Integration of ETCS in the Danish fleet

Size: px
Start display at page:

Download "Integration of ETCS in the Danish fleet"

Transcription

1 Integration of ETCS in the Danish fleet Agenda: o Signalling Programme overview o Scope of the onboard project o Survey process o Fitment process o Main challenges o Lessons learned 2015

2 Signalling programme overview S-bane Railway Fjernbane Railway o S-bane (technology) o TCC (Civil Works) o Training o Operational Rules o GSM-R Voice o Fjernbane infrastructure East o Fjernbane infrastructure West o Onboard o STM o Fjernbane IT o GSM-R Voice & Data o TCC (Civil Works) o Training o Operational Rules 2

3 Integration of ETCS in the Danish fleet Agenda: o Signalling Programme overview o Scope of the onboard project o Survey process o Fitment process o Main challenges o Lessons learned 2015

4 Scope of the onboard project 671 Passenger and Freight Trains 21 First of Class 89 Yellow Machines 21 First of Class Banekonferencen

5 Scope of the onboard project Design: o Implement ERTMS Baseline 3 o Integration of DK- and SE-STM o Installation design for 42 First Of Class o Training tools (Driving Simulator) Installation, test and approval for about 750 trains: o Installation o Lab tests, site tests (test trains, FoC, series) o Safety and interoperability approvals Training: train the trainers or direct training Decommissioning of ATC and STM Maintenance Banekonferencen

6 Generic Design Installation and Test of FoC trains (including approvals) Training concepts and tools System Tests Safety Approvals Software maintenance Scope Contract structure Supplier Equipment delivery Installation and Test of Rollout trains (including approvals) Decommissioning of STM Actual training Maintenance, spare parts Contract Subcontracts BDK Signalling Programme Back to Back Agreement RU s Operators Operators with public traffic agreement - Compensated - Banedanmark owns the equipment Rental Agreement Others - Not Compensated - Own their own equipment 6

7 Integration of ETCS in the Danish fleet Agenda: o Signalling Programme overview o Scope of the onboard project o Survey process o Fitment process o Main challenges o Lessons learned 2015

8 Overall design process Decide preliminary location of equipment Light Survey Confirm location of equipment + Engineer the detailed design (cable paths etc.) Detailed Survey FoC Designed Approved Draft FoC Design Review by BDK and Operators

9 Survey process Documentation Survey Installation design RFI process Documentation review Expert meetings Survey planning Train variance Components locations 3D scanning Installation constraints Train interfaces Survey report Mechanical design Electrical design Variance meetings Hot spot approach RU/BDK review Design freeze Banekonferencen

10 Integration of ETCS in the Danish fleet Agenda: o Signalling Programme overview o Scope of the onboard project o Survey process o Fitment process o Main challenges o Lessons learned 2015

11 Fitment process Train handover to Alstom Installation Test & commissioning Train Handback to RU HO protocol Location check Installation procedure RU inspection T&C procedure RU witnessing HB protocol HO + ETCS Function check Banekonferencen

12 Integration of ETCS in the Danish fleet Agenda: o Signalling Programme overview o Scope of the onboard project o Survey process o Fitment process o Main challenges o Lessons learned 2015

13 Main challenges and lessons learned Adaptation scale challenge What did BDK buy? 0 % 100 % Generic ETCS solution One size fits all Efficient roll out RU/litra optimisation Respecting train philosophy Less efficient roll out Lessons learned: Aligning of expectations Common understanding of funding 13

14 Main challenges and lessons learned Challenges 3 part project Diversity of the Danish fleet Non compensated RU s Train documentation Train variance Lessons learned Align on scope and expectations RU involvement F2F meetings Use of 3D scans Business culture Banekonferencen

15 Jakob Dalgaard and 15

Border Crossing issues and solutions

Border Crossing issues and solutions Border Crossing issues and solutions Robert SARFATI GSM-R Operators Group Chairman Norman FRISCH GSM-R Industry Group Speaker UIC ERTMS Conference Rome December 2004 1 Agenda Today s situation on Analogue

More information

Request for Information (RFI) for the Norwegian GSM-R BSS network replacement. Part A: Scope

Request for Information (RFI) for the Norwegian GSM-R BSS network replacement. Part A: Scope Request for Information (RFI) for the Norwegian Part A: Scope 1.1 N/A 11.10.2012 1.0 N/A 04.10.2012 Revision Revision Date Issued by Controlled by Approved by history Title Number of 16 pages: Request

More information

OPEN CALLS 2018 (draft) carlo m borghini, Executive Director 2017 Nov 20

OPEN CALLS 2018 (draft) carlo m borghini, Executive Director 2017 Nov 20 OPEN CALLS (draft) carlo m borghini, Executive Director 2017 Nov 20 A PUBLIC-PRIVATE PARTNERSHIP R&I PLATFORM FOR RAILWAY WORKING TOGETHER TO DRIVE INNOVATION BY 2024 What s ongoing - Award and signature

More information

ERTMS level 2 in stations

ERTMS level 2 in stations ERTMS level in stations A look at the ERTMS operational conditions in larger station areas Presentation at Banebranchen 07, Signalling Programme Chief Engineer Jens Holst Møller Kastrup Tog til/fra Kastrup

