Isograph Packages. A. Apollonio, 7/7/2016 Acknowledgements: M. Blumenschein, A. Fernandez Navarro, S. Hurst, O.

Size: px
Start display at page:

Download "Isograph Packages. A. Apollonio, 7/7/2016 Acknowledgements: M. Blumenschein, A. Fernandez Navarro, S. Hurst, O."

Transcription

1 Isograph Packages A. Apollonio, 7/7/2016 Acknowledgements: M. Blumenschein, A. Fernandez Navarro, S. Hurst, O. Rey Orozco

2 ISOGRAPH Overview Reliability Workbench, modules: Prediction (standards, ) Fault tree (FT) Reliability Block Diagrams (RBD) Event tree Markov Weibull FMECA Availability Workbench, modules: AvSim Weibull RCM cost Andrea Apollonio page 2

3 Fault Trees: Example BIS FT Andrea Apollonio page 3

4 Fault Trees: More Complex Example BLMs FT Manual creation of fault trees and input data insertion Copy paste option available (2 different options) Option available for importing data from external files (not straightforward) Andrea Apollonio page 4

5 System Linac4 Reliability Block Diagrams Blocks connected in series/parallel (voting) depending on the functionality of the system RBD Linac4 MPS Li Linac4 ELECTRONICS Converter BIS powering Linac4 MPS.1 BIS Linac4 MPS.2 WIC Linac4 ELECTRONICS Converter A hierarchical structure of blocks can be created: Linac4 Source Linac4 RF Linac4.BI Linac4 MAGNETS Linac4.VACUUM Linac4 ABSORBERS Linac4 COOLING Linac4 MPS Same considerations done for FTs apply here Andrea Apollonio page 5

6 Definition of Failure Modes Each block/fault tree event can be assigned a failure mode manually Failure density function Failure recovery function Consequences FT/RBD and a maintenance strategy Corrective Inspection Planned Andrea Apollonio page 6

7 Failure modes, effects and maintenance RBD Andrea Apollonio page 7

8 Resources Definition Resources needed for maintenance are assigned to each task Task duration Personnel required Spare components available RBD Andrea Apollonio page 8

9 Maintenance: Scheduled Technical Stops Requires the definition of 2 phases: Operation, planned maintenance RBD Planned maintenance in Isograph: fix all components at a predefined time Andrea Apollonio page 9

10 Rules for Performing Maintenance RBD Andrea Apollonio page 10

11 Simulations Many details can be defined in Isograph, some examples: Storage cost for spares, capacity, etc. Logistic delays and costs RBD Once all parameters related to the blocks are defined, the simulation options are selected: Lifetime Number of simulations (Monte Carlo) Results are then presented in terms of: Mean (Un)Availability (system and sub-systems) Required resources Consequences of outages Andrea Apollonio page 11

12 Results RBD Options available to export results to text files Customization of reports possible but not straightforward Andrea Apollonio page 12

13 ISOGRAPH Simulation Watch Chopper powering failure Magnet powering failure RBD RF Tuner failure Andrea Apollonio page 13

14 Failure Rate Predictions - Standards Prediction Calculation of failure rate of standard components from commonly used reliability handbooks Andrea Apollonio page 14

15 Example of CLIQ Trigger Card Prediction Andrea Apollonio page 15

16 Failure Rate Predictions Prediction Manual procedure, but definition of libraries possible Andrea Apollonio page 16

17 Weibull Analysis of Historical Data Eta estimator 50 FANS Cumulative Probability Weibull 2-parameter Weibull Median rank h: 4154 b: g: 0 30 r: Unreliability (%) e: B10: 1207 P0: 0% Time Importing data from e.g. excel files possible Andrea Apollonio page 17

18 FMEA Template FMEA Andrea Apollonio page 18

19 Costs Andrea Apollonio page 19

20 Summary Rather good experience with Isograph so far At CERN, especially used for: Fault tree modelling Failure rate predictions Availability modelling with RBD Some manual work required when: Creating models with a high number of components Defining maintenance strategies common for accelerator applications Retrieving useful information from the available results (strange terminology) Importing of input data (not intuitive) Good interaction with the support Andrea Apollonio page 20

21 THANKS A LOT FOR YOUR ATTENTION! Andrea Apollonio page 21

STPA FOR LINAC4 AVAILABILITY REQUIREMENTS. A. Apollonio, R. Schmidt 4 th European STAMP Workshop, Zurich, 2016

STPA FOR LINAC4 AVAILABILITY REQUIREMENTS. A. Apollonio, R. Schmidt 4 th European STAMP Workshop, Zurich, 2016 STPA FOR LINAC4 AVAILABILITY REQUIREMENTS A. Apollonio, R. Schmidt 4 th European STAMP Workshop, Zurich, 2016 LHC colliding particle beams at very high energy 26.8 km Circumference LHC Accelerator (100

More information

Reliability studies for a superconducting driver for an ADS linac

Reliability studies for a superconducting driver for an ADS linac Mol, Belgium, 6-9 May 2007 Reliability studies for a superconducting driver for an ADS linac Paolo Pierini, Luciano Burgazzi Work supported by the EURATOM 6 framework program of the EC, under contract

More information

Lecture Notes in Electrical: Reliability Analysis of Medium Voltage Panel

Lecture Notes in Electrical: Reliability Analysis of Medium Voltage Panel Lecture Notes in Electrical: Reliability Analysis of Medium Voltage Panel 1 K.Sreekanth, 2 N.Nagabushnam, 3 P.Sujatha 1,3 EEE, JNTUACEA, Anantapuramu, India 2 Head of Quality Assurance, AmaraRaja Power

