1 Business & Technology Strategies TechSurveillance Revision of IEEE Standard 1547 New Disturbance Response Requirements BY REIGH WALLING, WALLING ENERGY SYSTEMS CONSULTING, LLC. FEBRUARY 2017 This article is the third in a four-part series regarding the IEEE standard 1547 and its impact on the electric grid. The background and purpose of this standard was reviewed in the first article, Revision of IEEE Standard 1547 The Background for Change; and the second focused on the impact on voltage regulation, Revision of IEEE Standard 1547 New Reactive Power and Voltage Regulation Capability Requirements. This article focuses on the related issue of disturbance performance; and the final article will address a number of additional issues, including power quality. A primary purpose of this series is to ensure cooperatives are well informed of the importance of this standard and the upcoming related balloting session, and of the opportunity to be involved in the process to ensure their perspective is reflected in upcoming changes to the standard. Details on how to participate in the balloting process are defined in the first article. article snapshot What has changed? IEEE Standard 1547, which defines interconnection requirements for distributed energy resources (DER), is presently undergoing a major revision. The standard s coverage of system disturbance response response to faults, abnormal voltages, and frequency deviations has been greatly expanded and fundamentally changed in approach. The present (2003) version of this standard only requires that DER trip off for disturbances, and makes no requirements for DER to remain connected and in service. The voltage and frequency tripping thresholds in the existing standard are quite sensitive. This provides exceptional protection coordination and safety for distribution systems, but raises the potential for a Bulk Electric System (BES) fault or frequency disturbance to cause a large amount of DER across a wide area to trip off simultaneously. With ever-increasing DER penetration levels, the loss of generation can be significant, introducing risks to power system security. The new standard, now in the final draft stage, modifies tripping requirements and also imposes mandatory DER disturbance ride-through requirements. Continued s business and technology strategies transmission and distribution strategies work group nreca members only

2 Revision of IEEE Standard 1547 New Disturbance Response Requirements 2 article snapshot (cont.) What is the impact on cooperatives? The proposed changes to IEEE 1547 may require cooperatives to consider more closely the impact of DER on distribution circuit protection coordination. The standard will also require the cooperative to make choices regarding DER disturbance performance that may impact transmission-level security and reliability, inevitably expanding the distribution engineer s role and horizons. Some of the proposed changes to the standard could be perceived as compromising distribution level protection and even safety in order to preserve BES security. This perception, however, deserves a closer look to consider the practical potential for distribution system impacts and the measures included in the standard to address these issues. What do cooperatives need to know or do about it? Cooperatives need to understand the proposed changes to IEEE Standard 1547 because they may affect the way that co-ops design, protect, and operate their systems. Cooperatives distribution systems often have characteristics and constraints that differ from the suburban and urban systems dominating most of the investor-owned and public utilities. It is important that the standard provides adequate recognition of the special nature of the typical cooperative distribution system. As the standard s draft development is now concluding, co-op engineers are encouraged to join the ballot pool to ensure that the standard adequately addresses the needs of the cooperative community. The most dramatic changes in the standard relate to the performance required of DER during system disturbances such as faults, abnormal voltage conditions, and frequency variations. INTRODUCTION IEEE Standard is the model distributed energy resource (DER, i.e., distributed generation or storage) interconnection standard, used widely across the U.S. and Canada. Since the time when this standard was first adopted thirteen years ago, there has been tremendous growth in DER across the continent, to the degree where the power grid has begun to develop dependency on DER as an operating resource in some areas. Driven by this changing environment, the standard is now undergoing major revision. The revised standard is now in the final draft stage, with balloting by industry stakeholders scheduled for this spring. The most dramatic changes in the standard relate to the performance required of DER during system disturbances such as faults, abnormal voltage conditions, and frequency variations. Whereas the original standard covered this area in less than two pages, the new DER disturbance performance requirements extend over twenty pages and introduce substantial complexity to DER design and interconnection. This complexity is considered necessary to balance the need for safety against the increasing impact DERs can have on the BES. This TechSurveillance article is the third in a series of four articles that describe the changes proposed for this standard, provide the rationale for these changes, and describe how they will affect the planning, design, protection, and operation of rural electric cooperative distribution systems into the future. The first article of the series provided the background of IEEE 1547 and the drivers behind the present revision effort. The second article focused on DER reactive power and voltage regulation performance requirements that will be mandated. This article focuses on the changes to required DER disturbance performance proposed in the new

3 Revision of IEEE Standard 1547 New Disturbance Response Requirements 3 Loss of generation inherently aggravates an under-frequency event and can help drive a system to the point of no return system breakup and blackout. Sudden and simultaneous loss of large amounts of DER can be problematic today and even more so in the future. IEEE 1547 draft. Although it is now in the final draft stage, cooperative engineers are encouraged to become involved in the review and balloting of this proposed standard revision to ensure that it sufficiently addresses their system circumstances. CURRENT IEEE 1547 DISTURBANCE PERFORMANCE REQUIREMENTS The original 2003 version of IEEE 1547 imposed mandatory tripping requirements in response to voltage and frequency deviations that can be viewed as rather sensitive (i.e., responding to relatively small deviations from normal). Due to increasing concern over the widespread loss of DER generation due to BES events, the tripping requirements were modified in an amendment to the standard adopted in The underfrequency tripping thresholds in the original standard removes DER generation from the system at a frequency deviation less severe than the threshold for under-frequency load shedding in some regions. Loss of generation inherently aggravates an under-frequency event and can help drive a system to the point of no return system breakup and blackout. Neither the original IEEE nor the IEEE 1547a amendment impose any requirement whatsoever for a DER to ride through a system disturbance. The imposed tripping limits are upper limits on duration for a particular deviation magnitude; there is no restriction on a DER tripping prior to this time. For example, under the current standard, a DER experiencing 85 percent voltage on one phase must trip within two seconds, but nothing prohibits it from tripping in one cycle. The context in which IEEE was developed is far different from today. The original standard provides no consideration of impact due to DER output loss. While this was reasonable in 2003 due to very low levels of DER penetration, sudden and simultaneous loss of large amounts of DER can be problematic today and even more so in the future. The original standard required tripping of DER for any fault on the utility circuit to which it is connected. Also, should an island form after a cooperative protective device trips, the original standard called for the island to be eliminated within two seconds. (Feeder islands are energized solely by DER after a feeder is isolated by a utility breaker or recloser.) These requirements are both reasonable and necessary. Also, the sensitive voltage tripping specified in the original standard made it much easier for DER vendors and integrators to achieve these requirements using rather crude and unselective approaches. The original standard also required that DER cease to energize the Area EPS (i.e., utility system) circuit to which it is connected prior to reclosure by the Area EPS. Despite the obviousness of this requirement from a utility perspective, it was widely misinterpreted by the DER industry as limiting the utility s ability to reclose faster than the maximum DER island duration of two seconds. INCREASED GRID DEPENDENCY ON DER DER penetration has grown from minimal levels at the time IEEE 1547 was originally developed to quite significant levels in some areas today. Trending to the future, politically-driven policy decisions, environmental restrictions, renewable energy mandates, and tax incentives will probably continue to drive overall U.S. DER penetration levels higher. DER penetration, however, is unevenly distributed and tends to be concentrated in areas where policy drivers, natural resources (e.g., solar irradiance), and utility energy costs are the greatest. Utilities in higher-penetration areas are already seeing DER capacity exceeding load demand on individual feeders and even at distribution substations.

