1 LASER INTERFEROMETER GRAVITATIONAL WAVE OBSERVATORY -LIGO- CALIFORNIA INSTITUTE OF TECHNOLOGY MASSACHUSETTS INSTITUTE OF TECHNOLOGY Technical Note LIGO-T W 12/09/03 Increasing the laser power incident on the recycling mirrors in the LIGO interferometers D. Cook and R. Savage This is an internal working note of the LIGO Project. California Institute of Technology LIGO Project MS Pasadena CA Phone (626) Fax (626) WWW: Massachusetts Institute of Technology LIGO Project MS 20B-145 Cambridge, MA Phone (617) Fax (617) C:\User\Rick\Papers\Power_Increase\power_increase.doc 12/22/2003

2 ABSTRACT Drawing heavily from elog entries made by various authors, we evaluate the present power levels from the 126MOPA laser and through the PSL and IOO optics to the recycling mirror. We then estimate the effort and cost required to increase the laser power and transmission efficiency of the optical components. For reference we use the power levels from the subsystem design documents. However, because these documents are about ten years old and were written before the subsystems were built and installed, we recommend an integrated assessment of the present situation and most cost effective avenues toward increasing the power in the interferometers. Note that we do not address other subsystem requirements such as noise levels, we consider only raw power. 1 INTRODUCTION There are two subsystems responsible for delivering the laser light to the interferometer at the recycling mirror. The light originates in the pre-stabilized laser subsystem (PSL) and is conditioned by the input optics subsystem (IOO) before impinging on the recycling mirror (RM). The relevant components in the PSL are the 126MOPA laser source and the premodecleaner (PMC). In the IOO, they are the electro-optic modulators (EOMs), the modecleaner (MC), and the Faraday isolator (FI). There are a number of other lenses and mirrors in each subsystem, but because these components typically have efficiencies greater than 99% and because none has been identified as a potential source of significant loss of power, they are neglected in this analysis. Simply stated, the design requirement for the PSL was that it deliver 8.5 watts of laser power to the IOO. The IOO was to deliver 6 watts to the RM. We will discuss individual optical components of each subsystem, considering meeting the bottom line requirement of 6 watts at the RM to be paramount. Page 2 of 21

3 2 POWER BUDGET OVERVIEW An example of a power budget that would meet the requirement of 6 W of laser power at the RM is shown in Figure 1, below. Visibility = 88% Visibility = 95 % T 126 MOPA T PMC PSL T EOMS T MC T IOO FARADAY RM 10.0 Watts 8.5 Watts 6.0 Watts 85% 90 % 85 % 92 % T = 60 % Figure 1 Example of component transmissions that would meet the requirement of 6 watts of power at the recycling mirror The transmissions used in this example are not from optical component design requirements, they simply show one set of parameters that would be acceptable. The 126 MOPA power is the total power in all modes. The specification calls for 11 W in all modes with 10 W in the TEM 00 mode, so this budget would give 10% head room at the front end. 2.1 Present H1 Power Budget An estimate of the present H1 power buget is shown in Figure 2. Explanations of the various power levels and transmissions and references to the measurement data can be found in the relevant sections later in this document. Page 3 of 21

4 Modematching = 87.5% Visibility = 86 % T 126 MOPA T PMC T EOMS T MC T PSL IOO FARADAY RM 6.15 Watts 4.61 Watts 2.36 Watts 75 % 86 % 64 % 93 % T = 38 % Figure 2 Present (Dec. 2003) esitmate of the H1 power budget with the 126MOPA operating at full power. 2.2 Present H2 Power Budget An estimate of the present H2 power budget is shown in Figure 3. Visibility = 95 % Visibility = 97 % T 126 MOPA T PMC PSL T EOMS T MC T IOO FARADAY RM 6.58 Watts 5.59 Watts 3.04Watts 85.0 % 75 % 88.5 % 82 % T = 46 % Figure 3 Present (Dec. 2003) esitmate of the H2 power budget with the 126MOPA operating at full power. Page 4 of 21

5 2.3 L1 Power Budget on June 26, 2003 An estimate of the present (Dec. 2003) L1 power budget is shown in Figure 4 1. Note that the 126MOPA was replaced and a new style PMC was installed before these powers were measured. Visibility = 80 %? Visibility =?? % T 126 MOPA T PMC PSL T EOMS T MC T IOO FARADAY RM 7.5 watts 4.56 watts 5.5 watts??? watts 73.3 % 83 %?? %?? % T =?? % Figure 4 Present (Dec. 2003) esitmate of the L1 power budget with the 126MOPA operating at full power. 2.4 Present L1 Power Budget Figure 5 Present (Dec. 2003) esitmate of the L1 power budget. 3 PMC The 126 MOPA light traverses the PMC before reaching the PSL/IOO interface. Thus the laser output power and the PMC transmission efficiency are the two factors that determine the ability to meet the 8.5 W requirement at the PSL/IOO handoff point. Thus the efficiency of the PMC, determines the required power from the 126 MOPA laser. The PMC efficiency depends on the modematching of the laser beam to the PMC cavity normal mode and the ideal transmission of the PMC which depends on the mirror losses and matching of the input mirror transmission to the output mirror transmission plus losses (optimal coupling) 1 Private communications with Rupal Amin. Page 5 of 21

6 The PMC was recently redesigned to increase the cavity finesse for improved filtering of power fluctations at high frequencies (> 24 MHz) and to facilitate optical contacting of the input and output mirrors to the PMC spacer. One of these new style PMCs has been installed in the LIGO Hanford Observatory (LHO) 4-kilometer (H1) PSL. A second new style PMC has been delivered, but not yet installed in the LHO 2-kilometer (H2) interferometer. 3.1 H1 PMC A new style PMC was installed in the H1 PSL on May 2, The most recent assessment of this PMC s performance was performed on Sept. 18, The performance was evaluated by making a number of power measurements then using the procedure and Matlab program described in LIGO Technical Document LIGO-T W 4. The results are: Transmission efficiency = 75% Modematching efficiency = 87.5% (visibility = 87.1%) Estimated average losses per mirror = ppm per mirror The mode of the incident laser was not evaluated separately, but the manufacturer specification calls for greater than 90% in a circular TEM 00 mode. Thus 88% modematching efficiency is not far from the 90% best possible if the laser beam quality just met spec. However, the ppm losses per mirror are about ten times the expected 30 ppm per mirror. Options for improvement Improve modematching Experience with the Lightwave 126MOPA lasers indicated that can and often do meet the requirement of 90% of the power in a circular TEM 00 mode. However, they do not typically exceed the requirement, and if they do it is not usually by more than one or two percent. Thus improving the modematching is not likely to improve the PMC transmission by more than a few percent at best. This could be accomplished by adjusting the modematching telescope lens positions and by adding additional cylindrical lenses to circularize the 126 MOPA output beam. Effort and Cost We estimate the effort required to optimize the present modematching telescope and implement the beam circularization optics to be 2-3 days per PSL. The 126 MOPA would :38:01-rick :01:02-rick. 4 Page 6 of 21

7 likely need to be moved away from the PMC by 1-3 feet to provide room for the additional optics. The estimate cost is $2k per PMC Reduce mirror losses The larger-than-expected losses result in a significant loss of efficiency. The PMC transmission efficiency as a function of loss per PMC mirror is plotted in Figure 6. Figure 6 PMC transmission vs. loss per PMC mirror. The observed mode matching efficiency (M) is M=1 corresponds to perfect mode matching. Note that reducing the losses from 325 to 50 ppm per mirror would result in an increase in the transmission efficiency from 0.75 to The observed PMC mirror losses may result from operating in air rather than in vacuum. While N. Uehara, the designer of the PSL PMC, had favorable experience operating high-power cavities in air, his tests were likely over durations shorter than weeks or months. All of the measurement at LHO over the past five years have indicated that the PMC mirror losses are hundreds to thousands of ppm per mirror. Several years ago, motivated by the desires both to reduce the PMC sensitivity to atmospheric pressure variations and to reduce mirror contamination, S. Marka, R. Savage, and D. Cook initiated the design of a vacuum chamber for the PMC cavities. This design is approximately 50% complete. Page 7 of 21

8 Effort and Cost We estimate that the effort required to finish the mechanical design and drawings is about one week, with another one to two man-weeks for procurement, assembly and testing. The cost per PMC is estimate to be about $10k per PMC including ion pump and controller, vacuum windows, etc. This does not include the cost of new PMC cavities. 3.2 H2 PMC The H2 PSL PMC transmission efficiency was last measured on June 13, The measured transmission was 85% and the visibility measured in reflection ([brightdark]/bright) was 95%. The 95% visibility indicated that the beam quality of the 126 MOPA is better than the spec. (90%) so we should expect it to decrease if the laser were to be replaced. While the 85% transmission is better than the 75% measured for the new style PMC on H1, the H2 PMC will have to be upgraded to the new style as well to meet the high-frequency power fluctuations spec. Options for improvement Identical to those for the H1 PMC, described above. 3.3 LHO Spare PMC We do not present have a spare new style PMC at LHO. Options for improvement Procure and test spare PMC. Effort and Cost Ask Peter King to supply cost. The effort required to test the spare PMC at LHO would be several days. We would have to configure the test stand in the optics lab to allow operation of the PMC servo and we would need the HV power supplies, etc. We may have spares that could be utilized. Perhaps there is a test setup at Caltech that is already configured to enable testing. 3.4 L1 PMC The LI PMC transmission efficiency was measured on June 26, 2003 to be 65%. It appears that this was and old style (lower finesse) model. The PMC may have been replaced by then, but no record of the transmission could be found in the elog. We assume that the present PMC is the new, higher-finesse style. 3.5 LLO Spare PMC We have no info. regarding the existence of a spare PMC at LLO MOPA The 126MOPA output power required to meet the PSL requirement of 8.5 W at the PSL/IOO interface depends on the transmission of the PMCs. If we assume that the PMC mirror losses :06:08-rick Page 8 of 21

