounds the cellar at this drilling site Part of the rig s drilling assembly is temporarily placed in the rathole A joint of drill pipe rests in this rig s mousehole A rathole rig drills the first part of the hole The conductor hole 65 vi

5 67. The large diameter pipe to the right is the top of the conductor pipe A special ship carries a semisubmersible to a new drilling location A box-on-box substructure A slingshot substructure in folded position prior to being raised The slingshot substructure near its full height This drawworks will be installed on the rig floor Drilling line is spooled onto the drawworks drum A mast being raised to vertical position This rig with a standard derrick was photographed in the 1970s at work in West Texas The doghouse is usually located at rig-floor level In the foreground is a coal-fired boiler that made steam to power the cable-tool rig in the background A mechanical rig drilling in West Texas in the 1960s Three diesel engines power this rig Three engines drive a chain-and-sprocket compound to power equipment The diesel engine at right drives the electric generator attached directly to the engine The central control cabinet of a diesel-electric rig Two powerful electric motors drive the drawworks on this rig The hoisting system The drawworks Removing the drawworks housing reveals the main brake bands to the left and right on hubs of the drawworks drum The electromagnetic brake is mounted on the end of the drawworks In this photo taken in the 1960s, a floorhand has fiber rope (a catline) wrapped around a friction cathead to lift an object on the rig floor This floorhand is using an air hoist, or tugger, to lift an object This makeup cathead has a chain coming out of it that is connected to the tongs Wire rope drilling line coming off the drawworks drum Drilling line is stored on this supply reel at the rig Drilling line is firmly clamped to this deadline anchor The sheaves (pulleys) of this crown block are near the bottom of the photo Ten lines are strung between the traveling block and the crown block Several wraps of drilling line on the drawworks drum Traveling block, shock absorber, hook, and other equipment are suspended by wire rope drilling line The mast supports the blocks and other drilling tools. 93 vii

6 99. A rotary-table system The turntable is housed in a steel case The master bushing fits inside the turntable Crew members are installing one of two halves that make up the tapered bowl Crew members set slips around the drill pipe and inside the master bushing s tapered bowl to suspend the pipe This master bushing has four drive holes into which steel pins on the kelly drive bushing fit This master bushing has a square bottom that fits into a square opening in the master bushing A. A square kelly 98 B. A hexagonal kelly This hexagonal kelly fits inside a matching opening in top of the kelly drive bushing The hook on the bottom of the traveling block is about to be latched onto the bail of the swivel Drilling fluid goes through the rotary hose and enters the swivel through the gooseneck A top drive, or power swivel, hangs from the traveling block and hook Mud pressure pumped through the drill stem above the down-hole motor, forces the motor s spiral shaft to turn inside the housing Horizontal hole These drill collars are laid out on a rack prior to being run into the well Drill collars put weight on the bit, which forces the bit cutters into the formation to drill it Several joints of drill pipe are laid on the rack prior to being run into the hole A floorhand stabs the pin of a joint of drill pipe into the box of another joint Two drill collars on a pipe rack Drill collars stacked in front of drill pipe on the rig floor A roller cone bit has teeth (cutters) that roll, or turn, as the bit rotates Tungsten carbide inserts are tightly pressed into holes drilled into the bit cones Drilling fluid (salt water in this case) is ejected out of the nozzles of a roller cone bit Several types of diamond bit are available Several diamond coated tungsten carbide disks form the cutters on this polycrystalline diamond compact bit Drilling mud swirls in one of several steel tanks on this rig This derrickman is measuring the density (weight) of a sample of drilling mud in a balance that is calibrated in pounds per gallon Components of a rig circulating system 113 viii

7 127. Mud pumps (most rigs have at least two) are powerful machines that move drilling mud through the circulating system The standpipe runs up one leg of the derrick or mast and conducts mud from the pump to the rotary hose Mud and cuttings fall onto the shale shaker, which removes the cuttings Desanders remove fine particles, or solids, from drilling mud Desilters, like desanders, also remove fine solids from the mud Mud cleaners, like desanders and desilters, also remove small solid particles from the mud A mud centrifuge removes tiny solids from the mud A degasser removes relatively small volumes of gas that enter the mud from a downhole formation and are circulated to the surface in the annulus A derrickman, wearing personal protective equipment, adds dry components to the mud through a hopper Large quantities of dry mud components are stored in P-tanks This derrickman stands next to a small, red-colored, steel container through which he can add caustic materials to the mud that is in the tanks below the grating A bit being lowered into the hole on a drill collar The kelly and related equipment in the rathole Red-painted slips with three handgrips suspend the drill string in the hole The kelly drive bushing is about to engage the master bushing on the rotary table The motor in the top drive turns the drill stem and bit The red pointer on the weight indicator shows weight on the bit The kelly is drilled down (is very close to the kelly drive bushing), so it is time to make a connection Here, the driller has raised the kelly with the traveling block so that the first joint of drill pipe is exposed in the opening of the rotary table Crew members latch tongs on the kelly and on the drill pipe The kelly spinner rapidly rotates (spins) the kelly in or out of the drill pipe joint Crew members stab the kelly into the joint of pipe in the mousehole Crew members use tongs to buck up (tighten) one drill pipe joint to another Crew members remove the slips The kelly drive bushing is about to engage the master bushing Making a connection using a top drive 129 ix

