Installation, Operation & Maintenance Manual

Size: px
Start display at page:

Download "Installation, Operation & Maintenance Manual"

Transcription

1 Original Instructions Installation, Operation & Maintenance Manual Saf-T-Vise STV-HP1 Insertable Tool Holders S-CM-IOM

2 Do not install, maintain, or operate this equipment without reading, understanding, and following the appropriate Sentry Equipment Corp instructions. Otherwise, injury, damage, or both may result. Copyright 2017 by Sentry Equipment Corp. All rights reserved. All product and company names are property of their respective owners. This document contains proprietary information. No part of this document may be photocopied or reproduced without the prior written consent of Sentry Equipment Corp. Limit of Liability Sentry Equipment Corp, its employees, agents, and the authors and contributors to this document specifically disclaim all liabilities and warranties, express or implied (including warranties of merchantability and fitness for a particular purpose), for the accuracy, currency, completeness, and/or reliability of the information contained herein and/or for the fitness for any particular use and/or for the performance of any material and/or equipment selected in whole or part with the user of/or in reliance upon information contained herein. Selection of materials and/or equipment is at the sole risk of the user of this publication. Note The information contained in this document is subject to change without notice. 2 Sentry Equipment Corp

3 Table of Contents Safety Information... 4 General Safety Precautions... 5 General Description... 6 Specifications Saf-T-Vise SVT-HP1 Insertable Tool Holder Specifications... 6 Installation Operation Installation and Retrieval Saf-T-Vise STV-T1 Tool Insertion... 7 Saf-T-Vise STV-T1 Tool Retraction Saf-T-Vise STV-T2 Tool Insertion Saf-T-Vise STV-T2 Tool Retraction Saf-T-Vise STV-T3 Tool Insertion Saf-T-Vise STV-T3 Tool Retraction Maintenance Inspecting the Safety Cap Prepping the Tool Holder for Reinstallation Cleaning the Rod/Probe Shaft Changing a Rod/Shaft and Replacing a Seal Changing a Coupon/Checking Probe End Troubleshooting Leaks Locking Collet Standard Warranty Customer Support Saf-T-Vise STV-HP1 3

4 Safety Information Please read the entire manual before attempting to unpack, set up, or operate this product. Pay careful attention to all Warnings, Cautions, and Notes. Failure to do so could result in serious personal injury and/or equipment damage. Use of Hazard Information If multiple hazards exist, the signal word corresponding to the greatest hazard shall be used. Definitions DANGER indicates a hazardous situation which, if not avoided, will result in death or serious injury. WARNING indicates a hazardous situation which, if not avoided, could result in death or serious injury. CAUTION, used with the safety alert symbol, indicates a hazardous situation which, if not avoided, could result in minor or moderate injury. NOTICE is used to address practices not related to personal injury. Â Information that requires special emphasis. Â TIP Alternate techniques or clarifying information. SHALL: This word is understood to be mandatory. SHOULD: This word is understood to be advisory. 4 Sentry Equipment Corp

5 General Safety Precautions Product Selection, Installation, and Use Improper selection, installation, or use can cause personal injury or property damage. It is solely the responsibility of users, through their own analysis and testing, to select products suitable for their specific application requirements, ensure they are properly maintained, and limit their use to their intended purpose. Follow proper local, state, and federal regulations for proper installation and operational requirements. Always use caution and common sense when working with any chemical. Read the product label and Material Safety Data Sheets (MSDS) carefully and follow the instructions exactly. Potential Equipment Hazards Hot surfaces! This equipment may have very hot surfaces. If an operator contacts a hot surface, injury may occur. Use protective clothing to prevent injury. If other equipment comes in contact with a hot surface, damage to the equipment may occur. Ensure the area around this equipment is kept clear to prevent damage from occurring. High pressures! This equipment may contain fluids at very high pressures. Prior to installing, removing or maintaining this equipment, ensure that the equipment is isolated from all connecting piping, the equipment is depressurized, the contents have been drained, and the equipment is cool. Saf-T-Vise STV-HP1 5

6 General Description The Sentry Saf-T-Vise SVT-HP1 insertable tool holders are multi-functional tools that can be equipped to monitor pipeline corrosion, inject chemical into the process, or sample the pipeline medium. The holders are engineered to specific site applications with a variety of materials and connection styles and sizes. Design pressure and temperature requirements determine the model series and sealing technology of the holder. The holders are designed with a patented locking collet which secures the rod/shaft within the process stream until released by the operator. A process bleeder valve is standard on holders to allow depressurization of the holder after closure of the process isolation valve. The ability to fully retract the rod/shaft out of the pipeline while under pressure allows for pigging without bringing the line down. The standard Saf-T-Vise SVT-HP1 models require the use of an insertion tool. Collet lock bolt Upper body assembly Lower body assembly Indicator button Safety cap Safety cap NPT threads Upper body set screw Bleeder valve Specifications Saf-T-Vise SVT-HP1 Insertable Tool Holder Specifications Maximum allowable operating pressure (MAP) of 5,000 psi at 100 F (344.7 bar at 38 C). : Flanged units have a MAP based on the class of flange used for process line connection and can be rated to a lower MAP. The Teflon seal has a maximum process temperature of 450 F (232.2 C). The graphoil seal has a maximum process temperature of 1000 F (537.8 C). Holder Type: Corrosion Coupon, Atomizer, Sample or Injection Quill. 316/316L SS is the standard material for process wetted components. Connection Style: Flanged or NPT Threaded connection. Standard NPT Connection Sizes: 1/2", 3/4", 1", 1-1/2", or 2". Flange Connection Sizes: Customer specified. (In flanged units, holder is threaded and welded to flange.) Installation Rod/shaft NPT pipeline connection Welded stop The Saf-T-Vise SVT-HP1 tool holders attach to a pipeline isolation valve by means of either a flanged or NPT threaded connection. A holder is installed or removed during the operation and maintenance of the equipment as detailed in the following sections. 6 Sentry Equipment Corp

7 Operation Installation and Retrieval The installation and retrieval methods for the Saf-T-Vise SVT-HP1 tool holders depend upon which insertion tool is used: Saf-T-Vise STV-T1 Insertion Tool Saf-T-Vise STV-T2 Insertion Tool Saf-T-Vise STV-T3 Insertion Tool Read instructions thoroughly before installing or using equipment. Contact your representative or factory customer service if you have any questions. Failure to follow these instructions could result in serious injury or death. Tools needed tape measure permanent marker 12" adjustable wrench anti-seize lubricant torque wrench Teflon tape or paste Saf-T-Vise STV-T1 Tool Insertion The Saf-T-Vise STV-T1 insertion tool may be used for Saf-T-Vise SVT-HP1 coupon holders with rod lengths up to 42 (106.7 cm). Threaded Rod Brass Stem Actuator Wheel Brass Bushing Maintain a firm grip on the Saf-T-Vise STV-T1 insertion tool actuator wheel throughout the insertion procedure, and keep body away from the travel path of the holder rod. An unsecured rod could move outwards forcefully, causing serious injury or death. 1. Close and lock the process isolation valve to prevent incidental opening while installing the unit. 2. Determine desired insertion depth. a. Measure from the top of pipeline isolation valve to the desired zone within the pipeline. TIP Tool compensation: Coupons are generally located ¼ from the bottom of the process line. Set Screw Locking Collet Bolt Rod/Shaft Threaded Tube End Bleeder Valve b. Record measurement for use in step Mark desired insertion depth on rod/shaft. a. Loosen the locking collet bolt on the holder and insert the rod to the fully inserted position. b. Retract the rod until the desired insertion depth is achieved (reference recorded measurement from step 2). Desired insertion depth is measured from the tip of the rod, compensating for attachment (see Tip), to the bottom thread or flange of the body assembly. Saf-T-Vise STV-HP1 7

8 c. Mark the rod with a permanent marker just above the locking collet (above the NPT high pressure insertion tool/ safety cap connecting threads). 4. Secure holder to process line isolation valve connection. a. Retract the marked rod completely into the holder and tighten the locking collet bolt to secure the rod in the holder. b. Apply Teflon tape or paste to the process line isolation valve/holder connection c. Secure the holder to the isolation valve. d. Verify that the locking collet bolt is secure. e. Make sure that the bleeder valve is closed completely. 5. Install Saf-T-Vise STV-T1 insertion tool. a. Place the actuator wheel over the brass stem of the Saf-T-Vise STV-T1 tool housing. b. Turn the actuator wheel counterclockwise to move the brass bushing to the top of the tool. (The threaded rod of the insertion tool will protrude through the actuator wheel.) c. Position the threaded tube end of the Saf-T-Vise STV-T1 tool over the threads of the Saf-T-Vise SVT-HP1 tool holder and tighten onto the tool holder body. d. Tighten brass bushing onto rod adapter. e. Make sure that the brass bushing is flush with the rod and that the process pressure bleeder valve is tightly closed. f. Tighten the locking collet bolt to 35 ft-lb (47.45 Nm). This torque will hold a rod securely up to the design pressure of the unit. g. Tighten set screw. 6. Slowly open the process isolation valve. Check for leaks. If graphoil seal leaks: a. Close isolation valve. b. Slowly open bleeder valve. c. Loosen set screw that secures upper body to lower body. d. Tighten upper body onto lower body; re-tighten set screw. e. Close bleeder valve. f. Resume installation. If Teflon seal leaks: Close isolation valve, relieve pressure with bleeder valve, and contact your representative or factory customer service. 7. Insert rod/shaft into pipeline. a. Loosen the locking collet bolt. b. Turn the actuator wheel clockwise to insert the rod/shaft to the desired depth; use the mark made in step 3 as a reference. c. Tighten the locking collet bolt to 35 ft-lb (47.45 Nm). This torque will hold a rod securely up to the design pressure of the unit. 8. Remove Saf-T-Vise STV-T1 tool. a. Double-check that the locking collet bolt is tight on the rod. b. Loosen set screw on the Saf-T-Vise STV-T1 tool. 8 Sentry Equipment Corp