More information

Beam Control: Timing, Protection, Database and Application Software

Beam Control: Timing, Protection, Database and Application Software Beam Control: Timing, Protection, Database and Application Software C.M. Chu, J. Tang 储中明 / 唐渊卿 Spallation Neutron Source Oak Ridge National Laboratory Outline Control software overview Timing system Protection

More information

Interfaces with MPS/PSS

Interfaces with MPS/PSS Interfaces with / European Spallation Source Accelerator Division TB, 16 November 2016, Lund, Sweden / interfaces 1/21 Outline 1 Introduction 2 3 4 Conclusions / interfaces 2/21 Outline 1 Introduction

More information

Application of Life Data Analysis for the Reliability Assessment of Numerical Overcurrent Relays

Application of Life Data Analysis for the Reliability Assessment of Numerical Overcurrent Relays Vol:4, No:, 00 Application of Life Data Analysis for the Reliability Assessment of Numerical Overcurrent Relays, Kerk Lee Yen, Aminuddin Musa 3, Bahisham Yunus 4 International Science Index, Electrical

More information

Predict and Improve Support Cost and KPI for TERRIER Combat Engineer Vehicle

Predict and Improve Support Cost and KPI for TERRIER Combat Engineer Vehicle Predict and Improve Support Cost and KPI for TERRIER Combat Engineer Vehicle Presented by: - Richard Dobie - TERRIER Equipment Support Manager, BAE SYSTEMS, Global Combat systems Vehicles (BAES GCS-V)

More information

Field Proven Reliability Subsea: Reliability Best Practices and Subsea Materials Database

Field Proven Reliability Subsea: Reliability Best Practices and Subsea Materials Database Field Proven Subsea: Best Practices and Subsea Materials Database Jeremy Lucas Jeremy.Lucas@Teledyne.com Teledyne Marine October 26, 2016 1 Agenda The Importance of The Teledyne Marine Strategy In New

More information

FSI Machine Vision Training Programs

FSI Machine Vision Training Programs FSI Machine Vision Training Programs Table of Contents Introduction to Machine Vision (Course # MVC-101) Machine Vision and NeuroCheck overview (Seminar # MVC-102) Machine Vision, EyeVision and EyeSpector

More information

Intelligent and Flexible Monitor Circuits Detect & Record Load Profiles and Fault Events All Distribution Voltages All Conductor Types

Intelligent and Flexible Monitor Circuits Detect & Record Load Profiles and Fault Events All Distribution Voltages All Conductor Types IQ Insulator Self-powered Line Sensor & Insulator with Wireless Communications Monitor System Performance & Reliability Load Profiling and Fault Recording & Indication Intelligent and Flexible Monitor

More information

Beam Loss Monitoring (BLM) System for ESS

Beam Loss Monitoring (BLM) System for ESS Beam Loss Monitoring (BLM) System for ESS Lali Tchelidze European Spallation Source ESS AB lali.tchelidze@esss.se March 2, 2011 Outline 1. BLM Types; 2. BLM Positioning and Calibration; 3. BLMs as part

More information

Improving Distribution Circuit Performance without Circuit Rebuilds. John Lauletta, CEO

Improving Distribution Circuit Performance without Circuit Rebuilds. John Lauletta, CEO Improving Distribution Circuit Performance without Circuit Rebuilds John Lauletta, CEO Maintenance Strategies Reliability Centered Maintenance Reactive Maintenance (Run To Failure) Preventive Maintenance

More information

Rectifiers and Controllers Update on the Latest!

Rectifiers and Controllers Update on the Latest! Rectifiers and Controllers Update on the Latest! Event: IHAA Bi-annual conference Date: 2018/09/2018 Place: Seattle, WA, USA Presented by: Frank Munk Why this presentation? 1. When it comes to new technologies

More information

CERN PS, SL & ST Divisions

CERN PS, SL & ST Divisions EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH ORGANISATION EUROPÉENNE POUR LA RECHERCHE NUCLÉAIRE CERN PS, SL & ST Divisions CERN-PS-2002 CERN-SL-2002 CERN-ST-2002 1 st February 2002 TOWARDS A COMMON MONITORING

More information

Autodesk Advance Steel. Drawing Style Manager s guide

Autodesk Advance Steel. Drawing Style Manager s guide Autodesk Advance Steel Drawing Style Manager s guide TABLE OF CONTENTS Chapter 1 Introduction... 5 Details and Detail Views... 6 Drawing Styles... 6 Drawing Style Manager... 8 Accessing the Drawing Style

More information

Advance Steel. Drawing Style Manager s guide

Advance Steel. Drawing Style Manager s guide Advance Steel Drawing Style Manager s guide TABLE OF CONTENTS Chapter 1 Introduction...7 Details and Detail Views...8 Drawing Styles...8 Drawing Style Manager...9 Accessing the Drawing Style Manager...9

More information

Copenhagen Offshore Wind 2005

Copenhagen Offshore Wind 2005 Design for Reliability Henrik Stiesdal & Peter Hauge Madsen Siemens Wind Power A/S Borupvej 16, DK-7330 Brande, Denmark, Phone +45 99 42 22 22, Fax +45 99 99 22 22 Abstract In many cases future offshore

More information

ALICE SRF SYSTEM COMMISSIONING EXPERIENCE A. Wheelhouse ASTeC, STFC Daresbury Laboratory

