1 Conformity Assessment Gerardo Moino PRT Certificate Program April 2018
2 PRT Certificate of Authorization TO FABRICATE PARTS WITHOUT DESIGN RESPONSIBILITY UNDER ASME BPVC
3 BACKGROUND During Construction under ASME BPVC different Certificate Holders can be involved in the project ASME Certificate Holders compose an important part of the supply chain, helping the EPC or Main Manufacturer to meet project quality Code requirements and critical project time line shedules
4 BACKGROUND EPCs seek to have special process performed by ASME Certificate Holders Roll end Welded forms Welded parts Weld Overlay Complete Pressure vessel
5 PRE-PRT CERTIFICATE To obtain a certificate a part supplier (eg. weld overlay) was required to demonstrate design capabilities during the ASME Joint Review
6 PRE-PRT CERT A number of companies, especially in the international market, questioned why ASME required them to demostrate an activity that they do not necessarily need to perform These companies often were small fabricators who serviced a few larger companies, and had no interest in competing with their customers
7 PRE-PRT CERT In some cases they were manufacturers who have some special capabilities in a particular field or in some particular application: Roll, Form, Cladding, etc. Due to this specific competence they have no dedicated resources for design The main scope of the parts manufacturers is to form, machine and weld material, and to have the ability to perform NDE and heat treatment activities
8 ASME RESPONSE In response to the Industry need, ASME recognized that fabrication of parts within the BPVC could be managed without having the parts manufacturer perform any design activity or demonstrate design capabilities during the Joint Review Therefore ASME set out to add the PRT Certificate of Authorization to its array of Certificates
9 ASME BPVC PRT CERTIFICATE PROGRAM In order to offer a new Certificate ASME had to develop the framework: The Designator to be used the ASME Certification Mark PRT Intended Fabricator: Fabricators of parts not performing or assuming design responsibility
10 ASME BPVC PRT CERTIFICATE PROGRAM Framework: BPVC Sections: I, IV, VIII (Div. 1, Div. 2 and Div. 3) and Section XII of the BPVC. Code Shop: Limited to the Fabrication of Parts at the Code Shop Partial Data Report: Parts Cert Holder to furnish
11 ASME BPVC PRT CERTIFICATE PROGRAM Framework: Partial Data Report: Parts Cert Holder to furnish
12 ASME BPVC PRT CERTIFICATE PROGRAM QC System The PRT Certificate Holder s quality control system would need to describe how the design documents for the parts are to be controlled, as well as how the manufactured part(s) would be controlled while in the custody of the parts manufacturer
13 BPV CODE REVISIONS & PRT CERTIFICATE PROGRAM In order to make it a reality, the construction Sections of the BPVC needed to be revised: Incorporate the new Designator PRT Clarify responsibilites and capabilities of PRT Cert Holder Fabricator vs Main Cert Holder Have suitable Partial Manufacturer Data Report Forms As well as other revisions
14 BPV CODE REVISIONS & PRT CERTIFICATE PROGRAM Prior to the issuance of the 2017 edition of the BPVC and since the requirements of Section VIII, Div. 1 as well as Div. 2 already had the necessary requirements for the fabrication of parts, ASME issued new scopes U-21 and U2-10, while the PRT Designator and related requirements were incorporated
15 BPV PROGRAM SCOPES BEFORE PRT CERTIFICATES ASME offered the U-21 Scope for Section VIII, Div. 1, before the PRT scope was released U-21 Manufacture of pressure vessel parts (without design responsibility) at the above location only ASME currently offers the U2-10 scope for Section VIII, Div. 2, since there is currently No PRT Scope U2-10 Manufacture of Class 1 and Class 2 pressure vessel parts (without design responsibility) at the above location only
16 BPV CODE REVISIONS & PRT CERTIFICATE PROGRAM Due to the Nature (complexity and size) of each Section of the BPVC as well as the Committee s workload and willingness to move forward with the PRT Certificate of Authorization, as of the 2017 edition the Committees the following had been completed: Section I 2017 Edition Section IV 2015 Edition Section VIII, Div Edition Section VIII, Div Edition (Errors) Section VIII, Div. 3 work in progress Section XII 2017 Edition PRT Scopes shown next
17 BPV PROGRAM AND PRT CERTIFICATE SCOPES (PRT) Parts Fabrication PRT-1 PRT-2 PRT-3 PRT-4 Fabrication of parts without design responsibility for ASME Section I at the above location only Fabrication of parts without design responsibility for ASME Section IV at the above location only Fabrication of parts without design responsibility for ASME Section VIII, Div. 1 at the above location only Fabrication of parts without design responsibility for ASME Section XII at the above location only