9 c. Loosen the threaded end of the Saf-T-Vise STV-T1 tool tube and thread the tool off the Saf-T-Vise SVT-HP1 tool holder. Attach safety cap securely to the rod/shaft holder. A loose safety cap can become a projectile and could cause serious injury or death. 9. Install safety cap. a. Place the safety cap over the end of the insertion rod/shaft and thread securely to the holder. TIP If the safety cap is too short to thread securely, or if it engages the red warning indicator, please contact your representative or the factory for assistance. b. Make sure that the red warning indicator remains flush with the end of the safety cap. Saf-T-Vise STV-T1 Tool Retraction The Saf-T-Vise STV-T1 insertion tool may be used for Saf-T-Vise SVT-HP1 coupon holders with rod lengths up to 42 (106.7 cm). Maintain a firm grip on the Saf-T-Vise STV-T1 insertion tool actuator wheel throughout the retraction procedure, and keep body away from the travel path of the holder rod. An unsecured rod could move outwards forcefully, causing serious injury or death. Do not remove the safety cap if the red indicator button on the safety cap is extended. Removal of the safety cap could cause the cap and/or the rod/shaft to move outwards forcefully, causing serious injury or death. 1. Inspect the safety cap before removing. a. If the red indicator button is flush with the safety cap, continue with step 2. b. If the red indicator button is extended, the rod/shaft could be loose. Tighten the locking collet bolt and then test the safety cap. If the cap is hard to remove, the collet is not tightening on the rod/shaft. If the locking collet bolt cannot tighten or if the safety cap is hard to remove, do not continue until the process line is depressurized. If the rod is loose and cannot be tightened, the safety cap should not be removed while the process line is under pressure. 2. Remove safety cap slowly. Set Screw Locking Collet Bolt Threaded Rod Brass Stem Actuator Wheel Brass Bushing Rod/Shaft Threaded Tube End Bleeder Valve 3. Install the Saf-T-Vise STV-T1 tool. a. Make sure that the locking collet bolt is tight on the rod/shaft and that the process pressure bleeder valve is tightly closed. b. Place the actuator wheel over the brass stem of the Saf-T-Vise STV-T1 tool housing. Saf-T-Vise STV-HP1 9

10 c. Turn the actuator wheel counterclockwise to move the brass bushing to the top of the tool. (The threaded rod of the insertion tool will protrude through the actuator wheel.) d. Position the threaded tube end of the Saf-T-Vise STV-T1 tool over the threads of the Saf-T-Vise SVT-HP1 tool holder and tighten onto the holder body. e. Tighten brass bushing onto rod adapter. Make sure bushing is flush with the rod. f. Tighten set screw. 4. Retract rod/shaft from pipeline. a. Hold the actuator wheel firmly and loosen the locking collet bolt. b. Turn the actuator wheel counterclockwise until the rod no longer moves. This indicates that the rod has fully retracted into the body of the tool, past the process isolation valve. c. Slowly close the process isolation valve. If the process isolation valve has difficulty closing, make sure that the rod is completely retracted past the isolation valve. If the rod is stuck, use the Saf-T-Vise STV-T2 or STV-T3 tool to pull the rod. In some instances, the Saf-T-Vise STV-T1 tool might work by pushing it in and then retracting several times to remove the scale. 5. Slowly open the tool bleeder valve, venting the process pressure trapped within the tool. 6. Remove the Saf-T-Vise STV-T1 tool. a. Tighten the locking collet bolt to be hand tight to be sure the rod/shaft will not slip out when removing the tool. b. Slowly open the bleeder valve, venting the process pressure trapped within the holder. c. Turn the actuator wheel counterclockwise to thread the adapter off the end of the insertion rod/shaft. d. Loosen set screw. e. Loosen the threaded end of the Saf-T-Vise STV-T1 tool tube and thread the tool off the Saf-T-Vise SVT-HP1 tool holder. Support the rod/shaft during removal from the process isolation valve to prevent bending. 7. Remove the holder from the process isolation valve. Saf-T-Vise STV-T2 Tool Insertion Maintain a firm grip on the Saf-T-Vise STV-T2 insertion tool hand crank throughout the insertion procedure, and keep body away from the travel path of the rod/shaft. An unsecured rod/shaft could move outwards forcefully, causing serious injury or death. The Saf-T-Vise STV-T2 insertion tool may be used for Saf-T-Vise STV-HP1 tool holders with rod/shaft lengths up to 48" (121.9 cm). 1. Close and lock the process isolation valve to prevent incidental opening while installing the unit. 2. Determine desired insertion depth. a. Measure from the top of pipeline isolation valve to the desired zone within the pipeline. (See Tip.) 10 Sentry Equipment Corp

11 TIP Tool compensation: Coupons are generally located ¼ in (6.35 mm) from the bottom of the process line, atomizers are located in the upper 1/3 of the line, and quills are placed in the middle 1/3 of the process line. b. Record measurement for use in step Mark desired insertion depth on rod/shaft. a. Loosen the locking collet bolt on the holder and insert the rod/shaft to the fully inserted position. b. Retract the rod/shaft until the desired insertion depth is achieved (reference recorded measurement from step 2). Desired insertion depth is measured from the tip of the rod, compensating for attachment (see Tip), to the bottom thread or flange of the body assembly. c. Mark the rod/shaft with a permanent marker just above the locking collet (above the NPT high pressure insertion tool/safety cap connecting threads). 4. Secure holder to process line isolation valve connection. a. Retract the marked rod/shaft completely into the holder and tighten the locking collet bolt to secure the rod/ shaft in the holder. b. Apply Teflon tape or paste to the process line isolation valve/holder connection. c. Secure the holder to the isolation valve. d. Verify that the locking collet bolt is secure. 5. Install the Saf-T-Vise STV-T2 insertion tool. a. Remove the support handle from the storage area at the top of the tool and thread it into the handle position on the side of the base. If brand new, remove acorn nut on hand crank and remove hand crank assembly (be sure not to lose key on shaft). Flip assembly to allow for turning, and thread acorn nut back on. b. Turn the Saf-T-Vise STV-T2 tool hand crank counterclockwise until the travel plate is flush with the top plate. c. Align the groove openings of the brass swivel joint and the housing to allow installation of the rod/shaft into the insertion tool. d. Install the rod/shaft into the swivel joint and tighten swivel joint onto holder s threads. e. Reposition the holder so swivel joint groove aligns with housing opening. f. Quills, flat coupon holders, and 90-degree atomizers are marked with a directional arrow near the top of the shaft. If applicable, align the arrow so that the rod/shaft is oriented appropriately for the pipeline flow (see Tip). g. Use the hand crank to move the travel plate down far enough that the rod/shaft threads are fully exposed through the travel plate. h. Remove the retrieval bushing nut from the storage set screw on the top plate and thread it onto the end of the rod, securing the rod/shaft to the insertion tool. i. Tighten the locking collet bolt to 35 ft lb (47.45 Nm) and make sure that the bleeder valve is closed completely. Travel Plate Hand Crank Bleeder Valve Storage Set Screw Top Plate Retrieval Bushing Nut Support Handle Brass Swivel Joint Collet Lock Bolt Saf-T-Vise STV-HP1 11

12 TIP Aligning arrows: Injection quill: align arrow with pipe on downstream side. Sample quill: align arrow with pipe on upstream side. Flat coupon holder: align arrow with pipe on either the up or downstream side. 90-degree adapters with bete nozzles: align arrow with pipe on downstream side. 6. Insert rod/shaft into pipeline. a. Hold the hand crank firmly throughout the insertion. b. Open the process isolation valve slowly. Check for leaks. If graphoil seal leaks: a. Close isolation valve. b. Slowly open bleeder valve. c. Loosen set screw that secures upper body to lower body. d. Tighten upper body onto lower body; re-tighten set screw. e. Close bleeder valve. f. Resume installation. If Teflon seal leaks: Close isolation valve, relieve pressure with bleeder valve, and contact your representative or factory customer service. c. Loosen the locking collet bolt. d. Use the hand crank to insert the rod/shaft to the desired depth; use the mark made in step 3 as a reference. e. Tighten the locking collet bolt to 35 ft-lb (47.45 Nm). This torque will hold a rod/shaft securely up to the design pressure of the unit. 7. Remove Saf-T-Vise STV-T2 tool. a. Verify that the locking collet bolt is tightened to 35 ft lb (47.45 Nm). b. Remove the retrieval bushing nut from the end of the rod/shaft and thread it onto the storage set screw on the top plate of the insertion tool. c. Turn the Saf-T-Vise STV-T2 tool hand crank counterclockwise until the travel plate is past the top of the rod/shaft. If the rod/shaft retracts with the travel plate when you turn the hand crank counterclockwise, then the locking collet is not functioning properly. Contact your representative or Sentry customer service before continuing. d. Hold on to the insertion tool to prevent it from falling as you loosen the brass swivel joint from the holder s threads. e. Align the groove openings of the brass swivel joint and the housing to allow removal of the insertion tool. Attach safety cap securely to the rod/shaft holder. A loose safety cap can become a projectile and could cause serious injury or death. 8. Install safety cap. a. Place the safety cap over the end of the insertion rod/shaft and thread securely to the holder. b. Make sure that the red warning indicator remains flush with the end of the safety cap. 12 Sentry Equipment Corp

13 If the safety cap is too short to thread securely, or if it engages the red warning indicator, please contact your representative or the factory for assistance. Saf-T-Vise STV-T2 Tool Retraction The Saf-T-Vise STV-T2 insertion tool may be used for Saf-T-Vise STV-HP1 insertable tool holders with rod/shaft lengths up to 48" (121.9 cm). Maintain a firm grip on the Saf-T-Vise STV-T2 insertion tool hand crank throughout the retraction procedure, and keep body away from the travel path of the rod/shaft. An unsecured rod/shaft could move outwards forcefully, causing serious injury or death. Do not remove the safety cap if the red indicator button on the safety cap is extended. Removal of the safety cap could cause the cap and/or the rod/shaft to move outwards forcefully, causing serious injury or death. 1. Inspect the safety cap before removing. a. If the red indicator button is flush with the safety cap, continue with step 2. b. If the red indicator button is extended, the rod/shaft could be loose. If the rod/shaft is loose and cannot be tightened, the safety cap should not be removed while the process line is under pressure. Tighten the locking collet bolt and then test the safety cap. If the cap is hard to remove, the collet is not tightening on the rod/shaft. If the locking collet bolt cannot tighten or if the safety cap is hard to remove, do not continue until the process line is depressurized. 2. Remove safety cap slowly. 3. Install the Saf-T-Vise STV-T2 insertion tool. a. Remove the support handle from the storage area at the top of the tool and thread it into the handle position on the side of the base. If brand new, remove acorn nut on hand crank and remove hand crank assembly (be sure not to lose key on shaft). Flip assembly to allow for turning, and thread acorn nut back on. b. Turn the Saf-T-Vise STV-T2 tool hand crank counterclockwise until the travel plate is flush with the top plate. c. Align the groove openings of the brass swivel joint and the housing to allow installation of the rod/shaft into the insertion tool. d. Install the rod/shaft into the swivel joint and tighten swivel joint onto holder s threads. Travel Plate Hand Crank Bleeder Valve Storage Set Screw Top Plate Retrieval Bushing Nut Support Handle Brass Swivel Joint Collet Lock Bolt Saf-T-Vise STV-HP1 13

