ISSN: Page 298

Size: px
Start display at page:

Download "ISSN: Page 298"

Transcription

1 Sizing Current Transformers Rating To Enhance Digital Relay Operations Using Advanced Saturation Voltage Model *J.O. Aibangbee 1 and S.O. Onohaebi 2 *Department of Electrical &Computer Engineering, Bells University of Technology, Ota, Nigeria Department of Electrical / Electronic Engineering, University of Benin, Nigeria ABSTRACT Current transformers for transmission lines are rated to avoid saturation during the asymmetrical portion of the maximum fault current. The selection of current transformers (CTs) rating to maximize microprocessor-based (MPB) relay operations was investigated. This paper examines the effects of saturation on protection relays, and developed an advanced saturation voltage (VS) algorithm for the selection of CT rating for Microprocessorbased relays applications in transmission lines with high short circuit levels. Results show that Instantaneous MPB relay operation using 1200:5A ratio can be guaranteed with Voltage burden of 525, within 1-cycle trip time as compared to Voltage burden of 20 times rated voltage at standard burden to avoid saturation specified by IEEE standard for EMR. A criterion for selecting minimum CT rating for MPB overcurrent relay operations in transmission lines to avoid saturation using the developed voltage saturation (VS) algorithm is presented. It allows protection engineers to determine the limits of high current applications in terms of the fault current magnitude, the X/R ratio, and relay burden. The criteria address the limitation of CT ratings used in line protections. Small cores, long leads, high burdens, high currents, and dc offset lead to saturated CTs. Improper selection of CTs results in CT s saturation during fault conditions and this causes relay mal-operation or fail-to-trip. Keywords: Microprocessor-based relays, Relay burden, EMR, Current Transformers, Relay burden, Saturation Voltage (VS), dc offset, Fault current. 1. Introduction Most of the generating stations in Nigeria are retrofitted with Microprocessor-based (digital) relays and protection equipment with the rest of the installation such as Current transformers (CTs) and control cables (lead) remaining unchanged. In the past, due to the high burden of electromechanical relays (EMRs), it was the rated power of the CTs and potential transformers (PT) that was the crucial parameter. In recent time, it is the transient performance of instrument transformers that has become the over-riding influence within the digital relays, measuring and controlling devices. It is utmost important therefore to evaluate the dimensioning of CTs while planning such up-grade. The existing CT sizes and lead sizes of EMRs may not be adequate for the latest protective relays which might demand a different CT performance [1, 2, 4]. CTs are the basic interconnection between the power system networks and protective relays. CTs step the primary current down to a nominal secondary level for use by protective relays, meters, and other monitoring devices. CTs perform reasonably in most operating scenarios, faithfully reproducing primary current as a secondary current, with little distortion or error CTs for transmission lines are rated to avoid saturation during the asymmetrical portion of the maximum fault current. Saturation is avoided by selecting the voltage rating larger than the maximum fault burden voltage with the (X/R+1) factors applied according to [3]. This is possible in line protection applications since large load currents result in the use of high ratio CTs, and fault currents are typically limited from 5 to 7, and rarely exceed 10 times the CT primary current rating. In this paper, the relationship between the flux density and the time integral of the voltage is examined. Using this as a basis, the relationship between fault current, CT burdens, and system X/R ratio is established and this ultimately determines the useful range of any CT. II. Current Transformers Burden and Accuracy Class The burden of current transformers is the property of the circuit connected to the secondary winding, which determines the active and reactive power at the secondary terminals [3]. The external load applied to the secondary of a CT is called the burden The total burden is the combination of internal CT burden and the external burden connected to the CT terminals. In selecting CT, the process is to minimize the total burden that consists of the internal resistance of the CT winding itself, the resistance of the leads from the CT to the relay including the return path, and the burden of the connected relays. The accuracy of CT s is defined as the extent to which the current in the secondary circuit reproduces the current in the primary circuit as stated by the marked ratio. In many applications the use of the ANSI/IEEE accuracy class designation is adequate to assure satisfactory relay performance. The accuracy class can be obtained by calculation or by test, followed by the minimum secondary terminal voltage that transformer will produce at 20 times rated secondary current with one of the standard burdens without exceeding the accuracy class limit of 10%. The secondary voltage rating is the voltage the CT will deliver to a standard burden at 20 time s rated secondary current without exceeding 10% ratio correction. The standard burden values ISSN: Page 298

2 for relaying are 1.0, 2.0, 4.0, and 8.0 ohms all with an impedance angle of 60 0 [4,5,6]. Consequently, at 20 times the rated current of 5 amperes the standard voltage ratings are 100, 200, 400, and 800 volts respectively. Table 1 presents standard current transformers burdens with 5A secondary windings. Table 1: Standard burdens for current transformers with 5A Secondary [6] Burden Desig- nation Resis- tance (Ω) Induct- ance (mh) Imped- ance (Ω) Volt- Amp (VA) Pf Secon- dary voltage C C C C , Figure 1 shows the shaded volt-time area produced by asymmetrical fault current. Where I f is the magnitude of the fault current in the secondary; Z b is the burden impedance, and L/R is the time constant of the primary fault current. The sine wave and the exponential components of the wave are shown dashed for comparison. The plot shows the change of burden voltage with the time. The volt-time area of the asymmetrical fault is increases compared to the normal sine wave and hence will affect the performance of the CT and the relay [8]. III. System X/R Ratio on CT s Saturation CT performance is affected significantly by the D.C component of the ac current. When a current change occurs in the primary ac system, one or more of the three-phase currents may obtain some D.C offset. This results from the necessity to satisfy two conflicting requirements that may occur [7]. In a highly inductive network, the current wave must be near maximum when the voltage is at or near zero, and The actual current at the time of the change, which is determined by the prior networks conditions. During asymmetrical faults, the fault current can be represents by two parts, namely the d.c and ac components as follows: The total fault current can be rewritten as: Figure 1: Burden Voltage for Asymmetrical Fault current Using the asymmetrical burden voltage equation (3) and substituting in equation (5) will result in the following equation: The burden voltage can be expressed as follows: In equation (6), the limit of the integral of the exponential term is the X/R ratio of the primary circuit. Since the limit integral of the cosine term is unity, we can write the equation as follows: The burden voltage V is related to the core turn (N) of the CT and the rate of change of the core flux by the induction equation. Integrating equation (4) show that the flux density in the core is represented by the area under the voltage waveform. In other words, for a given secondary fault current, more burden voltage from the CT will be required and the core density is proportional to the time interval of this voltage. Therefore the flux linkages in the core are given by the interval of equation (5) where the flux is expressed as flux density B times the core cross sectional area A Equation (7) expresses the CT-rating voltage in terms of the physical parameters of the CT, namely the saturated flux density Bs, system turns ratio N, the core cross sectional areas A; and angular frequency w. A different form of Equation (7) can be derived by recognizing that the rating voltage is 20 times the voltage across the standard burden at rated current. If we then express the fault current I f in per unit of the rated current and the burden Z b in per unit of the standard burden, equation (8) becomes the simple criterion to avoid saturation. 20 (X/R + 1).* I F * Z b (8) Where VS = 20 ISSN: Page 299