4 Revision of IEEE Standard 1547 New Disturbance Response Requirements 4 Although DER is not typically considered as a capacity resource for planning purposes, the power system dispatch must account for the impacts of DER output in operation. With ever-increasing DER penetration nationwide, tripping of DER for system frequency deviations is an increasing concern. Although DER is not typically considered as a capacity resource for planning purposes, the power system dispatch must account for the impacts of DER output in operation. BES generators are dispatched according to the net load (i.e., customer load minus the negative load of generators that are not dispatched, such as DER). Therefore, simultaneous tripping of a large amount of DER creates a jump in the net load and upsets the generation-to-load balance that is essential to keep the grid frequency in control. Also, jumps in net load change transmission flows and can aggravate the dynamic power system swings that occur following faults. This potential loss of generation requires more generation reserves to be committed. The load pickup of these reserves, however, is not instantaneous and, thus, wide-scale tripping of large amounts of DER capacity can still result in a severe frequency deviation. Fault Sensitivity If DERs have sensitive undervoltage thresholds, a large amount of generation may potentially trip as the result of a transmission system fault. Transmission faults can cause a substantial voltage dip over a wide area. On a per-unit basis, the voltage levels on a distribution system during a transmission fault can be depressed to an even greater extent, and for a longer duration, than the voltage of the transmission bus at the distribution substation. This is primarily due to the dynamic characteristics of customer motor loads, which tend to stall during faults and draw a large amount of reactive current. The reactive current remains large as the motors spin back up to speed, and thus, the distribution voltage depression can last much longer than the relatively brief transmission fault. This delayed voltage recovery phenomenon was documented in field measurements performed in recent years by Southern California Edison. Distribution systems can also suffer consequences due to unnecessary DER tripping. An example is a distribution feeder with a large DER facility, such as a landfill gas powered generator, near the remote end. The power export from the facility tends to prop up the feeder voltage, and voltage regulators, substation transformer load (or on-load) tap changers (LTC)s, and switched capacitor banks will adjust accordingly. If, for example, a fault occurs on an adjacent feeder, and the resulting voltage dip causes the DER facility to trip, voltages on the feeder with the DER may sag below acceptable levels because the taps and capacitor switches are at the wrong position to support the feeder voltage without the DER. This undervoltage can persist until the taps and switches can respond and recover. If the DER had less sensitivity to undervoltage, the facility might ride through the adjacent feeder fault and avoid this power quality issue. Unlike the transmission fault impact, where it is DER pen etration over a large region that matters, these distribution level issues are related to the individual feeder or local distribution system DER penetration. Few cooperatives have large overall DER penetration today, but many have significant penetrations on specific feeders due to relatively large DER facilities. Frequency Variations With ever-increasing DER penetration nationwide, tripping of DER for system frequency deviations is an increasing concern. System frequency is consistent across an entire synchronous interconnection area the Eastern Interconnection (east of Colorado), WECC (Rocky Mountains states and west), and ERCOT (comprising most of Texas). There are also some small isolated systems, such as in Hawaii and Alaska. The frequency of these interconnections is governed by the balance between the total generation and the total load. Any frequency deviation within an interconnection area appears nearly equally across the entire area, so any DER within the interconnection area may trip. Local and even regional pene - tration levels are not a factor.

5 Revision of IEEE Standard 1547 New Disturbance Response Requirements 5 While the burden of compliance falls primarily on DER vendors and integrators, co-ops need to work with them to ensure their methods, settings, and testing are acceptable to the co-ops systems. As mentioned previously in this article, the present IEEE 1547 standard requires DER to trip for an under-frequency deviation for which the grid should be able to recover, if it were not for the disturbance-aggravating loss of DER generation. The over-frequency trip thresholds of the present standard can also be problematic. This issue was discovered, albeit too late, in Germany. The original DER interconnection standards there required tripping at 50.2 Hz, 0.2 above their nominal 50 Hz frequency. After a large amount of DER had been installed, it was found that an overfrequency deviation (such as might be caused by a sudden loss of load) would cause a sudden loss of DER generation so large as to then cause the system frequency to dive to a dangerously low value. As a result of this discovery, a large, complicated, and expensive DER retrofit program had to be initiated to change the behavior of hundreds of thousands of existing installed DER units. Clearly, it is in the best interests of all concerned if a similar situation is avoided in the U.S. We are not yet at the DER penetration levels that are present in Germany, but some parts of the country are headed in that direction. A NEW BALANCE POINT IN IEEE 1547 REVISION As mentioned in the opening of this article, IEEE 1547 is now undergoing complete revision.1 In the area of DER system disturbance performance, the current near-final draft of the revised standard makes a determined effort to balance BES security concerns with protection of distribution systems and public and worker safety. P15472 mandates DER to have the capability to ride through voltage and frequency disturbances of defined magnitude and duration. No longer may a DER trip whenever desired, as long as it is before the trip threshold. The proposed requirements now require that the DER must not trip before the end of the prescribed ride-through duration, but also must trip prior to a prescribed trip time. The trip times and associated disturbance severity levels have been modified to allow for the ride through performance needed to achieve grid security objectives. Achieving these performance goals is easier with the current IEEE tripping thresholds (even as amended by IEEE 1547a-2014) than with the new ride-through and trip thresholds defined in P1547. However, P1547 continues to require DER to cease energization of the feeder to which it is connected if the feeder is faulted or if the feeder becomes isolated or islanded from the main grid. The burden of compliance falls primarily on the DER vendors and integrators to use more advanced and innovative measures to achieve all of the required performance. The challenge for cooperative will be to work with vendors and integrators to ensure that their methods, settings, and testing are acceptable for the cooperative s system once the final standard becomes effective. Also, cooperatives will need to review internal E&O procedures and methods in order to adjust to the new requirements. This includes both disturbance ridethrough for events where tripping is not allowed, as well as satisfactory compliance with fault detection and anti-islanding requirements. Performance Categories IEEE 1547 is a national/ international standard and consequently needs to address a wide range of situations (e.g., DER penetration levels, system characteristics, etc.) as well as a 1 2 A more complete discussion of the history of IEEE 1547 and the reasons behind the present revision effort is provided in the first TechSurveillance article of this series. The P designation is an IEEE designation of a standard undergoing development. P1547 in this article refers to the current draft of the revised IEEE 1547 standard.

6 Revision of IEEE Standard 1547 New Disturbance Response Requirements 6 The new standard establishes performance categories to customize requirements to the abilities of different types of DERs to meet ride-through requirements. range of DER types. Different types of DER have varying inherent capability to meet the various ride-through requirements. To maintain technology neutrality, P1547 defined DER disturbance performance requirements in terms of performance categories.3 The categories allow customization of the requirements to the particular situation. It is left to the Authority Governing Interconnection Requirements (AGIR) to assign different types and applications of DER to the categories.4 An informative annex of the P1547 provides voluntary guidelines for the AGIR to consider when making decisions regarding performance category assignment. The categories for disturbance performance are similar to, but independent of the reactive power and voltage regulation performance Categories A and B that were discussed in the previous article in this TechSurveillance series. The separate disturbance performance categories are described below along with their basis: Category I is a level of disturbance performance that is compatible with most BES security needs, and is feasible for all current DER technologies to achieve. Because enginedriven synchronous generators have the greatest inherent difficulty meeting low-voltage ride-through performance requirements, the performance requirements are based on the German grid codes for medium-voltage connected synchronous generators, a performance level for which engine-generator vendors have been able to comply. Category II is a level of disturbance requirements that is believed to be fully consistent with BES security needs. These requirements are harmonized with the NERC PRC-024 protection-setting standard applicable for BES generators, with adaptation related to the fact that low-voltage events may have a more protracted duration at the distribution level due to load dynamics. Category III is an enhanced level of disturbance robustness that is intended for situations where continued DER operation is considered important for the benefit of the distribution system. This would normally be used in very high local-area DER penetration situations. Unlike Categories I and II, which are primarily intended to keep the DER in operation for BES faults, the Category III requirements are also designed to maintain DER output for subtransmission and distribution system (e.g., adjacent feeder) faults as well. The requirements of this category are harmonized with California Rule 21, and were added to IEEE 1547 at the request of the California utilities. It should be noted that presence of the advanced Category III requirements in IEEE 1547 does not obligate any cooperative to apply this category. FAULT AND VOLTAGE DISTURBANCE RESPONSE In this part of the article, the technical requirements proposed in P1547 are discussed and contrasted with the existing IEEE standard, as amended by IEEE 1547a in Fault Detection Requirements The existing requirement that DER must trip for faults on the distribution circuit to which it is connected remains in the revised standard, 3 4 Further discussion regarding the rationale for performance categories can be found in the previous article in this TechSurveillance series on the IEEE 1547 revision. The standard doesn t not define normatively (ie: as an established rule) who or what the AGIR is to be. In an informative annex, it suggests that the AGIR could be the utility regulatory agency, the BES operator, or the utility. The designation of this entity as the Authority Having Jurisdiction (AHJ) was purposely avoided as AHJ is commonly a local electrical inspector who is unlikely to have understanding of the BES needs and utility protection needs. The determination of who will be the AGIR is determined on a state-by-state or locality-by-locality basis, depending on what entity has the final authority regarding DER interconnection rules.

