TSG AC Access Network & Air Interfaces (Approved) March 2013 Meeting Summary The Westin Chosun, Busan, South Korea

Size: px
Start display at page:

Download "TSG AC Access Network & Air Interfaces (Approved) March 2013 Meeting Summary The Westin Chosun, Busan, South Korea"

Transcription

1 TSG AC Access Network & Air Interfaces (Approved) March 0 Meeting Summary The Westin Chosun, Busan, South Korea 0 0. Call to Order & Opening Remarks The meeting was opened on March 0 by the Chair, Dr. Edward Tiedemann (Qualcomm) and began at :am local Busan time. Participants were reminded that attendance is taken electronically (tsgac.gpp.net) and asked to sign in accordingly.. Attendance Registration & Roll Call Quorum was achieved as twelve () of the seventeen () quorum members were present (% participation). There were no proxies noted at this meeting.. Introduction & Numbering of Contributions (AC r, AC ) Document AC , the new meeting room assignment format was reviewed. It was noted that any joint meetings should be included. Participants were reminded to forward joint meeting information to the Secretariat for inclusion. Decision AC 0/0 0 The meeting room assignments will have a fixed/permanent contribution number ( 00) moving forward. Contributions were uploaded to the GPP server and noted on the document register (AC r). The following meeting details and additional activities for the week were noted: WG meetings will start on Monday at :00 PM (Tulip) WG meetings will start on Monday at :00 PM in the plenary room (Orchid) Jing Sun will chair WG in the absence of Sang Kim WG meetings will start on Tuesday at :00 PM (Violet, the office) WG will meet at AM in Korea time on Thursday (Violet, the office) WG meeting will start on Monday at :0 PM (Rose) Wednesday at :0 :0 AM, WG has a joint meeting with PDS on MM in TSG AC WG room (Rose) The ITU activities will be on Tuesday at :0 AM in conjunction with WG The Workshop Planning Ad Hoc will meeting on Tuesday at :00 PM in the Orchid Room TSG AC closing plenary will be held at :0 AM on Friday morning (Orchid) PMT will meet at PM Monday in the GPP office (Violet) The Chair noted the following progress regarding the processing of TSG AC documents:

2 March 0 TSG AC Meeting Summary Page of. Agenda Approval (AC r) Decision AC 0/0 0 The agenda presented in AC r was approved.. Assignment of Contributions to Agenda Items (AC r) Contributions were assigned to agenda items as noted on the agenda.. Approval of December 0 Meeting Summaries (AC , AC ) Decision AC 0/0 0 TSG AC approved the December 0 TSG C meeting summary presented in AC Decision AC 0/0 0 TSG AC approved the December 0 TSG A meeting summary presented in AC Review of Outstanding Action Items (AC ) The outstanding assignments, as listed in AC , were reviewed. 0 0 A call for volunteers has been issued for persons who are interested in serving as the TSG AC WG Vice Chair. 0 The following action plan related to Battery Benchmarking was agreed:

3 March 0 TSG AC Meeting Summary Page of 0 0 Asif Hamidullah (CCF) will help to arrange a call with John Bulger (AT&T) and John Sargent (CTIA) to discuss CTIA s role and how GPP might work with them. The call will be informal discussion which is open to all TSG C/TSG AC participants. Most likely, this call will be scheduled for early in January 0. The proposed WI (C00 0 0) will be CARRIED FORWARD to the next meeting pending the outcome of the discussions with CTIA. Contributions may be submitted to TSG C/TSG AC WG to begin technical deliberations. WG will take the lead in these discussions. This does not preclude discussions in other WGs. WG may also ask other WGs to handle various aspects of this discussion. This action item is now CLOSED. 0 TSG AC to develop its Scope/ToRs for approval by the SC by the March 0 SC/OP meeting in Busan, Korea. 0 WG must develop text for the GPP website which shows the succession of C.S00 documents and provides the mapping to their TIA transposed version no later than the March 0 meeting.. Liaison Reports. Organizational Partners. Steering Committee. SC PMT AC , the January 0 PMT Meeting Summary was reviewed and highlights were noted. The document is FYI. Decision AC 0/0 0 AC , an update to the Work Item Worksheet Template (v.0), is to be used for all new work items. All pending work items should be transferred to the new template. Action AC 0/0 0 AC , Correspondence from the PMT Coordinator initiating TSG review of four () work item worksheets, was remanded to all WGs for review and comment. Comments are to be provided to WG by Tuesday, March 0. Members were also welcomed to provide their comments to one of the scheduled PMT sessions. AC , Correspondence from the PMT Regarding the Review & Approval of Several SC level Documents, was presented. The SC level documents that were affected by the

4 March 0 TSG AC Meeting Summary Page of recent TSG restructuring will be presented to the SC for approval during the March SC meeting. Action AC 0/0 0 AC , the GPP and TSG AC Workplan reports, was remanded to all WGs for review and comment. Comments and updates to document development schedules are to be submitted to either the PMT or WG. Participants were invited to provide comments on the format of the TSG AC workplan reports and recommend whether having both A and C designated documents in one file or having separate files for A and C designate documents would be the most useful.. GPP Secretariat The contributions from the Secretariat were noted FYI. AC Correspondence from Secretariat regarding V&V initiation of A.S000 D v0. Interoperability Specification (IOS) for High Rate Packet Data (HRPD) Radio Access Network Interfaces with Session Control in the Access Network AC Correspondence from Secretariat regarding V&V initiation of A.S000 D v0. Interoperability Specification (IOS) for High Rate Packet Data (HRPD) Radio Access Network Interfaces with Session Control in the Packet Control Function AC Correspondence from Secretariat regarding SC review of A.S00 B v.0 Interoperability Specification (IOS) for Femtocell Access Points AC Correspondence from Secretariat regarding V&V initiation of C.P00 E v0.: Software Distribution for Enhanced Variable Rate Codec (EVRC), Speech Service Options,, 0,, and Minimum Performance Specification (MPS) AC Correspondence from Secretariat regarding V&V initiation of C.P00 E v.: Minimum Performance Specification for the Enhanced Variable Rate Codec, Speech Service Options,, 0, and for Wideband Spread Spectrum Digital Systems AC Correspondence from Secretariat announcing V&V extension of C.P00 E v0.: Software Distribution for Enhanced Variable Rate Codec (EVRC), Speech Service Options,, 0, and, Specification AC Correspondence from Secretariat regarding SC review of C.S00 A v.0 Mobile Equipment (ME) Conformance Testing with RUIM for cdma000 Spread Spectrum Standards AC Correspondence from Secretariat regarding V&V initiation of C.P00 A v0. Signaling Test Specification for EUTRAN cdma000 Connectivity and Interworking AC Correspondence from Secretariat regarding V&V initiation of C.P00 A v0. Electro Acoustic Recommended Minimum Performance Specification for cdma000 Mobile Stations

5 March 0 TSG AC Meeting Summary Page of 0 0 AC Correspondence from Secretariat announcing publication of C.S00 0 v.0 E UTRAN cdma000 x Connectivity and Interworking Air Interface Specification AC Correspondence from Secretariat regarding SC review of C.S0 0 v.0 cdma000 Application (CSIM) Conformance Testing for Spread Spectrum Systems AC Correspondence from Secretariat regarding SC review of C.S000 F v.0 ~ C.S000 F v.0 ( Documents) AC ) Correspondence from Secretariat regarding confirmation of TSG leadership. TSG SX The contributions from TSG SX were noted FYI. AC TSG S Document Status Table for December 0 AC Correspondence from TSG X, to the ITU T, regarding availability of civic alerting function of GPP/GPP terminal at roaming. AC Correspondence from TSG X, to the ITU T, regarding request for feedback on attached draft revision of Supplement to ITU T Q series Recommendations AC Correspondence from TSG X regarding two () new work item proposals AC TSG SX Structure & Working Procedures. TIA Action AC 0/0 0 AC , TIA Legal Comments Regarding the JAVA Trademark in C.S00 A v.0 (TIA A ), was remanded to WG for review and action. Action AC 0/0 0 AC , TIA Ballot Comments C.S00 A v.0 (Signaling Test Specification for E UTRAN cdma000 Connectivity and Interworking), was remanded to WG for review and action. Action AC 0/0 0 AC , TIA Voting Summary C.S00 A v.0 (Electro Acoustic Recommended Minimum Performance specification for cdma000 Mobile Stations), was remanded to WG for review and action. Action AC 0/0 0 AC , TIA Voting Summary C.R00 E v.0 (Software Distribution for Enhanced Variable Rate Codec, Speech Service Options,, 0, and for Wideband Spread Spectrum Digital Systems), was remanded to WG for preparation of document for publishing. Action AC 0/0 0

