BROOKINGS municipal utilities
|
|
- Dayna Robinson
- 6 years ago
- Views:
Transcription
1 BROOKINGS municipal utilities 525 Western Ave., P.O. Box 588 Brookings, SD (605) voice (605) fax March 28, 2016 Re: Request for Submittals Map Conversion Project Brookings, SD Brookings Municipal Utilities (BMU) is seeking submittals from interested and qualified consulting firms for engineering services for a Map Conversion Project. The project is generally to include Phases Nos. 1, 2, 4, and 5 identified in the March 2016 Mapping Conversion Needs Assessment prepared by Advanced Engineering & Environmental Services, Inc. (AE 2 S). Background BMU and Swiftel Communications currently maintain all electronic Autodesk mapping (water, wastewater, electric, and telephone/fiber) in a non-coordinate based system (base plat maps have historically been electronically manipulated to fit a 5,280 ft by 5,280 ft square box). The Map Conversion Project will involve the creation of a new Brookings area base plat map in AutoCAD DWG format with a high level of accuracy and shall be referenced to the South Dakota State Plane coordinate system. Proposed Scope of Services As such, BMU is soliciting submittals for the following tasks (identified as Phase Nos. 1, 2, 4, and 5 in the Mapping Conversion Needs Assessment report): Phase No. 1 Establish GPS control utilizing existing HARN monuments and installing new ones at key locations. This work shall include a client-agreed upon number and location of section, quarter, block, and lot corners. Phase No. 2 Assistance with the development and implementation of design standard for outside firm plat submission. The primary goal of this phase is to ensure that, once the existing plat map data base has been constructed in a coordinate-based system, that newly submitted plats match the new coordinate-based system as well as possible and are able to be inserted into the new coordinate-based system with little to no additional electronic manipulation.
2 Phase No. 4 Update reference documents by scanning publicly filed plats for use during the coordinate-based plat map construction. BMU currently has a majority of these plats already scanned. Phase No. 5 Create base plat map to a South Dakota State Plane coordinate-system. In general, this should include, but is not limited to, the following: Provide all line work for sections, city limits, additions, blocks, lots, parcels, and right of way centerlines (see PDF example of existing 5280 plat map for reference. Available on City of Brookings website, under bids). Utilize existing BMU acquired survey data as well as survey data obtained during Phase No. 1 to create appropriate line work, labels, and dimensions. In the absence of survey data, Firm shall utilize COGO to manually create work from the recorded plat information. Provide all labels and/or dimensions for sections, city limits, additions, blocks, lots, out-lots, addresses, and streets. Line work, labels, and dimensions shall not be scale dependent with insertion points and justification that allows mapping to display legibly from a 1:40 to 1:800 scale. The existing DWG format Plat Map consists of approximately 270 named additions and 8,000 lots. It includes 112,138 individual drawing objects and is 11.4 megabytes in size. Raster to Vector conversion shall not be accepted. Line work, labels, and dimension shall be uniformly spaced throughout the map. Schedule The project is to be completed within 12 months of contract authorization. Request for Submittals Interested consulting firms may submit Qualifications and Rates/Hours (rates/hours submitted to be limited to those specifically requested below). Submittals shall address, at a minimum, the following items: Firm history Project understanding and Firm s technical approach to plat construction. Key personnel who would be assigned to this project if selected, including but not limited to, the Project Manager and personnel/technician(s) who would actually create the plat map in the coordinate-based system (Phase No. 5 work). Related project experience, including a list of all relevant projects managed by the proposed personnel, including references (minimum three references).
3 Provide the proposed hourly rates and total hour estimate for the Phase No. 5 work for both the Project Manager and personnel/technician(s) actually create the plat map in the coordinate-based system. o Note that this is not intended to be a complete fee submittal for either the Phase No. 5 work or the entire project. Proposed schedule Submittal and Review Submittals are due by 2:00 pm, Friday, April 22, Address the submittal in a clearly identified package to Eric Witt. Please include three hard copies of the submittal as well as a.pdf format. Interested respondents may be invited for an interview. Submittals will be evaluated for the best overall value, based on the combination of qualifications, relevant experience and price. It is anticipated that a recommendation will be made at the May 9, 2016 Utility Board meeting. Pending Utility Board authorization, contract negotiations with the selected consulting firm would proceed thereafter. The March 2016 Mapping Conversion Needs Assessment is available upon request. Contact Eric Witt, BMU Engineering Supervisor, at (605) to request a copy or with any questions.