7 Revision of IEEE Standard 1547 New Disturbance Response Requirements 7 The revised standard effectively allows hot reclosing into a feeder energized by DER, if it does not cause excessive stress or disturbance. The draft standard delegates the specification of trip thresholds and time, within defined ranges, to the utility. but with further clarification. P1547 adds the statement that DER is not required to detect faults that the utility protection systems cannot detect. For example, a conductor dropped onto dry pavement creates a very high impedance fault that conventional utility relaying will not detect. It would be unreasonable to expect DER to detect this either. Effectively, this provision also makes it possible for the DER to rely on sequential tripping. In other words, the DER may only be able to detect the feeder fault after the utility source has tripped. Most DER, particularly inverter-interfaced DER (e.g., PV), have very low short-circuit current capability. This makes it very difficult for the DER to detect a feeder fault that does not make a large drop in voltage at the DER location while the feeder is connected to the substation. Once the feeder is tripped by the feeder breaker or recloser, the voltage should drop to a very low value due to the small amount of DER current available to feed the fault, and the DER will detect this and trip. Reclosing Coordination The reclosing coordination requirement has been modified in P1547 to be more qualitatively explicit, but it is now quantitatively open ended. The revised standard says that means should be implemented such that utility circuit reclosing does not result in unacceptable stresses or disturbances due to out-of-phase reclosing resulting from continued DER energization of the opened feeder section. The standard does not assign responsibility for implementing these means, but an informative footnote lists common solutions, such as voltage-supervised reclosing and direct transfer trip, and also indicates that reclosing may not be an issue where DER penetration is sufficiently low. The revised standard effectively allows hot reclosing into a feeder energized by DER, if it does not cause excessive stress or disturbance. This is to accommodate situations where it can be determined that the voltage on the DER-energized feeder section will not drift far enough out of phase from the utility source during the reclosing delay such that an unacceptable transient occurs upon reclosing. The standard draft, however, does not define quantitatively what stress or disturbance is unacceptable. During deliberations regarding this clause, specific phase angle and magnitude differences were considered, but rejected in favor of this more vague specification. Voltage Tripping The objective of undervoltage and overvoltage tripping is to remove the DER for conditions that are indicative of a local fault (e.g., a fault on the same feeder), or disturbances for which there is no reason to maintain DER operation. The latter includes overvoltage conditions which might be produced by the DER. Because of the low short-circuit contribution of DER, particularly inverter-interfaced DER, undervoltage is the primary means of distribution system fault detection by DER. Voltage trip thresholds are specified by P1547 to be on an individual phase basis, based on the least voltage phase magnitude for undervoltage tripping, and greatest phase voltage for overvoltage tripping. Ranges of undervoltage and overvoltage thresholds and clearing times5 are specified for each disturbance performance category. The draft standard delegates the specification of the thresholds and times, within these defined ranges, to the utility. With few exceptions, the trip ranges are beyond the mandated ride-through requirements, which are discussed later in this article. The draft 5 Clearing time is the total time until cessation of energization by the DER, so it includes detection time, intentional delay, and the time required to perform the cessation (e.g., open a circuit breaker).

8 Revision of IEEE Standard 1547 New Disturbance Response Requirements 8 The performance of a DER while riding through a voltage disturbance depends on the severity of the disturbance and the performance category to which the DER is assigned. Debate persists in the P1547 working group as to how the concept of cease to energize will be defined. standard also specifies default settings. These are the voltage thresholds and clearing times that will be used unless otherwise specified by the utility. Generally, DER will come from the manufacturer to the installer set with these default parameters. As defined in the P1547 standard, trip means the DER disconnects and does not restart again until the voltage is within Range B of ANSI C84.1 and frequency within 59.5 to 60.1 Hz continuously for a minimum time delay that is adjustable from zero to ten minutes. When the DER re-enters service from the tripped state, it must ramp up its output over a period adjustable from one to 1,000 seconds. Voltage Ride-Through Requirements Unlike the original IEEE standard, which only specifies when DER must trip off, P1547 specifies the conditions for which DER must not trip off and must continue to ride through. The performance of a DER while riding through a voltage disturbance depends on the severity of the disturbance and the performance category to which the DER is assigned. There are three different ride-through operating modes: (1) Mandatory Operation, in which the DER must continue to inject current; (2) Permissive Operation, in which the DER may continue to inject current or it may stop injecting current but must remain able to immediately resume operation after the voltage returns to the Continuous Operating Region ; and (3) Momentary Cessation, in which the DER must cease to energize the grid, but must also remain able to immediately resume operation after the return of voltage to the Continuous Operating Region. The Continuous Operating Region for voltage magnitude is between 0.88 and 1.10 times the nominal voltage. At the time this article was written, debate persists in the P1547 working group as to how the concept of cease to energize will be defined. It is universally agreed that DER should not continue to inject real power (kw) into the system while in this state. However, the debate is focused on reactive current. While larger DER may open some form of contactor or circuit breaker to achieve this state, some small inverters may suspend gating of their transistors (cause the transistors to not conduct). In either case, output filters, consisting of small shunt capacitors (typically a few percent of the DER rating in terms of kvar), inductors, and perhaps resistors remain connected to the grid. Even where a circuit breaker opens to isolate a conventional synchronous generator, a tiny amount of reactive current is supplied to the potential transformers that are necessary to monitor the grid voltage. Therefore, it is not possible to mandate that the current be abso - lutely zero; the argument centers around how much reactive current, what devices may produce it, and for how long. Figures 1, 2, and 3 plot the ride-through requirements for the three disturbance performance categories in terms of voltage magnitude and the cumulative duration. The DER may not trip while the voltage magnitude and cumulative duration are within the ride-through regions. As discussed previously, P1547 also specifies that the DER must trip for prescribed voltage thresholds and durations. In addition to the ride-through behavior, Figures 1 to 3 show the default tripping characteristic and the trip parameter adjustment range. DER manufac - turers may provide longer trip times within the range of adjustability, but may not provide shorter trip times than the minimum shown. This is to avoid trip settings that compromise BES security. Where any of these ride-through modes are specified, and the maximum duration of the ride-through period is not exceeded, the DER may not trip and must return to 80 percent of

9 Revision of IEEE Standard 1547 New Disturbance Response Requirements 9 its pre-disturbance current within 0.4 seconds of the voltage returning to the Continuous Operating Region. Although it is not explicitly stated, the standard does not prohibit DER from starting to recover as soon as the voltage rises above the upper Momentary Cessation threshold. FIGURE 1: Voltage ride-through and tripping characteristics in the current P1547 draft applicable to Category I DER. FIGURE 2: Voltage ride-through and tripping characteristics in the current P1547 draft applicable to Category II DER. previous view

10 Revision of IEEE Standard 1547 New Disturbance Response Requirements 10 FIGURE 3: Voltage ride-through and tripping characteristics in the current P1547 draft applicable to Category III DER. The draft standard also defines the periods over which the voltage deviations accumulate, as well as the definition of when the accumulations are reset. The Momentary Cessation mode is only specified for Category III. Using conventional circuit breakers and synchronization systems, it is not feasible for synchronous generators to achieve Category III performance. Consecutive Disturbance Ride Through Voltage disturbances can sometimes appear in sets of multiple disturbances interspersed with period of near-normal voltage. Some examples are multiple faults in short succession during severe storm events, unsuccessful reclosing attempts on the transmission or distribution system, and dynamic voltage oscillations that can occur after transmission system faults. The ride-through and tripping requirements of P1547 are based on cumulative durations of undervoltage or overvoltage. Therefore, the draft standard also defines the periods over which the voltage deviations accumulate, as well as the definition of when the accumulations are reset. Tripping During Normal Conditions P1547 mandates that DER shall not trip as a result of voltage deviations that remain in the Continuous Operating Region. An exception is for utility voltage imbalance (in terms of the negative sequence component) exceeding 5 percent for more than 60 seconds or 3 percent for more than ten minutes. There is no restriction on DER tripping or output reduction that are unrelated to the grid voltage and frequency condition. Frequency Disturbance Performance P1547 continues to specify DER tripping for frequency deviations, but also introduces mandatory frequency ride-through performance as well. The following section of this article summarizes the new requirements. Frequency Tripping The primary objective of under- and overfrequency tripping is to remove the DER for previous view

11 Revision of IEEE Standard 1547 New Disturbance Response Requirements 11 The robustness to ride through frequency deviations is a function of the DER design, and is not a setting. conditions indicative of an islanded feeder, isolated from the grid and energized by DER. Because all of the continental U.S. interconnections have a very stable frequency, rarely deviating by more than 0.05 Hz, very sensitive frequency protection could eliminate DER islands very quickly in most cases. However, with the increased penetration of DER across the U.S., sensitive frequency protection applied to generation resources can aggravate the imbalance between load and generation that is the cause of any frequency deviation. The rapid increase of DER penetration was not foreseen during the development of the original IEEE 1547 standard, and the impact of DER tripping on grid frequency stability was not a consideration. Now with thousands of MW of DER in the WECC interconnection alone, the situation is far different. Therefore, P1547 has opened up the frequency trip parameters substantially. These parameters are the same for all three disturbance performance categories. FIGURE 4: Comparison of P1547 and IEEE frequency trip characteristics. Figure 4 compares the frequency trip characteristics specified in IEEE with the default characteristics defined in the revised P1547 standard. P1547 also provides a range of adjustability for both frequency thresholds and durations (not shown in Figure 4), primarily to accommodate special grids, such as those on the Hawaiian Islands and in Alaska. Regional reliability entities (e.g. SERC, MRO, etc.) may specify DER frequency trip characteristics other than the default values, but within the ranges of adjustability. It is expected that the default values will be used in most cases. As in the case of voltage tripping, DER tripped for frequency variations beyond the defined characteristics are to remain off line until the grid frequency and voltage stabilizes for a specified period. Only then may the DER return to operation, and it must then ramp up power gradually. Frequency Ride-Through In addition to the mandatory frequency tripping characteristics, P1547 also mandates that DER ride through frequency disturbances of defined magnitude and duration. The robustness to ride through frequency deviations is a function of the DER design, and is not a setting. Unlike voltage ride through, which is challenging for many types of DER to achieve, most DER technologies are relatively insensitive to frequency deviations. Because of this, and because system frequency is an interconnection-wide parameter and not a local or regional penetration-related issue, the same frequency ridethrough requirements apply to all three disturbance performance categories. The frequency ride-through performance requirements are plotted, along with the mandatory frequency trip characteristics for comparison (including ranges of adjustability), in Figure 5.

