1 Basic Measurements for Pipe Inspections Period 7 Basic Corrosion Course 2017 February 21-23, 2017 Mark Anderson-MTS 1
2 DOT External corrosion control: Examination of buried pipeline when exposed. Requires that the exposed surface of pipe must be examined for external corrosion February 21-23, 2017 Mark Anderson-MTS 2
3 Key for Success Consistent data gathering Type of information Measurement of conditions (good/fair/bad) Documentation A must for record keeping February 21-23, 2017 Mark Anderson-MTS 3
4 February 21-23, 2017 Mark Anderson-MTS 4
5 February 21-23, 2017 Mark Anderson-MTS 5
6 Stake the excavation site to maintain control of base measurements February 21-23, 2017 Mark Anderson-MTS 6
7 Photographic documentation Land use Foreign structures February 21-23, 2017 Mark Anderson-MTS 7
8 Photographic documentation February 21-23, 2017 Mark Anderson-MTS 8
9 GIS Geographic Information System Location Latitude / Longitude Northern / Easting Physical attributes Wall Thickness Grade of Pipe Coating Type System will improve with quality data February 21-23, 2017 Mark Anderson-MTS 9
10 GIS February 21-23, 2017 Mark Anderson-MTS 10
11 Soil Moisture February 21-23, 2017 Mark Anderson-MTS 11
12 Definitions of terms ph ph is a measure of how acidic or basic things are and is measured using a ph scale between 0 to 14 Acidic things having a ph between 0-7 Basic things having a ph from 7 to 14. For instance, lemon juice and battery acid are acidic and fall in the 0-7 range, whereas seawater and bleach are basic (also called "alkaline") and fall in the 7-14 ph range. Pure water is neutral, or 7 on the ph scale. February 21-23, 2017 Mark Anderson-MTS 12
13 Definitions of terms February 21-23, 2017 Mark Anderson-MTS 13
14 Equipment needed Soil ph High impendence meter capable of measuring DC volts. Copper / copper sulfate reference cell Antimony cell Method Insure Copper / copper sulfate reference cell is charged with copper sulfate and distilled water Check calibration of reference cell against a new cell should be with in 5 mv February 21-23, 2017 Mark Anderson-MTS 14
15 Soil ph (continued) Insure that the tip of the antimony cell is clean and shinny Connect reference cell to the negative terminal of meter Connect antimony cell to the positive terminal of meter Place tip of reference cell and antimony cell in the ground, making sure you have good contact Avoid roots and other organics Record reading IS READING REASONABLE? February 21-23, 2017 Mark Anderson-MTS 15
16 Soil ph (continued) Digging to avoid roots Cleaning tip of cell February 21-23, 2017 Mark Anderson-MTS 16
17 Soil ph (continued) Taking reading Converting mv to ph February 21-23, 2017 Mark Anderson-MTS 17
18 Definitions of terms Soil Resistivity Soil resistivity is an electric characteristic of the soil / ground water that affects the ability for currents to flow through the electrolyte (soil/groundwater) Resistivity is the inverse of conductivity February 21-23, 2017 Mark Anderson-MTS 18
19 Definitions of terms Soil Resistivity (continued) Soil resistivity ,000 1,000 2,000 2,000 10,000 Above 10,000 Degree of Corrosivity Very Corrosive Corrosive Moderately Corrosive Mildly Corrosive Negligible February 21-23, 2017 Mark Anderson-MTS 19
20 Soil Resistivity Collins Rod Equipment needed Collins rod with receiver Method Insure tip of rod is clean Connect leads from receiver to rod Drive rod into ground Connect ear phone Turn unit on February 21-23, 2017 Mark Anderson-MTS 20
21 Soil Resistivity Collins Rod (continued) Method Adjust dial from lowest reading until unit nulls Adjust dial from highest reading until unit nulls Make final reading IS READING REASONABLE? February 21-23, 2017 Mark Anderson-MTS 21
22 Soil Resistivity Collins Rod (continued) Ensure tip is clean Drive rod in ground February 21-23, 2017 Mark Anderson-MTS 22
23 Soil Resistivity Collins Rod (continued) Turn unit on Adjust dial to obtain reading February 21-23, 2017 Mark Anderson-MTS 23
24 Pipeline Outside Diameter Equipment needed Hammer, scraper and wire brush Flexible tape measurer Method Clean coating from pipe 360 deg. Measure around the pipe in inches Take measurement and dived by pi (3.142) Record If coating is not removed, measure coating thickness. Take answer and subtract twice the coating thickness IS READING REASONABLE? February 21-23, 2017 Mark Anderson-MTS 24
25 Pipeline Outside Diameter Clean and measure the pipe February 21-23, 2017 Mark Anderson-MTS 25
26 Pipeline Outside Diameter Record the measurement Calculate the outside diameter February 21-23, 2017 Mark Anderson-MTS 26
27 Definitions of terms O clock A measurement to identify the location of a area of concern on the pipe. The measurement is to document the location around the circumference of the pipe. February 21-23, 2017 Mark Anderson-MTS 27
28 Definitions of terms O clock (continued) 12:00 9:00 3:00 6:00 February 21-23, 2017 Mark Anderson-MTS 28
29 Definitions of terms O clock (continued) 3:00 3:00 February 21-23, 2017 Mark Anderson-MTS 29
30 Definitions of terms Pipe to Soil A measurement of the pipe potential versus a standard half-cell electrode The measurement is normally taken with a copper-copper sulfate reference cell A high impendence voltmeter is used with the reference cell to obtain a reading February 21-23, 2017 Mark Anderson-MTS 30
31 Definitions of terms Pipe to Soil (continued) Pipe to soil readings are normally more negative than 850 mv on pipeline with cathodic protection Unprotected steel will range from 400 mv to 800 mv February 21-23, 2017 Mark Anderson-MTS 31
