SITE INVESTIGATION SURVEY REPORT

Size: px
Start display at page:

Download "SITE INVESTIGATION SURVEY REPORT"

Transcription

1 Site ID SITE INVESTIGATION SURVEY REPORT New Site RF SURVEY REPORT PRELIMINARY CME SURVEY REPORT PRELIMINARY SITAC SURVEY REPORT PROJECT ID : SITE ID : BAU 185 SITE NAME : DMT_ Sapatimanjawari CANDIDATE / RANK : P / Rank 1 REGION SUBCONTRACTOR SURVEYOR PROJECT : JABODETABEK : MTP : ALBERT : SIS Microcell Jabodetabek PHASE : BATCH

2 Site ID SUMMARY OF SIS Nominal Site Information Site ID BAU185 Site Category GF DMT_SAPATIMANJAWARI Province SULAWESI TENGGARA Nominal Latitude Nominal Longitude 122,58447 Datum of GPS WGS 84 Searching Radius 100 Priority 1 Recommended Yes Tower Sharing Information Latitude Longitude Distance to Nom (m) 0 Site Owner Candidate RF Survey Latitude Longitude Distance to Nom (m) 36 Visit Date 2 April 2016 Ground Elevation / ASL (m) 38 Tower Height Plan 25 Sector Coverage Objective Ant Height Alignment Ant Type Sector A : Perumahan, Jalan, Pabrik, Kantor desa v03 Sector B : Perumahan, Jalan, Kafe Karaoke, v03 Sector C : Perumahan, Jalan, Pangkalan Pertamina, perumahan v03 Candidate Site Conditions Site Type (GF/RT) GF Site Area (m) 2 x 2 Site Access (m) Site Address Jl.Erlangga Rt.002/03 Kel.Katobengke Kec.Betoambari Kota Bau Bau Land Lord Name Ibu Emi Contact Person Buy/Lease Lease Land Lord Addess Jl. Raya Kembangan No.2 Jakarta Barat Blok B Lt.8 Land Status Hak Milik Phone Number Sitaq Comment and Owner only willing to Lease the Land, Cand Location in Area Issue Civil Work Comment PT Dayamitra Telekomunikasi SmallBridge 0 m, Access Road 4x3m, Site Area 2 x 2 m2, Total Area Sitaq 4 m2, No Need Retaining Wall, No Need Cut and Fill, No Need Import Soil, Proposed SST 20 m,, JTR 10 m Candidate Approval Lease Duration 10 Recommended (Yes/No) Staff Planning DMT Staff Regional DMT Manager Development Planning YES RAE TWM Project Marketing/CAM PT Telkomsel 2

3 Site ID Street Map / Site Location Sketch Cand P Cand Q Jl.Sapati Manjawati Nom 3

4 Site ID Candidate Distance from Nominal Bearing Candidate_P 32m 320 o Candidate_Q 85m 349 o 4

5 Site ID RF SURVEY REPORT Site Information Distance from Nominal : 36 m Bearing from Nominal : 45 Site Type : GF Reason : New Coverage Split Cell from : Sector: Repeater Coverage and Topography Sector Coverage Objective Topography Landscape Demography A Perumahan, Flat Flat Fair B Perumahan, Flat Flat Fair C Perumahan, Flat Flat Fair Sector Antenna Height Antenna Azimuth RF Information Antenna Tilting TRX Configuration Antenna Type A 20 m 50 E 0 / M v03 B 20 m 150 E 2 / M v03 C 20 m 210 E 2 / M v03 Coverage Obstacle Sector Obstacle Object Obstacle Height Latitude Longitude Photo Number A N/A N/A N/A N/A N/A B N/A N/A N/A N/A N/A C N/A N/A N/A N/A N/A 5

6 This image cannot currently be displayed. This image cannot currently be displayed. Site ID NOMINAL Surounding Eksisting This image cannot currently be displayed. Eksisting 1 ( m, ) This image cannot currently be displayed. Eksisting 1 ( m, ) 6

7 Site ID Panorama Nominal

8 Site ID

9 Site ID CANDIDATE hotos Main Entrance of BAU185P Site Access of BAU185P Front View of BAU185P Back View of BAU185P Front View of BAU185P Back View of BAU185P 9

10 Site ID Panorama Candidat 45 Panoramic 0 of BAU185P Panoramic 45 of BAU185P Panoramic 90 of BAU185P Panoramic 135 of BAU185P Panoramic 180 of BAU185P Panoramic 225 of BAU185P 10

11 Site ID Panoramic 270 of BAU185P Panoramic 315 of BAU185P Pole 3 Phase of BAU185P Trafo of BAU185P GPS Photo 11

12 Site ID General Site Condition PRELIMINARY CME AND SITAC SURVEY REPORT Building Name N/A Owner Name Ibu Emi Street Address Jl.Erlangga Rt.002/03 Kel.Katobengke Kec.Betoambari Kota Bau Bau Telephone Mobile Phone Contact Person Name Ibu Emi Contact Person Address Jl.Erlangga Rt.002/03 Kel.Katobengke Kec.Betoambari Kota Bau Bau Telephone Mobile Phone Access Hour N/A Work Hour N/A Ground Elevation / ASL (m) 38 Tower Height Planning / AGL (m) 25 Antenna Height Planning / AGL (m) Site Type Green Field Rooftop Building Height / AGL (m) Land Condition Very Good Good OK Bad Very Bad Type of Soil Rocky Hard Other : Roof Condition Very Good Good OK Bad Very Bad 20/20/20 Access Road Condition Very Good Good OK Bad Very Bad Can Heavy Truck Access the Location Yes No Access Road : 4 m Electric PT PLN SWASTA Other : Supplier Acquisition and Permit Information Land/Rooftop Area Length x Width 2 x 2 m 2 Area 4 m 2 Acquisition Type Land Ownership Documents Lease 10 Years (Min) Buy Girik / Persil No Sertifikat No SPPT / PBB No AkteJual Beli No Lain Lain Can Be Extended Yes No Is the site located within 15 km from the Airport: Yes No, if yes km Permits Required Permit Possibilities RT/RW Tata Kota (RUTR) IMB Kelurahan Bapeda Community Kecamatan Hub Tel Socialisation IjinDephub/Bandara IjinWarga IjinPrinsip Ijin HO IjinLokasi Lain lain : Government Permits OK NOT OK Community Permits OK NOT OK 12

13 Site ID Preliminary Sitac Photo Pemkot (Owner) BAU185SAPATIMANJAWARI CandP KTP (Owner) BAU185SAPATIMANJAWARI CandP Legal Document BAU185SAPATIMANJAWARI CandP Sertificate BAU185SAPATIMANJAWARI CandP 13

14 Site ID Civil Work Survey Proposed location of shelter, tower 14

15 Site ID Site Contour Cross section is produced at minimum10m outside the site candidate that will be purchased or rented. If the elevation differs more than 3m within the 10m distance, it must be view in a cross section sketch. No need if less than 10 degrees 15