ALICE SRF SYSTEM COMMISSIONING EXPERIENCE A. Wheelhouse ASTeC, STFC Daresbury Laboratory ALICE SRF SYSTEM COMMISSIONING EXPERIENCE A. Wheelhouse ASTeC, STFC Daresbury Laboratory ERL 09 8 th 12 th June 2009 ALICE Accelerators and Lasers In Combined Experiments Brief Description ALICE Superconducting

More information

Root Cause Failure Analysis In Rotating Machinery

Root Cause Failure Analysis In Rotating Machinery Root Cause Failure Analysis In Rotating Machinery -Causes & Avoidance- A must course to understand the process of machinery failures, help with the job and add value to the business Abu Dhabi 16 20 March

More information

RECOMMENDATION ITU-R M * Definition of availability for radiocommunication circuits in the mobile-satellite service

RECOMMENDATION ITU-R M * Definition of availability for radiocommunication circuits in the mobile-satellite service Rec. ITU-R M.828-2 1 RECOMMENDATION ITU-R M.828-2 * Definition of availability for radiocommunication circuits in the mobile-satellite service (Question ITU-R 85/8) (1992-1994-2006) Scope This Recommendation

More information

A New Use for Fault Indicators SEL Revolutionizes Distribution System Protection. Steve T. Watt, Shankar V. Achanta, and Peter Selejan

A New Use for Fault Indicators SEL Revolutionizes Distribution System Protection. Steve T. Watt, Shankar V. Achanta, and Peter Selejan A New Use for Fault Indicators SEL Revolutionizes Distribution System Protection Steve T. Watt, Shankar V. Achanta, and Peter Selejan 2017 by Schweitzer Engineering Laboratories, Inc. All rights reserved.

More information

BNL Collider Complex Overview. MPS at the collider accelerator department (C-AD) RHIC Accelerator Protection Elements

BNL Collider Complex Overview. MPS at the collider accelerator department (C-AD) RHIC Accelerator Protection Elements MPS Experience at BNL-RHIC BNL Collider Complex Overview MPS at the collider accelerator department (C-AD) RHIC Accelerator Protection Elements Operational Experience Summary BNL Collider Complex Overview

More information

AC Power Monitoring Application Brief

AC Power Monitoring Application Brief AC Power Monitoring Application Brief APPLICATION NOTE Managing and monitoring AC power usage at remote sites (cell sites, communication huts, controlled environment vaults {CEVs}, substations, cabinets,

More information

Red Shadow. FPGA Trax Design Competition

Red Shadow. FPGA Trax Design Competition Design Competition placing: Red Shadow (Qing Lu, Bruce Chiu-Wing Sham, Francis C.M. Lau) for coming third equal place in the FPGA Trax Design Competition International Conference on Field Programmable

More information

NON-SELLABLE PRODUCT DATA

NON-SELLABLE PRODUCT DATA Two-plane Balancing Consultant Type 7790-A is an intuitive and effective tool for in-situ (field) single-plane and two-plane balancing of rotating machinery. Multiplane Balancing Consultant Type 7790-B

More information

Mechanical Design. CATIA - 3D Functional Tolerancing and Annotations 2 (FTA) CATIA V5R20

Mechanical Design. CATIA - 3D Functional Tolerancing and Annotations 2 (FTA) CATIA V5R20 Mechanical Design CATIA - 3D Functional Tolerancing and Annotations 2 (FTA) CATIA V5R20 Mechanical Design CATIA - 3D Functional Tolerancing and Annotations Define and manage tolerance specifications and

More information

Modeling Distribution Component Deterioration: An application to Transformer Insulation. A.U. Adoghe 1, a, C.O.A. Awosope 2,b and S.A.

Modeling Distribution Component Deterioration: An application to Transformer Insulation. A.U. Adoghe 1, a, C.O.A. Awosope 2,b and S.A. Advanced Materials Research Vol. 367 (202) pp 7-23 (202) Trans Tech Publications, Switzerland doi:0.4028/www.scientific.net/amr.367.7 Modeling Distribution Component Deterioration: An application to Transformer

More information

1.0 Introduction. 2.0 Scope

1.0 Introduction. 2.0 Scope 1.0 Introduction The LCLS project requires one horizontal kicker magnet (BXKIK) to be installed at sector 25-3d. Nominal LCLS beam energy at that location is 4.8 GeV. The BXKIK magnet is planned to be

More information

z47524 PXI Quad SPDT RF Changeover Switch Module

z47524 PXI Quad SPDT RF Changeover Switch Module TECHNICAL SPECIFICATIONS z47524 PXI Quad SPDT RF Changeover Switch Module 2017 LitePoint, A Teradyne Company. All rights reserved. Overview The z47524 PXI RF switching module has a bank of four individual

More information

Audio Similarity. Mark Zadel MUMT 611 March 8, Audio Similarity p.1/23

Audio Similarity. Mark Zadel MUMT 611 March 8, Audio Similarity p.1/23 Audio Similarity Mark Zadel MUMT 611 March 8, 2004 Audio Similarity p.1/23 Overview MFCCs Foote Content-Based Retrieval of Music and Audio (1997) Logan, Salomon A Music Similarity Function Based On Signal

More information

High Point Communications Authorized dealer for USA Fleet Services

High Point Communications Authorized dealer for USA Fleet Services Summary of Display Features Idle Alert - Idle alerts can be sent every 10 minutes (up to 60 minutes) Stop Duration Alert Stop Duration alerts can be sent every 10 minutes (up to 60 minutes), after 24 hours,

