1 SOLARPARK KAMENIČNÁ S.R.O. CZECH REPUBLIC 5.1 MW FREIBURG, MAY 2015
2 AGENDA 1. PROJECT OVERVIEW 2. PROJECT DETAILS 3. REGULATORY ENVIRONMENT 4. TECHNICAL APPENDICES 5. NEXT STEPS Q2/15
3 1. PROJECT OVERVIEW
4 PROJECT OVERVIEW SOLARPARK KAMENIČNÁ S.R.O. Capacity of 5, kwp The plant is completed since 2010 and produces reliably electricity Czech Republic ATTRACTIVE LOCATION IN THE EAST OF CZ ON A FORMER FARMLAND
5 PROJECT OVERVIEW SOLARPARK KAMENIČNÁ S.R.O. - LOCATION & CLUSTER DETAILS GPS Coordinates: N / E
6 PROJECT OVERVIEW SOLARPARK KAMENIČNÁ S.R.O. - PROJECT KEY FIGURES COMMERCIAL FINANCIAL Type of installation: Ground-mounted PV plant Bank financed:: German Bank Total system size: 5, kwp Location: Kameničná, Czech Republic Duration of loan: until 31st December 2025 Annuity 2015: 1,522,450 Grid connected: December 2010 Spec. annual yield: kwh/kwp FiT for 20 years: CZK/kWh O&M agreement: 40 CZK/kWp Sub-O&M Kaco: 7, /kwp Insurance: 719, CZK (2015) Land lease price: 719, CZK (2015) CZK/qm p. a. PRODUCTION & REVENUE Production & Revenues ,549,584 kwh 70,202,237 CZK ,973,847 kwh 64,177,548 CZK Timing ,234,511 kwh 68,891,396 CZK (solar tax not considered)
7 2. PROJECT DETAILS
8 PROJECT DETAILS SOLARPARK KAMENIČNÁ S.R.O. - LEGAL STRUCTURE SF SOLPOWER AG 100% ownership FINANCING BANK Loan agreement & Swap agreement SOLARPARK KAMENICNA S.R.O. Owner of Plants O&M Asset management S.A.G. SOLARSTROM CZECH S.R.O. S.A.G. SOLAR GMBH & CO. KG O&M inverters Monitoring KACO METEOCONTROL GMBH SF SOLPOWER AG IS A SHAREHOLDER OF 100%
9 PROJECT DETAILS SOLARPARK KAMENIČNÁ S.R.O. - TECHNICAL DESCRIPTION MODULES: Q.CELLS poly-crystalline modules Type: Q:BASE 230W/235W/240W 21,693modules (4,431 x 230W/10,164 x 235W/7,098 x 240W) / 5, kwp INVERTER: Kaco New Energy central inverters Type: XP350-HV-TL (15x) Installed in 5 concrete outdoor stations (Kaco New Energy Megawatt-Stations) MOUNTING SYSTEM: Solea AG mounting system with rotary foundation Type: Galvanized steel ground-mounting system Modules mounted in portrait orientation with 30 inclination MONITORING: Meteocontrol monitoring system incl. Safer Sun Portal Components: WebLog Pro, irradiation sensor, weather station, monitoring switchboard, WLAN antenna Professional remote monitoring via Safer Sun Portal FURTHER DETAILS: Senstar/Bosch security system Fence surveillance via microphonic cable / Video surveillance via IR cameras Type: Senstar Intelli-FLEX / Bosch Higspeed positioning system
10 3. REGULATORY ENVIRONMENT
11 REGULATORY ENVIRONMENT SOLARPARK KAMENIČNÁ S.R.O. Size FiT-Tariff Commissioning up to 30 kwp 12,25 CZK/kWh in > 30 kwp 12,15 CZK/kWh in 2010 up to 30 kwp 13,15 CZK/kWh in 2009 > 30 kwp 13,05 CZK/kWh in 2009 THE FEED-IN TARIFF IS GUARANTEED FOR 20 YEARS.