6 March 0 TSG AC Meeting Summary Page of 0 0 AC , TIA Voting Summary C.S00 E v.0 (Minimum Performance Specification for the Enhanced Variable Rate Codec, Speech Service Options,, 0, and and for Wideband Spread Spectrum Digital Systems), was remanded to WG to assist in the preparation of C.S00 E v.0 for publishing. Action AC 0/0 0 AC , TIA Voting Summary C.R00 E v.0 (Software Distribution for Enhanced Variable Rate Codec (EVRC), Speech Service Options,, 0, and, Minimum Performance Specification), was remanded to WG to assist in the preparation of C.R00 E v.0 for publishing. Action AC 0/0 0 AC , Correspondence from TR. regarding Completion of TIA D (A.S000 D v.0) ballot, was remanded to WG for review and action. Action AC 0/0 AC , Correspondence from TR. regarding Completion of TIA D (A.S000 D v.0) ballot, was remanded to WG for review and action.. ITU Action AC 0/0 AC , Liaison statement from ITU R WPD regarding "Study on IMT Vision for 00 and Beyond" was remanded to WG for review and action. Action AC 0/0 AC , Liaison statement from ITU R WPD regarding "Study on Future Technology Trends for Terrestrial IMT Systems" was remanded to WG for review and action. Action AC 0/0 AC , Liaison statement from ITU R WPD regarding "Revision of Recommendations ITU R M.0 and ITU R M. " was remanded to WG for review and action. Action AC 0/0 AC , Liaison statement from ITU R WPD regarding "plans to replace the Circular Letter /LCCE/ process for the IMT 000 updates of Recommendation ITU R M. with an adaptation of the IMT Advanced update process developed for Recommendation ITU R M.0" was remanded to WG for review and action.. CDG. OMA

7 March 0 TSG AC Meeting Summary Page of 0 0. GPP AC , Liaison statement from GPP SA regarding MSISDN Delivery for GPP network, was provided FYI.. ETSI. Other AC , Correspondence from onemm regarding service layer interworking with GPP/GPP defined networks, was remanded to all WGs FYI. AC , Liaison statement on MPEG HEVC Development, was remanded to WG FYI. Action AC 0/0 AC , NIST Wireless Characteristics Matrix, was remanded to WG for review and action.. Working Group Reports. WG Application Services AC , the TSG C Document Log, was provided FYI. AC , the TSG C Work Item Review Status Log, was provided FYI. A verbal report regarding WG activities, including their plans for the week, was presented by WG Chair, Doug Dunn (Kyocera), as FYI. Decision AC 0/0 0 AC r, Proposed Correspondence to the PMT regarding TSG AC review of GPP WI Worksheets, was approved for transmission to the PMT.. WG Signaling and Protocol A verbal report of WG activities and their plans for the week was presented by WG Chair, Orlett Pearson (Alcatel Lucent), as FYI.. WG Physical Layer A verbal report of WG activities and their plans for the week was presented by Jing Sun (Qualcomm) as FYI. Jing will be chairing the WG activities in the absence of Sang Kim.. WG Performance WG will be meeting, via teleconference, on Thursday; no verbal report was given during opening plenary.. WG Access Network Interfaces

8 March 0 TSG AC Meeting Summary Page of 0 0 A verbal report of WG activities and their plans for the week was presented by the WG Chair, Scott Marin (NSN) as FYI. AC , WG Vice Chair Recommendation, was reviewed. Catherine Zhu, China Telecom and Yuanfang Yu, ZTE, have volunteered as WG Vice Chairs. Support letters from China Telecom and ZTE is requested. Plenary approval of the roles is deferred until the support letters are received.. Old Business. Consideration of Projects for SC Level Review for Publication Action AC 0/0 AC , TIA PN 0 A Voting Summary (C.S v.0), was remanded to WG for review and action.. Consideration of Projects for SC Level Review for Re Publication. Consideration of Projects for Approval for V&V Review Action AC 0/0 AC , Qualcomm R&F Comments A.R0 D v0., was remanded to WG for review and action.. Consideration of Projects for Approval for Baseline Text:. ITU Activities. Development Schedules. WI Approvals. TSG AC Scope & Other Restructuring Related Topics Action AC 0/0 AC , the proposed new TSG AC Scope, was remanded to all WGs for review and comment. Comments are to be brought into Wednesday s Chairs meeting.. Other

9 March 0 TSG AC Meeting Summary Page of 0 0. New Business. New Work Items. CTIA/GPP Battery Life Discussions AC , Call with CTIA on Benchmarking CDMA000 Smartphone Battery Life, was provided FYI. AC , CTIA Industry Standards for Estimating Battery Life Presentation, was provided FYI. AC , Access to CTIA Battery Life Measurement Working Group, was provided FYI. Additional discussions will occur in WG, at a time to be announced to all who may be interested. Topics to include: Should TSG AC create a formal document or provide information to CTIA? Will TSG AC participants have access to GSMA websites? GSMA/GCF has shown interest in putting some parameters in TS0 doc David Crowe will update the proposed work item and provide it during the WG discussions.. Working Group Leadership AC , Nomination of Yingming Wang (Huawei) for TSG AC WG Vice Chair, was presented. Decision AC 0/0 0 Yingming Wang (Huawei) is appointed as the WG Vice Chair.. C.P00 A V&V Comments AC , C.P00 A V&V Comments, was remanded to WG for review and action.. CL CA (CDMA & LTE Carrier Aggregation) Introduction AC , CL CA (CDMA & LTE Carrier Aggregation) Introduction, will be discussed during a special session/interim plenary on Wednesday at :00pm.. Call for GPP Small Cells World Summit 0 AC , Call for GPP Representatives at the Small Cells World Summit 0, was provided as FYI. The TSG AC opening plenary recessed at :pm (local) on March 0. Interim Plenary Wednesday, March 0 An interim plenary of TSG AC was held on Wednesday, March 0 and began at :0pm.

10 March 0 TSG AC Meeting Summary Page of 0 0 One company, ACS, that did not attend the opening plenary attended the interim plenary. AC , CL CA (CDMA & LTE Carrier Aggregation) Introduction, was presented. During discussions it was noted: Any document that results from the study will likely be a technical report which may or may not be published o Joint studies typically wind up in an S.R designated document and are developed during joint sessions of the TSGs; however, it s too early in the process to decide at this point. The TSG SX working group that will be responsible for the development work has yet to be identified. As this is a contribution driven process, participants were encouraged to submit contributions on the topic. TSG SX will lead the work for now but additional details must be decided and communicated to TSG AC when available. AC , PMT correspondence regarding the TSG AC Review of GPP 00, was presented FYI. Work item GPP 00 CDMA & LTE Carrier Aggregation Study will finish TSG Review during the March 0 PMT meeting.,. Decision AC 0/0 0 WG can restart processing the approval of the Battery Life Measurement TSG AC work item. Closing Plenary Friday, March 0 TSG AC reconvened at :am (local) on March 0. There were no new companies in attendance at the closing plenary. During the closing plenary, updates to the agenda were made and AC 00 00r was created.. Working Group Reports. WG Application Services AC00 00 r, the WG Report, was presented as FYI. WG indicated that it would use up to four () meetings in 0, but it was really too early to tell. AC00 00, C.P00 E v.0 Software Distribution for Enhanced Variable Rate Codec (EVRC), Speech Service Options,, 0, and, Specification (To be published as C.R00 E v.0, WI: TSGC ) proposed publication text Decision AC 0/0 0 C.R00 E v.0 Software Distribution for Enhanced Variable Rate Codec (EVRC), Speech Service Options,, 0, and, Specification was approved for publication and will be liaised to TR..

11 March 0 TSG AC Meeting Summary Page of 0 0 AC00 00, C.P00 E v.0 Software Distribution for Enhanced Variable Rate Codec (EVRC), Speech Service Options,, 0, and, Minimum Performance Specification (MPS) (To be published as C.R00 E v.0, WI: TSGC ) proposed publication text Decision AC 0/0 C.R00 E v.0 Software Distribution for Enhanced Variable Rate Codec (EVRC), Speech Service Options,, 0, and, Minimum Performance Specification (MPS) was approved for publication and will be liaised to TR.. AC00 00, C.P00 E v.0 Minimum Performance Specification for the Enhanced Variable Rate Codec, Speech Service Options,, 0, and for Wideband Spread Spectrum Digital Systems (to be published as C.S00 E v.0, WI: TSGC proposed publication text Decision AC 0/0 C.S00 E v.0 Minimum Performance Specification for the Enhanced Variable Rate Codec, Speech Service Options,, 0, and for Wideband Spread Spectrum Digital Systems was approved for publication and will be liaised to TR.. AC00 00, GPP C.S00 A v.0 Mobile Equipment (ME) Conformance Testing with R UIM for cdma000 Spread Spectrum Standards proposed republication text. Only editorial edits (date, revision history and trademark acknowledgement of Java) were made to the document. Decision AC 0/0 C.S00 A v.0 Mobile Equipment (ME) Conformance Testing with R UIM for cdma000 Spread Spectrum Standards was approved for publication as republication text and will be liaised to TR.. AC00 00, Proposed TSG AC Work Items, was presented: Decision AC 0/0 The following two () TSG AC work items were approved and will sent to the PMT for processing: TSGAC Update C.S00 0 A Data Service Options for Spread Spectrum Systems to Support xrevf TSGAC Defining the cdma000 Radio Environment for Smartphone Battery Life Measurement AC00 00, Document Number Request, was presented: Decision AC 0/0 The following two () document number requests were approved: C.P00 D v.0 Removable User Identity Module for Spread Spectrum Systems