9 can be improved by operating in vacuum and that the modematching into the PMCs is optimized, it seems reasonable to expect 85% for the PMC transmission. The required 126MOPA power in the TEM 00 mode would then be 10 W, the design requirement. Assuming 90% of the output power is in a circular TEM 00 mode (again, the design requirement M 2 < 1.1), the required total output power is 11 W. Our experience with Lightwave to date indicates that the Gentec power meter they use overestimates the power by about 10% 6. Thus, what Lightwave calls 10 W is actually about 9W. Thus the required total output power when using a PMC with 85% transmission is about 12.4 W ( x0.9 for the power meter x 0.9 for the M 2 -> ~10 W). 4.1 H1 126 MOPA The H1 126 MOPA has been operating continuously since about March, 2001, about 25,000 hours. The NPRO was replaced in May, On Sept. 18 th, 2003 we increased the current of the 126MOPA from 24.4 A to the maximum recommended by the manufacturer, A. This resulted in about a 1.25 W increase in the output power 8. Without making any effort to realign the laser optical train, increase the NPRO power, or optimize the NPRO or amplifier pump diode temperatures, we measured 6.15 W of total output power. To meet the 12.4 W level would we would have to realize a factor of two increase in the output power. Options for improvement We have little experience with major realignment of the 126MOPA lasers and what little experience we have is not particularly encouraging. It is unlikely that simple realignment and optimization will result in a factor of two increase in the output power. Thus this laser will likely require an overhaul that includes rebuilding the amplifier (new pump diodes) Rebuild amplifier LLO has recently returned a 126MOPA laser for an overhaul that includes replacing the pump diodes in the amplifier. The overhaul will include realignment an returning the laser to the original power output specifications (11 W total power with at least 10 W in the TEM 00 mode. Note that these are powers measured at Lightwave, they should be de-rated by 10% because of the calibration of their power meter). Effort and Cost Based on the LLO rebuild estimate, this should cost about $30k. Jim Kayser from LTW estimates that they can turn around a laser in 3 weeks. If the ifo. cannot be without a source for this period, the spare laser would have to be swapped in. At LHO this would require first getting the spare laser up to spec. or temporarily swapping in the spare then replacing it with the rebuilt laser. Note that LTW will not align the laser with the phase-correcting EOM (PCEOM) for the FSS servo installed between the oscillator and the amplifier. 6 About 6 years ago, P. King and R. Savage made detailed comparisons with recently calibrated (at NIST) Scientech power meters :26:49-rick :54:33-rick Page 9 of 21

10 4.1.2 Swap out laser in the LVEA Swapping out the laser will require removing the PCEOM from the existing laser and installing it into the replacement laser, modematching the new laser to both the PMC and reference cavity paths, and adjusting the frequency stabilization servo (FSS) and intensity stabilization servo (ISS) to work with the new actuators. Effort and Cost Swapping out the laser, connecting the cooling lines and electrical cables, leveling the laser, etc. should take less than one day. It is the ancillary tasks, detailed below, that will consume more time Install PCEOM outside of laser head Historically, LTW has refused to align the 126MOPA lasers with the PCEOM installed between the oscillator and the amplifier. Jim Kayser from LTW indicates that one of the modematching lenses (L3) must be replaced when a PCEOM is installed. Experience with the LHO lasers indicates that output power is reduced and beam quality compromised when the PCEOM is installed. One option is to locate the PCEOM outside the laser box in the path of the full output power beam. Originally, the PCEOM was installed between the MO and the PA to avoid exposure to the amplified beam. However, UF measurements indicated that the NewFocus EOMs can withstand the full output power of the laser. A 3 month long-term exposure test at LHO did not indicate any measurable degradation in transmission or transmitted beam quality (using a BeamView camera) with the PCEOM transmitting the full 11 W laser output. Effort and Cost Diplicate the UF goniometer mounts for the IOO EOMs. Cost ~$1k per laser. Installation effort ~1 hour, significantly less than the effort to install the PCEOM inside the laser head Reconfigure upstream optical layout and modematching The present PSL/IOO table layout 9 resulted from efforts to reduce the number of optical components to the absolute minimum. At the time the layout was designed, the thinking was that we would avoid swapping out the whole laser at all costs, choosing to replace amplifier modules if necessary while preserving the MO and associated servo actuators, PCEOM, etc. Maser oscillators have been replaced several times, but the recent LLO swap is the first time that an amplifier has been replaced and they chose to replace the whole laser. With this scenario in mind, we propose revising the optical layout as shown in Figure Page 10 of 21

11 Figure 7 Revised upstream optical layout to facilitate swapping lasers and maintaining constant power to the FFS and PMC paths.. The laser would be moved back about two feet. A half-wave plate and polarizer would be installed at the laser output. This would enable maintaining a constant power level to the inputs of both the PMC path and the FSS path. Next,. We would mount the PCEOM then a modematching telescope (MMT) between the laser power adjustment polarizer and the splitter that samples the beam for the FSS path. The polarizer would help to reduce RFAM by cleaning up the polarization before the EOM. The MMT would match the beam to the PMC so that the presently-installed two-lens MMT would be removed. The two-lens MMT between the pick of and the frequency shifter in the FSS path would be replaced with different lenses to match the beam to the AOM. Once the layout is upgraded, replacement of the laser will simply require directing a sample of the beam downstream of the MMT to an analyzer and adjusting the MMT lenses to give the spot size and beam location required for the PMC. Once the beam is aligned into the PMC it should be sufficiently aligned and modematched to the FSS path. Effort and cost We now have a pretty good selection of CVI lenses (at least at LHO) but we will likely need a couple that we don t have. Approx. $1 k per laser should be enough for the lenses and mirrors. The estimated effort for the first swap is 1-2 days, slightly longer than just remodematching to both the PMC and FSS paths. Subsequent exchanges should be able to be completed in a significantly shorter time, ~1/2 day PSL servo optimization Assuming that the whole laser has been replaced, both the FSS and ISS servos will have new actuators. The actuation coefficient for the NPRO FAST actuator will likely vary by about 25% and may have the opposite sign. The FAST/PC crossover frequency and the loop UGF Page 11 of 21

12 will have to be measured and adjusted. If the current shunt for the replacement laser has not been upgraded, it will have to be swapped. The ISS loop shape will be measured and UGF adjusted if necessary. Effort and Cost The estimate time required to measure and tune both loops is about 1 day. No associated costs are expected. 4.2 H2 126 MOPA This laser has been operating continuously since December 1998, more than 40,000 hours. The performance of the H1 laser was last assessed on June 13, At that time no effort was made to assess the maximum power that could be delivered by the laser, i.e. the current was not increased and no effort was made to align components inside the laser head. The laser output power was 6.6 watts. Apparently the beam quality was particularly good because the PMC (old style) was 95% indicating that at least 95% of the output power was in the TEM 00 mode. Options for improvement Rebuild 126MOPA at LTW Assuming that the laser output power cannot be increased by a factor of two by alignment, temperature optimization, and MO and PA current increases, the laser would have to be sent back to LTW for rebuilding. Effort and Cost The rebuild and laser replacement effort and cost would be identical to that for the H1 PSL described in Section. 4.1, above. 4.3 LHO Spare 126 MOPA The spare 126MOPA laser at LHO is presently being evaluated in the optics lab. This laser has likely logged only a few thousand hours, mostly for the long-term exposure testing of the EOM outside the laser box and for a SURF project or two. The output power is about 7 watts with a reasonable, but not spectacular, looking beam. D. Cook has been working on alignment of the laser for the past few weeks. Based on that experience and suggestions from Jim Kayser at LTW, the amplifier head was opened and visually inspected. It appears that the last two (downstream) 20-W diode bars are not emitting as much light as the other six. This may be responsible for the difficulties encountered with achieving high power with good beam quality. Options for improvement Replace two diode bars ourselves If further efforts to improve performance are not successful within the next few weeks, we will have to make a decision about the amplifier. Rather than send it back to LTW for a $30k rebuild, we might investigate trying to replace (with guidance from LTW) the last two diode :06:08-rick Page 12 of 21