14 e. Reposition the holder so swivel joint groove aligns with housing opening. f. Use the hand crank to move the travel plate down far enough that the rod/shaft threads are fully exposed through the travel plate. g. Remove the retrieval bushing nut from the storage set screw on the top plate and thread it onto the end of the rod, securing the rod/shaft to the insertion tool. h. Make sure that the bleeder valve is closed completely. 4. Retract the rod/shaft from the pipeline. a. Hold the hand crank firmly throughout the retraction. b. Loosen the locking collet bolt. c. Turn the crank counterclockwise until the crank will no longer turn. This indicates that the tool has fully retracted into the body of the tool, past the process isolation valve. d. Slowly close the process isolation valve. If the process isolation valve has difficulty closing, make sure that the rod/shaft is completely retracted past the isolation valve. e. Slowly open the bleeder valve on the rod/shaft holder to vent the process pressure trapped within the holder. 5. Remove the Saf-T-Vise STV-T2 tool. a. Tighten the locking collet bolt to hand tight so the rod/shaft will not slip out when removing the tool. b. Remove the retrieval bushing nut from the end of the rod/shaft and thread it onto the storage set screw on the top plate of the insertion tool. c. Turn the Saf-T-Vise STV-T2 tool hand crank counterclockwise until the travel plate is past the top of the rod/shaft. d. Hold on to the Saf-T-Vise STV-T2 tool to prevent it from falling as you loosen the brass swivel joint from the tool holder s threads. e. Align the groove openings of the brass swivel joint and the housing to remove the Saf-T-Vise STV-T2 tool. Support the rod/shaft during removal from the process isolation valve to prevent bending. 6. Remove the tool holder from the process isolation valve. Leave the bleeder valve open to relieve pressure in the event the process valve leaks. 14 Sentry Equipment Corp

15 Saf-T-Vise STV-T3 Tool Insertion The Saf-T-Vise STV-T3 insertion tool is designed to insert rods/shafts that are longer than 48" (121.9 cm). Note that the Saf-T-Vise STV-T3 tool will work for any Saf-T-Vise SVT-HP1 tool holder regardless of length. Maintain a firm grip on the Saf-T-Vise STV-T3 insertion tool hand crank throughout the insertion procedure, and keep body away from the travel path of the rod/shaft. An unsecured rod/shaft could move outwards forcefully, causing serious injury or death. 1. Close and lock the process isolation valve to prevent incidental opening while installing the unit. 2. Determine desired insertion depth. a. Measure from the top of pipeline isolation valve to the desired zone within the pipeline. TIP Tool compensation: Coupons are generally located ¼" from the bottom of the process line, atomizers are located in the upper 1/3 of the line, and quills are placed in the middle 1/3 of the process line. b. Record measurement for use in step Mark desired insertion depth on rod/shaft. a. Loosen the locking collet bolt on the holder and insert the rod/shaft to the fully inserted position. b. Retract the rod/shaft until the desired insertion depth is achieved (reference recorded measurement from step 2). Desired insertion depth is measured from the tip of the rod, compensating for attachment (see Tip), to the bottom thread or flange of the body assembly. c. Mark the rod/shaft with a permanent marker just above the locking collet (above the NPT high pressure insertion tool/safety cap connecting threads). 4. Secure holder to process line isolation valve connection. a. Retract the marked rod/shaft completely into the holder and tighten the locking collet bolt to secure the rod/shaft in the holder. b. Apply Teflon tape or paste to the process line isolation valve/holder connection. c. Secure the holder to the isolation valve. d. Verify that the locking collet bolt is secure. Support Handle Locking Collet Bolt Top Plate Support Handle Storage Area Travel Plate Insertion Collet Assembly Hand Crank Brass Swivel Joint Bleeder Valve 5. Install the Saf-T-Vise STV-T3 insertion tool. a. Remove the support handle from the storage area at the top of the tool and thread it into the handle position on the side of the base. If brand new, remove acorn nut on hand crank and remove hand crank assembly (be sure not to lose key on shaft). Flip assembly to allow for turning, and thread acorn nut back on. b. Turn the Saf-T-Vise STV-T3 tool hand crank counter-clockwise until the travel plate is either flush with the top plate or only as high as it is possible to safely access the bolts once tool is on the holder. Saf-T-Vise STV-HP1 15

16 c. Remove the insertion collet assembly located on the travel plate by removing the two (2) collet assembly fasteners. Next, remove the front collet, making sure not to lose either collet. d. Align the groove openings of the brass swivel joint and the housing to allow installation of the rod/shaft into the insertion tool. e. Install the rod/shaft into the swivel joint and tighten swivel joint onto holder s threads. f. Reposition the holder so swivel joint groove aligns with housing opening. g. Quills, flat coupon holders, 90-degree atomizers are marked with a directional arrow near the top of the shaft. If applicable, align the arrow so that the rod/shaft is oriented appropriately for the pipeline flow. TIP Aligning arrows: Injection quill: align arrow with pipe on downstream side. Sample quill: align arrow with pipe on upstream side. Flat coupon holder: align arrow with pipe on either the up or downstream side. 90-degree adapters with bete nozzles: align arrow with pip on downstream side. h. Using the hand crank, adjust the position of the travel plate to the desired height. i. Insert the rod/shaft into the groove for the collet assembly as well as the groove on the top plate. j. Re-install the insertion collet assembly by installing the collet onto the rod/shaft. Secure the two (2) collet assembly fasteners to the travel plate. k. Tighten the locking collet bolt on the Saf-T-Vise STV-T3 tool to 35 ft lb (47.45 Nm) and make sure that the bleeder valve is closed completely. 6. Insert rod/shaft into pipeline. Collet Assembly Fasteners Maintain a firm grip on the insertion tool hand crank throughout the insertion procedure, and keep body away from the travel path of the rod/shaft. An unsecured rod/shaft could move outwards forcefully, causing serious injury or death. a. Open the process isolation valve slowly. Check for leaks. If graphoil seal leaks: a. Close isolation valve. b. Slowly open bleeder valve. c. Loosen set screw that secures upper body to lower body. d. Tighten upper body onto lower body; re-tighten set screw. e. Close bleeder valve. f. Resume installation. If Teflon seal leaks: Close isolation valve, relieve pressure with bleeder valve, and contact your representative or factory customer service. b. Loosen the locking collet bolt on the holder only, and use the hand crank to insert the rod/shaft. c. For rods/shafts longer than 48" (121.9 cm), multiple insertions are needed. To make an additional insertion of the tool: 16 Sentry Equipment Corp

17 Bring the travel plate to the bottom of the Saf-T-Vise STV-T3 tool and tighten the locking collet bolt on the holder to 35 ft-lb (47.45 Nm). Loosen the insertion collet on the Saf-T-Vise STV-T3 tool, move the draw bar up as high as you can safely reach, and then tighten the collet on the Saf-T-Vise STV-T3 tool to 35 ft-lb (47.45 Nm). Loosen the locking collet bolt on the holder, turn the crank, and move the draw bar and shaft down as far as it will go or until desired depth is achieved. Tighten the collet on the holder and repeat insertions as needed until the desired depth is achieved. d. Tighten the locking collet bolt on the holder to 35 ft-lb (47.45 Nm). This torque will hold a rod/shaft securely up to the design pressure of the unit. 7. Remove Saf-T-Vise STV-T3 tool. a. Remove the insertion collet assembly from the travel plate on the Saf-T-Vise STV-T3 tool by removing the two (2) collet assembly fasteners. b. Hold on to the Saf-T-Vise STV-T3 tool to prevent it from falling as you loosen the brass swivel joint from the holder s threads. c. Unthread the brass swivel joint from the holder and align the groove openings of the brass swivel joint and the housing to allow removal of the Saf-T-Vise STV-T3 tool. Attach safety cap securely to the rod/shaft holder. A loose safety cap can become a projectile and could cause serious injury or death. 8. Install safety cap. a. Place the safety cap over the end of the insertion rod/shaft and thread securely to the holder. If the safety cap is too short to thread securely, or if it engages the red warning indicator, please contact your representative or the factory for assistance. b. Make sure that the red warning indicator remains flush with the end of the safety cap. Saf-T-Vise STV-T3 Tool Retraction The Saf-T-Vise STV-T3 insertion tool is designed to insert rods/shafts that are longer than 48" (121.9 cm). Note that the Saf-T-Vise STV-T3 tool will work for any Saf-T-Vise SVT-HP1 tool holder regardless of length. Maintain a firm grip on the Saf-T-Vise STV-T3 insertion tool hand crank throughout the retraction procedure, and keep body away from the travel path of the rod/shaft. An unsecured rod/shaft could move outwards forcefully, causing serious injury or death. Do not remove the safety cap if the red indicator button on the safety cap is extended. Removal of the safety cap could cause the cap and/or the rod/shaft to move outwards forcefully, causing serious injury or death. 1. Inspect the safety cap before removing. a. If the red indicator button is flush with the safety cap, continue with step 2. b. If the red indicator button is extended, the rod/shaft could be loose. Saf-T-Vise STV-HP1 17

18 Tighten the locking collet bolt and then test the safety cap. If the cap is hard to remove, the collet is not tightening on the rod/shaft. If the locking collet bolt cannot tighten or if the safety cap is hard to remove, do not continue until the process line is depressurized. If the rod/shaft is loose and cannot be tightened, the safety cap should not be removed while the process line is under pressure. 2. Remove safety cap slowly. 3. Install the Saf-T-Vise STV-T3 insertion tool. a. Remove the support handle from the storage area at the top of the tool and thread it into the handle position on the side of the base. If brand new, remove acorn nut on hand crank and remove hand crank assembly (be sure not to lose key on shaft). flip assembly to allow for turning, and thread acorn nut back on. b. Turn the Saf-T-Vise STV-T3 tool hand crank counter-clockwise until the travel plate is flush with the top plate. c. Remove the insertion collet assembly located on the travel plate by removing the two (2) collet assembly fasteners. Next, remove the front collet, making sure not to lose either collet. d. Align the groove openings of the brass swivel joint and the housing to allow installation of the rod/shaft into the insertion tool. e. Install the rod/shaft into the swivel joint and tighten swivel joint onto holder s threads. f. Reposition the holder so swivel joint groove aligns with housing opening. g. Quills, flat coupon holders, and 90-degree atomizers are marked with a directional arrow near the top of the shaft. If applicable, align the arrow so that the rod/shaft is oriented appropriately for the pipeline flow. TIP Aligning arrows: Injection quill: align arrow with pipe on downstream side. Sample quill: align arrow with pipe on upstream side. Flat coupon holder: align arrow with pipe on either the up or downstream side. 90-degree adapters with bete nozzles: align arrow with pip on downstream side. h. Using the hand crank, adjust the position of the travel plate to the desired height. i. Insert the rod/shaft into the groove for the insertion collet assembly as well as the groove on the top plate. j. Re-install the insertion collet assembly by installing the insertion collet onto the rod/shaft. Secure the two (2) collet assembly fasteners to the travel plate. k. Tighten the insertion collet bolt on the Saf-T-Vise STV-T3 tool to 35 ft lb (47.45 Nm) and make sure that the bleeder valve on the holder is closed completely. 4. Retract rod/shaft from pipeline. Collet Assembly Fasteners Maintain a firm grip on the Saf-T-Vise STV-T3 insertion tool hand crank throughout the retraction procedure, and keep body away from the travel path of the rod/shaft. An unsecured rod/shaft could move outwards forcefully, causing serious injury or death. 18 Sentry Equipment Corp