3 I F = the maximum fault current in per unit of CT rating, undistorted CT secondary current to perform phasor Z b = the CT burden in per unit of standard burden and measurement in the presents of the dc offset. X/R = the system X/R ratio, that is the primary system Using class 1200:5 CT ratio with standard burden of reactance and resistance up to the point of fault. 4Ω, the calculated total burden is express as: However, most times, these rules result in impractically large CTs, which are not economically acceptable. CT cables of m full circuit run of #10 AWG (1.0 Ω/1000 feet) = 0.40 A. CT Selection Procedures CT winding of 240 turns at Ω/turn = 0.60 The algorithms for the selection of current transformers in a given transmission line relay application is outline as follows (IEEE standard C ). (1) Determine the maximum fault current I f in primary amperes (2) Determine the corresponding primary circuit X/R ratio. (3) Select the CT voltage rating based on the load requirements. (4) Determine the total burden in per unit of the CT standard burden. (5) Divide the maximum primary fault current I f by the per unit current to determine the CT nominal current rating. Select the nearest standard rating greater than the calculated value. (6) Calculate the saturation voltage VS. (7) Finally, compare VS to the current transformer rating. If the voltage rating is greater than or equal to the calculated secondary voltage, the current transformer is acceptable for the application. IV. Methodology Description Advanced Saturation Voltage Model Microprocessor-based (MPB) relays have a relatively small burden of 0.2 VA (0.008 Ω). The secondary burden is the impedance of the CT windings and cables (leads) full circuit runs; and it is purely resistive. In this paper, the CT selection criteria are based on the degree of saturation voltage produced by the 120KA fault in the 1200:5 CT primary rating. Evaluation of the effects of asymmetrical faults with DC offset on operation of instantaneous microprocessor-based relay is considered. In order to avoid DC saturation, the saturation voltage equation VS is as expressed in equation 9. VS (9) Where I f = the maximum faults current in per unit of CT rating, Z b is the CT burden in per unit of standard burden, VS is the CT saturation voltage in per unit, X/R is the X/R ratio of the primary fault current. A. CTs Selection for line Protection Modern Microprocessor-based relays clear faults in few cycles to preserve stability, accurately identify fault type for single-pole reclosing applications, and determine an accurate fault location. To accomplish this, line relays require Total burden = 1.00 Ω The burden is primarily due to the CT winding and external cables to the relay. Equation (10) determines the maximum burden in per unit of the standard burden: Z b = (10) With an X/R ratio of 20, the saturation voltage can be calculated using equation (9) as follows: Vs [20+1]* 100 * 0.25 = 525 Consequently, CTs used with the microprocessor relays should meet the criteria in equation 11; 525 (11) Calculated maximum load current of the protected line is A, so select CT of 1200:5A, being the nearest CT standard rating greater than the calculated value. Also, the calculated Voltage Saturation of CT 1200:5A rating from the enhanced model is 302 Volts. This is less than the 400 Volts rating of CT 1200:5A ratio, hence the selected CT rating of 1200:5A is thus adequate and suitable for protection application. For evaluation purposes, microprocessor overcurrent relay with a 240A instantaneous setting and X/R ratio of 20 (worst case) is considered. The equation for maximum fault current in terms of primary CT and ANSI voltage rating, burden in ohms, and X/R ratio is as express in equation 12, I max = * (12) The acceptable calculated saturated voltage VS is 525 volts, substituting equation (12) above, the maximum fault current for secure operation can be calculated as follows: I max = B. Simulation: Evaluation of CT Secondary Burden: * 1200 = 120,000 A for MPBRs In the simulation conducted at BELLS University of Technology, Power Laboratory, different secondary burdens of 1.0, 3.0, 5.0, and 10Ω were injected at different times into the SEL-551 MPB instantaneous overcurrent relay by the secondary test equipment ISA T2000, using a CT of 1200:5A ratio. Starting from a burden of 1.0 Ω; the burden is ISSN: Page 300

4 primary due to CT winding itself, and external leads (a wire size of #10 AWG) of a total length of 400ft (121.92m) from CTs to the relay including the return path. With total burden of 1.0 ohm, secondary current waveform results was obtained from ATP simulations base on transmission network parameters as shows in Figure 2; it indicates an undistorted waveform throughout the duration of the simulation. When secondary burden of 3.0 ohm was injected into the secondary circuit, the CT core saturates for at least four (4) cycles after the fault occurs. Subsequently increasing the burden to 5.0 ohm, and then 10 ohms respectively, the waveform distortion became more present (visible) during the entire simulation. The severe CT saturation (distortions) caused by the heavy fault current (115 KA) with maximum offset and different values of secondary burden (3, 5, and 10 ohms) is shown in Figure 3; these caused RMS current to be smaller than in fact it was, i.e. the secondary current is substantially reduced under severe saturation of main CTs. This proves that relative small burden can influence CT accuracy if the fault current is not correctly anticipated. Conclusively, proper selection of a CT is required for a better protection scheme operation. Figure 2: Non-saturated Waveform secondary burden (1.0 ohm). Since MPB instantaneous relays operates within one cycle (1) and that the CTs operation was accurate from one to four cycles of its operation before saturation start to occurs, this proved that MPB instantaneous relays operation is not affected by CT saturation. Thus the trip time of MPB relay is unimpaired by CT saturation due to DC offset with extremely high fault currents. Figure 3: Severe CT Saturation (Distorted Waveforms) due to varying burden (3, 5, and10ω). V. Case Study and Application A case study is considered to show the area of application of the work. A transmission line under protection with MPB overcurrent relay installed at the source of the busbar to protect against over load and short circuits is rated 600 MVA, three phase, 330 KV, 50Hz, line reactance (X) and resistance (R) of Ω/km and Ω/km (i.e, X/R of 11.4 ratios). A CT rating of 1200:5A ratio is selected based on the full load current of A. Short circuit faults occurred at 5km away from source, with maximum fault current calculated to be A. The CT performance data is shown in table 2. Table 2: CT Performance Data Description Current transformer in used Instantaneous element pickup setting (1200:5) Values Class 1200:5 240A secondary X/R ratio ( / ) 11.4 (85º) Maximum fault current at 5 km A Using and a total burden of 1.0 ohms, the minimum CT rating can be determine in terms of maximum fault current, X/R ratio, ANSI rating, and burden as in equation (13), CT Rating =.. 13 The parameters presented are the maximum fault current of 120 KA, X/R = 20 (worst case) and a total burden of 1.0 Ω. CT rating = = 1200 Table 3 lists the maximum fault current versus X/R ratio for which saturation is avoided. Using ANSI Class of CT ratio s of 2000:5, 1500: 5, 1200: 5, or 1000: 5, with varying burdens at various inception angles is presented. ISSN: Page 301