12 4. TECHNICAL APPENDICES
13 APPENDICES SOLARPARK KAMENIČNÁ S.R.O. - SITE INFORMATION
14 APPENDICES SOLARPARK KAMENIČNÁ S.R.O. - MODULES Q.CELLS Q.BASE 230W/235W/240W
15 APPENDICES SOLARPARK KAMENIČNÁ S.R.O. - INVERTER Kaco New Energy Powador XP350-HV-TL Kaco New Energy Powador Megawatt-Station A MEGAWATT-STATION CONSISTS OF THREE INVERTERS XP350-HV-TL AND ONE MEDIUM VOLTAGE TRANSFORMER
16 APPENDICES SOLARPARK KAMENIČNÁ S.R.O. - MOUNTING SYSTEM SOLEA AG MOUNTING SYSTEM WITH ROTARY FOUNDATION
17 APPENDICES SOLARPARK KAMENIČNÁ S.R.O. - GENERATOR CONNECTION BOXES KACO NEW ENERGY POWADOR ARGUS 16S DCS
18 APPENDICES SOLARPARK KAMENIČNÁ S.R.O. - SECURITY SYSTEM FENCE SURVEILLANCE WITH MICROPHONE CABLE - SENSTAR INTELLI-FLEX VIDEO SURVEILLANCE BOSCH HIGHSPEED IR CAMERAS BOSCH SECURITY SYSTEM
19 5. NEXT STEPS
20 NEXT STEPS SOLARPARK KAMENIČNÁ S.R.O. FURTHER PROCESS Until 12th of June 2015: From 15th of June: Until 22th of June: 30th of June: Until 24th of July: Afterwards: Expression of interest through transmission of signed NDA by the investor S.A.G. Solar provides process letter and further project information Indicative offer to S.A.G. Solar Opening of project dataroom for due diligence process to selected interested parties Binding offer to S.A.G. Solar Final negotiations and completion of contracts CONTACT DETAILS Markus Meyer, LL.M. Chief Legal Officer S.A.G. Solar GmbH & Co. KG Sasbacher Str Freiburg, Germany Tel: Fax: m.meyer@sagsolar.com
21 S.A.G. Solar GmbH & Co. KG Sasbacher Straße Freiburg i. Br., Germany +49 (0)
Application note. 0% - 100% feed-in regulation
Application note 0% - 00% feed-in regulation Contents The 0 W regulation The 0 W regulation 4 Schematic structure 5 Summary of options 7 System outputs In countries where feed-in of solar power into the
More informationContract No: EIE/07/164/SI Project Summary. Market Access for Smaller Size Intelligent Electricity Generation MASSIG
Project Summary Market Access for Smaller Size Intelligent Electricity Generation MASSIG Duration: October 2007 July 2010 (33 Months) Grant Agreement No.: EIE/07/164/SI2.467618 Project Co-ordinator: Fraunhofer
More informationApplication note. 0 % / 70 % feed-in regulation
Application note 0 % / 70 % feed-in regulation Application note 0 % / 70 % feed-in regulation PV feed-in regulation depending on owner's electricity consumption Contents Precondition.... Balancing settlement
More informationNER300 Offshore Wind Park Nordsee One. Tobias Griesshaber Shareholder representative of Innogy SE on behalf of project Nordsee One GmbH
NER300 Offshore Wind Park Nordsee One Tobias Griesshaber Shareholder representative of Innogy SE on behalf of project Nordsee One GmbH Brussels, 15 December 2017 1 Agenda General project overview & timeline
More informationWATSON FARLEY & WILLIAMS: KEY FACTS
UK: SOLAR WATSON FARLEY & WILLIAMS: KEY FACTS 150+ PARTNERS FOUNDED 1982 14 OFFICES OVER 500 LAWYERS 11 COUNTRIES OVER 20 LANGUAGES SPOKEN UK: Solar 3 EXPERIENCE IN UK SOLAR Watson Farley & Williams has
More informationTHE MERCHANT SOLAR PATH: Increasing Regulatory Certainty for the Settlement of PV Generation Resources in the ERCOT Market
THE UNIVERSITY OF TEXAS SCHOOL OF LAW Presented: RENEWABLE ENERGY LAW January 28-29, 2014 Austin, Texas THE MERCHANT SOLAR PATH: Increasing Regulatory Certainty for the Settlement of PV Generation Resources
More informationoptimizing solar power
optimizing solar power CONSULTING AND EXPERT SERVICE QUALITY ASSURANCE CONCEPTS SPECIFIC MEASUREMENT TECHNOLOGY Optimizing Solar power Harnessing and maximizing solar power is our business. CSP Services,
More informationThe stamp-collection plotting approach: What monitoring data do we actually have?