13 bars in the amplifier. Purchasing two bars from LTW and doing the work ourselves should save a lot of money and give us valuable experience. We may need to make or purchase some fixtures and diagnostic tools, but our clean facilities should be at least as good a what exists at LTW. Obviously this effort would require some support (advice) from LTW. Effort and Cost A WAG for the cost of the diodes is $2k each. We may need a few $k for fixturing. If we need a specialized power meter it is likely to be ~$2k. Total ~$10k. Time required for coordinating with LTW, designing fixtures, setting up the work area, replacing diodes, realigning and peaking ~ 10 man days. 4.4 L1 126 MOPA On June 26, 2003 the total laser output power was 4.8 W. This laser was subsequently removed and replaced with the LLO spare laser. The present full output power of the laser is 7.5 watts. Increasing the amplifier diode current and optimizing the alignment may increase the power somewhat, but recovering the full 11 W specified output is less likely. 4.5 LLO Spare 126 MOPA This laser is presently at LTW to have the amplifier rebuilt. We understand that the estimated cost is about $30k and that the scope of the work includes replacing the pump diodes in the amplifier, but not in the NPRO. Assessing the performance for of this laser after the LTW rebuild will help determine what course of action to take with our other lasers that are producing less than the specified output power. 5 IOO EOMs Presently each interferometer utilizes three NewFocus resonant EOMs (Model 4003) with custom V-coat AR coatings. These three modulators are mounted in series on the PSL/IOO table. A single beam waist is formed near the center of the middle modulator. The modulator chain is preceded and followed by Brewster polarizers and the automated rotatable half-wave plate that controls the power into the MC. 5.1 H1 EOMs The most recent measurement of the transmission of the H1 EOM chain (from input to first EOM to output of top PSL/IOO periscope mirror) were performed on Aug. 27, The measured transmission was 87%. Note that the 24.5 MHz EOM was replaced several months earlier because it was producing a lot of scattered light and the transmission was down. While visual inspection immediately after removing it revealed apparent optical damage, subsequent evaluation by NewFocus and by the UF group did not reveal any contamination or optical damage. This remains a mystery, with the only plausible (?) explanation that the crystal is somehow healing itself even at room temperature :39:18-rick Page 13 of 21

14 Options for improvement Implement single-eom modulation Implement the single-modulator technique investigated by Dick Gustafson and Paul Schwinberg s SURF student, Lucas Koerner during the summer of Effort and Cost Design and fabricate modulation summation electronics ~1 man week. If we adopt this scheme, we will have lots of spare resonant EOMs. The broadband EOMS (with V-coat) cost ~$5k.ea. new. However, converting resonant EOMs to broadband models should be less than $2k ea. Implementation and assessment ~ 2 man days Ifo. performance assessment ~ 2 days. 5.2 H2 EOMs The transmission of the H2 EOM chain was measured to be 75% on June The cost and effort to implement the single EOM scheme would be the same as for H1 (refer to Section LHO Spare EOMs We have a full set of spare resonant EOMs (I think, we should check this). If we go with the single-modulator scheme, we will have to convert one or more resonant modulators to broadband models for spares. 5.4 L1 EOMs 5.5 LLO Spare EOMs 6 Modecleaner The modecleaner transmissions are inferred from measurements made at the output of the top periscope mirror on the PSL/IOO table and at the REFL port and AS port tables. Because we expect that the Faraday Isolator is the principal source of losses for the optics downstream fo the MC, all of the downstream losses are attributed to the FI. We suspect that this is the case with the H2 FI, where the losses are particularly high. This may not be true for H H1 MC The most recent estimate of the H1 MC transmission, recorded in the detector elog on Dec. 31, , is 64%. The most recent measurement of the MC visibility that we could find, recorded on Aug. 9, , was 86%. This is a lower limit because the locked level included the modulation sidebands. Thus the H1 MC mirrors appear to have much higher losses than expected. 12 LIGO-T W :32:34-peterF :03:02-luca Page 14 of 21

15 Options for improvement Clean MC optics As cleaning SOS optics in-situ is difficult at best we would likely remove the optics from the suspension towers to drag wipe and re-hang. It may be more likely that the suspensions would be removed and replaced with new optics as it is doubtful that cleaning will resolve MC visibility issues Replace MC optics Should the modecleaner optics need replacing or cleaning, the installation should be coordinated with the Faraday isolator replacement, if required. To exchange the MC components in HAM1(HAM7 for H2) and HAM2 (HAM8 for H2) would require approximately three to five days of pre-vent preparations. Preparations include writing a procedure and receiving approvals, placing the IFO to standard configuration and freezing,. pulling IOT1 (IOT7 for H2) and probably ISCT1 (ISCT7 for H2) tables, staging clean rooms, platforms, class B tools etc. New SOS suspensions and hardware to be installed will need to be process to class A standards for vacuum compatibility in advance. Once doors are removed the in situ work will need to be completed in 2-3 days. For every 10hrs at atmosphere it will cost us 2 to 3weeks of pump down time. Assuming that we have a spare set of MC optics, there would be no additional cost. Labor will probably include several of the LHO resident staff along with UFO personnel. An approximation of the labor costs to reprocess the SOS suspensions ~ 300 man hours of LHO staff time. A guess of the labor costs would be ~ 150 man hours of LHO to complete the in situ work. 6.2 H2 MC The H2 MC transmission was noted in the elog on May 2, The estimate of the transmission inferred from power measurements made outside the vacuum envelope was 88.5%, significantly higher than for H1 (64%). The H2 MC visibility was measured to be 97% on Aug. 16, LHO Spare MC optics Hopefully the optics that are removed could be cleaned and re-processed to meet specifications. If this is not the case, a significant effort and cost would be required to procure, polish, and coat the optics. We will not estimate the cost here :22:51-vagesh :26:56-ottaway_d Page 15 of 21

16 6.4 L1 MC 6.5 LLO Spare MC optics 7 Faraday Isolator Because of how the measurements are made, we can only estimate the losses of the whole group optics between the MC and the RM, which includes the FI. We attribute all of the downstream optics losses to the FI. The FI is currently installed utilize thin-film polarizers that are known to be more lossy than Brewster angle polarizers. Also, there has been evidence of clipping at the FI aperture in the past. 7.1 H1 FI The Dec. 31, 2003 estimate of the transmission of the optics downstream of the MC 13 is 92.8%. This is not out of line with what is expected for the losses from the eight surfaces of the FI, which includes a half-wave plate. 7.2 H2 FI The May 2, 2003 estimate of the losses of the optics downstream of the H2 MC 15 was 81.7%. This is significantly higher than the estimate of 92.8% for H1. There have been a number of attempts to explain power variations on the H2 REFL table (ISCT7), and temperatureinduced changes in the FI optics have been suspected. Options for improvement Replace FI The UF group has been working on a larger aperture FI that utilizes Brewster polarizers. To exchange the Faraday isolator and components in HAM7 (H2) would require approximately three days of pre-vent preparations. Preparations include writing a procedure and receiving approvals, placing the IFO into standard configuration and freezing, pulling IOT7 and probably ISCT7 tables, staging clean rooms, platforms, class B tools, etc. Hardware to be installed will need to be processed to class A standards for vacuum compatibility in advance. Once doors are removed the in-situ work will need to be completed in 1-2 days. For every 10 hrs. at atmosphere it will cost us 2 to 3weeks of pump down time. Labor will probably include several of the LHO resident staff along with UFO personnel. A guess of the labor costs would be ~ man hours of LHO and 20 hrs of UFO time. 7.3 LHO Spare FI Obtain cost estimate from the UF group. Page 16 of 21

17 7.4 L1 FI 7.5 LLO Spare FI 8 Upgrade Scenarios 8.1 H1 interferometer Limiting ourselves to outside the vacuum upgrades, we could do the following: Rebuild 126MOPA laser Relocate PCEOM outside laser box and adjust laser position to allow modematching to PMC upstream of RC beamsplitter. Mount PMC inside a vacuum chamber Replace three IOO EOMs with a single EOM and implement the single-eom modulation scheme The expected H1 power budget after implementing these upgrades is shown in Figure 8. Modematching = 87.5% Visibility = 86 % T 126 MOPA T PMC T EOMS T MC T PSL IOO FARADAY RM 11 Watts 9.35 Watts 5.01 Watts 85 % 90 % 64 % 93 % T = 46 % Figure 8 Estimate of H1 power budget if only outside the vacuum upgrades were implemented. If we were to perform the outside the vacuum upgrades and clean or replace the H1 MC mirrors, assuming that we achieve the expected ~50 ppm losses, the expected power budget would be as shown in Figure 9 Page 17 of 21

18 Modematching = 87.5% Visibility = 95 % T 126 MOPA T PMC T EOMS T MC T PSL IOO FARADAY RM 11 Watts 9.35 Watts 7.04 Watts 85 % 90 % 90 % 93 % T = 64% Figure 9 Expected H1 power budget if the 'outside the vacuum' upgrades were inplemented AND the MC mirrors were cleaned or replaced. 8.2 H2 interferometer If we implemented the outside the vacuum upgrades for H2, i.e. Rebuild 126MOPA laser Relocate PCEOM outside laser box and adjust laser position to allow modematching to PMC upstream of RC beamsplitter. Mount PMC inside a vacuum chamber Replace three IOO EOMs with a single EOM and implement the single-eom modulation scheme, we expect that the power budget would be as shown in Figure 10. Page 18 of 21

