HydroFORM Phased Array Corrosion Mapping System Part 2 Mechanical Setup
|
|
- Candice Griffith
- 5 years ago
- Views:
Transcription
1 HydroFORM Phased Array Corrosion Mapping System Part 2 Mechanical Setup
2 HydroFORM Corrosion Mapping System Mechanical Setup The HydroFORM Phased Array System is designed to perform corrosion mapping in two possible configurations. Manual Encoded One Line Scans (1 axis) Semi-Automated Encoded Multiple Line Scans (2 axis) 2
3 HydroFORM Mechanical Setup Probe Installation Ensure that the probe is installed into the HydroFORM scanner where element number 1 is positioned correctly for the C-scan that will be created. The normal position for this is 1-64 left to right when scanning forward as pictured. When the Omniscan Start button is selected, the 0,0 position will set 2mm to the right of element number 1 as pictured. The Index axis will increment in the direction below indicated by the green arrow. (1mm focal law resolution and 61mm total width) The Scan axis will increment below in the direction indicated by the blue arrow at the resolution entered into the Omniscan. 3
4 HydroFORM Mechanical Setup Probe Installation Loosen the knob (pictured at right), apply light pressure on the probe to ensure the foam seal is secure against the inspection surface and tighten the knob. The HydroFORM wedge used by the focal law calculator has a default height (Water column) of 12mm. This can be visualized on the Omniscan display prior to tightening the probe knob and adjusted by applying light pressure until the interface signal is at 0. It is also acceptable to modify the Hydro wedge parameters to the current position. 4
5 HydroFORM Mechanical Setup Probe Installation The phased array probe will align parallel and level with the pipe when secured with the one-knob patent pending probe carriage. Minor differences in the water column due to the scanner Crabbing will not affect thickness readings when the interface gate (Yellow) is set to A-scan Syncro I/ To achieve the intended focal point, the real water column height must match the Hydro wedge height in the Omniscan database. Differences in the water column and calculator will not affect beam angle at 0 degrees for corrosion mapping and thickness readings. 5
6 HydroFORM Mechanical Setup Probe Installation - Foam Pressure applied to the probe during installation is directly related to the foam insert position and will affect the ability to maintain the water column. Care should be taken to ensure that the probe is not installed with too much or too little tension on the foam. To optimize both the position of the probe and tension of the foam the interface echo between the water and component surface should appear at 12mm. This is the default height of the Hydro wedge in the Omniscan database and when positioned correctly will result in the interface signal appearing at zero mm using the default set up file. (With gate I Syncro on Pulse, not \ I) 6
7 HydroFORM System Manual Encoded One Line Scans In the manual encoded one line scan configuration, the position of the data is maintained and recorded using the encoder integrated in the HydroFORM carriage. The integrated encoder has a resolution of 8 steps\mm that is entered into the Omniscan MXU software in the Scan-Encoder-Resolution for Encoder #1. In this configuration with the default aperture of 4 elements (4mm per A-scan), the HydroFORM will provide a one line scan of 61 A-scans (61mm) up to the limit of either the 160 megabyte file size (Standard) or 300 megabyte file size (Optional). For the 160 megabyte standard Omniscan, the limit would be a C-scan of 61mm X 7680mm at a resolution of 1mm in both axis. For the 300 megabyte optional Omniscan, the limit would be a C-scan of 61mm X 14,400mm at a resolution of 1mm in both axis. To piece multiple one line scans together in one data file, the probe can be indexed manually in the Omniscan software or indexed by use of a clicker (Olympus P/N: OPTX674) and index of the C-scan entered manual. 7
8 HydroFORM System Manual Encoded One Line Scans For manual encoded one line scans, plug the Mini-Wheel encoder cable to the Lemo-DE15 encoder cable extension. The DE15 connector will connect to the OmniScan. 8
9 HydroFORM System Semi-Auto Raster Scanning (2 Axis) Use of the HydroFORM system in the 2 axis semi-automated mode requires the Olympus CHAIN Scanner (Chainscan-XY38) or similar. The HydroFORM adaptation kit includes all of the required hardware to adapt the HydroFORM HD Mapper to a standard Olympus CHAIN Scanner XY38. Included in the adaptation kit is the crank handle, encoder junction with Lemo connector, reversed spring loaded arm for HydroFORM scanner attachment, four plastic wheels and parts to allow the CHAIN Scanner to inspect Flat surfaces. 9
10 HydroFORM System Semi-Auto CHAIN Scanner In the CHAIN Scanner manual, locate the required number of short links and long links for the diameter of pipe to be inspected and connect them in accordance with the manual. Insure the adjustment screw is set so that when clamped on the pipe the scanner is snug to the pipe and does not move freely. Make sure you use a small link with dovetail on it for installation of the umbilical attachment device. 10