32 Pipe to soil Equipment needed High impendence meter capable of measuring DC volts. Copper / copper sulfate reference cell Method Insure Copper / copper sulfate reference cell is charged with copper sulfate and distilled water Check calibration of reference cell against a new cell should be with in 5 mv February 21-23, 2017 Mark Anderson-MTS 32
33 Check for calibration February 21-23, 2017 Mark Anderson-MTS 33
34 Remove copper rod from reference cell February 21-23, 2017 Mark Anderson-MTS 34
35 Clean copper rod with sand paper February 21-23, 2017 Mark Anderson-MTS 35
36 Charge reference cell with new copper sulfate and distilled water February 21-23, 2017 Mark Anderson-MTS 36
37 Verify reading February 21-23, 2017 Mark Anderson-MTS 37
38 Pipe to soil (continued) Connect reference cell to the negative terminal of meter Connect the wire that will go to pipeline to the positive terminal of meter Place tip of reference cell in the ground, making sure you have good contact Connect the wire from the positive terminal of the meter to the pipe Record reading IS READING REASONABLE? February 21-23, 2017 Mark Anderson-MTS 38
39 Measurement of pipe-to-soil potentials At ground surface and at pipe interface Need to note location February 21-23, 2017 Mark Anderson-MTS 39
40 Pipe to Soil February 21-23, 2017 Mark Anderson-MTS 40
41 Pipe to Soil February 21-23, 2017 Mark Anderson-MTS 41
42 Coating type Shrink Sleeve and FBE February 21-23, 2017 Mark Anderson-MTS 42
43 Coating Thickness Equipment needed Wire brush Coating thickness gauge Method Clean surface of coating Place thickness gauge along longitudinal axis of the pipe Start with gauge at highest reading Push indicator of gauge in Rotate dial until indicator pops up Record If coating is thicker than range of gauge, not that coating thickness was greater than the limit (note limit) IS READING REASONABLE? February 21-23, 2017 Mark Anderson-MTS 43
44 Coating Thickness Place thickness gauge on clean pipe Turn dial until indicator pops up February 21-23, 2017 Mark Anderson-MTS 44
45 Mapping of coating degradation (blisters, disbondment, etc.) February 21-23, 2017 Mark Anderson-MTS 45
46 Measurements of under-film liquid ph February 21-23, 2017 Mark Anderson-MTS 46
47 Identification of corrosion defects February 21-23, 2017 Mark Anderson-MTS 47
48 Mapping and measurement of corrosion defects February 21-23, 2017 Mark Anderson-MTS 48
49 Simple Pit Equipment needed Hammer, scraper and wire brush Pit gauge Method Clean coating from pipe in the pit area Outline pit area Place pit gauge edge along longitudinal axis of the pipe Measure depth of pit Measure length of the pit along longitudinal axis of the pipe Record measurements IS READING REASONABLE? February 21-23, 2017 Mark Anderson-MTS 49
50 Simple Pit Clean pit and pipe Outline pit area February 21-23, 2017 Mark Anderson-MTS 50
51 Simple Pit Measure pit depth Measure pit length February 21-23, 2017 Mark Anderson-MTS 51
52 Complex Pit Equipment needed Hammer, scraper and wire brush Pit gauge Straight edge, ruler, wax pencil Method Clean coating from pipe in the pit area Outline pit area Grid pit Place pit gauge edge along longitudinal axis of the pipe Measure depth of pit in each grid (max pit depth for each grid) Record measurements IS READING REASONABLE? February 21-23, 2017 Mark Anderson-MTS 52
53 Complex Pit Clean pipe Outline pit February 21-23, 2017 Mark Anderson-MTS 53
54 Complex Pit Grid pit Measure and record February 21-23, 2017 Mark Anderson-MTS 54
55 Complex Pit Grid pit Measure and record February 21-23, 2017 Mark Anderson-MTS 55
56 Internal Corrosion Mapping Figure 2 -- Radiograph Setup (Cont.) NOTE: Do NOT Radiograph any girth weld. With "Shallow" Slope Change Due to Pipe Bend -- Inclusive Angle > 120 deg Single Film 6:00 FLOW End Point of Half Ponding Minimum of the Least of Half Ponding Point or 10'-0" Minimum of the Least of Projected End Point of Ponding End Point of Half Ponding February 21-23, 2017 Mark Anderson-MTS 56
57 Internal Corrosion Mapping February 21-23, 2017 Mark Anderson-MTS 57
58 Internal Corrosion Mapping February 21-23, 2017 Mark Anderson-MTS 58
59 Internal Corrosion Mapping February 21-23, 2017 Mark Anderson-MTS 59
60 Internal Corrosion Mapping February 21-23, 2017 Mark Anderson-MTS 60
61 Dent Equipment needed Hammer, scraper and wire brush Rigid straight edge Small ruler Method Clean coating from pipe in the dent area and down the pipe Place Rigid straight edge along longitudinal axis of the pipe Measure depth of dent at the deepest section Measure length of dent along longitudinal axis of the pipe Record measurements IS READING REASONABLE? February 21-23, 2017 Mark Anderson-MTS 61
62 Dent Clean pipe Measure depth of dent February 21-23, 2017 Mark Anderson-MTS 62
63 Definitions of terms (continued) MIC Microbiologically Induced Corrosion Caused by Sulfur Reducing Bacteria (SRB) Once a suspected area of MIC has been located, the presence of bacteria can be confirmed by means culture methods and antibody analyses or a field test using dilute hydrochloric acid. Detection of SRB or other bacteria in deposits associated with corrosion does not conclusively establish a casual relationship between the bacteria and the observed corrosion. of February 21-23, 2017 Mark Anderson-MTS 63
64 Definitions of terms (continued) MIC (continued) Metal loss due to MIC can not be established with just a positive test showing the presence of bacteria. Visual testing must be conducted to verify the cause of the metal loss. February 21-23, 2017 Mark Anderson-MTS 64
65 Key to Success Consistent data gathering February 21-23, 2017 Mark Anderson-MTS 65