19 Visibility = 95 % Visibility = 97 % T 126 MOPA T PMC PSL T EOMS T MC T IOO FARADAY RM 11 Watts 9.35 Watts 6.11Watts 85.0 % 90 % 88.5 % 82 % T = 56 % Figure 10 Expected H2 power budget if the 'outside the vacuum' upgrades were implemented. In addition, if we were to upgrade the H2 FI, we expect that the power budget would improve the the levels shown in Figure 11. Visibility = 95 % Visibility = 97 % T 126 MOPA T PMC PSL T EOMS T MC T IOO FARADAY RM 11 Watts 9.35 Watts 7.07 Watts 85.0 % 90 % 88.5 % 95 % T = 64 % Figure 11 Expected H2 power budget if the "outside the vacuum' upgrades were implemented AND the in-vacuum Faraday isolator were replaced. A summary of the cost and manpower estimates for the various upgrades is shown in the table below. Page 19 of 21

20 Cost and Manpower summary H1 Section Manpower Cost Rebuild 126 MOPA at LWE day $30k Relocate PCEOM, mod. layout, swap laser days $2k Mount PMC inside vacuum chamber days $10k 17 Implement single EOM modulation scheme days $2k Replace MC optics days $0k 18 H2 Rebuild 126 MOPA at LWE day $30k Relocate PCEOM, mod. layout, swap laser days $2k Mount PMC inside vacuum chamber days $10k 17 Implement single EOM modulation scheme day $2k Upgrade Faraday isolator days $0k 19 LHO Repair spare 126MOPA at LHO days $10k 9 Options for increasing the laser power above the specified power The present power budgets for the interferometers shown in Section 2 indicate that we would not achieve the goal of 6 W at the RM even if the 126MOPA lasers were operating at the full 11 W output power. This is certainly the case with H1, even if all of the outside-the-vacuum upgrades are implemented. This may also be the case for H2, but we would be closer to the goal. The power budgets do not take aging of the 126MOPA into consideration and our experience indicates that the power drops fairly quickly (order of months) down to the 7 or 8 wattt level where it sometimes degrades much more slowly (order of years). Experience does not engender confidence that even a rebuilt 126MOPA could provide 11 W of output power for between 6 months and one year. Note that because of LTW s mis-calibrated power meter the delivered power is actually closer to 11 W than 10 W. We thus consider several options for increasing the laser power above the nominal 11 W level. 9.1 Building for 15 to 20 W with the current amplifier diodes Over the past several years the LTW technicians have indicated that the 126MOPAs are easily capable of delivering 15 to 20 watts with the present design 20. The quoted available power increased as they gained experience while filling LIGO s initial orders. They found that they were able to reduce the NPRO power and PA diode current required to deliver the 17 Does not include the cost of a replacement PMC cavity. 18 Assuming that spare MC optics are available. 19 UF to supply the first large-aperture, low-loss Faraday isolator. 20 The early conceptual design for the LIGO II pre-stabilized laser ( was predicated on LTW upgrading the 126MOPA to 20 W output power. Page 20 of 21

21 specified 11 W output power. All of this information is anecdotal, but it may be worth discussing this possibility with LTW management. This is likely to be the lowest cost option, and the most conservative in terms of the likely increase in power and lifetime. 9.2 Replacing the current amplifier diodes with higher output power units Again, information is anecdotal, but we have heard of the availability of higher output power pump diodes for the amplifiers. Higher pump power would likely change the beam propagation through the amplifier so may require a complete rebuild. The cost of this kind of high-power rebuild and upgrade may only be incrementally more expensive than the $30k rebuilds using the present amplifier diodes. LTW technicians have indicated that the present 126MOPA power supply is capable of delivering the higher current that higher power diodes are likely to require. Additional chilling capacity may also be required. Higher capacity chillers have already been ordered and delivered to the sites, so only interfacing and installation costs would be required for the chillers. 9.3 Adding a second amplifier stage This is the option most likely to reliably deliver higher power, but is likely to be significantly more expensive than other options. LIGO has some experience with this option. The LIGO group at Stanford has experience operating a LIGO 126MOPA with a second amplifier stage mounted outside the 126MOPA box. Tests of the feasibility of this scheme could be carried out at Stanford where design issues such as single or double passing the last amplifier stage could be resolved. This option is likely the one that would enable the largest possible increase in output power. Options such as installing higher power pump diodes could be implemented in conjunction with this option to maximize output power if required. Page 21 of 21

Installation and Characterization of the Advanced LIGO 200 Watt PSL

Installation and Characterization of the Advanced LIGO 200 Watt PSL Installation and Characterization of the Advanced LIGO 200 Watt PSL Nicholas Langellier Mentor: Benno Willke Background and Motivation Albert Einstein's published his General Theory of Relativity in 1916,

More information

Multiply Resonant EOM for the LIGO 40-meter Interferometer

Multiply Resonant EOM for the LIGO 40-meter Interferometer LASER INTERFEROMETER GRAVITATIONAL WAVE OBSERVATORY - LIGO - CALIFORNIA INSTITUTE OF TECHNOLOGY MASSACHUSETTS INSTITUTE OF TECHNOLOGY LIGO-XXXXXXX-XX-X Date: 2009/09/25 Multiply Resonant EOM for the LIGO

More information

TNI mode cleaner/ laser frequency stabilization system

TNI mode cleaner/ laser frequency stabilization system LASER INTERFEROMETER GRAVITATIONAL WAVE OBSERVATORY -LIGO- CALIFORNIA INSTITUTE OF TECHNOLOGY MASSACHUSETTS INSTITUTE OF TECHNOLOGY Technical Note LIGO-T000077-00- R 8/10/00 TNI mode cleaner/ laser frequency

More information

Commissioning of Advanced Virgo

Commissioning of Advanced Virgo Commissioning of Advanced Virgo VSR1 VSR4 VSR5/6/7? Bas Swinkels, European Gravitational Observatory on behalf of the Virgo Collaboration GWADW Takayama, 26/05/2014 B. Swinkels Adv. Virgo Commissioning

More information

The Pre Stabilized Laser for the LIGO Caltech 40m Interferometer: Stability Controls and Characterization.

The Pre Stabilized Laser for the LIGO Caltech 40m Interferometer: Stability Controls and Characterization. LASER INTERFEROMETER GRAVITATIONAL WAVE OBSERVATORY LIGO CALIFORNIA INSTITUTE OF TECHNOLOGY MASSACHUSETTS INSTITUTE OF TECHNOLOGY Document Type LIGO-T010159-00-R 10/15/01 The Pre Stabilized Laser for the

More information

TCS beam shaping: optimum and achievable beam profiles for correcting thermo-refractive lensing (not thermo-elastic surface deformation)

TCS beam shaping: optimum and achievable beam profiles for correcting thermo-refractive lensing (not thermo-elastic surface deformation) LASER INTERFEROMETER GRAVITATIONAL WAVE OBSERVATORY Laboratory / Scientific Collaboration -T1200103-v2 Date: 28-Feb-12 TCS beam shaping: optimum and achievable beam profiles for correcting thermo-refractive

More information

Preliminary Optical Fiber Stabilization for AdvLIGO Pre-Lock Acquisition System

Preliminary Optical Fiber Stabilization for AdvLIGO Pre-Lock Acquisition System T080352-00 Preliminary Optical Fiber Stabilization for AdvLIGO Pre-Lock Acquisition System Jaclyn R. Sanders Mentors: Dick Gustafson, Paul Schwinberg, Daniel Sigg Abstract Advanced LIGO requires a seismic

More information

9) Describe the down select process that led to the laser selection in more detail

9) Describe the down select process that led to the laser selection in more detail 9) Describe the down select process that led to the laser selection in more detail David Shoemaker NSF Annual Review of the LIGO Laboratory 18 November 2003 Process Interested research groups pursued separate

More information

CALIFORNIA INSTITUTE OF TECHNOLOGY Laser Interferometer Gravitational Wave Observatory (LIGO) Project

CALIFORNIA INSTITUTE OF TECHNOLOGY Laser Interferometer Gravitational Wave Observatory (LIGO) Project CALIFORNIA INSTITUTE OF TECHNOLOGY Laser Interferometer Gravitational Wave Observatory (LIGO) Project To/Mail Code: Distribution From/Mail Code: Dennis Coyne Phone/FAX: 395-2034/304-9834 Refer to: LIGO-T970068-00-D

More information

Broadband Photodetector

Broadband Photodetector LASER INTERFEROMETER GRAVITATIONAL WAVE OBSERVATORY LIGO Laboratory / LIGO Scientific Collaboration LIGO-D1002969-v7 LIGO April 24, 2011 Broadband Photodetector Matthew Evans Distribution of this document:

More information

Stable Recycling Cavities for Advanced LIGO

Stable Recycling Cavities for Advanced LIGO Stable Recycling Cavities for Advanced LIGO Guido Mueller University of Florida 08/16/2005 Table of Contents Stable vs. unstable recycling cavities Design of stable recycling cavity Design drivers Spot