11 HydroFORM System Semi-Auto CHAIN Scanner Install the HydroFORM on the index arm as pictured below. The probe knob should be on the far side of the HD Mapper from the CHAIN Scanner wheels. The probe should be installed with element 1 closest to the CHAIN Scanner wheels. The umbilical should be configured with slack to allow a full range of movement on the index arm. Index Axis Scan Axis
12 HydroFORM System Semi-Auto CHAIN Scanner The HydroFORM assembly is connected to the CHAIN Scanner by a spring loaded arm that has 3 possible positions. 1. Locked up (for HydroFORM manipulation) 2. Locked down 3. Free moving When acquiring data and manipulating the scanner the arm should be in the free moving position. Acquiring data when the arm is in a locked position results in poor data quality and scanner operation. 12
13 HydroFORM System Semi-Auto CHAIN Scanner Position the scanner so that 0,0 (XY position) on the probe is in the intended position on the pipe. Using the default aperture of 4 elements, this puts 0,0 (Focal law 1) 2mm from the element 1 position line. 0,0 13
14 Semi-Auto Chain Scanner Position of 0,0 for C-scan To assist in positioning the HydroFORM at the correct 0,0 position a magnetic template is provided. Place the magnetic template on the component with the 0,0 position of the C- scan under the window below indicated by the red arrow. After the magnetic template is in place the HydroFORM can be put in place prior to locking down the chain scanner. 14
15 Semi-Auto Chain Scanner Position of 0,0 for C-scan The chain scanner has a arm length (Index or Y axis) that will allow the probe five revolutions or Strokes around the pipe. Using the default set up this results in a C-scan acquisition of 305mm X pipe circumference. (61mm X 5 strokes) For multiple acquisitions, the chain scanner must be repositioned every 305mm. The magnetic template is used to set the original 0,0 position and to maintain the correct position for successive scanner positions every 305mm. See Omniscan Setup Power Point for encoder preset position and C-scan area creation for consecutive repositioning of the chain scanner for inspections larger than five strokes (305mm) 15
16 HydroFORM System Semi-Auto CHAIN Scanner Move the scanner to the side slightly and open the water control valve until the water chamber is flooded and all bubbles have disappeared from the S-scan display. After initially flooding the water chamber and clearing the bubbles, the water pressure can be reduced to a light flow during scanning. The surface condition of the pipe will determine how much water is required. Best results and fastest scan speed will be achieved with an electric pump due to constant consistent pressure. Be sure to move the scanner back to 0,0 prior to starting the acquisition. 16
17
HydroFORM Phased Array Corrosion Mapping System Part 1 Equipment Overview
HydroFORM Phased Array Corrosion Mapping System Part 1 Equipment Overview HydroFORM Corrosion Mapping System - Equipment The HydroFORM Phased Array System is designed to perform internal and external corrosion\erosion
More informationHigh-Resolution Corrosion Monitoring for Reliable Assessment of Infrastructure
19 th World Conference on Non-Destructive Testing 2016 High-Resolution Corrosion Monitoring for Reliable Assessment of Infrastructure André Lamarre 1 1 Olympus Scientific Solutions Americas, Quebec City,
More informationISONIC PA AUT Spiral Scan Inspection of Tubular Parts Operating Manual and Inspection Procedure Rev 1.00 Sonotron NDT
ISONIC PA AUT Spiral Scan Inspection of Tubular Parts Operating Manual and Inspection Procedure Rev 1.00 Sonotron NDT General ISONIC PA AUT Spiral Scan Inspection Application was designed on the platform
More informationLegacy Woodworking Machinery a division of Phantom Engineering. The Legacy CNC. Assembly Manual
Legacy Woodworking Machinery a division of Phantom Engineering The Legacy CNC Assembly Manual New Orientation of the Legacy Step one: Re-orientation of the machine Remove the X-axis screw and supports.
More informationCopyright Next Wave Automation All Rights Reserved. Version SEPTEMBER Updates of this manual are Available at
Copyright Next Wave Automation All Rights Reserved. Version1.0 22 SEPTEMBER 2016 Updates of this manual are Available at www.nextwaveautomation.com FOR THE MOST RECENT MANUALS, DRIVERS, AND OTHER SOFTWARE,
More informationABM International, Inc. Navigator Assembly Manual
ABM International, Inc. 1 1.0: Parts List Tablet (Qty. 1) Tablet mount (Qty. 1) NOTE: Mount may appear and operate different then image below Control Box (Qty. 1) Motor Power Supply (Qty. 1) 2 X-axis motor
More information3.2.3 Rear Door Window and Quarter Window Carrier Assembly
Tighten all bolts. Tighten bolts marked -1- and -2- in specified sequence. Tightening torque: 8 Nm Remaining bolts can be tightened in any sequence. Insert door window -3- through window recess without
More informationThe Queen Quilter Professional Quilters Kit Frame
The Queen Quilter Professional Quilters Kit Frame Assembly Instructions Table of Contents: Before you begin......................... Pg. 2 Wood parts............................. Pg. 3 Hardware..............................
More informationINSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS PARTS REQUIRED Single QuickStand Lite Parts A (1) Lower Arm A B C D B (1) Upper Arm C (1) Base D (1) Base Plate E (1) M8 Dynamic Arm Long F (1) Clamp Bracket G H (1) VESA Plate
More informationHQ Pole Upgrade Kit for HQ Adjustable Table and HQ QuilTable Assembly Instructions 1
HQ Pole Upgrade Kit for HQ Adjustable Table and HQ QuilTable Assembly Instructions QF09775 The pole upgrade kit can be used with or without the QF09700 HQ Precison-Glide track upgrade kit. What s Included
More informationImproved Inspection of CRA-Clad Pipeline Girth Welds with the Use of Accessible Advanced Ultrasonic Phased-Array Technology
Improved Inspection of CRA-Clad Pipeline Girth Welds with the Use of Accessible Advanced Ultrasonic Phased-Array Technology André Lamarre, Olympus Scientific Solutions Americas 11th European Conference
More informationInstalling the 3 Indexer: PRS Standard Tools
888-680-4466 ShopBotTools.com Installing the 3 Indexer: PRS Standard Tools Copyright 2016 ShopBot Tools, Inc. page 1 Copyright 2016 ShopBot Tools, Inc. page 2 Table of Contents Route Cable into Box...5
More informationSection 9: Standard & Optional Machine Features
Rotary Attachment The optional Rotary Attachment allows you to mark, engrave or cut cylindrical objects. The Rotary Attachment works in both raster and vector modes. Follow the instructions below to install
More informationKit for building your own THz Time-Domain Spectrometer
Kit for building your own THz Time-Domain Spectrometer 16/06/2016 1 Table of contents 0. Parts for the THz Kit... 3 1. Delay line... 4 2. Pulse generator and lock-in detector... 5 3. THz antennas... 6
More information1 of 2 3/3/2017 4:49 PM
1 of 2 3/3/2017 4:49 PM Front Door Window, Assembly Overview 1 - Window guide - Inserted on flange 2 - Door 3 - Inner window recess seal - Inserted on flange 4 - Bolt - 20 Nm 5 - Carrier assembly - Window
More informationTom Marshall, Sonatest Ltd. Date: March 15, Typical Application. Introduction. Using the veo with the Phoenix Bracelet Scanner
Application Note Title: Author: Using the veo with the Phoenix Bracelet Scanner Tom Marshall, Sonatest Ltd. Date: March 15, 2011. Typical Application The Pheonix Bracelet Scanner has been developed for
More informationA Turnkey Weld Inspection Solution Combining PAUT & TOFD
A Turnkey Weld Inspection Solution Combining PAUT & TOFD INTRODUCTION With the recent evolutions of the codes & standards, the replacement of conventional film radiography with advanced ultrasonic testing
More informationOperating Manual. for CUTTING, PERFORATING, BENDING SLB120
Operating Manual for CUTTING, PERFORATING, BENDING SLB120 31040\B06eng 0896 0 Contents 1. Scope of delivery... 1 2. Technical specifications... 1 3. Applications... 1 4. Commissioning... 2 5. Cutting...
More informationEasy Ultrasonic Phased Array Inspection of Corrosion - Resistant Alloys and Dissimilar Weld Materials
Multimedia Application Notes Easy Ultrasonic Phased Array Inspection of Corrosion - Resistant Alloys and Dissimilar Weld Materials Many industries increasingly use austenitic welds and welds containing
More informationBasic steps to time the Gammill quilting machine s rotary sewing hook
Basic steps to time the Gammill quilting machine s rotary sewing hook 1.) Turn the machine off and unplug it. 2.) With the needle bar in the raised position, remove the bobbin and bobbin case. 3.) Remove
More informationN. 15th Street, Middlesboro, KY FLIP TARP DUMP BODY INSTALLATION INSTRUCTIONS
1-800-248-7717 1002 N. 15th Street, Middlesboro, KY 40965 FLIP TARP DUMP BODY INSTALLATION INSTRUCTIONS Congratulations on your purchase of a Mountain Flip Tarp Dump Body tarping system. With tarping systems
More information535A. Main Components. Pipe and Bolt Threading Machine. Printed in U.S.A. Ridge Tool Company/Elyria, Ohio, U.S.A.
Pipe and Bolt Threading Machine A Main Components 0 Screw, Button Head /" - 0 x /" () Washer, Flat /" ()" Top Cover 0 Base Bottom Cover Screw, Pan Head # - x " () Carriage Assembly 0 Front Support Bar
More informationABM International, Inc.