5 Table 3: Maximum current (Amps) to avoid saturation using Microprocessorbased Relays Line Angle X/R Ratio 2000:5 1.5 Ω 1500:5 1.2 Ω Amperes 1200:5 1.0 Ω 1000:5 0.8 Ω , , , , The CT primary current accuracy describes the highest fault current magnitude at which the CT will fulfill the specified accuracy. Beyond this level the secondary current of the CT will be distorted and it might have severe effects to the performance of the protective relay. Compliance with saturation voltage equation depends on the X/R ratio and the magnitude of the maximum fault current. Either by calculation or measuring the burden and the X/R ratio, the saturation voltage equation can be applied to calculate the maximum fault current for a given CT ratio. Thus, relay operations with 1200:5 CT can be selected and guaranteed with a saturation voltage of 525 for the relay trip operations as show in table 3. b) Transient Behavior of CT during Faults. The total secondary burden of the installation is Ω primarily due to the CT winding and external CT control wire of (400ft) m full circuit runs of #10 AWG to the relay. From equation (11), saturation voltage VS = 525 (X/R+I) * I f * Z b Fault current at 5 km away from source I f(5) = = = A Substitute these values into equation (11) to determine the limit of saturation voltage. 525 (11.4+1) * * = 302 Volts Result shows that the instantaneous operations of MPB relay using 1200:5A CT can be guaranteed with 302 times CT rating with X/R ratio of Figure 4 show the response of the relay with A short circuit fault currents for the case presented. The thick line indicates the root mean square current (I RMS) while the dash waveform is the secondary currents. It confirmed that the MPB relay with 240A instantaneous setting will respond to the fault in this case with no more than three cycles. Figure 4: Case Study Test Result with X/R =11.4 Applying the developed algorithm, instantaneous microprocessor-based relays will operate properly with 1200:5A CT ratio and high short circuit levels. CT performance will be satisfactory as the CT secondary maximum symmetrical fault current multiplied by the total secondary burden is less than the ANSI-class voltage rating of the CT. The criteria allow protection engineers to determine the limits of high current applications in terms of the fault current magnitudes, the X/R ratio and relay burden. The developed algorithm has addressed the limitation of CT ratings used in line protection where fault current exceed 525 times the CT primary rating. As shown in equation (9), a smaller size CT rating and accuracy class with adequate capability can be employ for line protection. However, the CT ratings that avoid saturation for asymmetrical current are impractical in applications near a generator bus-bar where X/R ratio and the fault current are both extremely high. A limit to the criterion is shown in table 3 where the permissible maximum fault current for a given CT rating is severely decreasing with increasing X/R ratio. The limit occurs where high X/R ratio and high fault current are experienced near the bus-bar. VI. Conclusion The effect of CT saturation on protective relays has been investigated. The relation between the ANSI voltage rating, CT burden, maximum fault current, and system X/R ratio defines the threshold of CT saturation. The derived equation provides the CT rating criteria for line protection in new installations and can identify the threshold of CT saturation in older installations. CT rating is selected based on short circuit level available, secondary burden connected, X/R ratio and required relay trip time. Consequently, the need for higher CT ratio with higher class could be eliminated. ISSN: Page 302

6 CT of smaller size rating can be used for MPBR as [4] Aibangbee J.O. Ph.D. Thesis, Current Transformer saturation impacts on Microprocessor-Based Protective Relays Application in Nigeria against the heavy and bulky type CT rating currently Electricity Transmission Network, university of Benin, Nigeria, used for electromechanical relays. The criterion used CT selection procedure for line [5] ABB Inc, Instrument Transformers Technical Information and protection which determined the CT ratio using the Application Guide maximum fault in amperes, the system X/R ratio and [6] U.S. Department of the Interior Bureau of Reclamation Denver, the ct burden expressed in per unit of a CT rated Colorado: Facilities Instructions, Operation, Maintenance, and Field standard burden. Testing Procedures for Protective Relays and associated circuits Vol.3- The instantaneous operations of microprocessor 8, May based relay can be guarantee with the advanced [7] ABB Inc Instrument Transformers Application Guides SE saturation voltage Algorithm developed. LUDVIKA, Sweden, REFERENCES [1] G. Benmouyal, and S. E. Zocholl Current Transformer Concepts Proceedings of the 46 th Annual Georgia Tech Protective Relay Conference, Atlanta, GA, April 29, [2] S. E. Zocholl, Armando Guzmán, and Daqing Hou, Transformer Modeling as Applied to Differential Relaying, Proceedings of the 22nd Annual Western Protective Relay Conference,Spokane, WA. October 24-26, [3] IEEE C , the Guide for the Application of Current Transformers Used for Protective Relaying Purposes. [8] Blackburn J. L. and Thomas J. Domin Protective Relaying Principles and Applications third edition CRC Press, 2007 [9] G. Benmouyal, E. O. Schweitzer III and Jeff Roberts, Distance Relay Element Design, Proceedings of the 19th Annual Western Protective Relay Conference, Spokane, WA, [10] IEEE Standard C57.13, 2008.Standard requirements for Instrument Transformers ISSN: Page 303

Operation Analysis of Current Transformer with Transient Performance Analysis Using EMTP Software

Operation Analysis of Current Transformer with Transient Performance Analysis Using EMTP Software Operation Analysis of Current Transformer with Transient Performance Analysis Using EMTP Software Govind Pandya 1, Rahul Umre 2, Aditya Pandey 3 Assistant professor, Dept. of Electrical & Electronics,

More information

Distance Element Performance Under Conditions of CT Saturation

Distance Element Performance Under Conditions of CT Saturation Distance Element Performance Under Conditions of CT Saturation Joe Mooney Schweitzer Engineering Laboratories, Inc. Published in the proceedings of the th Annual Georgia Tech Fault and Disturbance Analysis

More information

CURRENT TRANSFORMER CONCEPTS

CURRENT TRANSFORMER CONCEPTS CURRENT TRANSFORMER CONCEPTS S. E. Zocholl Schweitzer Engineering Laboratories, Inc. Pullman, WA USA D. W. Smaha Southern Company Services, Inc. Birmingham, AL USA ABSTRACT This paper reviews the C and

More information

Beyond the Knee Point: A Practical Guide to CT Saturation

Beyond the Knee Point: A Practical Guide to CT Saturation Beyond the Knee Point: A Practical Guide to CT Saturation Ariana Hargrave, Michael J. Thompson, and Brad Heilman, Schweitzer Engineering Laboratories, Inc. Abstract Current transformer (CT) saturation,

More information

Distance Relay Response to Transformer Energization: Problems and Solutions

Distance Relay Response to Transformer Energization: Problems and Solutions 1 Distance Relay Response to Transformer Energization: Problems and Solutions Joe Mooney, P.E. and Satish Samineni, Schweitzer Engineering Laboratories Abstract Modern distance relays use various filtering

More information

Reprinted from IEEE PCIC CONFERNECE, SEPTEMBER 2005, PAPER 32. This material is posted here with permission of the IEEE.