More information

Electron Linacs for Cargo Inspection and Other Industrial Applications

Electron Linacs for Cargo Inspection and Other Industrial Applications Electron Linacs for Cargo Inspection and Other Industrial Applications Chuanxiang Tang 1, Huaibi Chen 1,Yaohong Liu 2 Tang.xuh@tsinghua.edu.cn 1 Department of Engineering Physics, Tsinghua U., Beijing

More information

Integrated approach to upstream decision making. London January 2010

Integrated approach to upstream decision making. London January 2010 Integrated approach to upstream decision making London 20 21 January 2010 MSm3oe/Year MSm3oe % Setting the scene 300,0 250,0 200,0 150,0 100,0 50,0 90 80 70 60 50 40 30 20 10 0 60 50 40 30 20 10 0 0,0

More information

MuCool Test Area Experimental Program Summary

MuCool Test Area Experimental Program Summary MuCool Test Area Experimental Program Summary Alexey Kochemirovskiy The University of Chicago/Fermilab Alexey Kochemirovskiy NuFact'16 (Quy Nhon, August 21-27, 2016) Outline Introduction Motivation MTA

More information

Autodesk Navisworks: Using Autodesk Navisworks in a BIM Workflow

Autodesk Navisworks: Using Autodesk Navisworks in a BIM Workflow Autodesk Navisworks: Using Autodesk Navisworks in a BIM Workflow Course Length: 2 days The Autodesk Navisworks Using Autodesk Navisworks in a BIM Workflow learning guide teaches you how to better predict

More information

PowerMAX Redundant SSPA Systems. Soft-fail Redundancy Modular, Hot-swap Assemblies Indoor and Outdoor Packages

PowerMAX Redundant SSPA Systems. Soft-fail Redundancy Modular, Hot-swap Assemblies Indoor and Outdoor Packages MAX Redundant Systems Soft-fail Redundancy Modular, Hot-swap Assemblies Indoor and Outdoor Packages Overview Modular amplifier systems have been used in communication systems for over 40 years. Broadcast

More information

The ArtemiS multi-channel analysis software

The ArtemiS multi-channel analysis software DATA SHEET ArtemiS basic software (Code 5000_5001) Multi-channel analysis software for acoustic and vibration analysis The ArtemiS basic software is included in the purchased parts package of ASM 00 (Code

More information

THE HARDWARE INTERFACES BETWEEN WARM MAGNET INTERLOCK SYSTEM, NORMAL CONDUCTING MAGNETS, POWER CONVERTERS AND BEAM INTERLOCK SYSTEM FOR THE LHC RING

THE HARDWARE INTERFACES BETWEEN WARM MAGNET INTERLOCK SYSTEM, NORMAL CONDUCTING MAGNETS, POWER CONVERTERS AND BEAM INTERLOCK SYSTEM FOR THE LHC RING CERN CH-1211 Geneva 23 Switzerland the Large Hadron Collider project LHC Project Document No. CERN Div./Group or Supplier/Contractor Document No. AB/CO EDMS Document No. 599288 Date: 2005-06-09 Engineering

More information

MAKING REMAINING LIFE PREDICTIONS FOR POWER CABLES USING RELIABILITY ANALYSES

MAKING REMAINING LIFE PREDICTIONS FOR POWER CABLES USING RELIABILITY ANALYSES MAKING REMAINING LIFE PREDICTIONS FOR POWER CABLES USING RELIABILITY ANALYSES Jey K. JEYAPALAN, Dr. Jeyapalan & Associates, (USA), jkjeyapalan@earthlink.net ABSTRACT Most underground cable owners would

More information

System Failure Operational Recovery

System Failure Operational Recovery System Failure Operational Recovery VLBI data acquisition is a complex technical challenge for operators using various electronic data acquisition systems, large radio telescopes that use various drive

More information

Basic Level 1. PSA course for analysts

Basic Level 1. PSA course for analysts IAEA Training in level 1 PSA and PSA applications Basic Level 1. PSA course for analysts Reliability data analysis - use of generic and/or plant- specific data Content Types of data for PSA Reliability

More information

b+m Training Programming

b+m Training Programming b+m Training Programming Welcome to the training center of b+m Content Operating the Robot // T1-T2-BR 4 Robots are our passion yours as well? Do you want to stay up-to-date with the latest technology

More information

Power Transformer Failures Evaluation Using Failure Mode Effect and Criticality Analysis (FMECA) Method

Power Transformer Failures Evaluation Using Failure Mode Effect and Criticality Analysis (FMECA) Method Power Transformer Failures Evaluation Using Failure Mode Effect and Criticality Analysis (FMECA) Method Docki Saraswati 1, Iveline Anne Marie 2 and Amal Witonohadi 3 1 Production System Laboratory, Industrial

More information

Magnet Powering with zero downtime a dream?

Magnet Powering with zero downtime a dream? Magnet Powering with zero downtime a dream? M. Zerlauth LHC Performance Workshop February 2012 Thanks to : HWC team, H.Thiesen, V.Montabonnet, J.P.Burnet, S.Claudet, E.Blanco, R.Denz, R.Schmidt, E.Blanco,

More information

Bearing Failures... root causes and preventive procedures Seminar Synopsis

Bearing Failures... root causes and preventive procedures Seminar Synopsis Abstract The early detection and prevention of catastrophic bearing failures alone has justified the existence of predictive maintenance departments within companies. Preventing unexpected bearing failures

More information

Dual Waveform VSAT February 2012

Dual Waveform VSAT February 2012 Dual Waveform VSAT February 2012 SkyEdge II Accent The Operator s Dilemma Traditionally, when operators designed satellite broadband networks, they needed to make a decision on whether to implement a network