12 March 0 TSG AC Meeting Summary Page of 0 0 o Baseline beginning April 0 o V&V April 0 o Publication June 0 C.P0 A v.0 Unstructured Supplementary Service Data (USSD) Service Options for Spread Spectrum Systems: Service Options and o Baseline beginning April 0 o V&V April 0 o Publication June 0 Action AC 0/0 WG will complete the assignment of the numbers, as approved in AC00 00 and will add the documents to the contribution log. Decision AC 0/0 AC00 00 r, Proposed correspondence to the PMT regarding TSG AC Review of GPP WIs, was approved for transmission to the PMT. Decision AC 0/0 AC00 00 r, Proposed correspondence to the PMT Coordinator regarding the GPP Workplan, was approved for transmission to the PMT Coordinator. Decision AC 0/0 AC00 00 r, Proposed correspondence to ETSI SCP regarding a request for coding value in ETSI TS for ehrpd, was approved for transmission to ETSI SCP. Decision AC 0/0 AC r, Proposed reply correspondence to ETSI SCP regarding LS dated December 0 on a new feature for the REFRESH command in TS, was approved for transmission to ETSI SCP. Decision AC 0/0 AC00 00, Proposed correspondence to ETSI SCP TEC regarding MO Short Message Control Support in GPP, was approved for transmission to ETSI SCP TEC.. WG Signaling and Protocol AC00 00 r, the WG report was presented as FYI. With regards to the number of meetings that will be needed during 0, WG (as a group) did not discuss this topic specifically but the WG Chair noted that she does not believe more than four () meetings will be needed. Decision AC 0/0 0 AC00 00, C.S00 A v.0 E UTRAN cdma000 x Connectivity and Interworking Air Interface Specification was approved for V&V with comments due April 0. This document will be liaised to TR..

13 March 0 TSG AC Meeting Summary Page of 0 0 Decision AC 0/0 AC , C.S v.0 Data Service Options for Spread Spectrum Systems was approved for publication and liaised to TR.. Action AC 0/0 0 The GPP website needs to be updated to reflect the current document mapping information, as the document numbering for C.S v.0 has changed. The WG Chair will circulate proposed text for review prior to requesting the website update.. WG Physical Layer AC00 00 r, the WG report, was presented as FYI. During discussions, it was noted: WG indicated that is could use four () meetings in 0. The IMT 000 update process is changing to align with the IMT Advanced update process. The GPP Partners will have to sign off in agreement. Decision AC 0/0 AC00 00, Liaison to ITU R WPD on Intent to Update for M., was approved to be sent to the GPP Steering Committee and liaised to TR.. Decision AC 0/0 AC00 00, Cover letter from TIA to ITU R WPD for Intent to Update for M. and Exceptional Form A, was approved to be sent to the GPP Steering Committee and liaised to TR.. Decision AC 0/0 AC00 00, TSG AC Updated NIST wireless characteristics matrix, was approved to liaise to TR.. After TSG SX approves the matrix and incorporates the proposed changes from TSG AC, the document will be sent directly to TR. for merging with the document.. WG Performance AC00 00, the WG report was presented as FYI. Decision AC 0/0 As provided in AC00 00, C.S00 A v.0 Electro Acoustic Recommended Minimum Performance Specification for cdma000 Mobile Stations was approved for publication and will be liaised to TR... WG Access Network Interfaces AC00 00 Ar, the WG report, was presented FYI. WG indicated that it could use four () meetings in 0. Scott Marin resigned as the WG Chair. This meeting in Busan will be his last GPP meeting.

14 March 0 TSG AC Meeting Summary Page of 0 0 Action AC 0/0 Section.. of the WG report contains meeting requirements for the June 0 meeting and will be forwarded to the Secretariat for meeting planning purposes. Decision AC 0/0 David Ott (Qualcomm) will set up the conference call information and act as Facilitator for the next WG teleconference being held in April. Decision AC 0/0 AC00 00 B, the TSG AC WG workplan, was approved to be sent to the PMT. Decision AC 0/0 Yuanfang Yu, ZTE, was appointed as TSG AC WG Vice Chair as shown in the support letter provided in AC The WG replies to the TSG AC opening plenary remands and requests were provided FYI in AC Decision AC 0/0 AC00 00, A.S000 D v.0 Interoperability Specification (IOS) for High Rate Packet Data (HRPD) Radio Access Network Interfaces with Session Control in the Access Network was approved for publication and will be liaised to TR.. Decision AC 0/0 0 AC , A.S000 D v.0 Interoperability Specification (IOS) for High Rate Packet Data (HRPD) Radio Access Network Interfaces with Session Control in the Packet Control Function was approved for publication and will be liaised to TR. Decision AC 0/0 AC00 00, Correspondence to TR. noting pending A.S000/ D publication, was approved to be liaised to TIA TR.. Decision AC 0/0 AC00 00, A.R0 D Interoperability Specification (IOS) Numbering Referencewas approved for V&V with comments due 0 May 0. V&V comments are to be provided using the comment form provided in AC E. Decision AC 0/0 Caiqin Zhu, China Telecom, was appointed as a TSG AC WG Vice Chair as shown in the support letter provided in AC Liaison Reports. Organizational Partners

15 March 0 TSG AC Meeting Summary Page of 0 0. Steering Committee. GPP Secretariat. TSG SX. TIA. ITU. CDG. OMA. GPP/ETSI. Other. Old Business. TSG AC Terms of Reference Decision AC 0/0 AC00 00, the updated TSG AC Terms of Reference, will be presented to the SC for approval. This closed action item 0: TSG AC to develop its Scope/ToR for approval by the SC by the March 0 SC/OP meeting in Busan, Korea.. New Business. Updated TSG AC Correspondence Template AC00 00, an updated TSG AC Correspondence Template was provided as FYI. Action AC 0/0

16 March 0 TSG AC Meeting Summary Page of 0 0 The Secretary will incorporate changes proposed during the meeting to the new TSG AC Correspondence template (e.g., margins, line numbers, etc.). Once completed, the correspondence template will be sent to the TSG AC reflector for use by the TSG.. New Work Item Corrections and New Test Cases for Mobile Equipment Conformance Testing w/r UIM Action AC 0/0 Document AC00 0 0, Work Item Corrections and new test cases for Mobile Equipment Conformance Testing with R UIM, was remanded to WG for review and action.. New Work Item Administration of Parameter Value Assignments Action AC 0/0 AC00 0 0, Work Item Administration of Parameter Value Assignments, was remanded to WG for review and action and to WG for review and comment.. Future Meeting Schedule June 0 Miami, FL September 0 Guilin, China December 0 Kauai, HI Detailed information on all TSG AC meetings can be found on the GPP online calendar ( A (tentative) interim plenary is scheduled for April 0 at :00pm (ET). Topics to include: C.S0 baseline/v&v C.S00 B v.0 baseline/v&v C.S00 D v.0 baseline/v&v C.S0 A v.0 baseline/v&v A.S00 baseline o R&F comments will be due before the June 0 meeting o To be sent for V&V in June. Open Discussion & Other Business. Assignments See the annex to this report for the decisions and action items captured during the meeting.. Adjournment The TSG AC meeting ended at approximately :0am on March 0.

17 March 0 TSG AC Meeting Summary Page of 0 0 March 0 TSG AC Decisions Decision AC 0/0 0 The meeting room assignments will have a fixed/permanent contribution number ( 00) moving forward. Decision AC 0/0 0 The agenda presented in AC r was approved. Decision AC 0/0 0 TSG AC approved the December 0 TSG C meeting summary presented in AC Decision AC 0/0 0 TSG AC approved the December 0 TSG A meeting summary presented in AC Decision AC 0/0 0 AC , an update to the Work Item Worksheet Template (v.0), is to be used for all new work items. All pending work items should be transferred to the new template. Decision AC 0/0 0 AC r, Proposed Correspondence to the PMT regarding TSG AC review of GPP WI Worksheets, was approved for transmission to the PMT. Decision AC 0/0 0 Yingming Wang (Huawei) is appointed as the WG Vice Chair. Decision AC 0/0 0 WG can restart processing the approval of the Battery Life Measurement TSG AC work item. Decision AC 0/0 0 C.R00 E v.0 Software Distribution for Enhanced Variable Rate Codec (EVRC), Speech Service Options,, 0, and, Specification was approved for publication and will be liaised to TR.. Decision AC 0/0 C.R00 E v.0 Software Distribution for Enhanced Variable Rate Codec (EVRC), Speech Service Options,, 0, and, Minimum Performance Specification (MPS) was approved for publication and will be liaised to TR.. Decision AC 0/0 C.S00 E v.0 Minimum Performance Specification for the Enhanced Variable Rate Codec, Speech Service Options,, 0, and for Wideband Spread Spectrum Digital Systems was approved for publication and will be liaised to TR..