16 Site ID Horizontal Cross Section 16

17 Site ID Horizontal Cross Section 17

18 Site ID TRANSMISSION Site ID BAU185 Fiber Optic Data Coordinate Cand Coordinat RK Cand RK NAME Latitude Longitude Long Lat P no name Jarak 33 MAP LOKASI RK 18

19 Site ID Travo FOTO Situation RK/ODP/OTB GPS Travo 19

20 Site ID PLAN FIBER OPTIC = Jatayu Jelambar Baru = No name = BTS ROOM / STO PLUIT Nama site RK name Nama STO 194m 2385m 20

21 Site ID BAU185 Latitude Candidate Q DMT_SAPATIMANJAWARI Longitude SITE INVESTIGATION SURVEY REPORT New Site RF SURVEY REPORT PRELIMINARY CME SURVEY REPORT PRELIMINARY SITAC SURVEY REPORT PROJECT ID : SITE ID : BAU 185 SITE NAME : DMT_ Sapatimanjawari CANDIDATE / RANK : Q / Rank 2 REGION SUBCONTRACTOR SURVEYOR PROJECT : JABODETABEK : MTP : ALBERT : SIS Microcell Jabodetabek PHASE : BATCH

22 Site ID BAU185 Latitude Candidate Q DMT_SAPATIMANJAWARI Longitude SUMMARY OF SIS Nominal Site Information Site ID BAU185 Site Category GF DMT_SAPATIMANJAWARI Province SULAWESI TENGGARA Nominal Latitude Nominal Longitude Datum of GPS WGS 84 Searching Radius 100 Candidate Q Priority 2 Recommended Yes Tower Sharing Information Latitude Longitude Distance to Nom (m) 0 Site Owner Candidate RF Survey Latitude Longitude Distance to Nom (m) 12 Visit Date 2 April 2016 Ground Elevation / ASL (m) 39 Tower Height Plan 25 Sector Coverage Objective Ant Height Alignment Ant Type Sector A : Perumahan, Jalan, Pabrik v03 Sector B : Perumahan, Jalan, Kafe Karaoke,Kantor Kecamatan v03 Sector C : Perumahan, Jalan, Pangkalan Pertamina, perumahan v03 Candidate Site Conditions Site Type (GF/RT) GF Site Area (m) 2 x 2 Site Access (m) 4 x 3 Site Address Jl.Perintis No.8 Rt.001/002 Kel.Katobengke Kec.Betoambari Kota Bau Bau Land Lord Name Bpk.LA ODE ABDUL FALAQ Contact Person Buy/Lease Lease Land Lord Addess Jl.Perintis No.8 Rt.001/002 Kel.Katobengke Kec.Betoambari Kota Bau Bau Land Status Hak Milik Phone Number Sitaq Comment and Owner only willing to Lease the Land, Cand Location in Area Issue Civil Work Comment PT Dayamitra Telekomunikasi SmallBridge 0 m, Access Road 4x3m, Site Area 2 x 2 m2, Total Area Sitaq 4 m2, No Need Retaining Wall, No Need Cut and Fill, No Need Import Soil, Proposed SST 20 m,, JTR 10 m, Distance From Nearest Travo 400 m Candidate Approval Lease Duration 10 Recommended (Yes/No) Staff Planning DMT Staff Regional DMT Manager Development Planning YES RAE TWM Project Marketing/CAM PT Telkomsel 2

23 Site ID BAU185 Latitude Candidate Q DMT_SAPATIMANJAWARI Longitude Street Map / Site Location Sketch Candidate Distance from Nominal Bearing Candidate_P 32m 320 o Candidate_Q 85m 349 o 3

24 Site ID BAU185 Latitude Candidate Q DMT_SAPATIMANJAWARI Longitude RF SURVEY REPORT Site Information Distance from Nominal : 12 m Bearing from Nominal : 270 Site Type : GF Reason : New Coverage Split Cell from : Sector: Repeater Coverage and Topography Sector Coverage Objective Topography Landscape Demography A Perumahan, Flat Flat Fair B Perumahan, Flat Flat Fair C Perumahan, Flat Flat Fair Sector Antenna Height Antenna Azimuth RF Information Antenna Tilting TRX Configuration Antenna Type A 20 m 50 E 0 / M v03 B 20 m 150 E 0 / M v03 C 20 m 210 E 0 / M v03 Coverage Obstacle Sector Obstacle Object Obstacle Height Latitude Longitude Photo Number A N/A N/A N/A N/A N/A B N/A N/A N/A N/A N/A C N/A N/A N/A N/A N/A 4

25 This image cannot currently be displayed. This image cannot currently be displayed. Site ID BAU185 Latitude Candidate Q DMT_SAPATIMANJAWARI Longitude Surounding Eksisting NOMINAL This image cannot currently be displayed. Eksisting 1 ( m, ) This image cannot currently be displayed. Eksisting 1 ( m, ) 5

26 Site ID BAU185 Latitude Candidate Q DMT_SAPATIMANJAWARI Longitude Panorama Nominal

27 Site ID BAU185 Latitude Candidate Q DMT_SAPATIMANJAWARI Longitude

28 Site ID BAU185 Latitude Candidate Q DMT_SAPATIMANJAWARI Longitude hotos CANDIDATE Main Entrance of BAU185Q Site Access of BAU185Q Front View of BAU185Q Back View of BAU185Q Front View of BAU185Q Back View of BAU185Q 8

29 Site ID BAU185 Latitude Candidate Q DMT_SAPATIMANJAWARI Longitude Panorama Candidat 45 Panoramic 0 of BAU185Q Panoramic 45 of BAU185Q Panoramic 90 of BAU185Q Panoramic 135 of BAU185Q Panoramic 180 of BAU185Q Panoramic 225 of BAU185Q 9

30 Site ID BAU185 Latitude Candidate Q DMT_SAPATIMANJAWARI Longitude Panoramic 270 of BAU185Q Panoramic 315 of BAU185Q Pole 3 Phase of BAU185Q Trafo of BAU185Q GPS Photo 10

31 Site ID BAU185 Latitude Candidate Q DMT_SAPATIMANJAWARI Longitude PRELIMINARY CME AND SITAC SURVEY REPORT General Site Condition Building Name N/A Owner Name Bpk.LA ODE ABDUL FALAQ Street Address Jl.Perintis No.8 Rt.001/002 Kel.Katobengke Kec.Betoambari Kota Telephone Bau Bau Mobile Phone Contact Person Name Bpk.LA ODE ABDUL FALAQ Contact Person Address Jl.Perintis No.8 Rt.001/002 Kel.Katobengke Kec.Betoambari Kota Bau Bau Telephone Mobile Phone Access Hour N/A Work Hour N/A Ground Elevation / ASL (m) 39 Tower Height Planning / AGL (m) 25 Antenna Height Planning / AGL (m) Site Type Green Field Rooftop Building Height / AGL (m) Land Condition Very Good Good OK Bad Very Bad Type of Soil Rocky Hard Other : Roof Condition Very Good Good OK Bad Very Bad 20/20/20 Access Road Condition Very Good Good OK Bad Very Bad Can Heavy Truck Access the Location Yes No Access Road : 4 m Electric PT PLN SWASTA Other : Supplier Acquisition and Permit Information Land/Rooftop Area Length x Width 2 x 2 m 2 Area 4 m 2 Acquisition Type Land Ownership Documents Lease 10 Years (Min) Buy Girik / Persil No Sertifikat No SPPT / PBB No AkteJual Beli No Lain Lain Can Be Extended Yes No Is the site located within 15 km from the Airport: Yes No, if yes km Permits Required Permit Possibilities RT/RW Tata Kota (RUTR) IMB Kelurahan Bapeda Community Kecamatan Hub Tel Socialisation IjinDephub/Bandara IjinWarga IjinPrinsip Ijin HO IjinLokasi Lain lain : Government Permits OK NOT OK Community Permits OK NOT OK 11