The stamp-collection plotting approach: What monitoring data do we actually have? Nils Reich Fraunhofer ISE, Freiburg, Germany www.ise.fraunhofer.de Outline Introduction Stamps & a simple PV stamp-collection
More information1OO % transparency = 1OO % performance. SunSniffer: the operating system for PV plants, monitoring and. Secure your solar investment
Secure your solar investment inside 1OO % transparency = 1OO % performance SunSniffer: the operating system for PV plants, monitoring and www.innoway-sea.com www.innoway-sea.com page 2 How to read this
More informationAnnual Report
Annual Report 216 1/7 I. Basic Information about EKOMOR, s.r.o. Name: EKOMOR, s.r.o. (hereinafter EKOMOR ) ID - Number: 48397571 Company based in: Liskovec 397, 739 3 Frydek-Mistek, Czech Republic Day
More informationOffshore Wind Energy in Germany: System Benefits and Cost Reduction Potentials
Offshore Wind Energy in Germany: System Benefits and Cost Reduction Potentials Presentation of study results from prognos/fichtner and Fraunhofer-IWES Andreas WAGNER Stiftung OFFSHORE-WINDENERGIE German
More informationCompany Introduction
Company Introduction Copyright 2012 by SolarPark Korea Co., Ltd. ALL RIGHTS RESERVED. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means
More informationSOLAR. Representing clients across the renewable energy industry. Troutman Sanders LLP. troutman.com
SOLAR Representing clients across the renewable energy industry What clients value Troutman Sanders served as counsel to over 5600 MWs of solar projects in 2016-2017. U.S. News Best Lawyers Our innovative
More informationRolling code radio system RS 868
Technical information/planning document Rolling code radio system RS 868 Fields of application: for emitting/receiving commands for gate facilities for controlling light switches access controlling Overview
More informationPrivate Equity & Venture Capital
Private Equity & Venture Capital GSK. The Difference. Private Equity. Comprehensive advice in Germany and Luxembourg. We advise German, Luxembourg and foreign private equity funds, financial investors
More informationOptimizing wind farms
Optimizing wind farms We are Uniper We are a leading international energy company with operations in more than 40 countries and around 13,000 employees. We combine a balanced portfolio of modern assets
More informationTECHNICAL DATA SHEET. smartflower POP. As of: August 2015 Typing and printing errors reserved.
TECHNICAL DATA SHEET smartflower POP. TECHNICAL DATA POWER OUTPUT Nominal output Output through 2-axle tracking POP 2.31 kwp* 3.400 5.700 kwp/a** SYSTEM Modultype Modul power output warranty Module product
More informationFrank Meckes Partner. Languages German. English
Frank Meckes Partner Qualifications Admission to the bar (Rechtsanwalt) 2002. Law studies at the Albert-Ludwigs-University of Freiburg i. Br., Germany. University of Cooperative Education (Finance Centre),
More informationToolbox for Renewable Energy Tariff Design in West African Countries
Toolbox for Renewable Energy Tariff Design in West African Countries Abuja, 20-21 July 2017 Abuja, 20-21 July 2017 page 1 Part A Welcome and Introduction Abuja, 20-21 July 2017 Abuja, 20-21 July 2017 page
More informationCOFDM. video transmitter. in the world! *Extreme Low Delay only 5-9ms!
Probably the fastest* video transmitter COFDM in the world! *Extreme Low Delay only 5-9ms! Wireless COFDM Solutions for police, military or authorities Wireless Helmet Camera Transmitter with bidirectional
More informationRENEWABLE ENERGY. Contact. Professionals
Hodgson Russ has been involved in renewable energy from the earliest days of hydropower, to the first successful defense of a permit denial due to excess greenhouse gas emissions. We have counseled clients
More informationSIPROTEC 5 Application Note
www.siemens.com/protection SIPROTEC 5 Application Note SIP5-APN-015: Answers for infrastructure and cities. SIPROTEC 5 - Application: SIP5-APN-015 Content 1 Application 3 1.1 Introduction 3 1.2 Overview
More informationCIRCULAR SAWS. Production system for grinding tooth faces/tooth tops and side angles CC 355
CIRCULAR SAWS Production system for grinding tooth faces/tooth tops and side angles CC 355 / CIRCULAR SAWS // TOOTH FACES/TOOTH TOPS AND SIDE ANGLES MAXIMUM FLEXIBILITY AND PRODUCTIVITY IN THE MANUFACTURE
More informationHOTELS, TOURISM & LEISURE. Hotels, Tourism & Leisure
HOTELS, TOURISM & LEISURE nem is one of Australasia s largest boutique business consultancy firms, which is able to draw on the significant skills and experience of over 50 partners across Australia and