19 a. Hold the hand crank firmly throughout the retraction. b. Loosen the locking collet bolt on the holder only. c. Turn the hand crank counterclockwise until the travel plate is either flush with the top plate of the retraction tool or as high as you can safely reach. d. For rods longer than 48" (121.9 cm), multiple retractions will be needed. To make another retraction of the tool: Bring the travel plate flush to the top plate of the tool. Tighten the locking collet bolt on the holder to 35 ft lb (47.45 Nm). Loosen the insertion collet on the draw bar, move the draw bar down as far as possible, and then tighten the collet on the Saf-T-Vise STV-T3 tool to 35 ft lb (47.45 Nm). Loosen the collet on the holder, turn the crank to move the draw bar and shaft up as far as you can safely reach, then tighten the collet on the holder to 35 ft lb (47.45 Nm). Repeat until the tool is completely retracted into the body. e. Slowly close the process isolation valve. If the process isolation valve has difficulty closing, make sure that the rod/shaft is completely retracted past the isolation valve. f. Slowly open the tool bleeder valve, venting the process pressure trapped within the tool. 5. Remove Saf-T-Vise STV-T3 insertion tool. a. Remove the insertion collet assembly from the travel plate on the Saf-T-Vise STV-T3 tool by removing the two (2) collet assembly fasteners. TIP Each insertion collet assembly is unique to each retrieval tool, be sure to keep the removed assembly with the specific tool retractor. b. Hold on to the Saf-T-Vise STV-T3 tool to prevent it from falling as you loosen the brass swivel joint from the holder s threads. c. Align the groove openings of the brass swivel joint and the housing to allow removal of the Saf-T-Vise STV-T3 tool. Support the rod/shaft during removal from the process isolation valve to prevent bending. 6. Remove the holder from the process isolation valve. Leave the bleeder valve open to relieve pressure in the event the process valve leaks. Saf-T-Vise STV-HP1 19

20 Maintenance All maintenance procedures assume the Saf-T-Vise SVT-HP1 insertable tool holder has been properly removed from the line. See retraction section for the appropriate insertion tool for instructions. Inspecting the Safety Cap Remove safety cap from holder and ensure the red indicator is still in good condition. If the indicator is faded, brittle, or missing, return the cap to the factory for indicator repair. Prepping the Tool Holder for Reinstallation After each use the tool holder threads should be checked and cleaned. Tools needed Clean rag Pick or small screwdriver Teflon tape or paste Anti-seize lubricant 1. Use a small pick or screwdriver to remove Teflon tape from the threads of the holder and the isolation valve connection threads. 2. After tape and debris are removed, wipe down the threads with a clean rag. 3. Reapply Teflon tape and anti-seize lubricant to the holder threads. Cleaning the Rod/Probe Shaft The rod/probe shaft should be cleaned each time the tool holder is removed from the line. This helps prevent buildup on the rod/shaft and damage to the seal. Tools needed Clean rag Cleaner/solvent 320 grit sand paper or other finer grit paper Medium crescent wrench Molykote 55 lubricant or other fine viscosity lubricant 1. Remove the holder from the line. 2. Loosen the locking collet bolt and slide the rod/shaft to the fully inserted position (until the stop hits the top of the body). Leave the locking collet loose so the rod/shaft can be spun inside the body. 3. Clean the exposed rod/shaft with 320 grit or finer sand paper using a rotational motion. 4. When the exposed rod/shaft is cleaned of external debris, wipe the rod/shaft with a clean rag and solvent to remove any leftover debris. 5. Slide the rod/shaft to the fully retracted position and repeat the steps above to clean the remaining rod/shaft. 6. When the rod/shaft is thoroughly clean, wipe the rod/shaft with Molykote 55 lubricant or other fine viscosity lubricant. 20 Sentry Equipment Corp

21 Changing a Rod/Shaft and Replacing a Seal Tools needed Medium crescent wrench Permanent marker ¼" NPT nipple 2" 4" (5 10 cm) in length (for atomizers or quills only) Hex key set Small pick or screwdriver Clean rag Seal Installation Tool (for Teflon seals only) P/N E for 3/8" OD rod/shaft P/N F for ¼" OD rod/shaft New seal for holder (Teflon or graphoil as needed) Molykote 55 lubricant or other fine viscosity lubricant Anti-seize lubricant 320 grit or finer sandpaper Cleaner/solvent 1. Remove the rod/shaft. a. With the holder removed from the line, loosen the locking collet and slide the rod/shaft to the fully inserted position, leaving 1" (2.5 cm) between the top of the holder and the adapter lock nut. b. Tighten the locking collet bolt to 35 ft-lb (47.45 Nm). c. Remove adapter. Coupon holder only: If using a flat coupon, use a permanent marker to mark the rod to show where the orientation arrow points on the shaft (reference the arrow at the top of the shaft). Use a medium crescent wrench to loosen the adapter lock nut. Remove both the adapter and the lock nut. Atomizer shaft or quill shaft: With a permanent marker, mark the rod to show where the orientation arrow points on the shaft (reference the arrow at the top of the shaft). If fluid inlet does not have wrench flats, use a ¼" NPT nipple threaded into the fluid inlet adapter to remove the adapter from the shaft. If the adapter has a fluid inlet assembly, you can use the existing assembly to aid in removal. d. Loosen the collet and slide the shaft out of the body of the holder. 2. Separate the upper and lower body of the holder a. Use a hex key to loosen (but not completely remove) the small set screw on the upper body. Make sure the set screw is loose. Failure to loosen the set screw can cause permanent damage to the holder. b. With the set screw loose, remove the upper body. If the upper body is difficult to remove, stop immediately and make sure that the set screw is loose. 3. Replace the seal. a. With the upper body removed, use a pick or small screwdriver to gently pick out the old seal. Saf-T-Vise STV-HP1 21

22 b. Clean the seal body of the holder with a clean rag. c. Insert new seal: For Teflon seal: Place the new Teflon seal onto the seal insertion tool with the seal opening facing away from the handle. Lubricate the open-faced edge of the seal with Molykote 55 or other fine viscosity lubricant by placing a dot of lubricant on your finger, then slowly rolling your finger around the outside lip of the seal, completely coating the outside edge. Insert the Teflon seal into the holder body by pushing the tool and seal straight into the body of the holder. Make sure the seal tool is straight with the holder to ensure you do not side load the seal. Remove the seal tool. For graphoil seal: Insert the graphoil seal directly into the holder body. Make sure you push the seal straight into the body of the holder to avoid side loading the seal. 4. Reassemble the holder. a. Apply a small amount of anti-seize lubricant to the lower body threads where the upper body threads on. Do not tighten the set screw until the upper and lower body of the holder are properly aligned. Tightening the set screw on the threads will permanently damage the tool. b. Loosen the set screw enough to allow for easy assembly. c. Thread the upper body of the holder onto the lower body. For Teflon seal: Tighten the upper body until it is snug against the lower body. Tighten set screw. For graphoil seal: Do not tighten the set screw until after installation of the rod/shaft. Thread, but do not tighten the upper body down to the lower body. When using a graphoil seal, tightening the upper body without a rod/shaft in the holder will damage the seal and prevent insertion of the rod/shaft. 5. (Re)Install the rod/shaft. a. Clean the rod/shaft before installing. If reinstalling a used rod/shaft, thoroughly clean the rod/shaft with 320 grit or finer sandpaper using a rotational motion, then wipe the rod/shaft with a clean rag and solvent to remove any leftover debris. If installing a new rod/shaft, wipe the new rod/shaft down with solvent and a clean rag to remove any debris. b. Add a small amount of Molykote 55 or other fine lubricant to the rod/shaft c. Wrap the threaded end of the rod/shaft with two (2) complete wraps of Teflon tape to protect the seal during rod/shaft insertion. d. Place the rod/shaft into the holder carefully. If the rod/shaft cannot pass through the body, make sure the locking collet is loose and oriented in the correct direction (dot on top). It is sometimes easier to completely remove the locking collet from the body. Be careful not to lose collet. 22 Sentry Equipment Corp

23 Each insertion collet assembly is unique to each retrieval tool. Be sure to keep the removed assembly with the specific tool retractor. e. Once the rod/shaft is through the body of the holder, reinstall the locking collet (if removed) with the orientation dot facing the top of the tool, and tighten the collet. f. Remove the protective Teflon tape from the rod/shaft. g. For atomizer or quill shaft only, reapply new Teflon tape (2 3 wraps is adequate). Coupon holder rods do not need Teflon tape. 6. Finish reassembly. For coupon holder rods only a. Move rod/shaft through tool so the last 1.5 inches are visible out the top of the holder. b. Tighten the locking collet bolt to 35 ft-lb (47.45 Nm). c. Reinstall the adapter and lock nut securely on the rod. d. If using a graphoil seal, gently tighten the upper body onto the lower body, and then tighten the set screw. If using graphoil seal, do not overtighten the upper body. This will make the rod/shaft difficult to move and cause excessive wear on the seal. e. The tool is now ready to go back into service. For atomizer or quill shafts a. Add a very small amount of anti-seize lubricant to the shaft end (take special care not to get any anti-seize lubricant in the shaft as this could clog your nozzle tip). b. Thread the fluid adapter onto the shaft and tighten the adapter using the small ¼" nipple (or fluid inlet assembly) if no wrench flats are present. c. If re-installing a used shaft, tighten down to the mark made earlier. If installing a new shaft, align the mark on the fluid adapter with the outlet of the atomizer tip or quill. d. If using graphoil a seal, gently tighten the upper body onto the lower body, and then tighten the set screw. e. The tool is now ready to go back into service. Changing a Coupon/Checking Probe End Tools needed Clean rag Cleaner/solvent 320 grit sand paper or other finer grit paper Medium crescent wrench Molykote 55 lubricant or other fine viscosity lubricant Flat tip screwdriver 1. Remove tool holder from the process pipeline by following instructions for specific insertion tool. 2. Remove old coupon or inspect the rod/shaft as needed. 3. Clean the rod/probe shaft. 4. If using a coupon holder, attach the new coupon. 5. Reinstall the tool holder into the pipeline by following instructions for specific insertion tool. Saf-T-Vise STV-HP1 23