More information

European Infrastructure Compatibility Standards. Maya Petkova 7 March 2014

European Infrastructure Compatibility Standards. Maya Petkova 7 March 2014 European Infrastructure Compatibility Standards Maya Petkova 7 March 2014 Technical Specifications for Interoperability Subsystem 1. Infrastructure 2. Energy 3. Control-Command and Signalling (onboard

More information

THE DESIGN PROCESS. for an interior design project

THE DESIGN PROCESS. for an interior design project THE DESIGN PROCESS for an interior design project STAGE 1 Preliminary meeting The client brief The business proposal and client s agreement to proposal THE DESIGN PROCESS for an interior design project

More information

GSM-R Network Dimensioning, Design & Optimization

GSM-R Network Dimensioning, Design & Optimization GSM-R Network Dimensioning, Design & Optimization Giorgio Ronchi, NOKIA 1 GSM-R Network Planning & Optimization Agenda Network Dimensioning Traffic Model Network Design Tunnel Coverage Planning for High-Speed

More information

GSM R Notes on certification

GSM R Notes on certification GSM R Notes on certification Workshop Warsaw, 30th of July 2013 ERA ERTMS Unit Content GSM R in CCS TSI Notes on certification & authorisation Radio communication part of Trackside Subsystem Radio communication

More information

WHITEPAPER. A comparison of TETRA and GSM-R for railway communications

WHITEPAPER. A comparison of TETRA and GSM-R for railway communications A comparison of TETRA and GSM-R for railway communications TETRA vs GSM-R 2 Many railways operators face a dilemma when choosing the wireless technology to support their networks communications requirements:

More information

UIC GSM-R Conference Frequency Management Group

UIC GSM-R Conference Frequency Management Group GSM-R Conference Frequency Management Group Dirk Schattschneider Frequency Manager Communication is an important factor for the railways GSM-R is used for voice and data communication towards a traveling

More information

Capability Statement

Capability Statement Capability Statement Who we are RCS Telecommunications (RCST) is a leading Australian telecommunications service provider for medium to large organisations. With over 35 years experience in communication

More information

6th meeting of the. User Requirements/Implementation and Deployment Working Group. 13 September 2018 Brussels

6th meeting of the. User Requirements/Implementation and Deployment Working Group. 13 September 2018 Brussels 6th meeting of the User Requirements/Implementation and Deployment Working Group 13 September 2018 Brussels Agenda 1. INTRODUCTION Adoption of the Agenda and the MoM from previous meeting 2. SHIFT2RAIL

More information

ERTMS Level 1 Trackside

ERTMS Level 1 Trackside Industry experience with ERTMS Level 1 Trackside A CASAZZA (Ansaldo STS) UIC ERTMS World Conference Berne 12. September 2007 1 First ERTMS/ETCS Level 1 applications Experience on ERTMS/ETCS Level 1 applications

More information

CUSTOMISED SOLUTIONS THROUGH COLLABORATIVE WORK.

CUSTOMISED SOLUTIONS THROUGH COLLABORATIVE WORK. COMPANY PROFILE INDEX ADDING KNOWLEDGE Working for you INDUSTRY APPLICATIONS Specialised in parts for cutting-edge sectors THE OFFER THAT MAKES A DIFFERENCE The option chosen by the most demanding clients

More information

Rail segment. This presentation can be interpreted only together with the oral comments accompanying it

Rail segment. This presentation can be interpreted only together with the oral comments accompanying it Rail segment This presentation can be interpreted only together with the oral comments accompanying it 2 Market sub-segments and applications Asset Management includes several functions such as fleet management,

More information

Construction Phase Project Management and Documentation

Construction Phase Project Management and Documentation Construction Phase Project Management and Documentation Bill Mason CDM Smith Outline Design Bidding Construction Start-up & Closeout 2 DESIGN Design Preliminary Engineering Report Plans Specifications

More information

Network Equilibrium Balancing Act Conference Thursday 8th September 2016

Network Equilibrium Balancing Act Conference Thursday 8th September 2016 Network Equilibrium Balancing Act Conference Thursday 8th September 2016 Yiango Mavrocostanti Innovation and Low Carbon Networks Engineer Western Power Distribution Outline WPD Innovation - Introduction

More information

EMI/EMC ASPECTS OF RAIL TRANSIT ELECTRICAL SYSTEM COMPATIBILITY

EMI/EMC ASPECTS OF RAIL TRANSIT ELECTRICAL SYSTEM COMPATIBILITY EMI/EMC ASPECTS OF RAIL TRANSIT ELECTRICAL SYSTEM COMPATIBILITY L. A. FRASCO FRASCO & ASSOCIATES INC APTA Rail Transit Conference, June 10-14, 2001, Boston Electrical System Compatibility (ESC) System

More information

Table of contents Physical environmental conditions... 12

Table of contents Physical environmental conditions... 12 EN EN EN ANNEX to Recommendation N. ERA-REC-123-2015/REC on amending and recasting Commission Decision 2012/88/EU on the Technical Specification for Interoperability relating to the Control-Command and