ABM International, Inc. Lightning Stitch required 1 1.0: Parts List head and motor assembly (Qty. 1) Reel stand (Qty. 1) Needle bar frame clamp (Qty. 1) Motor drive (Qty. 1) 2 Cable harness with bracket
More informationScanning Electron Microscope FEI INSPECT F50. Step by step operation manual
Scanning Electron Microscope FEI INSPECT F50 Step by step operation manual Scanning Electron Microscope, FEI Inspect F50 FE-SEM-F Observation Flow Saving Data And Analysis Specimen preparation Error check
More informationWASP Extended Shuttle Fitting. Process Overview
Process Overview Tools needed; metric Hex key set Remove Wasp Plate sealer from all power and pneumatic supplies; situate the unit on a clear work area for access. Ensure the Wasp plate sealer has cooled
More informationQuick Start Guide. Contents
1 Quick Start Guide Contents Powering on the Machine Login/Password Entry Jaw Set Up High Security Cut by Code High Security Jaw Set Up Edge Cut Cut by Code Edge Cut Cut by Decode Cutter Replacement Tracer
More informationFBX-PA-2AC. Third edition : April No
FBX-PA-2AC Third edition : April 2006 No. 060058 INTRODUCTION Thank you very much for purchasing Kansai Special FBX series. Read and study this Instruction Manual carefully before you start any of the
More informationTools Required. * When installing on a fire door, please see instructions below. *
CL615 Tubular Mortice Latch with Code Free option CL615 Tubular Mortice Latch with Code Free option Number relating to picture Item 1 Front Plate and handle * 2 Back Plate and handle * 3 Neoprene seals
More informationSTRONGMAN TOOLS SCROLL BENDERS
STRONGMAN TOOLS SCROLL BENDERS Top- Large Scroll Bender Middle Medium Scroll Bender Bottom- Standard Scroll Bender with Banana Attachment. Scrolling Capacities (max) Std Scroller Flat Bar 40x5mm Square
More informationThis guide contains everything you need to set up and operate all three. Inspira Imperial Quilting Frame Assembly...2
Congratulations on the purchase of your Husqvarna Viking Mega Quilter 18x8, Inspira Imperial Quilting Frame, and QBOT by Inspira! This guide contains everything you need to set up and operate all three.
More informationMODEL H-9 HEAVY DUTY BENCH-TYPE UNDERCUTTER INSTRUCTIONS
MODEL H-9 HEAVY DUTY BENCH-TYPE UNDERCUTTER INSTRUCTIONS CAPACITY: Between centers - 32" long x 12" diameter. Between roller V- supports - 35" long x 17" diameter. Maximum armature weight - 200 lbs. SAW
More informationThorvie Instructions Always wear eye protection and do not wear loose clothing when operating machinery. FOR AV- 41 ICE AUGER MACHINE
FOR AV- 41 ICE AUGER MACHINE 1. Please study video and all instructions before proceeding to grind. For Mora, Jeffy and Eskimo blades use the 6 brown resin bond wheel. Mount with washer and left-hand nut
More informationMate Pilot Turret Calibration System
Mate Pilot Turret Calibration System Introducing the Mate Pilot Turret Calibration System! PATENT PENDING The Mate Pilot Turret Calibration System is the most accurate system available today for ensuring
More informationEnder-3 3D Printer. Instructions for assembly
Ender-3 3D Printer Instructions for assembly This guide is for the Ender-3 3D printer. Select the correct input voltage to match your local mains (220V or 110V). Because of software/hardware upgrades and
More informationOperating Checklist for using the Scanning Electron. Microscope, JEOL JSM 6400.
Smith College August 2009 Operating Checklist for using the Scanning Electron Microscope, JEOL JSM 6400. CONTENT, page no. Pre-Check 1 Startup 1 Specimen Insertion 2 Filament Saturation 2 Beam Alignment
More informationMate Pilot. Turret Calibration System. Mate Tooling Lasts Longer
Superior Solutions For Sheet Metal Fabricators Mate Pilot Turret Calibration System New! mate.com/pilot Mate Tooling Lasts Longer Mate Pilot Turret Calibration System Introducing the Mate Pilot Turret
More informationInstalling the Hughes BGAN Remote Antenna
Installing the Hughes BGAN Remote Antenna Product description BGAN Remote Antenna The Hughes BGAN Remote Antenna (HNS Part No. 9501286-0001) is designed to be permanently installed with the Basic Fixed
More informationRotary Fixture M/V/X CLASS LASER SYSTEMS. Installation and Operation Instructions
Rotary Fixture M/V/X CLASS LASER SYSTEMS Installation and Operation Instructions 02/01/2000 Introduction The Rotary Fixture controls in the Printer Driver are used along with the optional Rotary Fixture
More informationOPERATION OF THE HITACHI S-450 SCANNING ELECTRON MICROSCOPE. by Doug Bray Department of Biological Sciences University of Lethbridge
OPERATION OF THE HITACHI S-450 SCANNING ELECTRON MICROSCOPE by Doug Bray Department of Biological Sciences University of Lethbridge Revised September, 2000 Note: The terms in bold in this document represent
More informationService Manual for XLE/XLT Series Laser Engravers
Service Manual for XLE/XLT Series Laser Engravers Table of Contents Maintenance...1 Beam alignment...3 Auto focus alignment...8 Bridge alignment...10 Electronics panel replacement...11 X motor change...12
More informationWORKFLOW GUIDE. Trimble TX8 3D Laser Scanner Camera and Nodal Ninja R1w/RD5 Bracket Kit
WORKFLOW GUIDE Trimble TX8 3D Laser Scanner Camera and Nodal Ninja R1w/RD5 Bracket Kit Version 1.00 Revision A August 2014 1 Corporate Office Trimble Navigation Limited 935 Stewart Drive Sunnyvale, CA
More informationV-MOTION LITE USER GUIDE. Rat Rig All rights reserved.