66 Question When should you be called to evaluate the pipe? February 21-23, 2017 Mark Anderson-MTS 66
67 Sample Log for Shipping February 21-23, 2017 Mark Anderson-MTS 67
68 Remaining Strength Evaluate or calculate the remaining strength at locations where corrosion defects are found using one of the following methods. ASME B31G RSTRENG DNV Standard RP-F101 February 21-23, 2017 Mark Anderson-MTS 68
69 ASME B31G Remaining Strength Must use calculations NOT tables Most conservative RSTRENG The smaller the increments, the higher the predicated failure pressure Interaction rules DNV Standard RP-F101 February 21-23, 2017 Mark Anderson-MTS 69
70 Definitions of terms Calculated Failure Pressure The calculated pressure at which a pipe will fail due to metal loss. This is a calculation can be done by using any of the following methods. ASME B31G ASME Modified B31G Effective Areas February 21-23, 2017 Mark Anderson-MTS 70
71 Definitions of terms (continued) Calculated Failure Pressure (continued) ASME B31G Lowest Pressure Modified ASME B31G Higher Pressure Effective Area Highest Pressure February 21-23, 2017 Mark Anderson-MTS 71
72 Thank You! Questions? February 21-23, 2017 Mark Anderson-MTS 72
Pipeline Technology Conference 2010
THRESHOLDS, ACCURACIES AND RESOLUTION: QUANTITATIVE MEASUREMENT AND ITS ADVANTAGES FOR METAL LOSS INSPECTION A. Barbian, M. Beller, A. Hugger, C. Jäger, A. Pfanger NDT Systems & Services Stutensee, Germany
More informationExamples of Design for Cathodic Protection Systems
Examples of Design for Cathodic Protection Systems CURRENT REQUIREMENTS From Estimated Exposed Surface Area Estimating current requirements from expected exposed surface is always subject to error. There
More informationGeneral Consideration about Current Distribution and Potential Attenuation Based on Storage Tank Bottom Modeling Study
C2012-0001155 General Consideration about Current Distribution and Potential Attenuation Based on Storage Tank Bottom Modeling Study Jean Vittonato TOTAL E&P CONGO Pointe Noire Republic of Congo Jean.vittonato@total.com
More informationPipeline & Specialty Services (P&SS)
Pipeline & Specialty Services (P&SS) A Pipeline Inspection Case Study: Design Improvements on a New Generation UT In-line Inspection Crack Tool Mark Slaughter Global Product Line Manager Pipeline & Specialty
More informationEMAT Application on Incoloy furnace Tubing Ramamohan Reddy M (ASNT Level III UT, PCN Level III UT,PAUT&TOFD)
EMAT Application on Incoloy furnace Tubing By Ramamohan Reddy M (ASNT Level III UT, PCN Level III UT,PAUT&TOFD) Outlines 1. Introduction EMAT 2. EMAT- Ultrasound waves 3. EMAT-Surface waves 4. EMAT-Guided
More informationHANDS ON EXPERIENCE WITH THE BROADBAND ELECTROMAGNETIC TOOL IN THE TRENCH
The Northern California Pipe User s Group 22nd Annual Sharing Technologies Seminar www.norcalpug.com Berkeley, CA February 20, 2014 HANDS ON EXPERIENCE WITH THE BROADBAND ELECTROMAGNETIC TOOL IN THE TRENCH
More information60Hz Ratings. Typical Applications. Features & Characteristics. Ratings
The PCR is a solid-state device designed to simultaneously provide DC isolation and AC continuity/grounding when used with cathodically protected structures, such as pipelines, tanks, grounding systems,
More informationTitle of Innovation: In-Line Inspection for Water Pipelines
Title of Innovation: In-Line Inspection for Water Pipelines Nominee(s) Margaret Hannaford, P.E., Division Manager, Hetch-Hetchy Water and Power Division of the San Francisco Public Utilities Commission
More informationAsset Protection Cathodic Protection Soil Resistivity Measurement. Work Instruction No.:
Asset Protection Cathodic Protection Soil Resistivity Measurement Approved by: Manager Pipeline Standards 1 PURPOSE This work instruction describes the processes to be followed when measuring soil resistivity.
More informationThe Essentials of Pipeline Integrity Management
TRAINING METHODOLOGY This interactive training workshop includes the following training methodologies : Lectures Video Discussion of case histories and hands on calculations WHO SHOULD ATTEND The course
More informationLINEAR MEASUREMENT. Prof.H M Prajapati & Prof. A R Sankhla
LINEAR MEASUREMENT Introduction Classification Based on the type of standard Line measurement End measurement Based on precision Precise Direct: Vernier caliper, Micrometer Indirect: Telescopic gauge,
More informationPIPELINE CORROSION RISKS ASSOCIATED WITH AC VOLTAGES
Fact File No 1 PIPELINE CORROSION RISKS ASSOCIATED WITH AC VOLTAGES Cathodic Protection Co Ltd INTRODUCTION This document discusses corrosion that is believed to be caused by AC current flowing from (i.e.
More informationStandard Recommended Practice. High-Voltage Electrical Inspection of Pipeline Coatings
STD- NACE RP027q-ENGL BNLICE" NACE Standard RP0274-98 Item No. 21010 THE CORROSION SOCIETY Standard Recommended Practice High-Voltage Electrical Inspection of Pipeline Coatings This standard represents
More informationECDA to assess possibility of AC Corrosion. Mark Yunovich Honeywell Corrosion Solutions January 27 th, 2009
ECDA to assess possibility of AC Corrosion Mark Yunovich Honeywell Corrosion Solutions January 27 th, 2009 What are we talking about today? Assessing the degree of AC interference at the pipeline level
More informationENGINEERING REPORT PHASES I & II MITIGATOR PERFORMANCE TESTS
ENGINEERING REPORT PHASES I & II MITIGATOR PERFORMANCE TESTS INDUCED AC MITIGATION PERFORMANCE ON A STEEL GAS TRANSMISSION PIPELINE REPORT OF JANUARY 29, 2014 Copyright MATCOR, Inc. 2014 MITIGATOR TM VS.