More informationSunways Solar Inverters NT 2500, NT 3000, NT 3700, NT 4200 and NT 5000 AC output: 2.5 to 5.0 kw
Sunways Solar Inverters NT 2500, NT 3000, NT 3700, NT 4200 and NT 5000 AC output: 2.5 to 5.0 kw The tried and tested NT series has been completely reengineered and impresses with further improved performance
More informationEmbedded Generation Connection Application Form
Embedded Generation Connection Application Form This Application Form provides information required for an initial assessment of the Embedded Generation project. All applicable sections must be completed
More informationAnnual Report Pickling line for strip - Pakistan. 1/8
Annual Report 2015 Pickling line for strip - Pakistan www.ekomor.cz 1/8 I. Basic Information about EKOMOR, s.r.o. Name: EKOMOR, s.r.o. (hereinafter EKOMOR ) ID - Number: 48397571 Company based on: Day
More informationCAM ALL WEATHER TRANSMITTER AND RECEIVER SYSTEM
Copyright 2003 1156488 Ontario Inc. 1 5 4 2 6 ALL WEATHER TRANSMITTER WITH SURVEILLANCE ERA 3 9 7 ALL WEATHER TRANSMITTER AND RECEIVER SYSTEM 8 SECURITY MONITOR Mounting transmitter and receiver on the
More informationOffshore Wind Risks - Issues and Mitigations
DNV Offshore Wind Soren Karkov DNV an independent foundation Our Purpose To safeguard life, property and the environment Our Vision Global impact for a safe and sustainable future 2 More than 145 Years
More informationThe role of Intellectual Property (IP) in R&D-based companies: Setting the context of the relative importance and Management of IP
The role of Intellectual Property (IP) in R&D-based companies: Setting the context of the relative importance and Management of IP Thomas Gering Ph.D. Technology Transfer & Scientific Co-operation Joint
More informationOverview. Introduction. Long-Wave System Architecture. Physics of LV Propagation. Applications and Market. Company Structure and Business Model
Tariff and Load Management by wide area Long wave communication Burkhard Beyer Business Development Manager EFR Europäische Funk-Rundsteuerung Nymphenburger Straße 39 D-80335 München Overview Introduction
More informationEmbedded Generation Connection Application Form
Embedded Generation Connection Application Form This Application Form provides information required for an initial assessment of the Embedded Generation project. All applicable sections must be completed
More informationGSE GROUND SYSTEM. Ground Mounting System for framed PV modules. INSTALLATION MANUAL GSE GROUND SYSTEM Ground Mounting System for framed PV Modules
G R O U P E S O L U T I O N E N E R G I E GSE GROUND SYSTEM Ground Mounting System for framed PV modules INSTALLATION MANUAL GSE GROUND SYSTEM Ground Mounting System for framed PV Modules V 2.1 WWW.GSEINTEGRATION.COM
More informationOn-roof system Alpha + Product catalogue
On-roof system Alpha + Product catalogue Contents ALPHA +... 3 1. ALPHA + BASE RAILS... 4 2. ALPHA + SPLICES... 5 3. ALPHA + TELESCOPING END PIECES... 6 4. ALPHA + INTER-MODULE CLAMPS AND MODULE END CLAMPS...
More informationEmbedded Generation Connection Application Form
Embedded Generation Connection Application Form This Application Form provides information required for an initial assessment of the Embedded Generation project. All applicable sections must be completed
More informationThe ABCs of SBICs A PilieroMazza Webinar. October 25, 2017
The ABCs of SBICs A PilieroMazza Webinar October 25, 2017 Presented by Jon Williams, Partner jwilliams@pilieromazza.com (202) 857-1000 Kimi Murakami, Counsel kmurakami@pilieromazza.com (202) 857-1000 2
More informationMaking sure of a healthy environment. Narda EMF Monitors. Improving safety in electromagnetic fields
Making sure of a healthy environment Narda EMF Monitors Improving safety in electromagnetic fields EMF: The invisible radiation that permeates our world Rapid growth in complex infrastructures is taking
More informationTRACY SEWARD CPA DECEMBER 2015 PAGE 1
TRACY SEWARD CPA Tracy Seward has over 20 years of financial accounting experience obtained through a diverse range of industry and senior management experience. He is a team leader devoted to creating
More informationDeveloping Solar PV Power Projects in Ontario, Canada
Developing Solar PV Power Projects in Ontario, Canada Executive Summary - February 2018 Who We Are Business Description Solar Flow-Through Funds ( Solar Flow-Through ) is a Limited Partnership formed to
More informationWIND FARM MANAGEMENT YOUR INVESTMENT FUTURE ORIENTATED AND SECURE