24 Troubleshooting Leaks Fluid Inlet Assembly Leaks 1. Isolate and bleed down the pressure, and attempt to tighten the leak point. If leak persists, continue with next step. 2. Re-tape the fittings on the fluid inlet assembly. a. Remove the entire holder from the process line. b. Remove the fluid inlet assembly from the holder. c. Disassemble and remove all the old Teflon tape from fluid inlet assembly and then re-tape the fittings. d. Reassemble the fluid inlet assembly using a small amount of anti-seize lubricant on each fitting. Do not overtighten the fittings as this can cause a leak point. e. If leak persists, continue with the next step. 3. If the leak persists at a particular point, close the isolation valve, relieve pressure with bleeder valve, and contact your representative or factory customer service. Seal Leaks Teflon Seal: If the holder is leaking from the top of the holder body where the rod/shaft and body meet, the Teflon seal is damaged and requires replacement. See section on Seal Replacement on page 21. Graphoil Seal: If the holder is leaking from the top of the holder body where the rod/shaft and body meet, the graphoil seal is most likely loose. 1. Adjust the top body to tighten the seal. a. Loosen the small set screw on the upper body. b. Using a crescent wrench on the top body wrench flats, turn the upper body clockwise in 1/4-turn increments until the leak stops. c. Turn the upper body an additional 1/4 turn clockwise. d. Re-tighten the small set screw on the upper body to prevent the body from loosening. e. If leak persists, the graphoil seal is damaged and requires replacement. See section on Seal Replacement on page 21. Connection Leaks 1. If the holder leaks from any threaded portion, immediately isolate the holder from the line and remove process pressure. 2. Remove the holder from the isolation valve. 3. Follow the procedure for Prepping a Holder for Reinstallation. This procedure can be used for all connection points on a holder including the fluid inlet assembly, probe shaft adapters, bleeder valves, and any other connections that may be on the holder. Bleeder Valve Leaks If the holder leaks from the bleeder valve outlet or bleeder valve stem, the bleeder valve is damaged and should be replaced. Contact the factory to order a replacement valve. 24 Sentry Equipment Corp

25 Locking Collet Not locking shaft in place If the locking collet fails to lock the rod/shaft in place with 35 ft lb (47.45 Nm) of torque applied to the collet locking bolt, the locking collet is damaged and must be replaced. Please contact the factory to order a replacement. Do not interchange collets between tool holders. Collets are specially machined for each tool holder individually and cannot be interchanged. Collet repair must be performed by the factory. Rod/shaft marred by collet 1. Check collet orientation. If the collet has an orientation indicator dot (see photo), the indicator dot must always face toward the top of the holder. Collets without the indicator dot are not dependent on orientation. a. If the collet is upside down, remove the locking collet bolt from the holder and gently tap the holder on a hard surface to remove the collet. b. Reinstall the collet with the orientation indicator dot facing toward the top of the holder, and then reinstall the locking collet bolt. 2. Check the collet for wear. A worn collet will not distribute pressure evenly on the rod/shaft and may cause damage. If the collet is worn, the entire holder must be replaced immediately. Collets are matched to a body assembly during manufacturing and cannot be replaced separately. Standard Warranty Sentry Equipment Corp ( Seller ) warrants products manufactured by it and supplied hereunder ( Products ) to be free from defects in workmanship and, to the extent materials are selected by Seller, to be free from defects in materials, in each case for a period as defined in the table below: Brand Product Line Warranty Period Sentry Steam & Water Sampling Products and Systems Solid & Powder Sampling Products and Systems Gas Sampling Products and Systems Eighteen months from date of shipment or twelve months from startup (whichever occurs first) Liquid & Slurry Sampling Products and Systems Corrosion Monitoring Products Waters Equipment Steam & Water Sampling Products and Systems Twelve months from date of shipment To view the full warranty, go to Saf-T-Vise STV-HP1 25

Installation, Operation & Maintenance Manual

Installation, Operation & Maintenance Manual Original Instructions Installation, Operation & Maintenance Manual Saf-T-Vise STV-T Series Insertion Tools S-CM-IOM-00510-0 7-17 Do not install, maintain, or operate this equipment without reading, understanding,

More information

Installation, Operation & Maintenance Manual

Installation, Operation & Maintenance Manual Original Instructions Installation, Operation & Maintenance Manual Sentry HPT Series & Saf-T-Vise HPTEXL Insertion Tools S-PI-IOM-00463-1 8-16 Do not install, maintain, or operate this equipment without

More information

CV Control Valves Installation and Operation Manual

CV Control Valves Installation and Operation Manual CV00 - Control Valves Installation and Operation Manual Overview Warning: This bulletin should be used by experienced personnel as a guide to the installation of the Armstrong CV00 Control Valve. Selection

More information

Reliance SG800 Series Steel Water Gage Valves

Reliance SG800 Series Steel Water Gage Valves Installation, Operation, & Maintenance Instructions R500.541D1 10/16/2016 Reliance SG800 Series Steel Water Gage Valves Note: Design variations in Steel Water Gage Valves necessitate typical illustrations,

More information

INSTRUCTION SHEET STRUT DRIVER RETROFIT KIT PN: 22-79SDRF

INSTRUCTION SHEET STRUT DRIVER RETROFIT KIT PN: 22-79SDRF INSTRUCTION SHEET STRUT DRIVER RETROFIT KIT PN: 22-79SDRF COMPONENTS: - Note: Each kit comes with one Strut Driver Gear Case Assembly, one Strut Driver Tube End Adapter Assembly, and a One-Time-Use Threadlocker

More information

YALE FIGURE 500 & 500R CLOSURE OPERATION AND MAINTENANCE INSTRUCTIONS

YALE FIGURE 500 & 500R CLOSURE OPERATION AND MAINTENANCE INSTRUCTIONS YALE FIGURE 500 & 500R CLOSURE OPERATION AND MAINTENANCE INSTRUCTIONS IMPORTANT INFORMATION Note To Supervisor: Please share this information with your employees and make sure they have received training

More information

Caution: Installation and Operation Instructions. Locking Mechanism (if supplied) Set Screws Backed Out. Mounting Orientation

Caution: Installation and Operation Instructions. Locking Mechanism (if supplied) Set Screws Backed Out. Mounting Orientation Genie Probe Regulator (GPR)/ Genie Probe (GP2)/ Genie Probe for Composite Sampler (CSA)/ And (Model H) Installation and Operation Instructions Caution: Not designed for external fire. Prior to use in a

More information

MUELLER. Improved, Centurion Series, Modern Improved, and 107. Fire Hydrants. Inserting Extention Sections. Reliable Connections

MUELLER. Improved, Centurion Series, Modern Improved, and 107. Fire Hydrants. Inserting Extention Sections. Reliable Connections insertion Instructions manual MUELLER Improved, Centurion Series, Modern Improved, and 107 table of contents PAGE Centurion Series Fire Hydrant Adding an Extention 2-3 Improved Fire Hydrant Inserting Extention

More information

STRINGING MACHINE OWNER'S MANUAL. Copyright 1998 GAMMA Sports - All Rights Reserved

STRINGING MACHINE OWNER'S MANUAL. Copyright 1998 GAMMA Sports - All Rights Reserved 6002 STRINGING MACHINE OWNER'S MANUAL Issue 3 - June 20, 1998 Copyright 1998 GAMMA Sports - All Rights Reserved 6002 OWNER'S MANUAL TABLE OF CONTENTS PAGE 1... WARRANTY PAGE 2... FEATURES PAGE 3... ASSEMBLY

More information

GP-SD GENIE PROBE SMALL DIAMETER

GP-SD GENIE PROBE SMALL DIAMETER For GENIE PROBE SMALL DIAMETER Installation and Operation Instructions 2 for s Locking Mechanism (if supplied) Set Screws Backed Out To ensure that the is Locking never accidentally loosened or Mechanism

More information

Traditional Wall Mounted Potfiller

Traditional Wall Mounted Potfiller TOOLS NEEDED FOR INSTALLATION 1/4 hex wrench (provided in installation kit) 3/32 hex wrench (provided in installation kit) Pencil or marker PTFE tape Small level, or carpenters square Power Drill with

More information

Fisher 667 Diaphragm Actuators Size 80 and 100

Fisher 667 Diaphragm Actuators Size 80 and 100 Instruction Manual 667 Size 80 and 100 Actuators Fisher 667 Diaphragm Actuators Size 80 and 100 Contents Introduction... 1 Scope of Manual... 1 Description... 2 Specifications... 2 Maximum Pressure Limitations...

More information

HARDINGE Installation booklet For: Dead-Length Collet Adaptation Chucks Stationary Collet

HARDINGE Installation booklet For: Dead-Length Collet Adaptation Chucks Stationary Collet HARDINGE Installation booklet For: Dead-Length Collet Adaptation Chucks Stationary Collet Read the enclosed instructions and recommendations before any installations CONTENTS Dead-Length Collet Adaptation

More information

MODEL 83 Pail Handler

MODEL 83 Pail Handler MORSE MFG. CO., INC. 727 West Manlius Street P.O. Box 518 East Syracuse, NY 13057-0518 Phone: 315-437-8475 Fax: 315-437-1029 Email: service@morsemfgco.com Website: www.morsemfgco.com COPYRIGHT 2005 MORSE

More information

MUELLER GAS. DH-5 Drilling Machine. For use on 1 1 /2 & 2 Line Stopper Fittings. Reliable Connections. General Information 2

MUELLER GAS. DH-5 Drilling Machine. For use on 1 1 /2 & 2 Line Stopper Fittings. Reliable Connections. General Information 2 operating Instructions manual MUELLER GAS TAble of contents PAGE DH-5 Drilling Machine For use on 1 1 /2 & 2 Line Stopper Fittings General Information 2 Installing and Stopping-off 1 1 /2 and 2 Line Stopper

More information

Engineering Data Single Reduction Parts List Item # Description Basic Single Reduction Unit 1. Gear Housing 2. Pipe Plug 3. Vent Plug 4. Splash Guard

Engineering Data Single Reduction Parts List Item # Description Basic Single Reduction Unit 1. Gear Housing 2. Pipe Plug 3. Vent Plug 4. Splash Guard Engineering Data Single Reduction Parts List Item # Description Basic Single Reduction Unit 1. Gear Housing 2. Pipe Plug 3. Vent Plug 4. Splash Guard 5. Input Cover 6. O-Ring 7. Hex Head Cap Screw 8. Input

More information

MUELLER. Improved, Centurion Series, Modern Improved, and 107. Fire Hydrants. Inserting Extension Sections. Reliable Connections

MUELLER. Improved, Centurion Series, Modern Improved, and 107. Fire Hydrants. Inserting Extension Sections. Reliable Connections insertion Instructions manual MUELLER Improved, Centurion Series, Modern Improved, and 107 table of contents PAGE Centurion Series Fire Hydrant Adding an Extension 2-3 Improved Fire Hydrant Inserting Extension

More information

REPAIR INSTRUCTIONS. Cat. No Cat. No MILWAUKEE ELECTRIC TOOL CORPORATION. SDS Max Demolition Hammer. SDS Max Rotary Hammer

REPAIR INSTRUCTIONS. Cat. No Cat. No MILWAUKEE ELECTRIC TOOL CORPORATION. SDS Max Demolition Hammer. SDS Max Rotary Hammer Cat. No. 9-0 SDS Max Demolition Hammer Cat. No. -0 SDS Max Rotary Hammer MILWAUKEE ELECTRIC TOOL CORPORATION W. LISBON ROAD BROOKFIELD, WISCONSIN 00-0 8-9-0 d 000 8-9-0 d Special Tools Require Forcing

More information

Power Train Lift Max. Capacity: 1,250 lbs.