32 Site ID BAU185 Latitude Candidate Q DMT_SAPATIMANJAWARI Longitude Preliminary Sitac Photo Pemkot (Owner) BAU185SAPATIMANJAWARI CandQ KTP (Owner) BAU185SAPATIMANJAWARI CandQ Legal Document BAU185SAPATIMANJAWARI CandQ Sertificate BAU185SAPATIMANJAWARI CandQ 12

33 Site ID BAU185 Latitude Candidate Q DMT_SAPATIMANJAWARI Longitude Civil Work Survey Proposed location of shelter, tower 13

34 Site ID BAU185 Latitude Candidate Q DMT_SAPATIMANJAWARI Longitude Site Contour Cross section is produced at minimum10m outside the site candidate that will be purchased or rented. If the elevation differs more than 3m within the 10m distance, it must be view in a cross section sketch. No need if less than 10 degrees 14

35 Site ID BAU185 Latitude Candidate Q DMT_SAPATIMANJAWARI Longitude Horizontal Cross Section 15

36 Site ID BAU185 Latitude Candidate Q DMT_SAPATIMANJAWARI Longitude Horizontal Cross Section 16

37 Site ID BAU185 Latitude Candidate Q DMT_SAPATIMANJAWARI Longitude TRANSMISSION Site ID BAU185 Fiber Optic Data Coordinate Cand Coordinat RK Cand RK NAME Latitude Longitude Long Lat Q no name Jarak 400 MAP LOKASI RK 17

38 Site ID BAU185 Latitude Candidate Q DMT_SAPATIMANJAWARI Longitude Travo FOTO Situation RK/ODP/OTB GPS Travo 18

39 Site ID BAU185 Latitude Candidate Q DMT_SAPATIMANJAWARI Longitude PLAN FIBER OPTIC = Jatayu Jelambar Baru = No name = BTS ROOM / STO PLUIT Nama site RK name Nama STO 194m 2385m 19

SITE INVESTIGATION SURVEY REPORT

SITE INVESTIGATION SURVEY REPORT Latitude 5.46202 Candidate P Site Name DMT_Pasarnugraha Longitude 122.60767 SITE INVESTIGATION SURVEY REPORT New Site RF SURVEY REPORT PRELIMINARY CME SURVEY REPORT PRELIMINARY SITAC SURVEY REPORT PROJECT

More information

SITE INVESTIGATION SURVEY REPORT

SITE INVESTIGATION SURVEY REPORT SITE INVESTIGATION SURVEY REPORT New Site RF SURVEY REPORT PRELIMINARY CME SURVEY REPORT PRELIMINARY SITAC SURVEY REPORT PROJECT ID SITE ID SITE NAME : 16TS03Z0424 : KTG202 : DMT Lolak Bolmon CANDIDATE

More information

SITE INVESTIGATION SURVEY REPORT

SITE INVESTIGATION SURVEY REPORT SITE INVESTIGATION SURVEY REPORT New Site and Repeater RF SURVEY REPORT TRM SURVEY REPORT PRELIMINARY CME SURVEY REPORT PRELIMINARY SITAC SURVEY REPORT SITE ID SITE NAME CANDIDATE / RANK REGION SUBCONTRACTOR

More information

SITE INVESTIGATION SURVEY REPORT

SITE INVESTIGATION SURVEY REPORT SITE INVESTIGATION SURVEY REPORT New Site RF SURVEY REPORT TRM SURVEY REPORT PRELIMINARY CME SURVEY REPORT PRELIMINARY SITAC SURVEY REPORT SITE ID SITE NAME : MTW084 : MELAYU MTEWEH CANDIDATE / RANK :

More information

SITE INVESTIGATION SURVEY REPORT

SITE INVESTIGATION SURVEY REPORT SITE INVESTIGATION SURVEY REPORT New Site and Repeater RF SURVEY REPORT PRELIMINARY CME SURVEY REPORT PRELIMINARY SITAC SURVEY REPORT SITE ID SITE NAME : STG670 : Kauman Salatiga CANDIDATE / RANK : R /

More information

SITE INVESTIGATION SURVEY REPORT

SITE INVESTIGATION SURVEY REPORT Latitude S2.52707 Candidate P Site Name DMT MCP HOTEL NUMBAY Longitude E140.71841 SITE INVESTIGATION SURVEY REPORT New Site and Repeater RF SURVEY REPORT TRM SURVEY REPORT PRELIMINARY CME SURVEY REPORT

More information

LOSS SURVEY REPORT SITE NAME : DMT JALAN BIAK 2. CANDIDATE / RANK : Q / Rank 2 PROJECT : SIS MCP 2016 PHASE : BATCH New Site and Repeater

LOSS SURVEY REPORT SITE NAME : DMT JALAN BIAK 2. CANDIDATE / RANK : Q / Rank 2 PROJECT : SIS MCP 2016 PHASE : BATCH New Site and Repeater Site ID Site Name SMRXXX Latitude -0.46608 MT Temindung Permai Ex BMSEMPAJA2MW Longitude 117.17205 LOSS SURVEY REPORT New Site and Repeater TRM SURVEY REPORT SITE ID : MRK070 SITE NAME : DMT JALAN BIAK

More information

BR, Dear P. Bayu. Segera dieksekusi sesuai hasil validasi dr Telkomsel di bawah. Thank's. Sugeng Mu'ti

BR, Dear P. Bayu. Segera dieksekusi sesuai hasil validasi dr Telkomsel di bawah. Thank's. Sugeng Mu'ti From: Sugeng Mu'ti [mailto:sugeng@pt-sdm.co.id] Sent: 24 Nopember 2015 17:13 To: 'bayu putranro'; 'glenn pontoh' Cc: 'DMT Fatchur Rozi'; 'GNufus'; grouprojateng@mitratel.co.id Subject: FW: Validasi titik

More information

CHECK LIST ESR DOCUMENT

CHECK LIST ESR DOCUMENT CHECK LIST ESR DOCUMENT Site Name : HALIM GOLF Relocation Site ID : - Candidate : LAT : 6 16'38.3"S ; LONG : 106 53'23.5"E Proposed By : PT. XL AXIATA No DOCUMENT COMPLETENESS Remark OK NOK 1 Site Information