8 153. The kelly and swivel (with its bail) are put into the rathole Crew members latch elevators to the drill pipe tool joint suspended in the rotary table The derrickman has just placed the upper end of a stand of drill pipe between the fingers of the fingerboard The floorhands set the lower end of the stand of pipe off to one side of the rig floor A top view of an automatic pipe-handling device manipulating a stand of drill pipe A casing crew member cleans and inspects the casing as it lies on the rack next to the rig Casing threads must be clean, dry, and undamaged before they are run into the hole A joint of casing being lifted onto the rig floor A joint of casing suspended in the mast Casing elevators suspend the casing joint as the driller lowers the joint into the casing slips, or spider Working from a platform called the stabbing board, a casing crew member guides the casing elevators near the top of the casing joint Crew members install scratchers and centralizers at various points in the casing string Top view of casing not centered in the borehole; a cement void exists where the casing contacts the side of the hole A. Crew members lift the heavy steel-and-concrete guide shoe. 138 B. The guide shoe is made up on the bottom of the first joint of casing to go into the hole Cementing the casing; (A) the job in progress; (B) the finished job Crew members install a float collar into the casing string A cementing head (plug container) rests on the rig floor, ready to be made up on the last joint of casing to go into the hole To trip in, crew members stab a stand of drill pipe into another After stabbing the joint, crew members use a spinning wrench to thread the joints together After spin up, crew members use tongs to buck up the joint to final tightness An Iron Roughneck spins and bucks up joints with built-in equipment Intermediate casing is run and cemented in the intermediate hole Intermediate liner is hung in the surface casing A handful of cuttings made by the bit Logging personnel run and control logging tools by means of wireline from this laboratory on an offshore rig. 148 x

9 178. A well-site log is interpreted to give information about the formations drilled This small rig is a well servicing and workover unit Perforations (holes) Shaped charges in a perforating gun make perforations A coiled-tubing unit runs tubing into the well from a large reel This collection of valves and fittings is a Christmas tree Several directional wells tap an offshore reservoir A. A downhole motor laid on the rack prior to being run into the hole. 158 B. A bent sub deflects the bit a few degrees off-vertical to start the directional hole An overshot A. A spear goes inside the fish in a released position; B. once positioned, the spear is set and the fish removed Fluids erupting from underground caught fire and melted this rig A stack of blowout preventers (BOPs) installed on top of the well A subsea stack of BOPs being lowered to the seafloor from a floating rig Several valves and fittings make up a typical choke manifold A remote-controlled choke installed in the choke manifold This control panel allows an operator to adjust the size of the choke opening. 164 xi

10 Tables 1. Land rigs classified by drilling depth Types of MODU Roller cone and fixed-head bit cutters 107 xii

Section Nine Rig/Platform Environment. Oil & Gas Training. Oil & Gas Training. Oil & Gas Training. Rig/Platform Environment

Section Nine Rig/Platform Environment. Oil & Gas Training. Oil & Gas Training. Oil & Gas Training. Rig/Platform Environment Section Nine /Platform Environment /Platform Environment The rig site are broken into basic work areas. These are: Substructure /Platform Environment The rig site are broken into basic work areas. These

More information

03/31/2012. Site Preparation. Classifying Oil & Gas Operations. Presented By: Sharon Engle NSIPA & IAAW Annual Seminar April 19, 2012 Las Vegas, NV

03/31/2012. Site Preparation. Classifying Oil & Gas Operations. Presented By: Sharon Engle NSIPA & IAAW Annual Seminar April 19, 2012 Las Vegas, NV Classifying Oil & Gas Operations Presented By: Sharon Engle NSIPA & IAAW Annual Seminar April 19, 2012 Las Vegas, NV 1. Catline Boom and Hoist Line 2. Drilling Line 3. Monkeyboard 4. Traveling Block 5.

More information

Fundamentals Of Petroleum Engineering DRILLING OPERATIONS

Fundamentals Of Petroleum Engineering DRILLING OPERATIONS Fundamentals Of Petroleum Engineering DRILLING OPERATIONS Mohd Fauzi Hamid Wan Rosli Wan Sulaiman Department of Petroleum Engineering Faculty of Petroleum & Renewable Engineering Universiti Technologi

More information

An Introduction to Oil & Gas Drilling and Well Operations

An Introduction to Oil & Gas Drilling and Well Operations An Introduction to Oil & Gas Drilling and Well Operations Educational Material from the IOM 3 Oil and Gas Division The global network for the materials cycle Introduction The Institute of Materials, Minerals

More information

The Lease Pumper s Handbook. Chapter 4 Understanding the Oil Well. Section B DRILLING OPERATIONS

The Lease Pumper s Handbook. Chapter 4 Understanding the Oil Well. Section B DRILLING OPERATIONS 4B-1 The Lease Pumper s Handbook Chapter 4 Understanding the Oil Well Section B DRILLING OPERATIONS No two wells are alike, even if they are located near each other and are drilled into the same oil-bearing

More information

Offshore Drilling Rigs

Offshore Drilling Rigs Offshore Drilling Rigs Drilling Offshore Drilling Rigs Many of the world s potential reserves of hydrocarbons lie beneath the sea, and the hydrocarbon industry has developed techniques suited to conditions

More information

"DRILLING-101: Everything a Geoscientist needs to know about Well Engineering but was afraid to ask"

DRILLING-101: Everything a Geoscientist needs to know about Well Engineering but was afraid to ask London Petrophysical Society (a chapter of the SPWLA) One-day Seminar "DRILLING-101: Everything a Geoscientist needs to know about Well Engineering but was afraid to ask" 25th September 2014 The Geological

More information

Personalized Service, Industry Expertise. Franklin Howard

Personalized Service, Industry Expertise. Franklin Howard Personalized Service, Industry Expertise. Franklin Howard PRODUCTS Franklin Howard International provides high quality drilling equipment and spare parts from top manufacturers in the United States. Warranty

More information

OPERATING MANUAL SHOCK TOOL OWS WENZEL DOWNHOLE TOOLS LTD.

OPERATING MANUAL SHOCK TOOL OWS WENZEL DOWNHOLE TOOLS LTD. OPERATING MANUAL SHOCK TOOL OWS WENZEL DOWNHOLE TOOLS LTD. Release Notes: Release 2 Issued May 2016 Document # OM ST 001, Shock Tool Operating Manual Reviewed By: RG 1 P age OPERATING MANUAL SHOCK TOOL

More information

BRIEF INTRODUCTION OF OILMAN

BRIEF INTRODUCTION OF OILMAN BRIEF INTRODUCTION OF OILMAN Oilman provides equipment and services in support of well construction activities worldwide. Our primary focus is in the supply of rig packages to the international drilling

More information

When a drilling project is commenced, two goals must be achieved:

When a drilling project is commenced, two goals must be achieved: Technologies Drilling Technologies Oil well drilling is a complex operation and the drilling industry engages the services of personnel and a complicated array of machinery and materials to drill an oil/gas

More information

NORWAY. Norwegian Industrial Property Office (12) APPLICATION (19) NO (21) (13) A1. (51) Int Cl.