More informationDetermining Remaining Strength of Corroded Pipelines. Houston Section April 10, 2012
Determining Remaining Strength of Corroded Pipelines Houston Section April 10, 2012 Who is DCP Midstream? Formerly Duke Energy Field Services the Company was renamed on January 1, 2007 to align with DCP
More informationANALOG RESISTANCE METER USER S MANUAL
Page 1 of 14 MILLER 400A ANALOG RESISTANCE METER USER S MANUAL Page 2 of 14 CONTENTS Page Description.. 3 Operating Instructions 4 Applications 5 4-Electrode Applications.. 5 Earth Resistivity Measurement...
More informationUNDERSTANDING THE IMPORTANCE OF PUNCH LENGTH AND CUP DEPTH
WHITEPAPER UNDERSTANDING THE IMPORTANCE OF PUNCH LENGTH AND CUP DEPTH { Manufacturing tablets to a uniform hardness, weight, and thickness requires tablet press punches of consistent length. We will describe
More informationANALOG RESISTANCE METER
1 P a g e M A N 1 6 0 MILLER 400A ANALOG RESISTANCE METER USER S MANUAL Revised Aug 22, 2018 2 P a g e M A N 1 6 0 CONTENTS Page Description.. 3 Operating Instructions 4 Applications 5 4-Electrode Applications..
More informationSection COUPLINGS AND COUPLING ADAPTERS. This Section covers couplings and coupling adapters for ductile iron and steel pipe.
PART 1 GENERAL 1.01 SUMMARY Section 15155 This Section covers couplings and coupling adapters for ductile iron and steel pipe. 1.02 MEASUREMENT AND PAYMENT A. No separate payment for Work performed under
More informationPipeline Design & Installation Systems
Pipeline Design & Installation Systems Rigid pipeline subsea tie-backs new operational challenges Paul Georgeson Operations Support Manager Wood Group Kenny Agenda - Overview - Materials - Inspection -
More information-SQA- SCOTTISH QUALIFICATIONS AUTHORITY. Hanover House 24 Douglas Street GLASGOW G2 7NQ NATIONAL CERTIFICATE MODULE DESCRIPTOR
-SQA- SCOTTISH QUALIFICATIONS AUTHORITY Hanover House 24 Douglas Street GLASGOW G2 7NQ NATIONAL CERTIFICATE MODULE DESCRIPTOR -Module Number- 4281080 -Session-1990-91 -Superclass- YC -Title- GAS DISTRIBUTION:
More informationMIL-STD-1580B REQUIREMENT 11 DETAILED REQUIREMENTS FOR CONNECTORS
DETAILED REQUIREMENTS FOR CONNECTORS 11. General. This section describes detailed requirements for a DPA of commonly used connectors. These requirements supplement the general requirements in section 4.
More informationElectrical TP-18 February 2017 ELECTRICAL TECHNICAL PAPER 18 FREQUENTLY ASKED QUESTIONS ABOUT CATHODIC PROTECTION SYSTEM EQUIPMENT TESTING
ELECTRICAL TECHNICAL PAPER 18 FREQUENTLY ASKED QUESTIONS ABOUT CATHODIC PROTECTION SYSTEM EQUIPMENT TESTING CATHODIC PROTECTION SYSTEM EQUIPMENT TESTING Question No. 1 What should I (the contractor) check
More informationDCVG Coating Survey Data Sheet
DCVG Coating Survey Data Sheet DCVG COATING DEFECT SURVEYS Today, DC voltage gradient surveys have evolved as an accurate and economic means of locating coating defects. When a DC current is applied to
More informationFluid Sealing Association
Fluid Sealing Association STANDARD FSA-MG-501-02 STANDARD TEST METHOD FOR INWARD BUCKLING OF SPIRAL-WOUND GASKETS 994 Old Eagle School Road, Suite 1019 Wayne, Pennsylvania 19087-1866 Phone: (610) 971-4850
More informationBy: Derek Watson and Lee Robins, Tracerco, UK
TRACERCO DISCOVERY SUBSEA CT (COMPUTED TOMOGRAPHY) HELPS TO OPTIMISE YOUR OPERATIONAL PIGGING CAMPAIGN AND VERIFY ILI RESULTS: TECHNOLOGY FOR PIPELINE INTEGRITY AND FLOW ASSURANCE VISUALISATION By: Derek
More informationUltrasonic Phased Array Crack Detection Update
Ultrasonic Phased Array Crack Detection Update By A. Hugger, D. Allen, I. Lachtchouk, P. Senf (GE Oil & Gas, PII Pipeline Solutions) and S. Falter (GE Inspection Technology Systems) 1 Abstract This paper
More informationOperation Manual for CTL-3000
CATH-TECH CORROSION CONTROL EQUIPMENT Operation Manual for CTL-3000 DCVG Survey Instrument Cathodic Technology Ltd. 15-1 Marconi Court Bolton, Ontario Canada L7E 1E2 Ph: ++1-905-857-1050 ctl@cath-tech.com
More informationGuided Wave Testing - Maximizing Buried Pipe Corrosion Knowledge from each Excavation
Proceedings of the ASME 2012 Pressure Vessels & Piping Conference PVP2012 July 15-19, 2012, Toronto, Ontario, CANADA PVP2012-78561 Guided Wave Testing - Maximizing Buried Pipe Corrosion Knowledge from
More informationLong Range Ultrasonic Testing - Case Studies
More info about this article: http://www.ndt.net/?id=21145 Prawin Kumar Sharan 1, Sheethal S 1, Sri Krishna Chaitanya 1, Hari Kishore Maddi 1 1 Sievert India Pvt. Ltd. (A Bureau Veritas Company), 16 &
More informationCathodic Protection Close Interval Surveys. Field Manual. Prepared by R.L. Pawson
Cathodic Protection Close Interval Surveys Field Manual Prepared by R.L. Pawson 1 Table of Contents 1.0 INTRODUCTION... 3 2.0 STANDARD FIELD PRACTICES... 3 2.01 Reference Electrodes... 4 2.02 Structure
