AC Voltage- Pipeline Safety and Corrosion MEA 2015

Size: px
Start display at page:

Download "AC Voltage- Pipeline Safety and Corrosion MEA 2015"

Transcription

1 AC Voltage- Pipeline Safety and Corrosion MEA 2015

2 WHAT ARE THE CONCERNS ASSOCIATED WITH AC VOLTAGES ON PIPELINES? AC concerns Induced AC Faults Lightning Capacitive coupling Safety Code Induced AC Corrosion Induced AC Mitigation 2 INSERT TITLE OF PRESENTATION HERE

3 AC CONCERNS 3 INSERT TITLE OF PRESENTATION HERE

4 TYPICAL HIGH VOLTAGE AC LINE CONSTRUCTION Note: * Phases * Shield wires 4 INSERT TITLE OF PRESENTATION HERE

5 TYPICAL HIGH VOLTAGE AC LINE CONSTRUCTION 5 INSERT TITLE OF PRESENTATION HERE

6 INDUCED AC I 1 I 2 6 INSERT TITLE OF PRESENTATION HERE

7 FAULTS & LIGHTNING Faults A fault occurs when a path from phase to ground is introduced such that the full current available in the circuit flows to ground. This is a particular concern for lines on steel towers should the fault occur between a phase and the tower High voltage transmission lines typically do not have a neutral to carry full fault current Lightning Lighting can strike a phase or shield wire and be introduced into the ground through a tower or ground rod 7 INSERT TITLE OF PRESENTATION HERE

8 SAFETY (1) 8 INSERT TITLE OF PRESENTATION HERE

9 AC VOLTAGE AND SAFETY 9 INSERT TITLE OF PRESENTATION HERE

10 SAFETY Dry soils, dry shoes, and dry gloves can alter tolerable touch voltage levels. Voltage that might go undetected under dry conditions may give a nasty shock on a wet day. 10 INSERT TITLE OF PRESENTATION HERE

11 ADDITIONAL SHOCK RISKS Workers can still accidentally contact the pipeline, even after it s in the trench. Cathodic protection tests leads can give a shock. The same applies for other aboveground appurtenances such as valves, casing vents, fences, etc. When cutting pipe, a worker doesn t feel the current, so he believes he is safe. As soon as he separates the pipe the current may run through his body. He could be shocked and seriously injured. Adequate bonding across the point to be cut will eliminate the hazard, bond before starting the cut. Working aboveground pipes that are not electrically continuous, such as isolated flanges, joints, unions, or couplings. Putting his hands across the isolator could a worker s body a path for any current present on the pipeline 11 INSERT TITLE OF PRESENTATION HERE

12 LIGHTNING 12 INSERT TITLE OF PRESENTATION HERE

13 LIGHTNING 13 INSERT TITLE OF PRESENTATION HERE

14 GROUND FAULT 14 INSERT TITLE OF PRESENTATION HERE

15 GROUND FAULT OR INDUCED AC 15 INSERT TITLE OF PRESENTATION HERE

16 16 INSERT TITLE OF PRESENTATION HERE

17 SAFETY SUMMARY During construction, aboveground sections can be made safe with a simple temporary grounding and bonding. Measurements should be recorded prior to performing any work to ensure everyone s safety. Communications and measurements are required along the spread during construction because conditions may change as the installation progresses. Warning signs should be posted and RED ZONES clearly designated, including at electrical power system crossings. Both NACE SP0177 and CAN/CSA-C22.3 No.6-M91 recognize 15 V as a potential shock hazard. Check the weather forecast prior to beginning work. Work should be stopped when lightning activity is present. 17 INSERT TITLE OF PRESENTATION HERE

18 CAPACITIVE COUPLING When underground metallic pipelines are in close proximity to HVAC transmission lines, there are three ways in which HVAC can influence pipelines. [4] Capacitive coupling occurs between two conductors that are separated by a dielectric.. The power lines are one conductor, the air is the dielectric, and the pipeline is the other conductor. The electrical charge from the power line conductors is transferred into the pipeline over time. Once a pipeline is buried, the impacts of capacitive coupling to the pipeline are typically negligible. When the pipeline is isolated above ground during construction, hazardous charges can accumulate on the pipeline. 18 INSERT TITLE OF PRESENTATION HERE

19 RESISTIVE COUPLING (FAULTS OR LIGHTNING) Resistive coupling between the power line and pipeline occurs when the power line transmits an electrical charge directly into the earth at grounded structures. This is short duration occurrence that is not typical of proper system operation, but it may occur during lightning strikes and electrical transmission fault scenarios. When this charge is transmitted into the soil near a pipeline, the pipeline can provide a lower resistance path. The current pickup and return locations for this charge can result in coating damage and rapid metal loss. 19 INSERT TITLE OF PRESENTATION HERE

20 INDUCTIVE COUPLING Inductive coupling occurs as a result of the electromagnetic field (EMF) that is created around the electric conductors in the HVAC system. Each conductor creates an EMF with a direction and magnitude that are related to the direction and magnitude of the alternating current (AC) flow in the conductor. If the pipeline is the area of influence for the EMF, the EMF will induce an alternating current on the pipeline. Inductive coupling is primarily of concern on electric power lines with voltage ratings of 69 kv or higher, however severe phase imbalances on electric lines with lower voltage ratings can result in significant AC interference on a pipeline 20 INSERT TITLE OF PRESENTATION HERE

21 THE IMPACT OF HVAC ON PIPELINES AC interference can impact all types of metallic pipeline including petroleum liquids, natural gas, water, and wastewater.. The industry has been aware of this issue for decades but in recent years, both the frequency and the magnitude of occurrences seems to be increasing. Induced AC interference appears to b eon the rise with the increased emphasis on collocation of pipelines and HVAC power transmission lines coupled with increasing transmission currents Improved pipeline coating quality on new pipelines 21 INSERT TITLE OF PRESENTATION HERE

22 FACTORS INFLUENCING INDUCED AC The amount of AC that is induced onto the pipeline is influenced by several factors. The information listed in Table 1 is not meant to be all inclusive of the influencing factors, and is only presented as a general representation of system influence. Table 1: Impact of System Properties on Induced AC Voltage Property Change Impact to the Magnitude of Induced AC on the Pipeline Soil Resistivity Increases Increases* Pipeline Coating Resistance Increases Increases Pipeline Outside Diameter Decreases Increases HVAC Current Load Increases Increases Distance between the Tower and Pipeline Decreases Increases Length of Collocation Increases Increases *Soil resistivity will have the opposite relationship with AC density. 22 INSERT TITLE OF PRESENTATION HERE

23 Discharge of AC at the pipe to soil interface can result in accelerated corrosion that is detrimental to the integrity of the pipeline 23 INSERT TITLE OF PRESENTATION HERE