18 March 0 TSG AC Meeting Summary Page of 0 0 Decision AC 0/0 C.S00 A v.0 Mobile Equipment (ME) Conformance Testing with R UIM for cdma000 Spread Spectrum Standards was approved for publication as republication text and will be liaised to TR.. Decision AC 0/0 The following two () TSG AC work items were approved and will sent to the PMT for processing: TSGAC Update C.S00 0 A Data Service Options for Spread Spectrum Systems to Support xrevf TSGAC Defining the cdma000 Radio Environment for Smartphone Battery Life Measurement Decision AC 0/0 The following two () document number requests were approved: C.P00 D v.0 Removable User Identity Module for Spread Spectrum Systems o Baseline beginning April 0 o V&V April 0 o Publication June 0 C.P0 A v.0 Unstructured Supplementary Service Data (USSD) Service Options for Spread Spectrum Systems: Service Options and o Baseline beginning April 0 o V&V April 0 o Publication June 0 Decision AC 0/0 AC00 00 r, Proposed correspondence to the PMT regarding TSG AC Review of GPP WIs, was approved for transmission to the PMT. Decision AC 0/0 AC00 00 r, Proposed correspondence to the PMT Coordinator regarding the GPP Workplan, was approved for transmission to the PMT Coordinator. Decision AC 0/0 AC00 00 r, Proposed correspondence to ETSI SCP regarding a request for coding value in ETSI TS for ehrpd, was approved for transmission to ETSI SCP. Decision AC 0/0 AC r, Proposed reply correspondence to ETSI SCP regarding LS dated December 0 on a new feature for the REFRESH command in TS, was approved for transmission to ETSI SCP. Decision AC 0/0 AC00 00, Proposed correspondence to ETSI SCP TEC regarding MO Short Message Control Support in GPP, was approved for transmission to ETSI SCP TEC.

19 March 0 TSG AC Meeting Summary Page of 0 0 Decision AC 0/0 0 AC00 00, C.S00 A v.0 E UTRAN cdma000 x Connectivity and Interworking Air Interface Specification was approved for V&V with comments due April 0. This document will be liaised to TR.. Decision AC 0/0 AC , C.S v.0 Data Service Options for Spread Spectrum Systems was approved for publication and liaised to TR.. Decision AC 0/0 AC00 00, Liaison to ITU R WPD on Intent to Update for M., was approved to be sent to the GPP Steering Committee and liaised to TR.. Decision AC 0/0 AC00 00, Cover letter from TIA to ITU R WPD for Intent to Update for M. and Exceptional Form A, was approved to be sent to the GPP Steering Committee and liaised to TR.. Decision AC 0/0 AC00 00, TSG AC Updated NIST wireless characteristics matrix, was approved to liaise to TR.. After TSG SX approves the matrix and incorporates the proposed changes from TSG AC, the document will be sent directly to TR. for merging with the document. Decision AC 0/0 As provided in AC00 00, C.S00 A v.0 Electro Acoustic Recommended Minimum Performance Specification for cdma000 Mobile Stations was approved for publication and will be liaised to TR.. Decision AC 0/0 David Ott (Qualcomm) will set up the conference call information and act as Facilitator for the next WG teleconference being held in April. Decision AC 0/0 AC00 00 B, the TSG AC WG workplan, was approved to be sent to the PMT. Decision AC 0/0 Yuanfang Yu, ZTE, was appointed as TSG AC WG Vice Chair as shown in the support letter provided in AC Decision AC 0/0 AC00 00, A.S000 D v.0 Interoperability Specification (IOS) for High Rate Packet Data (HRPD) Radio Access Network Interfaces with Session Control in the Access Network was approved for publication and will be liaised to TR.. Decision AC 0/0 0

20 March 0 TSG AC Meeting Summary Page 0 of AC , A.S000 D v.0 Interoperability Specification (IOS) for High Rate Packet Data (HRPD) Radio Access Network Interfaces with Session Control in the Packet Control Function was approved for publication and will be liaised to TR. Decision AC 0/0 AC00 00, Correspondence to TR. noting pending A.S000/ D publication, was approved to be liaised to TIA TR.. Decision AC 0/0 AC00 00, A.R0 D Interoperability Specification (IOS) Numbering Referencewas approved for V&V with comments due 0 May 0. V&V comments are to be provided using the comment form provided in AC E. Decision AC 0/0 Caiqin Zhu, China Telecom, was appointed as a TSG AC WG Vice Chair as shown in the support letter provided in AC Decision AC 0/0 The updated TSG AC Terms of Reference will be presented to the SC for approval as shown in AC00 00.

21 March 0 TSG AC Meeting Summary Page of Carried Over Action Items 0 0 A call for volunteers has been issued for persons who are interested in serving as the TSG AC WG Vice Chair. 0 WG must develop text for the GPP website which shows the succession of C.S00 documents and provides the mapping to their TIA transposed version no later than the March 0 meeting. 0 0 March 0 TSG AC Recorded Actions Action AC 0/0 0 AC , Correspondence from the PMT Coordinator initiating TSG review of four () work item worksheets, was remanded to all WGs for review and comment. Comments are to be provided to WG by Tuesday, March 0. Members were also welcomed to provide their comments to one of the scheduled PMT sessions. Action AC 0/0 0 AC , the GPP and TSG AC Workplan reports, was remanded to all WGs for review and comment. Comments and updates to document development schedules are to be submitted to either the PMT or WG. Participants were invited to provide comments on the format of the TSG AC workplan reports and recommend whether having both A and C designated documents in one file or having separate files for A and C designate documents would be the most useful. Action AC 0/0 0 AC , TIA Legal Comments Regarding the JAVA Trademark in C.S00 A v.0 (TIA A ), was remanded to WG for review and action. Action AC 0/0 0 AC , TIA Ballot Comments C.S00 A v.0 (Signaling Test Specification for E UTRAN cdma000 Connectivity and Interworking), was remanded to WG for review and action. Action AC 0/0 0 AC , TIA Voting Summary C.S00 A v.0 (Electro Acoustic Recommended Minimum Performance specification for cdma000 Mobile Stations), was remanded to WG for review and action. Action AC 0/0 0 AC , TIA Voting Summary C.R00 E v.0 (Software Distribution for Enhanced Variable Rate Codec, Speech Service Options,, 0, and for Wideband Spread Spectrum Digital Systems), was remanded to WG for preparation of document for publishing.

22 March 0 TSG AC Meeting Summary Page of 0 0 Action AC 0/0 0 AC , TIA Voting Summary C.S00 E v.0 (Minimum Performance Specification for the Enhanced Variable Rate Codec, Speech Service Options,, 0, and and for Wideband Spread Spectrum Digital Systems), was remanded to WG to assist in the preparation of C.S00 E v.0 for publishing. Action AC 0/0 0 AC , TIA Voting Summary C.R00 E v.0 (Software Distribution for Enhanced Variable Rate Codec (EVRC), Speech Service Options,, 0, and, Minimum Performance Specification), was remanded to WG to assist in the preparation of C.R00 E v.0 for publishing. Action AC 0/0 0 AC , Correspondence from TR. regarding Completion of TIA D (A.S000 D v.0) ballot, was remanded to WG for review and action. Action AC 0/0 AC , Correspondence from TR. regarding Completion of TIA D (A.S000 D v.0) ballot, was remanded to WG for review and action. Action AC 0/0 AC , Liaison statement from ITU R WPD regarding "Study on IMT Vision for 00 and Beyond" was remanded to WG for review and action. Action AC 0/0 AC , Liaison statement from ITU R WPD regarding "Study on Future Technology Trends for Terrestrial IMT Systems" was remanded to WG for review and action. Action AC 0/0 AC , Liaison statement from ITU R WPD regarding "Revision of Recommendations ITU R M.0 and ITU R M. " was remanded to WG for review and action. Action AC 0/0 AC , Liaison statement from ITU R WPD regarding "plans to replace the Circular Letter /LCCE/ process for the IMT 000 updates of Recommendation ITU R M. with an adaptation of the IMT Advanced update process developed for Recommendation ITU R M.0" was remanded to WG for review and action. Action AC 0/0 AC , NIST Wireless Characteristics Matrix, was remanded to WG for review and action. Action AC 0/0

23 March 0 TSG AC Meeting Summary Page of 0 AC , TIA PN 0 A Voting Summary (C.S v.0), was remanded to WG for review and action. Action AC 0/0 AC , Qualcomm R&F Comments A.R0 D v0., was remanded to WG for review and action. Action AC 0/0 AC , the proposed new TSG AC Scope, was remanded to all WGs for review and comment. Comments are to be brought into Wednesday s Chairs meeting. Action AC 0/0 WG will complete the assignment of the numbers, as approved in AC00 00 and will add the documents to the contribution log. Action AC 0/0 0 The GPP website needs to be updated to reflect the current document mapping information, as the document numbering for C.S v.0 has changed. The WG Chair will circulate proposed text for review prior to requesting the website update. Action AC 0/0 Section.. of the WG report contains meeting requirements for the June 0 meeting and will be forwarded to the Secretariat for meeting planning purposes. Action AC 0/0 The Secretary will incorporate changes proposed during the meeting to the new TSG AC Correspondence template (e.g., margins, line numbers, etc.). Once completed, the correspondence template will be sent to the TSG AC reflector for use by the TSG. Action AC 0/0 Document AC00 0 0, Work Item Corrections and new test cases for Mobile Equipment Conformance Testing with R UIM, was remanded to WG for review and action. Action AC 0/0 AC00 0 0, Work Item Administration of Parameter Value Assignments, was remanded to WG for review and action and to WG for review and comment.