V-MOTION LITE USER GUIDE Rat Rig 2017. All rights reserved. PACKAGE CONTENTS 1 1x V-Motion Motor 2 1x Belt 3 1x 3mm Hex Key 4 1x AA Battery Pack (for 8x AA batteries)* 5 1x V-Motion Controller 6 2x Knob
More informationDACON INSPECTION SERVICES. Phased Array Ultrasonic Testing
Phased Array Ultrasonic Testing Who we are Conventional and Advanced NDT and Inspection Services Oil and Gas, Refinery, Petrochemical, Heavy Industry, Mining Over 400 personnel including more than 300
More informationSized for Print. Primary timing chain - from 08/ L, without supercharger. Special Service tools. Camshaft Setting Tool
Primary timing chain - from 08/1998 4.0L, without supercharger Special Service tools Camshaft Setting Tool 303-530 Timing chain tensioning tool 303-532 Wedges, primary chain 303-533 http://alldatapro.com/alldata/pro~v376737902~c36065~r0~od~n/0/80851247/83501684/84900382/86331920/34853741/100411974/34853743/56492475/1445
More informationGeneral Wood Shop Notes
General Wood Shop Notes Restricted Materials No METAL or BONE of any kind on any machine or in the room o See additional restrictions individual machine All reclaimed and other than new lumber must be
More informationTin Lizzie 18 Assembly Instructions
Tin Lizzie 18 Assembly Instructions Revision: 07/29/16 Table of Contents Aides 3 Before You Begin 5 Aides 5 Tools 6 Perfect Stitch Parts 2 12 Modify the Machine 12 Prepare Drill Templates 12 Front Display
More informationInstalling CNC Stepper Motor Mounts On A Sherline Lathe
Installing CNC Stepper Motor Mounts On A Sherline Lathe P/N 6720 (6725 Metric) 4000/4100/4500/4600 Lathes P/N 6730 (6735 Metric) 4400/4410 Lathe USING THE TEMPLATE BLOCKS TO LOCATE NEW MOUNTING HOLES FOR
More informationUsing the Roller-Type Rotary attachment...
Using the Roller-Type Rotary attachment... Our customer was very interested in purchasing our laser machine, and also interested in using the roller-style rotary attachment. **** Make sure the main door
More informationFig. 2 DORMA-Glas Stand/Issue 02/03 Seite/Page 1/7
FSW Installation instructions Track rail 75 x 72 mm 1. Ceiling substructure and installation of the track rail (Fig. 1): The track rail must be bolted over its entire length (including the stacking track
More informationWarranty. RBS-T Linear Encoder Installation Manual and Owner s Guide
www.anilam.com - Warranty Warranty ANILAM warrants its products to be free from defects in material and workmanship for three (3) years from date of installation. At our option, we will repair or replace
More informationBUMP GATE FITTING INSTRUCTIONS.
1 BUMP GATE FITTING INSTRUCTIONS. HEAVY DUTY MODEL FOR STEEL POSTS. Hinge post Lock post Bump arms Two-way lock Thank you for purchasing a Bump Gate. This device will provide you with many years of good
More informationINSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS ANSI/BHMA - A156.2 BOX CONTENTS CHECK THAT THE CONTENTS OF YOUR BOX ARE CORRECT ACCORDING TO THE MODEL Model 600/605 Model 610/615 Model 620/625 1 Front plate and handle 2 Back
More informationMSR/MSB Mechanical Setting Tool
Tech Unit No: 0620000004 Revision: B Approved By: Quality Engineer Date: 2014-12-16 MSR/MSB Mechanical Setting Tool FEATURES: Special designed Bow Spring provides positive control and allows one size Mechanical
More informationReferencing 0,0 position
Page 1 of 11 TITLE: SABRE X-Axis Lead Screw Replacement Procedure Gerber FastFact #: 2013 Supplied by: Gerber Hardware Support Last Modified: March 1, 2011 Summary: The following procedure explains how
More informationINSTALLATION LS MODEL
INSTALLATION LS MODEL Page 2 TABLE OF CONTENTS Section 1: Included parts... pg 4 Section 2: Installing the Shirley Stitcher II on Quilt Frame.. pg 5 Section 3: Connecting Shirley Stitcher II to Tin Lizzie
More informationENC 125 T/E. Quill Installation... Mounting Information... Center reading head... First Steps...