NORWAY. Norwegian Industrial Property Office (12) APPLICATION (19) NO (21) (13) A1. (51) Int Cl. (12) APPLICATION (19) NO (21) 11782 (13) A1 NORWAY (1) Int Cl. E21B 43/00 (06.01) E21B 43/01 (06.01) E21B 43/12 (06.01) Norwegian Industrial Property Office (21) Application nr 11782 (86) Int.application.day

More information

GTSC Rig for Hands-on Training

GTSC Rig for Hands-on Training GTSC Rig for Hands-on Training The Rig To meet the high demand of Petroleum Industry, GTSC has launched the Middle East s first fully operational Training Rig & Well in May 2010 at its main building location

More information

CIVIL ENGINEERING Vol. II - Offshore Drilling and Production Equipment - S. Tanaka, Y. Okada, Y. Ichikawa OFFSHORE DRILLING AND PRODUCTION EQUIPMENT

CIVIL ENGINEERING Vol. II - Offshore Drilling and Production Equipment - S. Tanaka, Y. Okada, Y. Ichikawa OFFSHORE DRILLING AND PRODUCTION EQUIPMENT OFFSHORE DRILLING AND PRODUCTION EQUIPMENT S. Tanaka Professor Emeritus, The University of Tokyo, Tokyo, Japan Y. Okada General Manager, Japan Oil Engineering Co., Ltd., Tokyo, Japan Y. Ichikawa General

More information

Ladiz Niroo Company (Joint Stuck) Supplier of Drilling Equipment. Drilling Catalogue

Ladiz Niroo Company (Joint Stuck) Supplier of Drilling Equipment. Drilling Catalogue Ladiz Niroo Company (Joint Stuck) Supplier of Drilling quipment Drilling Catalogue LNCO is involved in the field of supplying consumable equipment for Oil & Gas Drilling Industries. 1 :Oil and Gas Drilling

More information

3/14/2015 Contacted and Solicited bids from construction vendors to build location. (San Jan, Orbit, Sweat, Storm).

3/14/2015 Contacted and Solicited bids from construction vendors to build location. (San Jan, Orbit, Sweat, Storm). Operator Torchlight Energy Page 1 3/12/2015 Mark McCoy, engineer with Mojo, met with University Lands representative, Drew McEachern and the land rancher, John Hunter to discuss access roads to Orogrande

More information

DRILLING & WORKING TOOLS

DRILLING & WORKING TOOLS EAGLE EQUIPMENT SUPPLIES & SERVICES PTE LTD 48 Toh Guan Road East #06-107 Enterprise Hub, Singapore 608586 Tel : (65) 6795 2411 Fax: (65) 6795 5877 Email: eesss@singnet.com.sg Company Registration (UEN)

More information

Casing while Drilling. Enhanced Casing Installation

Casing while Drilling. Enhanced Casing Installation Casing while Drilling Enhanced Casing Installation CWD Definition, History & Experience Casing while Drilling means utilizing the casing string as the drill string instead of drill pipe. 1907 Reuben Baker

More information

Fundamentals of Drilling Course Outline. (1)Basics of Rotary Drilling Rotary Operations/Coring

Fundamentals of Drilling Course Outline. (1)Basics of Rotary Drilling Rotary Operations/Coring Fundamentals of Drilling Course Outline (1)Basics of Rotary Drilling (2)Rotary (2) Operations/Coring Rotary Operations/Coring (3)Directional -Drilling Drilling (4)Fishing-Roundtrip (5)Casing/Cementing

More information

OILWELL PT1100A, S/N P199A61, p/b CAT 3508, S/N 95Y01254, w/5 x 6 Charge Pump (Rebuilt)

OILWELL PT1100A, S/N P199A61, p/b CAT 3508, S/N 95Y01254, w/5 x 6 Charge Pump (Rebuilt) Capabilities: DEPTH RATING 18,000 Draw Works OIME SL 1500 1 1/4 DL Brake PARMAC 342 Hydromatic Engines (3) CAT 3412 Engines, S/Ns 81Z11431 & 81708039 Mast PYRAMID 146 x 23 815,000# SHL w/6 Sheave Crown

More information

Moduels in PetroTrainer. PetroTrainer. How PetroTrainer is used

Moduels in PetroTrainer. PetroTrainer. How PetroTrainer is used PetroTrainer E-Learning for the Petroleum industry PetroTrainer is probably the world s largest and most comprehensive tool made for training purposes in the petroleum industry. The ITC Boreskolen started

More information

MSR/MSB Mechanical Setting Tool

MSR/MSB Mechanical Setting Tool Tech Unit No: 0620000004 Revision: B Approved By: Quality Engineer Date: 2014-12-16 MSR/MSB Mechanical Setting Tool FEATURES: Special designed Bow Spring provides positive control and allows one size Mechanical

More information

C o n t a c t U s f o r S p e c i a l C o r p o r a t e R a t e N o w!