TSG AC Access Network & Air Interfaces (Approved) 3 7 June 2013 Meeting Summary The Hyatt Miami, Miami, FL

TSG AC Access Network & Air Interfaces (Approved) 3 7 June 2013 Meeting Summary The Hyatt Miami, Miami, FL TSG AC Access Network & Air Interfaces (Approved) June Meeting Summary The Hyatt Miami, Miami, FL 0. Call to Order & Opening Remarks The meeting was opened on June by the Vice Chair, Tony Lee (VIA Telecom)

More information

ETSI TS V8.7.0 ( ) Technical Specification

ETSI TS V8.7.0 ( ) Technical Specification TS 136 214 V8.7.0 (2009-10) Technical Specification LTE; Evolved Universal Terrestrial Radio Access (E-UTRA); Physical layer - Measurements (3GPP TS 36.214 version 8.7.0 Release 8) 1 TS 136 214 V8.7.0

More information

International Telecommunication Union

International Telecommunication Union International Telecommunication Union ITU-R standardization of IMT-Advanced ITU-D Regional Development Forum for the Arab Region: "NGN and Broadband, Opportunities and Challenges Cairo (Egypt) 13-15 December

More information

Report ITU-R M.2198 (11/2010)

Report ITU-R M.2198 (11/2010) Report ITU-R M.2198 (11/2010) The outcome of the evaluation, consensus building and decision of the IMT-Advanced process (Steps 4 to 7), including characteristics of IMT-Advanced radio interfaces M Series

More information

Stoa Administrative Calendar

Stoa Administrative Calendar January o Select next year's NITOC TD to shadow this year's TD at NITOC (or earlier -Ideally this would happen ahead of time, so that the process would begin whenever the current TD begins working on the

More information

IEEE Session #14 Opening Plenary Presentation

IEEE Session #14 Opening Plenary Presentation IEEE 802.16 Session #14 Opening Plenary Presentation Document Number: IEEE 802.16-01/31 Date Submitted: 2001-07-09 Source: Roger Marks Venue: IEEE 802.16 Session #14 Base Document: none Purpose: To assist

More information

INTERNATIONAL TELECOMMUNICATION UNION

INTERNATIONAL TELECOMMUNICATION UNION 参考資料 2 INTERNATIONAL TELECOMMUNICATION UNION Radiocommunication Bureau (Direct Fax N. +41 22 730 57 85) Administrative Circular CACE/564 22 March 2012 To Administrations of Member States of the ITU, Radiocommunication

More information

Annotations to the provisional agenda INTRODUCTION

Annotations to the provisional agenda INTRODUCTION CBD Distr. GENERAL 6 November 2013 ORIGINAL: ENGLISH WORKSHOP OF THE NETWORK OF LABORATORIES FOR THE DETECTION AND IDENTIFICATION OF LIVING MODIFIED ORGANISMS Ispra, Italy, 25-27 November 2013 Item 2 of

More information

TECHNICAL COMMITTEE No. 100: AUDIO, VIDEO AND MULTIMEDIA SYSTEMS AND EQUIPMENT

TECHNICAL COMMITTEE No. 100: AUDIO, VIDEO AND MULTIMEDIA SYSTEMS AND EQUIPMENT 100(Tel Aviv/Secretariat)30 For IEC use only 2010-10-22 INTERNATIONAL ELECTROTECHNICAL COMMISSION TECHNICAL COMMITTEE No. 100: AUDIO, VIDEO AND MULTIMEDIA SYSTEMS AND EQUIPMENT Decision list of Fifteenth

More information

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 SGS KOREA CO., LTD. (GUNPO LABORATORY) Gunpo1-4, LS-ro 182beon-gil, Gunpo-si, Gyeonggi-do, South Korea Technical Manager Automotive EMC Elan Lee elan.lee@sgs.com

More information

ETSI TS V ( )

ETSI TS V ( ) TS 132 451 V15.0.0 (2018-07) TECHNICAL SPECIFICATION Universal Mobile Telecommunications System (UMTS); LTE; Telecommunication management; Key Performance Indicators (KPI) for Evolved Universal Terrestrial

More information

Band Class Specification for cdma2000 Spread Spectrum Systems

Band Class Specification for cdma2000 Spread Spectrum Systems GPP C.S00-B Version.0 Date: August, 00 Band Class Specification for cdma000 Spread Spectrum Systems Revision B COPYRIGHT GPP and its Organizational Partners claim copyright in this document and individual

More information

1 st MEETING OF THE IHO COUNCIL

1 st MEETING OF THE IHO COUNCIL C1-3.1 1 st MEETING OF THE IHO COUNCIL Monaco, 17-19 October 2017 REPORT OF THE IHO HYDROGRAPHIC SERVICES AND STANDARDS COMMITTEE C1-3.1 - P a g e 3 REPORT OF THE HYDROGRAPHIC STANDARDS AND SERVICES COMMITTEE

More information

Band Class Specification for cdma2000 Spread Spectrum Systems

Band Class Specification for cdma2000 Spread Spectrum Systems GPP C.S00 Version.0 Date: February, 00 Band Class Specification for cdma000 Spread Spectrum Systems Revision 0 COPYRIGHT GPP and its Organizational Partners claim copyright in this document and individual

More information

Status report of ETSI STC SMG2 to SMG#25

Status report of ETSI STC SMG2 to SMG#25 ETSI TC SMG Tdoc SMG 175/98 Meeting no 25 Sophia Antipolis, France 16-20 March 1998 Source: SMG2 Secretary and Chairman Date: 13 March 1998 Status report of ETSI STC SMG2 to SMG#25 Abstract: This document

More information

Minute of Meeting of 22 February 2016

Minute of Meeting of 22 February 2016 BOARD OF MANAGEMENT The meeting commenced at 1300 hours. Minute of Meeting of 22 February 2016 PRESENT: D Anderson, A Bell, S Brimmer, S Cormack, D Duthie, I Gossip, J Harper, J Henderson, C Inglis, R

More information

ETSI TS V8.1.0 ( ) Technical Specification

ETSI TS V8.1.0 ( ) Technical Specification TS 136 410 V8.1.0 (2009-01) Technical Specification LTE; Evolved Universal Terrestrial Radio Access Network (E-UTRAN); S1 layer 1 general aspects and principles (3GPP TS 36.410 version 8.1.0 Release 8)

More information

1. Introduction. 2. General 2(6)

1. Introduction. 2. General 2(6) ARRANGEMENT between the Electronic Communications Office of the Republic of Latvia and the Communications Regulations Authority of the Republic of Lithuania on shared use of the frequency band 453.000-457.475/

More information

www.telecom-cloud.net Harish Vadada The 3rd Generation Partnership Project (3GPP) is collaboration between groups of telecommunications associations, known as the Organizational Partners. The initial scope

More information

ETSI TS V9.1.1 ( ) Technical Specification

ETSI TS V9.1.1 ( ) Technical Specification TS 136 410 V9.1.1 (2011-05) Technical Specification LTE; Evolved Universal Terrestrial Radio Access Network (E-UTRAN); S1 general aspects and principles (3GPP TS 36.410 version 9.1.1 Release 9) 1 TS 136

More information

Update on ITU-R Working Party 5D on IMT-2020 for 5G

Update on ITU-R Working Party 5D on IMT-2020 for 5G CEPT Workshop on 5G Mobile Communications 2-4 November 2016 Mainz, Germany Update on ITU-R Working Party on IMT-2020 for 5G Hakan Ohlsen Vice-Chairman, ITU-R Working Party Stephen M. Blust Chairman, ITU-R

More information

3GPP: Evolution of Air Interface and IP Network for IMT-Advanced. Francois COURAU TSG RAN Chairman Alcatel-Lucent

3GPP: Evolution of Air Interface and IP Network for IMT-Advanced. Francois COURAU TSG RAN Chairman Alcatel-Lucent 3GPP: Evolution of Air Interface and IP Network for IMT-Advanced Francois COURAU TSG RAN Chairman Alcatel-Lucent 1 Introduction Reminder of LTE SAE Requirement Key architecture of SAE and its impact Key

More information

3GPP TS V ( )

3GPP TS V ( ) TS 36.410 V10.2.0 (2011-09) Technical Specification 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access Network (E-UTRAN);

More information

ITU-R activities on 5G

ITU-R activities on 5G IEEE WCNC 2015 New Orleans, USA 9-12 March 2015 ITU-R activities on 5G Colin Langtry Chief, Radiocommunication Study Groups Department ITU-T Telecommunication standardization - network and service aspects

More information

Reflections on progress made at the fifth part of the second session of the Ad Hoc Working Group on the Durban Platform for Enhanced Action

Reflections on progress made at the fifth part of the second session of the Ad Hoc Working Group on the Durban Platform for Enhanced Action Reflections on progress made at the fifth part of the second session of the Ad Hoc Working Group on the Durban Platform for Enhanced Action Note by the Co-Chairs 7 July 2014 I. Introduction 1. At the fifth

More information

John Bednar, Chairman

John Bednar, Chairman MINUTES API Subcommittee 17 (SC17) Subsea Production Equipment 2016 Summer Committee Meeting Grand Hyatt Hotel, Washington DC Wednesday, June 29 th 2016 John Bednar, Chairman Brian Skeels, (Co) Vice-Chairman

More information

WINNER+ Miia Mustonen VTT Technical Research Centre of Finland. Slide 1. Event: CWC & VTT GIGA Seminar 2008 Date: 4th of December 2008

WINNER+ Miia Mustonen VTT Technical Research Centre of Finland. Slide 1. Event: CWC & VTT GIGA Seminar 2008 Date: 4th of December 2008 Process and Requirements for IMT-Advanced Miia Mustonen VTT Technical Research Centre of Finland Slide 1 Outline Definitions Process and time schedule of IMT-Advanced Minimum requirements Technical Performance

More information

The Standards Development Process. Substations Committee Erin Spiewak IEEE SA May 20, 2012

The Standards Development Process. Substations Committee Erin Spiewak IEEE SA May 20, 2012 The Standards Development Process Substations Committee Erin Spiewak IEEE SA May 20, 2012 The Standards Development Lifecycle Agenda 2 What is the Standards process? There are 6 steps to the IEEE Standards

More information

3GPP TS V ( )

3GPP TS V ( ) TS 36.410 V12.1.0 (2014-12) Technical Specification 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access Network (E-UTRAN);

More information

ETSI TS V ( ) Technical Specification

ETSI TS V ( ) Technical Specification TS 136 214 V10.1.0 (2011-04) Technical Specification LTE; Evolved Universal Terrestrial Radio Access (E-UTRA); Physical layer; Measurements (3GPP TS 36.214 version 10.1.0 Release 10) 1 TS 136 214 V10.1.0

More information

SUMMARY. Adopt draft Decision 19.2/1 Roadmap to Enhanced WMO Technical Regulations Framework.