WIND FARM MANAGEMENT YOUR INVESTMENT FUTURE ORIENTATED AND SECURE CONTENTS PREFACE 3 VISION + MISSION 4-5 DECISIVE EFFICIENCY 6-7 SERVICE OVERVIEW 8-9 FACTS 10 PARTNERSHIPS 11 NETWORKED EXPERTISE FOR YOU
More informationComputer-Assisted Wiring Optimization Method for Photovoltaic Power Plant Area
American Journal of Modern Energy 218; 4(3): 17-25 http://www.sciencepublishinggroup.com/j/ajme doi: 1.11648/j.ajme.21843.11 ISSN: 2575-398 (Print); ISSN: 2575-3797 (Online) Computer-Assisted Wiring Optimization
More informationSATELLITE MONITORING OF REMOTE PV-SYSTEMS
SATELLITE MONITORING OF REMOTE PV-SYSTEMS Stefan Krauter, Thomas Depping UFRJ-COPPE-EE, PV-Labs, C. P. 68504, Rio de Janeiro 21945-970 RJ, BRAZIL Tel: +55-21-2562-8032, Fax: +55-21-22906626, E-mail: krauter@coe.ufrj.br
More informationRENEWABLE ENERGY TECHNOLOGY ACCELERATOR (RETA) PROJECT
RENEWABLE ENERGY TECHNOLOGY ACCELERATOR (RETA) PROJECT PROJECT FUNDED BY: PROJECT PARTNERS: RENEWABLE ENERGY TECHNOLOGY ACCELERATOR (RETA) Innovation in the supply chain is vital to the success of the
More informationThe offshore wind puzzle getting the pieces right
ENERGY The offshore wind puzzle getting the pieces right FOWIND workshop Paul Reynolds 09/09/14 1 SAFER, SMARTER, GREENER World s largest dedicated renewable energy consultancy 2 Content & Key messages
More informationIZAR RADIO. A safe form of radio
IZAR RADIO A safe form of radio 1 IZAR RADIO A safe form of radio 2 Radio-based technologies have found their way into almost all areas of our lives. And when it comes to recording consumption data, wireless
More informationPrivate Equity to us does not solely consist of preparing tailor-made acquisition, financing and exit structures, as well as developing and negotiatin
Private Equity to us does not solely consist of preparing tailor-made acquisition, financing and exit structures, as well as developing and negotiating, e.g., joint venture, purchase and participation
More informationElgar ETS TerraSAS. 1kW-1MW V. Standalone TerraSAS Photovoltaic Simulator
Elgar ETS TerraSAS Standalone TerraSAS Photovoltaic Simulator Low output capacitance High bandwidth up to 30kHz High resolution I-V curve simulates static and dynamic conditions Designed for high speed
More informationWATERFLUX 3000 Quick Start
WATERFLUX 3000 Quick Start Electromagnetic flow sensor The documentation is only complete when used in combination with the relevant documentation for the signal converter. KROHNE CONTENTS WATERFLUX 3000
More informationInstallation and operating instructions
Installation and operating instructions GPS TILT-Module Version: V3.20120515 30302495-02-EN Read and follow these operating instructions. Keep these operating instructions in a safe place for later reference.
More informationINNOVATIVE SOLUTIONS FOR CSP CONTROLLERS
CSP TODAY 2015 INNOVATIVE SOLUTIONS FOR CSP CONTROLLERS 11-12 November 2015, Seville OUR PRODUCTS Local tracking Controllers With embedded SPA Algorithm for autonomous /slave tracking strategies. High
More informationLow performing modules do not limit the string
Voltage = key performance indicator Low performing modules do not limit the string Referring to Paper: Defect Analysis of installed PV-Modules IR-Thermography and In-String Power Measurement, Bavarian
More informationGMS FLEX. / Versatile mounting system for open-terrain PV power plants / Adaptable to terrain: Variable module tilt angle and lateral tilt, various
GMS FLEX Adjustable and flexible as the nature / Versatile mounting system for open-terrain PV power plants / Adaptable to terrain: Variable module tilt angle and lateral tilt, various foundation types
More informationIsraeli Desk. Legal and Tax Advice
Israeli Desk Legal and Tax Advice www.luther-lawfirm.com Luther Rechtsanwaltsgesellschaft mbh Israeli Desk Our Israeli Desk advises Israeli companies and investors when doing business in Germany, as well
More informationSOLON Corporation Potential Induced Degradation
SOLON Corporation Potential Induced Degradation William Richardson NREL PVRW, February 1 th, 2011 SOLON at a Glance One of the largest manufacturers of solar modules in Europe Large scale rooftop and greenfield
More informationAdvanced training Market overview, securitisation structures and regulation
Advanced training Thursday, 25 June 2015 8.40 18.00 True Sale International GmbH Mainzer Landstraße 51 Advanced training Market overview, securitisation structures and regulation 60329 Frankfurt Germany
More informationInstrument transformers for indoor applications. Product overview. Instrument transformers for indoor applications.