24 COATING DEFECT SIZE IMPACT ON CORROSION RATE The size of the coating defect is critical. While large coating defects are of concern related to the application of cathodic protection and remediation of typical galvanic corrosion, the opposite is of concern related to AC corrosion. Large defects can behave more as a grounding effect. Small defects, generally estimated to be 1 cm 2, are the greatest risk as the AC discharge density is focused and more likely to cause accelerated corrosion. This is especially true in lower resistivity soils. 24 INSERT TITLE OF PRESENTATION HERE

25 AC CORROSION STANDARDS Current Density 0 to 20 A/m 2 (0 to 2 ma/cm 2 ) 20 to 100 A/m 2 (2 to 10 ma/cm 2 ) Greater than 100 A/m 2 (Greater than 10 ma/cm 2 ) Table 2: Current Density Likelihood of AC Corrosion Low or Unlikely Medium or Unpredictable High or Anticipated NACE has established TG 430 with the task of publishing criteria for AC corrosion. At the time of this writing, this task group has not published any criteria but has given consideration to the information included in the NACE State of the Art Publication 35110, EN :2013, and PRCI Member Study PR These documents generally discus AC density criteria in the range of 10 A/m 2 to 30 A/m 2 with consideration for excursion above these criteria if specific DC density criterion is maintained. 25 INSERT TITLE OF PRESENTATION HERE

26 CALCULATING AC CURRENT DENSITY The calculation for estimating the AC density at a holiday is listed below. where: i AC = 8V AC ρπd Equation 1 i AC = AC density at a coating holiday in amps per square meter [A/m 2 ] V AC = AC voltage of the pipeline to remove earth in volts [V] ρ = soil resistivity in ohm meters [Ω-m] d = diameter of circular holiday having an area equal to that of the actual holiday in meters [m] 26 INSERT TITLE OF PRESENTATION HERE

27 Measuring Current Density with Coupon Test Stations A coupon test station typically consists of two coupons. One coupon is usually referred to as the protected or CP coupon, and the other commonly called the native coupon. T The protected coupon is electrically connected to the pipeline, while the native coupon is not. Since the coupon size is known, measuring the AC discharge through the protected coupon is an effective way of determining the AC density. Coupon test stations are designed to represent the environments the pipeline are in. Therefore, they should be installed close to the pipeline, and in the same soil environment as the pipeline. 27 INSERT TITLE OF PRESENTATION HERE

28 Remote Monitoring of Test Stations In areas where AC interference is a concern, continuous remote monitoring of test stations is recommended. Because HVAC transmission loads can vary throughout the day, week, and seasons as supply and demand fluctuate, it is appropriate for the coupon test station monitoring the effects of the AC interference to be remotely monitored. There are many industry products available to remotely monitor coupon test stations. These products are generally battery powered, with batteries that are designed to last multiple years. These remote monitors can be configured to take AC density and AC voltage readings, as well as many other cathodic protection related measurements, at coupon test stations. Typically, the measurement frequency can be adjusted to be suitable for various applications 28 INSERT TITLE OF PRESENTATION HERE

29 Communication with the Power Companies To perform AC interference calculations and mitigation system design, information is required from the company operating the power lines suspected of causing AC interference on the pipeline. Typically, the pipeline company submits an inquiry form to the power company requesting design characteristics of the power line system. Typical items of interest are listed below. Plan and profile drawings for the power line systems. Electronic system maps that can be used in conjunction with electronic pipeline maps to improve work process efficiency. Design ratings such as maximum and emergency load ratings Design materials conductor types, insulator types, and shield wire types Design geometries such as tower configurations and phase arrangements Fault currents 29 INSERT TITLE OF PRESENTATION HERE

30 Establishing Design Parameters There is no current industry standard to establish design parameters for AC mitigation but design considerations include the following: Power line current load limit; average, peak, or emergency loads may be used. Circuit configurations; many power lines contain two circuits that can be operated independently of one another. The effect of an individual circuit in operation may be worse than if both circuits are in operation. The opposite is also true. Fault current; the magnitude and duration of a fault can vary with depending on the type of fault. AC voltage criterion; the limit is often set at 15 V AC, but some situation may require lower criterion. AC current density criterion; the limit for the maximum allowable current density will need to be established 30 INSERT TITLE OF PRESENTATION HERE

31 AC Interference Modeling Computer modeling is required to predict AC interference on a pipeline. In addition to the information obtained from the power company, pipeline and environmental properties are needed. The typical pipeline information includes: Pipeline diameter and wall thickness Coating and coating quality Location relative to the power lines Location of any electrical isolation joints. 31 INSERT TITLE OF PRESENTATION HERE

32 AC Mitigation System Using the computer model, a mitigation system can be designed to reduce the AC interference to levels below the established criterion at the established design conditions. AC mitigation systems are typically comprised of a combination of grounding systems designed to provide a parallel path to ground for the induced AC on the pipeline. Gradient control mats can also be used in specific locations to mitigate step and touch hazards. If gradient control mats are used at stations that require grounding for other purposes, a common ground must be established between the gradient mat system and the station grounding systems. 32 INSERT TITLE OF PRESENTATION HERE

33 AC CORROSION SUMMARY An increase in collocation of power lines and pipelines combined with increased AC system loads may increase the amount of AC interference on pipelines. This interference can become hazardous if the step and touch voltages exceed established criterion, AC discharge caused by AC interference results in accelerated corrosion of the pipeline. The industry accepted method for measuring AC corrosion risk is AC current density, which can be measured with coupon test stations. 33 INSERT TITLE OF PRESENTATION HERE

34 AC CORROSION SUMMARY In situations where AC interference is suspected, industry has access to technology, such as remote monitored coupon test stations, processes, such as computer modeling, that can assess the hazards associated with AC interference. In areas where pipelines are found to have voltages or current densities above the established criterion, it is advisable to consider application of such technologies and processes to install effective AC mitigation systems. 34 INSERT TITLE OF PRESENTATION HERE

35 SOURCES (1) Some Safety Considerations for Pipelines Near Overhead Power Lines, NACE, INSERT TITLE OF PRESENTATION HERE

36 To insert the presentation title in the footer: 1. Click View, Master, Slide Master. 2. On slide 1, click the text at the bottom of the slide and replace with the presentation title. (You do not need to do anything with the # symbol; the # symbol generates the slide numbering.) 3. Click View, Normal. 4. Delete this slide and insert a New Slide. 36 INSERT TITLE OF PRESENTATION HERE

ECDA to assess possibility of AC Corrosion. Mark Yunovich Honeywell Corrosion Solutions January 27 th, 2009

ECDA to assess possibility of AC Corrosion. Mark Yunovich Honeywell Corrosion Solutions January 27 th, 2009 ECDA to assess possibility of AC Corrosion Mark Yunovich Honeywell Corrosion Solutions January 27 th, 2009 What are we talking about today? Assessing the degree of AC interference at the pipeline level

More information

What Are We Protecting? Over-Voltage Protection for CP Systems. Personnel (primary) Equipment (secondary)

What Are We Protecting? Over-Voltage Protection for CP Systems. Personnel (primary) Equipment (secondary) What Are We Protecting? Personnel (primary) Equipment (secondary) Over-Voltage Protection for CP Systems Personnel Protection: Touch Potential Personnel Protection: Step Potential Equipment Protection

More information

ENGINEERING REPORT PHASES I & II MITIGATOR PERFORMANCE TESTS

ENGINEERING REPORT PHASES I & II MITIGATOR PERFORMANCE TESTS ENGINEERING REPORT PHASES I & II MITIGATOR PERFORMANCE TESTS INDUCED AC MITIGATION PERFORMANCE ON A STEEL GAS TRANSMISSION PIPELINE REPORT OF JANUARY 29, 2014 Copyright MATCOR, Inc. 2014 MITIGATOR TM VS.