Quill Installation... * Supplied with encoder hardware M6 flat washer.017 thk. (2) 1/4 Flat washer.09 thk. (2) 1/4-20 x 1/2 BHCS (2) M4 x 8mm SHSS (2) (special length) 4 Encoder 8-32 x 1/4 SHSS (4) 1/4
More information308940J INSTRUCTIONS-PARTS LIST. Kit, Beads Dispenser WARNING. Pressure Relief Procedure ENG GRACO INC. P.O. BOX 1441 MINNEAPOLIS, MN
INSTRUCTIONS-PARTS LIST Important Safety Instructions Read all warnings and instructions in this manual. Save these instructions. Kit, Beads Dispenser 3300 psi (230 bar, 23 MPa ) Maximum Working Pressure
More informationInstalling a 3 Indexer: Desktop Tools
888-680-4466 ShopBotTools.com Installing a 3 Indexer: Desktop Tools built after October, 2012 Copyright 2016 ShopBot Tools, Inc. page 1 Copyright 2016 ShopBot Tools, Inc. page 2 Table of Contents Overview...5
More informationThe Bowflex Revolution XP Home Gym Assembly Instructions. P/N: Rev ( /0 )
P/N: 001-7057 Rev ( /0 ) The Bowflex Revolution XP Home Gym Assembly Instructions 2 Table of Contents Before You Start... 2 Tools You Will Need / Hardware Contents... 3 Box Contents... 6 Assembling Your
More informationOperating Checklist for using the Scanning Electron Microscope, JEOL JSM 6400.
Smith College August 2005 Operating Checklist for using the Scanning Electron Microscope, JEOL JSM 6400. CONTENT, page no. Pre-Check, 1 Specimen Insertion, 1 Startup, 2 Filament Saturation, 2 Beam Alignment,
More informationCS276D. CASSESE SA Zone Industrielle - F VERNEUIL L'ETANG. Telecopie : (1)
CS276D S.A. CASSESE Z.I. - 77390 VERNEUIL L'ETANG SIREN 308 305 333 00038 S.A. au capital de 5 000 000 F Téléphone : 01 64 42 49 50 Fax 01 64 42 58 90 CASSESE SA Zone Industrielle - F 77390 VERNEUIL L'ETANG.
More informationReplacing the Reciprocator on the SWF Compact Series Machine (601C and 1201C)
Follow the instructions below to replace the reciprocator in the SWF Compact series machines. The tools required can be found in the tool kit that came with the machine. Preparation 1. First, place the
More informationRAITH e-line OPERATING INSTRUCTIONS
RAITH e-line OPERATING INSTRUCTIONS 1) LOADING A SAMPLE a. Start the system i. On the Column PC (Right side monitor [R]), select the SmartSEM icon to on the desktop to begin the column software. ii. On
More informationALWAYS disconnect the power source before using the Betterley UNA-GAUGE with any power tool or machine!
Betterley UNA-GAUGE Thank you for purchasing the Betterley UNA-GAUGE. You will find the UNA-GAUGE provides quick adjustments and alignment of most tools and machinery with extreme accuracy. The versatile
More informationNumber Of Holes Chart For Standard Book Length Sheet Size
RHIN- -TUFF INSTRUCTION BOOK FOR THE EWC-8370, HD-8370, HC-8318 HD-8370 Semi Automatic Wire Inserter/Closer } www.rhin-o-tuff.com HC-8318 Semi Automatic Wire Inserter/Closer AND INTRODUCTION TO OTHER HD
More informationDepending on the size you ordered you will have either 5 Foot sections which will build the 10 Foot frame or 6 Foot sections which will build the 12
XL Quilting Frame 1 Depending on the size you ordered you will have either 5 Foot sections which will build the 10 Foot frame or 6 Foot sections which will build the 12 Foot frame Printed 2 June 2014 Updated
More informationStage 2: Preparing the door (read in conjunction with Hole Drilling Options on back of Template).