More information

Standardisation and Immunity Tests regarding IEMI

Standardisation and Immunity Tests regarding IEMI Standardisation and Immunity Tests regarding IEMI Véronique Beauvois ULG ERTMS: European Railway Traffic Management System ERTMS = Unique signalling standards throughout Europe M O D E M GSM-R Data and

More information

Managing Rail Mobile Communications Evolution. On tracks for future Challenges", Nice Nov 2-3. Anne-Sophie CHAZEL - Siemens. Diffusion non restreinte

Managing Rail Mobile Communications Evolution. On tracks for future Challenges, Nice Nov 2-3. Anne-Sophie CHAZEL - Siemens. Diffusion non restreinte Managing Rail Mobile Communications Evolution. On tracks for future Challenges", Nice Nov 2-3 Anne-Sophie CHAZEL - Siemens Diffusion non restreinte Introduction - Agenda NGTC project short presentation

More information

GE/GN8648. Guidance on Positioning of Lineside Telephones. Rail Industry Guidance Note for GE/RT8048

GE/GN8648. Guidance on Positioning of Lineside Telephones. Rail Industry Guidance Note for GE/RT8048 GN This document contains one or more pages which contain colour. Published by: Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2013 Rail Safety and Standards Board Limited GE/GN8648 Issue

More information

Personalized Service, Industry Expertise. Franklin Howard

Personalized Service, Industry Expertise. Franklin Howard Personalized Service, Industry Expertise. Franklin Howard PRODUCTS Franklin Howard International provides high quality drilling equipment and spare parts from top manufacturers in the United States. Warranty

More information

Radio Communications. Recommendation. Executive summary. Strategic context

Radio Communications. Recommendation. Executive summary. Strategic context Radio Communications Recommendation That the Board: I. Note that AT has renewed its TeamTalk contract for another 12 months to ensure continuity of services for radio communications, within its existing

More information

CO-ORDINATION MECHANISMS FOR DIGITISATION POLICIES AND PROGRAMMES:

CO-ORDINATION MECHANISMS FOR DIGITISATION POLICIES AND PROGRAMMES: CO-ORDINATION MECHANISMS FOR DIGITISATION POLICIES AND PROGRAMMES: NATIONAL REPRESENTATIVES GROUP (NRG) SUMMARY REPORT AND CONCLUSIONS OF THE MEETING OF 10 DECEMBER 2002 The third meeting of the NRG was

More information

RADIO SPECTRUM POLICY GROUP. Opinion on Spectrum Aspects of Intelligent Transport Systems

RADIO SPECTRUM POLICY GROUP. Opinion on Spectrum Aspects of Intelligent Transport Systems EUROPEAN COMMISSION Directorate-General for Communications Networks, Content and Technology Electronic Communications Networks and Services Radio Spectrum Policy Group RSPG Secretariat Brussels, 07 February

More information

URBAN RAIL EXPECTATIONS FOR FUTURE COMMUNICATION SYSTEMS

URBAN RAIL EXPECTATIONS FOR FUTURE COMMUNICATION SYSTEMS URBAN RAIL EXPECTATIONS FOR FUTURE COMMUNICATION SYSTEMS Jean-Marc CHAROUD, RATP, Paris convergence benefits with regional and long distance rail UITP URBAN RAIL RADIO USAGE Communications performances

More information

Objectives. Designing, implementing, deploying and operating systems which include hardware, software and people

Objectives. Designing, implementing, deploying and operating systems which include hardware, software and people Chapter 2. Computer-based Systems Engineering Designing, implementing, deploying and operating s which include hardware, software and people Slide 1 Objectives To explain why software is affected by broader

More information

NZQA unit standard version 3 Page 1 of 5. Install and maintain telecommunications radio frequency systems

NZQA unit standard version 3 Page 1 of 5. Install and maintain telecommunications radio frequency systems Page 1 of 5 Title Install and maintain telecommunications radio frequency systems Level 4 Credits 25 Purpose This unit standard covers installation and maintenance of telecommunications radio frequency

More information

ICT strategy and solutions for upstream oil and gas. Supporting exploration and production globally

ICT strategy and solutions for upstream oil and gas. Supporting exploration and production globally ICT strategy and solutions for upstream oil and gas Supporting exploration and production globally We work extensively with the upstream oil and gas industry to shape IT and communications strategy and

More information

(Non-legislative acts) DECISIONS

(Non-legislative acts) DECISIONS 4.12.2010 Official Journal of the European Union L 319/1 II (Non-legislative acts) DECISIONS COMMISSION DECISION of 9 November 2010 on modules for the procedures for assessment of conformity, suitability

More information

A MODERN AND INNOVATIVE UNIVERSITY

A MODERN AND INNOVATIVE UNIVERSITY IT UNIVERSITY OF COPENHAGEN A MODERN AND INNOVATIVE UNIVERSITY Making Denmark exceptionally good at creating value with IT ABOUT THE IT UNIVERSITY IN COPENHAGEN Established in 1999, the IT University of

More information

Summaries of Papers read at Presidential Programme Technical Meetings

Summaries of Papers read at Presidential Programme Technical Meetings IRSE PROCEEDINGS 2015 2016 Summaries of Papers read at Presidential Programme Technical Meetings Each year the President of the IRSE invites six keynote speakers to produce papers and presentations on