More information

AC Interference Corrosion, Corrosive Soil, Design Issues, Zinc Ribbon and Corrosion Mitigation

AC Interference Corrosion, Corrosive Soil, Design Issues, Zinc Ribbon and Corrosion Mitigation Paper No. 12828 AC Interference Corrosion, Corrosive Soil, Design Issues, Zinc Ribbon and Corrosion Mitigation Mehrooz Zamanzadeh, Peyman Taheri, and George T. Bayer Matergenics, Inc. 100 Business Center

More information

PIPELINE CORROSION RISKS ASSOCIATED WITH AC VOLTAGES

PIPELINE CORROSION RISKS ASSOCIATED WITH AC VOLTAGES Fact File No 1 PIPELINE CORROSION RISKS ASSOCIATED WITH AC VOLTAGES Cathodic Protection Co Ltd INTRODUCTION This document discusses corrosion that is believed to be caused by AC current flowing from (i.e.

More information

Monitoring DC Decoupling Devices at Isolation Flanges for Compliance and Pipeline Integrity

Monitoring DC Decoupling Devices at Isolation Flanges for Compliance and Pipeline Integrity Monitoring DC Decoupling Devices at Isolation Flanges for Compliance and Pipeline Integrity Jamey Hilleary Director of M2M Products Elecsys Corporation Jerry Dewitt Senior Cathodic Protection Specialist

More information

Field Instruction. Induced voltages can occur in overhead lines, underground cables, or in switchyards.

Field Instruction. Induced voltages can occur in overhead lines, underground cables, or in switchyards. 8.3 Induced Voltage Purpose The purpose of this instruction is to provide awareness of Electrostatic and Electromagnetic induced voltages and the method required to reduce or eliminate it. An induced voltage

More information

Earthing of Electrical Devices and Safety

Earthing of Electrical Devices and Safety Earthing of Electrical Devices and Safety JOŽE PIHLER Faculty of Electrical Engineering and Computer Sciences University of Maribor Smetanova 17, 2000 Maribor SLOVENIA joze.pihler@um.si Abstract: - This

More information

Static Stray DC Current Interference Testing

Static Stray DC Current Interference Testing Static Stray DC Current Interference Testing Period 6 Intermediate Corrosion Course 2017 February 21-23, 2017 Mike Placzek ARK Engineering 1 February 21-23, 2017 Mike Placzek ARK Engineering 2 Agenda What

More information

Analysis of the Electromagnetic Interferences between Overhead Power Lines and Buried Pipelines

Analysis of the Electromagnetic Interferences between Overhead Power Lines and Buried Pipelines Mediterranean Journal of Modeling and Simulation MJMS 1 (214) 13 23 Analysis of the Electromagnetic Interferences between Overhead Power Lines and Buried Pipelines M hamed Ouadah a*, Mourad Zergoug b a

More information

Standard Recommended Practice. Mitigation of Alternating Current and Lightning Effects on Metallic Structures and Corrosion Control Systems

Standard Recommended Practice. Mitigation of Alternating Current and Lightning Effects on Metallic Structures and Corrosion Control Systems NACE Standard RP0177-2000 Item No. 21021 Standard Recommended Practice Mitigation of Alternating Current and Lightning Effects on Metallic Structures and Corrosion Control Systems This NACE International

More information

Technical Seminar for Cathodic Protection to GOGC Design Unit Specialists. Dr. Nick Kioupis, Cathodic & Lightning Protection Section Head, DESFA

Technical Seminar for Cathodic Protection to GOGC Design Unit Specialists. Dr. Nick Kioupis, Cathodic & Lightning Protection Section Head, DESFA Technical Seminar for Cathodic Protection to GOGC Design Unit Specialists Dr. Nick Kioupis, Cathodic & Lightning Protection Section Head, DESFA Photo of a typical T/R cabinet Impressed current stations

More information

Instant-Off (I-O) Measurements on Decoupled Systems

Instant-Off (I-O) Measurements on Decoupled Systems Instant-Off (I-O) Measurements on Decoupled Systems Important Considerations What Is A Decoupler? A device that has a very low impedance to ac current but blocks the flow of dc current up to a predetermined

More information

OVERCOMING THE NEW THREAT TO PIPELINE INTEGRITY - AC CORROSION ASSESSMENT AND ITS MITIGATION -

OVERCOMING THE NEW THREAT TO PIPELINE INTEGRITY - AC CORROSION ASSESSMENT AND ITS MITIGATION - 23rd World Gas Conference, Amsterdam 2006 OVERCOMING THE NEW THREAT TO PIPELINE INTEGRITY - AC CORROSION ASSESSMENT AND ITS MITIGATION - Main author Y. Hosokawa JAPAN ABSTRACT AC corrosion risk on gas

More information

INTEGRATED METHOD IN ELECTROMAGNETIC INTERFERENCE STUDIES

INTEGRATED METHOD IN ELECTROMAGNETIC INTERFERENCE STUDIES INTEGRATED METHOD IN ELECTROMAGNETIC INTERFERENCE STUDIES Jinxi Ma and Farid P. Dawalibi Safe Engineering Services & technologies ltd. 1544 Viel, Montreal, Quebec, Canada, H3M 1G4 Tel.: (514) 336-2511

More information

ACCURATE SIMULATION OF AC INTERFERENCE CAUSED BY ELECTRICAL POWER LINES: A PARAMETRIC ANALYSIS

ACCURATE SIMULATION OF AC INTERFERENCE CAUSED BY ELECTRICAL POWER LINES: A PARAMETRIC ANALYSIS ACCURATE SIMULATION OF AC INTERFERENCE CAUSED BY ELECTRICAL POWER LINES: A PARAMETRIC ANALYSIS J. Liu and F. P. Dawalibi Safe Engineering Services & technologies ltd. 1544 Viel, Montreal, Quebec, Canada