More information

Wind Power GeoPlanner. GPS Study

Wind Power GeoPlanner. GPS Study Prepared on Behalf of Eight Point Wind, LLC Table of Contents 1. Introduction - 1-2. Project Overview - 1-3. Line-of-Sight Analysis - 2-4. Impact Assessment - 5-5. Contact - 5 - Comsearch Proprietary -

More information

Suveying Lectures for CE 498

Suveying Lectures for CE 498 Suveying Lectures for CE 498 SURVEYING CLASSIFICATIONS Surveying work can be classified as follows: 1- Preliminary Surveying In this surveying the detailed data are collected by determining its locations

More information

SITE SURVEY REPORT. Contract number: Customer: Site Name: Site Location: (City, Country) Sub-contractor: Requested by TSS/Project Manager Date:

SITE SURVEY REPORT. Contract number: Customer: Site Name: Site Location: (City, Country) Sub-contractor: Requested by TSS/Project Manager Date: Contract number: Customer: Site Name: Site Location: (City, Country) SITE SURVEY REPORT Sub-contractor: Requested by TSS/Project Manager Date: Survey Date: Surveyor: Survey: CONTRACT NUMBER: SITE Survey

More information

Checklist for Tentative Subdivision Map

Checklist for Tentative Subdivision Map Checklist for Tentative Subdivision Map All submittal information shall be provided to the Community Development Department. All submittal information shall be presented along with the Uniform Application,

More information

BGRI Stem Rust Survey Protocol. Overview of Field Survey Procedure

BGRI Stem Rust Survey Protocol. Overview of Field Survey Procedure Overview of Field Survey Procedure 1. Ensure survey team have all items on check-list before departure 2. Travel to 1 st survey location 3. At survey location switch on GPS 4. Wait until GPS receives satellite

More information

BreezeACCESS VL. Beyond the Non Line of Sight

BreezeACCESS VL. Beyond the Non Line of Sight BreezeACCESS VL Beyond the Non Line of Sight July 2003 Introduction One of the key challenges of Access deployments is the coverage. Operators providing last mile Broadband Wireless Access (BWA) solution

More information

CALCULATING RADIOFREQUENCY FIELD STRENGTH SAFETY CODE 6 SITE VALIDATION

CALCULATING RADIOFREQUENCY FIELD STRENGTH SAFETY CODE 6 SITE VALIDATION CALCULATING RADIOFREQUENCY FIELD STRENGTH SAFETY CODE 6 SITE VALIDATION FOR SITE: W2352 Study conducted by: RF Designer: Henry Phan, P.Eng Henry Phan, P.Eng Report Date: August 19, 2013 Department: Radio

More information

CITY OF DES MOINES, IA PERMIT AND DEVELOPMENT CENTER 602 Robert D Ray Drive Des Moines, IA Phone:

CITY OF DES MOINES, IA PERMIT AND DEVELOPMENT CENTER 602 Robert D Ray Drive Des Moines, IA Phone: CITY OF DES MOINES, IA PERMIT AND DEVELOPMENT CENTER 602 Robert D Ray Drive Des Moines, IA 50311 Phone: 515-283-4200 Minor Site Plan list This checklist should be used as a guide in the preparation of

More information

NEW LEASE AMENDMENT TO EXISTING LEASE RECONTRACT BTS ANCHOR TENANT

NEW LEASE AMENDMENT TO EXISTING LEASE RECONTRACT BTS ANCHOR TENANT NEW LEASE AMENDMENT TO EISTING LEASE RECONTRACT BTS ANCHOR TENANT PLEASE RETURN THIS APPLICATION VIA EMAIL TO: Vertical Bridge 750 Park of Commerce Drive E-Mail: Suite 200 Boca Raton, FL 33487 Attn: Regional

More information

Network Design Considerations and Deployment Concerns for a Ground Aircraft Communication System

Network Design Considerations and Deployment Concerns for a Ground Aircraft Communication System Network Design Considerations and Deployment Concerns for a Ground Aircraft Communication System CelPlan Technologies Leonhard Korowajczuk CEO/CTO Leonhard @celplan.com 703-259-4022 www.celplan.com 9/10/2013

More information

Essential Skills: Reading and Interpreting Maps and Plans

Essential Skills: Reading and Interpreting Maps and Plans Essential Skills: Reading and Interpreting Maps and Plans Prepared for: NEW YORK STATE PLANNING FEDERATION April 14, 2015 Prepared by: BME ASSOCIATES Peter G. Vars, P.E. Stages of Plan Review Concept /

More information

City of Burbank. Planning and Transportation Division WIRELESS AND DISTRIBUTED ANTENNA SYSTEM ( DAS ) PROJECTS SUPPLEMENTAL APPLICATION FORM

City of Burbank. Planning and Transportation Division WIRELESS AND DISTRIBUTED ANTENNA SYSTEM ( DAS ) PROJECTS SUPPLEMENTAL APPLICATION FORM Planning and Transportation Division WIRELESS AND DISTRIBUTED ANTENNA SYSTEM ( DAS ) PROJECTS SUPPLEMENTAL APPLICATION FORM 150 North Third Street Burbank, California 91502 www.burbankusa.com T: 818-235-5250

More information

LAB PROCEDURES: TOPCON TOOLS FAMILIARIZATION

LAB PROCEDURES: TOPCON TOOLS FAMILIARIZATION LAB PROCEDURES: TOPCON TOOLS FAMILIARIZATION This lab will cover the basic setup and processing options of Topcon Tools (TT). We will learn how to start a project, upload data and control files, set up

More information

Radiocommunication Facility Review Protocol

Radiocommunication Facility Review Protocol Radiocommunication Facility Review Protocol 1.0 PURPOSE 1.1 The purpose of this protocol is to outline the guidelines and review process through which Radiocommunication Facilities are evaluated within

More information

DAS Solutions. Delivering coverage and capacity in today s challenging environments

DAS Solutions. Delivering coverage and capacity in today s challenging environments DAS Solutions Delivering coverage and capacity in today s challenging environments Wireless subscribers expect clear coverage Partner with an industry leader With a diverse offering of communications sites

More information

CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET

CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET THE FOLLOWING PACKET CONTAINS: PETITION FOR NONRESIDENTIAL DEVELOPMENT SITE PLAN AND COMMUNITY DESIGN REVIEW SCHEDULE OF DATES

More information

PRELIMINARY PLAT CHECK LIST

PRELIMINARY PLAT CHECK LIST Name of Proposed Subdivision: The following items must be included with the initial submittal of a Preliminary Plat: Application, filled out completely Project Narrative Pre-application Conference Report

More information

TDS Ranger Survey Pro CE Version RTK Base on known Control Point. RTK Rover - Localization with Control Points.