More information

BIM4Water case study template

BIM4Water case study template BIM4Water case study template Section 1: Project Details Project name Minworth Thermal Hydrolysis Plant (THP) Client Project Scope and Outcomes What are the project timescales? Minworth is Severn Trent

More information

Specification For. Asset Information Pr8701

Specification For. Asset Information Pr8701 Specification For Asset Pr8701 Written Direction Control Document Sponsor Document Owner Subject Matter Expert References Infrastructure Technical Standards Committee Manager, Capital Delivery, SIS Network

More information

Solutions for Public Transport SCHNOOR SOLUTIONS

Solutions for Public Transport SCHNOOR SOLUTIONS Solutions for Public Transport SCHNOOR SOLUTIONS SCHNOOR Cab Radios We serve the public transport industry with our professional communication systems. Cab radio integration in Berlin Subway The right

More information

LOFAR: Lessons Learnt

LOFAR: Lessons Learnt LOFAR: Lessons Learnt Michiel van Haarlem van Weeren, Bonafede, Ferrari, Orrù, Pizzo, Shulevski, van der Tol, Macario Jason Hessels & Pulsar Team LOFAR 40 stations in NL and 8 stations throughout Europe

More information

The application of ERTMS/ETCS Baseline 3 on L2 (Corridor D Milano - Treviglio section) and L1 (Sicily) pilot lines

The application of ERTMS/ETCS Baseline 3 on L2 (Corridor D Milano - Treviglio section) and L1 (Sicily) pilot lines The application of ERTMS/ETCS Baseline 3 on L2 (Corridor D Milano - Treviglio section) and L1 (Sicily) pilot lines 7/11/2012, Control Command and Railway Communication Conference 2012 - Lille Gabriele

More information

Technical Memorandum# TM2

Technical Memorandum# TM2 Technical Memorandum#0-6902-TM2 To: From: RTI Project Manager: Sonya Badgley CTR Research Team: Andrea Gold, Kristie Chin, C. Michael Walton Subject: TxDOT Project 0-6902 Technical Memorandum for Task

More information

ENGINEERING DRAWINGS MANAGEMENT POLICY (IFC/AS BUILTS)

ENGINEERING DRAWINGS MANAGEMENT POLICY (IFC/AS BUILTS) Approval Amendment Record Approval Date Version Description 15/10/2015 1 This policy takes precedence over L1-NAM-PRO-003 Infrastructure As Built Drawing Management due to business restructures. New Content

More information

UK Government Building A New World

UK Government Building A New World CONSTRUCTION 4.0 CONFERENCE CONSTRUCTION DIGITALIZATION CHALLENGE AND CIVIL ENGINEERING IN THE CONTEXT OF INDUSTRY 4.0 UK Government Building A New World Digital Built Britain Sector Digitalisation March

More information

Introduction to GNSS opportunities in different Market Segments. Fiammetta Diani Market Development

Introduction to GNSS opportunities in different Market Segments. Fiammetta Diani Market Development Introduction to GNSS opportunities in different Market Segments Fiammetta Diani Market Development fiammetta.diani@gsa.europa.eu 3-Mar-14 European GNSS Agency 2 Congratulations! Agenda European GNSS market

More information

i-tech SERVICES DELIVERING INTEGRATED SERVICES AND PRODUCTS ACROSS THE FIELD LIFE CYCLE

i-tech SERVICES DELIVERING INTEGRATED SERVICES AND PRODUCTS ACROSS THE FIELD LIFE CYCLE i-tech SERVICES DELIVERING INTEGRATED SERVICES AND PRODUCTS ACROSS THE FIELD LIFE CYCLE 3 About us 4 What we do 6 Why choose us? 7 Service and product capabilities OUR VALUES Safety Integrity Innovation

More information

Preface... Acknowledgments... Glossary Introduction Management Systems and the Management of Chemical Process Safety...

Preface... Acknowledgments... Glossary Introduction Management Systems and the Management of Chemical Process Safety... Preface... Acknowledgments... Glossary... xi xiii xv 1. Introduction... 1 1.1 Process Safety Management Activities of the Center for Chemical Process Safety (CCPS)... 1 1.2 Definition of "Process Safety

More information

Marine Renewable-energy Application

Marine Renewable-energy Application Marine Renewable-energy Application OFFICE USE ONLY Date Received: Application #: Time Received: Date of Complete Application: Received by: Processed by: Type of Application Permit (unconnected) Permit

More information

GSM-R Traffic Model for Radio-based Train Operation Wolfgang Hillenbrand / Holm Hofestädt

GSM-R Traffic Model for Radio-based Train Operation Wolfgang Hillenbrand / Holm Hofestädt GSM-R Traffic Model for Radio-based Train Operation Wolfgang Hillenbrand / Holm Hofestädt Summary The article presents the GSR-R traffic model for FFB railway operation (FFB is the German abbreviation