4
5
DIGITAL DATA SUBMISSION STANDARDS Procedures and Guidelines
DIGITAL DATA SUBMISSION STANDARDS Procedures and Guidelines 2014 Citizens Wastewater of Westfield - GIS Digital Standards Table of Contents Introduction... 3 Definitions and Terms... 3 Reference Documents...
More informationREQUEST FOR PROPOSAL For Color Orthogonal & Color Oblique Imagery
REQUEST FOR PROPOSAL For Color Orthogonal & Color Oblique Imagery OVERVIEW Austin County Appraisal District is seeking services from a qualified and experienced vendor for the delivery of color Orthogonal
More informationCONSULTANT: Wantman Group, Inc SERVICE AUTHORIZATION NO. _12-03 FOR CONSULTING SERVICES CITY PROJECT NO CONSULTANT PROJECT NO.
EXHIBIT A CONSULTING SERVICE AUTHORIZATION DATE: CONSULTANT: Wantman Group, Inc SERVICE AUTHORIZATION NO. _12-03 FOR CONSULTING SERVICES CITY P.O. NO. CITY EXPENSE CODE CITY PROJECT NO. 14-073 CONSULTANT
More informationNEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017
NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP 697-16-016 July 28, 2017 Reference is made to the Request for Proposal (RFP) to Service Providers for Nevada Shared Radio Replacement Project, upon
More informationSUMMARY: On June 14, 2013, the President issued a Memorandum to the heads of executive
This document is scheduled to be published in the Federal Register on 02/18/2014 and available online at http://federalregister.gov/a/2014-03413, and on FDsys.gov OFFICE OF SCIENCE AND TECHNOLOGY POLICY
More informationBuilding Standards Department. Markham eplan Submission Standards For Building Permits, Sign Permits and Zoning Preliminary Review
Markham eplan Submission Standards For Building Permits, Sign Permits and Zoning Preliminary Review eplan Submission Standards Building Standards February 2018 SUBMISSION STANDARDS PREPARING YOUR ELECTRONIC
More informationADDENDUM NO. 1. November 6, 2016 BIDDING AND CONTRACT DOCUMENTS FOR
ADDENDUM NO. 1 November 6, 2016 BIDDING AND CONTRACT DOCUMENTS FOR North District Pre-Development Studies Soils and Geotechnical Engineering Survey/Study, Site Hydrology Report and Phase 2 Environmental
More information***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)
DRAFT UFGS- 01 XX XX (FEB 2014) ------------------------ Drafting Activity: USACE UNIFIED FACILITIES GUIDE SPECIFICATION SECTION TABLE OF CONTENTS DIVISION 01 GENERAL REQUIREMENTS SECTION 01 XX XX (FEB
More informationElectronic Plan Review. City of Mesquite, TX. eplan Review Standards Document
Electronic Plan Review City of Mesquite, TX eplan Review Standards Document Contents Document Control... Error! Bookmark not defined. Document Contacts... Error! Bookmark not defined. eplan Review Standards...