TDS Ranger Survey Pro CE Version RTK Base on known Control Point. RTK Rover - Localization with Control Points. TDS Ranger Survey Pro CE Version 2.1.8 RTK Base on known Control Point. RTK Rover - Localization with Control Points. Pre-load control Coordinates and appropriate NGS Geoid 99/96 data files into the Ranger

More information

City of Laguna Hills Application for a Conditional Use Permit Project Information and Justification

City of Laguna Hills Application for a Conditional Use Permit Project Information and Justification Authorized Agent for Verizon Wireless City of Laguna Hills Application for a Conditional Use Permit Project Information and Justification With current efforts underway to establish the required infrastructure

More information

MOBILE COMMUNICATIONS (650520) Part 3

MOBILE COMMUNICATIONS (650520) Part 3 Philadelphia University Faculty of Engineering Communication and Electronics Engineering MOBILE COMMUNICATIONS (650520) Part 3 Dr. Omar R Daoud 1 Trunking and Grade Services Trunking: A means for providing

More information

CHAPTER 11 SURVEY CADD

CHAPTER 11 SURVEY CADD CHAPTER 11 SURVEY CADD Chapter Contents Sec. 11.01 Sec. 11.02 Sec. 11.03 Sec. 11.04 Sec. 11.05 Sec. 11.06 Sec. 11.07 Sec. 11.08 Sec. 11.09 Sec. 11.10 General Description of Survey File Contents of Survey

More information

Checklist for Minor Plan Modification

Checklist for Minor Plan Modification Checklist for Minor Plan Modification All submittal information shall be provided to the Community Development Department. All submittal information shall be presented along with the Uniform Application,

More information

High Precision Positioning Unit 1: Accuracy, Precision, and Error Student Exercise

High Precision Positioning Unit 1: Accuracy, Precision, and Error Student Exercise High Precision Positioning Unit 1: Accuracy, Precision, and Error Student Exercise Ian Lauer and Ben Crosby (Idaho State University) This assignment follows the Unit 1 introductory presentation and lecture.

More information

M Y R E V E A L - C E L L U L A R

M Y R E V E A L - C E L L U L A R M Y R E V E A L - C E L L U L A R The hexagon cell shape If we have two BTSs with omniantennas and we require that the border between the coverage area of each BTS is the set of points where the signal

More information

AT&T MOBILITY 500 KAHELU AVENUE MILILANI, HI 96789

AT&T MOBILITY 500 KAHELU AVENUE MILILANI, HI 96789 PROJECT VICINITY & AREA MAPS ZONING DRAWINGS PROJECT CONTACTS & DRAWING INDEX MAUI COUNTY CODE, CHAPTER 6.6A ENERGY CODE To the best of my knowledge, this project's design substantially conforms to the

More information

ENGINEERING REPORT CONCERNING THE EFFECTS UPON FCC LICENSED RF FACILITIES DUE TO CONSTRUCTION OF THE (Name of Project) WIND PROJECT Near (City, State)

ENGINEERING REPORT CONCERNING THE EFFECTS UPON FCC LICENSED RF FACILITIES DUE TO CONSTRUCTION OF THE (Name of Project) WIND PROJECT Near (City, State) ENGINEERING REPORT CONCERNING THE EFFECTS UPON FCC LICENSED RF FACILITIES DUE TO CONSTRUCTION OF THE (Name of Project) WIND PROJECT Near (City, State) for (Name of Company) January 3, 2011 By: B. Benjamin

More information

Instructions to Candidates

Instructions to Candidates Gozo College Boys Secondary School Victoria - Gozo, Malta Half Yearly Examination 2012 2013 Form 2 Mathematics - Level 7-8 Non-Calculator Paper Time: 30 mins Name: Class: Question 1 2 3 4 5 6 7 8 Total

More information

Safety Code 6 Analysis Freedom Mobile 3G & LTE Network. Radio frequency exposure for uncontrolled and controlled environment.

Safety Code 6 Analysis Freedom Mobile 3G & LTE Network. Radio frequency exposure for uncontrolled and controlled environment. Safety Code 6 Analysis Freedom Mobile 3G & LTE Network Radio frequency exposure for uncontrolled and controlled environment Freedom Mobile 207 Queen's Quay West, Suite 710 Toronto, ON M5J 1A7 3655 Wesbrook

More information

LUCAS 2009 (Land Use / Cover Area Frame Survey)

LUCAS 2009 (Land Use / Cover Area Frame Survey) EUROPEAN COMMISSION EUROSTAT Directorate E: Agriculture and environment statistics; Statistical Cooperation Unit E-1: Farms, Agro-Environment and Rural development LUCAS 2009 (Land Use / Cover Area Frame

More information

Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project

Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project Bureau of Engineering SURVEY DIVISION REQUEST FOR TOPOGRAPHIC SURVEY Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project Caltrans involvement (must

More information

EENG473 Mobile Communications Module 2 : Week # (8) The Cellular Concept System Design Fundamentals

EENG473 Mobile Communications Module 2 : Week # (8) The Cellular Concept System Design Fundamentals EENG473 Mobile Communications Module 2 : Week # (8) The Cellular Concept System Design Fundamentals Improving Capacity in Cellular Systems Cellular design techniques are needed to provide more channels

More information

Downtilt: How to set it

Downtilt: How to set it : How to set it 2017 KP Performance Antennas, Inc. All Rights Reserved. Page 1 As operators expand their fixed-wireless networks from a single to multiple base stations, mitigating interference between

More information

Legal Description & Site Plan Requirements and Layouts

Legal Description & Site Plan Requirements and Layouts Legal Description & Site Plan Requirements and Layouts Plot Plan * A plot plan shows the location of a house from an aerial view. * The site plan, also known as a plot or lot plan includes: 1. Site plan

More information

Maxis Project GABS SITE SURVEY REPORT

Maxis Project GABS SITE SURVEY REPORT Date: 17012013 Rev. B Maxis Project GABS SITE SURVEY REPORT SITE LRD : IMSIM1 SUB REGION : SARAWAK Site Owner: Site Address: SACOFA Pujut, 98000 Miri, Sarawak Lat (N-WGS 84-Decimal): 4.430350 Long (E-WGS

More information

SITE PLAN REVIEW GUIDELINES Rev. 2016

SITE PLAN REVIEW GUIDELINES Rev. 2016 SITE PLAN REVIEW GUIDELINES Rev. 2016 The Site Plan Review process mandates that all information required in the Zoning Resolution and on the checklist be submitted and/or indicated on the site plan before

More information

Cellular Wireless Networks and GSM Architecture. S.M. Riazul Islam, PhD

Cellular Wireless Networks and GSM Architecture. S.M. Riazul Islam, PhD Cellular Wireless Networks and GSM Architecture S.M. Riazul Islam, PhD Desirable Features More Capacity Less Power Larger Coverage Cellular Network Organization Multiple low power transmitters 100w or

More information

S320 and SurvCE RTK Base Unknown Location

S320 and SurvCE RTK Base Unknown Location S320 and SurvCE RTK Base Unknown Location Part Number 874-0303-000 Released April 17, 2012 Overview This document describes how to configure the S320 RTK base using SurvCE at an unknown location, perform

More information

Black Marlin radar systems may be purchased with a flat-top radome for mounting cameras on

Black Marlin radar systems may be purchased with a flat-top radome for mounting cameras on SPECIFICATIONS The Black Marlin is DMT s midrange security radar system. It may be used to search and track threats from land and sea. This radar is an X- Band, pulsed- Doppler system that operates in