There are three stages to fitting the CL100 mortise case: Stage 1: Marking out the position of the lock. Stage 2: Preparing the door by mortising and drilling holes. Stage 3: Fitting lock, door furniture,
More informationPHASED ARRAYS FOR SMALL DIAMETER, THIN-WALLED PIPING INSPECTIONS
PHASED ARRAYS FOR SMALL DIAMETER, THIN-WALLED PIPING INSPECTIONS Michael Moles 1 and Ed Ginzel 2 1. Senior Technology Manager, Olympus NDT, 48 Woerd Avenue, Waltham, MA, USA 02543. Tel: +1 416 831 4428,
More informationNo. 412, 414, 416 Operations Manual
No. 412, 414, 416 Operations Manual CARE: Occasional oiling of moving parts with machine oil will ease operation and extend the life of the brake. Occasionally check and tighten the lower beam bracket
More information7902 Dado Jig. Owners Manual Please Read Carefully! Hardware List: 7902 Parts List:
7902 Dado Jig Owners Manual Please Read Carefully! 7902 Dado Jig Hardware List: Identify and verify that you have all of the hardware shown below prior to assembly. Please read the instructions at least
More informationOPERATIONS MANUAL. Port-O-Slitter
Tapco Products Company The World Leader in Specialty Tools for the Professional Port-O-Slitter OPERATIONS MANUAL General instructions, set up, accessories and guide to using your portable precision slitting,
More information19 to 39 TV WALL MOUNT - FULL MOTION
19 to 39 TV WALL MOUNT - FULL MOTION RF-HTVMMAB For wood-stud and concrete wall installations Safety information and specifications...2 Tools needed...2 Package contents...3 Installation instructions...5
More informationThis document will provide detailed specifications, BOM information, and assembly instructions for the Official Competition Field.
This document will provide detailed specifications, BOM information, and assembly instructions for the Official Field. Teams who do not need an official field should refer to the separate low-cost field
More informationBand-Master ATS Nano Pneumatic Banding Tool Operating Instructions
Band-Master ATS 601-118 Nano Pneumatic Banding Tool CONTENTS 601-118 Overview... 3 Safety.... 5 Initial Tool Set-up... 5 Regulator assembly mounting... 5 Attach tool head to regulator.... 6 Operating instructions...
More informationSpeedTube Operations Manual
SpeedTube Operations Manual 955424_01 2/16 1 Contents SpeedTube Setup... 3 Swath Calibration... 5 SpeedTube Operation... 6 Vacuum Setting... 6 Good Ride Metric... 7 SpeedTube Diagnostics... 7 SpeedTube
More information3M Locator Plate
M Locator Plate 44-119 Instructions for the Assembly of Series 158 2 mm x 2 mm Socket Connectors 1.0 General The Locator Plate 44-119 is designed for rapid assembly of all available pin count positions
More informationPlease read carefuly before using. Aerobic Lateral Trainer ASSEMBLY MANUAL H901
Please read carefuly before using. Aerobic Lateral Trainer ASSEMBLY MANUAL H901 TABLE OF CONTENTS 1 IMPORTANT SAFETY INFORMATION 2 Important Safety Precautions 2 Weight Limit Capacities 2 Warning 2 2
More informationUSER MANUAL & PARTS LIST MODEL 40B S/N:
NUMBERALL STAMP & TOOL CO., INC. USER MANUAL & PARTS LIST MODEL 40B S/N: P.O. BOX 187, 1 HIGH ST. SANGERVILLE, ME 04479 www.numberall.com office@numberall.com TEL: 207-876-3541 FAX: 207-876-3566 MODEL
More informationAPS Small Seeds Box Assembly Instructions
APS Small Seeds Box Assembly Instructions For APS15 Series All Purpose Seeder Manual No. 313-473M Before You Start! When you see this symbol, the subsequent instructions and warnings are serious - follow
More informationCable Tray Kit: - Cable Tray - Cable Tray Cover - Power Block Support (x2) Top Support Kit: (x2) - 2 Top Supports. Quantities are per bench
Parts Included (per back to back bench) Column Kit: (x2) - 1 LH & 1 RH Column - Control Box - Hand Switch Cable Tray Kit: - Cable Tray - Cable Tray Cover - Power Block Support (x2) Depth Support Kit: -
More informationAutomated Ultrasonic Inspection for Pipeline Girth Welds
Automated Ultrasonic Inspection for Pipeline Girth Welds Sebastien Rigault PipeWizard - Product Mgr. Bob Peck EMEA NDT Business Development Mgr. Pipeline Girth Weld Inspection: In the last several years
More information1.2. Make sure the viewing screen is covered (exposure to liquid N 2 may cause it to crack).
FEI Tecnai F20 S/TEM: imaging in TEM mode Nicholas G. Rudawski ngr@ufl.edu (805) 252-4916 (352) 392-3077 Last updated: 01/21/18 1. Filling the cold trap (if needed) 1.1. Prior to use, the cold trap needs
More informationPole Conversion System For safe and efficient conversion of non-lowering light poles.