More information

60Hz Ratings. Typical Applications. Features & Characteristics. Ratings

60Hz Ratings. Typical Applications. Features & Characteristics. Ratings The PCR is a solid-state device designed to simultaneously provide DC isolation and AC continuity/grounding when used with cathodically protected structures, such as pipelines, tanks, grounding systems,

More information

Industrial and Commercial Power Systems Topic 7 EARTHING

Industrial and Commercial Power Systems Topic 7 EARTHING The University of New South Wales School of Electrical Engineering and Telecommunications Industrial and Commercial Power Systems Topic 7 EARTHING 1 INTRODUCTION Advantages of earthing (grounding): Limitation

More information

Examples of Design for Cathodic Protection Systems

Examples of Design for Cathodic Protection Systems Examples of Design for Cathodic Protection Systems CURRENT REQUIREMENTS From Estimated Exposed Surface Area Estimating current requirements from expected exposed surface is always subject to error. There

More information

CHAPTER 15 GROUNDING REQUIREMENTS FOR ELECTRICAL EQUIPMENT

CHAPTER 15 GROUNDING REQUIREMENTS FOR ELECTRICAL EQUIPMENT CHAPTER 15 GROUNDING REQUIREMENTS FOR ELECTRICAL EQUIPMENT A. General In a hazardous location grounding of an electrical power system and bonding of enclosures of circuits and electrical equipment in the

More information

National Radio Astronomy Observatory Socorro, NM EVLA Memorandum 41 Lightning Protection for Fiber Optic Cable. T. Baldwin June 05, 2002

National Radio Astronomy Observatory Socorro, NM EVLA Memorandum 41 Lightning Protection for Fiber Optic Cable. T. Baldwin June 05, 2002 National Radio Astronomy Observatory Socorro, NM 87801 EVLA Memorandum 41 Lightning Protection for Fiber Optic Cable T. Baldwin June 05, 2002 Summary Double-armor triple-sheath fiber optic cable will be

More information

TRANSACTION RECORD TR

TRANSACTION RECORD TR COMMON GROUND ALLIANCE BEST PRACTICES COMMITTEE Proposal Form Revision to Best Practice Name: Ralph Graeser Date: 03/09/2015 Affiliation: PA PUC/NAPSR/GPTC Member. Phone: 717-554-3666 E-Mail: rgraeser@pa.gov

More information

MODERN COMPUTATIONAL METHODS FOR THE DESIGN AND ANALYSIS OF POWER SYSTEM GROUNDING

MODERN COMPUTATIONAL METHODS FOR THE DESIGN AND ANALYSIS OF POWER SYSTEM GROUNDING MODERN COMPUTATIONAL METHODS FOR THE DESIGN AND ANALYSIS OF POWER SYSTEM GROUNDING J. Ma and F. P. Dawalibi Safe Engineering Services & technologies ltd. 1544 Viel, Montreal, Quebec, Canada, H3M 1G4 Tel.:

More information

Importance of Grounding in Power System. Presented by Mr. H Jayakumar Ex- Joint Director CPRI

Importance of Grounding in Power System. Presented by Mr. H Jayakumar Ex- Joint Director CPRI Importance of Grounding in Power System Presented by Mr. H Jayakumar Ex- Joint Director CPRI OBJECT OF EARTHING Prime Object of Earthing is to Provide a Zero Potential Surface in and around and under the

More information

Increasing the Cost-Effectiveness of AC Interference Mitigation Designs with Integrated Electromagnetic Field Modeling

Increasing the Cost-Effectiveness of AC Interference Mitigation Designs with Integrated Electromagnetic Field Modeling Increasing the Cost-Effectiveness of AC Interference Mitigation Designs with Integrated Electromagnetic Field Modeling R. D. Southey, Eng. F. P. Dawalibi, Eng., Ph.D. Y. Li, B.Sc, M.Sc. W. Ruan, Ph.D.

More information

EMC Philosophy applied to Design the Grounding Systems for Gas Insulation Switchgear (GIS) Indoor Substation

EMC Philosophy applied to Design the Grounding Systems for Gas Insulation Switchgear (GIS) Indoor Substation EMC Philosophy applied to Design the Grounding Systems for Gas Insulation Switchgear (GIS) Indoor Substation Marcos Telló Department of Electrical Engineering Pontifical Catholic University of Rio Grande

More information

PRACTICAL PROBLEMS WITH SUBSTATION EARTHING

PRACTICAL PROBLEMS WITH SUBSTATION EARTHING 1 PRACTICAL PROBLEMS WITH SUBSTATION EARTHING Dr Hendri Geldenhuys Craig Clark Eskom Distribution Technology This paper considers the issues around substation sites where the soil resistivity is of particularly

More information

from ocean to cloud LAND CABLE INTERFERENCE MODEL AND CABLE CROSSINGS WITH POWER INTERCONNECTS

from ocean to cloud LAND CABLE INTERFERENCE MODEL AND CABLE CROSSINGS WITH POWER INTERCONNECTS LAND CABLE INTERFERENCE MODEL AND CABLE CROSSINGS WITH POWER INTERCONNECTS Mr. Ritesh Dass (Cable&Wireless Worldwide) Email: ritesh.dass@cw.com Cable&Wireless Worldwide, 32-43 Chart Street, London, N1

More information

Outdoor Installation 2: Lightning Protection and Grounding

Outdoor Installation 2: Lightning Protection and Grounding Outdoor Installation 2: Lightning Protection and Grounding Training materials for wireless trainers This one hour talk covers lightning protection, grounding techniques and problems, and electrolytic incompatibility.

More information

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-I) UNDERGROUND NETWORK GROUNDING. Rev. 01

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-I) UNDERGROUND NETWORK GROUNDING. Rev. 01 SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-I) UNDERGROUND NETWORK GROUNDING Rev. 01 This specification is property of SEC and subject to change or modification without any notice

More information

1 Comparison of Approaches (SESTLC, ROW & HIFREQ) for AC Interference Study

1 Comparison of Approaches (SESTLC, ROW & HIFREQ) for AC Interference Study 1 Comparison of Approaches (SESTLC, ROW & HIFREQ) for AC Interference Study 1 Comparison of Approaches (SESTLC, ROW & HIFREQ) for AC Interference Study 1.1 Introduction Yexu Li and Simon Fortin Three independent

More information

Electric Power Systems Research

Electric Power Systems Research Electric Power Systems Research 94 (2013) 54 63 Contents lists available at SciVerse ScienceDirect Electric Power Systems Research j ourna l ho me p a ge: www.elsevier.com/locate/epsr Calculation of overvoltage

More information

(IDC) INTEGRATED DATA COLLECTION TECHNOLOGY. Presented by: Kevin Pastotnik

(IDC) INTEGRATED DATA COLLECTION TECHNOLOGY. Presented by: Kevin Pastotnik (IDC) INTEGRATED DATA COLLECTION TECHNOLOGY Presented by: Kevin Pastotnik Definition and Brief History to the Need INTEGRATED DATA COLLECTION TECHNOLOGY What is IDC? IDC is an external assessment tool