18 BPV PROGRAM SCOPES BEFORE PRT CERTIFICATES ASME offered the U-21 Scope for Section VIII, Div. 1, before PRT-3 was released U-21 Manufacture of pressure vessel parts (without design responsibility) at the above location only PRT-3 Fabrication of parts without design responsibility for ASME Section VIII, Div. 1 at the above location only ASME currently offers the U2-10 scope for Section VIII, Div. 2, since there is currently No PRT Scope U2-10 Manufacture of Class 1 and Class 2 pressure vessel parts (without design responsibility) at the above location only PRT-5 Fabrication of parts without design responsibility for ASME Section VIII, Div. 2 Class 1 and Class 2 pressure vessels at the above location only
19 BENEFITS OF PRT CERTIFICATE PROGRAM Removes a barrier for manufacturers wanting to become an ASME Certificate Holder to fabricate parts w/o design responsibilities as they would not be required to demonstrate design capabilities Organizations that do not perform design, as a part of supply, can spend their resources focusing on their core competencies The PRT Certificate will compliment and expand the existing BPVC product certificate program and increase the number of qualified suppliers
20 PRT CERTIFICATE PROMOTIONAL PRICE It is important to note that ASME is currently offering the PRT Certificate of Authorization at a 26% discount of the Certificate Fee The promotional price applies to new Certificate Holders
21 PRT CERTIFICATE PROGRAM FUTURE ASME expects to release the PRT Scope for Section VIII, Div. 2 with the publication of the 2019 edition. ASME also expects to be able to release PRT Scopes covering fabrication of parts for multiple BPV Sections under one Certificate (i.e. PRT-6 Fabrication of parts without design responsibility for ASME Sections I and VIII, Div. 1 for the above location ) sometime in 2019.
22 MUCHAS GRACIAS! Questions? Gerardo Moino
Pressure Vessels Asme Code Simplified
We have made it easy for you to find a PDF Ebooks without any digging. And by having access to our ebooks online or by storing it on your computer, you have convenient answers with pressure vessels asme
More informationQuality Control Manual For Asme Certification READ ONLINE
Quality Control Manual For Asme Certification READ ONLINE Boiler Quality Control Quality Boiler Work NBS - with the American Society of Mechanical Engineers and reduce manual entry time. Quality Control
More informationHSB Global Standards ASME Code Changes and Discussions
HSB Global Standards ASME Code Changes and Discussions Presented by: David M. Allore Field Services Manager September 12, 2012 AGENDA Guidelines for AI Review of Design Calculations Frequent Mistakes on
More informationSTP-NU CODE COMPARISON REPORT
CODE COMPARISON REPORT for Class 1 Nuclear Power Plant Components CODE COMPARISON REPORT for Class 1 Nuclear Power Plant Components Prepared for: Multinational Design Evaluation Programme Codes and Standards
More informationQUALITY ASSURANCE SPECIFICATION
Page 1 of 8 QAS: 2.02 QUALITY ASSURANCE SPECIFICATION REVISION: 0 DATE: 08/29/14 MATERIAL PURCHASING Code Material Purchase Specification for Pipe, Valves, Fitting, and Flanges PAGE 1 OF 8 1.0 Purpose
More informationASME SECTION VIII DIVISION 1 PDF
ASME SECTION VIII DIVISION 1 PDF ==> Download: ASME SECTION VIII DIVISION 1 PDF ASME SECTION VIII DIVISION 1 PDF - Are you searching for Asme Section Viii Division 1 Books? Now, you will be happy that
More informationRules for Inservice Inspection of Nuclear Power Plant Components
2013 ASME Boiler and Pressure Vessel Code AN INTERNATIONAL CODE XI Rules for Inservice Inspection of Nuclear Power Plant Components 29. 2013 ASME FINAL Covers_XI Rules Nuc MECH 5.9.indd 1 5/15/13 5:09
More informationEnabling the convergence of mechanical nuclear codes and standards requirements
Enabling the convergence of mechanical nuclear codes and standards requirements Dr. Andrew Wasylyk Project Manager - CORDEL October 2016 Moscow International Harmonisation Applicable and internationally
More informationMECHANICAL ENGINEERING FUNDAMENTALS Training Duration 5 days
Training Title MECHANICAL ENGINEERING FUNDAMENTALS Training Duration 5 days Training Dates & Venue REF ME091 Mechanical Engineering Fundamentals 5 28 Aug 01 Sep $4,250 Abu Dhabi, UAE Training will be held
More informationOptime Subsea AS. Web: BIC/SWIFT: SPTRN022 IBAN: NO
~Ä TABLE OF CONTENTS TABLE OF CONTENTS... 1 1 Introduction to Optime... 1 2 Products... 2 3 Services... 1 4 Quality, Health, Safety & Environment... 2 5 Partners & Supply chain... 2 1 Introduction to Optime,
More informationSECTION IX. ASME Boiler and Pressure Vessel Code An International Code ASME B PVC.I X-2017
ASME B PVC.I X-2017 SECTION IX We l d i n g, Br a zi n g, a n d Fu sin g Qu alific ations 2017 ASME Boiler and Pressure Vessel Code An International Code Qual i fi cat i on St and ard for We l d i ng,
More informationASME Geometric Dimensioning and Tolerancing Professional Certification Applicant Information Handbook
GO.ASME.ORG/GDTP ASME Geometric Dimensioning and Tolerancing Professional Certification Applicant Information Handbook The American Society of Mechanical Engineers ASME STATEMENT OF POLICY ON THE USE OF
More informationIntroduction to Fitness For Service November 10, 2016, University of Alberta, Edmonton.