More informationCATHODIC PROTECTION FIELD TESTING
AIR FORCE HANDBOOK 32-1290(I) MIL-HDBK-1136/1 (SUPERSEDES NAVFAC MO-306.1) 1 February 1999 CATHODIC PROTECTION FIELD TESTING DEPARTMENTS OF THE AIR FORCE AND NAVY AIR FORCE HANDBOOK 32-1290(I) MIL-HDBK-1136/1
More informationElectrical Measurements
Electrical Measurements INTRODUCTION In this section, electrical measurements will be discussed. This will be done by using simple experiments that introduce a DC power supply, a multimeter, and a simplified
More informationDIGITAL RESISTANCE METER
1 P a g e M A N 1 7 0 MILLER 400D DIGITAL RESISTANCE METER USER S MANUAL Revised May 19, 2014 2 P a g e M A N 1 7 0 CONTENTS Page Section 1: Description 3 Section 2: How to Take Resistance Readings Manually
More informationEVALUATING DAMAGED SUBSEA PIPELINES USING AN ENGINEERING-BASED INTEGRITY MANAGEMENT PROGRAM
Proceedings of Conference ASME International Offshore Pipeline Forum October 28-29, 2009, Houston, Texas USA IOPF2009-6002 EVALUATING DAMAGED SUBSEA PIPELINES USING AN ENGINEERING-BASED INTEGRITY MANAGEMENT
More informationAC Voltage- Pipeline Safety and Corrosion MEA 2015
AC Voltage- Pipeline Safety and Corrosion MEA 2015 WHAT ARE THE CONCERNS ASSOCIATED WITH AC VOLTAGES ON PIPELINES? AC concerns Induced AC Faults Lightning Capacitive coupling Safety Code Induced AC Corrosion
More informationPRACTICAL ENHANCEMENTS ACHIEVABLE IN LONG RANGE ULTRASONIC TESTING BY EXPLOITING THE PROPERTIES OF GUIDED WAVES
PRACTICAL ENHANCEMENTS ACHIEVABLE IN LONG RANGE ULTRASONIC TESTING BY EXPLOITING THE PROPERTIES OF GUIDED WAVES PJ Mudge Plant Integrity Limited, Cambridge, United Kingdom Abstract: Initial implementations
More informationFIELD LOK 350. Gasket 4" 24" JOINT RESTRAINT NSF FOR WATER & WASTEWATER, FIRE PROTECTION & INDUSTRIAL APPLICATIONS. Certified to ANSI/NSF 61
4" 24" FIELD LOK 350 JOINT RESTRAINT Gasket FOR WATER & WASTEWATER, FIRE ROTECTION & INDUSTRIAL ALICATIONS 4" 24" FIELD LOK 350 Gasket 2 Table of Contents FIELD LOK 350 Gasket 3 Assembly 4 Alternative
More informationHigh-Resolution Corrosion Monitoring for Reliable Assessment of Infrastructure
19 th World Conference on Non-Destructive Testing 2016 High-Resolution Corrosion Monitoring for Reliable Assessment of Infrastructure André Lamarre 1 1 Olympus Scientific Solutions Americas, Quebec City,
More informationNDT KONFERANSEN ZENOVIEA VOROSCIUC
NDT KONFERANSEN 2011 ZENOVIEA VOROSCIUC Short about FMC Expectations Requirements New Challenges. New Solutions. 2 FMC Technologies Subsea Eastern ~ 150% growth from 2004-2010 MUSD Revenue Employees ER
More information1: Introduction : Caution : Tips for Reading this Manual : Preface : System Highlights : Receiver
1: Introduction....1 1 2: Caution.... 2 2 3: Tips for Reading this Manual....3 3 4: Preface....4 4 5: System Highlights....6 6 6: Receiver..7 7 6.1: Specifications......7 7 6.2: Receiver Operation... 7
More information18th World Conference on Non-destructive Testing, April 2012, Durban, South Africa
18th World Conference on Non-destructive Testing, 16-20 April 20, Durban, South Africa Guided Wave Testing for touch point corrosion David ALLEYNE Guided Ultrasonics Ltd, London, UK; Phone: +44 2082329102;
More informationStatic Stray DC Current Interference Testing
Static Stray DC Current Interference Testing Period 6 Intermediate Corrosion Course 2017 February 21-23, 2017 Mike Placzek ARK Engineering 1 February 21-23, 2017 Mike Placzek ARK Engineering 2 Agenda What
More informationManaging Metallic Pipe
Managing Metallic Pipe Metallic Pipe Overview Buried infrastructure is the backbone of our modern society. It connects communities, empowers our economy and enables everyday life. While there are many
More informationICCP Retrofit Challenges for an Offshore Jacket Complex
Paper No. 6012 ICCP Retrofit Challenges for an Offshore Jacket Complex Christophe Baeté, CP Manager Elsyca n.v. Vaartdijk 3/603, 3018 Wijgmaal, Belgium christophe.baete@elsyca.com ABSTRACT An offshore
More informationTesting of Buried Pipelines Using Guided Waves
Testing of Buried Pipelines Using Guided Waves A. Demma, D. Alleyne, B. Pavlakovic Guided Ultrasonics Ltd 16 Doverbeck Close Ravenshead Nottingham NG15 9ER Introduction The inspection requirements of pipes
More informationTapecoat. Application Guideline
Tapecoat Application Guideline 1.0 SCOPE This document contains general instructions and recommended practices for the application of Tapecoat wax/petrolatum coating systems. The various coating grades
More informationRISK & RELIABILITY BASED FITNESS FOR SERVICE (FFS) ASSESSMENT FOR SUBSEA PIPELINES By. Ir. Muhd Ashri Mustapha & Dr. Yong BaI.