More information

Optical Vernier Technique for Measuring the Lengths of LIGO Fabry-Perot Resonators

Optical Vernier Technique for Measuring the Lengths of LIGO Fabry-Perot Resonators LASER INTERFEROMETER GRAVITATIONAL WAVE OBSERVATORY -LIGO- CALIFORNIA INSTITUTE OF TECHNOLOGY MASSACHUSETTS INSTITUTE OF TECHNOLOGY Technical Note LIGO-T97074-0- R 0/5/97 Optical Vernier Technique for

More information

Arm Cavity Finesse for Advanced LIGO

Arm Cavity Finesse for Advanced LIGO LASER INTERFEROMETER GRAVITATIONAL WAVE OBSERVATORY - LIGO - CALIFORNIA INSTITUTE OF TECHNOLOGY MASSACHUSETTS INSTITUTE OF TECHNOLOGY Technical Note LIGO-T070303-01-D Date: 2007/12/20 Arm Cavity Finesse

More information

Final Report for IREU 2013

Final Report for IREU 2013 Final Report for IREU 2013 Seth Brown Albert Einstein Institute IREU 2013 7-20-13 Brown 2 Background Information Albert Einstein s revolutionary idea that gravity is caused by curves in the fabric of space

More information

Modulators and Isolators for Advanced LIGO

Modulators and Isolators for Advanced LIGO LIGO-G060361-00-D Modulators and Isolators for Advanced LIGO UF LIGO group 28 April 2006 1 LIGO mid-life upgrade After S5 LIGO will undergo a mid-life upgrade Laser power will be increased to 30 W» Electro-optic

More information

Ultra-stable flashlamp-pumped laser *

Ultra-stable flashlamp-pumped laser * SLAC-PUB-10290 September 2002 Ultra-stable flashlamp-pumped laser * A. Brachmann, J. Clendenin, T.Galetto, T. Maruyama, J.Sodja, J. Turner, M. Woods Stanford Linear Accelerator Center, 2575 Sand Hill Rd.,

More information

Lasers for Advanced Interferometers

Lasers for Advanced Interferometers Lasers or Advanced Intererometers Benno Willke Aspen Meeting Aspen CO, February 2004 G040041-00-Z Requirements - Topology Sagnac: broadband source to reduce scattered light noise power control recycled

More information

EE119 Introduction to Optical Engineering Fall 2009 Final Exam. Name:

EE119 Introduction to Optical Engineering Fall 2009 Final Exam. Name: EE119 Introduction to Optical Engineering Fall 2009 Final Exam Name: SID: CLOSED BOOK. THREE 8 1/2 X 11 SHEETS OF NOTES, AND SCIENTIFIC POCKET CALCULATOR PERMITTED. TIME ALLOTTED: 180 MINUTES Fundamental

More information

10W Injection-Locked CW Nd:YAG laser

10W Injection-Locked CW Nd:YAG laser 10W Injection-Locked CW Nd:YAG laser David Hosken, Damien Mudge, Peter Veitch, Jesper Munch Department of Physics The University of Adelaide Adelaide SA 5005 Australia Talk Outline Overall motivation ACIGA

More information

The VIRGO detection system

The VIRGO detection system LIGO-G050017-00-R Paolo La Penna European Gravitational Observatory INPUT R =35 R=0.9 curv =35 0m 95 MOD CLEAN ER (14m )) WI N d:yag plar=0 ne.8 =1λ 064nm 3km 20W 6m 66.4m M odulat or PR BS N I sing lefrequ

More information

AM Stabilized RF Amplifier Driver

AM Stabilized RF Amplifier Driver LIGO T00074 AM Stabilized RF Amplifier Driver SURF Project Final Report August 00 Jing Luo Mentor: Daniel Sigg Co Mentor: Paul Schwinberg Abstract: The AOM/EOM driver is a high power RF amplifier used

More information

LASER INTERFEROMETER GRAVITATIONAL WAVE OBSERVATORY - LIGO - CALIFORNIA INSTITUTE OF TECHNOLOGY MASSACHUSETTS INSTITUTE OF TECHNOLOGY

LASER INTERFEROMETER GRAVITATIONAL WAVE OBSERVATORY - LIGO - CALIFORNIA INSTITUTE OF TECHNOLOGY MASSACHUSETTS INSTITUTE OF TECHNOLOGY LASER INTERFEROMETER GRAVITATIONAL WAVE OBSERVATORY - LIGO - CALIFORNIA INSTITUTE OF TECHNOLOGY MASSACHUSETTS INSTITUTE OF TECHNOLOGY Technical Report LIGO-T010061-00- D 5/16/01 ISC Electrooptic Shutter:

More information

Results from the Stanford 10 m Sagnac interferometer

Results from the Stanford 10 m Sagnac interferometer INSTITUTE OF PHYSICSPUBLISHING Class. Quantum Grav. 19 (2002) 1585 1589 CLASSICAL ANDQUANTUM GRAVITY PII: S0264-9381(02)30157-6 Results from the Stanford 10 m Sagnac interferometer Peter T Beyersdorf,

More information

Designing Optical Layouts for AEI s 10 meter Prototype. Stephanie Wiele August 5, 2008

Designing Optical Layouts for AEI s 10 meter Prototype. Stephanie Wiele August 5, 2008 Designing Optical Layouts for AEI s 10 meter Prototype Stephanie Wiele August 5, 2008 This summer I worked at the Albert Einstein Institute for Gravitational Physics as a member of the 10 meter prototype

More information

SodiumStar 20/2 High Power cw Tunable Guide Star Laser

SodiumStar 20/2 High Power cw Tunable Guide Star Laser SodiumStar 20/2 High Power cw Tunable Guide Star Laser Laser Guide Star Adaptive Optics Facilities LIDAR Atmospheric Monitoring Laser Cooling SodiumStar 20/2 High Power cw Tunable Guide Star Laser Existing

More information

A gravitational wave is a differential strain in spacetime. Equivalently, it is a differential tidal force that can be sensed by multiple test masses.

A gravitational wave is a differential strain in spacetime. Equivalently, it is a differential tidal force that can be sensed by multiple test masses. A gravitational wave is a differential strain in spacetime. Equivalently, it is a differential tidal force that can be sensed by multiple test masses. Plus-polarization Cross-polarization 2 Any system

More information

Difrotec Product & Services. Ultra high accuracy interferometry & custom optical solutions

Difrotec Product & Services. Ultra high accuracy interferometry & custom optical solutions Difrotec Product & Services Ultra high accuracy interferometry & custom optical solutions Content 1. Overview 2. Interferometer D7 3. Benefits 4. Measurements 5. Specifications 6. Applications 7. Cases

More information

Compensating thermal lensing in Faraday rotators.

Compensating thermal lensing in Faraday rotators. Compensating thermal lensing in Faraday rotators. Donovan McFeron University of Florida. New Physics Building Corner of Museum and North South Drive Gainesville, FL 36 ( August 3, 000) ABSTRACT An analyzer

More information

R. J. Jones College of Optical Sciences OPTI 511L Fall 2017

R. J. Jones College of Optical Sciences OPTI 511L Fall 2017 R. J. Jones College of Optical Sciences OPTI 511L Fall 2017 Active Modelocking of a Helium-Neon Laser The generation of short optical pulses is important for a wide variety of applications, from time-resolved

More information

FPPO 1000 Fiber Laser Pumped Optical Parametric Oscillator: FPPO 1000 Product Manual

FPPO 1000 Fiber Laser Pumped Optical Parametric Oscillator: FPPO 1000 Product Manual Fiber Laser Pumped Optical Parametric Oscillator: FPPO 1000 Product Manual 2012 858 West Park Street, Eugene, OR 97401 www.mtinstruments.com Table of Contents Specifications and Overview... 1 General Layout...

More information

Mode mismatch and sideband imbalance in LIGO I PRM

Mode mismatch and sideband imbalance in LIGO I PRM LASER INTERFEROMETER GRAVITATIONAL WAVE OBSERVATORY -LIGO- CALIFORNIA INSTITUTE OF TECHNOLOGY MASSACHUSETTS INSTITUTE OF TECHNOLOGY Technical Note LIGO-T04077-00- E Sep/0/04 Mode mismatch and sideband

More information

This is a brief report of the measurements I have done in these 2 months.