More informationA. Section includes administrative and procedural requirements for project record documents, including the following:
SECTION 017839 - PROJECT RECORD DOCUMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01
More informationSection XV - PER, Design, and Construction Submittal Requirements
Section XV - PER, Design, and Construction Submittal Requirements A. Introduction - In an effort to reduce paper and to further implement the Oracle Unifier Project Management System, the Engineering Department
More informationSTATEMENT OF WORK Environmental Assessment for the Red Cliffs/Long Valley Land Exchange in Washington County, Utah
I. Introduction STATEMENT OF WORK Environmental Assessment for the Red Cliffs/Long Valley Land Exchange in Washington County, Utah The Bureau of Land Management s (BLM) St. George Field Office (SGFO) requires
More informationWATER WASTEWATER CAD DELIVERABLES SUBMISSION STANDARDS
WATER WASTEWATER CAD DELIVERABLES SUBMISSION STANDARDS New Braunfels, TX 78130 Approved November 15, 2004 PREFACE In order to create a consistency and increase efficiency, Comal County, Comal Appraisal
More informationElectronic Plans Management Training. Submitting a Revision to Approved Plans (RTAP) Application & Uploading Drawings
Electronic Plans Management Training Submitting a Revision to Approved Plans (RTAP) Application & Uploading Drawings The Electronic Plan Management system (EPM) is an online tool designed to allow architects,
More informationCHAPTER A-10 DRAWINGS
CHAPTER A-10 DRAWINGS INDEX Revised May 2018 10.1 GENERAL 10.1.1 Purpose and Scope 10.2 APPLICABLE PUBLICATIONS 10.3 COMPUTER AIDED DESIGN (CAD) 10.3.1 CAD Requirements 10.3.2 CAD Deliverables 10.3.3 CAD
More informationCITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT
CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT ADDENDUM NO. 1 TO REQUEST FOR PROPOSALS For EQUIPMENT FOR THE 2014 CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT WASTEWATER TREATMENT PLANT IMPROVEMENT PROJECT:
More informationUpdate: July 20, 2012
Location and Design Manual, Volume 3 ODOT Office of CADD and Mapping Services Update: July 20, 2012 ** NOTE: All metric references have been removed from this manual. ** PREFACE REVISIONS Glossary of Terms
More informationMinimum Drawing & Electronic Submittal Requirements For Record Drawings /As-Builts
Minimum Drawing & Electronic Submittal Requirements For Record Drawings /As-Builts PUBLIC WORKS ENGINEERING DEPARTMENT Revised: February 1, 2017 MINIMUM DRAWING REQUIREMENTS A. GENERAL PLAN REQUIREMENTS:
More informationREQUEST FOR PROPOSALS Rochester Downtown Alliance Rochester, Minnesota 2013 Transformer Cabinet Mural Project Budget of $500 per large transformer
REQUEST FOR PROPOSALS Rochester Downtown Alliance Rochester, Minnesota 2013 Transformer Cabinet Mural Project Budget of $500 per large transformer The Rochester Downtown Alliance is seeking to commission
More informationMetro Area Planning Agency. Request for Proposal Omaha-Lincoln Metro Area Imagery Project
Metro Area Planning Agency Request for Proposal 2018 Omaha-Lincoln Metro Area Imagery Project 1. General Info 1.1. Objective The Metro Area Planning Agency ( MAPA ) in Omaha is soliciting proposals from
More informationAutoCAD Standards University of California, Santa Cruz Physical Planning & Construction
University of California, Santa Cruz Physical Planning & Construction 1. General Requirements: 1.1 Format 1.2 Ownership 2. Required Data: 2.1 Area Tabulation 2.2 Drawing Files 2.3 External References 2.4
More informationDigital Drawings Submittal Process
Digital Drawings Submittal Process A. Purpose a. All public improvement projects within the City of Olathe require digital copies of the Approved for Construction drawings and Construction Record Drawings
More informationWATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.:
WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO-00111 Job No.: 16-7003 To Respondent of Record: ADDENDUM 2 July 5, 2017 This addendum, applicable to work referenced
More informationCALL TO ARTISTS DOWNTOWN SYLVA MURAL PROJECT SYLVA, NORTH CAROLINA
CALL TO ARTISTS DOWNTOWN SYLVA MURAL PROJECT SYLVA, NORTH CAROLINA The Town of Sylva and the Sylva Public Art Committee invite artists or artist teams to submit qualifications for an artist to develop
More informationCertificate by the Architect: Certified that no addition and deletion has been made to the tender documents downloaded from the IIT Madras web site.