12 Revision of IEEE Standard 1547 New Disturbance Response Requirements 12 FIGURE 5: Frequency ride-through and tripping characteristics in the current P1547 draft applicable to Categories I, II, and III DER. P1547 provides a Volts per Hertz exception for when the ratio of voltage to frequency exceeds 1.1 times normal. DER may not trip as a result of frequency deviations within the Continuous Operating Region, which is defined by P1547 as 58.5 Hz to 60.6 Hz. However, an exception is allowed if the ratio of voltage to frequency exceeds 1.1 times nominal. This Volts per Hertz exception is because overexcitation of magnetics (transformers and inductors) and rotating generators could otherwise be problematic. DER may not trip for abrupt shifts in voltage phase less than 20, although they may momentarily interrupt output while their controls get back into synchronism with the system. Phase jumps can occur when there are large step changes in the BES power flow, such as caused by loss of a major line, dropping of a large load, or a major generation trip. DER also may not trip off for ramps of frequency change that are less than 0.5, 2.0, or 3.0 Hz per second for Categories I to III, respectively. Rate of Change of Frequency (ROCOF) has been used as an inadvertent island detection scheme in some DER designs, and this ROCOF ride-through requirement will constrain this approach and may require DER manufacturers to adopt other schemes to meet the anti-islanding requirements of IEEE Primary Frequency (Governor) Response In the power grid, the primary means to control frequency is the governor action of generators, changing power output in response to frequency variation. Presently, all of this primary frequency response is provided by BES generators. As DER penetration increases, the amount of BES generation capacity on line will inevitably decline, as will the amount of frequency regulation available. Compounding this erosion of frequency stability is the decrease of system inertia. Inertia is the characteristic that slows frequency changes and is primarily provided by large synchronous generators. Small synchronous generators used for DER have much lower per-unit inertia factors and most DERs installed today are inverter interfaced (e.g., PV, microturbines, etc.), which have no inertia at all. With decrease in system inertia, system frequency variations previous view

13 Revision of IEEE Standard 1547 New Disturbance Response Requirements 13 DER must be considered as a critical grid resource that cannot be allowed to trip simultaneously in large numbers unless absolutely necessary. caused by mismatch of load and generation output occur faster and are more severe. Therefore, P1547 now requires DER to provide primary frequency response to a limited extent. Similar to the governor characteristics used in BES generators, DER are to have a frequency droop characteristic causing the DER power output to change in proportion to the frequency deviation from 60 Hz. For over-frequency deviations, the DER reduces power and for underfrequency deviations the DER increases power, if it is capable of doing so. A majority of DERs are powered by renewable resources, and normally deliver the maximum amount of power that is available at all times. These DER are not expected to increase their output in response to frequency, unless their output has been previously curtailed for another reason. INCREASING DER PENETRATION ADDS NEW DIMENSION TO INTERCONNECTION Unlike 14 years ago when the present IEEE 1547 standard was adopted, DER can no longer be disregarded as insignificant to the grid at large. Impacts of DER are no longer limited to issues related to local-area penetration. Effects can now be seen within regions or even across entire interconnect areas of the BES. The current and expected future trajectory continues to indicate increasing DER penetration levels. DER must, therefore, be considered as a critical grid resource that cannot be allowed to trip simultaneously in large numbers unless absolutely necessary. Doing so can lead to significant consequences for overall system stability and security. The DER equipment being installed today will be in service for many years. The experience gained in Europe, where DER penetration is much more extensive than it is presently in most of the U.S., has shown that appropriate DER characteristics need to be implemented in the equipment being installed now; retrofitting existing equipment when the situation reaches a critical stage in the future is extremely expensive and administratively complex. At the same time, distribution system reliability, safety, and power quality must also be preserved. While there is inherent tension between the BES security and local distribution-oriented objectives, the solution lies in improved DER technology that allows both objectives to be achieved without excessive compromise. With the draft P1547 now being finalized, the opportunity for participation in draft development has come to a close. However, there is an opportunity for more co-op engineers to participate in the standard balloting process. The IEEE-SA standards balloting process, and the procedure to join the ballot pool was described in the first TechSurveillance article in this series. Review of the new IEEE 1547 by co-op engineers and participation in balloting will help to ensure that the needs of the rural cooperative segment of the power industry are appropriately addressed. n

14 Revision of IEEE Standard 1547 New Disturbance Response Requirements 14 references and resources Performance of Distributed Energy Resources During and After System Disturbance, NERC Integration of Variable Generation Task Force, Task 1-7, December, J.C. Boemer, K. Burges, P. Zolotarev, and J. Lehner et al., Overview of German Grid Issues and Retrofit of German Photovoltaic Power Plants for the Prevention of Frequency Stability Problems in Abnormal System Conditions of the ENTSO-E Region Continental Europe, 1st International Workshop on Integration of Solar Power into Power Systems, Aarhus, Denmark, October R. Bravo, Distribution FIDVR Events Analysis, Seventh Annual IEEE Green Technologies Conference (GreenTech), New Orleans, April, Recommended Settings for Voltage and Frequency Ride-Through of Distributed Energy Resources: Minimum and Advanced Requirements and Settings for the Performance of Distributed Energy Resources During and After System Disturbances to Support Bulk Power System Reliability and Their Respective Technical Implications on Industry Stakeholders. EPRI. Electric Power Research Institute (EPRI), Palo Alto, CA: May About the Author Reigh Walling is a utility and renewable energy industry consultant, focusing his practice on the technical issues related to DER interconnections and renewable energy integration, as well as a variety of transmission-related areas. He has long been heavily involved in standards related to interconnection of DER and transmission-scale renewable energy plants, including participation in the inner writing group of the original IEEE 1547, several of the IEEE 1547.x companion standards, NERC PRC-024, and the NERC Integration of Variable Generation Task Force, and as well as a co-facilitator in the current IEEE 1547 revision working group. Prior to establishing Walling Energy Systems Consulting in 2012, he was a key member of GE s Energy Consulting group for 32 years. While at GE, he was the program manager for the Distribution Systems Testing, Application, and Research utility consortium, of which NRECA is a long-standing member. previous view

15 Revision of IEEE Standard 1547 New Disturbance Response Requirements 15 Questions or Comments Robert Harris, PE, Principal, Transmission & Distribution Engineering Work Group: Business and Technology Strategies feedback line. To find more TechSurveillance articles on business and technology issues for cooperatives, please visit our website archive. business and technology strategies transmission and distribution strategies work group The Transmission and Distribution Strategies Work Group, part of NRECA s Business and Technology Strategies team, is focused on identifying opportunities and challenges associated with efficient, reliable electricity delivery by cooperatives to consumers. TechSurveillance research relevant to this work group looks at the various aspects of transmission and distribution grid infrastructure technology and standards. For more information about technology and business resources available to members through the Transmission and Distribution Strategies Work Group, please visit and for the current work by the Business and Technology Strategies department of NRECA, please see our Portfolio. Legal Notice This work contains findings that are general in nature. Readers are reminded to perform due diligence in applying these findings to their specific needs, as it is not possible for NRECA to have sufficient understanding of any specific situation to ensure applicability of the findings in all cases. The information in this work is not a recommendation, model, or standard for all electric cooperatives. Electric cooperatives are: (1) independent entities; (2) governed by independent boards of directors; and (3) affected by different member, financial, legal, political, policy, operational, and other considerations. For these reasons, electric cooperatives make independent decisions and investments based upon their individual needs, desires, and constraints. Neither the authors nor NRECA assume liability for how readers may use, interpret, or apply the information, analysis, templates, and guidance herein or with respect to the use of, or damages resulting from the use of, any information, apparatus, method, or process contained herein. In addition, the authors and NRECA make no warranty or representation that the use of these contents does not infringe on privately held rights. This work product constitutes the intellectual property of NRECA and its suppliers, and as such, it must be used in accordance with the NRECA copyright policy. Copyright 2017 by the National Rural Electric Cooperative Association. previous view

IEEE Major Revision of Interconnection Standard

IEEE Major Revision of Interconnection Standard IEEE 1547-2018 - Major Revision of Interconnection Standard NRECA & APA s Emerging Priorities in Energy Research Day, Anchorage, AK Charlie Vartanian PE Secretary, IEEE 1547 Working Group October 31, 2018

More information

IEEE Std Bulk System Opportunities from New Distributed Energy Resource Interconnection and Interoperability Standards

IEEE Std Bulk System Opportunities from New Distributed Energy Resource Interconnection and Interoperability Standards IEEE Std 1547-2018 Bulk System Opportunities from New Distributed Energy Resource Interconnection and Interoperability Standards Clayton Stice, ERCOT Jens C. Boemer, EPRI (on behalf of SCC21) NERC SPIDER

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements Division 502 Technical Applicability 1(1) Section 502.1 applies to: Expedited Filing Draft August 22, 2017 the legal owner of an aggregated generating facility directly connected to the transmission system

More information

TechSurveillance. Revision of IEEE Standard New Reactive Power and Voltage Regulation Capability Requirements. Business & Technology Strategies

TechSurveillance. Revision of IEEE Standard New Reactive Power and Voltage Regulation Capability Requirements. Business & Technology Strategies Business & Technology Strategies TechSurveillance Revision of IEEE Standard 1547 New Reactive Power and Voltage Regulation Capability Requirements BY REIGH WALLING, WALLING ENERGY SYSTEMS CONSULTING, LLC.