This is a brief report of the measurements I have done in these 2 months. 40m Report Kentaro Somiya This is a brief report of the measurements I have done in these 2 months. Mach-Zehnder MZ noise spectrum is measured in various conditions. HEPA filter enhances the noise level

More information

Development of optical imaging system for LIGO test mass contamination and beam position monitoring

Development of optical imaging system for LIGO test mass contamination and beam position monitoring Development of optical imaging system for LIGO test mass contamination and beam position monitoring Chen Jie Xin Mentors: Keita Kawabe, Rick Savage, Dan Moraru Progress Report 2: 29 July 2016 Summary of

More information

PHYS 3153 Methods of Experimental Physics II O2. Applications of Interferometry

PHYS 3153 Methods of Experimental Physics II O2. Applications of Interferometry Purpose PHYS 3153 Methods of Experimental Physics II O2. Applications of Interferometry In this experiment, you will study the principles and applications of interferometry. Equipment and components PASCO

More information

1.6 Beam Wander vs. Image Jitter

1.6 Beam Wander vs. Image Jitter 8 Chapter 1 1.6 Beam Wander vs. Image Jitter It is common at this point to look at beam wander and image jitter and ask what differentiates them. Consider a cooperative optical communication system that

More information

HIGH POWER LASERS FOR 3 RD GENERATION GRAVITATIONAL WAVE DETECTORS

HIGH POWER LASERS FOR 3 RD GENERATION GRAVITATIONAL WAVE DETECTORS HIGH POWER LASERS FOR 3 RD GENERATION GRAVITATIONAL WAVE DETECTORS P. Weßels for the LZH high power laser development team Laser Zentrum Hannover, Germany 23.05.2011 OUTLINE Requirements on lasers for

More information

7th Edoardo Amaldi Conference on Gravitational Waves (Amaldi7)

7th Edoardo Amaldi Conference on Gravitational Waves (Amaldi7) Journal of Physics: Conference Series (8) 4 doi:.88/74-6596///4 Lock Acquisition Studies for Advanced Interferometers O Miyakawa, H Yamamoto LIGO Laboratory 8-34, California Institute of Technology, Pasadena,

More information

A Thermal Compensation System for the gravitational wave detector Virgo

A Thermal Compensation System for the gravitational wave detector Virgo A Thermal Compensation System for the gravitational wave detector Virgo M. Di Paolo Emilio University of L Aquila and INFN Roma Tor Vergata On behalf of the Virgo Collaboration Index: 1) Thermal Lensing

More information

LASER INTERFEROMETER GRAVITATIONAL WAVE OBSERVATORY - LIGO - CALIFORNIA INSTITUTE OF TECHNOLOGY MASSACHUSETTS INSTITUTE OF TECHNOLOGY

LASER INTERFEROMETER GRAVITATIONAL WAVE OBSERVATORY - LIGO - CALIFORNIA INSTITUTE OF TECHNOLOGY MASSACHUSETTS INSTITUTE OF TECHNOLOGY LASER INTERFEROMETER GRAVITATIONAL WAVE OBSERVATORY - LIGO - CALIFORNIA INSTITUTE OF TECHNOLOGY MASSACHUSETTS INSTITUTE OF TECHNOLOGY Document Type LIGO-T950112-00- D 31 Oct 95 ASC Optical Lever Specification

More information

CHAPTER 5 FINE-TUNING OF AN ECDL WITH AN INTRACAVITY LIQUID CRYSTAL ELEMENT

CHAPTER 5 FINE-TUNING OF AN ECDL WITH AN INTRACAVITY LIQUID CRYSTAL ELEMENT CHAPTER 5 FINE-TUNING OF AN ECDL WITH AN INTRACAVITY LIQUID CRYSTAL ELEMENT In this chapter, the experimental results for fine-tuning of the laser wavelength with an intracavity liquid crystal element

More information

Initial Results from the C-Mod Prototype Polarimeter/Interferometer

Initial Results from the C-Mod Prototype Polarimeter/Interferometer Initial Results from the C-Mod Prototype Polarimeter/Interferometer K. R. Smith, J. Irby, R. Leccacorvi, E. Marmar, R. Murray, R. Vieira October 24-28, 2005 APS-DPP Conference 1 Abstract An FIR interferometer-polarimeter

More information

Toward the Advanced LIGO optical configuration investigated in 40meter prototype

Toward the Advanced LIGO optical configuration investigated in 40meter prototype Toward the Advanced LIGO optical configuration investigated in 4meter prototype Aspen winter conference Jan. 19, 25 O. Miyakawa, Caltech and the 4m collaboration LIGO- G547--R Aspen winter conference,

More information

Advanced Virgo commissioning challenges. Julia Casanueva on behalf of the Virgo collaboration

Advanced Virgo commissioning challenges. Julia Casanueva on behalf of the Virgo collaboration Advanced Virgo commissioning challenges Julia Casanueva on behalf of the Virgo collaboration GW detectors network Effect on Earth of the passage of a GW change on the distance between test masses Differential

More information

LIGO SURF Report: Three Input Matching/Driving System for Electro-Optic Modulators

LIGO SURF Report: Three Input Matching/Driving System for Electro-Optic Modulators LIGO SURF Report: Three Input Matching/Driving System for Electro-Optic Modulators Lucas Koerner, Northwestern University Mentors: Dr. Dick Gustafson and Dr. Paul Schwinberg, LIGO Hanford Abstract LIGO

More information

Base model features 1.0Vpp, 50ohm modulation input level and 24/28Vdc supply. L : +15V supply operation

Base model features 1.0Vpp, 50ohm modulation input level and 24/28Vdc supply. L : +15V supply operation ISOMET Acousto-Optic Deflector Driver Including: Basic Deflector Alignment Instruction Manual 620c Series Digital Modulation Key to model types : 620C-fff-m Base model features 1.0Vpp, 50ohm modulation

More information

ECEN. Spectroscopy. Lab 8. copy. constituents HOMEWORK PR. Figure. 1. Layout of. of the

ECEN. Spectroscopy. Lab 8. copy. constituents HOMEWORK PR. Figure. 1. Layout of. of the ECEN 4606 Lab 8 Spectroscopy SUMMARY: ROBLEM 1: Pedrotti 3 12-10. In this lab, you will design, build and test an optical spectrum analyzer and use it for both absorption and emission spectroscopy. The

More information

The AEI 10 m Prototype. June Sina Köhlenbeck for the 10m Prototype Team

The AEI 10 m Prototype. June Sina Köhlenbeck for the 10m Prototype Team The AEI 10 m Prototype June 2014 - Sina Köhlenbeck for the 10m Prototype Team The 10m Prototype Seismic attenuation system Suspension Platform Inteferometer SQL Interferometer Suspensions 2 The AEI 10

More information

Devices & Services Company

Devices & Services Company Devices & Services Company 10290 Monroe Drive, Suite 202 - Dallas, Texas 75229 USA - Tel. 214-902-8337 - Fax 214-902-8303 Web: www.devicesandservices.com Email: sales@devicesandservices.com D&S Technical

More information

Stable recycling cavities for Advanced LIGO

Stable recycling cavities for Advanced LIGO Stable recycling cavities for Advanced LIGO Guido Mueller LIGO-G070691-00-D with input/material from Hiro Yamamoto, Bill Kells, David Ottaway, Muzammil Arain, Yi Pan, Peter Fritschel, and many others Stable

More information

ISC RF Photodetector Design: LSC & WFS

ISC RF Photodetector Design: LSC & WFS LASER INTERFEROMETER GRAVITATIONAL WAVE OBSERVATORY LIGO Laboratory / LIGO Scientific Collaboration LIGO 7 August 2014 ISC RF Photodetector Design: LSC & WFS Rich Abbott, Rana Adhikari, Peter Fritschel.

More information

ISOMET. Acousto-Optic Modulator Driver. Instruction Manual. 512c-m Series. Including: Basic Modulator Alignment

ISOMET. Acousto-Optic Modulator Driver. Instruction Manual. 512c-m Series. Including: Basic Modulator Alignment Acousto-Optic Modulator Driver Including: Basic Modulator Alignment Instruction Manual 512c-m Series Voltage Controlled Crystal Oscillator (VCXO) Driver with Analog Modulation and BIAS, m indicates options

More information

Development of C-Mod FIR Polarimeter*

Development of C-Mod FIR Polarimeter* Development of C-Mod FIR Polarimeter* P.XU, J.H.IRBY, J.BOSCO, A.KANOJIA, R.LECCACORVI, E.MARMAR, P.MICHAEL, R.MURRAY, R.VIEIRA, S.WOLFE (MIT) D.L.BROWER, W.X.DING (UCLA) D.K.MANSFIELD (PPPL) *Supported

More information

Base model features 1.0Vpp, 50ohm modulation input level and 24/28Vdc supply.

Base model features 1.0Vpp, 50ohm modulation input level and 24/28Vdc supply. 2016-11 ISOMET Acousto-Optic Deflector Driver Including: Basic Deflector Alignment Instruction Manual 630c Series Analog Modulation Key to model types : 630C-fff-m Base model features 1.0Vpp, 50ohm modulation

More information

MASSACHUSETTS INSTITUTE OF TECHNOLOGY Department of Electrical Engineering and Computer Science

MASSACHUSETTS INSTITUTE OF TECHNOLOGY Department of Electrical Engineering and Computer Science Student Name Date MASSACHUSETTS INSTITUTE OF TECHNOLOGY Department of Electrical Engineering and Computer Science 6.161 Modern Optics Project Laboratory Laboratory Exercise No. 6 Fall 2010 Solid-State

More information

Southern African Large Telescope. RSS Throughput Test Plan

Southern African Large Telescope. RSS Throughput Test Plan Southern African Large Telescope RSS Throughput Test Plan Kenneth Nordsieck University of Wisconsin Document Number: SALT-3160AP0005 Revision 1.0 27 June, 2006 Change History Rev Date Description 1.0 27

More information

Base model features TTL buffer compatible modulation input level and 24/28Vdc supply.