INDIAN INSTITUTE OF TECHNOLOGY MADRAS ENGINEERING UNIT CHENNAI 600 036 NOTICE INVITING TENDERS FOR APPOINTMENT OF ARCHITECTURAL CONSULTANT No: 35/ ARC / 2013 14 TECHNICAL BID COVER 2 NAME OF WORK: Providing
More informationPORTAGE COUNTY WATER RESOURCES DRAFTING STANDARDS. Date: January 26, 2001
PORTAGE COUNTY WATER RESOURCES DRAFTING STANDARDS Date: January 26, 2001 Portage County Water Resources Drafting Standards. AutoCad 2000/Land Development Desktop R2 Friday, January 26, 2001 Preface: Part
More informationDeep Panuke. 01U 27 Feb 08 Issued for Use C. Hewitt N. Coonan D. Riffe R. MacQueen Rev Date Reason for Issue Prepared Checked Checked Approved Title
01U 27 Feb 08 Issued for Use C. Hewitt N. Coonan D. Riffe R. MacQueen Rev Date Reason for Issue Prepared Checked Checked Approved Title Design of Subsea Wellhead Protection Structures Prequalification
More informationBid Advertisement in The Wylie News and NTMWD.com Website INVITATION TO BID NORTH TEXAS MUNICIPAL WATER DISTRICT DIGITAL IMAGING SERVICES
Bid Advertisement in The Wylie News and NTMWD.com Website INVITATION TO BID NORTH TEXAS MUNICIPAL WATER DISTRICT DIGITAL IMAGING SERVICES Sealed bids addressed to Kelly O Brian, Records Manager, will be
More informationTCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II
SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More information1.1 GENERAL RECORD DRAWING REQUIREMENTS
Page 1 of 5 VILLAGE OF ROMEOVILLE RECORD DRAWINGS CHECKLIST PART I GENERAL Record drawings are required to provide a means of schematic verification that the intent of the approved engineering design has
More informationwelcome to temp time, inc.
welcome to temp time, inc. policies and procedures assignments Working as a temporary employee allows you a certain amount of flexibility, both in the kinds of jobs you wish to accept and how often you
More informationACWWA DRAWING SUBMITTAL INFORMATION - UTILITY DRAWING REQUIREMENTS
ACWWA DRAWING SUBMITTAL INFORMATION - UTILITY DRAWING REQUIREMENTS Detailed construction drawings for system extensions shall be prepared for approval with a submittal to the Authority. All construction
More informationREQUEST FOR PROPOSAL
REQUEST FOR PROPOSAL Engineering Design Services for the Preliminary Engineering of Lake Nepessing/Davison/Genesee Intersection Improvements Sections 1, 2, 11 and 12 of Elba Township Lapeer County, Michigan
More informationBID DOCUMENTS FOR THE PURCHASE OF PRECAST CONCRETE BOX CULVERT
February 04, 2016 BID DOCUMENTS FOR THE PURCHASE OF PRECAST CONCRETE BOX CULVERT The Bid Documents that are included as part of the above bid package include the following: 1). Instructions to bidders
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018
SECTION 01 7839 - PROJECT RECORD DOCUMENTS GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationMISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration
SECTION 01 340 - SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other
More informationDocument Archival System Guidelines
Document Archival System Guidelines Engineering & Campus Planning Texas A&M University Kingsville Last Updated: January 13, 2009 Table of Contents I. Purpose II. III. Methodology Processing Project Documents
More informationThe Corporation of the City of Nelson Office of the Finance and Purchasing Manager Telephone : (250) Fax : (250)
The Office of the Finance and Purchasing Manager Telephone : (250) 352-8204 Fax : (250) 352-6594 REQUEST FOR PREQUALIFICATIONS RADIO COMMUNICATIONS INFRASTRUCTURE UPGRADE CONTRACTOR SERVICES 2018-PRQ-01
More informationThis Call for Qualifications does not require the preparation of a design proposal.