C o n t a c t U s f o r S p e c i a l C o r p o r a t e R a t e N o w! ADVANCED FISHING C o n t a c t U s f o r S p e c i a l C o r p o r a t e R a t e N o w! ADVANCED FISHING Course Overview This course has been written for Advanced-level Operator Staff,, Drilling Contractor

More information

Drill Line Tension Guide User Procedure Manual

Drill Line Tension Guide User Procedure Manual Oilfield Solutions Inc. Drill Line Tension Guide User Procedure Manual Special Instructions I Conditions of Use Reading this user procedure manual prior to use is essential. Slip & Cut, Drill Line Tension

More information

HDD Training. HDD Equipment and Tooling. Mark Miller, PE Jon Robison, PE

HDD Training. HDD Equipment and Tooling. Mark Miller, PE Jon Robison, PE HDD Training HDD Equipment and Tooling Mark Miller, PE Jon Robison, PE HDD Drill Rigs Horizontal Directional Drilling (HDD) drill rigs come in various shapes and sizes. The small drill rigs are usually

More information

Chapter 02. Casing and Tubing

Chapter 02. Casing and Tubing Chapter 02 Casing and Tubing Table of Contents Introduction 2-4 Topic Areas 2-4 Learning Objectives 2-4 Unit A: Casing and Tubing Uses 2-4 Unit A Quiz 2-5 Unit B: Typical Casing Strings 2-5 Conductor

More information

SETTING UP THE MODEL 210B-2 SRA

SETTING UP THE MODEL 210B-2 SRA SETTING UP THE MODEL 210B-2 SRA SAFETY PRECAUTIONS FOR THE MODEL 210B-2 SRA System Under Pressure: Shut off air supply and disconnect air hose before disassembling or disconnecting parts. Flying Debris:

More information

Subsea Well Engineering

Subsea Well Engineering Subsea Well Engineering Prof. Marcio Yamamoto UNIVERSITY OF SÃO PAULO Dept. of Mining and Petroleum Engineering December 11th, 2014 Kashiwa, Chiba Subsea Well Engineering Water Depth Petroleum Well Classification

More information

TZ400 Self - elevating Drilling Unit General Specification (Revision: B1)

TZ400 Self - elevating Drilling Unit General Specification (Revision: B1) TZ400 Self - elevating Drilling Unit General Specification (Revision: B1) Name : TZ 400ft Self-elevating Drilling Unit (TZ301-1) Flag/Port of registration : Panama Call sign : T.B.A Built : 2014 Official

More information

Multi-Bowl Applications

Multi-Bowl Applications Multi-Bowl Applications Standard Off-the- Shelf Casing Head Lower Profile Solution Common Support Bushing Field Proven Sealing Designs FS Seals require No Plastic Packing C-22 Profile = Standard Off-the-

More information

COILED TUBING DESIGN & OPERATIONS

COILED TUBING DESIGN & OPERATIONS Training Title COILED TUBING DESIGN & OPERATIONS Training Date & Duration Will be held at any 5 star hotel- 5 Days Coiled Tubing Design & Operations 5 days 15-19 December 2013 US $ 4,250 Abu Dhabi Training

More information

MODEL 83 Pail Handler

MODEL 83 Pail Handler MORSE MFG. CO., INC. 727 West Manlius Street P.O. Box 518 East Syracuse, NY 13057-0518 Phone: 315-437-8475 Fax: 315-437-1029 Email: service@morsemfgco.com Website: www.morsemfgco.com COPYRIGHT 2005 MORSE

More information

for High School Students Presented in collaboration by:

for High School Students Presented in collaboration by: for High School Students Presented in collaboration by: Find us online www.petroed.com/tea Download our whitepaper! Written for CTE Directors & Ag Teachers Provides information on jobs Outlines the course

More information

MSR/MSB Mechanical Setting Tool

MSR/MSB Mechanical Setting Tool Tech Unit No: 0620000004 Revision: C Approved By: Quality Engineer Date: 201-1-9 MSR/MSB Mechanical Setting Tool FEATURES: Special designed Bow Spring provides positive control and allows one size Mechanical

More information

18000 HDL FOUR POST LIFT LB CAPACITY INSTALLATION AND OWNER'S MANUAL

18000 HDL FOUR POST LIFT LB CAPACITY INSTALLATION AND OWNER'S MANUAL 18000 HDL FOUR POST LIFT 18000 LB CAPACITY INSTALLATION AND OWNER'S MANUAL WARNING! Do not raise a vehicle unless the front stops are in place, the parking brake is set, and the wheels are chocked. Stay

More information

SETTING UP THE MODEL 210-3, -4, and -5 EQ MT

SETTING UP THE MODEL 210-3, -4, and -5 EQ MT SETTING UP THE MODEL 210-3, -4, and -5 EQ MT SAFETY PRECAUTIONS FOR THE MODEL 210-3, -4, -5 EQ MT System Under Pressure: Shut off air supply and disconnect air hose before disassembling or disconnecting

More information

Mærsk Deliverer. Ultra deepwater drilling and development. semi-submersible

Mærsk Deliverer. Ultra deepwater drilling and development. semi-submersible Mærsk Deliverer Ultra deepwater drilling and development semi-submersible Maersk Drilling Mærsk Deliverer TYPE DPS2/M, Column stabilised dynamically positioned semisubmersible drilling rig with capability

More information

International Well Control Forum IWCF. Well Control Training Syllabus. Drilling Level 2. 1 st January 2014 Version 3.0

International Well Control Forum IWCF. Well Control Training Syllabus. Drilling Level 2. 1 st January 2014 Version 3.0 International Well Control Forum IWCF Well Control Training Drilling Level 2 1 st January 2014 Version.0 Drilling Well Control Written Test Level 2 Surface & Subsea BOP Stack s and Structure Written Test

More information

Drilling Courses

Drilling Courses 2017-2018 Drilling Courses Includes Prentice Training Company Courses Taught By: Calvin Barnhill NORTHSTAR TRAINING Northstar Training is very excited to be able to continue to teach the Prentice Training

More information

The Rotary Rig And Its Components Rotary Drilling Series Unit 1 Lesson 1

The Rotary Rig And Its Components Rotary Drilling Series Unit 1 Lesson 1 The Rotary Rig And Its Components Rotary Drilling Series Unit 1 Lesson 1 THE ROTARY RIG AND ITS COMPONENTS ROTARY DRILLING SERIES UNIT 1 LESSON 1 PDF - Are you looking for the rotary rig and its components