More information

UK offshore wind industry progress to cost reduction

UK offshore wind industry progress to cost reduction UK offshore wind industry progress to cost reduction Mike Newman, Innovation manager 30 September 2015 Agenda 1. Introduction to ORE Catapult 2. Cost Reduction Monitoring Framework (CRMF) 2014 3. CRMF

More information

CER-Report to GSM-R Follow-Up Group

CER-Report to GSM-R Follow-Up Group CER-Report to GSM-R Follow-Up Group 26.06.205 CER update on the interferences issues Funding remain the core issue to speed up resolution: The financial burden of coordination and retrofitting of fleet

More information

Drivers and Technologies for Next Generation Digital Connectivity in Offshore O&G Production Facilities

Drivers and Technologies for Next Generation Digital Connectivity in Offshore O&G Production Facilities Drivers and Technologies for Next Generation Digital Connectivity in Offshore O&G Production Facilities Wayne Nielsen, Managing Director, WFN Strategies Greg Otto, E&P DCT Field Digital Infrastructure

More information

Train Control & Monitoring System UNIFE s achievements and perspective

Train Control & Monitoring System UNIFE s achievements and perspective Train Control & Monitoring System UNIFE s achievements and perspective ACRI/CENELEC conference Prague, 21 October 2011 Jean-Pierre Gilbert Alstom, Chief Architect, TCMS UNIFE TCMS Topical Group speaker

More information

Progress report of GRSG informal group on Accident Emergency Call System (AECS)

Progress report of GRSG informal group on Accident Emergency Call System (AECS) Transmitted by Chair of the AECS IWG Informal document GRSG-110-22 (110 th GRSG session, 26 29 April 2016 Agenda item 16.) Progress report of GRSG informal group on Accident Emergency Call System (AECS)

More information

Contents EUROPEAN UNION AGENCY FOR RAILWAYS. Accompanying Report Practical arrangements for safety certification ERA-REC-126/ACR V 1.

Contents EUROPEAN UNION AGENCY FOR RAILWAYS. Accompanying Report Practical arrangements for safety certification ERA-REC-126/ACR V 1. Contents 1. Executive summary... 3 2. Introduction... 4 2.1. Purpose and scope... 4 2.2. Background... 4 3. Workgroups... 5 4. Working method... 5 5. Content of the practical arrangements... 7 5.1. Objective...

More information

OF THE EUROPEAN UNION AGENCY FOR RAILWAYS. for. European Commission. regarding OPINION ERA/OPI/ CCS TSI Error Corrections

OF THE EUROPEAN UNION AGENCY FOR RAILWAYS. for. European Commission. regarding OPINION ERA/OPI/ CCS TSI Error Corrections EUROPEAN UNION AGENCY FOR RAILWAYS Opinion ERA/OPI/2017-2 Making the rai way system work better for society. OPINION ERA/OPI/201 7-2 OF THE EUROPEAN UNION AGENCY FOR RAILWAYS for European Commission regarding

More information

In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or

In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or April 2018 Quarterly Summary Report on Approved (A) Transaction Technical Assistance Not Exceeding $5,000,000; (B) Knowledge and Support Technical Assistance Projects Not Exceeding $225,000; and (C) Technical

More information

6 th December South West Scotland Forum

6 th December South West Scotland Forum 6 th December 2017 South West Scotland Forum SWS Developers Forum 6 www.spenergynetworks.co.uk th Dec 2017 1 Agenda Introduction Pearse Murray System Design Diyar Kadar Programme Update Bob McGuire, Colin

More information

Capability Statement. Brisbane. Dalby. Mackay. Moranbah

Capability Statement. Brisbane. Dalby. Mackay. Moranbah Capability Statement Brisbane Dalby Mackay Moranbah Who we are RCS Telecommunications was created in 2013 through the merger of Queensland Communications and Networking (QCN) and Radio Communications Solutions

More information

The work under the Environment under Review subprogramme focuses on strengthening the interface between science, policy and governance by bridging

The work under the Environment under Review subprogramme focuses on strengthening the interface between science, policy and governance by bridging The work under the Environment under Review subprogramme focuses on strengthening the interface between science, policy and governance by bridging the gap between the producers and users of environmental

More information

GUIDELINES FOR AN AGREEMENT FOR THE SHARED USE OF RADAR SENSOR DATA

GUIDELINES FOR AN AGREEMENT FOR THE SHARED USE OF RADAR SENSOR DATA EUROPEAN ORGANISATION FOR THE SAFETY OF AIR NAVIGATION EUROCONTROL GUIDELINES FOR AN AGREEMENT FOR THE SHARED USE OF RADAR SENSOR DATA SUR.ET1.ST05.3000-GUI-01-00 Edition : 1.0 Edition Date : November

More information

SECTION ADMINISTRATIVE REQUIREMENTS

SECTION ADMINISTRATIVE REQUIREMENTS PART 1 GENERAL 1.01 SECTION INCLUDES A. Electronic document submittal service. B. Preconstruction meeting. C. Progress meetings. D. Construction progress schedule. E. Coordination drawings. SECTION 013000