EDMS# 211137 I. Introduction This Call for Qualifications invites professional artists, or artist team, to participate in a two-stage selection process to develop an original, public art work for Port
More informationElectronic Document Review (EDR)
Electronic Document Review (EDR) Submittal Requirements Table of Contents Introduction... 3 Electronic Document Review Submittals:... 4 Plans... 4 Plat... 4 Forms... 4 Correspondence... 5 Plan Revisions...
More informationSECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.1 DESCRIPTION A. This specification defines the general requirements and procedures for submittals. A submittal is information
More informationSECTION D BIM COORDINATION DRAWINGS - CONTRACTORS
END OF SECTION 01 30 00 SECTION 01 31 21-3D BIM COORDINATION DRAWINGS - CONTRACTORS PART 1 - GENERAL 1.01 RELATED DOCUMENTS Attention is directed to Bidding and Contract Requirements, and to Division 1,
More informationWork Type Definition and Submittal Requirements Work Type: Subsurface Utility Engineering (SUE)
MUST be qualified under Minnesota Department of Transportation Prequalification Program - Work Type 15.1 Subsurface Utility Engineering The first section, Work Type Definition, provides a detailed explanation
More informationVanderbilt University Standard Specification Revised 2/6/08
SECTION 01 78 23 OPERATION AND MAINTENANCE DATA PART 1 GENERAL 1.01 RELATED SECTIONS A. Section 01 77 00 Closeout Procedures B. Section 01 78 39 Project Record Documents 1.02 SUMMARY A. This section provides
More informationThe attached information contains mandatory requirements and a submission form.
The Municipality of Greenstone Greenstone Fire Department REQUEST FOR PROPOSAL (RFP) Fire Department VHF Digital Radio Communication System The Municipality of Greenstone seeks Requests for Proposals (RFP
More information00-General Drawings. Doc. no.: NA-00-STS002
Gæðaskjal (GSK) GSK-1773 Date of issue: 24.11.2016 Revision no.:2.0 Responsible: Einar Friðgeir Björnsson Editor: Rafn Magnús Jónsson 00-General Drawings Doc. no.: NA-00-STS002 This standard technical
More informationUCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL
SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationApplications should be ed to:
REQUEST FOR PROPOSALS (RFP) City of Fort Collins, Colorado Art in Public Places Program (APP) Celebrating 20 Years 2015 Community Transformer Cabinet Mural Project Honorarium $450. The Art in Public Places
More informationPublic Art Opportunity Request for Qualifications & Letter of Interest for Outdoor Latino Heritage Mural
Public Art Opportunity Request for Qualifications & Letter of Interest for Outdoor Latino Heritage Mural The Port of Kennewick is seeking an artist or team of artists to create mural artwork to be installed
More informationApplications should be ed to:
REQUEST FOR PROPOSALS (RFP) City of Fort Collins, Colorado Art in Public Places Program (APP) 2013 Community Transformer Cabinet Mural Project (7462) Honorarium - $450. The Art in Public Places Program
More informationA. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.
SECTION 01300 PART 1 GENERAL 1.1 SECTION INCLUDES A. Description of Requirements B. Submittal Procedures C. Specific Submittal Requirements D. Action on Submittals E. Repetitive Review 1.2 DESCRIPTION
More informationElectronic Plan Check (EPC) Building Permit Submittal Requirements
Electronic Plan Check (EPC) Building Permit Submittal Requirements Submittals do not become active plan check activities until payment is received. Beginning with Cycle 2, all design professional stamps
More informationSECTION SUBMITTAL PROCEDURES
SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification
More informationSECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS
SECTION 01 33 00 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationThis specification describes the general requirements for Engineering Services provided to Vale.