RISK & RELIABILITY BASED FITNESS FOR SERVICE (FFS) ASSESSMENT FOR SUBSEA PIPELINES By Ir. Muhd Ashri Mustapha & Dr. Yong BaI. June 2011 Hannover All rights reserved. No part of this document may be reproduced,
More informationINTEGRITY MANAGEMENT PROGRAMS FOR AGING INFRASTRUCTURES IN HYDROELECTRIC GENERATING STATIONS
INTEGRITY MANAGEMENT PROGRAMS FOR AGING INFRASTRUCTURES IN HYDROELECTRIC GENERATING STATIONS Jagannath Hiremagalur *, Charles Ahlgren &, Steve J. White *, and Richard A. Mattson * & Chief Dam Safety Engineer,
More informationPENSTOCK CONDITION ASSESSMENT
Northwest Hydro Association May 17, 2012 Technical Seminar PENSTOCK CONDITION ASSESSMENT Thomas L. Kahl, P.E. Kleinschmidt TOPICS Concerns Types of Penstock Failure Modes Steel and Wood Stave Failure Mode
More informationFLAW DETECTION USING ENCIRCLING COIL EDDY CURRENT SYSTEMS
DATA SHEET NO GI-2 Magnetic Analysis Corporation FLAW DETECTION USING ENCIRCLING COIL EDDY CURRENT SYSTEMS PRINCIPLES OF OPERATION The detection of flaws such as seams, cracks, pits, slivers, weld-line
More informationLaserSnake Development of Multi-Skin Cutting Techniques Phase 1: Preliminary Study Deliverable D3.29 TWI
LaserSnake2 110128 Development of Multi-Skin Cutting Techniques Phase 1: Preliminary Study Deliverable D3.29 TWI-007 9-13 Contents 1 Introduction 1 1.1 Background 1 1.2 Suggested test geometries 1 2 Objective
More informationLatest Developments for Pipeline Girth Welds using 3D Imaging Techniques. Novel Construction Meeting Jan van der Ent March 2016, Geneva
Latest Developments for Pipeline Girth Welds using 3D Imaging Techniques Novel Construction Meeting Jan van der Ent March 2016, Geneva 1 Content of presentation Standard A(UT) inspection What do we expect
More informationVIEWpanel Technical Manual
VIEWpanel Technical Manual VIEWpanel is a prefabricated panel comprising 0.21 aluminium skin (1100 alloy) both sides, apart from our lite grade, which is 0.12 aluminium skin both sides and a polyethylene
More informationCall Today Ship Today!
JUST LIKE HAVING IT ON THE SHELF MOLDS WELD METAL ACCESSORIES M-100 M-101 M-102 M-10 M-106 M-112 M-12 M-151 M-15 M-156 M-159 M-161 SAME DAY SERVICE ( Market) 15CP 25CP 25CI 32CI 5CI Mini- Clamp Flint Ignitors
More information(IDC) INTEGRATED DATA COLLECTION TECHNOLOGY. Presented by: Kevin Pastotnik
(IDC) INTEGRATED DATA COLLECTION TECHNOLOGY Presented by: Kevin Pastotnik Definition and Brief History to the Need INTEGRATED DATA COLLECTION TECHNOLOGY What is IDC? IDC is an external assessment tool
More informationSight glass window Sight flow indicator
SIGHT GLASS Sight glass components allow operators to safely observe processes inside tanks, pipes, reactors and vessels. When it comes to selecting a sight glass, a wide variety of factors should be considered
More informationIdentification and Control of Impressed Current Cathodic Protection System
Identification and Control of Impressed Current Cathodic Protection System Bassim N. Abdul Sada Ramzy S. Ali Khearia A. Mohammed Ali Electrical Eng. Department, Electrical Eng. Department, Electrical Eng.
More informationSECTION TRACER WIRE FOR NONMETALLIC PIPE
PART 1 GENERAL 1.1 DESCRIPTION A. The CONTRACTOR shall furnish and install a conductive tracer wire with all buried plastic water mains, services and appurtenances in accordance with the Water Utilities
More informationA NOVEL APPROACH TO NON-PIGGABLE SUBSEA PIPELINE INSPECTION
A NOVEL APPROACH TO NON-PIGGABLE SUBSEA PIPELINE INSPECTION S. Hartmann, Innospection Ltd., Aberdeen Dr. K. Reber, Innospection Germany GmbH, Stutensee, Germany A. Boenisch, Innospection Ltd., Aberdeen
More informationGRAPHICAL INTERFACE FOR EXPERIMENTAL ANALYSIS OF NONDESTRUCTIVE TESTING OF DRILL PIPES
GRAPHICAL INTERFACE FOR EXPERIMENTAL ANALYSIS OF NONDESTRUCTIVE TESTING OF DRILL PIPES Stan Ioana-Gabriela, Assistant lecturer, U.P.G. Ploiesti Niculae Georgrta-Claudia, Lecturer Dr., U.P.G. Ploiesti ABSTRACT:In
More information10x10 Trellis Pergola
0x0 Trellis Pergola ASSEMBLY GUIDE Ver.0-7 Table of Contents PAGE Introduction & Overview...................................................... Pergola Materials Overview..............................................................