Instrument transformers for indoor applications Product overview Instrument transformers for indoor applications Product overview 2 I N S T R U M E N T T R A N S F O R M E R S F O R I N D O O R A P P L
More informationSICLOCK DCFRS Industrial Version with TTY Interface 2XV9450-1AR21
SICLOCK DCFRS Industrial Version with TTY Interface 2XV9450-1AR21 User Manual Version 1.2 Revision: May 2014 Order No. 2XV9450-1AR48 Contact Person: Orders: local SIEMENS branch local SIEMENS branch Published
More informationRemotes Case 2&3 Form REINDEER Cases 2&3 -Connection Impact Assessment (CIA) Application
General Application Information Remotes Case 2&3 Form REINDEER Cases 2&3 -Connection Impact Assessment (CIA) Application Hydro One Remote Communities Inc. Lori.Rice@hydroone.com 1-807-474-2828 This Application
More informationRoschier Projects & Energy Practice. Vaasa Gas Exchange 23 March 2017
Roschier Projects & Energy Practice Vaasa Gas Exchange 23 March 2017 Roschier Projects & Energy practice provides strategic support from an early stage and delivers results for our clients in their key
More informationNew York Bar admission (or eligibility to obtain admission promptly) is required.
Job Opportunities To apply to any of the positions send cover letter referencing job opening with resume and salary requirements to info@bryantrabbino.com Senior Level Corporate Finance Attorney We are
More information03 / Data Sheet. PIKO-Inverter
03 / 2013 EN Data Sheet PIKO-Inverter 3.0 3.6 4.2 5.5 7.0 8.3 10.1 Table of content 4 Overview technical data Inverter single-phase 5 Inverter PIKO 3.0 5 Inverter PIKO 3.6 Inverter three-phase 6 Inverter
More informationAPAS assistant. Product scope
APAS assistant Product scope APAS assistant Table of contents Non-contact human-robot collaboration for the Smart Factory Robots have improved the working world in the past years in many ways. Above and
More informationViking Advisory Group. Company Presentation September 2011
Viking Advisory Group Company Presentation September 2011 Viking Advisory Group Mission To offer value added, high quality services within the disciplines of financial management, accounting, legal, insurance,
More informationPhotovoltaic Cells for Optical Power and Data Transmission
Photovoltaic Cells for Optical Power and Transmission H. Helmers, S.P. Philipps, S.K. Reichmuth, E. Oliva, D. Lackner, A.W. Bett Fraunhofer Institute for Solar Energy Systems ISE European Telemetry and
More informationB O A R D O F D I R E C T O R S. Minutes of the meeting held in Luxembourg on 11 June 2018
B O A R D O F D I R E C T O R S Minutes of the meeting held in Luxembourg on Parts of this document may have been redacted if, at the time of the Board s decision, falling under the exceptions for disclosure
More informationTailoring deployment policies to support innovation in specific energy technologies
February 24, 2014 Tailoring deployment policies to support innovation in specific energy technologies Energy Policy Seminar Series, Spring 2014 Joern Huenteler Pre-doctoral fellow, Belfer Center for Science
More informationEuropean funding opportunities for Ocean Energy
www.oceanenergy-europe.eu European funding opportunities for Ocean Energy Rémi Gruet Policy & Operations Director Ocean Energy Europe www.oceanenergy-europe.eu The European Ocean Energy Association Representing
More informationTechnical Information Short-Circuit Currents Information on short-circuit currents of SMA PV inverters
Technical Information Short-Circuit Currents Information on short-circuit currents of SMA PV inverters Content During grid failures as for example voltage dips, all PV inverters may generate currents that
More informationAttitude Determination and Control Specifications
Attitude Determination and Control Specifications 1. SCOPE The attitude determination and control sub system will passively control the orientation of the two twin CubeSats. 1.1 General. This specification
More informationB O A R D O F D I R E C T O R S. Minutes of the meeting held in Luxembourg on 17 July 2017
B O A R D O F D I R E C T O R S Minutes of the meeting held in Luxembourg on Parts of this document that, at the time of the meeting, fall under the exceptions for disclosure defined by the EIF Transparency
More informationKlaus-Fischer-Straße Waldachtal DEUTSCHLAND EAD This version replaces ETA-07/0025 issued on 14 May 2018
European Technical Assessment ETA-07/0025 of 28 August 2018 - Original version in German language General Part Technical Assessment Body issuing the European Technical Assessment: Trade name of the construction
More informationSolmetric White Paper: Winning Contracts with PV Array Testing
Solmetric White Paper: Winning Contracts with PV Array Testing Contents Introduction...1 Background: I-V Curves in Field Applications...2 What is an I-V curve?...2 Where has I-V curve tracing been used