More information

Canadian Technology Accreditation Criteria (CTAC) POWER SYSTEMS ENGINEERING TECHNOLOGY - TECHNICIAN Technology Accreditation Canada (TAC)

Canadian Technology Accreditation Criteria (CTAC) POWER SYSTEMS ENGINEERING TECHNOLOGY - TECHNICIAN Technology Accreditation Canada (TAC) Canadian Technology Accreditation Criteria (CTAC) POWER SYSTEMS ENGINEERING TECHNOLOGY - TECHNICIAN Technology Accreditation Canada (TAC) Preamble These CTAC are applicable to programs having titles involving

More information

RISK & RELIABILITY BASED FITNESS FOR SERVICE (FFS) ASSESSMENT FOR SUBSEA PIPELINES By. Ir. Muhd Ashri Mustapha & Dr. Yong BaI.

RISK & RELIABILITY BASED FITNESS FOR SERVICE (FFS) ASSESSMENT FOR SUBSEA PIPELINES By. Ir. Muhd Ashri Mustapha & Dr. Yong BaI. RISK & RELIABILITY BASED FITNESS FOR SERVICE (FFS) ASSESSMENT FOR SUBSEA PIPELINES By Ir. Muhd Ashri Mustapha & Dr. Yong BaI. June 2011 Hannover All rights reserved. No part of this document may be reproduced,

More information

DOCSIS 1.0 Micro CMTS

DOCSIS 1.0 Micro CMTS DOCSIS 1.0 Micro CMTS Our Micro CMTS Provides a number of interface types, some of which are necessary to implement the basic functionality of a DOCSIS HFC network and others which are necessary for management

More information

Power transformer failure management on the Eskom distribution network in Limpopo

Power transformer failure management on the Eskom distribution network in Limpopo Power transformer failure management on the Eskom distribution network in Limpopo MM Sako*, A Wessels** and JHC Pretorius*** *Eskom Holdings SOC Ltd, Distribution, Gobie Street, Menlopark, South Africa

More information

ANSE VISUAL, developed within the

ANSE VISUAL, developed within the ANSE VISUAL Software to Analyze Substation Robustness ANSE VISUAL, developed within the Institutional Project 1724, is a tool to analyze the robustness of electrical substations. The software carries out

More information

XR kw AM Medium Wave Broadcast Transmitter

XR kw AM Medium Wave Broadcast Transmitter XR12 12 kw AM Medium Wave Broadcast Transmitter Ready for digital. Ready for anything. Nautel XR12 Quick Specs RF Output Power 12 kw (rated) 15 kw (capable) 145% positive peak modulation at 12 kw 1.5:1

More information

The frequency inverter continues to carry hazardous voltages for up to 5 minutes after it was switched off.

The frequency inverter continues to carry hazardous voltages for up to 5 minutes after it was switched off. Getriebebau NORD GmbH & Co. KG Getriebebau-Nord-Straße 1 22941 Bargteheide, Germany www.nord.com o SK BRI4-1-200-100 Part number: 275 272 008 Internal braking resistor for connection to a NORDAC FLEX SK

More information

Building a Computer Mahjong Player Based on Monte Carlo Simulation and Opponent Models

Building a Computer Mahjong Player Based on Monte Carlo Simulation and Opponent Models Building a Computer Mahjong Player Based on Monte Carlo Simulation and Opponent Models Naoki Mizukami 1 and Yoshimasa Tsuruoka 1 1 The University of Tokyo 1 Introduction Imperfect information games are

More information

Tower Top Amplifier Systems Application Note

Tower Top Amplifier Systems Application Note Tower Top Amplifier Systems Application Note 1 About RFI RFI is a global technology solutions company, specialising in wireless coverage and solar power products. RFI has one of the largest, most innovative

More information

Mining Phasor Data To Find The Hidden Gems In Your Archive

Mining Phasor Data To Find The Hidden Gems In Your Archive Electric Power Group Presents Phasor Data Mining Application PDMA Mining Phasor Data To Find The Hidden Gems In Your Archive October 16, 2014 Presented by Vivek Bhaman & Frank Carrera Webinar Phone Number:

More information

Low-Level RF. S. Simrock, DESY. MAC mtg, May 05 Stefan Simrock DESY

Low-Level RF. S. Simrock, DESY. MAC mtg, May 05 Stefan Simrock DESY Low-Level RF S. Simrock, DESY Outline Scope of LLRF System Work Breakdown for XFEL LLRF Design for the VUV-FEL Cost, Personpower and Schedule RF Systems for XFEL RF Gun Injector 3rd harmonic cavity Main

More information

Analysis Techniques for WiMAX Network Design Simulations

Analysis Techniques for WiMAX Network Design Simulations Technical White Paper Analysis Techniques for WiMAX Network Design Simulations The Power of Smart Planning 1 Analysis Techniques for WiMAX Network Jerome Berryhill, Ph.D. EDX Wireless, LLC Eugene, Oregon

More information

Commissioning of the ALICE SRF Systems at Daresbury Laboratory Alan Wheelhouse, ASTeC, STFC Daresbury Laboratory ESLS RF 1 st 2 nd October 2008

Commissioning of the ALICE SRF Systems at Daresbury Laboratory Alan Wheelhouse, ASTeC, STFC Daresbury Laboratory ESLS RF 1 st 2 nd October 2008 Commissioning of the ALICE SRF Systems at Daresbury Laboratory Alan Wheelhouse, ASTeC, STFC Daresbury Laboratory ESLS RF 1 st 2 nd October 2008 Overview ALICE (Accelerators and Lasers In Combined Experiments)