More information

Investor Relations Presentation April 30, 2013

Investor Relations Presentation April 30, 2013 Investor Relations Presentation April 30, 2013 FORWARD LOOKING STATEMENTS In addition to the historical data contained herein, this document may include forward-looking statements regarding the future

More information

Assmann Corporation of America TANK INSTALLATION AND USE GUIDELINES FOR BULK STORAGE TANKS

Assmann Corporation of America TANK INSTALLATION AND USE GUIDELINES FOR BULK STORAGE TANKS Assmann Corporation of America TANK INSTALLATION AND USE GUIDELINES FOR BULK STORAGE TANKS General Information Assmann polyethylene storage tanks are manufactured to give you the toughest, most reliable

More information

Module No. # 01 Lecture No. # 3 Safety in design and operations. (Refer Slide Time: 00:10)

Module No. # 01 Lecture No. # 3 Safety in design and operations. (Refer Slide Time: 00:10) Health, Safety and Environmental Management in Petroleum and offshore Engineering Prof. Dr. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institute Of Technology, Madras Module No. #

More information

@balance Deepwater. MPD services

@balance Deepwater. MPD services @balance Deepwater MPD services Drill faster and reach farther with @balance Deepwater MPD services Achieve drilling objectives with closed-loop systems MPD provides a closed-loop circulation system in

More information

AADE-05-NTCE-56. New Impregnated Bit Achieves Outstanding Drill Outs Daniel Colléter Halliburton Security DBS Nuno da Silva Halliburton Security DBS

AADE-05-NTCE-56. New Impregnated Bit Achieves Outstanding Drill Outs Daniel Colléter Halliburton Security DBS Nuno da Silva Halliburton Security DBS AADE-05-NTCE-56 New Impregnated Bit Achieves Outstanding Drill Outs Daniel Colléter Halliburton Security DBS Nuno da Silva Halliburton Security DBS This paper was prepared for presentation at the AADE

More information

Well Abandonment Services. Plug into a New Approach

Well Abandonment Services. Plug into a New Approach Well Abandonment Services Plug into a New Approach Get it Right the First Time Permanent Solutions to Your Well Abandonment Challenge Thousands of wells await safe and permanent abandonment. It s critical

More information

Speaker at the Americas: Decommissioning and Well Abandonment. September 23, 2015

Speaker at the Americas: Decommissioning and Well Abandonment. September 23, 2015 Speaker at the Americas: Decommissioning and Well Abandonment September 23, 2015 TETRA Offshore Services TETRA Offshore Services ISO 9001:2008 Certified 2 Decommissioning Case Study - Agenda A general

More information

BT-4000 LIGHT WORKOVER UNIT

BT-4000 LIGHT WORKOVER UNIT BT-4000 LIGHT WORKOVER UNIT BT-4000 LIGHT WORKOVER UNIT DESIGNED TO IMPROVE EFFICIENCY DURING WELL INTERVENTION OPERATIONS The BT-4000 LWO is the new generation DP-3 semi-submersible for efficient light

More information

The intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure.

The intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure. 1 The intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure. This document is not intended to override any specific local

More information

Inspection. Assembly Install the springs. 1. Discard the 0-rings. 2. Clean all parts in cleaning solvent.

Inspection. Assembly Install the springs. 1. Discard the 0-rings. 2. Clean all parts in cleaning solvent. 6010-34 Inspection 3. Install the springs. 1. Discard the 0-rings. 2. Clean all parts in cleaning solvent. 3. If spring test equipment is available, check the tension of each spring according to the specifications

More information

AUGER TOOLS. www. .com MINERAL EXPLORATION ENVIRONMENTAL GEOTECHNICAL GEOTHERMAL ROTARY SONIC HDD

AUGER TOOLS. www. .com MINERAL EXPLORATION ENVIRONMENTAL GEOTECHNICAL GEOTHERMAL ROTARY SONIC HDD AUGER TOOLS MINERAL EXPLORATION ENVIRONMENTAL GEOTECHNICAL GEOTHERMAL ROTARY SONIC HDD www..com AUGER TOOLS TABLE OF CONTENTS AUGER OVERVIEW... 3 HOLLOW STEM AUGERS... 4-12 2 1/4" Hollow Stem Augers...

More information

ROTARY STEERABLE SYSTEMS TO REDUCE THE COST AND INCREASE THE ENERGY VALUE OF DRILLING DIRECTIONAL WELLS IN OLKARIA GEOTHERMAL FIELD

ROTARY STEERABLE SYSTEMS TO REDUCE THE COST AND INCREASE THE ENERGY VALUE OF DRILLING DIRECTIONAL WELLS IN OLKARIA GEOTHERMAL FIELD ROTARY STEERABLE SYSTEMS TO REDUCE THE COST AND INCREASE THE ENERGY VALUE OF DRILLING DIRECTIONAL WELLS IN OLKARIA GEOTHERMAL FIELD George Karimi Kenya Electricity Generating Company Limited Geothermal

More information

EMB MANUFACTURING INC.

EMB MANUFACTURING INC. TRAILER WOOD PROCESSOR MODELS WP865, WP835, WP635 ASSEMBLY INSTRUCTION MANUAL Please review and understand the operators manual before attempting to operate this machinery. EMB MANUFACTURING INC. 4144

More information

SAVE THIS FOR FUTURE REFERENCE THIS PRODUCT IS FOR PROFESSIONAL LABORATORY USE ONLY USER'S MANUAL

SAVE THIS FOR FUTURE REFERENCE   THIS PRODUCT IS FOR PROFESSIONAL LABORATORY USE ONLY USER'S MANUAL DENTAL, INC. TECHNICAL BULLETIN Q827-022510 5860 FLYNN CREEK ROAD READ ALL INSTRUCTIONS P.O. BOX 106 BEFORE PROCEEDING COMPTCHE, CALIFORNIA, U.S.A. 95427 SAVE THIS FOR FUTURE REFERENCE www.wellsdental.com