Reprinted from IEEE PCIC CONFERNECE, SEPTEMBER 2005, PAPER 32. This material is posted here with permission of the IEEE. Copyright 2005 IEEE Reprinted from IEEE PCIC CONFERNECE, SEPTEMBER 2005, PAPER 32. This material is posted here with permission of the IEEE. Such permission of the IEEE does not in any way imply IEEE endorsement

More information

GE Multilin technical note

GE Multilin technical note GE Digital Energy Multilin GE Multilin technical note GE Multilin releases fast and dependable short circuit protection enhanced for performance under CT saturation GE publication number: GER-4329 GE Multilin

More information

Verifying Transformer Differential Compensation Settings

Verifying Transformer Differential Compensation Settings Verifying Transformer Differential Compensation Settings Edsel Atienza and Marion Cooper Schweitzer Engineering Laboratories, Inc. Presented at the 6th International Conference on Large Power Transformers

More information

SATURATION OF CURRENT TRANSFORMERS AND ITS IMPACT ON DIGITAL OVERCURRENT RELAYS NABIL H. AL-ABBAS

SATURATION OF CURRENT TRANSFORMERS AND ITS IMPACT ON DIGITAL OVERCURRENT RELAYS NABIL H. AL-ABBAS SATURATION OF CURRENT TRANSFORMERS AND ITS IMPACT ON DIGITAL OVERCURRENT RELAYS by NABIL H. AL-ABBAS A Thesis Presented to the DEANSHIP OF GRADUATE STUDIES In Partial Fulfillment of the Requirements for

More information

2C73 Setting Guide. High Impedance Differential Relay. Advanced Protection Devices. relay monitoring systems pty ltd

2C73 Setting Guide. High Impedance Differential Relay. Advanced Protection Devices. relay monitoring systems pty ltd 2C73 Setting Guide High Impedance Differential Relay relay monitoring systems pty ltd Advanced Protection Devices 1. INTRODUCTION This document provides guidelines for the performance calculations required

More information

2C73 Setting Guide. High Impedance Differential Relay. relay monitoring systems pty ltd Advanced Protection Devices

2C73 Setting Guide. High Impedance Differential Relay. relay monitoring systems pty ltd Advanced Protection Devices 2C73 Setting Guide High Impedance Differential Relay relay monitoring systems pty ltd Advanced Protection Devices 1. INTRODUCTION This document provides guidelines for the performance calculations required

More information

Bus protection with a differential relay. When there is no fault, the algebraic sum of circuit currents is zero

Bus protection with a differential relay. When there is no fault, the algebraic sum of circuit currents is zero Bus protection with a differential relay. When there is no fault, the algebraic sum of circuit currents is zero Consider a bus and its associated circuits consisting of lines or transformers. The algebraic

More information

Symmetrical Components in Analysis of Switching Event and Fault Condition for Overcurrent Protection in Electrical Machines

Symmetrical Components in Analysis of Switching Event and Fault Condition for Overcurrent Protection in Electrical Machines Symmetrical Components in Analysis of Switching Event and Fault Condition for Overcurrent Protection in Electrical Machines Dhanashree Kotkar 1, N. B. Wagh 2 1 M.Tech.Research Scholar, PEPS, SDCOE, Wardha(M.S.),India

More information

Design of Differential Protection Scheme Using Rogowski Coil

Design of Differential Protection Scheme Using Rogowski Coil 2017 IJSRST Volume 3 Issue 2 Print ISSN: 2395-6011 Online ISSN: 2395-602X National Conference on Advances in Engineering and Applied Science (NCAEAS) 16 th February 2017 In association with International

More information

Current Transformer Requirements for VA TECH Reyrolle ACP Relays. PREPARED BY:- A Allen... APPROVED :- B Watson...

Current Transformer Requirements for VA TECH Reyrolle ACP Relays. PREPARED BY:- A Allen... APPROVED :- B Watson... TECHNICAL REPORT APPLICATION GUIDE TITLE: Current Transformer Requirements for VA TECH Reyrolle ACP Relays PREPARED BY:- A Allen... APPROVED :- B Watson... REPORT NO:- 990/TIR/005/02 DATE :- 24 Jan 2000

More information

NERC Protection Coordination Webinar Series June 9, Phil Tatro Jon Gardell

NERC Protection Coordination Webinar Series June 9, Phil Tatro Jon Gardell Power Plant and Transmission System Protection Coordination GSU Phase Overcurrent (51T), GSU Ground Overcurrent (51TG), and Breaker Failure (50BF) Protection NERC Protection Coordination Webinar Series

More information

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 4: (June 10, 2013) Page 1 of 75

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 4: (June 10, 2013) Page 1 of 75 PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion

More information

Back to the Basics Current Transformer (CT) Testing

Back to the Basics Current Transformer (CT) Testing Back to the Basics Current Transformer (CT) Testing As test equipment becomes more sophisticated with better features and accuracy, we risk turning our field personnel into test set operators instead of

More information

Impact of transient saturation of Current Transformer during cyclic operations Analysis and Diagnosis

Impact of transient saturation of Current Transformer during cyclic operations Analysis and Diagnosis 1 Impact of transient saturation of Current Transformer during cyclic operations Analysis and Diagnosis BK Pandey, DGM(OS-Elect) Venkateswara Rao Bitra, Manager (EMD Simhadri) 1.0 Introduction: Current

More information

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 5: (August 2, 2013) Page 1 of 76

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 5: (August 2, 2013) Page 1 of 76 PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion

More information

Motor Protection. May 31, Tom Ernst GE Grid Solutions

Motor Protection. May 31, Tom Ernst GE Grid Solutions Motor Protection May 31, 2017 Tom Ernst GE Grid Solutions Motor Relay Zone of Protection -Electrical Faults -Abnormal Conditions -Thermal Overloads -Mechanical Failure 2 Setting of the motor protection

More information

Comparison of recloser and breaker standards

Comparison of recloser and breaker standards s Technical Data TD280024EN Supersedes February 1994 (R280-90-5) COOPER POWER SERIES Comparison of recloser and breaker standards Technical Data TD280024EN Comparison of recloser and breaker standards

More information

ECE 2006 University of Minnesota Duluth Lab 11. AC Circuits

ECE 2006 University of Minnesota Duluth Lab 11. AC Circuits 1. Objective AC Circuits In this lab, the student will study sinusoidal voltages and currents in order to understand frequency, period, effective value, instantaneous power and average power. Also, the

More information

BED INTERCONNECTION TECHNICAL REQUIREMENTS

BED INTERCONNECTION TECHNICAL REQUIREMENTS BED INTERCONNECTION TECHNICAL REQUIREMENTS By Enis Šehović, P.E. 2/11/2016 Revised 5/19/2016 A. TABLE OF CONTENTS B. Interconnection Processes... 2 1. Vermont Public Service Board (PSB) Rule 5.500... 2

More information

NERC Protection Coordination Webinar Series June 16, Phil Tatro Jon Gardell

NERC Protection Coordination Webinar Series June 16, Phil Tatro Jon Gardell Power Plant and Transmission System Protection Coordination Phase Distance (21) and Voltage-Controlled or Voltage-Restrained Overcurrent Protection (51V) NERC Protection Coordination Webinar Series June

More information

Reducing the Effects of Short Circuit Faults on Sensitive Loads in Distribution Systems

Reducing the Effects of Short Circuit Faults on Sensitive Loads in Distribution Systems Reducing the Effects of Short Circuit Faults on Sensitive Loads in Distribution Systems Alexander Apostolov AREVA T&D Automation I. INTRODUCTION The electric utilities industry is going through significant