More information

900 MW Fault Induced Solar Photovoltaic Resource Interruption Disturbance Report

900 MW Fault Induced Solar Photovoltaic Resource Interruption Disturbance Report 900 MW Fault Induced Solar Photovoltaic Resource Interruption Disturbance Report Southern California Event: October 9, 2017 Joint NERC and WECC Staff Report February 2018 NERC Report Title Report Date

More information

Implementation of Revised IEEE Standard 1547

Implementation of Revised IEEE Standard 1547 MAY 31, 2017 HOLYOKE, MASSACHUSETTS Implementation of Revised IEEE Standard 1547 Presentation to ISO-TO Operations Committee David Forrest Key Points As New England adds significant amounts of Distributed

More information

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 5: (August 2, 2013) Page 1 of 76

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 5: (August 2, 2013) Page 1 of 76 PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion

More information

Inverter-Based Resource Disturbance Analysis

Inverter-Based Resource Disturbance Analysis Inverter-Based Resource Disturbance Analysis Key Findings and Recommendations Informational Webinar February 15, 2018 August 16, 2016 Blue Cut Fire Disturbance Key Findings and Recommendations 2 Western

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Wind Aggregated Generating Facilities Technical Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Wind Aggregated Generating Facilities Technical Requirements Applicability 1(1) Section 502.1 applies to the ISO, and subject to the provisions of subsections 1(2), (3) and (4) to any: (a) a new wind aggregated generating facility to be connected to the transmission

More information

1

1 Guidelines and Technical Basis Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive

More information

BED INTERCONNECTION TECHNICAL REQUIREMENTS

BED INTERCONNECTION TECHNICAL REQUIREMENTS BED INTERCONNECTION TECHNICAL REQUIREMENTS By Enis Šehović, P.E. 2/11/2016 Revised 5/19/2016 A. TABLE OF CONTENTS B. Interconnection Processes... 2 1. Vermont Public Service Board (PSB) Rule 5.500... 2

More information

Reliability Guideline: Generating Unit Operations During Complete Loss of Communications

Reliability Guideline: Generating Unit Operations During Complete Loss of Communications 1 1 1 1 1 1 1 1 0 1 0 1 0 1 Reliability Guideline: Generating Unit Operations During Complete Loss of Communications Preamble It is in the public interest for the North American Electric Reliability Corporation

More information

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 4: (June 10, 2013) Page 1 of 75

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 4: (June 10, 2013) Page 1 of 75 PRC-025-1 Introduction The document, Power Plant and Transmission System Protection Coordination, published by the NERC System Protection and Control Subcommittee (SPCS) provides extensive general discussion

More information

Wind Power Facility Technical Requirements CHANGE HISTORY

Wind Power Facility Technical Requirements CHANGE HISTORY CHANGE HISTORY DATE VERSION DETAIL CHANGED BY November 15, 2004 Page 2 of 24 TABLE OF CONTENTS LIST OF TABLES...5 LIST OF FIGURES...5 1.0 INTRODUCTION...6 1.1 Purpose of the Wind Power Facility Technical

More information

Grid codes and wind farm interconnections CNY Engineering Expo. Syracuse, NY November 13, 2017

Grid codes and wind farm interconnections CNY Engineering Expo. Syracuse, NY November 13, 2017 Grid codes and wind farm interconnections CNY Engineering Expo Syracuse, NY November 13, 2017 Purposes of grid codes Grid codes are designed to ensure stable operating conditions and to coordinate the

More information

IEEE sion/1547revision_index.html

IEEE sion/1547revision_index.html IEEE 1547 IEEE 1547: Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces http://grouper.ieee.org/groups/scc21/1547_revi sion/1547revision_index.html

More information

Table of Contents. Introduction... 1

Table of Contents. Introduction... 1 Table of Contents Introduction... 1 1 Connection Impact Assessment Initial Review... 2 1.1 Facility Design Overview... 2 1.1.1 Single Line Diagram ( SLD )... 2 1.1.2 Point of Disconnection - Safety...

More information

Reliability Guideline: Generating Unit Operations During Complete Loss of Communications

Reliability Guideline: Generating Unit Operations During Complete Loss of Communications 1 1 1 1 1 1 1 1 0 1 0 1 0 1 Reliability Guideline: Generating Unit Operations During Complete Loss of Communications Preamble: It is in the public interest for the North American Electric Reliability Corporation

More information

Preview of the New Interconnection Standard

Preview of the New Interconnection Standard Preview of the New Interconnection Standard Robert W. Harris, PE Senior Principal, T&D Engineering NRECA February 26, 2018 IEEE 1547 is the Standard for Interconnecting Distributed Resources with Electric

More information

E N G I N E E R I N G M A N U A L

E N G I N E E R I N G M A N U A L 1 1 1.0 PURPOSE The purpose of this document is to define policy and provide engineering guidelines for the AP operating companies (Monongahela Power Company, The Potomac Edison Company, and West Penn

More information

NERC Protection Coordination Webinar Series June 23, Phil Tatro

NERC Protection Coordination Webinar Series June 23, Phil Tatro Power Plant and Transmission System Protection Coordination Volts Per Hertz (24), Undervoltage (27), Overvoltage (59), and Under/Overfrequency (81) Protection NERC Protection Coordination Webinar Series

More information

DER Ride-Through Performance Categories and Trip Settings Presentation at PJM Ride-Through Workshop, Philadelphia, PA, October 1-2, 2018

DER Ride-Through Performance Categories and Trip Settings Presentation at PJM Ride-Through Workshop, Philadelphia, PA, October 1-2, 2018 DER Ride-Through Performance Categories and Trip Settings Presentation at PJM Ride-Through Workshop, Philadelphia, PA, October 1-2, 2018 Dr. Jens C. Boemer, Principal Technical Leader, EPRI Reigh Walling,

More information

1200 MW Fault Induced Solar Photovoltaic Resource Interruption Disturbance Report

1200 MW Fault Induced Solar Photovoltaic Resource Interruption Disturbance Report 1200 MW Fault Induced Solar Photovoltaic Resource Interruption Disturbance Report Rich Bauer Associate Director Reliability Risk Management / Event Analysis Mid C Seminar July 19, 2017 Western Interconnection

More information

Texas Reliability Entity Event Analysis. Event: May 8, 2011 Loss of Multiple Elements Category 1a Event

Texas Reliability Entity Event Analysis. Event: May 8, 2011 Loss of Multiple Elements Category 1a Event Texas Reliability Entity Event Analysis Event: May 8, 2011 Loss of Multiple Elements Category 1a Event Texas Reliability Entity July 2011 Page 1 of 10 Table of Contents Executive Summary... 3 I. Event

More information

System Protection and Control Subcommittee

System Protection and Control Subcommittee Power Plant and Transmission System Protection Coordination Volts Per Hertz (24), Undervoltage (27), Overvoltage (59), and Under/Overfrequency (81) Protection System Protection and Control Subcommittee

More information

Transmission Interconnection Requirements for Inverter-Based Generation

Transmission Interconnection Requirements for Inverter-Based Generation Transmission Requirements for Inverter-Based Generation June 25, 2018 Page 1 Overview: Every generator interconnecting to the transmission system must adhere to all applicable Federal and State jurisdictional

More information

Revised IEEE 1547 Standard for Interconnecting Distributed Energy Resources with Electric Power Systems- National Grid Solar Program

Revised IEEE 1547 Standard for Interconnecting Distributed Energy Resources with Electric Power Systems- National Grid Solar Program 1 Revised IEEE 1547 Standard for Interconnecting Distributed Energy Resources with Electric Power Systems- National Grid Solar Program Babak Enayati, PhD, PE Lead Engineer, National Grid Waltham, MA Email:

More information

IEEE 1547: Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces

IEEE 1547: Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces IEEE PES Boston Chapter Technical Meeting IEEE 1547: Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces P1547 Chair David