Base model features TTL buffer compatible modulation input level and 24/28Vdc supply. Acousto-Optic Modulator Driver Including: Basic Modulator Alignment Instruction Manual 750c Series Analog and Digital Dual Modulation Key to model types : 75o.C-m-ff Base model features TTL buffer compatible

More information

ISOMET. Acousto-Optic Deflector Driver. Instruction Manual. D3x5-BS Series. Including: Basic Deflector Alignment. Models -

ISOMET. Acousto-Optic Deflector Driver. Instruction Manual. D3x5-BS Series. Including: Basic Deflector Alignment. Models - Acousto-Optic Deflector Driver Including: Basic Deflector Alignment Instruction Manual D3x5-BS Series Models - D325-BS D335-BS : 10V Tuning Input, TTL Digital Modulation Input : 10V Tuning Input, 1.0V

More information

ACOUSTIC MITIGATION STATUS FOR S3

ACOUSTIC MITIGATION STATUS FOR S3 ACOUSTIC MITIGATION STATUS FOR S3 Robert Schofield, University of Oregon Doug Cook, Akiteru Takamori, Daniel Sigg, LHO Jonathan Kern, Joe Kovalik, LLO Peter Fritschel, Ken Mason, MIT AND MANY OTHERS PROBLEM

More information

CO2 laser heating system for thermal compensation of test masses in high power optical cavities. Submitted by: SHUBHAM KUMAR to Prof.

CO2 laser heating system for thermal compensation of test masses in high power optical cavities. Submitted by: SHUBHAM KUMAR to Prof. CO2 laser heating system for thermal compensation of test masses in high power optical cavities. Submitted by: SHUBHAM KUMAR to Prof. DAVID BLAIR Abstract This report gives a description of the setting

More information

NANO 703-Notes. Chapter 9-The Instrument

NANO 703-Notes. Chapter 9-The Instrument 1 Chapter 9-The Instrument Illumination (condenser) system Before (above) the sample, the purpose of electron lenses is to form the beam/probe that will illuminate the sample. Our electron source is macroscopic

More information

LASER INTERFEROMETER GRAVITATIONAL WAVE OBSERVATORY - LIGO - CALIFORNIA INSTITUTE OF TECHNOLOGY MASSACHUSETTS INSTITUTE OF TECHNOLOGY

LASER INTERFEROMETER GRAVITATIONAL WAVE OBSERVATORY - LIGO - CALIFORNIA INSTITUTE OF TECHNOLOGY MASSACHUSETTS INSTITUTE OF TECHNOLOGY LASER INTERFEROMETER GRAVITATIONAL WAVE OBSERVATORY - LIGO - CALIFORNIA INSTITUTE OF TECHNOLOGY MASSACHUSETTS INSTITUTE OF TECHNOLOGY Specification LIGO-E970034-03 D 3/25/98 Document Type Doc Number Group-Id

More information

Optical generation of frequency stable mm-wave radiation using diode laser pumped Nd:YAG lasers

Optical generation of frequency stable mm-wave radiation using diode laser pumped Nd:YAG lasers Optical generation of frequency stable mm-wave radiation using diode laser pumped Nd:YAG lasers T. Day and R. A. Marsland New Focus Inc. 340 Pioneer Way Mountain View CA 94041 (415) 961-2108 R. L. Byer

More information

R. De Rosa INFN Napoli For the VIRGO collaboration

R. De Rosa INFN Napoli For the VIRGO collaboration R. De Rosa INFN Napoli For the VIRGO collaboration The lesson of VIRGO+ and VIRGO Science Runs; The Technical Design Report of the Advanced VIRGO project; Conclusion. CSN2 - Frascati, 16-18 Aprile 2012

More information

The Florida control scheme. Guido Mueller, Tom Delker, David Reitze, D. B. Tanner

The Florida control scheme. Guido Mueller, Tom Delker, David Reitze, D. B. Tanner The Florida control scheme Guido Mueller, Tom Delker, David Reitze, D. B. Tanner Department of Physics, University of Florida, Gainesville 32611-8440, Florida, USA The most likely conguration for the second

More information

Squeezed light and radiation pressure effects in suspended interferometers. Thomas Corbitt

Squeezed light and radiation pressure effects in suspended interferometers. Thomas Corbitt Squeezed light and radiation pressure effects in suspended interferometers Thomas Corbitt MIT Sarah Ackley, Tim Bodiya, Keisuke Goda, David Ottaway, Eugeniy Mihkailov, Daniel Sigg, Nicolas, Smith, Chris

More information

arxiv: v1 [gr-qc] 10 Sep 2007

arxiv: v1 [gr-qc] 10 Sep 2007 LIGO P070067 A Z A novel concept for increasing the peak sensitivity of LIGO by detuning the arm cavities arxiv:0709.1488v1 [gr-qc] 10 Sep 2007 1. Introduction S. Hild 1 and A. Freise 2 1 Max-Planck-Institut

More information

LIGO SURF Progress Report II: Squeezer

LIGO SURF Progress Report II: Squeezer LIGO SURF Progress Report II: Squeezer Nathan Z. Zhao August 1, 2014 1 Current Progress, Observations, Problems 1.1 Cavity Lock The Pound-Drever-Hall servomechanism has finally been stabilized to an acceptable

More information

NIST EUVL Metrology Programs

NIST EUVL Metrology Programs NIST EUVL Metrology Programs S.Grantham, C. Tarrio, R.E. Vest, Y. Barad, S. Kulin, K. Liu and T.B. Lucatorto National Institute of Standards and Technology (NIST) Gaithersburg, MD USA L. Klebanoff and

More information

ADALAM Sensor based adaptive laser micromachining using ultrashort pulse lasers for zero-failure manufacturing D2.2. Ger Folkersma (Demcon)

ADALAM Sensor based adaptive laser micromachining using ultrashort pulse lasers for zero-failure manufacturing D2.2. Ger Folkersma (Demcon) D2.2 Automatic adjustable reference path system Document Coordinator: Contributors: Dissemination: Keywords: Ger Folkersma (Demcon) Ger Folkersma, Kevin Voss, Marvin Klein (Demcon) Public Reference path,

More information

INTERPLANT STANDARD - STEEL INDUSTRY

INTERPLANT STANDARD - STEEL INDUSTRY INTERPLANT STANDARD - STEEL INDUSTRY IPSS SPECIFICATION OF SENSOR MEASUREMENTS OF LENGTH OF ROLLED MATERIALS IPSS: 2-07-037-13 (First Revision) Corresponding Indian Standard does not exist Formerly-: IPSS:

More information

Pound-Drever-Hall Locking of a Chip External Cavity Laser to a High-Finesse Cavity Using Vescent Photonics Lasers & Locking Electronics

Pound-Drever-Hall Locking of a Chip External Cavity Laser to a High-Finesse Cavity Using Vescent Photonics Lasers & Locking Electronics of a Chip External Cavity Laser to a High-Finesse Cavity Using Vescent Photonics Lasers & Locking Electronics 1. Introduction A Pound-Drever-Hall (PDH) lock 1 of a laser was performed as a precursor to

More information

A Low-Noise 1542nm Laser Stabilized to an

A Low-Noise 1542nm Laser Stabilized to an A Low-Noise 1542nm Laser Stabilized to an Optical Cavity Rui Suo, Fang Fang and Tianchu Li Time and Frequency Division, National Institute of Metrology Background Narrow linewidth laser are crucial in

More information

10 GHz Microwave Link

10 GHz Microwave Link 10 GHz Microwave Link Project Project Objectives System System Functionality Testing Testing Procedures Cautions and Warnings Problems Encountered Recommendations Conclusion PROJECT OBJECTIVES Implement

More information

DCS laser for Thomson scattering diagnostic applications

DCS laser for Thomson scattering diagnostic applications DCS laser for Thomson scattering diagnostic applications Authors Jason Zweiback 10/6/2015 jzweiback@logostech.net 1 Summary Motivation DCS laser Laser for Thomson scattering diagnostics 2 What is the Dynamic

More information

Stabilized lasers for advanced gravitational wave detectors

Stabilized lasers for advanced gravitational wave detectors Early View publication on www.interscience.wiley.com (issue and page numbers not yet assigned; citable using Digital Object Identifier DOI) Laser & Photon. Rev., 1 15 (2010) / DOI 10.1002/lpor.200900036

More information

LIGO. Advanced LIGO. Keita KAWABE, LIGO Hanford, Caltech LIGO-G

LIGO. Advanced LIGO. Keita KAWABE, LIGO Hanford, Caltech LIGO-G Advanced Keita KAWABE, Hanford, Caltech Introduction Current status Future TOC Why a What is a Introduction Why a: i was not that bad S6 (peak, average) NSNS ~(21, 16) Mpc (H1) and ~(20, 14) Mpc (L1),