More information

AIMS Radar Specifications

AIMS Radar Specifications Transmitted Frequency: Peak Radiated Power: Average Power: Antenna Beamwidth: 9.23 GHz 1 Watt (Optional 2 to 80 Watts) 6.25 microwatts up to 0.4 watts; < 1 milliwatt for most applications Fast-Scan (rotating):

More information

Chapter 3 Ahmad Bilal ahmadbilal.webs.com

Chapter 3 Ahmad Bilal ahmadbilal.webs.com Chapter 3 A Quick Recap We learned about cell and reuse factor. We looked at traffic capacity We looked at different Earling Formulas We looked at channel strategies We had a look at Handoff Interference

More information

Remote RF is Becoming a Mainstream Solution

Remote RF is Becoming a Mainstream Solution Remote RF is Becoming a Mainstream Solution Cedric Taylor Celerica 55 Madison Avenue Morristown, NJ 07960 www.celerica.com Abstract This paper examines the technologies and applications associated with

More information

Rezoning/OCP Amendment Application. Current OCP Designation. Proposed OCP Designation

Rezoning/OCP Amendment Application. Current OCP Designation. Proposed OCP Designation Development Permit Application Rezoning/OCP Amendment Application Zoning DP Area yes no Variances Requested Development Details Property Size (m² or ha) Current Zoning Current OCP Designation Proposed

More information

OKLAHOMA CORPORATION COMMISSION OIL & GAS CONSERVATION DIVISION P.O. BOX OKLAHOMA CITY, OK (Rule 165:10-3-1) PERMIT TO DRILL

OKLAHOMA CORPORATION COMMISSION OIL & GAS CONSERVATION DIVISION P.O. BOX OKLAHOMA CITY, OK (Rule 165:10-3-1) PERMIT TO DRILL API NUMBER: 043 Horizontal Hole 23525 Oil & Gas OKLAHOMA CORPORATION COMMISSION OIL & GAS CONSERVATION DIVISION P.O. BOX 52000 OKLAHOMA CITY, OK 73152-2000 (Rule 165:10-3-1) Approval Date: 06/26/2017 Expiration

More information

APPLICATION FOR SITE PLAN REVIEW

APPLICATION FOR SITE PLAN REVIEW APPLICATION FOR SITE PLAN REVIEW ONLY COMPLETE SUBMISSIONS WILL BE PROCESSED CITY OF PORT ST. LUCIE P&Z File No. PLANNING & ZONING DEPARTMENT Fees (Nonrefundable) $ Arch.: $ (772) 871-5212 FAX: (772) 871-5124

More information

Real Time Kinematic VALUE GUIDE (US, Canada, Australia & New Zealand) CLICK THE ARROW TO GET STARTED

Real Time Kinematic VALUE GUIDE (US, Canada, Australia & New Zealand) CLICK THE ARROW TO GET STARTED Real Time Kinematic VALUE GUIDE (US, Canada, Australia & New Zealand) Copyright 2014 Deere & Company This material is the property of Deere & Company. All use, disclosure, and/or reproduction not specifically

More information

Assignment no.(s): To be used when applying for amateur station apparatus assignment(s) except for amateur repeater station

Assignment no.(s): To be used when applying for amateur station apparatus assignment(s) except for amateur repeater station Suruhanjaya Komunikasi dan Multimedia Malaysia Malaysian Communications and Multimedia Commission MCMC Tower 1, Jalan Impact, Cyber 6 63000 Cyberjaya, Selangor Darul Ehsan Tel: 6 03-86888000 Fax: 6 03-86881000

More information

SUBDIVISION PLAT APPLICATION

SUBDIVISION PLAT APPLICATION SUBDIVISION PLAT APPLICATION ONLY COMPLETE SUBMISSIONS WILL BE PROCESSED CITY OF PORT ST. LUCIE P&Z File No. PLANNING & ZONING DEPARTMENT Fee (Nonrefundable)$ (772)871-5212 FAX: (772)871-5124 Receipt #.......................................

More information

Deploying the Promise of NLOS WiMAX. Les Sparrey Director of NA Sales

Deploying the Promise of NLOS WiMAX. Les Sparrey Director of NA Sales Deploying the Promise of NLOS WiMAX Les Sparrey Director of NA Sales WiMAX Coverage, Capacity & Affordability Superior Range More Throughput Much Lower Cost 2 Product Introduction About develops high performance,

More information

Community & Economic Development Department Planning Division Frederick Street PO Box 8805 Moreno Valley, CA SUBMITAL REQUIREMENTS

Community & Economic Development Department Planning Division Frederick Street PO Box 8805 Moreno Valley, CA SUBMITAL REQUIREMENTS Community & Economic Development Department Planning Division 14177 Frederick Street PO Box 8805 Moreno Valley, CA 92552-0805 (951) 413-3206 Fax (951) 413-3210 SECOND UNITS Completed and Signed Project

More information

SPO MORAN 4620 S GLENROSE ROAD SPOKANE, WA 99223

SPO MORAN 4620 S GLENROSE ROAD SPOKANE, WA 99223 0 S GLENROSE ROAD CONTACT LIST APPLICANT: VERIZON WIRELESS 8TH AVENUE SE, MS BELLEVUE, WA 8008 ARCHITECT: LDC, INC. 0 NE 00TH ST, SUITE 00 WOODINVILLE, WA 80 CONTACT: RICHARD B. HALL, AIA PHONE: () 80-8

More information

UNIK4230: Mobile Communications Spring Per Hjalmar Lehne Tel:

UNIK4230: Mobile Communications Spring Per Hjalmar Lehne Tel: UNIK4230: Mobile Communications Spring 2015 Per Hjalmar Lehne per-hjalmar.lehne@telenor.com Tel: 916 94 909 Cells and Cellular Traffic (Chapter 4) Date: 12 March 2015 Agenda Introduction Hexagonal Cell

More information

TDS Survey Pro CE Version Setup RTK Base on known NAD83/WGS84 Point: Mapping Plane Geoid99 Modeling.