Advancing Your Career! November 10, 2016 University of Alberta Engineering Teaching and Learning Center, 6th floor room 060 (ETLC 6 060) 116 Street NW., Edmonton, AB T6G 2V4 About This Workshop This workshop
More informationPressure Vessels Asme Code Simplified
We have made it easy for you to find a PDF Ebooks without any digging. And by having access to our ebooks online or by storing it on your computer, you have convenient answers with pressure vessels asme
More informationSCOPE OF ACCREDITATION TO ISO/IEC 17025:2005
SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 ZETEC, INCORPORATED 8226 Bracken Place SE, Suite 100 Snoqualmie, WA 98065 Scott Taylor, After Market Service Manager Phone: 425 974 2766 CALIBRATION Valid To:
More informationGENERAL DESCRIPTION OF THE CMC SERVICES
STANDARD FOR CERTIFICATION No.1.1 GENERAL DESCRIPTION OF THE CMC SERVICES MAY 2007 FOREWORD (DNV) is an autonomous and independent foundation with the objectives of safeguarding life, property and the
More informationFORM Q-120 PROCEDURE SPECIFICATION FOR CLASS II VESSELS (Revision C 2017) Part I Fabrication
FORM Q-120 Part I Fabrication PROCEDURE SPECIFICATION NUMBER: NOTE: Procedure Specification Form Q-120 for Class II vessels consists of three parts. Part I, Fabrication, shall be completed for each separately
More informationEssential Pressure Vessel Series
US ASME PV Course is now in Malaysia! Reserve early to avoid disappointment! Essential Pressure Vessel Series *HRDF Claimable *Claim 30 PDUs or 3.0 CEU with this course! (PMBOKTM Guide on Category Four
More informationsubmittals 1s e c t i o n
Architectural Woodwork Standards submittals 1s e c t i o n SECTION 1 introductory Information Introduction...25 What to Expect...25 Purpose...25 Level of Detail...25 Approvals...25 Scheduling...25 The
More informationInspection and Test Plan for Water Tube Boiler
www.inspectionforindustry.com Inspection and Test Plan for Water Tube Boiler No. AND TEST PLAN REFERENCE DOCUMENT ACCEPTANCE CRITERIA VERIFING DOCUMENT ACTIVITY BY MANUF. TPI CLIENT REMARK 1 PRE MEETING
More informationSTP-PT-032 BUCKLING OF CYLINDRICAL, THIN WALL, TRAILER TRUCK TANKS AND ASME SECTION XII
STP-PT-032 BUCKLING OF CYLINDRICAL, THIN WALL, TRAILER TRUCK TANKS AND ASME SECTION XII Date of Issuance: September 1, 2009 This report was prepared as an account of work sponsored by ASME Pressure Technologies
More informationTABLE OF CONTENTS. 1.0 Scope. 2.0 References. 3.0 Definitions. 4.0 Submission and Design Requirements. 5.0 Materials 5.1 General 5.