More information

GNSS CONSTRUCTION INSPECTION EQUIPMENT

GNSS CONSTRUCTION INSPECTION EQUIPMENT Project: Jamaica-Winhall STP 2904(1) Advertised Date: 5/30/2018 GNSS CONSTRUCTION INSPECTION EQUIPMENT DESCRIPTION. This work shall consist of furnishing, configuring, installing, maintaining, and removing

More information

Efficient Tactics of Project Management

Efficient Tactics of Project Management Ohio Structure Steel & Architectural Metals Association Efficient Tactics of Project Management Friday, June 23, 2017 Mark V. Holland, P.E. Chief Engineer Paxton & Veirling Steel Co. How to get paid. This

More information

PORT OF POOLE DEVELOPING FOR THE FUTURE

PORT OF POOLE DEVELOPING FOR THE FUTURE PORT OF POOLE DEVELOPING FOR THE FUTURE Nick Clarke & Kim Moore INTRODUCTION Masterplan the benefits EIA & SEA (Strategic Environmental ) Changes in Marine Licensing. PORT DEVELOPMENT PROCESS Development

More information

NeTIRail-INFRA final conference Ljubljana, Slovenia 24 May 2018

NeTIRail-INFRA final conference Ljubljana, Slovenia 24 May 2018 final conference Ljubljana, Slovenia 24 May 2018 Detailed Programme & Practical Information An event co-organised by: Page 1 On behalf of the FP7 EU-funded project we would like to invite you to the FINAL

More information

Simple Guide to In-Building Coverage Systems

Simple Guide to In-Building Coverage Systems Simple Guide to In-Building Coverage Systems for Building Owners, Managers and Tenants Accessing high-quality network coverage for mobile phones or tablet devices can be problematic within large buildings

More information

Optimizing wind farms

Optimizing wind farms Optimizing wind farms We are Uniper We are a leading international energy company with operations in more than 40 countries and around 13,000 employees. We combine a balanced portfolio of modern assets

More information

ST02893CH FAA Supplemental Type Certificate

ST02893CH FAA Supplemental Type Certificate ST02893CH FAA Supplemental Type Certificate Installation of a SATCOM System on Boeing 767 Series Aircraft (FAA STC ST02893CH) OVERVIEW FAA STC ST02893CH. Argentina Civil Aviation Administration STC 1205.18.

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT PASSENGER SHIP SAFETY EXPERT SUB-GROUP

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT PASSENGER SHIP SAFETY EXPERT SUB-GROUP EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT i Directorate D - Logistics, maritime & land transport and passenger rights D.2 - Maritime safety Brussels, MOVE D2 (2016) PASSENGER SHIP

More information

EDS LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS

EDS LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS ENGINEERING DESIGN STANDARD EDS 08-2109 LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS Network(s): Summary: EPN, LPN, SPN This standard provides guidance on the installation of

More information

THEFUTURERAILWAY THE INDUSTRY S RAIL TECHNICAL STRATEGY 2012 INNOVATION

THEFUTURERAILWAY THE INDUSTRY S RAIL TECHNICAL STRATEGY 2012 INNOVATION 73 INNOVATION 74 VISION A dynamic industry that innovates to evolve, grow and attract the best entrepreneurial talent OBJECTIVES Innovation makes a significant and continuing contribution to rail business

More information

Airwave Service Business Benefits Summary

Airwave Service Business Benefits Summary Police Authority Resources Committee 24 April 2008 Open for the purposes of FOI Report of Mike Walton, Head of ICT Agenda Item No.8 Airwave Service Business s Summary Recommendation(s): (i) That the Committee

More information

SEFEV. Simulation Environment for Fast ERTMS Validation (2011-EU S)

SEFEV. Simulation Environment for Fast ERTMS Validation (2011-EU S) SEFEV Simulation Environment for Fast ERTMS Validation 2012-2014 (2011-EU-60009-S) Contents Introduction... 3 Architecture... 3 List of Abbreviations... 6 Page 2 of 7 Introduction The European Rail Traffic

More information

Government Soft Landings (GSL) An Overview 29 th October 2013

Government Soft Landings (GSL) An Overview 29 th October 2013 Government Soft Landings (GSL) An Overview 29 th October 2013 1 WWW.BENTLEY.COM Customers not getting the assets & outcomes they need / want? Dropping the baton at key stages 2 WWW.BENTLEY.COM Have greater

More information

BIM EXECUTION PLAN IN CZECH REPUBLIC

BIM EXECUTION PLAN IN CZECH REPUBLIC Abstract BIM EXECUTION PLAN IN CZECH REPUBLIC Otmar Hrdina* 1, Petr Matějka 2 1 Faculty of Civil Engineering, Czech Technical University in Prague, Thakurova 7/2077 166 29 Prague 6 - Dejvice, Czech Republic,

More information

Peak performance in operation.