1/9 1.0 PURPOSE This specification describes the general requirements for Engineering Services provided to Vale. 2.0 GENERAL For the purposes of this document, the Engineering Consultant shall be referred
More informationStanford University-Facilities Design Guideline SECTION Plans Review Submission Guidelines
SECTION 01 33 00 Plans Review Submission Guidelines PART 1 GENERAL 1.01 OVERVIEW A. University Plans Review Process: 1. The process by which the Designer s schematic, design development, construction documents
More informationSECTION SUBMITTAL PROCEDURES
SECTION 01330 SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide submittals in accordance with the General Conditions as modified by the Supplementary Conditions,
More informationPART XIII: HYDRAULIC/ HYDROLOGY SURVEYS
PART XIII: HYDRAULIC/ HYDROLOGY SURVEYS 13.1 Purpose and Scope Hydraulic surveys are required for flow analysis to determine bridge and culvert design characteristics. A hydraulic survey is usually but
More informationApplications should be ed to:
REQUEST FOR QUALIFICATIONS (RFQ) City of Fort Collins, Colorado Art in Public Places Program (APP) 2014 Transformer Cabinet Mural Project (7592) Budget: Minimum of $1,000 per artist The Art in Public Places
More informationMiami University. Physical Facilities Department. CAD Standards. April 2004
Miami University Physical Facilities Department CAD Standards April 2004 1.0.0 OVERVIEW These standards pertain to the use, production and submittal of electronic CAD files at Miami University. They have
More informationDesign Appendix: Throughout this document various supporting appendixes are referenced. These appendixes can be found at
Aetna Information Services (AIS) http://ot.aetna.com March 16, 2016 Ver 21 Design Phase / Process This sequence of eight design weeks DW s leads the project team from project kickoff through to construction
More informationSuggested Traffic Signal Design Procedures Indefinite Delivery (ID) Contract Locations and Conventional Signal Contract Locations
Suggested Traffic Signal Design Procedures Indefinite Delivery (ID) Contract Locations and Conventional Signal Contract Locations MDOT SUGGESTED TRAFFIC SIGNAL DESIGN PROCEDURE INDEFINITE DELIVERY INSTALLATION
More informationOakland County Michigan Register of Deeds Plat Engineering, GIS, & Remonumentation Dept. Ph: (248) Fax (248)
Oakland County Michigan Register of Deeds Plat Engineering, GIS, & Remonumentation Dept. Ph: (248)-858-1447 Fax (248)-858-7466 Requirements Needed for Final Condominium Approval General Requirements. 1
More informationScope of Services. Project management tasks are estimated based upon anticipated project duration of 52 weeks.
Scope of Services Project Understanding The City of Sparks (City) has also requested the HDR Engineering, Inc. (HDR) provided limited shop drawing review and periodic observation during construction and
More informationCITY OF BROOKLYN PARK COMMUNICATIONS TECHNOLOGY SITE APPLICATION / MODIFICATION REQUEST FORM
City of Brooklyn Park 5200 85 th Avenue N. Brooklyn Park, MN 55443-1825 Permit #: CITY OF BROOKLYN PARK COMMUNICATIONS TECHNOLOGY SITE APPLICATION / MODIFICATION REQUEST FORM Site Name & Address: (existing
More informationRequest for Proposals: Beacon Hill Pump House Mural Project
Request for Proposals: This is an open call to Canada-based artists issued by the Regional Municipality of Wood Buffalo, for a temporary public mural project in Fort McMurray. This project is part of a
More informationApplications should be ed to:
REQUEST FOR QUALIFICATIONS (RFQ) City of Fort Collins, Colorado Art in Public Places Program (APP) 2013 Transformer Cabinet Mural Project (7461) Budget: Minimum of $1,000 per artist The Art in Public Places
More informationTAB B-9 RECORD DRAWINGS
TAB B-9 RECORD DRAWINGS Project record drawings and shall be prepared for all University of Arizona projects. The concept Record Drawings shall replace what has previously been called As-Builts. During
More informationNOTICE TO BIDDERS PURCHASE OF PORTABLE FORENSIC LASER SCANNING TECHONOLGY
NOTICE TO BIDDERS Sealed bids will be received by the City of Midwest City at its City Clerk' s office located in the Municipal Building, 100 N. Midwest Blvd., Midwest City, Oklahoma until 2: 00 p. m.,
More informationJEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia
BULLETIN NO. 6 TO THE PLANS AND SPECIFICATIONS FOR JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia EwingCole Architects.Engineers.Interior Designers.Planners