1.0 Scope 2.0 References 3.0 Definitions 4.0 Submission and Design Requirements 5.0 Materials 5.1 General 5.2 Marking 6.0 Equipment 7.0 Production 7.1 Steel Octagonal Poles 7.2 Base Plate 7.3 Top Cap 7.4
More informationINSPECTION AND TEST PLAN
BOILER AND TEST PLAN No. AND TEST PLAN REFERENCE DOCUMENT ACCEPTANCE CRITERIA VERIFING DOCUMENT ACTIVITY BY MANUF. TPI CLIENT REMARK 1 PRE MEETING SPEC. SPEC. MOM H H H Before Manufacturing 2 DWG, DESIGN,
More informationGeneral Presentation. EARTO WORKING GROUP Quality and Excellence in RTO Management. Presentation
EARTO WORKING GROUP Quality and Excellence in RTO Management Presentation Who is AIMEN? The Technology Centre AIMEN was established in Vigo (Spain) in 1967, promoted by a group of companies to provide
More informationType Approval JANUARY The electronic pdf version of this document found through is the officially binding version
STANDARD FOR CERTIFICATION No. 1.2 Type Approval JANUARY 2013 The electronic pdf version of this document found through http://www.dnv.com is the officially binding version The content of this service
More informationWeldment Visual Inspection Requirements
Table of Contents 1.0 Purpose / Scope / Timing... 2 1.1 Purpose / Scope... 2 1.2 Compliance Date... 2 2.0 Procedure / Quality Recd Requirements... 2 2.1 General Requirements... 2 2.2 Acceptance Criteria...
More informationPROPOSAL PAGE 1 OF 5 Revision 3, 4/21/2016. Inquiry: Is it permissible in Section I construction to utilize
PROPOSAL PAGE 1 OF 5 Case 2697 Unstayed Flat Head Constructed From Forged Material Section I Inquiry: Is it permissible in Section I construction to utilize flat heads with integral flanges constructed
More informationMEC-QW-E-2002 Senior QA/QC Welding Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS
101835-MEC-QW-E-2002 Senior QA/QC Welding Engineer Holds a B. Sc. in Mechanical Power Engineering and has about 15 years hands-on experience working as QA/QC Engineer & Welding Inspector in several industrial
More informationSCOPE OF ACCREDITATION TO ISO/IEC 17025:2005
SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005, CANADA 875, boul. Charest ouest, Suite 100 Quebec, QC, G1N 2C9 CANADA Ghislain Cournoyer, Systems Manufacturer & Services Manager Phone: 418 263 3686 CALIBRATION
More informationSECTION VIII. ASME Boiler and Pressure Vessel Code An International Code. Div ision 1 ASME BPVC.VI I I
ASME BPVC.VI I I.1-2017 SECTION VIII R u l e s f o r C o n stru cti o n o f P re ssu re Ves s els 2017 ASME Boiler and Pressure Vessel Code An International Code Div ision 1 Markings such as ASME, ASME
More informationISO INTERNATIONAL STANDARD
INTERNATIONAL STANDARD ISO 28781 First edition 2010-08-15 Petroleum and natural gas industries Drilling and production equipment Subsurface barrier valves and related equipment Industries du pétrole et
More informationDNVGL-CP-0338 Edition October 2015
CLASS PROGRAMME DNVGL-CP-0338 Edition October 2015 The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version. FOREWORD DNV GL class
More informationAnnexure - V. Specifications, Typical Drawing & Data Sheet for Split TEE (Hot Tapping Material)
Annexure - V Specifications, Typical Drawing & Data Sheet for Split TEE (Hot Tapping Material) CONTENTS SL NO. DESCRIPTION 1.0 SCOPE 2.0 REFERENCE DOCUMENTS 3.0 MANUFACTURER'S QUALIFICATION 4.0 MATERIALS
More informationMETAL FABRICATION SECTION 8: METAL FABRICATION SCOPE MATERIAL.
METAL FABRICATION SCOPE This specification applies to all metal intended to be rubber lined. Metals furnished must conform to this specification with respect to suitability for rubber lining or covering.