More information

Mast and Antennas for Field Day & Emergencies

Mast and Antennas for Field Day & Emergencies Mast and Antennas for Field Day & Emergencies John A. Allocca, WB2LUA, July 2005 This is a 27 feet 1.5 diameter portable guyed mast with a 28 feet diameter footprint. It breaks down into four 6 feet sections

More information

IDEAS E-Learning Course

IDEAS E-Learning Course IDEAS E-Learning Course Welcome to IDEAS E-Learning Courses There are many advantages to E-Learning! Key features among them are: You can study in your own time and at your own pace You can repeat sections

More information

GEOTHERMAL WELL DRILLING

GEOTHERMAL WELL DRILLING Presented at Short Course VII on Exploration for Geothermal Resources, organized by UNU-GTP, GDC and KenGen, at Lake Bogoria and Lake Naivasha, Kenya, Oct. 27 Nov. 18, 2012. GEOTHERMAL TRAINING PROGRAMME

More information

Syllabus CH EN 6181 Drilling and Completions Fall 2015

Syllabus CH EN 6181 Drilling and Completions Fall 2015 Faculty Syllabus CH EN 6181 Drilling and Completions Fall 2015 Ian Walton EGI, Suite 300, 423 Wakara Way 801-581- 8497 (office) iwalton@egi.utah.edu Office Hours: Any time or by appointment Meetings Tuesdays

More information

INSTALLATION INSTRUCTIONS FOR HAND OPERATED MODELS: 170, 171-R, 171-N, 172, 260

INSTALLATION INSTRUCTIONS FOR HAND OPERATED MODELS: 170, 171-R, 171-N, 172, 260 INSTALLATION INSTRUCTIONS FOR HAND OPERATED MODELS: 170, 171-R, 171-N, 172, 260 I. SUSPENDED INSTALLATIONS NOTE: MODEL 260 FENSTEEL TRACK IS ASSEMBLED IN THE SAME MANNER AS DESCRIBED BELOW WITH THE EXCEPTION

More information

Appendix F Lock-Down Sleeve Decision. Appendix F Lock-Down Sleeve Decision

Appendix F Lock-Down Sleeve Decision. Appendix F Lock-Down Sleeve Decision Appendix F Lock-Down Sleeve Decision Appendix F Lock-Down Sleeve Decision After the production casing has been installed in the well and cemented in place, the operator may elect to run a lock-down sleeve.

More information

PORTA-DOCK, INC. AP17 APD DS 4 X 16 T12 AW17 CPD DS 4 X 16 T12

PORTA-DOCK, INC. AP17 APD DS 4 X 16 T12 AW17 CPD DS 4 X 16 T12 Page 1 of 7 PORTA-DOCK, INC. AP17 APD DS 4 X 16 T12 AW17 CPD DS 4 X 16 T12 *For Beige Decking Add the Letter B to Model* Thank you for purchasing out product! *Please read these instructions and follow

More information

NCCER Progress Blvd, Alachua, Florida Phone: (888)

NCCER Progress Blvd, Alachua, Florida Phone: (888) NCCER 13614 Progress Blvd, Alachua, Florida 32615 Phone: (888) 622-3720 E-mail: info@nccer.org PIPEFITTING Competencies / Objectives Level One MODULE 08101-06 - ORIENTATION TO THE TRADE 1. Describe the

More information

Drilling Engineering Handbook

Drilling Engineering Handbook Drilling Engineering Handbook Drilling Engineering Handbook Ellis H. Austin International Human Resources Development Corporation Boston D. Reidel Publishing Company, A Member of the Kluwer Academic Publishers

More information

Hollow Stem Auger Modifications

Hollow Stem Auger Modifications Hollow Stem Auger Modifications Auger Extensions Auger Extensions are used to compensate for the distance from the ground up to the rig. To order these extensions please specify: 1. Length: standards are

More information

A59 APD & A86 CPD 5'X 16' SW ALUMINUM PORTA-DOCK

A59 APD & A86 CPD 5'X 16' SW ALUMINUM PORTA-DOCK Page 1 of 5 PORTA-DOCK, INC. A59 APD & A86 CPD 5'X 16' SW ALUMINUM PORTA-DOCK *For Beige Decking Add the Letter B to model* Thank you for purchasing our product! *Please read these instructions and follow

More information

580A Automatic Cable Tying Machine 580A

580A Automatic Cable Tying Machine 580A Automatic Cable Tying Machine 580A Contenido Regular Information...3 Technical parameters:...5 Operation Instruction....6 Trouble Shooting....8 Maintenance....9 After-sales Service...9 Safety Instructions....10

More information

Standard External Cutters. Manual E525

Standard External Cutters. Manual E525 Standard External Cutters Manual E525 CONTENTS Logan Standard External Cutters Overview... 2 Uses... 2 Construction... 2 Spring Dog Assembly... 2 Ratchet Pawl Assembly... 2 Slip Assembly... 5 Tool Illustrations...

More information

DE123 Advanced Drilling Practice Technology

DE123 Advanced Drilling Practice Technology DE123 Advanced Drilling Practice Technology H.H. Sheikh Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E www.ictd.ae ictd@ictd.ae Course Introduction: This five-day advanced training course provide

More information

SAVE THIS FOR FUTURE REFERENCE THIS PRODUCT IS FOR PROFESSIONAL LABORATORY USE ONLY USER'S MANUAL

SAVE THIS FOR FUTURE REFERENCE   THIS PRODUCT IS FOR PROFESSIONAL LABORATORY USE ONLY USER'S MANUAL DENTAL, INC. TECHNICAL BULLETIN G801-022510 5860 FLYNN CREEK ROAD READ ALL INSTRUCTIONS P.O. BOX 106 BEFORE PROCEEDING COMPTCHE, CALIFORNIA, U.S.A. 95427-0106 SAVE THIS FOR FUTURE REFERENCE www.wellsdental.com

More information

. Recommended guidelines for the field inspection of TenarisHydril connections, FSOG Wedge 513. Handling Plugs TN 9906.