More information

ASSESSMENT OF MEDIUM VOLTAGE EQUIPMENT OPERATIONAL RELIABILITY WITH IN THE MANAGEMENT OF BRASOV SDEE

ASSESSMENT OF MEDIUM VOLTAGE EQUIPMENT OPERATIONAL RELIABILITY WITH IN THE MANAGEMENT OF BRASOV SDEE JOURNAL OF SUSTAINABLE ENERGY VOL. II, NO. 2, JUNE, 1 ASSESSMENT OF MEDIUM VOLTAGE EQUIPMENT OPERATIONAL RELIABILITY WITH IN THE MANAGEMENT OF BRASOV SDEE FELEA I.*, PĂCUREANU I**,ALBUŢ-DANA D.*. *University

More information

Superconducting RF System. Heung-Sik Kang

Superconducting RF System. Heung-Sik Kang Design of PLS-II Superconducting RF System Heung-Sik Kang On behalf of PLS-II RF group Pohang Accelerator Laboratory Content 1. Introduction 2. Physics design 3. Cryomodules 4. Cryogenic system 5. High

More information

[APP NOTE TITLE] Application Profile. Challenges

[APP NOTE TITLE] Application Profile. Challenges [APP NOTE TITLE] 03/23/2018 Application Profile Wireless infrastructure encompasses a broad range of radio technologies, antennas, towers, and frequencies. Radio networks are built from this infrastructure

More information

Agent Model of On-Orbit Servicing Based on Orbital Transfers

Agent Model of On-Orbit Servicing Based on Orbital Transfers Agent Model of On-Orbit Servicing Based on Orbital Transfers September 20, 2007 M. Richards, N. Shah, and D. Hastings Massachusetts Institute of Technology Agenda On-Orbit Servicing (OOS) Overview Model

More information

CEBAF Overview June 4, 2010

CEBAF Overview June 4, 2010 CEBAF Overview June 4, 2010 Yan Wang Deputy Group Leader of the Operations Group Outline CEBAF Timeline Machine Overview Injector Linear Accelerators Recirculation Arcs Extraction Systems Beam Specifications

More information

Packaging of Cryogenic Components

Packaging of Cryogenic Components Packaging of Cryogenic Components William J. Schneider Senior Mechanical Engineer Emeritus November 19-23 2007 1 Packaging of Cryogenic Components Day one Introduction and Overview 2 What is important?

More information

KCS MULTI-FUNCTIONAL SENSOR NETWORK MANAGEMENT

KCS MULTI-FUNCTIONAL SENSOR NETWORK MANAGEMENT KCS MULTI-FUNCTIONAL SENSOR NETWORK MANAGEMENT KCS KEY FEATURES The KCS is a solution for the organisation, configuration, and monitoring of sensors. It embeds sensors for the detection, identification,

More information

COURSE CONTENTS FOR THE AVTS COURSES

COURSE CONTENTS FOR THE AVTS COURSES Revision: 00 LEARNING CONTENT Page 1 of 14 COURSE CONTENTS FOR THE AVTS COURSES AT CAD- CAM LAB, ATI, VIDYANAGAR, HYDERABAD Revision: 00 LEARNING CONTENT Page 2 of 14 III COURSE CODE CAD-01 IV COURSE TITLE

More information

Bearing Fault Diagnosis

Bearing Fault Diagnosis Quick facts Bearing Fault Diagnosis Rolling element bearings keep our machines turning - or at least that is what we expect them to do - the sad reality however is that only 10% of rolling element bearings

More information

The frequency inverter continues to carry hazardous voltages for up to 5 minutes after it was switched off.

The frequency inverter continues to carry hazardous voltages for up to 5 minutes after it was switched off. o SK BRW4-2-200-200 Part number: 275 273 408 External brake resistor for direct wall mounting of decentralised frequency inverters Only qualified electricians are allowed to install and commission the

More information

BCS UPDATE. j. welch 2/9/17

BCS UPDATE. j. welch 2/9/17 BCS UPDATE j. welch 2/9/17 TOPICS RP requirements Shutoff path Beam loss detection scheme Beam loss detectors and FPGAs Current monitors Dumps RP REQUIREMENTS Revised BCS PRD was circulated Tuesday for

More information

RF-LAMBDA LEADER OF RF BROADBAND SOLUTIONS

RF-LAMBDA LEADER OF RF BROADBAND SOLUTIONS 80W Broadband High Power Amplifier Module 20-1000MHz Electrical Specifications, T A = +25⁰C, VDD = +28V Features Broadband High Power High Efficiency Great Linearity Small Size & Light Weight Low Distortion

More information

QIF and the Future of Digital Metrology

QIF and the Future of Digital Metrology and the Future of Digital Metrology Daniel Campbell Capvidia dc@capvidia.com GPDIS_2016.ppt 1 Overview Current metrology process What is? use cases Capvidia and GPDIS_2016.ppt 2 Modern Software Process:

More information

Reliability/availability methods for subsea risers and deepwater systems design and optimization

Reliability/availability methods for subsea risers and deepwater systems design and optimization Reliability/availability methods for subsea risers and deepwater systems design and optimization Annamaria Di Padova a, Fabio Castello b Fabrizio Tallone a *, Michele Piccini b, a Saipem S.p.A., Fano,