More information

Evaluating Step and Touch Potential Risks on Earthing Systems of High Voltage Cable Systems TP, THINUS DU PLESSIS ESKOM SOUTH AFRICA HJ, HARTMUT JAGAU

Evaluating Step and Touch Potential Risks on Earthing Systems of High Voltage Cable Systems TP, THINUS DU PLESSIS ESKOM SOUTH AFRICA HJ, HARTMUT JAGAU Technology solutions and innovations for developing economies Evaluating Step and Touch Potential Risks on Earthing Systems of High Voltage Cable Systems TP, THINUS DU PLESSIS ESKOM SOUTH AFRICA HJ, HARTMUT

More information

Safety earthing. Sector Energy PTI NC. Copyright Siemens AG All rights reserved. Theodor Connor

Safety earthing. Sector Energy PTI NC. Copyright Siemens AG All rights reserved. Theodor Connor Safety earthing Sector Energy PTI NC Theodor Connor Copyright Siemens AG 2008. All rights reserved. Content Introduction Theoretical background Soil Analysis Design of earthing system Measurements on earthing

More information

Grounding and Lightning arrestors

Grounding and Lightning arrestors CHAPTER - Four Grounding and Lightning arrestors 4.1. Introduction Electrical connection of neutral point of a supply system or the non current carrying part of electrical equipments to the general mass

More information

Fatima Michael college of Engineering and Technology

Fatima Michael college of Engineering and Technology Fatima Michael college of Engineering and Technology DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING EE2303 TRANSMISSION AND DISTRIBUTION SEM: V Question bank UNIT I INTRODUCTION 1. What is the electric

More information

PRELIMINARIES. Generators and loads are connected together through transmission lines transporting electric power from one place to another.

PRELIMINARIES. Generators and loads are connected together through transmission lines transporting electric power from one place to another. TRANSMISSION LINES PRELIMINARIES Generators and loads are connected together through transmission lines transporting electric power from one place to another. Transmission line must, therefore, take power

More information

Exhibit DD Specific Standards for Transmission Lines. Boardman to Hemingway Transmission Line Project

Exhibit DD Specific Standards for Transmission Lines. Boardman to Hemingway Transmission Line Project Specific Standards for Transmission Lines Boardman to Hemingway Transmission Line Project West Idaho Street Boise, Idaho 0 Mark Stokes, Project Leader Zach Funkhouser, Permitting (0) - (0) - mstokes@idahopower.com

More information

CONTINUING EDUC ATION

CONTINUING EDUC ATION 3 CONTINUING EDUC ATION FOR WISCONSIN ELECTRICIANS 2017 NEC Article 250 2 Hours WISCONSIN CONTRACTORS INSTITUTE N16 W23217 Stone Ridge Drive Suite 290 Waukesha, WI 53188 262-409-4282 www.wcitraining.com

More information

Safety Issues Caused by High Earth Resistance and Identifying Them Using Instruments

Safety Issues Caused by High Earth Resistance and Identifying Them Using Instruments Safety Issues Caused by High Earth Resistance and Identifying Them Using Instruments Thomas Szollossy Senior Technical Support Engineer Power Quality Thailand PQSynergy 2017, Chiang Mai, Thailand Introduction

More information

Underground System Design TADP 547

Underground System Design TADP 547 Underground System Design TADP 547 Industry Standards, Specifications and Guides Presentation 6.4 Instructor: Frank Frentzas Industry Organizations Several professional organizations develop standards

More information

A PARAMETRIC ANALYSIS OF AC INTERFERENCE CAUSED BY HIGH VOLTAGE POWER LINES ON NEIGHBORING RAILROAD TRACKS

A PARAMETRIC ANALYSIS OF AC INTERFERENCE CAUSED BY HIGH VOLTAGE POWER LINES ON NEIGHBORING RAILROAD TRACKS A PARAMETRIC ANALYSIS OF AC INTERFERENCE CAUSED BY HIGH VOLTAGE POWER LINES ON NEIGHBORING RAILROAD TRACKS Yexu Li and Farid Paul Dawalibi Safe Engineering Services & technologies ltd. 1544 Viel, Montreal,

More information

American Electrical Institute

American Electrical Institute American Electrical Institute Oregon Electricians Continuing Education Grounding & Bonding (Article 250) 4 Hours American Electrical Institute PO Box 31131 Spokane, WA 99223 www.aeitraining.com Article

More information

DCVG Coating Survey Data Sheet

DCVG Coating Survey Data Sheet DCVG Coating Survey Data Sheet DCVG COATING DEFECT SURVEYS Today, DC voltage gradient surveys have evolved as an accurate and economic means of locating coating defects. When a DC current is applied to

More information

Webinar: An Effective Arc Flash Safety Program

Webinar: An Effective Arc Flash Safety Program Webinar: An Effective Arc Flash Safety Program Daleep Mohla September 10 th, 2015: 2pm ET Agenda Arc Flash Defined and Quantified NFPA 70E / CSA Z 462 - Recent Updates What is the ANSI Z10 Hierarchy of

More information

Power Quality. Case Study. Conrad Bottu Laborelec January 2008

Power Quality. Case Study. Conrad Bottu Laborelec January 2008 Case Study Electromagnetic compatibility (EMC) study Breakdown of low voltage electronic equipment in a 25 kv substation Conrad Bottu Laborelec January 2008 Power Quality Power Quality 1 Introduction Description

More information

Article 250 Grounding & Bonding

Article 250 Grounding & Bonding Article 250 Grounding & Bonding AMERICAN ELECTRICAL INSTITUTE N16 W23217 Stone Ridge Dr. Waukesha, WI 53188 855-780-5046 www.aeitraining.com DISCLAIMER NOTE: This course is APPROVED for continuing education

More information

Overview of Grounding for Industrial and Commercial Power Systems Presented By Robert Schuerger, P.E.