More informationRequest For Information (RFI) For
Request For Information (RFI) For Metro - Replace 800 MHZ EDACS Radio System Project No. 31AW1201 Metropolitan Transportation Center 181 Ellicott Street Buffalo, New York 14203 Date: December 12, 2012
More informationElectronic Plan Check (EPC) Building Permit Submittal Requirements
Electronic Plan Check (EPC) Building Permit Submittal Requirements Submittals do not become active plan check activities until payment is received. Beginning with Cycle 2, all design professional stamps
More informationAutodesk Map from A to Z
Autodesk Map from A to Z Brian Glidden Course ID: GI11-2 Course outline: 3.5-Hour Tutorial (beginners) Related Class Project Environment of Autodesk Map (GI23-2L) Intermediate Lab Wednesday 4:00 P.M. -
More information2017 CDM Smith All Rights Reserved November 2016 SECTION PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS)
ATTACHMENT 5, CONTRACT 13, ADDENDUM 3 2017 CDM Smith 14955-109447 SECTION 01725 PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS) PART 1 GENERAL 1.01 DESCRIPTION A. The Owner and Contractor shall utilize the
More informationSimonson Design Lab, Inc. Design Agreement
2016-2017 Simonson Design Lab, Inc. The Terms Consultation Time: The time you spend working directly with a designer either with or without your builder. We highly recommend you use the A Guide to Designing
More informationBRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006
Project Name: BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006 Phase: Unit: # Lots: Development Type (residential, commercial, industrial, etc.) Braselton Project No.
More informationAttachment J-8 Contractor / Supplier Submittal Register
Contractor / Supplier Register Contract / PO : XXXXXXX Contract / PO Title: OSWDF Construction Quality Control (CQC ) Base Title Proposal s Technical Bid Package Section L G 14 PROC ACC Subcontractor Request
More informationSECTION SUBMITTAL PROCEDURES
SECTION 013300 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply
More informationSUBDIVISION PLAT APPLICATION
SUBDIVISION PLAT APPLICATION ONLY COMPLETE SUBMISSIONS WILL BE PROCESSED CITY OF PORT ST. LUCIE P&Z File No. PLANNING & ZONING DEPARTMENT Fee (Nonrefundable)$ (772)871-5212 FAX: (772)871-5124 Receipt #.......................................
More informationUNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ
SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 General
More informationNovember 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA. Y CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT
November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Y18-703-CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT REVISED BID OPENING DATE: DECEMBER 5, 2017 This addendum is hereby incorporated
More informationHarris County Capital Projects Electronic Submittal Guidelines for Consultants
Harris County Capital Projects Electronic Submittal Guidelines for Consultants This document sets forth the guidelines for electronic submittal for consultants as termed by Harris County Capital Projects.
More informationSection 101. Street Design
Section 101 Street Design This section establishes the uniform policies and procedures for the preparation of street design plans and construction requirements in the City of Irvine. It is not intended
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 01 3300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationThe coordinate system and vertical datum shall be noted in the drawing in the metadata.
Purpose This document is provided for informational purposes and to assure data compatibility and compliance for as-built drawings or vector data formats specifically for the 354th Civil Engineer Squadron
More informationPROFESSIONAL PHOTOGRAPHY SERVICES AND RELATED PRODUCTS 2019 LEGISLATIVE SESSION
State of Nevada Legislative Counsel Bureau 401 S. Carson Street Carson City, NV 89701 775.684.6800 (Phone) 775.684.6600 (Fax) REQUEST FOR PROPOSAL for: PROFESSIONAL PHOTOGRAPHY SERVICES AND RELATED PRODUCTS
More informationSPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS
Page: 4-1 4.0 URD Process and Documentation Requirements 4.1 Process Steps The process of developing underground distribution facilities in a residential area consists of 10 major steps, which are summarized
More informationAnticipated schedule, Page 2. Change the Contract Term from 635 Days to be 1,127 Days.