TDS Survey Pro CE Version Setup RTK Base on known NAD83/WGS84 Point: Mapping Plane Geoid99 Modeling. TDS Survey Pro CE Version 2.1.8 Setup RTK Base on known NAD83/WGS84 Point: Mapping Plane Geoid99 Modeling. Pre-load known NAD83 State Plane Coordinates and appropriate NGS Geoid 99/96 data files into the

More information

Beach monitoring with GPS William F Price Department of Civil Engineering, University of Brighton, BRIGHTON, BN1 4GJ, UK

Beach monitoring with GPS William F Price Department of Civil Engineering, University of Brighton, BRIGHTON, BN1 4GJ, UK Beach monitoring with GPS William F Price Department of Civil Engineering, University of Brighton, BRIGHTON, BN1 4GJ, UK Abstract In common with many other countries that have an extended coastline, sea

More information

Lecture # 7 Coordinate systems and georeferencing

Lecture # 7 Coordinate systems and georeferencing Lecture # 7 Coordinate systems and georeferencing Coordinate Systems Coordinate reference on a plane Coordinate reference on a sphere Coordinate reference on a plane Coordinates are a convenient way of

More information

DEVELOPMENT PLAN CHECKLIST

DEVELOPMENT PLAN CHECKLIST Project Identification Information: DEVELOPMENT PLAN CHECKLIST 1.0 GENERAL 1.1 Additional information as required by specific Land Use 1.2 All sheets to include sheet number ( of ) 1.3 Seal and signature

More information

Appendix B. Airport Master Plan Update William R. Fairchild International Airport Port Angeles, Washington AIRPORT LAYOUT PLAN CHECKLIST

Appendix B. Airport Master Plan Update William R. Fairchild International Airport Port Angeles, Washington AIRPORT LAYOUT PLAN CHECKLIST APPENDICES Appendix B AIRPORT LAYOUT PLAN CHECKLIST 3 Airport Master Plan Update William R. Fairchild International Airport Port Angeles, Washington September 2011 AC 150/5070-6B (incl. Chg. 1, 5/1/07)

More information

GPS for Snowmobilers. By Wayne Fischer. November 14, 2006

GPS for Snowmobilers. By Wayne Fischer. November 14, 2006 GPS for Snowmobilers By Wayne Fischer November 14, 2006 Wayne@TahoeSnowmobiling.org Copy of White Paper & Presentation Both this presentation and the white paper are available on the www.tahoesnowmobiling.org

More information

DEVELOPMENT SERVICES SITE PLAN SUBMITTAL 2.2.3

DEVELOPMENT SERVICES SITE PLAN SUBMITTAL 2.2.3 DEVELOPMENT SERVICES SITE PLAN SUBMITTAL 2.2.3 Unified Development Code (UDC) Article 2, Applications, Procedures and Criteria provides the steps for applying the Unified Development Code standards to

More information

PLAN SUBMITTAL REQUIREMENTS

PLAN SUBMITTAL REQUIREMENTS DEPARTMENT OF ECONOMIC AND COMMUNITY DEVELOPMENT BUILDING DIVISION PLAN SUBMITTAL REQUIREMENTS Residential and Commercial Projects Welcome to the South San Francisco Building Division. We are providing

More information

PART XII: TOPOGRAPHIC SURVEYS

PART XII: TOPOGRAPHIC SURVEYS PART XII: TOPOGRAPHIC SURVEYS 12.1 Purpose and Scope The purpose of performing topographic surveys is to map a site for the depiction of man-made and natural features that are on, above, or below the surface

More information

Basic Geodetics. Bobby Saleh Guidon Energy April 13, 2017

Basic Geodetics. Bobby Saleh Guidon Energy April 13, 2017 Experts in Geomatics, Surveying, Positioning, Geospatial Data, and Mapping Sciences Basic Geodetics Bobby Saleh Guidon Energy b.saleh@guidonenergy.com April 13, 2017 The Earth is NOT flat Q: So what does

More information

Town of Holly Springs Sign Installation Packet

Town of Holly Springs Sign Installation Packet Town of Holly Springs Sign Installation Packet Department of Planning & Zoning 128 S. Main Street P.O. Box 8 Holly Springs, NC 27540 (919) 557-3908 HSPlanning@hollyspringsnc.us GENERAL INFORMATION: If

More information

MAXIMUM PERMISSIBLE EXPOSURE STUDY

MAXIMUM PERMISSIBLE EXPOSURE STUDY MAXIMUM PERMISSIBLE EXPOSURE STUDY THEORETICAL REPORT Site Number: VW-MA-0057 Site Name: Wellfleet 6 Latitude: 41.89696667 Longitude: -69.984375 Address: 724 Route 6, Wellfleet, MA 02667 Conclusion: The

More information

Digital GPS Repeaters for Wireless Network Timing

Digital GPS Repeaters for Wireless Network Timing Whitepaper Digital GPS Repeaters for Wireless Network Timing David Cheskis Vice President of Product Management, Microlab Abstract Modern wireless telecommunications networks rely on accurate frequency

More information

CUSTOMER MANUAL. General Installation Guide. Indoor/Outdoor RF Repeater Systems MARCH 1,

CUSTOMER MANUAL. General Installation Guide. Indoor/Outdoor RF Repeater Systems MARCH 1, CUSTOMER MANUAL General Installation Guide Indoor/Outdoor RF Repeater Systems MARCH 1, 2018 WWW.EXCELWAVETECHNOLOGIES.COM 1-888-329-2878(Tel) 1-888-318-5528(Fax) Disclaimer This document is provided for

More information

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of July 18, 2015

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of July 18, 2015 ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of July 18, 2015 DATE: July 3, 2015 SUBJECT: U-3409-15-1 USE PERMIT for installation of telecommunications equipment at Mercedes-Benz of Arlington;

More information

CAMOUFLAGE ANTENNAS.

CAMOUFLAGE ANTENNAS. CAMOUFLAGE ANTENNAS www.rosenbergerap.com Rosenberger HQ, Bavaria, Germany INTRODUCTION A Rosenberger Hochfrequenztechnik GmbH&Co. was founded in Germany in 1958 and ranks among the leading manufacturers

More information

Metro Cell: Best Practices. For a Successful Densification Strategy

Metro Cell: Best Practices. For a Successful Densification Strategy Metro Cell: Best Practices For a Successful Densification Strategy Metro Cell Best Practice: Introduction Densification: a big part of your capacity strategy Densification is the best known and most effective

More information

MHz. ANT150D, D3, D6-9 DIPOLE AND DIPOLE ARRAY 1 TO 9 dbd

MHz. ANT150D, D3, D6-9 DIPOLE AND DIPOLE ARRAY 1 TO 9 dbd 138-174 MHz ANTD, D3, D6-9 DIPOLE AND DIPOLE ARRAY 1 TO 9 dbd The Telewave ANTD series consists of single, dual, and 4-element di pole array antennas with a precision phasing harness for optimum per formance.