Overview of Grounding for Industrial and Commercial Power Systems Presented By Robert Schuerger, P.E. Overview of Grounding for Industrial and Commercial Power Systems Presented By Robert Schuerger, P.E. HP Critical Facility Services delivered by EYP MCF What is VOLTAGE? Difference of Electric Potential

More information

Grounding for Power Quality

Grounding for Power Quality Presents Grounding for Power Quality Grounding for Power Quality NEC 250.53 states that ground resistance should be less than 25 ohms. Is this true? Grounding for Power Quality No! NEC 250.53 states

More information

CIPS, DCVG & GPCM Pipeline Surveyor. Corrosion Control Equipment

CIPS, DCVG & GPCM Pipeline Surveyor. Corrosion Control Equipment CIPS, DCVG & GPCM Pipeline Surveyor Corrosion Control Equipment Electronic Pipeline Technology 153 Milos Road Richmond Hill, Ontario, Canada, L4C 0P8 Tel: (905) 918-0025 Fax: (905) 918-0033 www.ep-tech.ca

More information

AC INTERFERENCE OF TRANSMISSION LINES ON RAILWAYS: INFLUENCE OF TRACK-CONNECTED EQUIPMENT I. ABSTRACT

AC INTERFERENCE OF TRANSMISSION LINES ON RAILWAYS: INFLUENCE OF TRACK-CONNECTED EQUIPMENT I. ABSTRACT AC INTERFERENCE OF TRANSMISSION LINES ON RAILWAYS: INFLUENCE OF TRACK-CONNECTED EQUIPMENT R. D. Southey, J. Liu, F. P. Dawalibi, Y. Li Safe Engineering Services & technologies ltd. 1544 Viel, Montreal,

More information

FAQ ON EARTHING STANDARDS 16/08/2018

FAQ ON EARTHING STANDARDS 16/08/2018 FAQ ON EARTHING STANDARDS 16/08/2018 This document has been updated to include changes made to substation earthing layouts that have been made necessary due to copper theft. The main changes to be aware

More information

High Voltage Pylon Earth Measurements

High Voltage Pylon Earth Measurements High Voltage Pylon Earth Measurements Speaker: Gavin van Rooy Authors: Frank Barnes and Gavin van Rooy Tycom (Pty) Ltd PO Box 3546, Randburg, 2125, South Africa E-mail: frank@tycom.co.za Phone: 011 787

More information

Cable Protection against Earth Potential Rise due to Lightning on a Nearby Tall Object

Cable Protection against Earth Potential Rise due to Lightning on a Nearby Tall Object Cable Protection against Earth Potential Rise due to Lightning on a Nearby Tall Object U. S. Gudmundsdottir, C. F. Mieritz Abstract-- When a lightning discharge strikes a tall object, the lightning current

More information

Isolating Spark Gaps. Isolating spark gaps at an additional earth ring conductor. Isolating spark gaps for Ex zones

Isolating Spark Gaps. Isolating spark gaps at an additional earth ring conductor. Isolating spark gaps for Ex zones Isolating Spark Gaps Isolating spark gaps at an additional earth ring conductor Isolating spark gaps for Ex zones 187 Protective Spark Gaps For use at roof supports for overhead lines For indirect connection

More information

Attendee Announcements

Attendee Announcements Attendee Announcements Seminar Raffle Be sure to drop your raffle ticket in the drum at today s Keynote located in the Mile High Ballroom. You have a chance to win a $250 American Express Gift Card. One

More information

2007 DEHN + SÖHNE / protected by ISO EXFS / 5392

2007 DEHN + SÖHNE / protected by ISO EXFS / 5392 2007 DEHN + SÖHNE / protected by ISO 16016 EXFS 100 11.12.07 / 5392 Ex Isolating Spark Gaps EXFS 100 (923 100) and EXFS 100 KU (923 101) 2007 DEHN + SÖHNE / protected by ISO 16016 Ex isolating spark gap

More information

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-II) OVERHEAD NETWORK GROUNDING. Rev. 01

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-II) OVERHEAD NETWORK GROUNDING. Rev. 01 SEC DISTRIBUTION GROUNDING STANDARD SDCS-03 Part-II Rev.01 SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-II) OVERHEAD NETWORK GROUNDING Rev. 01 This specification is property of SEC

More information

A Case Study on Selection and Application of Lightning Arrester and Designing its Suitable Grounding Grid

A Case Study on Selection and Application of Lightning Arrester and Designing its Suitable Grounding Grid A Case Study on Selection and Application of Lightning Arrester and Designing its Suitable Grounding Grid 1 Arpan K. Rathod, 2 Chaitanya H. Madhekar Students Electrical Engineering, VJTI, Mumbai, India

More information

LONGITUDINAL INDUCTION VOLTAGE MEASUREMENT ON COMMUNICATION CABLES RUNNING PARALLEL TO OVERHEAD LINES

LONGITUDINAL INDUCTION VOLTAGE MEASUREMENT ON COMMUNICATION CABLES RUNNING PARALLEL TO OVERHEAD LINES LONGITUDINAL INDUCTION VOLTAGE MEASUREMENT ON COMMUNICATION CABLES RUNNING PARALLEL TO OVERHEAD LINES IEEE PES Transmission and Distribution Conference_ Chicago April 2008 Dean Sharafi Introduction Electro-magnetic

More information

GROUNDING. What is it? Al Lewey K7ABL. Disclaimer

GROUNDING. What is it? Al Lewey K7ABL. Disclaimer GROUNDING What is it? Al Lewey K7ABL Disclaimer Disclamier Mechanical Engineer with some electrical background My primary reference is References UP THE TOWER The Complete Guide to Tower Construction By

More information

CROSS-CONNECT CABINET

CROSS-CONNECT CABINET TELEPHONE EXCHANGE FEEDER CABLE CROSS-CONNECT CABINET DISTRIBUTION CABLE CUSTOMERS PREMISES 48Vdc 200 pairs 400 pairs 2000 pairs 50 pairs 15 pairs 7 pairs 1 } Chorus increasingly common roadside electronic

More information

Best Practices for Power and Transient Protection on Rosemount Radar Transmitters

Best Practices for Power and Transient Protection on Rosemount Radar Transmitters Technical Note Rosemount Radar Transmitters Best Practices for Power and Transient Protection on Rosemount Radar Transmitters BACKGROUND INTRODUCTION This document describes best practices for power and

More information

Great Northern Transmission Line: Behind the (Electrical) Design

Great Northern Transmission Line: Behind the (Electrical) Design Great Northern Transmission Line: Behind the (Electrical) Design November 8, 2017 Christian Winter, P.E. Minnesota Power Sivasis Panigrahi, P.E. POWER Engineers, Inc. What is the Great Northern Transmission

More information

Using Remote Data-Logging Techniques to Evaluate Transit System Interference

Using Remote Data-Logging Techniques to Evaluate Transit System Interference Using Remote Data-Logging Techniques to Evaluate Transit System Interference Jamey Hilleary Director of M2M Products Elecsys Corporation Jerry Dewitt Senior Cathodic Protection Specialist Enbridge Pipelines

More information

Electricity Supply to Africa and Developing Economies. Challenges and opportunities. Technology solutions and innovations for developing economies

Electricity Supply to Africa and Developing Economies. Challenges and opportunities. Technology solutions and innovations for developing economies Electricity Supply to Africa and Developing Economies. Challenges and opportunities. Technology solutions and innovations for developing economies Magnetic induced currents and voltages on earthed lines

More information

AMENDMENT NO. 1 SEPTEMBER IS (Part 1) : 2001/IEC (1991) SURGE ARRESTORS

AMENDMENT NO. 1 SEPTEMBER IS (Part 1) : 2001/IEC (1991) SURGE ARRESTORS AMENDMENT NO. 1 SEPTEMBER 2011 TO IS 15086 (Part 1) : 2001/IEC 60099-1 (1991) SURGE ARRESTORS PART 1 NON-LINEAR RESISTOR TYPE GAPPED SURGE ARRESTORS FOR a.c. SYSTEMS (The Amendment was originally published