SUMMARY. Adopt draft Decision 19.2/1 Roadmap to Enhanced WMO Technical Regulations Framework. World Meteorological Organization EXECUTIVE COUNCIL Sixty-Eighth Session Geneva, 15 to 24 June 2016 EC-68/Doc. 19.2 Submitted by: President 21.VI.2016 APPROVED AGENDA ITEM 19: AGENDA ITEM 19.2: GENERAL

More information

IMT-Advanced Standardization Process

IMT-Advanced Standardization Process ITU-D Regional Development Forum for the Asia Pacific Region: "NGN and Broadband, Opportunities and Challenges" IMT-Advanced Standardization Process Colin LANGTRY Counsellor, ITU Radiocommunication Bureau

More information

RQIA Board Meeting. Min/Nov17/public. To share with Board members a record of the previous meeting of the RQIA Board.

RQIA Board Meeting. Min/Nov17/public. To share with Board members a record of the previous meeting of the RQIA Board. RQIA Board Meeting Date of Meeting 11 January 2018 Title of Paper Public Session Minutes Agenda Item 1 Reference Author Presented by Purpose Executive Summary FOI Exemptions Applied Equality Impact Assessment

More information

Minutes Board of Trustees Teleconference Meeting University of Central Florida August 21, 2018

Minutes Board of Trustees Teleconference Meeting University of Central Florida August 21, 2018 Minutes Board of Trustees Teleconference Meeting University of Central Florida August 21, 2018 Chairman Marcos Marchena called the teleconference meeting of the Board of Trustees to order at 3:00 p.m.

More information

IEEE Working Group on Broadband Wireless Access (BWA)

IEEE Working Group on Broadband Wireless Access (BWA) IEEE 802.16 2003-07-21 IEEE 802.16-03/32 03/32 Working Group on Broadband Wireless Access (BWA) Welcome IEEE 802.16 Working Group on Broadband Wireless Access 802.16 Session #26 Opening Plenary 21 July

More information

b. A roll call was completed and confirmed that there was a quorum of 22 present for this meeting (a minimum of 15 is required).

b. A roll call was completed and confirmed that there was a quorum of 22 present for this meeting (a minimum of 15 is required). MINUTES API Subcommittee 17 (SC17) Subsea Production Equipment 2017 Summer Committee Meeting Lloyd s Register Training Center, Houston, Texas Wednesday, June 14, 2017 Brian Skeels, (Co) Vice-Chairman Ross

More information

Band Class Specification for cdma2000 Spread Spectrum Systems

Band Class Specification for cdma2000 Spread Spectrum Systems GPP C.P00-C Version 0.0. Date: May 00Oct 00 Band Class Specification for cdma000 Spread Spectrum Systems COPYRIGHT GPP and its Organizational Partners claim copyright in this document and individual Organizational

More information

Radiocommunication Bureau (BR)

Radiocommunication Bureau (BR) 参考資料 3 Radiocommunication Bureau (BR) Administrative Circular CACE/811 16 May 2017 To Administrations of Member States of the ITU, Radiocommunication Sector Members, ITU R Associates participating in the

More information

Working Party 5D LIAISON STATEMENT TO EXTERNAL ORGANIZATIONS ON THE SCHEDULE FOR UPDATING RECOMMENDATION ITU-R M.

Working Party 5D LIAISON STATEMENT TO EXTERNAL ORGANIZATIONS ON THE SCHEDULE FOR UPDATING RECOMMENDATION ITU-R M. Radiocommunication Study Groups 23rd Meeting of Working Party Beijing, China, 23 Feb. - 2 Mar. 2016 Attachment to Document /82 (not yet available) (Source: Document /TEMP/15(Rev.2)) 2 March 2016 English

More information

ETSI TR V9.0.0 ( ) Technical Report

ETSI TR V9.0.0 ( ) Technical Report TR 136 913 V9.0.0 (2010-02) Technical Report LTE; Requirements for further advancements for Evolved Universal Terrestrial Radio Access (E-UTRA) (LTE-Advanced) (3GPP TR 36.913 version 9.0.0 Release 9) 1

More information

ETSI TS V ( )

ETSI TS V ( ) Technical Specification Universal Mobile Telecommunications System (UMTS); LTE; Universal Terrestrial Radio Access (UTRA) and Evolved UTRA () and Evolved Packet Core (EPC); User Equipment (UE) conformance

More information

ETSI TR V1.2.1 ( )

ETSI TR V1.2.1 ( ) TR 102 021-1 V1.2.1 (2005-05) Technical Report Terrestrial Trunked Radio (TETRA); User Requirement Specification TETRA Release 2; Part 1: General overview 2 TR 102 021-1 V1.2.1 (2005-05) Reference RTR/TETRA-01136

More information

ETSI documents published or circulated for vote/comment in December 2018

ETSI documents published or circulated for vote/comment in December 2018 ETSI documents published or circulated for vote/comment in December 2018 ETSI documents issued under AP20190307. Comments should be sent to the named contact by 05/02/2019 EN 300 338-1 Technical characteristics

More information

ETSI TS V ( )

ETSI TS V ( ) TS 137 571-5 V14.3.0 (2018-04) TECHNICAL SPECIFICATION Universal Mobile Telecommunications System (UMTS); LTE; Universal Terrestrial Radio Access (UTRA) and Evolved UTRA (E-UTRA) and Evolved Packet Core

More information

ETSI TS V8.2.0 ( ) Technical Specification

ETSI TS V8.2.0 ( ) Technical Specification TS 136 306 V8.2.0 (2008-11) Technical Specification LTE; Evolved Universal Terrestrial Radio Access (E-UTRA); User Equipment (UE) radio access capabilities (3GPP TS 36.306 version 8.2.0 Release 8) 1 TS

More information

ETSI TS V9.1.0 ( )

ETSI TS V9.1.0 ( ) TS 137 571-3 V9.1.0 (2012-03) Technical Specification Universal Mobile Telecommunications System (UMTS); LTE; Universal Terrestrial Radio Access (UTRA) and Evolved UTRA (E-UTRA) and Evolved Packet Core

More information

Chairperson Jean Humpherys welcomed everyone. A special welcome was extended to Abby Payne from the Tremonton City Youth Council.

Chairperson Jean Humpherys welcomed everyone. A special welcome was extended to Abby Payne from the Tremonton City Youth Council. TREMONTON CITY LIBRARY BOARD MEETING January 18, 2012 Members Present: Kim Griffiths, Library Director Diana Doutre, City Council Rep. Jean Humpherys, Chairperson Daniel Francom, Vice Chair Brandy Greer,

More information

ETSI TS V ( )

ETSI TS V ( ) TS 138 522 V15.0.0 (2018-10) TECHNICAL SPECIFICATION 5G; NR; User Equipment (UE) conformance specification; Applicability of radio transmission, radio reception and radio resource management test cases

More information

3GPP TS V ( )

3GPP TS V ( ) TS 37.571-3 V10.5.0 (2013-09) Technical Specification 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Universal Terrestrial Radio Access (UTRA) and Evolved UTRA

More information

Board of Directors Meeting, Thursday, January 30th 2003, at 3:15 PM at La Creole Beach Hotel, Gosier, Guadeloupe, FWI

Board of Directors Meeting, Thursday, January 30th 2003, at 3:15 PM at La Creole Beach Hotel, Gosier, Guadeloupe, FWI Board of Directors Meeting, Thursday, January 30th 2003, at 3:15 PM at La Creole Beach Hotel, Gosier, Guadeloupe, FWI Present Ray Hirschfeld, Director, partly President, partly Chair Marc Briceno, Director,

More information

RANCHO CUCAMONGA COMMUNITY & ARTS FOUNDATION MINUTES OF THE APRIL 27, 2016, REGULAR MEETING

RANCHO CUCAMONGA COMMUNITY & ARTS FOUNDATION MINUTES OF THE APRIL 27, 2016, REGULAR MEETING RANCHO CUCAMONGA COMMUNITY & ARTS FOUNDATION MINUTES OF THE APRIL 27, 2016, REGULAR MEETING A. CALL TO ORDER The regular meeting of the Rancho Cucamonga Community & Arts Foundation was held on Wednesday,