More information

ATP modeling of internal transformer faults for relay performance testing

ATP modeling of internal transformer faults for relay performance testing Michigan Technological University Digital Commons @ Michigan Tech Dissertations, Master's Theses and Master's Reports - Open Dissertations, Master's Theses and Master's Reports 2011 ATP modeling of internal

More information

CURRENT TRANSFORMER SELECTION TECHNIQUES FOR LOW-VOLTAGE MOTOR CONTROL CENTERS

CURRENT TRANSFORMER SELECTION TECHNIQUES FOR LOW-VOLTAGE MOTOR CONTROL CENTERS CURRENT TRANSFORMER SELEION TECHNIQUES FOR LOW-OLTAGE MOTOR CONTROL CENTERS Copyright Material IEEE Paper No. PCIC-TBD Scott Manson Senior Member, IEEE Schweitzer Engineering Laboratories, Inc. 235 NE

More information

Addendum to Instructions for Installation, Operation and Maintenance of Digitrip 3000 Protective Relays

Addendum to Instructions for Installation, Operation and Maintenance of Digitrip 3000 Protective Relays Dual-Source Power Supply Addendum to I.B. 17555 Addendum to Instructions for Installation, Operation and Maintenance of Digitrip 3000 Protective Relays Table of Contents Page 1.0 Introduction...1 2.0 General

More information

Forward to the Basics: Selected Topics in Distribution Protection

Forward to the Basics: Selected Topics in Distribution Protection Forward to the Basics: Selected Topics in Distribution Protection Lee Underwood and David Costello Schweitzer Engineering Laboratories, Inc. Presented at the IEEE Rural Electric Power Conference Orlando,

More information

Short Circuit Current Calculations

Short Circuit Current Calculations Introduction Several sections of the National Electrical Code relate to proper overcurrent protection. Safe and reliable application of overcurrent protective devices based on these sections mandate that

More information

ARC FLASH PPE GUIDELINES FOR INDUSTRIAL POWER SYSTEMS

ARC FLASH PPE GUIDELINES FOR INDUSTRIAL POWER SYSTEMS The Electrical Power Engineers Qual-Tech Engineers, Inc. 201 Johnson Road Building #1 Suite 203 Houston, PA 15342-1300 Phone 724-873-9275 Fax 724-873-8910 www.qualtecheng.com ARC FLASH PPE GUIDELINES FOR

More information

Alternative Testing Techniques for Current Transformers. Dinesh Chhajer, PE Technical Support Group MEGGER

Alternative Testing Techniques for Current Transformers. Dinesh Chhajer, PE Technical Support Group MEGGER Alternative Testing Techniques for Current Transformers Dinesh Chhajer, PE Technical Support Group MEGGER Agenda Current Transformer Definition and Fundamentals Current Transformer Applications o Metering

More information

ENHANCED DISTANCE PROTECTION FOR SERIES COMPENSATED TRANSMISSION LINES

ENHANCED DISTANCE PROTECTION FOR SERIES COMPENSATED TRANSMISSION LINES ENHANCED DISTANCE PROTECTION FOR SERIES COMPENSATED TRANSMISSION LINES N. Perera 1, A. Dasgupta 2, K. Narendra 1, K. Ponram 3, R. Midence 1, A. Oliveira 1 ERLPhase Power Technologies Ltd. 1 74 Scurfield

More information

Innovative Science and Technology Publications

Innovative Science and Technology Publications Innovative Science and Technology Publications Manuscript Title SATURATION ANALYSIS ON CURRENT TRANSFORMER Thilepa R 1, Yogaraj J 2, Vinoth kumar C S 3, Santhosh P K 4, 1 Department of Electrical and Electronics

More information

SATURATION ANALYSIS ON CURRENT TRANSFORMER

SATURATION ANALYSIS ON CURRENT TRANSFORMER Volume 118 No. 18 2018, 2169-2176 ISSN: 1311-8080 (printed version); ISSN: 1314-3395 (on-line version) url: http://www.ijpam.eu ijpam.eu SATURATION ANALYSIS ON CURRENT TRANSFORMER MANIVASAGAM RAJENDRAN

More information

Current Transformer Performance study Using Software Tools.

Current Transformer Performance study Using Software Tools. Current Transformer Performance study Using Software Tools. A. Mechraoui, A. Draou, A. Akkouche, and S. AL Ahmadi Department of Electronics Technology Madinah College of Technology, Madinah Council of

More information

3Ø Short-Circuit Calculations

3Ø Short-Circuit Calculations 3Ø Short-Circuit Calculations Why Short-Circuit Calculations Several sections of the National Electrical Code relate to proper overcurrent protection. Safe and reliable application of overcurrent protective

More information

Extensive LV cable network. Figure 1: Simplified SLD of the transformer and associated LV network

Extensive LV cable network. Figure 1: Simplified SLD of the transformer and associated LV network Copyright 2017 ABB. All rights reserved. 1. Introduction Many distribution networks around the world have limited earth-fault current by a resistor located in the LV winding neutral point of for example

More information

CHAPTER 9. Sinusoidal Steady-State Analysis

CHAPTER 9. Sinusoidal Steady-State Analysis CHAPTER 9 Sinusoidal Steady-State Analysis 9.1 The Sinusoidal Source A sinusoidal voltage source (independent or dependent) produces a voltage that varies sinusoidally with time. A sinusoidal current source

More information

POWER SYSTEM ANALYSIS TADP 641 SETTING EXAMPLE FOR OVERCURRENT RELAYS

POWER SYSTEM ANALYSIS TADP 641 SETTING EXAMPLE FOR OVERCURRENT RELAYS POWER SYSTEM ANALYSIS TADP 641 SETTING EXAMPLE FOR OVERCURRENT RELAYS Juan Manuel Gers, PhD Example - Single Line Example 1 - Data Calculate the following: 1. The three phase short circuit levels on busbars

More information

Power. Power is the rate of using energy in joules per second 1 joule per second Is 1 Watt

Power. Power is the rate of using energy in joules per second 1 joule per second Is 1 Watt 3 phase Power All we need electricity for is as a source of transport for energy. We can connect to a battery, which is a source of stored energy. Or we can plug into and electric socket at home or in

More information

The InterNational Electrical Testing Association Journal. BY STEVE TURNER, Beckwith Electric Company, Inc.