Peak performance in operation. 1 2 3 4 5 Ensuring productivity Peak performance in operation. As easy as that. 1 2 Developing ideas Are you looking to build the best machine possible and already have some initial ideas? Then get these

More information

Route Planning & Cable Route Surveys

Route Planning & Cable Route Surveys Route Planning & Cable Route Surveys Graham Evans Director EGS Survey Group www.egssurvey.com Concept to Reality Key Phases Development of Business Model Definition of Key Project Milestones Project Concept

More information

The Intergovernmental Platform on Biodiversity and Ecosystem Services (IPBES)

The Intergovernmental Platform on Biodiversity and Ecosystem Services (IPBES) The Intergovernmental Platform on Biodiversity and Ecosystem Services (IPBES) LESSONS LEARNED FROM SOUTH AFRICA S PARTICIPATION IN IPBES SA scientists and Policy Makers influential and globally competitive

More information

RENEWABLE ENERGY SOLUTIONS. oceaneering.com

RENEWABLE ENERGY SOLUTIONS. oceaneering.com RENEWABLE ENERGY SOLUTIONS oceaneering.com 2 Oceaneering / Renewable Energy Solutions From initial site surveys through decommissioning, our products and services deliver unmatched value designed to lower

More information

SPANISH RAILWAYS TECHNOLOGICAL PLATFORM: COORDINATION OF THE SECTOR TO FOSTER SPANISH RAIL R&D AND INNOVATION

SPANISH RAILWAYS TECHNOLOGICAL PLATFORM: COORDINATION OF THE SECTOR TO FOSTER SPANISH RAIL R&D AND INNOVATION Rail Innovation. BCN Rail November 17th, 2015 SPANISH RAILWAYS TECHNOLOGICAL PLATFORM: COORDINATION OF THE SECTOR TO FOSTER SPANISH RAIL R&D AND INNOVATION Ángeles Táuler Director of the Spanish Railways

More information

TETRA data services: Applications & innovations

TETRA data services: Applications & innovations TETRA data services: Applications & innovations Risto Toikkanen Vice chairman, TETRA Association Wireless China, Beijing 2007 13.7.2007 1 Agenda: Usage trends How the standard supports development TETRA

More information

Vulnerability modelling of ad hoc routing protocols a comparison of OLSR and DSR

Vulnerability modelling of ad hoc routing protocols a comparison of OLSR and DSR 5 th Scandinavian Workshop on Wireless Ad-hoc Networks May 3-4, 2005 Vulnerability modelling of ad hoc routing protocols a comparison of OLSR and DSR Mikael Fredin - Ericsson Microwave Systems, Sweden

More information

Annex III - 3. Memorandum of Understanding on the development of the Pan-European Transport Corridor VII (The Danube) (DRAFT)

Annex III - 3. Memorandum of Understanding on the development of the Pan-European Transport Corridor VII (The Danube) (DRAFT) Annex III - 3 Memorandum of Understanding on the development of the Pan-European Transport Corridor VII (The Danube) (DRAFT) Desiring to promote international transport of goods and passengers through

More information

EXPERT GROUP MEETING ON CONTEMPORARY PRACTICES IN CENSUS MAPPING AND USE OF GEOGRAPHICAL INFORMATION SYSTEMS New York, 29 May - 1 June 2007

EXPERT GROUP MEETING ON CONTEMPORARY PRACTICES IN CENSUS MAPPING AND USE OF GEOGRAPHICAL INFORMATION SYSTEMS New York, 29 May - 1 June 2007 EXPERT GROUP MEETING ON CONTEMPORARY PRACTICES IN CENSUS MAPPING AND USE OF GEOGRAPHICAL INFORMATION SYSTEMS New York, 29 May - 1 June 2007 STATEMENT OF DR. PAUL CHEUNG DIRECTOR OF THE UNITED NATIONS STATISTICS

More information

DNVGL-CP-0212 Edition March 2016

DNVGL-CP-0212 Edition March 2016 CLASS PROGRAMME Type approval DNVGL-CP-0212 Edition March 2016 The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version. FOREWORD

More information

It all starts here. Format fermé : 9" x 12" Format ouvert : 18 x 12 Marges : 0,125" Couleurs : CMYK

It all starts here. Format fermé : 9 x 12 Format ouvert : 18 x 12 Marges : 0,125 Couleurs : CMYK It all starts here 4521, rue clark, montréal (québec) H2T 2T3 t. 514.286.9696 f. 514.284.9152 espressocommunication.com Date : 3 septembre 2010 Client : Ultragen Projet : ULT1001_Brochure EN Numéro d épreuve:

More information

ELECTRONIC DRAFTING GUIDELINES

ELECTRONIC DRAFTING GUIDELINES ELECTRONIC DRAFTING GUIDELINES Edition No. 6 Updated November 2016 TABLE OF CONTENTS Section Title Page 1 Definitions 3 2 Drawing Format 3 2.1 Standards & Guidelines 3 2.2 Survey Plans 4 2.3 Underground

More information

Introductory remarks

Introductory remarks Introductory remarks This document is a draft of a permit for Gaz System to construct a natural gas pipeline on the Danish continental shelf in the Baltic Sea. It should be emphasised that it has not yet

More information

Training for New Technologies

Training for New Technologies Training for New Technologies Be prepared when your organization meets the pressures of implementing new technologies. Panelists will discuss lessons learned when designing, developing and implementing