More information

TECHNICAL COMMITTEE No. 100: AUDIO, VIDEO AND MULTIMEDIA SYSTEMS AND EQUIPMENT

TECHNICAL COMMITTEE No. 100: AUDIO, VIDEO AND MULTIMEDIA SYSTEMS AND EQUIPMENT For IEC use only 100(Berlin/Secretariat)28 2006-09-29 INTERNATIONAL ELECTROTECHNICAL COMMISSION TECHNICAL COMMITTEE No. 100: AUDIO, VIDEO AND MULTIMEDIA SYSTEMS AND EQUIPMENT Decision list of eleventh

More information

ETSI TS V ( )

ETSI TS V ( ) TS 136 307 V8.11.0 (2014-03) Technical Specification LTE; Evolved Universal Terrestrial Radio Access (E-UTRA); Requirements on User Equipments (UEs) supporting a release-independent frequency band (3GPP

More information

Statement on variation of 900 MHz and 1800 MHz Wireless Telegraphy Act licences

Statement on variation of 900 MHz and 1800 MHz Wireless Telegraphy Act licences Statement on variation of 900 MHz and 1800 MHz Wireless Telegraphy Act licences Statement Publication date: 06 January 2011 Contents Section Page 1 Executive summary 1 2 Introduction 2 3 Assessment of

More information

3GPP TS V ( )

3GPP TS V ( ) TS 32.451 V10.0.0 (2011-03) Technical Specification 3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Telecommunication management; Key Performance Indicators

More information

TS-3GB-N.S0017-Bv1.0 International Implementation of Wireless Telecommunication Systems Compliant with JJ-70.11

TS-3GB-N.S0017-Bv1.0 International Implementation of Wireless Telecommunication Systems Compliant with JJ-70.11 TS-GB-N.S00-Bv.0 International Implementation of Wireless Telecommunication Systems Compliant with JJ-0. May 0, 00 THE TELECOMMUNICATION TECHNOLOGY COMMITTEE TS-GB-N.S00-Bv.0 International Implementation

More information

5G Standardization Status in 3GPP

5G Standardization Status in 3GPP As the radio interface of mobile phones has evolved, it has typically been changed about every ten years, and the 5G (5th Generation) interface is expected to start being used in the 2020s. Similar to

More information

ETSI TR V1.2.1 ( )

ETSI TR V1.2.1 ( ) TR 100 392-17-3 V1.2.1 (2006-06) Technical Report Terrestrial Trunked Radio (TETRA); Voice plus Data (V+D); Part 17: TETRA V+D and DMO specifications; Sub-part 3: Release 1.3 2 TR 100 392-17-3 V1.2.1 (2006-06)

More information

Open letter to the Community February 21, 2019

Open letter to the Community February 21, 2019 Open letter to the Community February 21, 2019 After the recent turn of events related to the MMH Board we felt compelled to set the record straight regarding certain statements and/or actions which needed

More information

ETSI TS V1.5.1 ( ) Technical Specification

ETSI TS V1.5.1 ( ) Technical Specification TS 100 392-15 V1.5.1 (2011-02) Technical Specification Terrestrial Trunked Radio (TETRA); Voice plus Data (V+D); Part 15: TETRA frequency bands, duplex spacings and channel numbering 2 TS 100 392-15 V1.5.1

More information

Signaling Test Specification for Mobile Station Equipment Identifier (MEID) Support for cdma2000 Spread Spectrum Systems

Signaling Test Specification for Mobile Station Equipment Identifier (MEID) Support for cdma2000 Spread Spectrum Systems GPP C.P00-B Version. Version Date: March 0 Signaling Test Specification for Mobile Station Equipment Identifier (MEID) Support for cdma000 Spread Spectrum Systems GPP 0 GPP and its Organizational Partners

More information

Introduction to cdma2000 Standards for Spread Spectrum Systems Release C

Introduction to cdma2000 Standards for Spread Spectrum Systems Release C Version.0 Date: May 8, 00 Introduction to cdma000 Standards for Spread Spectrum Systems Release C GPP 00 GPP and its Organizational Partners claim copyright in this document and individual Organizational

More information

ETSI TS V ( )

ETSI TS V ( ) TS 136 521-3 V14.5.0 (2018-09) TECHNICAL SPECIFICATION LTE; Evolved Universal Terrestrial Radio Access (E-UTRA); User Equipment (UE) conformance specification; Radio transmission and reception; Part 3:

More information

TheR&DandStandardization Activities of ARIB

TheR&DandStandardization Activities of ARIB TheR&DandStandardization Activities of ARIB Kohei Satoh Managing Director, Association of Radio Industries and Businesses (ARIB) Received: 29 March, 2013; Accepted: 9 October, 2013 Abstract Radio systems

More information

Finding right frequencies

Finding right frequencies Finding right frequencies - new additional spectrum for future UMTS / IMT systems Lasse Wieweg World LTE Conference, Berlin - 17 July 2011 Agenda UMTS Forum contributions to the work on IMT the study work

More information

3GPP TS V ( )

3GPP TS V ( ) TS 37.571-3 V10.1.1 (2012-09) Technical Specification 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Universal Terrestrial Radio Access (UTRA) and Evolved UTRA

More information

Student Advisory Council Regular meeting August 18, 2015

Student Advisory Council Regular meeting August 18, 2015 Student Advisory Council Regular meeting August 18, 2015 The Student Advisory Council met in regular session on Tuesday, August 18, 2015 in the Council Chambers of City Hall, 555 South Washington Avenue,

More information

Awarded the special prize of broadcasting technology of the 40th Hoso Bunka Foundation Award

Awarded the special prize of broadcasting technology of the 40th Hoso Bunka Foundation Award October 2014 Awarded the special prize of broadcasting technology of the 40th Hoso Bunka Foundation Award Presentation ceremony of the 40th Hoso Bunka Foundation (HBF* ) Award was held in Tokyo on 25 June

More information

ETSI TR V3.0.0 ( )

ETSI TR V3.0.0 ( ) TR 121 910 V3.0.0 (2000-07) Technical Report Universal Mobile Telecommunications System (UMTS); Multi-mode User Equipment (UE) issues; Categories principles and procedures (3G TR 21.910 version 3.0.0 Release

More information

RADIO SPECTRUM POLICY GROUP. Commission activities related to radio spectrum policy

RADIO SPECTRUM POLICY GROUP. Commission activities related to radio spectrum policy EUROPEAN COMMISSION Directorate-General for Communications Networks, Content and Technology Electronic Communications Networks and Services Radio Spectrum Policy Group RSPG Secretariat Brussels, 03 October

More information

APT RECOMMENDATION USE OF THE BAND MHZ FOR PUBLIC PROTECTION AND DISASTER RELIEF (PPDR) APPLICATIONS

APT RECOMMENDATION USE OF THE BAND MHZ FOR PUBLIC PROTECTION AND DISASTER RELIEF (PPDR) APPLICATIONS APT RECOMMENDATION on USE OF THE BAND 4940-4990 MHZ FOR PUBLIC PROTECTION AND DISASTER RELIEF (PPDR) APPLICATIONS No. APT/AWF/REC-01(Rev.1) Edition: September 2006 Approved By The 31 st Session of the

More information

Minutes Followspot Position Working Group Meeting Thursday, 21 January 2010 Dallas/Ft. Worth Marriott Solana Westlake, TX

Minutes Followspot Position Working Group Meeting Thursday, 21 January 2010 Dallas/Ft. Worth Marriott Solana Westlake, TX Minutes Followspot Position Working Group Meeting Thursday, 21 January 2010 Dallas/Ft. Worth Marriott Solana Westlake, TX Chairmen: Jack Schmidt; Special Lighting Solutions (Ballantyne of Omaha, Inc.);

More information

ETSI TS V ( ) Technical Specification

ETSI TS V ( ) Technical Specification TS 132 450 V10.1.0 (2011-06) Technical Specification Universal Mobile Telecommunications System (UMTS); LTE; Telecommunication management; Key Performance Indicators (KPI) for Evolved Universal Terrestrial

More information

UK Shared Business Services Ltd

UK Shared Business Services Ltd SBS 001-18 UK Shared Business Services Ltd Minutes of the 76 th UK SBS Board Meeting held at Polaris House, Swindon on Wednesday 6 th December 2017 commencing at 10.00am. Attending: Board Members: UK SBS

More information

ETSI TR V5.0.1 ( )

ETSI TR V5.0.1 ( ) TR 143 026 V5.0.1 (2002-07) Technical Report Digital cellular telecommunications system (Phase 2+); Multiband operation of GSM / DCS 1800 by a single operator (3GPP TR 43.026 version 5.0.1 Release 5) GLOBAL

More information

TECHNICAL COMMITTEE No. 100: AUDIO, VIDEO AND MULTIMEDIA SYSTEMS AND EQUIPMENT

TECHNICAL COMMITTEE No. 100: AUDIO, VIDEO AND MULTIMEDIA SYSTEMS AND EQUIPMENT For IEC use only 100(Minsk/Secretariat)36 2015-10-10 INTERNATIONAL ELECTROTECHNICAL COMMISSION TECHNICAL COMMITTEE No. 100: AUDIO, VIDEO AND MULTIMEDIA SYSTEMS AND EQUIPMENT Resolution list of the twenty-first

More information

ETSI TR V ( )

ETSI TR V ( ) TR 136 913 V15.0.0 (2018-09) TECHNICAL REPORT LTE; Requirements for further advancements for Evolved Universal Terrestrial Radio Access (E-UTRA) (LTE-Advanced) (3GPP TR 36.913 version 15.0.0 Release 15)