Power Train Lift Max. Capacity: 1,250 lbs. 655 EISENHOWER DRIVE OWATONNA, MN 55060 USA PHONE: (507) 455-7000 TECH. SERV.: (800) 533-6127 FAX: (800) 955-8329 ORDER ENTRY: (800) 533-6127 FAX: (800) 283-8665 INTERNATIONAL SALES: (507) 455-7223 FAX:

More information

25000 Series Lo-T TM Butterfly Control Valve Instructions

25000 Series Lo-T TM Butterfly Control Valve Instructions November 2001 25000 Series Lo-T TM Butterfly Control Valve Instructions Instruction No. 25.1:IM PRELIMINARY STEPS Before installation, note the flow direction arrow on the valve body. The flow should enter

More information

LPK1550 Hydraulic Crimping Tool 15-ton

LPK1550 Hydraulic Crimping Tool 15-ton SERVICE MANUAL LPK1550 Hydraulic Crimping Tool 15-ton Serial Code FYF Read and understand all of the instructions and safety information in this manual before operating or servicing this tool. Register

More information

COBRA SERIES CONVERTER

COBRA SERIES CONVERTER COBRA SERIES CONVERTER Important: Any maintenance, service or repair should be performed by trained and experienced service technicians. Proper tools and equipment should be used to prevent injury to the

More information

Pro Lift Instructions

Pro Lift Instructions Pro Lift Instructions Effective January 2018 Review full manual instructions prior to use for important safety information. Always check Rockler.com to confirm that you are using the most recent manual

More information

Reliance SG777 Series Steel Water Gage Valves

Reliance SG777 Series Steel Water Gage Valves Installation, Operation, & Maintenance Instructions R500.SG777 10/16/2016 Reliance SG777 Series Steel Water Gage Valves Note: Design variations in Steel Water Gage Valves necessitate typical illustrations,

More information

Maintenance Information

Maintenance Information 16601023 Edition 2 January 2014 Air Impact Wrench 2705P1 Maintenance Information Save These Instructions Product Safety Information WARNING Failure to observe the following warnings, and to avoid these

More information

WALK-BEHIND SPREADER 50 LB. CAPACITY Model 99623

WALK-BEHIND SPREADER 50 LB. CAPACITY Model 99623 WALK-BEHIND SPREADER 50 LB. CAPACITY Model 99623 Assembly, Operating, and Maintenance Instructions Diagrams within this manual may not be drawn proportionally. Due to continuing improvements, actual product

More information

HARDINGE Installation booklet For:

HARDINGE Installation booklet For: HARDINGE Installation booklet For: L Flange Nose Dead-Length Collet Adaptation Chucks Draw Collet Read the enclosed instructions and recommendations before any installations WARRANTY & RETURN PROCEDURES

More information

3 Emergency Breakaway Coupling

3 Emergency Breakaway Coupling SM64227 July 2008 Applicable addition manuals: N/A Aerospace Group Conveyance Systems Division Carter Ground Fueling Maintenance & Repair Manual 3 Emergency Breakaway Coupling Model 64227 Table of Contents

More information

3 POINT HITCH LOGSPLITTER

3 POINT HITCH LOGSPLITTER 3 POINT HITCH LOGSPLITTER OPERATOR S MANUAL AND PARTS LIST TABLE OF CONTENTS SECTION PAGE 1. GENERAL INFORMATION 1 2. SAFETY GUIDELINES 2 2.1 DEFINITIONS 2 2.2 SAFE OPERATING PROCEDURE 3 3. LOG SPLITTER

More information

High Speed Air Turbine Handpiece

High Speed Air Turbine Handpiece OPERATION MANUAL High Speed Air Turbine Handpiece Please read this Operation Manual carefully before use and file for future reference. Handpiece should not be used with friction grip burs exceeding 18.5

More information

Model DB Disc Caliper Brake AIR CHAMP PRODUCTS. User Manual. (i) MTY (81)

Model DB Disc Caliper Brake AIR CHAMP PRODUCTS. User Manual. (i) MTY (81) DIST. AUTORIZADO MEX (55) 53 63 3 3 QRO (44) 95 7 60 MTY (8) 83 54 0 8 AIR CHAMP PRODUCTS User Manual Model DB Disc Caliper Brake (i) FORM NO. L-00-G-030 MEX (55) 53 63 3 3 MTY (8) 83 54 0 8 DIST. AUTORIZADO

More information

Fisher 667 Diaphragm Actuator Sizes 30/30i 76/76i and 87

Fisher 667 Diaphragm Actuator Sizes 30/30i 76/76i and 87 Instruction Manual 667 Actuator (Size 30/30i - 76/76i and 87) Fisher 667 Diaphragm Actuator Sizes 30/30i 76/76i and 87 Contents Introduction... 1 Scope of Manual... 1 Description... 2 Specifications...

More information

H4670/42192 Submersible Trash Pump

H4670/42192 Submersible Trash Pump SERVICE MANUAL H4670/42192 Submersible Trash Pump Serial Code GLW Read and understand all of the instructions and safety information in this manual before operating or servicing this tool. 99916070 REV

More information

NOVA-EXT Versatile Projector Mount Model: NOVA-EXT

NOVA-EXT Versatile Projector Mount Model: NOVA-EXT INSTALLATION MANUAL NOVA-EXT Versatile Projector Mount Model: NOVA-EXT NORTH AMERICA 3130 East Miraloma Avenue Anaheim, CA 92806 USA USA and Canada Phone: 800-368-9700 Fax: 800-832-4888 Other Locations

More information

Fig Remove chain cover plate bolts. Fig Remove hammer member. Fig Loosen set screws at base of 12-tooth sprocket.

Fig Remove chain cover plate bolts. Fig Remove hammer member. Fig Loosen set screws at base of 12-tooth sprocket. Fig. 17.2. Remove chain cover plate bolts. Fig. 17.1. Remove hammer member. Fig. 17.3. Remove chain cover plate. Fig. 17.4. Loosen set screws at base of 12-tooth sprocket. Page 61 Fig. 17.5. Remove socket

More information

APG TM-APG WARNING. CUT GROOVING/BEVELING TOOL FOR 4 12-inch/ mm AQUAMINE PIPE

APG TM-APG WARNING. CUT GROOVING/BEVELING TOOL FOR 4 12-inch/ mm AQUAMINE PIPE APG CUT GROOVING/BEVELING TOOL FOR 4 12-inch/114.3 323.9-mm AQUAMINE PIPE warning WARNING Failure to follow instructions and warnings could result in serious personal injury, property damage, and/or product

More information

INSTALLATION INSTRUCTIONS for DALTON LED SERIES

INSTALLATION INSTRUCTIONS for DALTON LED SERIES WINSCAPE INSTALLATION INSTRUCTIONS for DALTON LED SERIES These instructions cover the installation for the following fixtures & options: - Dalton LED (DALED, DABRLED) series - Any Modified or Custom fixture

More information

Model Assembly & Operating Instructions

Model Assembly & Operating Instructions 30 SHEAR BRAKE ROLL Model 05907 Assembly & Operating Instructions Diagrams within this manual may not be drawn proportionally. Due to continuing improvements, actual product may differ slightly from the

More information

20 TON HyDRAULIC SHOP PRESS with GRID GUARD 06/2015 INSTRUCTION MANUAL MODEL: KHP-20T-GG COPYRIGHT 2015 ALL RIGHTS RESERVED BY KING CANADA TOOLS INC.

20 TON HyDRAULIC SHOP PRESS with GRID GUARD 06/2015 INSTRUCTION MANUAL MODEL: KHP-20T-GG COPYRIGHT 2015 ALL RIGHTS RESERVED BY KING CANADA TOOLS INC. 06/2015 20 TON HyDRAULIC SHOP PRESS with GRID GUARD MODEL: KHP-20T-GG INSTRUCTION MANUAL COPYRIGHT 2015 ALL RIGHTS RESERVED BY KING CANADA TOOLS INC. warranty INFORMATION 2-yEAR LIMITED WARRANTY FOR THIS

More information

Disc Caliper Brake Model DBSE

Disc Caliper Brake Model DBSE AIR CHAMP PRODUCTS User Manual Disc Caliper Brake Model DBSE i In accordance with Nexen s established policy of constant product improvement, the specifications contained in this manual are subject to

More information

Assmann Corporation of America TANK INSTALLATION AND USE GUIDELINES FOR BULK STORAGE TANKS

Assmann Corporation of America TANK INSTALLATION AND USE GUIDELINES FOR BULK STORAGE TANKS Assmann Corporation of America TANK INSTALLATION AND USE GUIDELINES FOR BULK STORAGE TANKS General Information Assmann polyethylene storage tanks are manufactured to give you the toughest, most reliable

More information

Repair Instructions. Durametallic PSS III. Experience In Motion. Split Seal

Repair Instructions. Durametallic PSS III. Experience In Motion. Split Seal Repair Instructions Durametallic PSS III Split Seal Experience In Motion PSS III seal reference Gland Gland Gasket Split Joint gasket Coil Spring Seal Drive Sleeve Gasket Split Joint Gasket Rotating Face

More information

Owner s Manual & Safety Instructions

Owner s Manual & Safety Instructions Owner s Manual & Safety Instructions Save This Manual Keep this manual for the safety warnings and precautions, assembly, operating, inspection, maintenance and cleaning procedures. Write the product s

More information

INSTRUCTION MANUAL TAPER ATTACHMENT MODEL M1022. Phone: (360) On-Line Technical Support: FOR USE WITH MODEL M1019

INSTRUCTION MANUAL TAPER ATTACHMENT MODEL M1022. Phone: (360) On-Line Technical Support: FOR USE WITH MODEL M1019 MODEL M1022 TAPER ATTACHMENT FOR USE WITH MODEL M1019 INSTRUCTION MANUAL Phone: (360) 734-3482 On-Line Technical Support: tech-support@shopfox.biz #6809BL COPYRIGHT DECEMBER, 2004 BY WOODSTOCK INTERNATIONAL,

More information

Tidland Narrow Web Shaft

Tidland Narrow Web Shaft TIDLAND WINDING SOLUTIONS Tidland Narrow Web Shaft User Manual 3" GN 3" GH EN MI 556500 1 J IMPORTANT SAFETY INSTRUCTIONS When using this Tidland product, basic safety precautions should always be followed

More information

The Ultimate Critical Service Triple Offset Valve INSTALLATION, OPERATION & MAINTENANCE MANUAL

The Ultimate Critical Service Triple Offset Valve INSTALLATION, OPERATION & MAINTENANCE MANUAL INSTALLATION, OPERATION & MAINTENANCE MANUAL Operation Table of Contents 1.0 Introduction 2 2.0 Safety Information 2 2.1 Definition of Terms 2 2.2 ATEX Directive 94/9/EC 2 2.2.1 Marking 3 2.2.2 Special

More information

Mechanical Frappe Press

Mechanical Frappe Press Mechanical Frappe Press Operation Manual CONTENTS OPERATIONAL INSTRUCTIONS PRECAUTIONS PART NAMES INCLUDED ITEMS BASIC OPERATION MAINTENANCE REPLACEMENT PARTS Thank you for using The Frapptastic Five Mechanical

More information

w w w. h d o n l i n e s h o p. d e TIMKEN BEARING CONVERSION TOOL GENERAL INSTALLATION -J04672 REV Kit Number Models

w w w. h d o n l i n e s h o p. d e TIMKEN BEARING CONVERSION TOOL GENERAL INSTALLATION -J04672 REV Kit Number Models -J067 REV. 008-07- GENERAL Kit Number 8-08 Models TIMKEN BEARING CONVERSION TOOL For model fitment information, see the P&A Retail Catalog or the Parts and Accessories section of www.harley-davidson.com

More information

MODEL M1023 QUICK CHANGE COLLET ATTACHMENT INSTRUCTION MANUAL. Phone: On-Line Technical Support:

MODEL M1023 QUICK CHANGE COLLET ATTACHMENT INSTRUCTION MANUAL. Phone: On-Line Technical Support: MODEL M1023 QUICK CHANGE COLLET ATTACHMENT INSTRUCTION MANUAL Phone: 1-360-734-3482 On-Line Technical Support: tech-support@shopfox.biz #6727BL COPYRIGHT JANUARY, 2005 BY WOODSTOCK INTERNATIONAL, INC.