This addendum is hereby made part of the Request for Bid for the above-named project and shall be taken into consideration by all firms preparing a submittal on this project. Acknowledge receipt of this
More information(A Sample Letter of Agreement for manuscript preparation) (Sample) Letter of Agreement
lifewriters.ca Toll-free: 800.864.9152 Assisted memoirs, family stories, and corporate histories Email: info@lifewriters.ca (A Sample Letter of Agreement for manuscript preparation) Mr. John Doe 850 Eighth
More informationBERKELEY COUNTY ENGINEERING AND
BERKELEY COUNTY ENGINEERING AND BUILDING INSPECTIONS 400 West Stephen Street - Suite 202, Martinsburg, WV 25401-3838 Telephone: 304-264-1966, Fax: 304-262-3128 Web Page: www.berkeleywv.org I. WHAT ARE
More informationMcKenzie County Healthcare Systems
McKenzie County Healthcare Systems Hospital Replacement and Long-Term Care Replacement Watford City, North Dakota Request for Proposal (RFP) for Distributed Antenna System Table of Contents Introducti
More informationElectronic Plans Management Training. Upload Drawings
Electronic Plans Management Training Upload Drawings Upload Drawings The Electronic Plan Management system (EPM) is an online tool designed to allow architects, engineers, and designers the ability to
More informationMINIMUM DRAWING REQUIREMENTS FOR WATER AND SEWER LINE PROJECTS
Public Works Department Water & Wastewater Services WATER & WASTEWATER ENGINEERING DIVISION 2555 West Copans Road Pompano Beach, Florida 33369 954-831-0745 FAX 954-831-0798/0925 MINIMUM DRAWING REQUIREMENTS
More informationSPECIFICATIONS FOR TENDER # SUPPLY OF ONE WIRELESS CLOCK SYSTEM & ASSOCIATED COMPONENTS FOR WESTERN HEALTH
SPECIFICATIONS FOR TENDER # 0171-0838 SUPPLY OF ONE WIRELESS CLOCK SYSTEM & ASSOCIATED COMPONENTS FOR WESTERN HEALTH CLOSING DATE: 21 March 2008 CLOSING TIME: 11:00 AM (Newfoundland Time) Invitation to
More informationINVITATION TO NEGOTIATE
INVITATION TO NEGOTIATE ITN14-18 - Indigocrisp FL98-325 Blueberry Cultivar Florida Foundation Seed Producers, Inc. (FFSP) invites all interested parties to submit comments and/or proposals for the exclusive
More informationLoyola University Maryland Provisional Policies and Procedures for Intellectual Property, Copyrights, and Patents
Loyola University Maryland Provisional Policies and Procedures for Intellectual Property, Copyrights, and Patents Approved by Loyola Conference on May 2, 2006 Introduction In the course of fulfilling the
More informationPublic Call to Artists for Expressions of Interest Newton Recreation Centre Glass Curtain Wall Design for glass frit application
Public Call to Artists for Expressions of Interest Newton Recreation Centre Glass Curtain Wall Design for glass frit application Goal: an image and metaphor that represents: Weaving Communities Together
More informationCONVEYANCE PIPELINE AND PUMP STATION
SCOPE OF WORK CONVEYANCE PIPELINE AND PUMP STATION The purpose of this scope of work is to provide engineering services to revise and complete the design of the RUWAP pipeline and 5th Avenue Pump Station
More information[LLIDB00100 LF HT0000 LXSS020D ] Notice of Intent to amend the Cascade Resource Management Plan (RMP) and the
This document is scheduled to be published in the Federal Register on 10/18/2012 and available online at http://federalregister.gov/a/2012-25593, and on FDsys.gov 4310-GG DEPARTMENT OF THE INTERIOR Bureau
More informationBIM. e Submission Guideline Structural. Annex 1a. Recommended Process Revit 2010
BIM e Submission Guideline Structural Annex 1a Recommended Process Revit 2010 Building and Construction Authority 5 Maxwell Road #16-00 Tower Block MND Complex Singapore 069110 www.bca.gov.sg Revision
More information