More information

Well Casing Cathodic Protection - Design Issues, Lessons Learned and a Case History

Well Casing Cathodic Protection - Design Issues, Lessons Learned and a Case History Well Casing Cathodic Protection - Design Issues, Lessons Learned and a Case History Jeffrey L. Didas Matcor, Inc. 101 Liberty Lane Chalfont, PA 19111 USA WRGC Western Regional Gas Conference 2018 Henderson,

More information

Article information: Access to this document was granted through an Emerald subscription provided by Emerald Author Access

Article information: Access to this document was granted through an Emerald subscription provided by Emerald Author Access COMPEL: The International Journal for Computation and Mathematics in Electrical and Electronic Engineering Emerald Article: Evaluation of induced AC voltages in underground metallic pipeline Dan D. Micu,

More information

The influence of environment on condition of location damage in screen of the coaxial cable. 1. Introduction

The influence of environment on condition of location damage in screen of the coaxial cable. 1. Introduction Computer Applications in Electrical Engineering The influence of environment on condition of location damage in screen of the coaxial cable Wiesław Tarczyński Opole University of Technology 45-233 Opole,

More information

Transmission of Electrical Energy

Transmission of Electrical Energy Transmission of Electrical Energy Electrical energy is carries by conductors such as overhead transmission lines and underground cables. The conductors are usually aluminum cable steel reinforced (ACSR),

More information

CURRENT, POTENTIAL DIFFERENCE AND RESISTANCE PART I

CURRENT, POTENTIAL DIFFERENCE AND RESISTANCE PART I CURRENT, POTENTIAL DIFFERENCE AND RESISTANCE PART I Q1. An electrical circuit is shown in the figure below. (a) The current in the circuit is direct current. What is meant by direct current? Tick one box.

More information

Analysis of lightning performance of 132KV transmission line by application of surge arresters

Analysis of lightning performance of 132KV transmission line by application of surge arresters Analysis of lightning performance of 132KV transmission line by application of surge arresters S. Mohajer yami *, A. Shayegani akmal, A.Mohseni, A.Majzoobi High Voltage Institute,Tehran University,Iran

More information

High Voltage Pylon earth Measurements. Tycom (Pty) Ltd Frank Barnes Comtest (Pty) Ltd Presented by Gavin van Rooy

High Voltage Pylon earth Measurements. Tycom (Pty) Ltd Frank Barnes Comtest (Pty) Ltd Presented by Gavin van Rooy High Voltage Pylon earth Measurements Tycom (Pty) Ltd Frank Barnes Comtest (Pty) Ltd Presented by Gavin van Rooy Abstract The earth connection of high voltage electrical power line pylons is obviously

More information

APPLICATION OF THE ELECTROMAGNETIC FIELD METHOD TO STUDY A COMMUNICATION SATELLITE SITE DAMAGED BY LIGHTNING

APPLICATION OF THE ELECTROMAGNETIC FIELD METHOD TO STUDY A COMMUNICATION SATELLITE SITE DAMAGED BY LIGHTNING APPLICATION OF THE ELECTROMAGNETIC FIELD METHOD TO STUDY A COMMUNICATION SATELLITE SITE DAMAGED BY LIGHTNING W. Ruan, R. Southey, F. P. Dawalibi Safe Engineering Services & technologies ltd. 1544 Viel,

More information

EPR Safety Mat Modelling & Field Testing Summary Report

EPR Safety Mat Modelling & Field Testing Summary Report EPR Safety Mat Modelling & Field Testing Summary Report 15 April 2014 1. Purpose This document present a summary of the calculations and field testing used to prove the efficacy of the new EPR Safety Mat

More information

Operation Manual for CTL-3000

Operation Manual for CTL-3000 CATH-TECH CORROSION CONTROL EQUIPMENT Operation Manual for CTL-3000 DCVG Survey Instrument Cathodic Technology Ltd. 15-1 Marconi Court Bolton, Ontario Canada L7E 1E2 Ph: ++1-905-857-1050 ctl@cath-tech.com

More information

Ultrasonic Level Transducer Type: MPUL06 Article No.: ca. 122

Ultrasonic Level Transducer Type: MPUL06 Article No.: ca. 122 Type: Article No.: 0067720.006 Dimensions ø95 PG7 45.25 16 101 ca. 122 ø53 NPS 2" Figure 1: Ultrasonic Level Transducer Description and application The MPULxx is an ultrasonic transducer used for determining

More information

Safe Engineering Services & technologies ltd.

Safe Engineering Services & technologies ltd. Safe Engineering Services & technologies ltd. Advanced Technical Seminar on Power System Grounding & Electromagnetic Interference Analysis and CDEGS Level I Certification Location Date Course Fee Sydney,

More information

Instructions For Installing A Pig Fence

Instructions For Installing A Pig Fence Instructions For Installing A Pig Fence A Multi-wire Fence on a Single Line of Posts Height: 18 Inches Polywire for seasonally removable fences Aluminum wire for permanent fences These pages provide the

More information

Stake-less earth / ground testing

Stake-less earth / ground testing APPLICATION NOTE Stake-less earth / ground testing NEW DET14C and DET24C CLAMPS GETTING-AROUND ANY CHALLENGE What is stake-less testing? How does it work? Where and how can it be used? What are the potential

More information

FALL-OF-POTENTIAL GROUND RESISTANCE TESTER

FALL-OF-POTENTIAL GROUND RESISTANCE TESTER FALL-OF-POTENTIAL GROUND RESISTANCE TESTER Models 3620, 3640 & 4610 Call toll free (800) 537-0351 or visit www.allspec.com Measures soil resistivity (4-Point) (Model 4610) Measures ground resistance (2-

More information

Neutral Earthing. For permanent or temporary neutral earthing in HV systems

Neutral Earthing. For permanent or temporary neutral earthing in HV systems Neutral Earthing Resistors RESISTORS For permanent or temporary neutral earthing in HV systems For continuous or temporary low-resistance neutral grounding in medium voltage systems Neutral point connection

More information

WHY YOU NEED A CURRENT BALUN

WHY YOU NEED A CURRENT BALUN HF OPERATORS WHY YOU NEED A CURRENT BALUN by John White VA7JW NSARC HF Operators 1 What is a Balun? A BALUN is a device typically inserted at the feed point of a dipole-like antenna wire dipoles, Yagi

More information

2/15/2015. Current will always try to return to its source. In order for there to be current, there must be a complete circuit

2/15/2015. Current will always try to return to its source. In order for there to be current, there must be a complete circuit Current will always try to return to its source In order for there to be current, there must be a complete circuit Current will take as many paths or circuits available to it to return to the source The