. Recommended guidelines for the field inspection of TenarisHydril connections, FSOG Wedge 513. Handling Plugs TN 9906. Wedge 513 / 511 Connections Scope These guidelines apply specifically to the use of Wedge 513 and Wedge 511 connections. This document should be used in conjunction with the Running Manual which is the

More information

Frameless Inline Door With Return QCI5263

Frameless Inline Door With Return QCI5263 INSTALLATION INSTRUCTIONS Frameless Inline Door With Return QCI5263 WALL MOUNT HINGES FRAMELESS DOOR / PANEL / RETURN PANEL QCI5263 REV. 0 Page 1 Certified 06/17/2016 Parts List with wall mount hinges

More information

MODEL T TON HYDRAULIC PRESS INSTRUCTIONS (For Machines Mfd. Since 10/17)

MODEL T TON HYDRAULIC PRESS INSTRUCTIONS (For Machines Mfd. Since 10/17) MODEL T1241 20-TON HYDRAULIC PRESS INSTRUCTIONS (For Machines Mfd. Since 10/17) For questions or help with this product contact Tech Support at (570) 546-9663 or techsupport@grizzly.com Identification

More information

Installation, Assembly, and Operation Manual: Multi-Section Prestige Flagpole

Installation, Assembly, and Operation Manual: Multi-Section Prestige Flagpole Installation, Assembly, and Operation Manual: Multi-Section Prestige Flagpole We are honored that you have selected a Trident Support Prestige Flagpole from which to proudly fly the flag of your choice.

More information

Thank you for purchasing out product! *Please read these instructions and follow them step by step. *

Thank you for purchasing out product! *Please read these instructions and follow them step by step. * Page 1 of 7 AD17 AA DS 4 X 16 T12 Thank you for purchasing out product! *Please read these instructions and follow them step by step. * STEP 1. Slide two support posts (REF. # 24) into the two outside

More information

SILVERBACK INSTALLATION MANUAL

SILVERBACK INSTALLATION MANUAL SILVERBACK INSTALLATION MANUAL R-SERIES SOLAR RACKS T OLL FREE 866-766-3727 WWW.ROOFSCREEN.COM Introduction... 2 The Silverback Solar Racking System... 2 This manual... 2 Application... 2 System Overview...

More information

Vincent/Enfield Conductor and Flowbase Installation Review. Roy Grant, TSMarine

Vincent/Enfield Conductor and Flowbase Installation Review. Roy Grant, TSMarine Vincent/Enfield Conductor and Flowbase Installation Review Roy Grant, TSMarine Project scope Offshore installation Mobilised in Dampier (KBSB) on 10 October TSMarine scope is onshore project management

More information

Appendix B Drilling Methods

Appendix B Drilling Methods Appendix B Drilling Methods B-1. Introduction A brief discussion of available drilling methods is included below. It is not the intent of this manual to include a detailed description of these methods.

More information

Top Drive Drilling System

Top Drive Drilling System Release Product Bulletin No.: TDS-93-1 Top Drive Drilling System Date: March 29, 2011 Subject: Product: Affected Assemblies: Objective: Problem: Solution: Post Jarring and Hard Drilling Inspection of Top

More information

installation guide

installation guide JANUS INTERNATIONAL 1 866 562 2580 w w w. j a n u s i n t l. c o m 2000 2500 3000 installation guide RIGHT DRIVE END SHOWN LH OPPOSITE LEFT TENSION END SHOWN RH OPPOSITE PUSH-UP OPERATION 2000 2500 3000

More information

MPD ACTIVE PRESSURE MANAGEMENT Next-generation MPD technology, built by manufacturing specialists

MPD ACTIVE PRESSURE MANAGEMENT Next-generation MPD technology, built by manufacturing specialists MPD ACTIVE PRESSURE MANAGEMENT Next-generation MPD technology, built by manufacturing specialists Our experienced service personnel have supported operators with more than 80+ wells drilled to date. Our

More information

HDD Training. HDD Construction Process. Mark Miller, PE Jon Robison, PE

HDD Training. HDD Construction Process. Mark Miller, PE Jon Robison, PE HDD Training HDD Construction Process Mark Miller, PE Jon Robison, PE What is HDD Horizontal Directional Drilling (HDD) is meant to be a convenient method of installing utilities beneath sensitive areas

More information

pipeline FSHR and tether for fatigue, stress, and any other abnormal condition (e.g., corrosion) that may negatively impact the riser or tether; and

pipeline FSHR and tether for fatigue, stress, and any other abnormal condition (e.g., corrosion) that may negatively impact the riser or tether; and (3) A description of how you met the design requirements, load cases, and allowable stresses for each load case according to API RP 2RD (as incorporated by reference in 250.198); (4) Detailed information

More information

The MUELLER method of making a main to service connection using the MUELLER E-5 Small Drilling Machine. Hand or power. kpa/34.

The MUELLER method of making a main to service connection using the MUELLER E-5 Small Drilling Machine. Hand or power. kpa/34. MUELLER SMALL DRILLING MACHINES 2.1 Shaded area indicates change Rev. 9-09 MUELLER Co. manufactures several different small drilling machines for drilling holes from 7/16" to 2" in all types of pipe. Machines

More information

Reliance SG800 Series Steel Water Gage Valves

Reliance SG800 Series Steel Water Gage Valves Installation, Operation, & Maintenance Instructions R500.541D1 10/16/2016 Reliance SG800 Series Steel Water Gage Valves Note: Design variations in Steel Water Gage Valves necessitate typical illustrations,

More information

SELF-ALIGNING PLASTIC INCLINOMETER CASING IN BOREHOLES. Model GEO-LOK. Roctest Limited, All rights reserved.