More information

Automation of Photoluminescence Measurements of Polaritons

Automation of Photoluminescence Measurements of Polaritons Automation of Photoluminescence Measurements of Polaritons Drake Austin 2011-04-26 Methods of automating experiments that involve the variation of laser power are discussed. In particular, the automation

More information

The Core Optics. Input Mirror T ~ 3% T ~ 3% Signal Recycling Photodetector

The Core Optics. Input Mirror T ~ 3% T ~ 3% Signal Recycling Photodetector The Core Optics End Mirror Power Recycling Mirror Input Mirror T ~ 3% T ~ 3% End Mirror T ~ 10 ppm Laser Nd:Yag 6 W 100 W 12 kw 20 m 4000 m Signal Recycling Photodetector Mirror (dark fringe) Fold mirrors

More information

Vibration-compensated interferometer for measuring cryogenic mirrors

Vibration-compensated interferometer for measuring cryogenic mirrors Vibration-compensated interferometer for measuring cryogenic mirrors Chunyu Zhao and James H. Burge Optical Sciences Center, University of Arizona, 1630 E. University Blvd, Tucson, AZ 85721 Abstract An

More information

LIGO II Photon Drive Conceptual Design

LIGO II Photon Drive Conceptual Design LIGO II Photon Drive Conceptual Design LIGO-T000113-00-R M. Zucker 10/13/00 ABSTRACT LIGO II will require very small forces to actuate the final stage test masses, due to the high isolation factor and

More information

Laser stabilization and frequency modulation for trapped-ion experiments

Laser stabilization and frequency modulation for trapped-ion experiments Laser stabilization and frequency modulation for trapped-ion experiments Michael Matter Supervisor: Florian Leupold Semester project at Trapped Ion Quantum Information group July 16, 2014 Abstract A laser

More information

Plans for DC Readout Experiment at the 40m Lab

Plans for DC Readout Experiment at the 40m Lab Plans for DC Readout Experiment at the 40m Lab Alan Weinstein for the 40m Lab July 19, 2005 Ben Abbott, Rana Adhikari, Dan Busby, Jay Heefner, Keita Kawabe, Osamu Miyakawa, Virginio Sannibale, Mike Smith,

More information

HP 8509B Lightwave Polarization Analyzer. Product Overview. Optical polarization measurements of signal and components nm to 1600 nm

HP 8509B Lightwave Polarization Analyzer. Product Overview. Optical polarization measurements of signal and components nm to 1600 nm HP 8509B Lightwave Polarization Analyzer Product Overview polarization measurements of signal and components 1200 nm to 1600 nm 2 The HP 8509B Lightwave Polarization Analyzer The HP 8509B lightwave polarization

More information

MMA Memo 143: Report of the Receiver Committee for the MMA

MMA Memo 143: Report of the Receiver Committee for the MMA MMA Memo 143: Report of the Receiver Committee for the MMA 25 September, 1995 John Carlstrom Darrel Emerson Phil Jewell Tony Kerr Steve Padin John Payne Dick Plambeck Marian Pospieszalski Jack Welch, chair

More information

Wave Front Detection for Virgo

Wave Front Detection for Virgo Wave Front Detection for Virgo L.L.Richardson University of Arizona, Steward Observatory, 933 N. Cherry ave, Tucson Arizona 8575, USA E-mail: zimlance@email.arizona.edu Abstract. The use of phase cameras

More information

880 Quantum Electronics Optional Lab Construct A Pulsed Dye Laser

880 Quantum Electronics Optional Lab Construct A Pulsed Dye Laser 880 Quantum Electronics Optional Lab Construct A Pulsed Dye Laser The goal of this lab is to give you experience aligning a laser and getting it to lase more-or-less from scratch. There is no write-up

More information

Instructions for the Experiment

Instructions for the Experiment Instructions for the Experiment Excitonic States in Atomically Thin Semiconductors 1. Introduction Alongside with electrical measurements, optical measurements are an indispensable tool for the study of

More information

Thulium-Doped Fiber Amplifier Development for Power Scaling the 2 Micron Coherent Laser Absorption Instrument for ASCENDS

Thulium-Doped Fiber Amplifier Development for Power Scaling the 2 Micron Coherent Laser Absorption Instrument for ASCENDS Thulium-Doped Fiber Amplifier Development for Power Scaling the 2 Micron Coherent Laser Absorption Instrument for ASCENDS Mark W. Phillips Lockheed Martin Coherent Technologies 135 South Taylor Avenue,

More information

Optical design of shining light through wall experiments

Optical design of shining light through wall experiments Optical design of shining light through wall experiments Benno Willke Leibniz Universität Hannover (member of the ALPS collaboration) Vistas in Axion Physics: A Roadmap for Theoretical and Experimental

More information

SA210-Series Scanning Fabry Perot Interferometer

SA210-Series Scanning Fabry Perot Interferometer 435 Route 206 P.O. Box 366 PH. 973-579-7227 Newton, NJ 07860-0366 FAX 973-300-3600 www.thorlabs.com technicalsupport@thorlabs.com SA210-Series Scanning Fabry Perot Interferometer DESCRIPTION: The SA210

More information

The Lightwave Model 142 CW Visible Ring Laser, Beam Splitter, Model ATM- 80A1 Acousto-Optic Modulator, and Fiber Optic Cable Coupler Optics Project

The Lightwave Model 142 CW Visible Ring Laser, Beam Splitter, Model ATM- 80A1 Acousto-Optic Modulator, and Fiber Optic Cable Coupler Optics Project The Lightwave Model 142 CW Visible Ring Laser, Beam Splitter, Model ATM- 80A1 Acousto-Optic Modulator, and Fiber Optic Cable Coupler Optics Project Stephen W. Jordan Seth Merritt Optics Project PH 464

More information

A fast F-number 10.6-micron interferometer arm for transmitted wavefront measurement of optical domes

A fast F-number 10.6-micron interferometer arm for transmitted wavefront measurement of optical domes A fast F-number 10.6-micron interferometer arm for transmitted wavefront measurement of optical domes Doug S. Peterson, Tom E. Fenton, Teddi A. von Der Ahe * Exotic Electro-Optics, Inc., 36570 Briggs Road,

More information

Interferometer signal detection system for the VIRGO experiment. VIRGO collaboration

Interferometer signal detection system for the VIRGO experiment. VIRGO collaboration Interferometer signal detection system for the VIRGO experiment VIRGO collaboration presented by Raffaele Flaminio L.A.P.P., Chemin de Bellevue, Annecy-le-Vieux F-74941, France Abstract VIRGO is a laser

More information

Testbed for prototypes of the LISA point-ahead angle mechanism

Testbed for prototypes of the LISA point-ahead angle mechanism Testbed for prototypes of the LISA point-ahead angle mechanism, Benjamin Sheard, Gerhard Heinzel and Karsten Danzmann Albert-Einstein-Institut Hannover 7 th LISA Symposium Barcelona, 06/16/2008 Point-ahead

More information

UNMATCHED OUTPUT POWER AND TUNING RANGE

UNMATCHED OUTPUT POWER AND TUNING RANGE ARGOS MODEL 2400 SF SERIES TUNABLE SINGLE-FREQUENCY MID-INFRARED SPECTROSCOPIC SOURCE UNMATCHED OUTPUT POWER AND TUNING RANGE One of Lockheed Martin s innovative laser solutions, Argos TM Model 2400 is

More information

A new picosecond Laser pulse generation method.

A new picosecond Laser pulse generation method. PULSE GATING : A new picosecond Laser pulse generation method. Picosecond lasers can be found in many fields of applications from research to industry. These lasers are very common in bio-photonics, non-linear

More information

"Internet Telescope" Performance Requirements

Internet Telescope Performance Requirements "Internet Telescope" Performance Requirements by Dr. Frank Melsheimer DFM Engineering, Inc. 1035 Delaware Avenue Longmont, Colorado 80501 phone 303-678-8143 fax 303-772-9411 www.dfmengineering.com Table

More information

EMC Amplifiers Going Beyond the Basics to Ensure Successful Immunity Tests

EMC Amplifiers Going Beyond the Basics to Ensure Successful Immunity Tests EMC Amplifiers Going Beyond the Basics to Ensure Successful Immunity Tests Paul Denisowski, Application Engineer Broadband amplifiers are used to generate the high field strengths required by EMC radiated

More information

Lasers PH 645/ OSE 645/ EE 613 Summer 2010 Section 1: T/Th 2:45-4:45 PM Engineering Building 240

Lasers PH 645/ OSE 645/ EE 613 Summer 2010 Section 1: T/Th 2:45-4:45 PM Engineering Building 240 Lasers PH 645/ OSE 645/ EE 613 Summer 2010 Section 1: T/Th 2:45-4:45 PM Engineering Building 240 John D. Williams, Ph.D. Department of Electrical and Computer Engineering 406 Optics Building - UAHuntsville,

More information

Virgo status and commissioning results

Virgo status and commissioning results Virgo status and commissioning results L. Di Fiore for the Virgo Collaboration 5th LISA Symposium 13 july 2004 VIRGO is an French-Italian collaboration for Gravitational Wave research with a 3 km long

More information