More information

Generation and Load Interconnection Standard

Generation and Load Interconnection Standard Generation and Load Interconnection Standard Rev. 0A DRAFT Name Signature Date Prepared: Approved: VP Acceptance APEGGA Permit to Practice P-08200 TABLE OF CONTENTS 1.0 INTRODUCTION...5 1.1 Purpose...5

More information

Final ballot January BOT adoption February 2015

Final ballot January BOT adoption February 2015 Standard PRC-024-21(X) Generator Frequency and Voltage Protective Relay Settings Standard Development Timeline This section is maintained by the drafting team during the development of the standard and

More information

Technical Requirements for Connecting Small Scale PV (sspv) Systems to Low Voltage Distribution Networks

Technical Requirements for Connecting Small Scale PV (sspv) Systems to Low Voltage Distribution Networks 2014 Technical Requirements for Connecting Small Scale PV (sspv) Systems to Low Voltage Distribution Networks This document specifies the technical requirement for connecting sspv to the low voltage distribution

More information

Possible Future Modifications to IEEE 1547

Possible Future Modifications to IEEE 1547 California Rule 21 SWIG Possible Future Modifications to IEEE 1547 Michael Sheehan, P.E IREC mikes@irecusa.com PV Significant Trends Installed prices for distributed PV installations fell by at least 11

More information

Generation and Load Interconnection Standard

Generation and Load Interconnection Standard Generation and Load Interconnection Standard Rev. 0 DRAFT Name Signature Date Prepared: Approved: VP Acceptance APEGGA Permit to Practice P-08200 TABLE OF CONTENTS 1.0 INTRODUCTION...5 1.1 Purpose...5

More information

BPS-Connected Inverter-Based Resource Performance

BPS-Connected Inverter-Based Resource Performance 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Reliability Guideline BPS-Connected Inverter-Based Resource Performance May 2018 20 21 22 23 24 25 26 27 28 29 NERC Report Title Report Date I 30 31 32 33

More information

NPCC Regional Reliability Reference Directory # 12. Underfrequency Load Shedding Program Requirements

NPCC Regional Reliability Reference Directory # 12. Underfrequency Load Shedding Program Requirements NPCC Regional Reliability Reference Directory # 12 Under frequency Load Shedding Program Requirements Task Force on System Studies Revision Review Record: June 26 th, 2009 March 3 rd, 2010 Adopted by the

More information

Protective Relaying for DER

Protective Relaying for DER Protective Relaying for DER Rogerio Scharlach Schweitzer Engineering Laboratories, Inc. Basking Ridge, NJ Overview IEEE 1547 general requirements to be met at point of common coupling (PCC) Distributed

More information

Inverter Source Requirement Document of ISO New England (ISO-NE)

Inverter Source Requirement Document of ISO New England (ISO-NE) Inverter Source Requirement Document of ISO New England (ISO-NE) This Source Requirement Document applies to inverters associated with specific types of generation for projects that have applied for interconnection

More information

GUIDE FOR GENERATOR INTERCONNECTION THE WIRES OWNER DISTRIBUTION SYSTEM

GUIDE FOR GENERATOR INTERCONNECTION THE WIRES OWNER DISTRIBUTION SYSTEM DATE: 200/06/2 PAGE 1 of GUIDE FOR GENERATOR INTERCONNECTION TO THE WIRES OWNER DISTRIBUTION SYSTEM The intent of this Guide is to establish the interconnection requirements of Distributed Resources with

More information

Renewable Interconnection Standard & Experimental Tests. Yahia Baghzouz UNLV Las Vegas, NV, USA

Renewable Interconnection Standard & Experimental Tests. Yahia Baghzouz UNLV Las Vegas, NV, USA Renewable Interconnection Standard & Experimental Tests Yahia Baghzouz UNLV Las Vegas, NV, USA Overview IEEE Std 1547 Voltage limitations Frequency limitations Harmonic limitations Expansion of IEEE Std

More information

Performance of Distributed Energy Resources During and After System Disturbance Voltage and Frequency Ride Through Requirements

Performance of Distributed Energy Resources During and After System Disturbance Voltage and Frequency Ride Through Requirements Performance of Distributed Energy Resources During and After System Disturbance Voltage and Frequency Ride Through Requirements A report by the Integration of Variable Generation Task Force (Task 1 7)

More information

Reliability and Power Quality Indices for Premium Power Contracts

Reliability and Power Quality Indices for Premium Power Contracts Mark McGranaghan Daniel Brooks Electrotek Concepts, Inc. Phone 423-470-9222, Fax 423-470-9223, email markm@electrotek.com 408 North Cedar Bluff Road, Suite 500 Knoxville, Tennessee 37923 Abstract Deregulation

More information

Hybrid Anti-Islanding Algorithm for Utility Interconnection of Distributed Generation

Hybrid Anti-Islanding Algorithm for Utility Interconnection of Distributed Generation Hybrid Anti-Islanding Algorithm for Utility Interconnection of Distributed Generation Maher G. M. Abdolrasol maher_photo@yahoo.com Dept. of Electrical Engineering University of Malaya Lembah Pantai, 50603

More information

The Connecticut Light and Power Company

The Connecticut Light and Power Company The Connecticut Light and Power Company and The United Illuminating Company Exhibit B - Generator Interconnection Technical Requirements May 12, 2010 Page 1 of 26 Table of Contents 1. SCOPE... 3 2. GENERAL

More information

Keeping it up to Speed Off-Nominal Frequency Operations. CETAC 2018 San Ramon

Keeping it up to Speed Off-Nominal Frequency Operations. CETAC 2018 San Ramon Keeping it up to Speed Off-Nominal Frequency Operations CETAC 2018 San Ramon 1 Welcome CETAC 2018 San Ramon Valley Conference Center General Class Information: Safety/Fire evacuation In event of emergency,

More information

each time the Frequency is above 51Hz. Continuous operation is required

each time the Frequency is above 51Hz. Continuous operation is required GC0101 EXTRACT OF EUROPEAN CONNECTION CONDITIONS LEGAL TEXT DATED 08/01/2018. ECC.6 ECC.6.1 ECC.6.1.1 ECC.6.1.2 ECC.6.1.2.1 ECC.6.1.2.1.1 ECC.6.1.2.1.2 ECC.6.1.2.1.3 TECHNICAL, DESIGN AND OPERATIONAL CRITERIA

More information

Performance of Distributed Energy Resources During and After System Disturbance Voltage and Frequency Ride-Through Requirements

Performance of Distributed Energy Resources During and After System Disturbance Voltage and Frequency Ride-Through Requirements Performance of Distributed Energy Resources During and After System Disturbance Voltage and Frequency Ride-Through Requirements A report by the Integration of Variable Generation Task Force (Task 1-7)

More information

Power Plant and Transmission System Protection Coordination

Power Plant and Transmission System Protection Coordination Technical Reference Document Power Plant and Transmission System Protection Coordination NERC System Protection and Control Subcommittee Revision 1 July 2010 Table of Contents 1. Introduction... 1 1.1.

More information

Recently, the SS38 Working Group on Inter-Area Dynamic Analysis completed two study reports on behalf of the UFLS Regional Standard Drafting Team.

Recently, the SS38 Working Group on Inter-Area Dynamic Analysis completed two study reports on behalf of the UFLS Regional Standard Drafting Team. December 7 th, 2010 NPCC Full Member Committee; Please find attached a draft revised NPCC Regional Reliability Directory #12 Underfrequency Load Shedding Program Requirements and a draft revised NPCC UFLS

More information

Phase-phase/phase-neutral: 24/13.8 kv star, 13.8 kv delta, 12/6.9 kv star.