More informationApplying Advanced Assessment Methodologies and Guided Wave Testing (GWT) on Difficult to Assess Segments
Applying Advanced Assessment Methodologies and Guided Wave Testing (GWT) on Difficult to Assess Segments Larry Legendre Williams Supervisor, Asset Integrity Center of Excellence (713) 215-2733 Larry.D.Legendre@Williams.com
More informationAMERICAN Ductile Iron Flex-Ring Joint Pipe Centrifugally Cast for Water, Sewage, or Other Liquids
AMERICAN Ductile Iron Flex-Ring Joint Pipe Centrifugally Cast for Water, Sewage, or Other Liquids 4-12 Flex-Ring Joint 14-54 Flex-Ring Joint AMERICAN Flex-Ring Restrained Joint Ductile Iron pipe, utilizing
More informationLab 11: Circuits. Figure 1: A hydroelectric dam system.
Description Lab 11: Circuits In this lab, you will study voltage, current, and resistance. You will learn the basics of designing circuits and you will explore how to find the total resistance of a circuit
More informationCONTINUING EDUC ATION
3 CONTINUING EDUC ATION FOR WISCONSIN ELECTRICIANS 2017 NEC Article 250 2 Hours WISCONSIN CONTRACTORS INSTITUTE N16 W23217 Stone Ridge Drive Suite 290 Waukesha, WI 53188 262-409-4282 www.wcitraining.com
More informationEMW-C and EMW-I NDT for Annulus and Internal Pipe Inspection
EMW-C and EMW-I NDT for Annulus and Internal Pipe Inspection WaveTrue Science + Technologies 504 El Paraiso Rd NE Albuquerque, NM 87113 CEO Ron Floit President John DeWees (888) 711-2532/ (212) 625-6622
More informationlimiting factor on the thread type used.
1 Definition The diameters, threads per inch (TPI) and thread pitch, etc. are necessary to completely identify a thread. In a shop, specialty gauges are required to accurately gauge or identify threads.
More informationSCREENING EFFICIENCY TESTER Model 271
SCREENING EFFICIENCY TESTER Model 271 Operating Manual 11/1/05 1 1.0 INTRODUCTION Conductive suits are worn by power company personnel for protection while performing maintenance on live wire transmission
More informationField test voltages for Fusion- Bonded Epoxy (FBE) coated steel pipe
APIA-RSC Seminar Wednesday 11 th June, 2008 Hyatt Hotel, Canberra Field test voltages for Fusion- Bonded Epoxy (FBE) coated steel pipe Mehdi Behrouzvaziri, Lex Edmond, Wayne Neil, Nolene Byrne, Stephen
More informationUPDATE REPORT 20 MONTHS AFTER TERMARUST OVERCOATING
UPDATE REPORT 20 MONTHS AFTER TERMARUST OVERCOATING High Pressure (5,000 psi) Water Wash Cleaning And Overcoating of a Historic (1915) truss bridge on Route 778 over the Middle River - in Augusta County,
More informationFoundation Specifications
Installation Instructions Bulletin 237746 Foundation Specifications for High-Wind 4.5-Meter Earth Station Antennas Revision C 1.0 INTRODUCTION 1.1 This document specifies typical foundation characteristics,
More informationDynatel 2250E/2273E Advanced Cable and Fault Locator
Dynatel 2250E/2273E Advanced Cable and Fault Locator Operators Manual September 1999 78-8097-6500-7-B TABLE OF CONTENTS Introduction... 2 Installing or Replacing the Batteries... 2 Initial Receiver Configuration...
More information1. ASME A Scheme for the Identification of Piping Systems.
SECTION 40 05 53 - IDENTIFICATION FOR PROCESS PIPING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Nameplates. 2. Tags. 3. Stencils. 4. Pipe markers. 5. Labels. 6. Lockout devices. B. Related Requirements:
More informationQuestion: My polarity switch appears to be defective. How can I replace it on my own?
Title: Replacing the polarity switch on an Axopatch 200B. Question: My polarity switch appears to be defective. How can I replace it on my own? Answer: This is a very difficult procedure. We highly recommend
More informationCIPS, DCVG & GPCM Pipeline Surveyor. Corrosion Control Equipment
CIPS, DCVG & GPCM Pipeline Surveyor Corrosion Control Equipment Electronic Pipeline Technology 153 Milos Road Richmond Hill, Ontario, Canada, L4C 0P8 Tel: (905) 918-0025 Fax: (905) 918-0033 www.ep-tech.ca
More informationOverview The Thomas & Betts Method is Better. Just Four Easy Steps to a Perfect Connection! Step 1. Step 2
Overview The Thomas & Betts Method is Better. The Thomas & Betts method of installing compression connectors on power cables is designed to provide a high degree of reliability in electrical wiring. This
More informationSTANDARD OPERATING PROCEDURES SOP:: 2057 PAGE: 1 of 6 REV: 0.0 DATE: 07/11/03
PAGE: 1 of 6 1.0 SCOPE AND APPLICATION 2.0 METHOD SUMMARY CONTENTS 3.0 SAMPLE PRESERVATION, CONTAINERS, HANDLING, AND STORAGE 4.0 INTERFERENCES AND POTENTIAL PROBLEMS 5.0 EQUIPMENT/APPARATUS 6.0 REAGENTS
More informationOceanside Outdoor Vinyl Shower Kit (3 x 3 Enclosure)
Oceanside Outdoor Vinyl Shower Kit ( x Enclosure) A B ASSEMBLY GUIDE REQUIRED FOR INSTALLATION (A) Zippity Post Extension for In-Ground Installation (Sold as 4-Packs) (B) Zippity Galvanized Steel Surface
More informationBattery Installation Controls and Displays Safety Initial Setup Guidelines Level Setup Slope setup...