More information

Form No Assembly & Operating Instructions for: SAFETY PRECAUTIONS

Form No Assembly & Operating Instructions for: SAFETY PRECAUTIONS Form No. 0230 Assembly & Operating Instructions for: 833 20300 83 2220 837 0-0008 078 SHOP PRESS Max. Capacity: 2 Ton These instructions are intended for various shop presses. Some models are shipped assembled

More information

AFB (AIR FAN BEARING) INSTALLATION GUIDE

AFB (AIR FAN BEARING) INSTALLATION GUIDE 654 AFB (AIR FAN BEARING) INSTALLATION GUIDE AFB PARTS Bearing Housing - Secured together with two 3/8 x 1.25 in. Cap Screws Black Wiper Seals - Secured together with O-ring cord (Subsequently depicted

More information

Installation Instructions

Installation Instructions Installation Instructions XLC Series Self-aligning split bearing Experience In Motion 1 Equipment Check 1.1 Follow plant safety regulations prior to equipment disassembly: Lock out motor. Wear designated

More information

Owner s Manual ODYSSEY BENCH MODEL. O4100B shown REV E. Southern Avenue, Phoenix, AZ USA Workhorseproducts.

Owner s Manual ODYSSEY BENCH MODEL. O4100B shown REV E. Southern Avenue, Phoenix, AZ USA Workhorseproducts. Owner s Manual ODYSSEY BENCH MODEL O4100B shown 67-1375 REV 218 3730 E. Southern Avenue, Phoenix, AZ 85040 USA 800-778-8779 Workhorseproducts.com 1 Table of Contents I. Introduction & Safety Information.

More information

The Ultimate Critical Service Triple Offset Valve INSTALLATION, OPERATION & MAINTENANCE MANUAL

The Ultimate Critical Service Triple Offset Valve INSTALLATION, OPERATION & MAINTENANCE MANUAL INSTALLATION, OPERATION & MAINTENANCE MANUAL For more information on this product and other bray products please visit our website www.bray.com Operation Table of Contents 1.0 Introduction 2 2.0 Safety

More information

LASER ENHANCED REVOLVER GRIP OWNER S MANUAL RED LASER GREEN LASER

LASER ENHANCED REVOLVER GRIP OWNER S MANUAL RED LASER GREEN LASER LASER ENHANCED RED LASER GREEN LASER REVOLVER GRIP OWNER S MANUAL LASER ENHANCED GRIP Installation Instructions Caution... 3 Safety Labels... 4 Installation...5-7 Programming...8-10 Batteries (Red Laser)...

More information

OTECO INC. MODEL ,000 PSI 4-1/16 PORT DM GATE VALVE MAINTENANCE MANUAL

OTECO INC. MODEL ,000 PSI 4-1/16 PORT DM GATE VALVE MAINTENANCE MANUAL Page 1 of 7 OTECO INC. MODEL 45 4 5,000 PSI 4-1/16 PORT DM GATE VALVE MAINTENANCE MANUAL Page 2 of 7 TABLE OF CONTENTS 1. Assembly Blowout 2. Repair Kit Contents & Technical Specifications 3. Disassembly

More information

TYPE 3740/3740D WET/DRY RUNNING CARTRIDGE SPLIT SEAL

TYPE 3740/3740D WET/DRY RUNNING CARTRIDGE SPLIT SEAL 1 Foreword These instructions are provided to familiarize the user with the seal and its designated use. The instructions must be read and applied whenever work is done on the seal, and must be kept available

More information

Tube Facing Tool.

Tube Facing Tool. www.swagelok.com Tube Facing Tool This manual contains important information for the safe and effective operation of the Swagelok TF72 series tube facing tool. Users should read and understand its contents

More information

H8508 Impact Wrench SERVICE MANUAL. Model (Serial Code FWN) Model (Serial Code FWP)

H8508 Impact Wrench SERVICE MANUAL. Model (Serial Code FWN) Model (Serial Code FWP) SERVICE MANUAL H8508 Impact Wrench Model 48755 (Serial Code FWN) Model 48760 (Serial Code FWP) Read and understand all of the instructions and safety information in this manual before operating or servicing

More information

SR-1.0 Manual, a.doc 11/14/2006 Page 1 of 17

SR-1.0 Manual, a.doc 11/14/2006 Page 1 of 17 SR-1.0 Manual, 20061108a.doc 11/14/2006 Page 1 of 17 ASSEMBLY INSTRUCTIONS, MODEL SR-1.0 EXTRUSION HEAD STREAMLINE EXTRUSION, INC. Following is a set of photos and verbal descriptions for assembling the

More information

MUELLER GAS. DH-5/EH-5 Drilling. Reliable Connections. DH-5 Drilling Machine General Information 2. EH-5 Drilling Machine General Information 3

MUELLER GAS. DH-5/EH-5 Drilling. Reliable Connections. DH-5 Drilling Machine General Information 2. EH-5 Drilling Machine General Information 3 operating Instructions manual MUELLER GAS TAble of contents PAGE DH-5 Drilling Machine General Information 2 DH-5/EH-5 Drilling EH-5 Drilling Machine General Information 3 Operating Instructions 4-5 DH-5

More information

TYPE 3740XL EXTRA LARGE WET RUNNING CARTRIDGE SPLIT SEAL

TYPE 3740XL EXTRA LARGE WET RUNNING CARTRIDGE SPLIT SEAL 1 Foreword These instructions are provided to familiarize the user with the seal and its designated use. The instructions must be read and applied whenever work is done on the seal, and must be kept available

More information

TECHNICAL INSTRUCTIONS

TECHNICAL INSTRUCTIONS 0 TECHNICAL INSTRUCTIONS Innovation Anode Retrofit Instructions This kit applies to all Innovation model water heaters ITEM 1: P/N 44173 ANODE MOUNTING BRACKET ITEM 2: P/N 44174 ANODE BLOCK (2 each) ITEM

More information

I-VICFLEX.VS1. Victaulic VicFlex Style VS1 Dry Sprinkler WARNING WARNING TECHNICAL DATA BEND CHARACTERISTICS INSTALLATION INSTRUCTIONS SIDEWALL

I-VICFLEX.VS1. Victaulic VicFlex Style VS1 Dry Sprinkler WARNING WARNING TECHNICAL DATA BEND CHARACTERISTICS INSTALLATION INSTRUCTIONS SIDEWALL INSTALLATION INSTRUCTIONS I-VICFLEX.VS1 Victaulic VicFlex Style VS1 Dry Sprinkler SIDEWALL Y Read and understand all instructions before attempting to install any Victaulic VicFlex Style VS1 Dry Sprinklers.

More information

RULTRACT RETRACTOR CABLE REPLACEMENT INSTRUCTIONS. Rultract, Inc. is the ONLY authorized service center in the U.S.A.

RULTRACT RETRACTOR CABLE REPLACEMENT INSTRUCTIONS. Rultract, Inc. is the ONLY authorized service center in the U.S.A. RULTRACT RETRACTOR CABLE REPLACEMENT INSTRUCTIONS Rultract, Inc. is the ONLY authorized service center in the U.S.A. When your Rultract instrument needs repair or service, contact Rultract Inc. or Rultract

More information

3-1/4 HP VARIABLE SPEED PLUNGE ROUTER

3-1/4 HP VARIABLE SPEED PLUNGE ROUTER IMPORTANT INFORMATION 2-YEAR LIMITED WARRANTY FOR THIS PLUNGE ROUTER KING CANADA TOOLS OFFERS A 2-YEAR LIMITED WARANTY FOR NON-COMMERCIAL USE. 3-1/4 HP VARIABLE SPEED PLUNGE ROUTER PROOF OF PURCHASE Please

More information

SERVICE INSTRUCTIONS Model 9670 Lubricant Pump

SERVICE INSTRUCTIONS Model 9670 Lubricant Pump TM TM SERVICE INSTRUCTIONS Model 9670 Lubricant Pump 9670 DESCRIPTION Model 9670 Lubricant Pump is designed to pump light to heavy oils directly from the original container. This design features a 10:1

More information

Repair Manual 12 PL PILOT

Repair Manual 12 PL PILOT Repair Manual 12 PL PILOT 12 PL PILOT REPAIR MANUAL INDEX Introduction... 1 Elastomer Materials... 2 Disassembly... 3 Assembly... 7 Testing... 11 NOTE: We reserve the right to modify or change, without

More information

ELECTRIC TOOL CORPORATION

ELECTRIC TOOL CORPORATION Cat. No. -0 / Hex Demolition Hammer Cat. No. 0-0 Spline Rotary Hammer MILWAUKEE ELECTRIC TOOL CORPORATION W. LISBON ROAD BROOKFIELD, WISCONSIN 00-0 -9-00 d 000 -9-00 d SpecialTools Require Forcing discs

More information

Please read and understand the OnBoard Timpani Cart Owner s Manual before using the Timpani Cart.