More informationMilling & Pressing. Wire rope construction. On board & On shore
SVB Specialist for Yacht & Boat Equipment Gelsenkirchener Str. 25-27 D - 28199 Bremen Tel. +49 421 57290-0 Fax: +49 421 57290-40 email: info@svb24.com www.svb24.com Milling & Pressing construction Many
More informationBeeWaTec GLT TransferSystem for your Production Process. Version 1.0
GLT TransferSystem for your Production Process Version 1.0 S i m p l e. F l ex i b l e. I n d i v i d u a l. All About: GLT TransferSystem Ergonomic Efficient Transport load carriers efficiently, without
More informationWATERFLUX 3000 Quick Start
WATERFLUX 3000 Quick Start Electromagnetic flowmeter The documentation is only complete when used in combination with the relevant documentation for the signal converter. KROHNE CONTENTS WATERFLUX 3000
More informationMetal Air Batteries International Congress Santander, Spain, 7 th March2016
Metal Air Batteries International Congress 2016 Santander, Spain, 7 th March2016 Metal Air Batteries International Congress, Santander, 7-10 March 2016 1 Demonstration of a low cost and environmentally
More informationStrategic equity investment of C$723 million in Ivanhoe Mines by China-based CITIC Metal has been completed
September 19, 2018 Strategic equity investment of C$723 million in Ivanhoe Mines by China-based CITIC Metal has been completed Zijin Mining also has exercised its anti-dilution rights, raising additional
More informationCOSME Financial Perspectives European programmes and funds to foster growth Madrid 30 October/Seville 31 October 2013
COSME 2014-2020 2014-2020 Financial Perspectives European programmes and funds to foster growth Madrid 30 October/Seville 31 October 2013 Vilmos Budavari European Commission DG Enterprise and Industry,
More informationATTACHMENT - AESO FUNCTIONAL SPECIFICATION
ATTACHMENT - AESO FUNCTIONAL SPECIFICATION Functional Specification Revision History Revision Description of Revision By Date D1 For internal Comments Yaoyu Huang January 8, 2018 D2 For external Comments
More informationSecure your solar investment. inside. 1OO % transparency = 1OO % performance.
Secure your solar investment inside 1OO % transparency = 1OO % performance www.sunsniffer.de www.sunsniffer.de page 2 Why 1OO % transparency? With a solar energy system, anybody can produce environmentally
More informationDesign Guide of the Medium Voltage Transformers for KACO Central Inverter
Design Guide of the Medium Voltage Transformers for KACO This document describes the requirements of medium-voltage transformers that are connected to KACO central inverter. KACO new energy only accepts
More informationA Dynamic Analysis of Internationalization in the Solar Energy Sector: The Co-Evolution of TIS in Germany and China
Forschungszentrum für Umweltpolitik Rainer Quitzow Forschungszentrum für Umweltpolitik (FFU) Freie Universität Berlin rainer.quitzow@fu-berlin.de www.fu-berlin.de/ffu A Dynamic Analysis of Internationalization
More informationRockfield & 2-10 McLaren Irvine, CA 92618
15791-15801 Rockfield & 2-10 McLaren AVAILABILITIES SUITE TOTAL SIZE OFFICE SIZE ASKING RATE DESCRIPTION 15791 Rockfield B 3,626 20% $1.40/G 15791 Rockfield O 1,985 30% $1.40/G, 2 private offices, 2 restrooms,
More informationParking Lot Application
Parking Lot Application Description Auto Dealerships and parking lots are a prime target for vandalism and theft. Multiple vehicles scattered over a wide area can be difficult or impossible to monitor
More informationSOLAR PV POWER PLANT SERVICES & TRAININGS
SOLAR PV POWER PLANT SERVICES & TRAININGS Steinbeis Centre for Technology Transfer India 9-1-364/A/2/A 3rd Floor NAS Enclave Opposite Bapughat, Langar House Hyderabad 500 008 India Ph: +91-40-29880034-37
More informationKEVA B Indoor voltage sensor
Medium Voltage Products KEVA B Indoor voltage sensor Parameters for Application Unit Value Rated primary voltage of application kv up to 24 Sensor Parameters Unit Value Rated primary voltage, U pn Highest
More informationDA 30 High Torque Technical Specification
1/17 DA 30 High Torque DA 30-HT-30-5848 2/17 Content 1. General Description... 3 2. Operating Data... 4 3. Performance... 5 4. Materials and Protective Features... 6 5. Dimensions... 6 5.1. Installation
More informationMedium Voltage Products. KECA 80 C85 Indoor current sensor
Medium Voltage Products KECA 80 C85 Indoor current sensor Parameters for Application Value Rated primary current of application up to 2 500 A Sensor Parameters Value Highest voltage for equipment, U m
More informationDA DA 26 Technical Specification. Page 1/27. Volz Servos GmbH & Co. KG servos.com
1/27 DA 26 DA 26 30 5024 2/27 Content 1. General Description... 3 2. Operating Data... 4 3. Performance... 5 4. Command Signal... 6 4.1. PWM Command Interface... 6 4.2. RS 485 Command Signal... 6 4.3.