Phase-phase/phase-neutral: 24/13.8 kv star, 13.8 kv delta, 12/6.9 kv star. Summary Of Interconnection Technical Guidelines for Renewable Energy Systems 0-100 kw under Standard Offer Contract (Extract from JPS Guide to Interconnection of Distributed Generation) This document is

More information

INTERIM ARRANGEMENTS FOR GRID TIED DISTRIBUTED ENERGY RESOURCES. Technical Requirements for Grid-Tied DERs

INTERIM ARRANGEMENTS FOR GRID TIED DISTRIBUTED ENERGY RESOURCES. Technical Requirements for Grid-Tied DERs INTERIM ARRANGEMENTS FOR GRID TIED DISTRIBUTED ENERGY RESOURCES Technical Requirements for Grid-Tied DERs Projects Division 6/29/2017 Contents 1 Definitions and Acronyms... 1 2 Technical Interconnection

More information

PRC Generator Relay Loadability. A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1

PRC Generator Relay Loadability. A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1 A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1 Purpose: To set load-responsive protective relays associated with generation Facilities at a level to prevent unnecessary tripping

More information

PJM Manual 07:: PJM Protection Standards Revision: 2 Effective Date: July 1, 2016

PJM Manual 07:: PJM Protection Standards Revision: 2 Effective Date: July 1, 2016 PJM Manual 07:: PJM Protection Standards Revision: 2 Effective Date: July 1, 2016 Prepared by System Planning Division Transmission Planning Department PJM 2016 Table of Contents Table of Contents Approval...6

More information

NERC Protection Coordination Webinar Series June 16, Phil Tatro Jon Gardell

NERC Protection Coordination Webinar Series June 16, Phil Tatro Jon Gardell Power Plant and Transmission System Protection Coordination Phase Distance (21) and Voltage-Controlled or Voltage-Restrained Overcurrent Protection (51V) NERC Protection Coordination Webinar Series June

More information

PRC Generator Relay Loadability. A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1

PRC Generator Relay Loadability. A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1 PRC-025-1 Generator Relay Loadability A. Introduction 1. Title: Generator Relay Loadability 2. Number: PRC-025-1 Purpose: To set load-responsive protective relays associated with generation Facilities

More information

Standard PRC Generator Frequency and Voltage Protective Relay Settings. A. Introduction

Standard PRC Generator Frequency and Voltage Protective Relay Settings. A. Introduction A. Introduction 1. Title: Generator Frequency and Voltage Protective Relay Settings 2. Number: PRC-024-1 3. Purpose: Ensure Generator Owners set their generator protective relays such that generating units

More information

Voltage and Frequency Dependency

Voltage and Frequency Dependency Average hourly generation (GW) System Operability Framework Voltage and Frequency Dependency The demand and generation we see on the electricity network has been changing in recent years and is set to

More information

Standard PRC Generator Frequency and Voltage Protective Relay Settings. A. Introduction. See the Implementation Plan for PRC

Standard PRC Generator Frequency and Voltage Protective Relay Settings. A. Introduction. See the Implementation Plan for PRC A. Introduction 1. Title: Generator Frequency and Voltage Protective Relay Settings 2. Number: PRC-024-2 3. Purpose: Ensure Generator Owners set their generator protective relays such that generating units

More information

Impact of High PV Penetration on Grid Operation. Yahia Baghzouz Professor of Electrical engineering University of Nevada Las Vegas

Impact of High PV Penetration on Grid Operation. Yahia Baghzouz Professor of Electrical engineering University of Nevada Las Vegas Impact of High PV Penetration on Grid Operation Yahia Baghzouz Professor of Electrical engineering University of Nevada Las Vegas Overview Introduction/Background Effects of High PV Penetration on Distribution

More information

Harmonizing the Changing Resource Mix Keeping the Grid Together

Harmonizing the Changing Resource Mix Keeping the Grid Together Harmonizing the Changing Resource Mix Keeping the Grid Together Robert W. Cummings Senior Director of Engineering and Reliability Initiatives i-pcgrid March 30, 2017 NERC-IEEE Memorandum of Understanding

More information

Introduce system protection relays like underfrequency relays, rate of change of frequency relays, reverse - power flow

Introduce system protection relays like underfrequency relays, rate of change of frequency relays, reverse - power flow Module 1 : Fundamentals of Power System Protection Lecture 3 : Protection Paradigms - System Protection Objectives In this lecture we will: Overview dynamics in power systems. Introduce system protection

More information

Loss of Solar Resources during Transmission Disturbances due to Inverter Settings II

Loss of Solar Resources during Transmission Disturbances due to Inverter Settings II Loss of Solar Resources during Transmission Disturbances due to Inverter Settings II Informational Webinar on Level 2 NERC Alert Ryan Quint, Senior Manager, Advanced Analytics and Modeling Rich Bauer,

More information

Intermittent Renewable Resources (Wind and PV) Distribution Connection Code (DCC) At Medium Voltage (MV)

Intermittent Renewable Resources (Wind and PV) Distribution Connection Code (DCC) At Medium Voltage (MV) Intermittent Renewable Resources (Wind and PV) Distribution Connection Code (DCC) At Medium Voltage (MV) IRR-DCC-MV 1. Introduction 1 IRR-DCC-MV 2. Scope 1 IRR-DCC-MV 2.1. General 1 IRR-DCC-MV 2.2. Affected

More information

NVESTIGATIONS OF RECENT BLACK-

NVESTIGATIONS OF RECENT BLACK- DIGITAL VISION outs indicate that the root cause of almost all major power system disturbances is voltage collapse rather than the underfrequency conditions prevalent in the blackouts of the 1960s and

More information

DP&L s Technical Requirements for Interconnection and Parallel Operation of Distributed Generation

DP&L s Technical Requirements for Interconnection and Parallel Operation of Distributed Generation DP&L s Technical Requirements for Interconnection and Parallel Operation of Distributed Generation Technical Requirements for Interconnection and Parallel Operation of Distributed Generation Single Phase

More information

SYNCHROPHASOR TECHNOLOGY GLOSSARY Revision Date: April 24, 2011

SYNCHROPHASOR TECHNOLOGY GLOSSARY Revision Date: April 24, 2011 SYNCHROPHASOR TECHNOLOGY GLOSSARY Revision Date: April 24, 2011 Baselining using large quantities of historical phasor data to identify and understand patterns in interconnection-wide grid behavior, to

More information

Generation Interconnection Requirements at Voltages 34.5 kv and Below

Generation Interconnection Requirements at Voltages 34.5 kv and Below Generation Interconnection Requirements at Voltages 34.5 kv and Below 2005 March GENERATION INTERCONNECTION REQUIREMENTS AT 34.5 KV AND BELOW PAGE 1 OF 36 TABLE OF CONTENTS 1. INTRODUCTION 5 1.1. Intent

More information

Central Hudson Gas & Electric Corporation. Transmission Planning Guidelines

Central Hudson Gas & Electric Corporation. Transmission Planning Guidelines Central Hudson Gas & Electric Corporation Transmission Planning Guidelines Version 4.0 March 16, 2016 Version 3.0 March 16, 2009 Version 2.0 August 01, 1988 Version 1.0 June 26, 1967 Table of Contents

More information

IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form)

IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form) IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form) Transmission Provider: IDAHO POWER COMPANY Designated Contact Person: Jeremiah Creason Address: 1221 W. Idaho Street, Boise ID 83702 Telephone

More information

ECE 528 Understanding Power Quality

ECE 528 Understanding Power Quality ECE 528 Understanding Power Quality http://www.ece.uidaho.edu/ee/power/ece528/ Paul Ortmann portmann@uidaho.edu 208-733-7972 (voice) Lecture 22 1 Today Homework 5 questions Homework 6 discussion More on

More information

System Protection and Control Subcommittee

System Protection and Control Subcommittee Power Plant and Transmission System Protection Coordination Reverse Power (32), Negative Sequence Current (46), Inadvertent Energizing (50/27), Stator Ground Fault (59GN/27TH), Generator Differential (87G),

More information

POWER QUALITY IMPACTS AND MITIGATION OF DISTRIBUTED SOLAR POWER

POWER QUALITY IMPACTS AND MITIGATION OF DISTRIBUTED SOLAR POWER POWER QUALITY IMPACTS AND MITIGATION OF DISTRIBUTED SOLAR POWER Presented by Ric Austria, Principal at Pterra Consulting to the IEEE San Francisco Chapter Feb 17, 2016 California Public Utilities Commission,

More information

ENTSO-E Draft Network Code on High Voltage Direct Current Connections and DCconnected

ENTSO-E Draft Network Code on High Voltage Direct Current Connections and DCconnected ENTSO-E Draft Network Code on High Voltage Direct Current Connections and DCconnected Power Park Modules 30 April 2014 Notice This document reflects the work done by ENTSO-E in line with ACER s framework

More information

Unit Auxiliary Transformer Overcurrent Relay Loadability During a Transmission Depressed Voltage Condition

Unit Auxiliary Transformer Overcurrent Relay Loadability During a Transmission Depressed Voltage Condition Unit Auxiliary Transformer Overcurrent Relay Loadability During a Transmission Depressed Voltage Condition NERC System Protection and Control Subcommittee March 2016 NERC Report Title Report Date I Table

More information

PRC Disturbance Monitoring and Reporting Requirements

PRC Disturbance Monitoring and Reporting Requirements Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

Transmission System Phase Backup Protection

Transmission System Phase Backup Protection Reliability Guideline Transmission System Phase Backup Protection NERC System Protection and Control Subcommittee Draft for Planning Committee Approval June 2011 Table of Contents 1. Introduction and Need

More information

NERC Protection Coordination Webinar Series June 9, Phil Tatro Jon Gardell

NERC Protection Coordination Webinar Series June 9, Phil Tatro Jon Gardell Power Plant and Transmission System Protection Coordination GSU Phase Overcurrent (51T), GSU Ground Overcurrent (51TG), and Breaker Failure (50BF) Protection NERC Protection Coordination Webinar Series

More information

OPERATING, METERING, AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 2,000 KILOWATTS

OPERATING, METERING, AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 2,000 KILOWATTS OPERATING, METERING, AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 2,000 KILOWATTS CONNECTED TO THE DISTRIBUTION SYSTEM ORANGE AND ROCKLAND