Please read and understand the OnBoard Timpani Cart Owner s Manual before using the Timpani Cart. Assembly and Owner s Manual OnBoard Timpani Cart Performance Position Towing Position CONTENTS Important User Information...........................2 General......................................2 Manufacturer.................................2

More information

Installation Instructions 8115F 8115SF

Installation Instructions 8115F 8115SF TM Installation Instructions 85F 85SF Single Control Centerset Lavatory Faucet with Speed Connect Drain Congratulations on purchasing your American Standard faucet with the Speed Connect Drain, a feature

More information

MALEKO WALL-MOUNT FAUCET INSTALLATION

MALEKO WALL-MOUNT FAUCET INSTALLATION SKU(s): 934146 BEFORE YOU BEGIN We recommend consulting a professional if you are unfamiliar with installing bathroom fixtures and plumbing. Signature Hardware accepts no liability for any damage to the

More information

INSTRUCTION BOOK AND PARTS LIST

INSTRUCTION BOOK AND PARTS LIST Rag Cutter MODEL WE WARNING This machine is equipped with a very sharp knife. Keep hands, arms, and hair away from the knife area at all times. Misuse of this machine or failure to follow all safety instructions

More information

SAVE THIS FOR FUTURE REFERENCE THIS PRODUCT IS FOR PROFESSIONAL LABORATORY USE ONLY USER'S MANUAL

SAVE THIS FOR FUTURE REFERENCE   THIS PRODUCT IS FOR PROFESSIONAL LABORATORY USE ONLY USER'S MANUAL DENTAL, INC. TECHNICAL BULLETIN G801-022510 5860 FLYNN CREEK ROAD READ ALL INSTRUCTIONS P.O. BOX 106 BEFORE PROCEEDING COMPTCHE, CALIFORNIA, U.S.A. 95427-0106 SAVE THIS FOR FUTURE REFERENCE www.wellsdental.com

More information

Manual Carton Closing Staplers

Manual Carton Closing Staplers Operator s Manual Manual Carton Closing Staplers SHB00-A Item No. 6400 -/8" Crown Carton Closing Stapler 5/8" and /4" (5mm and 8mm) Ask for Genuine INTERCHANGE A58 and A4 Staples SHB50-C Item No. 640 -/4"

More information

HYDRAULIC NUT SPLITTER

HYDRAULIC NUT SPLITTER AutoSPLITTER ANGLE HEAD MODELS HYDRAULIC NUT SPLITTER OPERATIONS AND MAINTENANCE MANUAL 1 CONTENTS INTRODUCTION... Page 3 WARNINGS AND SAFETY TIPS... Page 4 POWER REQUIREMENTS... Page 5 ASSEMBLY... Page

More information

1.0 Tool Components and Operation Instructions

1.0 Tool Components and Operation Instructions DBS-2200 MANUAL BANDING TOOL FOR 1/8 STAMPED BUCKLE BANDS DATASHEET SEE PAGE 18 FOR IMPORTANT INFORMATION CONCERNING LIMITED WARRANTY AND LIMITATION OF LIABILITY. INTRODUCTION The Daniels DBS-2200 (M81306/1B)

More information

J D SQUARED INC. NOTCH MASTER Tube and Pipe Notcher Operating Instructions

J D SQUARED INC.   NOTCH MASTER Tube and Pipe Notcher Operating Instructions Copyright (c) 2006 J D SQUARED INC. www.jd2.com NOTCH MASTER Tube and Pipe Notcher Operating Instructions Angled Notches PATENT PENDING Straight Notches Offset Notches Tube Clamp Slider Tube Clamp Exploded

More information

Sunset Swings By Health in Motion, LLC

Sunset Swings By Health in Motion, LLC Sunset Swings By Health in Motion, LLC Model 421 Lounge Swing Assembly and Operation Manual Record Serial Number Here www.sunsetswings.com by Health In Motion, LLC. 11/6/2009 421 Owners Assembly and Operation

More information

TOOL SEE PAGE 11 FOR IMPORTANT INFORMATION CONCERNING LIMITED WARRANTY, AND LIMITATION OF LIABILITY

TOOL SEE PAGE 11 FOR IMPORTANT INFORMATION CONCERNING LIMITED WARRANTY, AND LIMITATION OF LIABILITY SCTP SERIES PNEUMATIC SAFE-T-CABLE TOOL DATASHEET SEE PAGE 11 FOR IMPORTANT INFORMATION CONCERNING LIMITED WARRANTY, AND LIMITATION OF LIABILITY INTRODUCTION The Daniels SCTP Series Pneumatic Safe-T-Cable

More information

Fisher 1052 Size 20 Diaphragm Rotary Actuator with H Mounting Adaptation

Fisher 1052 Size 20 Diaphragm Rotary Actuator with H Mounting Adaptation Instruction Manual 1052 Size 20 Actuator (H) Fisher 1052 Size 20 Diaphragm Rotary Actuator with H Mounting Adaptation Contents Introduction... 1 Scope of Manual... 1 Description... 2 Specifications...

More information

Installation Instructions

Installation Instructions Installation Instructions XLC Generation 2 Self-aligning split bearing Experience In Motion 1 Equipment Check 1.1 Follow plant safety regulations prior to equipment disassembly: Lock out motor. Wear designated

More information

Elimination of Elevator Bounce

Elimination of Elevator Bounce For the Agilent Archon Autosampler Rework Instructions CAUTION This kit is intended for use by Agilent Service personnel only. Elevator Removal 1 Open top cover. 2 Open front lower door. 3 Remove vial

More information

MM340 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

MM340 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS MM30 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS Please read this entire manual before you begin. Do not unpack any contents until you verify all requirements on PAGE.

More information

MSR/MSB Mechanical Setting Tool

MSR/MSB Mechanical Setting Tool Tech Unit No: 0620000004 Revision: B Approved By: Quality Engineer Date: 2014-12-16 MSR/MSB Mechanical Setting Tool FEATURES: Special designed Bow Spring provides positive control and allows one size Mechanical

More information

accidents which arise due to nonobservance and the safety information herein. SPECIFICATIONS

accidents which arise due to nonobservance and the safety information herein. SPECIFICATIONS 7 TON ELECTRIC LOG SPLITTER Model: 05620 CALIFORNIA PROPOSITION 65 WARNING: You can create dust when you cut, sand, drill or grind materials such as wood, paint, metal, concrete, cement, or other masonry.

More information

4.2 - PUMP MAINTENANCE MODELS: AC, AS, WC, WS

4.2 - PUMP MAINTENANCE MODELS: AC, AS, WC, WS 4.2 - PUMP MAINTENANCE MODELS: AC, AS, WC, WS 4.2.1 - EXPLODED VIEW DRAWING REF NO. 1 2 4 QTY 3 1 1.5 5 ¾ HP HP HP HP HP DESCRIPTION PART # 1 CASE 1.25 x 1 NPT 018266 1 CASE 1.25 X 1 NPT 018268 1 CASE

More information

4-8 HSF 250 Patriot. Line Stop Fitting Installation Instructions. Installation Instructions and Best Practices continued on back

4-8 HSF 250 Patriot. Line Stop Fitting Installation Instructions. Installation Instructions and Best Practices continued on back HSF 250 Patriot Heavy Duty Line Stop Fitting - 4, 6, 8 inch Nominal Sizes Line Stop Fitting Installation Instructions Push and Pin Completion Plug Installation Instructions IMPORTANT: Read installation

More information

Page 1. SureMotion Quick-Start Guide: LACPACC_QS 1st Edition - Revision A 03/15/16

Page 1. SureMotion Quick-Start Guide: LACPACC_QS 1st Edition - Revision A 03/15/16 R K C T I Repair Kit Product Compatibility Repair Kit # Linear Actuator Assembly # LACPACC-002 LACPACC-003 LACP-16TxxLP5 (0.5-in lead screw pitch) LACP-16TxxL1 (1-in lead screw pitch) C P I R K 4 ea Flanged

More information

Portable System Owners Manual Customer Service Center N53 W24700 South Corporate Circle Sussex, WI U.S.A.

Portable System Owners Manual Customer Service Center N53 W24700 South Corporate Circle Sussex, WI U.S.A. Portable System Owners Manual Customer Service Center N53 W24700 South Corporate Circle Sussex, WI 53089 U.S.A. Adult Assembly Required. This manual, accompanied by sales receipt, should be saved and kept

More information

OWNER'S MANUAL Issue 2 - December 14, 2000

OWNER'S MANUAL Issue 2 - December 14, 2000 OWNER'S MANUAL AL Issue 2 - December 14, 2000 Copyright 2000 GAMMA Sports - All Rights Reserved Provided by www.gssalliance.com OWNER'S MANUAL TABLE OF CONTENTS PAGE 1... WARRANTY PAGE 2...FEATURES PAGE

More information

Installation Instructions

Installation Instructions The IMS ETERNAL FIX PATENT PENDING Installation Instructions EPS recommends professional installation for the Eternal IMS Fix. Please take all precautionary safety measures. We also recommend putting the

More information

10 Ton Pull Back Ram

10 Ton Pull Back Ram 10 Ton Pull Back Ram Model 97207 Set up And Operating Instructions Diagrams within this manual may not be drawn proportionally. Due to continuing improvements, actual product may differ slightly from the

More information

Assemble and Adjustment Instructions and Flex Balance Beam and Crank Balance Beam

Assemble and Adjustment Instructions and Flex Balance Beam and Crank Balance Beam Sales & Service sasportonline.com Head Office 135 Forestview Road P.O. Box 40 Orillia, Ontario Canada L3V 6H9 Toll Free (800) 563-6479 Phone (705) 325-2274 Fax (705) 325-1485 USA Office 7879 Will Rogers

More information

OPERATION AND MAINTENANCE FOR MODEL MRV050A REVERSIBLE

OPERATION AND MAINTENANCE FOR MODEL MRV050A REVERSIBLE OPERATION AND MAINTENANCE FOR MODEL MRV050A REVERSIBLE MANUAL AIR MOTOR 04666770 Edition 1 April, 1999 IMPORTANT SAFETY INFORMATION ENCLOSED. READ THIS MANUAL BEFORE OPERATING TOOL. FAILURE TO OBSERVE

More information

Rev B C-RING TOOL VA0375 ½ in. OPERATING MANUAL

Rev B C-RING TOOL VA0375 ½ in. OPERATING MANUAL Rev B 4-30-0 C-RING TOOL VA0375 ½ in. OPERATING MANUAL Operational Instructions for Vertex C-Ring Tool VA0375 Vertex Fasteners is committed to providing our customers with world-class customer service

More information

Installation, Maintenance and Operating Instructions

Installation, Maintenance and Operating Instructions Emission-Pak ASSEMBLY CARTRIDGES A, B AND C MODEL B FOR: 1/2 2 (DN 15 50) SERIES 5150 1/2 2 (DN 15 50) SERIES 5300 AND 530S 3/4 1-1/2 (DN 20 40) SERIES 6150 3/4 1-1/2 (DN 20 40) SERIES 6300 2 (DN 50) SERIES

More information

Emission-Pak Assemblies

Emission-Pak Assemblies Emission-Pak Assemblies 25, 35 and 45 Installation, Maintenance and Operating Instructions IMO-266 EN 11/2017 2 IMO-266 EN TABLE OF CONTENTS 1. GENERAL... 3 2. INSTALLATION... 3 2.1 Installation Into Pipeline...

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS CREATING POSITIVE CUSTOMER EXPERIENCES INSTALLATION INSTRUCTIONS PDS-PLUS Universal Projector Mount Model: NORTH AMERICA 3130 East Miraloma Avenue Anaheim, CA 92806 USA USA and Canada Phone: 1.800.368.9700

More information

3/8 Butterfly Air Impact Wrench

3/8 Butterfly Air Impact Wrench 3/8 Butterfly Air Impact Wrench 37730 ASSEMBLY AND OPERATING INSTRUCTIONS 3491 Mission Oaks Blvd., Camarillo, CA 93011 Visit our Web site at http://www.harborfreight.com Copyright 2004 by Harbor Freight

More information