More informationINTERMEDIATE HEAT EXCHANGER (IHX) STP-NU-038
INTERMEDIATE HEAT EXCHANGER (IHX) STP-NU-038 STP-NU-038 ASME CODE CONSIDERATIONS FOR THE INTERMEDIATE HEAT EXCHANGER (IHX) Date of Issuance: September 24, 2010 This report was prepared as an account of
More informationASME BPV XI Interpretation Handout May 10, 2017
ASME BPV XI Interpretation Handout May 10, 2017 Interpretation# 16-2355 and Code Change pg. 2-4 Interpretation# 16-2701 pg. 5 Interpretation# 16-2702 pg. 6 Interpretation# 17-765 pg. 7 1 of 7 Revised Question
More informationFORM A-1P MANUFACTURER'S DATA REPORT FOR PLATE HEAT EXCHANGERS As Required by the Provisions of the ASME Code Rules, Section VIII, Division 2
Page of FORM A-1P MANUFACTURER'S DATA REPORT FOR PLATE HEAT EXCHANGERS As Required by the Provisions of the ASME Code Rules, Section VIII, Division 2 1. Manufactured and certified by: 2. Manufactured for:
More informationASME BPVC Sec I PG-99.2 The metal temperature shall not exceed 120 F (50 C) during the close visual examination
Code Comparison of ASME Boiler and Vessel Codes, Piping and API Standard Practices: Compiled by Goutham Rathinam, AweldI, CWSIP 3.1 (TWI,UK) Maximum Permissible Test Minimum Test ASME BPVC Sec I PG-99.1
More informationSCOPE OF ACCREDITATION TO ISO/IEC 17025:2005
SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 FRANCE Bâtiment : Le Pélican 3, Avenue Jeanne Garnerin, 91320 Wissous, FRANCE Francois Wlodarzyck, Calibration/Repair Lab Manager Phone: 00 33 1 60 92 39 39
More informationModule B contains eleven modules. This is Module B8. International Standards Development
0 Module B contains eleven modules. This is Module B8. International Standards Development 1 At the end of this module you will know What makes a Standard International The process by which ASME Standards
More informationSummary of the Recent AM Activities at the FAA
Summary of the Recent AM Activities at the FAA Presented to: AMMO Working Group October 4, 2017 (via telecon) Presented by: Dr. Michael Gorelik FAA Chief Scientist and Technical Advisor for Fatigue and
More informationSIGMA Ingenieurgesellschaft mbh
Software & Engineering PROBAD PROBAD Overview PROBAD is a solution for the code-based strength calculations of pressure parts. It allows re-checking, designing or optimizing of vessel- and pipe components
More informationWaste Treatment Plant Project Supply Chain Collaboration Event. QVD How To Get Started
Waste Treatment Plant Project 2016 Supply Chain Collaboration Event QVD How To Get Started Quality Verification Documentation (QVD) Discussion Topics Lessons Learned Start With The End In Mind (G-321-V
More informationASME B31.3 INTERPRETATIONS NO.9,
ASME B31.3 INTERPRETATIONS NO.9,, t, Replies to Technical Inquiries June 1, 1990, Through March 31, 1991 General Information It has been agreed to publish interpretations issued by the B31 Committee concerning
More information(AMMA) American Maritime Modernization Association
(AMMA) American Maritime Modernization Association AUDIT GUIDE FOR THE EVALUATION OF AMMA MEMBER WELDING, BRAZING, AND NON-DESTRUCTIVE TESTING (NDT) PROGRAMS Revised By: Joe Frith, AMMA Welding/Brazing/NDT
More informationEngineering Design and Training Services
PRESSURE VESSEL RELATED SERVICES: Pressure Vessels essels, Heat Exchangers,, Tanks Oil & Gas, Power,, Chemical, Petrochemical, Fertilizer etc. Engineering Design and Training Services Vision Statement
More informationPART MATERIALS. Section Fencing Materials. Description
PART 03000 - MATERIALS Section 03010 - Fencing Materials Description 03010.00 Scope - This section consists of the test requirements, specifications and tolerances for barbed wire, woven wire and chain
More informationAn FEA-Based Acoustic Fatigue Analysis Methodology
An FEA-Based Acoustic Fatigue Analysis Methodology Timothy C. Allison, Ph.D. Lawrence J. Goland, P.E. Southwest Research Institute San Antonio, TX ANSYS Regional Conference: Engineering the System August
More informationMeeting of October 21, 2014 Columbus, Ohio
Date Distributed: November 13, 2014 SUBCOMMITTEE REPAIR AND ALTERATION Meeting of October 21, 2014 Columbus, Ohio MINUTES These minutes are subject to approval and are for Committee use only. They are
More informationNew Work Item Proposal. Minimum requirements for the certification of products from sustainable marine fishery
New Work Item Proposal Minimum requirements for the certification of products from sustainable marine fishery ISO/TC 234 7th plenary meeting 28-29 October 2013 - Kochi Anne-Kristen Lucbert FranceAgriMer