Conversion System USER GUIDE: OVERVIEW The Swivelpole Conversion Tool clamps onto the existing non-lowering pole and safely supports the pole during a cold cut with the Ratchet Pipe Cutter, eliminating
More informationInstallation Guide. Suitable for: OEM Integration OEM Installation Retro Fit Installation
Installation Guide Suitable for: OEM Integration OEM Installation Retro Fit Installation DTI AngleBlaster release 1.1 DTI 2010 Overview Angleblaster Installation Guide A-1 To obtain the best accuracy from
More informationBand-Master ATS Nano Banding Tool Operating Instructions
Band-Master ATS Nano Banding Tool 601-108 Step 1 Prepare Cable Braid for termination process NOTE: banding must occur on an unfixtured cable assembly. Attaching a band to a firmly clamped cable will affect
More informationInventory MODEL H7937 TAPER ATTACHMENT FOR THE G0600 LATHE INSTRUCTIONS. Inventory (Figure 1) Needed Items
MODEL H7937 TAPER ATTACHMENT FOR THE G0600 LATHE INSTRUCTIONS Inventory The Model H7937 taper attachment was carefully packed when it left our warehouse. If you discover it is damaged after you have signed
More informationPAUT as Tool for Corrosion Damage Monitoring
More info about this article: http://www.ndt.net/?id=21146 ShivputraRamanna Tangadi 1, N.K.S. Praveen Telidevara 1, Hari Kishore Maddi 1 1 Sievert India Pvt. Ltd. (A Bureau Veritas Company), 16 & 17, Sec-2,
More informationASSEMBLY INSTRUCTIONS
ASSEMBLY INSTRUCTIONS ITEM No. :Quilty/ 3 A helpful Assembly Video can be found on www.arrowcabinets.com in the Video Section under Quilty Incorrect Correct The turning direction of attaching The arrow
More informationPrint Head Installation Guide
Print Head Installation Guide MCS Raptor 6 (MCS Eagle AMS Software) is copyright of MCS Incorporated. 2015 MCS Incorporated. 1 Contents Tools... 4 Warnings... 4 Introduction... 4 Section One - Pillar Installation...
More informationGENUINE ACCESSORIES INSTALLATION INSTRUCTIONS. ITEM QTY DESCRIPTION Usage Chart
PART NUMBER: 0000 8C R0 GENUINE ACCESSORIES INSTALLATION INSTRUCTIONS Rev. AAA *550-0554-000* APPLICABLE MODELS: 203 > CX-5 REQUIRED COMPONENTS: ITEM QTY DESCRIPTION Usage Chart MIRROR ASSEMBLY: Mirror
More informationTools Needed Hardware Provided (per shade) Hardware Needed
Baby Grande or Grande Motorized (XQ5 Premium) Shade with Cables and Housing Installation Instructions Tools Needed Hardware Provided (per shade) Hardware Needed Drill 3/8 Metal Drill Bit Measuring Tape
More informationInventory MODEL T10096 TAPER ATTACHMENT FOR G0509 & G0509G LATHE INSTRUCTIONS. Inventory (Figure 1) Needed Items
MODEL T10096 TAPER ATTACHMENT FOR G0509 & G0509G LATHE INSTRUCTIONS Inventory The Model T10096 taper attachment was carefully packed when it left our warehouse. If you discover it is damaged after you
More informationFRAME. Pull Type Rigid Frame, Lift Rotate INNER HITCH
Pull Type Rigid Frame, Lift Rotate INNER HITCH The hitch length can be adjusted in 15" increments to accommodate the tractor tire options (single or dual tires) being used and attachments installed on
More informationTraditional Wall Mounted Potfiller
TOOLS NEEDED FOR INSTALLATION 1/4 hex wrench (provided in installation kit) 3/32 hex wrench (provided in installation kit) Pencil or marker PTFE tape Small level, or carpenters square Power Drill with
More informationINVENT3D Printer Kit Disassembly Instructions
INVENT3D Printer Kit Disassembly Instructions Version 6 AST2 10/26/16 1 I. General Disassembly Instructions Use the case layer drawings to ensure that components are stored in the appropriate location
More informationSENC 150. Longitudinal Installation... Mounting Information... Center reading head... First Steps...
Clausing 1545 lathe: Longitudinal Z & X Cross Feed Axis Longitudinal Installation... * Supplied with spar hardware ** Supplied with hardware 1/4-20 x 1/2 SHSS (2 per block) 10-24 x 5/8 BHCS (2) mounting
More informationPanosaurus Rex. May Please Visit To view the setup video for the Panosaurus Rex.
Panosaurus Rex May 2009 Please Visit http://gregwired.com/pano/support.htm To view the setup video for the Panosaurus Rex. Note: There currently is no printed setup information available. This booklet
More informationCopyright 2007 MLCS 1
Copyright 2007 MLCS 1 REFERENCE GUIDE and SPECIFICATIONS: Edge Guides: This 12 Dovetail Template comes complete with 2 Edge Guide Sets one set for Half Blind and one set for Rabbeted Half Blind Dovetails.
More informationPOWER PET. Low-E Automatic Patio Pet Door Installation and Operating Instructions
POWER PET Low-E Automatic Patio Pet Door Installation and Operating Instructions Power Pet, Regular Height, Patio Door Assembly Steps Estimated assembly time: Under 1 hour STEP 1: Assemble the tools you
More informationParamount MYT Tripod User Guide
Paramount MYT Tripod User Guide Revision 1.1 December, 2014 Software Bisque, Inc. All rights reserved. Table of Contents MYT Tripod Setup and Use... 3 Height Adjustments... 3 Top Plate Adjustment... 7
More information