More information

Radio Mobile. Software for Wireless Systems Planning

Radio Mobile. Software for Wireless Systems Planning Latin American Networking School (EsLaRed) Universidad de Los Andes Merida Venezuela Javier Triviño and E.Pietrosemoli Radio Mobile Software for Wireless Systems Planning About Radio Mobile It is a tool

More information

GPS (GLOBAL POSITIONING SYSTEM)

GPS (GLOBAL POSITIONING SYSTEM) GPS (GLOBAL POSITIONING SYSTEM) What is GPS? GPS, standing for Global Positioning System, is becoming common nowadays. Following is a brief introduction. The American Defense Department developed GPS originally

More information

WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305

WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305 WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305 COMMUNITY DEVELOPMENT SERVICES (954) 390-2180 FAX: (954) 567-6069 This package includes: General Submittal Procedures Submittal

More information

Prototype Software-based Receiver for Remote Sensing using Reflected GPS Signals. Dinesh Manandhar The University of Tokyo

Prototype Software-based Receiver for Remote Sensing using Reflected GPS Signals. Dinesh Manandhar The University of Tokyo Prototype Software-based Receiver for Remote Sensing using Reflected GPS Signals Dinesh Manandhar The University of Tokyo dinesh@qzss.org 1 Contents Background Remote Sensing Capability System Architecture

More information

Differential Global Positioning ~ System Techniques For Surveying/ Mapping within Forested Wetlands

Differential Global Positioning ~ System Techniques For Surveying/ Mapping within Forested Wetlands WRP Technical Note WG-SW-2.2 ~- Differential Global Positioning ~ System Techniques For Surveying/ Mapping within Forested Wetlands PURPOSE: This technical note describes the use of Differential Global

More information

Telecommunication Application Form

Telecommunication Application Form Page 1 of 5 Fees Total Fee $1130.00 Processing Fee $330.00 *Advertising Deposit $800.00 *Where costs differ from the deposit, the balance will be charged or refunded to the applicant. Description of proposed

More information

Town of Skowhegan Application For Development Review

Town of Skowhegan Application For Development Review Town of Skowhegan Application For Development Review Return to: Skowhegan Planning Office 225 Water St., Skowhegan, ME 04976 (207) 474-6904 skowcodesec@skowhegan.org To be filled in by Staff: Project Name:

More information

CAB APPLICATION FOR MASTER SIGNAGE PLAN

CAB APPLICATION FOR MASTER SIGNAGE PLAN CAB APPLICATION FOR MASTER SIGNAGE PLAN Instructions: Fully complete all sections of the application form (Type or print-must be legible) Application Sections 1. Applicant 2. Master Signage Plan Requirements

More information

9/26/2016. Accuracy with GNSS What are you getting? Presented By Tom Bryant PLS Kelly Harris PLS Seiler Instrument

9/26/2016. Accuracy with GNSS What are you getting? Presented By Tom Bryant PLS Kelly Harris PLS Seiler Instrument Accuracy with GNSS What are you getting? Presented By Tom Bryant PLS Kelly Harris PLS Seiler Instrument 1 What We Will Talk About Today What coordinate system should I use in my data collector Site Calibrations-what

More information

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS 11.01.00 Preliminary Site Plan Approval 11.01.01 Intent and Purpose 11.01.02 Review 11.01.03 Application 11.01.04 Development Site to be Unified 11.01.05

More information

Broadcast Antenna & Service Guide

Broadcast Antenna & Service Guide Telecommunications Broadcast Antenna & Service Guide Multiple Solutions Various Patterns and Gain Coaxial, Dipole and Patch Designs www.alivetele.com 2 Alive Telecom - Variety of Antenna System Solutions

More information

CITY OF BROOKLYN PARK COMMUNICATIONS TECHNOLOGY SITE APPLICATION / MODIFICATION REQUEST FORM

CITY OF BROOKLYN PARK COMMUNICATIONS TECHNOLOGY SITE APPLICATION / MODIFICATION REQUEST FORM City of Brooklyn Park 5200 85 th Avenue N. Brooklyn Park, MN 55443-1825 Permit #: CITY OF BROOKLYN PARK COMMUNICATIONS TECHNOLOGY SITE APPLICATION / MODIFICATION REQUEST FORM Site Name & Address: (existing

More information

RADIO: FORM TC004 APPLICATION FOR SPECTRUM LICENCE IN AMATEUR, RADIODETERMINATION AND SATELLITE SERVICES. Provisions of the Telecommunication Act 2009

RADIO: FORM TC004 APPLICATION FOR SPECTRUM LICENCE IN AMATEUR, RADIODETERMINATION AND SATELLITE SERVICES. Provisions of the Telecommunication Act 2009 Explanatory Notes: Please read this information and the notes at the back of this form before completing the application You may use this form only for the type of licences shown in Section D. If space

More information

Installation Guide For FPD Antenna

Installation Guide For FPD Antenna Installation Guide For 104590-1 FPD.5-5.8-18 Antenna 495R Billerica Ave. North Billerica, MA 01862 USA Tel (978)459-8800 fax (978)459-3310 / 8814 Email: sales@radiowaves.com www.radiowaves.com IMPORTANT!

More information

Pole Mount Installation Guide

Pole Mount Installation Guide Pole Mount Installation Guide (No Fine Adjustment) 495R Billerica Ave. North Billerica, MA 01862 USA Tel (978)459-8800 fax (978)459-3310 / 8814 Email: sales@radiowaves.com www.radiowaves.com IMPORTANT!

More information

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN N/A Waiver (1) Four (4) copies of application form. (2) Fifteen (15) copies of plan (3) Subdivision/site plan application fee & professional review escrow deposit (4) Variance application fee & professional

More information

COUNTY OF CLEVELAND, NORTH CAROLINA AGENDA FOR THE PLANNING BOARD MEETING. July 31, :00 PM. Commissioners Chamber

COUNTY OF CLEVELAND, NORTH CAROLINA AGENDA FOR THE PLANNING BOARD MEETING. July 31, :00 PM. Commissioners Chamber COUNTY OF CLEVELAND, NORTH CAROLINA AGENDA FOR THE PLANNING BOARD MEETING July 31, 2018 6:00 PM Commissioners Chamber Call to order and Establishment of a Quorum Invocation and Pledge of Allegiance Approval

More information

Tony Wattwood Sunsight Instruments CEO 05/2017

Tony Wattwood Sunsight Instruments CEO   05/2017 Tony Wattwood Sunsight Instruments CEO www.sunsight.com 05/2017 Alignment products across multiple industries and applications Wireless Wind Energy Oil and Gas Transportation Emergency Services 911 Location

More information

City of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT

City of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT City of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT There is a $200.00 non-refundable fee for each request. Requests must be completed and submitted to the Public Works Department, City of Hamilton,

More information

NJDEP GPS Data Collection Standards for GIS Data Development

NJDEP GPS Data Collection Standards for GIS Data Development NJDEP GPS Data Collection Standards for GIS Data Development Bureau of Geographic Information Systems Office of Information Resource Management April 24 th, 2017 Table of Contents 1.0 Introduction... 3

More information

MINOR SITE PLAN APPLICATION TOWER COLLOCATION OR MODIFICATION (ELIGIBLE FACILITIES)

MINOR SITE PLAN APPLICATION TOWER COLLOCATION OR MODIFICATION (ELIGIBLE FACILITIES) MINOR SITE PLAN APPLICATION TOWER COLLOCATION OR MODIFICATION (ELIGIBLE FACILITIES) TOWN OF CLAYTON Planning Department 111 E. Second St., P.O. Box 879 Clayton, NC 27528 Phone: 919-553-5002 Fax: 919-553-1720

More information

dpd client assistance memo CAM Plot Plan Requirements Basic Plot Plan What is a Plot Plan?

dpd client assistance memo CAM   Plot Plan Requirements Basic Plot Plan What is a Plot Plan? dpd Seattle Department of Planning and Development formerly the Department of Design, Construction and Land Use CAM 103 client assistance memo Plot Plan Requirements November 2001 Applications for City

More information