More informationInternational Organization for Standardization. American National Standards Institute
DFTG1329 Standards are published documents that set up rules, specifications and protocols designed to ensure consistency, compatibility and reliability of products, materials and services. Standards are
More informationASME NQA-1 Quality Assurance Requirements for Nuclear Facility Applications. Prague, CR July 7 8, 2014
ASME NQA-1 Quality Assurance Requirements for Nuclear Facility Applications Prague, CR July 7 8, 2014 ASME NQA-1 Due to the expansion of the global supply chain and advances in technology, many codes and
More informationFEST Engineering Ltd. Technical Company for Engineering, Calculation and Design of Energy Facilities
FEST Engineering Ltd. Technical Company for Engineering, Calculation and Design of Energy Facilities ABOUT US In operation since 2005, first as FEST Engineering s.r.o., now FEST Engineering Ltd., was originally
More informationSCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 & ANSI/NCSL Z
SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 & ANSI/NCSL Z540-1-1994 THE MODAL SHOP, INC. A PCB GROUP COMPANY 3149 E. Kemper Road Cincinnati OH 45241 Lisa Moore Phone: 513 351-9919 CALIBRATION Valid To:
More informationEngineering Policy & Procedure
FPD > Engineering > Global Standards Engineering Policy & Procedure Revision History Number: G2-4 Section: G Subject: Radiographic Examination Procedure 1.0 SCOPE This procedure specifies the requirements
More informationPROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA
If project is not administered in PRISM, coordinate use of Exhibit 6 submittal schedule with this section. SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 REQUIREMENTS INCLUDED
More informationASME Boiler and Pressure Vessel Code AN INTERNATIONAL CODE VIII. Rules for Construction of Pressure Vessels. Division 1
2013 ASME Boiler and Pressure Vessel Code AN INTERNATIONAL CODE VIII Rules for Construction of Pressure Vessels Division 1 AN INTERNATIONAL CODE 2013 ASME Boiler & Pressure Vessel Code 2013 Edition July
More informationTPS 49 EDITION 2 JUNE 2009
TPS 49 EDITION 2 JUNE 2009 Interim arrangements & guidance on the interpretation of IEC 61672 Sound Level Meters - Periodic Tests CONTENTS SECTION PAGE 1 Purpose and duration 2 2 Statement 2 3 Specific
More information2017 British Woodworking Federation
2017 British Woodworking Federation Background The woodworking sector employs the highest ratio of apprentices in the construction sector. Apprenticeship reform opens up new opportunities for employing
More informationThis specification describes the minimum requirements for piping systems for the following service:
201/11/2 1/9 1.0 APPLICATION This specification describes the minimum requirements for piping systems for the following service: Underground Service Water Note: This specification does not apply to piping
More informationDNV GL approval of service supplier scheme
CLASS PROGRAMME DNVGL-CP-0484 Edition February 2016 The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version. FOREWORD DNV GL class
More informationAsme B31 1 Power Piping Design Standard Certification
ASME B31 1 POWER PIPING DESIGN STANDARD CERTIFICATION PDF - Are you looking for asme b31 1 power piping design standard certification Books? Now, you will be happy that at this time asme b31 1 power piping
More informationHarmonization of Nuclear Codes & Standards Pacific Nuclear Council Working and Task Group Report
Harmonization of Nuclear Codes & Standards Pacific Nuclear Council Working and Task Group Report 1. Introduction By S. S Dua PNC Working Group/Task Group Chair Atomic Energy of Canada Ltd. Canada This
More informationCORPORATE QUALITY SYSTEM PROCEDURE
Number: JVICQC-14.0 03/07/2016 Revision: 5 Page: Page 1 of 6 Approvals Author Director of Quality Assurance Name: Gary Corley Doyle Cassity Signature: Date: 03/07/2016 03/07/2016 Electronic versions of
More informationTrade of Metal Fabrication. Module 5: Pipe Fabrication Unit 3: Flanges Phase 2
Trade of Metal Fabrication Module 5: Pipe Fabrication Unit 3: Flanges Phase 2 Table of Contents List of Figures... 4 List of Tables... 5 Document Release History... 6 Module 5 Pipe Fabrication... 7 Unit
More informationa. Does a written detailed procedure exist and is it utilized for the soldering process? Identify procedure number and revision.