SELF-ALIGNING PLASTIC INCLINOMETER CASING IN BOREHOLES. Model GEO-LOK. Roctest Limited, All rights reserved. INSTRUCTION MANUAL SELF-ALIGNING PLASTIC INCLINOMETER CASING IN BOREHOLES Model Roctest Limited, 2013. All rights reserved. This product should be installed and operated only by qualified personnel. Its

More information

26. TenarisHydril Blue Riser Connection

26. TenarisHydril Blue Riser Connection IDM Code GDL 00368/2 / November 2015 26. TenarisHydril Blue Riser Connection Scope These guidelines apply specifically to the use of TenarisHydril Blue Riser connections. This document shall be used in

More information

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS 12/11/07 PAGE 1 OF 12 400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS Thank you for purchasing our product! *Please read these instructions

More information

Bertram Binder. 2 String & 4 String Versions. Operating Manual. V 4.2 Cork Disc Tension Control. Visit

Bertram Binder. 2 String & 4 String Versions. Operating Manual. V 4.2 Cork Disc Tension Control. Visit Bertram Binder 2 String & 4 String Versions Operating Manual V 4.2 Cork Disc Tension Control Visit www.quinchat.webs.com for videos Binder Manual v 4.2 page1 Binder Design Change This edition of the operating

More information

Quick Set Dovetail Jig

Quick Set Dovetail Jig Quick Set Dovetail Jig FOR HELP OR ADVISE ON THIS PRODUCT PLEASE CALL OUR CUSTOMER SERVICE HELP LINE : 01509 500359 THE MANUFACTURER RESERVES THE RIGHT TO ALTER THE DESIGN OR SPECIFICATION TO THIS PRODUCT

More information

A Division of Engtek Manoeuvra Systems Pte Ltd. SubSea Propulsion Technology

A Division of Engtek Manoeuvra Systems Pte Ltd. SubSea Propulsion Technology Engtek SubSea Systems A Division of Engtek Manoeuvra Systems Pte Ltd SubSea Propulsion Technology SubSea Hydraulic Thruster Systems The enclosed data, information, description, photos and illustrations

More information

Sinking of the Deepwater Horizon. 11 perish and 115 survive

Sinking of the Deepwater Horizon. 11 perish and 115 survive Sinking of the Deepwater Horizon 11 perish and 115 survive The Rig Rig cost about $500,000 per day to contract With all the drilling spread, helicopters, support vessels, other services cost about $1,000,000

More information

Land wellhead systems & offshore surface wellhead systems

Land wellhead systems & offshore surface wellhead systems Land wellhead systems & offshore surface wellhead systems Presented by Oseghale Lucas Okohue BEngr. Msc. CIPMP Objectives The objective of this chapter is to provide a brief overview of the types of wellhead

More information

AADE 01-NC-HO-02. Copyright 2001 AADE National Drilling Technical Conference

AADE 01-NC-HO-02. Copyright 2001 AADE National Drilling Technical Conference AADE 01-NC-HO-02 Using Multi-Function Fishing Tool Strings to Improve Efficiency and Economics of Deepwater Plug and Abandonment Operations David B. Haughton and Walter S. Going, P.E., SPE, Baker Oil Tools

More information

The MUELLER method of making a main to service connection using the MUELLER E-5 Small Drilling Machine. The main is drilled out under pressure.

The MUELLER method of making a main to service connection using the MUELLER E-5 Small Drilling Machine. The main is drilled out under pressure. MUELLER SMALL DRILLING MACHINES 2.1 Rev. 9-09 MUELLER Co. manufactures several different small drilling machines for drilling holes from 7/16" to 2" in all types of pipe. Machines are available in hand

More information

HD installation guide

HD installation guide JANUS INTERNATIONAL 1 866 562 2580 www.janusintl.c o m 1950 1950HD installation guide RIGHT DRIVE END SHOWN LH OPPOSITE LEFT TENSION END SHOWN RH OPPOSITE PUSH-UP OPERATION 1950 1950HD SHOWN A rolling

More information

Advanced Well Completion Design. 30 Sep - 04 Oct 2018, Dubai. REP logo, PMI & PMP are registered trademarks of Project Management Institute, Inc.

Advanced Well Completion Design. 30 Sep - 04 Oct 2018, Dubai. REP logo, PMI & PMP are registered trademarks of Project Management Institute, Inc. 30 Sep - 04 Oct 2018, Dubai Approved Centre REP logo, PMI & PMP are registered trademarks of Project Management Institute, Inc. Introduction Organisational Impact This Glomacs Advanced Well training seminar

More information

Seeing through software

Seeing through software Seeing through software Gefei Liu and Cissy Zhao, Pegasus Vertex Inc., USA, explain how the use of advanced software can help engineers see underground by predicting subsurface conditions. Oil well drilling

More information

POWERMATIC PWBS-14 Bandsaw

POWERMATIC PWBS-14 Bandsaw POWERMATIC PWBS-14 Bandsaw The versatility of the bandsaw has made it a favorite of woodworkers for decades. The POWERMATIC PWBS-14 Bandsaw was designed to be rugged, accurate and to bring a surprising

More information

SALES CUSTOMER SERVICE TECHNICAL ASSISTANCE CALL TOLL-FREE:

SALES CUSTOMER SERVICE TECHNICAL ASSISTANCE CALL TOLL-FREE: DENTAL, INC. TECHNICAL BULLETIN U802-022510 5860 FLYNN CREEK ROAD READ ALL INSTRUCTIONS P.O. BOX 106 BEFORE PROCEEDING COMPTCHE, CALIFORNIA, U.S.A. 95427 SAVE THIS FOR FUTURE REFERENCE THIS PRODUCT IS

More information

. Recommended guidelines for the field inspection of TenarisHydril connections, FSOG Wedge 521. Handling plugs TN 9711.

. Recommended guidelines for the field inspection of TenarisHydril connections, FSOG Wedge 521. Handling plugs TN 9711. IDM Code GDL00384/3 / March 2018 TenarisHydril Wedge 523 / 521 Connections Scope These guidelines apply specifically to the use of TenarisHydril Wedge 523 and Wedge 521 connections. This document should

More information