More informationRENEWABLE ENERGY SUB-CODE for Distribution Network connected Variable Renewable Energy Power Plants in Ghana
RENEWABLE ENERGY SUB-CODE for Distribution Network connected Variable Renewable Energy Power Plants in Ghana JANUARY 2015 i Table of Content PART A: 1 1 Introduction 1 1.1 Scope 1 1.2 Status 1 1.3 Terms
More informationSolar. wfw.com. Finance & investment. Transport Real estate ICT. Maritime Energy Natural resources. Corporate Finance Tax Dispute resolution
Solar Finance & investment Maritime Energy Natural resources Transport Real estate ICT Corporate Finance Tax Dispute resolution Employment Regulatory London New York Paris Hamburg Munich Frankfurt Milan
More informationKlaus-Fischer-Straße Waldachtal DEUTSCHLAND EAD This version replaces ETA-15/0352 issued on 12 April 2016
European Technical Assessment ETA-15/0352 of 30 October 2018 - Original version in German language General Part Technical Assessment Body issuing the European Technical Assessment: Trade name of the construction
More informationTwo years of PV-Hybrid Stand Alone Systems on the island of Kythnos: A socio-technical analysis
Two years of PV-Hybrid Stand Alone Systems on the island of Kythnos: A socio-technical analysis P. Schweizer-Ries, C. Claudia Villalobos, Ph. Strauss*, S. Tselepis** & J. Reekers*** University of Magdeburg,
More informationPhotovoltaic testing for R&D, DV, and manufacturing
Photovoltaic testing for R&D, DV, and manufacturing Neil Forcier Application Engineer Agilent Technologies Jim Freese President Freese Enterprises Inc. www.agilent.com/find/solarcell Page 1 Agenda Introduction
More informationGRID-CONNECTED SOLAR PV SYSTEMS. Design Guidelines for Accredited Installers NO BATTERY STORAGE. January 2013 (Effective 1 February 2013)
GRID-CONNECTED SOLAR PV SYSTEMS NO BATTERY STORAGE Design Guidelines for Accredited Installers January 2013 (Effective 1 February 2013) These guidelines have been developed by Clean Energy Council. They
More informationResults Briefing Fourth Financial Quarter, 2012* Analyst & Investor Update 20 th December 2012
Results Briefing Fourth Financial Quarter, 2012* Analyst & Investor Update 20 th December 2012 *Financial Quarter ending 30 September 2012 Disclaimer This Analyst Presentation has been prepared by Mermaid
More informationHow to Evaluate PV Project Energy Yield
How to Evaluate PV Project Energy Yield There are three main characteristics of a PV module that could affect the real energy generation of a PV plant: Temperature coefficient; Low light performance; IAM
More informationFORWARD-LOOKING STATEMENTS
CONSOLIDATED QUARTERLY STATEMENT Q1 2016 FORWARD-LOOKING STATEMENTS This report may contain forward-looking statements that are subject to risks and uncertainties, many of which relate to factors that
More informationAnalysis of the Effectiveness of Grid Codes for Offshore Wind Farms Connected to Onshore Grid via VSC-Based HVDC
Conference of the Wind Power Engineering Community Analysis of the Effectiveness of Grid Codes for Offshore Wind Farms Connected to Onshore Grid via VSC-Based HVDC Moritz Mittelstaedt, Andreas Roehder,.Hendrik
More informationThe RapidEye Mission. WGISS-24 Host Workshop Michael Oxfort / Oberpfaffenhofen / 17th October RapidEye proprietary information
The RapidEye Mission WGISS-24 Host Workshop Michael Oxfort / Oberpfaffenhofen / 17th October 2007 1 Contents 1. Introduction 2. Business Concept 3. Markets and Segments 4. Products and Services (Selected
More information