More information

THE USE OF A SAFETY CASE APPROACH TO SUPPORT DECISION MAKING IN DESIGN

THE USE OF A SAFETY CASE APPROACH TO SUPPORT DECISION MAKING IN DESIGN THE USE OF A SAFETY CASE APPROACH TO SUPPORT DECISION MAKING IN DESIGN W.A.T. Alder and J. Perkins Binnie Black and Veatch, Redhill, UK In many of the high hazard industries the safety case and safety

More information

Building Information Modelling HMG Strategic Overview. Mark Bew

Building Information Modelling HMG Strategic Overview. Mark Bew Building Information Modelling HMG Strategic Overview Mark Bew Chairman HMG BIM Working Group Chairman BuildingSMART UK Director ECS Ltd 1 WWW.BENTLEY.COM Introduction HMG BIM Strategy Where are we? Progress

More information

Nevada Shared Radio System Update. WCRCS 800 MHz Joint Operating Committee Meeting, July 28, 2017 Agenda Item 11

Nevada Shared Radio System Update. WCRCS 800 MHz Joint Operating Committee Meeting, July 28, 2017 Agenda Item 11 Nevada Shared Radio System Update WCRCS 800 MHz Joint Operating Committee Meeting, July 28, 2017 Agenda Item 11 1 NSRS - Current Status NSRS Contract was signed and is in effect as of May 8 th, 2017. RFP

More information

RADIO SPECTRUM COMMITTEE

RADIO SPECTRUM COMMITTEE Ref. Ares(2018)3947109-25/07/2018 EUROPEAN COMMISSION Communications Networks Content & Technology Directorate-General Electronic Communications Networks & Services Spectrum Brussels, 12 July 2018 DG CONNECT/B4

More information

Continuous Monitoring on the SSE Networks Transmission System

Continuous Monitoring on the SSE Networks Transmission System 10 th Universities High Voltage Network Colloquium 18 th - 19 th January 2017, GCU, Glasgow, Scotland Continuous Monitoring on the SSE Networks Transmission System The Need for Standards, Specifications

More information

Applied Robotics for Installations and Base Operations (ARIBO)

Applied Robotics for Installations and Base Operations (ARIBO) Applied Robotics for Installations and Base Operations (ARIBO) Overview January, 2016 Edward Straub, DM U.S. Army TARDEC, Ground Vehicle Robotics edward.r.straub2.civ@mail.mil ARIBO Overview 1 ARIBO Strategic

More information

Pan-Canadian Trust Framework Overview

Pan-Canadian Trust Framework Overview Pan-Canadian Trust Framework Overview A collaborative approach to developing a Pan- Canadian Trust Framework Authors: DIACC Trust Framework Expert Committee August 2016 Abstract: The purpose of this document

More information

SECRET SECurity of Railways against Electromagnetic attacks

SECRET SECurity of Railways against Electromagnetic attacks SECRET SECurity of Railways against Electromagnetic attacks Grant Agreement number: 285136 Funding Scheme: Collaborative project Start date of the contract: 01/08/2012 Project website address: http://www.secret-project.eu

More information

INTEGRATED SERVICES AND PRODUCTS ACROSS THE FIELD LIFE CYCLE

INTEGRATED SERVICES AND PRODUCTS ACROSS THE FIELD LIFE CYCLE INTEGRATED SERVICES AND PRODUCTS ACROSS THE FIELD LIFE CYCLE 4 What we do 6 Why choose us? 7 Service and product capabilities For more than 35 years, we have been providing clients with standalone and

More information

Title: DECISIONS/ACTIONS and INFO at the Platform Steering Group #11 Lille, 5 Feb ERA Offices 299, boulevard de Leeds - FR

Title: DECISIONS/ACTIONS and INFO at the Platform Steering Group #11 Lille, 5 Feb ERA Offices 299, boulevard de Leeds - FR Title: DECISIONS/ACTIONS and INFO at the Platform Steering Group #11 Source: Author: Distributed to: U I C ERTMS Support Team President of Platform Steering Group Members Document: For: Decision Date:

More information

TABLE OF CONTENTS. 1.0 Scope. 2.0 References. 3.0 Definitions. 4.0 Submission and Design Requirements. 5.0 Materials 5.1 General 5.

TABLE OF CONTENTS. 1.0 Scope. 2.0 References. 3.0 Definitions. 4.0 Submission and Design Requirements. 5.0 Materials 5.1 General 5. 1.0 Scope 2.0 References 3.0 Definitions 4.0 Submission and Design Requirements 5.0 Materials 5.1 General 5.2 Marking 6.0 Equipment 7.0 Production 7.1 Steel Octagonal Poles 7.2 Base Plate 7.3 Top Cap 7.4

More information

Trunk line and radio system optical fiber for multileveled analogue and digital railway applications

Trunk line and radio system optical fiber for multileveled analogue and digital railway applications Trunk line and radio system optical fiber for multileveled analogue and digital railway applications exans, worldwide leader in s and cabling systems As a global expert in s and cabling systems, Nexans

More information

Mongolia: Intelligent Transport Systems Development for Mongolia

Mongolia: Intelligent Transport Systems Development for Mongolia Technical Assistance Report Project Number: 48082-001 Policy and Advisory Technical Assistance (PATA) July 2016 Mongolia: Intelligent Transport Systems Development for Mongolia (Financed by the Republic

More information