More information

XR kw AM Medium Wave Broadcast Transmitter

XR kw AM Medium Wave Broadcast Transmitter XR12 12 kw AM Medium Wave Broadcast Transmitter XR12 12 kw AM Medium Wave Broadcast Transmitter XR Series Power Module POWERFUL BUILDING BLOCKS The building block for the XR12 is a power module integrating

More information

SOLID STATE MARX MODULATORS FOR EMERGING APPLICATIONS*

SOLID STATE MARX MODULATORS FOR EMERGING APPLICATIONS* SOLID STATE MARX MODULATORS FOR EMERGING APPLICATIONS* M.A. Kemp #, SLAC National Accelerator Laboratory, Menlo Park, CA, USA SLAC-PUB-15235 Abstract Emerging linear accelerator applications increasingly

More information

TEMPERATURE MAPPING SOFTWARE FOR SINGLE-CELL CAVITIES*

TEMPERATURE MAPPING SOFTWARE FOR SINGLE-CELL CAVITIES* TEMPERATURE MAPPING SOFTWARE FOR SINGLE-CELL CAVITIES* Matthew Zotta, CLASSE, Cornell University, Ithaca, NY, 14853 Abstract Cornell University routinely manufactures single-cell Niobium cavities on campus.

More information

Buskerud University College: Program Systems Engineering

Buskerud University College: Program Systems Engineering by Gerrit Muller Buskerud University College e-mail: gaudisite@gmail.com www.gaudisite.nl Abstract The focus of the Systems Engineering program of Buskerud University is on multidisciplinary design fitting

More information

Power Transformers Reliability Estimation Study

Power Transformers Reliability Estimation Study Power Transformers Reliability Estimation Study Cristinel POPESCU 1, Mircea GRIGORIU 2, Marius-Constantin POPESCU 3, Luminita Georgeta POPESCU 1, Constantina Liliana GROFU 4 1 University Constantin Brancusi

More information

ATC s Mackinac Back-to-Back HVDC Project: Planning and Operation Considerations for Michigan s Eastern Upper and Northern Lower Peninsulas

ATC s Mackinac Back-to-Back HVDC Project: Planning and Operation Considerations for Michigan s Eastern Upper and Northern Lower Peninsulas 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2013 Grid of the Future Symposium ATC s Mackinac Back-to-Back HVDC Project: Planning and Operation Considerations for

More information

CERN-TE-EPC. Aug-14 TE-EPC Presentation 2

CERN-TE-EPC. Aug-14 TE-EPC Presentation 2 CERN-TE-EPC Aug-14 TE-EPC Presentation 2 CERN The worldwide biggest physics laboratory Geneva Lake LHC SWITZERLAND FRANCE Aug-14 TE-EPC Presentation 3 CERN Core Activity Spying matter using: Accelerators

More information

ICAO EUR PERFORMANCE BASED NAVIGATION TASK FORCE & EUROCONTROL RAiSG MEETING (ICAO EUR PBN TF & EUROCONTROL RAiSG)

ICAO EUR PERFORMANCE BASED NAVIGATION TASK FORCE & EUROCONTROL RAiSG MEETING (ICAO EUR PBN TF & EUROCONTROL RAiSG) PBNTF ECTL-RAISG/2 - WP/05 07/03/2014 ICAO EUR PERFORMANCE BASED NAVIGATION TASK FORCE & EUROCONTROL RAiSG MEETING (ICAO EUR PBN TF & EUROCONTROL RAiSG) SECOND MEETING (Brussels, Belgium, 12-14 March 2014)

More information

TRAINING COURSE PROSPECTUS

TRAINING COURSE PROSPECTUS SOLIDWORKS Essentials Duration: Prerequisites: Description: The topics covered in this course are: 4 Days Mechanical design experience; experience with the Windows operating system SOLIDWORKS Essentials

More information

Vibration based condition monitoring of rotating machinery

Vibration based condition monitoring of rotating machinery Vibration based condition monitoring of rotating machinery Goutam Senapaty 1* and Sathish Rao U. 1 1 Department of Mechanical and Manufacturing Engineering, Manipal Institute of Technology, Manipal Academy

More information

200 MHz 350 MHz 750 MHz Linac2 RFQ2 202 MHz 0.5 MeV /m Weight : 1000 kg/m Ext. diameter : 45 cm

200 MHz 350 MHz 750 MHz Linac2 RFQ2 202 MHz 0.5 MeV /m Weight : 1000 kg/m Ext. diameter : 45 cm M. Vretenar, CERN for the HF-RFQ Working Group (V.A. Dimov, M. Garlasché, A. Grudiev, B. Koubek, A.M. Lombardi, S. Mathot, D. Mazur, E. Montesinos, M. Timmins, M. Vretenar) 1 1988-92 Linac2 RFQ2 202 MHz

More information

RF-LAMBDA LEADER OF RF BROADBAND SOLUTIONS

RF-LAMBDA LEADER OF RF BROADBAND SOLUTIONS 50W Broadband High Power Amplifier Module 500 2500MHz Electrical Specifications, T A = +25⁰C, Vdd = +28V Features Ultra-broadband Amplifier Module Small and lightweight Supply Voltage: +28V Parameter Min.