More information

-SQA- SCOTTISH QUALIFICATIONS AUTHORITY. Hanover House 24 Douglas Street GLASGOW G2 7NQ NATIONAL CERTIFICATE MODULE DESCRIPTOR

-SQA- SCOTTISH QUALIFICATIONS AUTHORITY. Hanover House 24 Douglas Street GLASGOW G2 7NQ NATIONAL CERTIFICATE MODULE DESCRIPTOR -SQA- SCOTTISH QUALIFICATIONS AUTHORITY Hanover House 24 Douglas Street GLASGOW G2 7NQ NATIONAL CERTIFICATE MODULE DESCRIPTOR -Module Number- 4281080 -Session-1990-91 -Superclass- YC -Title- GAS DISTRIBUTION:

More information

Simulation and Analysis of Lightning on 345-kV Arrester Platform Ground-Leading Line Models

Simulation and Analysis of Lightning on 345-kV Arrester Platform Ground-Leading Line Models International Journal of Electrical & Computer Sciences IJECS-IJENS Vol:15 No:03 39 Simulation and Analysis of Lightning on 345-kV Arrester Platform Ground-Leading Line Models Shen-Wen Hsiao, Shen-Jen

More information

DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING QUESTION BANK SUBJECT CODE & NAME : EE 1402 HIGH VOLTAGE ENGINEERING UNIT I

DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING QUESTION BANK SUBJECT CODE & NAME : EE 1402 HIGH VOLTAGE ENGINEERING UNIT I DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING QUESTION BANK SUBJECT CODE & NAME : EE 1402 HIGH VOLTAGE ENGINEERING YEAR / SEM : IV / VII UNIT I OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS 1. What

More information

DIGITAL RESISTANCE METER

DIGITAL RESISTANCE METER 1 P a g e M A N 1 7 0 MILLER 400D DIGITAL RESISTANCE METER USER S MANUAL Revised May 19, 2014 2 P a g e M A N 1 7 0 CONTENTS Page Section 1: Description 3 Section 2: How to Take Resistance Readings Manually

More information

Earthing, HV Switching and Associated Operational Equipment. Approval: Chief Operating Officer

Earthing, HV Switching and Associated Operational Equipment. Approval: Chief Operating Officer ACCESS PRACTICE AP 24 Earthing, HV Switching and Associated Operational Equipment Process Authority: Manager Operations Improvement Approval: Chief Operating Officer Version Date: 27/08/2013 Revision:

More information

General Consideration about Current Distribution and Potential Attenuation Based on Storage Tank Bottom Modeling Study

General Consideration about Current Distribution and Potential Attenuation Based on Storage Tank Bottom Modeling Study C2012-0001155 General Consideration about Current Distribution and Potential Attenuation Based on Storage Tank Bottom Modeling Study Jean Vittonato TOTAL E&P CONGO Pointe Noire Republic of Congo Jean.vittonato@total.com

More information

TECHNICAL BULLETIN 004a Ferroresonance

TECHNICAL BULLETIN 004a Ferroresonance May 29, 2002 TECHNICAL BULLETIN 004a Ferroresonance Abstract - This paper describes the phenomenon of ferroresonance, the conditions under which it may appear in electric power systems, and some techniques

More information

PCR Polarization Cell Replacement. The Polarization Cell Replacement (PCR) Technical Literature COMMON APPLICATIONS

PCR Polarization Cell Replacement. The Polarization Cell Replacement (PCR) Technical Literature COMMON APPLICATIONS The Polarization Cell Replacement (PCR) Technical Literature INTRODUCTION The Polarization Cell Replacement (PCR) is a solid-state device commonly used in conjunction with cathodically protected structures.

More information

ROEVER ENGINEERING COLLEGE ELAMBALUR, PERAMBALUR DEPARTMENT OF ELECTRICAL & ELECTRONICS ENGINEERING

ROEVER ENGINEERING COLLEGE ELAMBALUR, PERAMBALUR DEPARTMENT OF ELECTRICAL & ELECTRONICS ENGINEERING ROEVER ENGINEERING COLLEGE ELAMBALUR, PERAMBALUR 621 212 DEPARTMENT OF ELECTRICAL & ELECTRONICS ENGINEERING EE1003 HIGH VOLTAGE ENGINEERING QUESTION BANK UNIT-I OVER VOLTAGES IN ELECTRICAL POWER SYSTEM

More information

Electronic Pipeline Technology

Electronic Pipeline Technology Pipe and Cable Locator Pearson Holiday Detector Model EPT- 1000 Electronic Pipeline Technology Electronic Pipeline Technology 26 Palomino Drive, Richmond Hill, Ontario, Canada, L4C 0P8 Tel: (905) 918-0025

More information

Electrical TP-18 February 2017 ELECTRICAL TECHNICAL PAPER 18 FREQUENTLY ASKED QUESTIONS ABOUT CATHODIC PROTECTION SYSTEM EQUIPMENT TESTING

Electrical TP-18 February 2017 ELECTRICAL TECHNICAL PAPER 18 FREQUENTLY ASKED QUESTIONS ABOUT CATHODIC PROTECTION SYSTEM EQUIPMENT TESTING ELECTRICAL TECHNICAL PAPER 18 FREQUENTLY ASKED QUESTIONS ABOUT CATHODIC PROTECTION SYSTEM EQUIPMENT TESTING CATHODIC PROTECTION SYSTEM EQUIPMENT TESTING Question No. 1 What should I (the contractor) check

More information

Novel Simulation Method to Quantify Induced Voltage & Current between Parallel or Partially Parallel Proximity AC Transmission Circuits

Novel Simulation Method to Quantify Induced Voltage & Current between Parallel or Partially Parallel Proximity AC Transmission Circuits 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2015 Grid of the Future Symposium Novel Simulation Method to Quantify Induced Voltage & Current between Parallel or Partially

More information

INTERNATIONAL TELECOMMUNICATION UNION SERIES K: PROTECTION AGAINST INTERFERENCE

INTERNATIONAL TELECOMMUNICATION UNION SERIES K: PROTECTION AGAINST INTERFERENCE INTERNATIONAL TELECOMMUNICATION UNION )454 + TELECOMMUNICATION STANDARDIZATION SECTOR OF ITU (10/96) SERIES K: PROTECTION AGAINST INTERFERENCE 2ISK ASSESSMENT OF DAMAGES TO TELECOMMUNICATION SITES DUE

More information

Asset Protection Cathodic Protection Soil Resistivity Measurement. Work Instruction No.:

Asset Protection Cathodic Protection Soil Resistivity Measurement. Work Instruction No.: Asset Protection Cathodic Protection Soil Resistivity Measurement Approved by: Manager Pipeline Standards 1 PURPOSE This work instruction describes the processes to be followed when measuring soil resistivity.

More information