More information

ADVANCED VECTOR SHIFT ALGORITHM FOR ISLANDING DETECTION

ADVANCED VECTOR SHIFT ALGORITHM FOR ISLANDING DETECTION 23 rd International Conference on Electricity Distribution Lyon, 5-8 June 25 Paper 48 ADVANCED VECT SHIFT ALGITHM F ISLANDING DETECTION Murali KANDAKATLA Hannu LAAKSONEN Sudheer BONELA ABB GISL India ABB

More information

OPERATING, METERING AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 25,000 KILOWATTS

OPERATING, METERING AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 25,000 KILOWATTS OPERATING, METERING AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 25,000 KILOWATTS AND MEDIUM-SIZE FACILITIES (5,000-25,000KW) CONNECTED

More information

COMPARATIVE STUDY OF TAP CHANGER CONTROL ALGORITHMS FOR DISTRIBUTION NETWORKS WITH HIGH PENETRATION OF RENEWABLES

COMPARATIVE STUDY OF TAP CHANGER CONTROL ALGORITHMS FOR DISTRIBUTION NETWORKS WITH HIGH PENETRATION OF RENEWABLES COMPARATIVE STUDY OF TAP CHANGER CONTROL ALGORITHMS FOR DISTRIBUTION NETWORKS WITH HIGH PENETRATION OF RENEWABLES Marianne HARTUNG Eva-Maria BAERTHLEIN Ara PANOSYAN GE Global Research Germany GE Global

More information

NERC Requirements for Setting Load-Dependent Power Plant Protection: PRC-025-1

NERC Requirements for Setting Load-Dependent Power Plant Protection: PRC-025-1 NERC Requirements for Setting Load-Dependent Power Plant Protection: PRC-025-1 Charles J. Mozina, Consultant Beckwith Electric Co., Inc. www.beckwithelectric.com I. Introduction During the 2003 blackout,

More information

Fault Induced Delayed Voltage Recovery (FIDVR) Advisory

Fault Induced Delayed Voltage Recovery (FIDVR) Advisory Fault Induced Delayed Voltage Recovery (FIDVR) Advisory NERC Synchronized Measurement Subcommittee (SMS) NASPI Engineering Analysis Task Team (EATT) July 2015 Why the Advisory? The goal of this advisory

More information

IEEE sion/1547revision_index.html

IEEE sion/1547revision_index.html IEEE 1547 IEEE 1547: Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces http://grouper.ieee.org/groups/scc21/1547_revi sion/1547revision_index.html

More information

ITC Holdings Planning Criteria Below 100 kv. Category: Planning. Eff. Date/Rev. # 12/09/

ITC Holdings Planning Criteria Below 100 kv. Category: Planning. Eff. Date/Rev. # 12/09/ ITC Holdings Planning Criteria Below 100 kv * Category: Planning Type: Policy Eff. Date/Rev. # 12/09/2015 000 Contents 1. Goal... 2 2. Steady State Voltage & Thermal Loading Criteria... 2 2.1. System Loading...

More information

Considerations for Power Plant and Transmission System Protection Coordination

Considerations for Power Plant and Transmission System Protection Coordination Considerations for Power Plant and Transmission System Protection Coordination Technical Reference Document Revision 2 System Protection and Control Subcommittee July 2015 I Table of Contents Preface...

More information

Loss of Mains Protection

Loss of Mains Protection Loss of Mains Protection Summary All generators that are connected to or are capable of being connected to the Distribution Network are required to implement Loss of Mains protection. This applies to all

More information

Fuel cell power system connection. Dynamics and Control of Distributed Power Systems. DC storage. DC/DC boost converter (1)

Fuel cell power system connection. Dynamics and Control of Distributed Power Systems. DC storage. DC/DC boost converter (1) Dynamics and Control of Distributed Power Systems Fuel cell power system connection Ian A. Hiskens University of Wisconsin-Madison ACC Workshop June 12, 2006 This topology is fairly standard, though there

More information

Setting and Verification of Generation Protection to Meet NERC Reliability Standards

Setting and Verification of Generation Protection to Meet NERC Reliability Standards 1 Setting and Verification of Generation Protection to Meet NERC Reliability Standards Xiangmin Gao, Tom Ernst Douglas Rust, GE Energy Connections Dandsco LLC. Abstract NERC has recently published several

More information

ESB National Grid Transmission Planning Criteria

ESB National Grid Transmission Planning Criteria ESB National Grid Transmission Planning Criteria 1 General Principles 1.1 Objective The specific function of transmission planning is to ensure the co-ordinated development of a reliable, efficient, and

More information

TECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR INTERCONNECTION OF GENERATION FACILITIES NOT SUBJECT TO FERC JURISDICTION

TECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR INTERCONNECTION OF GENERATION FACILITIES NOT SUBJECT TO FERC JURISDICTION TECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR INTERCONNECTION OF GENERATION FACILITIES NOT SUBJECT TO FERC JURISDICTION Document 9022 Puget Sound Energy, Inc. PSE-TC-160.70 December

More information

1,200 MW Fault Induced Solar Photovoltaic Resource Interruption Disturbance Report

1,200 MW Fault Induced Solar Photovoltaic Resource Interruption Disturbance Report 1,200 MW Fault Induced Solar Photovoltaic Resource Interruption Disturbance Report Southern California 8/16/2016 Event June 2017 NERC Report Title Report Date I Version 1.0 June 8, 2017 Version 1.1 June

More information

Testing Advanced Photovoltaic Inverters Conforming to IEEE Standard 1547 Amendment 1

Testing Advanced Photovoltaic Inverters Conforming to IEEE Standard 1547 Amendment 1 > REPLACE THIS LINE WITH YOUR PAPER IDENTIFICATION NUMBER (DOUBLE-CLICK HERE TO EDIT) < Testing Advanced Photovoltaic Inverters Conforming to IEEE Standard 547 Amendment Anderson Hoke, Student Member,

More information

Geoff Brown & Associates Ltd

Geoff Brown & Associates Ltd Geoff Brown & Associates Ltd REVIEW OF WESTERN POWER S APPLICATION FOR A TECHNICAL RULES EXEMPTION FOR NEWMONT MINING SERVICES Prepared for ECONOMIC REGULATION AUTHORITY Final 20 August 2015 Report prepared

More information

September 19, Errata to Implementation Plan for the Revised Definition of Remedial Action Scheme

September 19, Errata to Implementation Plan for the Revised Definition of Remedial Action Scheme !! September 19, 2017 VIA ELECTRONIC FILING Veronique Dubois Régie de l'énergie Tour de la Bourse 800, Place Victoria Bureau 255 Montréal, Québec H4Z 1A2 RE: Errata to for the Revised Definition of Remedial

More information

Wind Power Plants and future Power System Frequency Stability

Wind Power Plants and future Power System Frequency Stability Wind Power Plants and future Power System Frequency Stability Peter W. Christensen Vestas Technology R&D, Denmark Event on Future Power System Operation Lund University, Sweden, June 12, 2012 1 Agenda

More information

TECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR SMALL GENERATION INTERCONNECTIONS

TECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR SMALL GENERATION INTERCONNECTIONS TECHNICAL SPECIFICATIONS AND OPERATING PROTOCOLS AND PROCEDURES FOR SMALL GENERATION INTERCONNECTIONS Puget Sound Energy, Inc. PSE-ET-160.60 October 30, 2007 TABLE OF CONTENTS 1. INTRODUCTION...1 1.1 GENERAL

More information

SYNCHRONISING AND VOLTAGE SELECTION

SYNCHRONISING AND VOLTAGE SELECTION SYNCHRONISING AND VOLTAGE SELECTION This document is for Relevant Electrical Standards document only. Disclaimer NGG and NGET or their agents, servants or contractors do not accept any liability for any

More information

Ameren Illinois Company d/b/a Ameren Illinois Smart Inverter Specifications

Ameren Illinois Company d/b/a Ameren Illinois Smart Inverter Specifications 1. SCOPE OF WORK 1.1 Purpose This document is formulated to provide guidance to SMART inverter installers in Illinois. The document provides the minimum specification for inverters that interconnect with

More information

Power Plant and Transmission System Protection Coordination

Power Plant and Transmission System Protection Coordination Agenda Item 5.h Attachment 1 A Technical Reference Document Power Plant and Transmission System Protection Coordination Draft 6.9 November 19, 2009 NERC System Protection and Control Subcommittee November

More information

Numbering System for Protective Devices, Control and Indication Devices for Power Systems

Numbering System for Protective Devices, Control and Indication Devices for Power Systems Appendix C Numbering System for Protective Devices, Control and Indication Devices for Power Systems C.1 APPLICATION OF PROTECTIVE RELAYS, CONTROL AND ALARM DEVICES FOR POWER SYSTEM CIRCUITS The requirements

More information