SECTION I Procedure: A 1. Identify the standard the supplier uses for performing soldering. MIL- STD 454 IPC-A-610 OTHER IF Other, Specify: A 2 a. Does a written detailed procedure exist and is it utilized
More informationASME B31.3 INTERPRETATIONS NO. 13
/. '.... _,' ASME B31.3 INTERPRETATIONS NO. 13 1 Replies to Technical Inquiries April 1, 1994, Through March 31, 1995 General Information It has been agreed to publish interpretations issued by the B31
More informationAsme Code Section Iii Division 5 Rules Of Construction
We have made it easy for you to find a PDF Ebooks without any digging. And by having access to our ebooks online or by storing it on your computer, you have convenient answers with asme code section iii
More informationThickness tolerances of steel plates and wide flats
(1981) (Rev.1 1989) (Rev.2 1992) (Rev.3 1995) (Rev.4 Oct 2009) (Rev.5 Feb 2012) Thickness tolerances of steel plates and wide flats.1 Scope.1.1 These requirements apply to the tolerance on thickness of
More informationCalculations per ABS Code along with ASME Sec. VIII Div.1 XXXX
Calculations per ABS Code along with ASME Sec. VIII Div.1 XXXX Grouping of Boilers and Pressure Vessels: PART 4 CHAPTER 4 SECTOIN 1 Table #2 and #3 >> Group II PART 4 CHAPTER 4 SECTOIN 1 Appendix 1 Rules
More informationSpecifications for EA31002 U Tube Bundle for CDU 3
Specifications for EA31002 U Tube Bundle for CDU 3 Tube Bundle Specificatio Tube Bundle for Heat Exchanger EA31002A/B/C/D Quantity required : One with Dummy shell Exchanger Type: BEU Horizontal No of U
More informationMESP TECHNICAL SPECIFICATION FOR TRANSMISSION WIRE HARD-DRAWN COPPER 19/ mm 2
Engineering Specification Electrical Networks TECHNICAL SPECIFICATION FOR TRANSMISSION WIRE HARD-DRAWN COPPER 19/2.14 70mm 2 Version: 1 Issued: January 2015 Owner: Engineering Division Approved By: Pat
More informationDevelopments in Electromagnetic Inspection Methods I
6th International Conference on NDE in Relation to Structural Integrity for Nuclear and Pressurized Components October 2007, Budapest, Hungary For more papers of this publication click: www.ndt.net/search/docs.php3?mainsource=70
More informationASME INTERPRETATIONS NO. 19
ASME 831.3 INTERPRETATIONS NO. 19 Replies to Technical Inquiries April 1, 2001 through October 31, 2003 General Information It has been agreed to publish interpretations issued by the B31 Committee concerning
More informationElectroimpact Supplier Inspection Documentation
AN AS9100 REGISTERED COMPANY Electroimpact Supplier Inspection Documentation 1. Inspection documentation may be submitted using one of two methods: a. Preferred method - Electronic - Submitting a complete
More informationTechnical specification for Purchase requisition number:
Technical specification for Purchase requisition number: 3000012238 Fabrication, Testing and Supply of the Heat Exchanger & Tube Bundle 1. Scope of Supply: Fabrication, Testing and Supply of one (01) nos
More informationCITY OF NAPERVILLE DEVELOPMENT SERVICES TEAM ELEVATOR INSTALLATION/MODERNIZATION/REPAIR
CITY OF NAPERVILLE DEVELOPMENT SERVICES TEAM ELEVATOR INSTALLATION/MODERNIZATION/REPAIR Permit # Complete this application and submit it to the Development Services Team, 400 S. Eagle Street, Naperville.
More informationThe use of FRP & Dual Laminates
AC Plastiques The use of FRP & Dual Laminates to solve all your corrosion problems w w w. a c p l a s t i q u e s. c o m Approved and acclaimed piping technology: Exabond 1395, montée Chénier, Les Cèdres,
More informationForming and process experience from the operation of a 3,000 ton Flexform deep draw press
Forming and process experience from the operation of a 3,000 ton Flexform deep draw press Document no SE037406 Revision 1 Page 1(3) White paper Siemens Industrial Turbomachinery AB. Sture Olsson and Ingemar
More informationAmerican Nuclear Society
American Nuclear Society 1 Unraveling the Mystery of Consensus Standards Presented by: The American Nuclear Society Standards Committee January 31, 2017 Copyright 2017 by American Nuclear Society Purpose
More informationPressure Vessel FEA Consulting Services
Pressure Vessel FEA Consulting Services ASME Section VIII, Division 2 Fatigue Analysis of Pressure Vessels and Heat Exchangers Within the ASME Section VIII, Division 2 code, the design-by-analysis requirement
More informationA. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.
SECTION 01300 PART 1 GENERAL 1.1 SECTION INCLUDES A. Description of Requirements B. Submittal Procedures C. Specific Submittal Requirements D. Action on Submittals E. Repetitive Review 1.2 DESCRIPTION
More informationA. Action Submittals: Written and graphic information that requires Architect's responsive action.
SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification
More informationAC 20.IMA and RTCA/DO- 297, Integrated Modular Avionics (IMA) Development Guidance Certification and Considerations
AC 20.IMA and RTCA/DO- 297, Integrated Modular Avionics (IMA) Development Guidance Certification and Considerations Issues involved with invoking RTCA/DO-297 as an Acceptable Means of Compliance for IMA
More information2.14 Main Cable Type HO7RN-F4G10-15 Metres each Chiller Tank Capacity- 75 Litres Compressor- 3.5 Tons Refrigeration type
PAGE 2 of 6 2.14 Main Cable Type HO7RN-F4G10-15 Metres each 2.15 (a) O/P Voltage-350V(Max.) (b) O/P Current 150A(Max.) 2.16 Chiller Tank Capacity- 75 Litres Compressor- 3.5 Tons Refrigeration type 2.17
More informationSection Meetings Section Material and Equipment. None Required
January 2000 Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK PART 2 PRODUCTS The General Conditions of the Contract, General Requirements and Supplemental
More informationShell-and-Tube Heat Exchangers API STANDARD 660 NINTH EDITION, MARCH 2015
Shell-and-Tube Heat Exchangers API STANDARD 660 NINTH EDITION, MARCH 2015 Special Notes API publications necessarily address problems of a general nature. With respect to particular circumstances, local,
More informationRADIOGRAPHIC EXAMINATION PROCEDURE
Page 1 of 19 Doc. No. KNS/RT/01.REV 0 RADIOGRAPHIC EXAMINATION PROCEDURE Page: 19 of 19 Date: 15.09.2012 RADIOGRAPHIC EXAMINATION PROCEDURE PREPARED & APPROVED BY NDE- Level III CERTIFIED BY REVIEWED BY
More informationTECHNICAL INSTRUCTIONS: FOUNDRY. Page 1 of 8
TECHNICAL INSTRUCTIONS: FOUNDRY. Page 1 of 8 SPECIFICATION FOR M.S. FABRICATED MOULDING TIF 717 BOXES ( WITH BUSHES ) Rev: 01 1.0 SCOPE: 1.1. This specification covers the requirements of moulding boxes
More informationIntroducing FIRE RATED Raised Panel Doors and Frames Call for details
08 14 33/ENJ BuyLine 0179 R ENJO Architectural Millwork Custom Wood Doors and Windows for Commercial and Residential Applications When ENJO makes an entrance,...everybody notices. Introducing FIRE RATED
More informationEngineering Drawing Office Practice; Graphical Engineering Communication Engineering Draughting Skills; Introduction to CAD/CAM or similar Unit
Higher National Unit Specification General information for centres Unit title: Engineering Drawing Unit code: DR1W 34 Unit purpose: This Unit is designed to enable candidates to gain knowledge of current
More informationMarket Survey for the F4E Diagnostics Team
Market survey on availability of engineering effort to (1) provide support on the preparation of build-to-print design specifications of the Diagnostics; (2) and to provide industrial expertise on the
More informationSupplier Quality Requirements for First Article Inspection SQR-011. Revision Date: 16 March 2011
Supplier Quality Requirements for First Article Inspection SQR-011 Revision Date: 16 March 2011 Approved David Copeland, Manager Supply Chain Quality Suppliers may view this document via the Internet at:
More informationSCOPE OF ACCREDITATION TO ISO/IEC 17043:2010
SCOPE OF ACCREDITATION TO ISO/IEC 17043:2010 HN PROFICIENCY TESTING INC. 10219 Coral Reef Way Indianapolis, IN 46256 Henrik Nielsen Phone: 317 713 2988 Web: http://www.hn-proficiency.com/ PROFICIENCY TESTING
More informationIS STANDARDIZATION FOR AUTONOMOUS CARS AROUND THE CORNER? By Shervin Pishevar
IS STANDARDIZATION FOR AUTONOMOUS CARS AROUND THE CORNER? By Shervin Pishevar Given the recent focus on self-driving cars, it is only a matter of time before the industry begins to consider setting technical
More informationEmergency Pipeline Repair Systems; A Global Overview of Best Practice
Emergency Pipeline Repair Systems; A Global Overview of Best Practice Brief Introduction to EPRS EPRS: Key Challenges Worldwide EPRS: Global Approaches to These Challenges Best Practice Comparison James
More informationTYPE OF PIPING PRESSURE TESTING. For large diameter piping hand wipe/ sweep should be applied as much as possible (inspection to be recorded).
ATTACHMENT A (1/1) TYPE OF PIPING PRESSURE TESTING TEST TYPE TEST MEDIUMS APPLIED (As per Block Dia.) WORK SEQUENCE HYDROSTATIC Water * For SS/HA piping Max. Cl. 40 ppm General CASE-1 (Base Case) CASE-2
More informationSECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS
SECTION 01 33 00 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationMDEP Codes and Standards Working Group. CSWG s Initiative to Harmonize Nuclear Pressure-Boundary Codes and Standards
MDEP Codes and Standards Working Group CSWG s Initiative to Harmonize Nuclear Pressure-Boundary Codes and Standards MDEP Codes and Standards Working Group s (CSWG s) Goal Achieve harmonization of code
More informationIndustrial Solutions & Innovation, LLC. Watts Specialties
Watts Specialties Improving Your Pipe Capabilities For Over 30 Years www.watts-specialties.com 24 & 36 Computerized Cutter Specifications W-242 W-244 W-362 W-364 Number of computer drive axis Number of
More information