The InterNational Electrical Testing Association Journal. BY STEVE TURNER, Beckwith Electric Company, Inc. The InterNational Electrical Testing Association Journal FEATURE PROTECTION GUIDE 64S Theory, Application, and Commissioning of Generator 100 Percent Stator Ground Fault Protection Using Low Frequency

More information

Solutions to Consider in Current Transformer Selection for APR1400 Nuclear Power Plant Medium Voltage Switchgears

Solutions to Consider in Current Transformer Selection for APR1400 Nuclear Power Plant Medium Voltage Switchgears Journal of Energy and Power Engineering 11 (2017) 670-678 doi: 10.17265/1934-8975/2017.10.008 D DAVID PUBLISHING Solutions to Consider in Current Transformer Selection for APR1400 Nuclear Power Plant Medium

More information

University of Jordan School of Engineering Electrical Engineering Department. EE 219 Electrical Circuits Lab

University of Jordan School of Engineering Electrical Engineering Department. EE 219 Electrical Circuits Lab University of Jordan School of Engineering Electrical Engineering Department EE 219 Electrical Circuits Lab EXPERIMENT 7 RESONANCE Prepared by: Dr. Mohammed Hawa EXPERIMENT 7 RESONANCE OBJECTIVE This experiment

More information

Generator Protection GENERATOR CONTROL AND PROTECTION

Generator Protection GENERATOR CONTROL AND PROTECTION Generator Protection Generator Protection Introduction Device Numbers Symmetrical Components Fault Current Behavior Generator Grounding Stator Phase Fault (87G) Field Ground Fault (64F) Stator Ground Fault

More information

Application Guide High Impedance Differential Protection Using SIEMENS 7SJ602

Application Guide High Impedance Differential Protection Using SIEMENS 7SJ602 Application Guide High Impedance Differential Protection Using SIEMENS 7SJ602 1 / 12 1 INTRODUCTION This document provides guidelines for the performance calculations required for high impedance differential

More information

Data. Dr Murari Mohan Saha ABB AB. KTH/EH2740 Lecture 3. Data Acquisition Block. Logic. Measurement. S/H and A/D Converter. signal conditioner

Data. Dr Murari Mohan Saha ABB AB. KTH/EH2740 Lecture 3. Data Acquisition Block. Logic. Measurement. S/H and A/D Converter. signal conditioner Digital Protective Relay Dr Murari Mohan Saha ABB AB KTH/EH2740 Lecture 3 Introduction to Modern Power System Protection A digital protective relay is an industrial microprocessor system operating in real

More information

A Pyrotechnic Fault Current Limiter Model for Transient Calculations in Industrial Power Systems

A Pyrotechnic Fault Current Limiter Model for Transient Calculations in Industrial Power Systems A Pyrotechnic Fault Current Limiter Model for Transient Calculations in Industrial Power Systems T. C. Dias, B. D. Bonatto, J. M. C. Filho Abstract-- Isolated industrial power systems or with high selfgeneration,

More information

MODEL POWER SYSTEM TESTING GUIDE October 25, 2006

MODEL POWER SYSTEM TESTING GUIDE October 25, 2006 October 25, 2006 Document name Category MODEL POWER SYSTEM TESTING GUIDE ( ) Regional Reliability Standard ( ) Regional Criteria ( ) Policy ( ) Guideline ( x ) Report or other ( ) Charter Document date

More information

Reyrolle Protection Devices. 7PG21 Solkor R/Rf Pilot Wire Current Differential Protection. Answers for energy

Reyrolle Protection Devices. 7PG21 Solkor R/Rf Pilot Wire Current Differential Protection. Answers for energy Reyrolle Protection Devices 7PG21 Solkor R/Rf Pilot Wire Current Differential Protection Answers for energy 7PG21 Solkor R/Rf Pilot Wire Current Differential Protection Additional Options 15kV Isolation

More information

7PG21 Solkor R/Rf Pilot Wire Current Differential Protection Energy Management

7PG21 Solkor R/Rf Pilot Wire Current Differential Protection Energy Management Reyrolle Protection Devices 7PG21 Solkor R/Rf Pilot Wire Current Differential Protection Energy Management 7PG21 Solkor R/Rf Pilot Wire Current Differential Protection Description Solkor R & Solkor Rf

More information

Using Event Recordings

Using Event Recordings Feature Using Event Recordings to Verify Protective Relay Operations Part II by Tony Giuliante, Donald M. MacGregor, Amir and Maria Makki, and Tony Napikoski Fault Location The accuracy of fault location

More information

7PG21 Solkor R/Rf Pilot Wire Current Differential Protection Answers for energy

7PG21 Solkor R/Rf Pilot Wire Current Differential Protection Answers for energy Reyrolle Protection Devices 7PG21 Solkor R/Rf Pilot Wire Current Differential Protection Answers for energy 7PG21 Solkor R/Rf Pilot Wire Current Differential Protection Description Additional Options Solkor

More information

Maintaining Voltage-Current Phase Relationships in Power Quality Monitoring Systems

Maintaining Voltage-Current Phase Relationships in Power Quality Monitoring Systems Maintaining Voltage-Current Phase Relationships in Power Quality Monitoring Systems Brian Kingham, Utility Market Manager, Schneider Electric, PMC Division Abstract: Historical power quality measurement

More information

Evaluating the Impact of Increasing System Fault Currents on Protection

Evaluating the Impact of Increasing System Fault Currents on Protection Evaluating the Impact of Increasing System Fault Currents on Protection Zhihan Xu, Ilia Voloh GE Grid Solutions, LLC Mohsen Khanbeigi Hydro One Abstract Every year the capacity of power systems is increasing,

More information

Generator Protection Overcomes Current Transformer Limitations

Generator Protection Overcomes Current Transformer Limitations Generator Protection Overcomes Current Transformer Limitations Marcos Donolo, Armando Guzmán, Mangapathirao V. Mynam, Rishabh Jain, and Dale Finney, Schweitzer Engineering Laboratories, Inc. Abstract Following

More information

WATT TRANSDUCER. Instruction Manual

WATT TRANSDUCER. Instruction Manual WT 9200 WATT TRANSDUCER Instruction Manual IM-2 September 2003 USA: 6428 Ridglea Drive, Watauga, Texas 76148 Tel/Fax 1-817-427-2060/2067 E-mail: wes@westecinstruments.com SPECIFICATIONS Power Supply Input

More information

Short-Circuit Current Calculations

Short-Circuit Current Calculations Basic Point-to-Point Calculation Procedure Step. Determine the transformer full load amps (F.L.A.) from either the nameplate, the following formulas or Table : Multiplier = 00 *% Z transformer Step 2.

More information

RELAY LOADABILITY CHALLENGES EXPERIENCED IN LONG LINES. Authors: Seunghwa Lee P.E., SynchroGrid, College Station, Texas 77845

RELAY LOADABILITY CHALLENGES EXPERIENCED IN LONG LINES. Authors: Seunghwa Lee P.E., SynchroGrid, College Station, Texas 77845 RELAY LOADABILITY CHALLENGES EXPERIENCED IN LONG LINES Authors: Seunghwa Lee P.E., SynchroGrid, College Station, Texas 77845 Joe Perez P.E., SynchroGrid, College Station, Texas 77802 Presented before the

More information

Performance Analysis of Traditional and Improved Transformer Differential Protective Relays

Performance Analysis of Traditional and Improved Transformer Differential Protective Relays Performance Analysis of Traditional and Improved Transformer Differential Protective Relays Armando Guzmán, Stan Zocholl, and Gabriel Benmouyal Schweitzer Engineering Laboratories, Inc. Hector J. Altuve

More information

Protection Basics Presented by John S. Levine, P.E. Levine Lectronics and Lectric, Inc GE Consumer & Industrial Multilin