PRO SHOTTMTM Slope Lasers AS2 \ AS2 MAGNUM Operations Guide Introduction Thank you for purchasing a Pro ShotTM AS2 or AS2 MAGNUM laser system. You now have superior laser accuracy and productivity available
More informationBi-partite gouge auger model P
Bi-partite gouge auger model P Manual Meet the difference Eijkelkamp Soil & Water Nijverheidsstraat 30, 6987 EM Giesbeek, the Netherlands T +31 313 880 200 E info@eijkelkamp.com I www.eijkelkamp.com 2018-07
More informationTEGAM INC. MODEL DSRS-5DA DECADE SYNCO/RESOLVER STANDARD
TEGAM INC. MODEL DSRS-5DA DECADE SYNCO/RESOLVER STANDARD Instruction Manual PN# 500783-349 Publication Date: Novermber 2007 REV. A NOTE: This user s manual was as current as possible when this product
More informationThe CTRM Newsletter. The Motley Fool for the CT Industry? Why CTRM? February 2008 Issue
February 2008 Issue 2008-1 Coiled Tube Resource Management (281) 657-3333 The Motley Fool for the CT Industry? This is our first newsletter. We want to make it both interesting and informative. The Motley
More informationSECTION HELICAL PILES AND HELICAL ANCHORS
PART 1 GENERAL 1.01 Description SECTION 31 66 13 HELICAL PILES AND HELICAL ANCHORS This work pertains to furnishing and installing Helical Piles, Helical Anchors, and Bracket Assemblies shown in the Contract
More informationModel R7900. Instruction Manual. Ultrasonic Thickness Gauge. reedinstruments. www. com
Model R7900 Ultrasonic Thickness Gauge Instruction Manual reedinstruments com Table of Contents Features... 3 Specifications...4-5 Instrument Description... 6 Operating Instructions...7-10 Adjusting the
More informationElectronic Pipeline Technology Ltd
Electronic Pipeline Technology Ltd www.ep-tech.ca E-mail: sales@ep-tech.ca Dear valued customers, Corrosion is a serious problem for pipelines and costs money. As you well know, cathodic protection is
More informationH O O P RAC K. Simple Security
H O O P RAC K Simple Security The Hoop Rack is a proven design that provides high security and easy bike parking. The Hoop Rack uses thick pipe construction and the full radius of the bend makes the Hoop
More informationDACON INSPECTION SERVICES I MFL INSPECTION OF PIPELINES
I MFL INSPECTION OF PIPELINES DACON AND INLINE INSPECTION Dacon well-known for pipeline inspection solutions using UT, MFL and LRUT UT tools provide unrivaled inspection accuracy compared to MFL Wide variety
More informationMODEL PD PEARSON DETECTOR
MODEL PD PEARSON DETECTOR FIVE SECTIONS of QUICK INFORMATION I. Model PD Functions II. Operation Methods III. Apparatus IV. Instructions for Unpacking & Inspection V. Operating Instructions TINKER & RASOR
More informationOHM S LAW. Ohm s Law The relationship between potential difference (V) across a resistor of resistance (R) and the current (I) passing through it is
OHM S LAW Objectives: a. To find the unknown resistance of an ohmic resistor b. To investigate the series and parallel combination of resistors c. To investigate the non-ohmic resistors Apparatus Required:
More informationINGAA Foundation Workshop - Industry Initiatives Regarding Welding of Field Segmented Induction Bends and Elbows for Pipeline Construction
INGAA Foundation Workshop - Industry Initiatives Regarding Welding of Field Segmented Induction Bends and Elbows for Pipeline Construction October 20, 2011 Steve Rapp, P.E. Spectra Energy Transmission
More informationCORRIGENDUM ADDENDUM NO. 04 DATED TO TENDER NO. SDG5327P18/09 DATED
MATERIALS DEPARTMENT P.O. DULIAJAN-786602 DIST. DIBRUGARH ASSAM, INDIA PHONE: 0374-2808724 FAX: 0374-2800533 E-MAIL: mmfd1@oilindia.in CORRIGENDUM ADDENDUM NO. 04 DATED 06.10.2017 TO TENDER NO. SDG5327P18/09
More informationDowntown Rack. Custom logo option available
Custom logo option available Downtown Rack The Downtown Rack uses thick, square-tube construction that can t be cut with a pipe cutter. The extended width of the Downtown Rack makes for easy bike parking
More information1. ANSI/ASME Standard B , Square and Hex Bolts and Screws, Inch Series
SECTION 31 66 13 HELICAL PILES AND HELICAL ANCHORS PART 1 - GENERAL 1.1 DESCRIPTION A. This work pertains to furnishing and installing Helical Piles and Bracket Assemblies shown in the Contract in accordance
More informationDevice Interconnection
Device Interconnection An important, if less than glamorous, aspect of audio signal handling is the connection of one device to another. Of course, a primary concern is the matching of signal levels and
More informationREV A.1 CMCP810PC SERIES RUNOUT KIT INSTRUCTION MANUAL STI VIBRATION MONITORING INC
REV A.1 CMCP810PC SERIES RUNOUT KIT INSTRUCTION MANUAL STI VIBRATION MONITORING INC WWW.STIWEB.COM About the Runout Kit The CMCP810PC Series Electrical Runout Kit uses industry standard sensors to detect
More informationWhat is Precision Technology?
Using Precision Technology for Application of Fertilizer and Herbicides Dana Ritenour Chemical Containers Inc. What is Precision Technology? * Ability to apply different amounts of inputs to specific points
More informationSECTION IDENTIFICATION OF PLUMBING, PIPING AND EQUIPMENT. A. Section includes nameplates, tags, stencils and pipe markers.
SECTION 22 05 53 IDENTIFICATION OF PLUMBING, PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section includes nameplates, tags, stencils and pipe markers. B. Related Sections: 1. Section 09 05 00
More informationSwerve Rack CUSTOM RACKS AVAILABLE
CUSTOM RACKS AVAILABLE Swerve Rack The design of the Swerve mirrors the bike frame, thus providing superior bike support while making it easy to secure both the bike frame and wheel with a standard u-lock.
More information