More information

Test Plan for Hearing Aid Compatibility

Test Plan for Hearing Aid Compatibility Test Plan for Hearing Aid Compatibility Version Number 3.1 February 2017 2017 CTIA - The Wireless Association. All rights reserved. CTIA hereby grants to CTIA Authorized Testing Laboratories (CATLs), and

More information

April 1998 doc:. IEEE /158. IEEE P Wireless LANs. WINForum Sharing Rules Requirements And Goals

April 1998 doc:. IEEE /158. IEEE P Wireless LANs. WINForum Sharing Rules Requirements And Goals IEEE P802.11 Wireless LANs WINForum Sharing Rules Requirements And Goals Date: April 6, 1998 Source: WINForum 5 GHz Sharing Rules Development Committee (SRDC) Submitted by: Donald C. Johnson, Chairman

More information

ETSI TR V8.0.0 ( ) Technical Report

ETSI TR V8.0.0 ( ) Technical Report TR 122 935 V8.0.0 (2009-04) Technical Report Digital cellular telecommunications system (Phase 2+); Universal Mobile Telecommunications System (UMTS); LTE; Feasibility study on Location Services (LCS)

More information

ETSI TS V8.1.0 ( ) Technical Specification

ETSI TS V8.1.0 ( ) Technical Specification TS 125 144 V8.1.0 (2009-03) Technical Specification Universal Mobile Telecommunications System (UMTS); User Equipment (UE) and Mobile Station (MS) over the air performance requirements (3GPP TS 25.144

More information

IEEE L /001r2. Proposal by Roberto Macchi

IEEE L /001r2. Proposal by Roberto Macchi Proposal by Roberto Macchi Dear Jose and Giulio, I had a chat with Marianna on the BRAN contribution (BRAN39d058r1) to 802.16 for further contributing to WP9B for the finalisation of PDNRF.BWA. I understood

More information

I (EUROPEAN TELECOMMUNICATIONS STANDARDS INSTITUTE) EUROPEAN PUBLICATIONS

I (EUROPEAN TELECOMMUNICATIONS STANDARDS INSTITUTE) EUROPEAN PUBLICATIONS I (EUROPEAN TELECOMMUNICATIONS STANDARDS INSTITUTE) EUROPEAN PUBLICATIONS EN 300 175-1: September 2013 Common Interface (CI). Part 1. Overview EN 300 175-2: September 2013 Common Interface (CI). Part 2.

More information

Tha Board O Ulster-Scotch 97th Board Meeting 31 March 2010 Ulster-Scots Agency Board Room Belfast

Tha Board O Ulster-Scotch 97th Board Meeting 31 March 2010 Ulster-Scots Agency Board Room Belfast Tha Board O Ulster-Scotch 97th Board Meeting 31 March 2010 Ulster-Scots Agency Board Room Belfast Present; In attendance: Recording Secretary: Mrs Angela Graham Dr Ian Adamson Mr William Humphrey Mr John

More information

NACAS Education Foundation

NACAS Education Foundation 1 NACAS Education Foundation Board of Directors Meeting Minutes January 14, 2015 2:00pm 3:30pm ET In attendance: Matt Sirinek, Nancy Becerra, Maria Hoagland, Dave Kratzer, Mary Perry, Bill Redwine, Laura

More information

Welcome to JigsawBox!! How to Get Started Quickly...

Welcome to JigsawBox!! How to Get Started Quickly... Welcome to JigsawBox!! How to Get Started Quickly... Welcome to JigsawBox Support! Firstly, we want to let you know that you are NOT alone. Our JigsawBox Customer Support is on hand Monday to Friday to

More information

IEEE le-04/04. IEEE Broadband Wireless Access Working Group <http://ieee802.org/16>

IEEE le-04/04. IEEE Broadband Wireless Access Working Group <http://ieee802.org/16> Project Date Submitted Source(s) Re: Abstract Notice Release Patent Policy and Procedures IEEE 802.16 Broadband Wireless Access Working Group IEEE 802.16 Study Group on LE Coexistence

More information

Agenda Sustainability Task Force A Committee of the Chico City Council

Agenda Sustainability Task Force A Committee of the Chico City Council Agenda Sustainability Task Force A Committee of the Chico City Council Meeting of Thursday, January 26, 2017 5:30 p.m. Municipal Center - 421 Main Street, Conference Room No. 1 in the Council Chambers

More information

ETSI TS V1.1.1 ( ) Technical Specification

ETSI TS V1.1.1 ( ) Technical Specification TS 100 392-3-8 V1.1.1 (2008-04) Technical Specification Terrestrial Trunked Radio (TETRA); Voice plus Data (V+D); Part 3: Interworking at the Inter-System Interface (ISI); Sub-part 8: Generic Speech Format

More information

ETSI TS V1.4.1 ( ) Technical Specification

ETSI TS V1.4.1 ( ) Technical Specification TS 100 392-15 V1.4.1 (2010-03) Technical Specification Terrestrial Trunked Radio (TETRA); Voice plus Data (V+D); Part 15: TETRA frequency bands, duplex spacings and channel numbering 2 TS 100 392-15 V1.4.1

More information

Callback to an Emergency Call Origination

Callback to an Emergency Call Origination GPP S.R0-0 Version.0 June 00 Callback to an Emergency Call Origination Stage Requirements 00 GPP GPP and its Organizational Partners claim copyright in this document and individual Organizational Partners

More information

BOARD OF TRUSTEES The University of West Alabama Regular Quarterly Meeting Bell Conference Center June 6, 2016, 1:00 p.m.

BOARD OF TRUSTEES The University of West Alabama Regular Quarterly Meeting Bell Conference Center June 6, 2016, 1:00 p.m. BOARD OF TRUSTEES The University of West Alabama Regular Quarterly Meeting Bell Conference Center June 6, 2016, 1:00 p.m. A G E N D A I. Call to Order (Mr. Terry Bunn) II. Roll Call III. Approval of Agenda

More information

3GPP TS V ( )

3GPP TS V ( ) TS 32.450 V13.0.0 (2016-01) Technical Specification 3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Telecommunication management; Key Performance Indicators

More information

Quality comparison of wideband coders including tandeming and transcoding

Quality comparison of wideband coders including tandeming and transcoding ETSI Workshop on Speech and Noise In Wideband Communication, 22nd and 23rd May 2007 - Sophia Antipolis, France Quality comparison of wideband coders including tandeming and transcoding Catherine Quinquis

More information

IEEE Working Group on Broadband Wireless Access.

IEEE Working Group on Broadband Wireless Access. 2001-04-03 IEEE 802.16l-01/10r1 (DRAFT 5) IEEE 802.16 Working Group on Broadband Wireless Access Mr. Robert Jones Director of the Radiocommunication Bureau International Telecommunication Union Radiocommunication

More information

ETSI TS V ( )

ETSI TS V ( ) TS 123 216 V11.7.0 (2013-01) Technical Specification Digital cellular telecommunications system (Phase 2+); Universal Mobile Telecommunications System (UMTS); LTE; Single Radio Voice Call Continuity (SRVCC);

More information

TECHNICAL COMMITTEE No. 100: AUDIO, VIDEO AND MULTIMEDIA SYSTEMS AND EQUIPMENT

TECHNICAL COMMITTEE No. 100: AUDIO, VIDEO AND MULTIMEDIA SYSTEMS AND EQUIPMENT For IEC use only 100(Tokyo/Secretariat)43 2014-11-09 INTERNATIONAL ELECTROTECHNICAL COMMISSION TECHNICAL COMMITTEE No. 100: AUDIO, VIDEO AND MULTIMEDIA SYSTEMS AND EQUIPMENT Resolution list of the twentieth

More information

NEU Board Meeting Minutes. January 10, Concordia University Brandes Room 2811 NE Holman Street Portland, OR 97211

NEU Board Meeting Minutes. January 10, Concordia University Brandes Room 2811 NE Holman Street Portland, OR 97211 NEU Board Meeting Minutes Concordia University Brandes Room 2811 NE Holman Street Portland, OR 97211 Tom Sincic, President called the meeting to order at 6:15 p.m. The following NEU Board Members were

More information

LTE and NB-IoT. Luca Feltrin. RadioNetworks, DEI, Alma Mater Studiorum - Università di Bologna. Telecom Italia Mobile S.p.a. - TIM

LTE and NB-IoT. Luca Feltrin. RadioNetworks, DEI, Alma Mater Studiorum - Università di Bologna. Telecom Italia Mobile S.p.a. - TIM LTE and NB-IoT Luca Feltrin RadioNetworks, DEI, Alma Mater Studiorum - Università di Bologna Telecom Italia Mobile S.p.a. - TIM Index Ø 3GPP and LTE Specifications Ø LTE o Architecture o PHY Layer o Procedures

More information

ARIB STD-T V Mandatory speech codec; AMR speech codec; Interface to lu and Uu (Release 1999)

ARIB STD-T V Mandatory speech codec; AMR speech codec; Interface to lu and Uu (Release 1999) ARIB STD-T63-26.102 V3.4.0 Mandatory speech codec; AMR speech codec; Interface to lu and Uu (Release 1999) Refer to "Industrial Property Rights (IPR)" in the preface of ARIB STD-T63 for Related Industrial

More information