Protection Basics Presented by John S. Levine, P.E. Levine Lectronics and Lectric, Inc GE Consumer & Industrial Multilin Protection Basics Presented by John S. Levine, P.E. Levine Lectronics and Lectric, Inc. 770 565-1556 John@L-3.com 1 Protection Fundamentals By John Levine 2 Introductions Tools Outline Enervista Launchpad

More information

STRAY FLUX AND ITS INFLUENCE ON PROTECTION RELAYS

STRAY FLUX AND ITS INFLUENCE ON PROTECTION RELAYS 1 STRAY FLUX AND ITS INFLUENCE ON PROTECTION RELAYS Z. GAJIĆ S. HOLST D. BONMANN D. BAARS ABB AB, SA Products ABB AB, SA Products ABB AG, Transformers ELEQ bv Sweden Sweden Germany Netherlands zoran.gajic@se.abb.com

More information

Pinhook 500kV Transformer Neutral CT Saturation

Pinhook 500kV Transformer Neutral CT Saturation Russell W. Patterson Tennessee Valley Authority Presented to the 9th Annual Fault and Disturbance Analysis Conference May 1-2, 26 Abstract This paper discusses the saturation of a 5kV neutral CT upon energization

More information

Improved differential relay for bus bar protection scheme with saturated current transformers based on second order harmonics

Improved differential relay for bus bar protection scheme with saturated current transformers based on second order harmonics Journal of King Saud University Engineering Sciences (2016) xxx, xxx xxx King Saud University Journal of King Saud University Engineering Sciences www.ksu.edu.sa www.sciencedirect.com ORIGINAL ARTICLES

More information

Unit Auxiliary Transformer (UAT) Relay Loadability Report

Unit Auxiliary Transformer (UAT) Relay Loadability Report Background and Objective Reliability Standard, PRC 025 1 Generator Relay Loadability (standard), developed under NERC Project 2010 13.2 Phase 2 of Relay Loadability: Generation, was adopted by the NERC

More information

Outdoor Instrument Transformers. Application Guide

Outdoor Instrument Transformers. Application Guide Outdoor Instrument Transformers Application Guide Introduction Edited by Knut Sjövall, knut.sjovall@se.abb.com ABB Power Technologies AB Department: PTHV/HV/MT SE-771 80 LUDVIKA, Sweden 2 1HSE 9543 40-00en

More information

Review 6. unlike poles cause the magnets to attract. like poles cause the magnets to repel.

Review 6. unlike poles cause the magnets to attract. like poles cause the magnets to repel. Review 6 1. The two characteristics of all magnets are: they attract and hold Iron, and, if free to move, they will assume roughly a south - north position. 2. Lines of flux always leave the north pole

More information

Delayed Current Zero Crossing Phenomena during Switching of Shunt-Compensated Lines

Delayed Current Zero Crossing Phenomena during Switching of Shunt-Compensated Lines Delayed Current Zero Crossing Phenomena during Switching of Shunt-Compensated Lines David K Olson Xcel Energy Minneapolis, MN Paul Nyombi Xcel Energy Minneapolis, MN Pratap G Mysore Pratap Consulting Services,

More information

Transmission Lines and Feeders Protection Pilot wire differential relays (Device 87L) Distance protection

Transmission Lines and Feeders Protection Pilot wire differential relays (Device 87L) Distance protection Transmission Lines and Feeders Protection Pilot wire differential relays (Device 87L) Distance protection 133 1. Pilot wire differential relays (Device 87L) The pilot wire differential relay is a high-speed

More information

Company Directive STANDARD TECHNIQUE: SD7F/2. Determination of Short Circuit Duty for Switchgear on the WPD Distribution System

Company Directive STANDARD TECHNIQUE: SD7F/2. Determination of Short Circuit Duty for Switchgear on the WPD Distribution System Company Directive STANDARD TECHNIQUE: SD7F/2 Determination of Short Circuit Duty for Switchgear on the WPD Distribution System Policy Summary This document provides guidance on calculation of fault levels

More information

Overview of Grounding for Industrial and Commercial Power Systems Presented By Robert Schuerger, P.E.

Overview of Grounding for Industrial and Commercial Power Systems Presented By Robert Schuerger, P.E. Overview of Grounding for Industrial and Commercial Power Systems Presented By Robert Schuerger, P.E. HP Critical Facility Services delivered by EYP MCF What is VOLTAGE? Difference of Electric Potential

More information

Protection of Microgrids Using Differential Relays

Protection of Microgrids Using Differential Relays 1 Protection of Microgrids Using Differential Relays Manjula Dewadasa, Member, IEEE, Arindam Ghosh, Fellow, IEEE and Gerard Ledwich, Senior Member, IEEE Abstract A microgrid provides economical and reliable

More information

A NEW DIFFERENTIAL PROTECTION ALGORITHM BASED ON RISING RATE VARIATION OF SECOND HARMONIC CURRENT *

A NEW DIFFERENTIAL PROTECTION ALGORITHM BASED ON RISING RATE VARIATION OF SECOND HARMONIC CURRENT * Iranian Journal of Science & Technology, Transaction B, Engineering, Vol. 30, No. B6, pp 643-654 Printed in The Islamic Republic of Iran, 2006 Shiraz University A NEW DIFFERENTIAL PROTECTION ALGORITHM

More information

Keywords: Transformer, differential protection, fuzzy rules, inrush current. 1. Conventional Protection Scheme For Power Transformer

Keywords: Transformer, differential protection, fuzzy rules, inrush current. 1. Conventional Protection Scheme For Power Transformer Vol. 3 Issue 2, February-2014, pp: (69-75), Impact Factor: 1.252, Available online at: www.erpublications.com Modeling and Simulation of Modern Digital Differential Protection Scheme of Power Transformer

More information

IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form)

IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form) IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form) Transmission Provider: IDAHO POWER COMPANY Designated Contact Person: Jeremiah Creason Address: 1221 W. Idaho Street, Boise ID 83702 Telephone

More information

1

1 Guidelines and Technical Basis Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive

More information

Bus Protection Fundamentals

Bus Protection Fundamentals Bus Protection Fundamentals Terrence Smith GE Grid Solutions 2017 Texas A&M Protective Relay Conference Bus Protection Requirements High bus fault currents due to large number of circuits connected: CT

More information

Using a Multiple Analog Input Distance Relay as a DFR

Using a Multiple Analog Input Distance Relay as a DFR Using a Multiple Analog Input Distance Relay as a DFR Dennis Denison Senior Transmission Specialist Entergy Rich Hunt, M.S., P.E. Senior Field Application Engineer NxtPhase T&D Corporation Presented at

More information

Section 11: Power Quality Considerations Bill Brown, P.E., Square D Engineering Services

Section 11: Power Quality Considerations Bill Brown, P.E., Square D Engineering Services Section 11: Power Quality Considerations Bill Brown, P.E., Square D Engineering Services Introduction The term power quality may take on any one of several definitions. The strict definition of power quality

More information

Comparative Performance of Conventional Transducers & Rogowski Coil for Relaying Purpose