More information

Telecommunications Recommendation extension "A" SPECIFICATION FOR COMMON CHANNEL SIGNALLING SYSTEM No. 7. Message Transfer Part /MTP/

Telecommunications Recommendation extension A SPECIFICATION FOR COMMON CHANNEL SIGNALLING SYSTEM No. 7. Message Transfer Part /MTP/ Telecommunications Recommendation extension "A" SPECIFICATION FOR COMMON CHANNEL SIGNALLING SYSTEM No. 7 Message Transfer Part /MTP/ ISSUE 1.0 02-2002 References References: -CCITT Blue Book Recommendation

More information

LA122/LA122W. Professional Line-Array Element USER MANUAL

LA122/LA122W. Professional Line-Array Element USER MANUAL LA122/LA122W Professional Line-Array Element USER MANUAL Content INTRODUCTION - 2 - SAFETY FIRST - 2 - UNPACKING - 3 - LA122/LA122W OVERVIEW - 3 - CONNECTIONS AND ELECTRIC DIAGRAM - 4 - AMPLIFICATION -

More information

AutoCAD Electrical Fundamentals with NFPA Standards

AutoCAD Electrical Fundamentals with NFPA Standards AutoCAD Electrical Fundamentals with NFPA Standards Course Length: 3 days The AutoCAD Electrical Fundamentals with NFPA Standards training course covers the indispensable core topics for working with the

More information

Volkan Vatansever. Zuverlässigkeitsanalyse der neuen Verbindung zwischen dem Beam Interlock System und dem LHC Beam Dumping System

Volkan Vatansever. Zuverlässigkeitsanalyse der neuen Verbindung zwischen dem Beam Interlock System und dem LHC Beam Dumping System Zuverlässigkeitsanalyse der neuen Verbindung zwischen dem Beam Interlock System und dem LHC Beam Dumping System Reliability Analysis of the new Link between the Beam Interlock System and the LHC Beam Dumping

More information

Systems Dependability Assessment

Systems Dependability Assessment FOCUS RISK MANAGEMENT AND DEPENDABILITY SERIES Systems Dependability Assessment Modeling with Graphs and Finite State Automata Jean-François Aubry Nicolae Brinzei Systems Dependability Assessment FOCUS

More information

The Preliminary Risk Analysis Approach: Merging Space and Aeronautics Methods

The Preliminary Risk Analysis Approach: Merging Space and Aeronautics Methods The Preliminary Risk Approach: Merging Space and Aeronautics Methods J. Faure, A. Cabarbaye & R. Laulheret CNES, Toulouse,France ABSTRACT: Based on space industry but also on aeronautics methods, we will

More information

Human Reliability, Error, and Human Factors in. Engineering Maintenance. with Reference to Aviation and Power Generation

Human Reliability, Error, and Human Factors in. Engineering Maintenance. with Reference to Aviation and Power Generation Human Reliability, Error, and Human Factors in Engineering Maintenance with Reference to Aviation and Power Generation Human Reliability, Error, and Human Factors in Engineering Maintenance with Reference

More information

Reliability Engineering and Availability of a Large Collider Complex CAS on Beam Dynamics and Technologies for Future Colliders

Reliability Engineering and Availability of a Large Collider Complex CAS on Beam Dynamics and Technologies for Future Colliders Reliability Engineering and Availability of a Large Collider Complex CAS on Beam Dynamics and Technologies for Future Colliders M. Zerlauth, A.Apollonio, R. Giacchino, B.Todd, R. Schmidt, J. Wenninger,

More information

Replacement, Maintenance, and Reliability. Theory and Applications SECOND EDITION. (cfc. Andrew K.S. Jardine Albert H.C. Tsang.

Replacement, Maintenance, and Reliability. Theory and Applications SECOND EDITION. (cfc. Andrew K.S. Jardine Albert H.C. Tsang. Maintenance, Replacement, and Reliability Theory and Applications SECOND EDITION Andrew K.S. Jardine Albert H.C. Tsang (cfc CRC Press Taylor & Francis Croup Boca Raton London New York CRC Press is an imprint

More information

Optimize Outage Management and Improve Underground System Reliability

Optimize Outage Management and Improve Underground System Reliability SEL-8301 Underground Distribution Sensor Optimize Outage Management and Improve Underground System Reliability Line current measurement accuracy of 1.5 percent allows for more effective switching decisions

More information

Presentation Overview

Presentation Overview EPRI In a nutshell and EPRI s new research into the area of Circuit Breakers Luke van der Zel EPRI Power Delivery and Markets Presentation Overview Thank you IEEE The 4 main ways EPRI operates EPRI s new

More information

Robotic Installation of OSI-Bolts

Robotic Installation of OSI-Bolts Robotic Installation of OSI-Bolts 2015-01-2512 Mark W. Sydenham and Tim Brown Electroimpact Inc. CITATION: Sydenham, M. and Brown, T., "Robotic Installation of OSI-Bolts," SAE Technical Paper 2015-01-2512,

More information

Security Enhancement through Direct Non-Disruptive Load Control

Security Enhancement through Direct Non-Disruptive Load Control Security Enhancement through Direct Non-Disruptive Load Control Ian Hiskens (UW Madison) Vijay Vittal (ASU) Tele-Seminar, April 18, 26 Security Enhancement through Direct Non-Disruptive Load Control PROJECT

More information

Wireless Occupancy Sensor User Guide

Wireless Occupancy Sensor User Guide Wireless Occupancy Sensor Wireless Occupancy Sensor User Guide This Manual covers both the Wide angle and the Narrow long range occupancy sensor. Dialight Part Numbers described here-in are: WOSU22BG2

More information

IEEE ECTC June 4, 2004, Las Vegas, Nevada

IEEE ECTC June 4, 2004, Las Vegas, Nevada Reliability Testing and Data Analysis of an 657CCGA (Ceramic Column Grid Array) Package with Lead-Free Solder Paste on Lead-Free PCBs (Printed Circuit Boards) IEEE ECTC June 4, 004, Las Vegas, Nevada Study

More information