Comparative Performance of Conventional Transducers & Rogowski Coil for Relaying Purpose Comparative Performance of Conventional Transducers & Rogowski Coil for Relaying Purpose Ashish S. Paramane1, Avinash N. Sarwade2 *, Pradeep K. Katti3, Jayant G. Ghodekar4 1 M.Tech student, 2 Research

More information

Burdens & Current Transformer Requirements of MiCOM Relays. Application Notes B&CT/EN AP/B11. www. ElectricalPartManuals. com

Burdens & Current Transformer Requirements of MiCOM Relays. Application Notes B&CT/EN AP/B11. www. ElectricalPartManuals. com Burdens & Current Transformer Requirements of MiCOM Relays Application Notes B&CT/EN AP/B11 Application Notes B&CT/EN AP/B11 Burdens & CT Req. of MiCOM Relays Page 1/46 CONTENTS 1. ABBREVIATIONS & SYMBOLS

More information

Multimeter 500CVD21 RTU500 series

Multimeter 500CVD21 RTU500 series Remote Terminal Units - Data sheet Multimeter 500CVD21 RTU500 series CT/VT interface with 4 voltage and 24 current inputs for direct monitoring of 3/4 wire 0 300 V AC (line to earth), 0...500 V AC (phase

More information

Transformer Waveforms

Transformer Waveforms OBJECTIVE EXPERIMENT Transformer Waveforms Steady-State Testing and Performance of Single-Phase Transformers Waveforms The voltage regulation and efficiency of a distribution system are affected by the

More information

Figure 1 System One Line

Figure 1 System One Line Fault Coverage of Memory Polarized Mho Elements with Time Delays Hulme, Jason Abstract This paper analyzes the effect of time delays on the fault resistance coverage of memory polarized distance elements.

More information

Protection of a 138/34.5 kv transformer using SEL relay

Protection of a 138/34.5 kv transformer using SEL relay Scholars' Mine Masters Theses Student Theses and Dissertations Fall 2016 Protection of a 138/34.5 kv transformer using SEL 387-6 relay Aamani Lakkaraju Follow this and additional works at: http://scholarsmine.mst.edu/masters_theses

More information

E N G I N E E R I N G M A N U A L

E N G I N E E R I N G M A N U A L 1 1 1.0 PURPOSE The purpose of this document is to define policy and provide engineering guidelines for the AP operating companies (Monongahela Power Company, The Potomac Edison Company, and West Penn

More information

N. TEST TEST DESCRIPTION

N. TEST TEST DESCRIPTION Multi function system for testing substation equipment such as: current, voltage and power transformers, over-current protection relays, energy meters and transducers Primary injection testing capabilities

More information

Substation Testing and Commissioning: Power Transformer Through Fault Test

Substation Testing and Commissioning: Power Transformer Through Fault Test 1 Substation Testing and Commissioning: Power Transformer Through Fault Test M. Talebi, Member, IEEE, Power Grid Engineering Y. Unludag Electric Power System Abstract This paper reviews the advantage of

More information

System Protection and Control Subcommittee

System Protection and Control Subcommittee Power Plant and Transmission System Protection Coordination Reverse Power (32), Negative Sequence Current (46), Inadvertent Energizing (50/27), Stator Ground Fault (59GN/27TH), Generator Differential (87G),

More information

ADVANCED VECTOR SHIFT ALGORITHM FOR ISLANDING DETECTION

ADVANCED VECTOR SHIFT ALGORITHM FOR ISLANDING DETECTION 23 rd International Conference on Electricity Distribution Lyon, 5-8 June 25 Paper 48 ADVANCED VECT SHIFT ALGITHM F ISLANDING DETECTION Murali KANDAKATLA Hannu LAAKSONEN Sudheer BONELA ABB GISL India ABB

More information

MVCT. Megger VT & CT Analyzer. MVCT Megger VT & CT Analyzer

MVCT. Megger VT & CT Analyzer. MVCT Megger VT & CT Analyzer MVCT Ability to test both VT and CT Easy to use one-button automated test plans Industry leading test duration using patented simultaneous tap measurements Smallest and lightest unit on the market CT Kneepoints

More information

Analyzing the Impact of Shunt Reactor Switching Operations Based on DFR Monitoring System

Analyzing the Impact of Shunt Reactor Switching Operations Based on DFR Monitoring System Analyzing the Impact of Shunt Reactor Switching Operations Based on DFR Monitoring System Lalit Ghatpande, SynchroGrid, College Station, Texas, 77840 Naveen Ganta, SynchroGrid, College Station, Texas,

More information

Electrical Protection System Design and Operation

Electrical Protection System Design and Operation ELEC9713 Industrial and Commercial Power Systems Electrical Protection System Design and Operation 1. Function of Electrical Protection Systems The three primary aims of overcurrent electrical protection

More information

MICROPROCESSOR-BASED METERING EQUIPMENT SECTION 16901C PART 2

MICROPROCESSOR-BASED METERING EQUIPMENT SECTION 16901C PART 2 PART 1 PART 2 PRODUCTS 2.01 MANUFACTURERS A. Eaton products B.. C.. The listing of specific manufacturers above does not imply acceptance of their products that do not meet the specified ratings, features

More information

THE ROLE OF SYNCHROPHASORS IN THE INTEGRATION OF DISTRIBUTED ENERGY RESOURCES

THE ROLE OF SYNCHROPHASORS IN THE INTEGRATION OF DISTRIBUTED ENERGY RESOURCES THE OLE OF SYNCHOPHASOS IN THE INTEGATION OF DISTIBUTED ENEGY ESOUCES Alexander APOSTOLOV OMICON electronics - USA alex.apostolov@omicronusa.com ABSTACT The introduction of M and P class Synchrophasors

More information

T/3000 T/3000. Substation Maintenance and Commissioning Test Equipment

T/3000 T/3000. Substation Maintenance and Commissioning Test Equipment T/3000 Substation Maintenance and Commissioning Test Equipment MULTI FUNCTION SYSTEM FOR TESTING SUBSTATION EQUIPMENT SUCH AS: CURRENT, VOLTAGE AND POWER TRANSFORMERS, ALL TYPE OF PROTECTION RELAYS, ENERGY

More information

Solution for Effect of Zero Sequence Currents on Y-Y Transformer Differential Protection

Solution for Effect of Zero Sequence Currents on Y-Y Transformer Differential Protection ABSTRACT National conference on Engineering Innovations and Solutions (NCEIS 2018) International Journal of Scientific Research in Computer Science, Engineering and Information Technology 2018 IJSRCSEIT

More information

Manual Supplement. This supplement contains information necessary to ensure the accuracy of the above manual.

Manual Supplement. This supplement contains information necessary to ensure the accuracy of the above manual. Manual Title: 550A Getting Started Supplement Issue: Part Number: 415509 Issue Date: 9/18 Print Date: November 01 Page Count: 19 Revision/Date: This supplement contains information necessary to ensure

More information

Minnesota Power Systems Conference 2015 Improving System Protection Reliability and Security

Minnesota Power Systems Conference 2015 Improving System Protection Reliability and Security Minnesota Power Systems Conference 2015 Improving System Protection Reliability and Security Steve Turner Senior Application Engineer Beckwith Electric Company Introduction Summarize conclusions from NERC

More information