1 LCLS project update LCLS Photon Systems Manager LCLS major construction nearly finished Technical systems turning on with good performance Experimental instruments Expectations for early operation First solicitation of User proposals 2 June

2 Construction >78% complete FY02 FY03 FY04 FY05 1 FY06 FY07 2 FY08 FY09 FY10 Total TEC OPC TPC FY2005 TEC funding includes $29,760,000 for long lead procurements. 2 FY07 TPC funding reflects the ~$8M reduction as a result of the FY2007 CR and directed change. 2 June

3 LCLS accelerator is nearly finished Commissioning Complete 9/2007 Commissioning Complete 3/ June

4 Injector Emittance Measured Over 3 Days (0.25 nc) OTR screen at 135 MeV injector injector is is stable stable γε x = 0.91, γε y = 1.01 γε x γε y J. Welch wire-scanner at 250 MeV after BC1 2 June γε x = 0.83, γε y = 0.83

5 Normalized phase space centroid jitter after BC1 (~5% of rms beam size) 1-σ beam size RMS A xn = 4.9% RMS A yn = 4.1% Stability is not so far off of our goals (~10%) D. Ratner near end of linac (~15% of rms beam size, but sometimes larger) RMS A xn = 19.9% RMS A yn = 8.5% accelerator accelerator is is stable stable poor poor BPM BPM resolution resolution Q = 0.25 nc 2 June ΔE/E jitter < 0.1% ΔQ/Q jitter < 2%

6 X-ray front end optics being assembled at LLNL All mirrors ordered; soft X-ray mirror figure meets spec Gas Detector Hard x-ray Monochromator Solid (K Spectrometer) Attenuator 5 mm collimator Direct Imager Soft X-Ray Offset mirror system e - Muon Shield Slit Gas Attenuator Gas Detector Pulse Energy Thermal Detector 2 June LLNL Hard X-Ray Offset mirror system Start of Experimental Hutches

7 Conventional Facilities >80% complete Linac-to-Undulator (227m) Undulator Hall (175m) Beam Dump (40M) Near Expt l. Hall Far Expt l. Hall Front End (29m) X-ray Transport (200m) 14 m Near Experimental Hall 64.6 m 2 June

8 Beam Transport Hall 2 June

9 Beam Transport Hall facing west 2 June

10 UNDULATOR HALL 2 June

11 Near Experimental Hall 2 June

12 NEAR EXPERIMENTAL HALL SUBBASEMENT 2 June

13 Far Hall rebar lattice Tunnel construction complete 25 April June

14 AMO Instrument QuickTime and a TIFF (Uncompressed) decompressor are needed to see this picture. John Bozek jdbozek@slac.stanford.edu 2 June

15 LUSI Status Instrument scientists on board Successful DOE Conceptual Design Review But budget is not increasing as expected FY2008 budget reduced from $10M to $6M 2009 funding will surely be delayed until mid-2009 Who knows about 2010? Some scope cuts made, schedule impact being assessed Next review late summer 2008 will give baseline for XPP, CXI, XCS 2 June

16 XPP Instrument QuickTime and a TIFF (Uncompressed) decompressor are needed to see this picture. David Fritz dmfritz@slac.stanford.edu 2 June

17 XPP Diffractometer XPP Diffractometer Requirements 30 micron sample sphere of confusion < 100 micron detector sphere of confusion (< 1 pixel) 10 cm 100 cm sample to detector distance Accommodate large sample environments (up to 50 kg) 2 June

18 XPP Detector System 2D detector (BNL) 1024 x 1024 pixels 90 micron pixel size High Detector Quantum Efficiency (DQE) 10 4 dynamic range per pixel at 8 kev 120 Hz readout 2 June

19 XPP will live in Hutch 3 Near Experimental Hall AMO XPP X-ray Transport Tunnel XCS CXI Far Experimental Hall 2 June

20 CXI Instrument QuickTime and a TIFF (Uncompressed) decompressor are needed to see this picture. Sebastien Boutet sboutet@slac.stanford.edu 2 June

21 CXI 0.1 µm focus KB mirrors 100 nm focus is required for imaging small particles Focal length First mirror 900 mm Second mirror 500 mm Focus 68 x 120 nm spot Requires reentrant KB design Closest point of approach to interaction region = 300 mm 2 June

22 CXI Detector (Cornell) 2D Pixel Array Detector Si diode array bump-bonded to CMOS ASIC Tiled detector permits variable hole size Collaboration with the Gruner Group at Cornell University 2 June

23 CXI will live in Hutch 5 Far Experimental Hall HED XCS Coherent X-ray Imaging Instrument 2 June

24 XCS Instrument QuickTime and a TIFF (Uncompressed) decompressor are needed to see this picture. Aymeric Robert aymeric@slac.stanford.edu 2 June

25 Split and Delay J. Schneider G. Grübel W. Roseker Provided by by DESY/SLAC MoU Prototype existing Delay up up to to 3 ns ns based on on Si Si (511) E=8.389 kev kev 2 June

26 XCS will live in Hutch 4 Far Experimental Hall CXI HED XCS 2 June

27 Future - Beam Sharing SXP Electron Dump S0 PPS Stopper Set Moveable Dump X- Ray Mirror X-Ray Crystal Primary Movable Elements Experiment M1S FEE M2S M3/4S Horizontal Offset Mirrors S1 S2 SH 1 SXR Hutch 1 Hutch 2 Hutch 3 SXP Near Experimental Hall LCLS AM O LUSI S3 X3 SH 2 X-Ray Tunnel Soft x-ray experiments will require exclusive use of beam Ability to split/share the hard X-ray beam with thin crystals XPP Pos2 XPP Pos1 X4 M6 S4 S5 S6 Far Experimental Hall LUSI Hutch 4 XPC S Pos2 XPC S Pos1 LUSI Hutch 5 CXI Hutch HED 2 June

28 LCLS expansion priorities First projects Gun test facility Soft X-ray FEL for End Station A Use rest of SLAC linac Upstream 2km could provide 28 GeV Additional tunnels/undulators/halls 2 June

29 LCLS 2 June

30 LCLS Installation and Commissioning Time-Line PEP-II run ends now LTU/Und/Dump Install PPS Cert. LTU/Dump FEE/NEH Install First Light in FEE X-Rays in NEH FEH Hutch BO FEH Install First Light in FEH CD-4 (7/31/2010) JJ F M A M J J A S ON D J F M AM A M J J A S O N D J F M A M J J 2008 Down PPS Linac/BC2 Commissioning Re-commission Inj/BC2 to SL2 LTU/Und Comm. FEE Comm. AMO Experiment program begins 2 June

31 Parameter Latest estimates of 2009 FEL performance Photon energy FEL fundamental power Rel.. FEL bandwidth (FWHM) Photon pulse duration (FWHM) Energy per pulse Number of photons/0.1%-bw Peak brightness (0.1%-BW/s/mm 2 /mrad 2 ) Average brightness (at 30 Hz) Relative power in 3 rd harmonic Relative power in 5 th harmonic Energy jitter Timing jitter Pointing jitter 15 Å FEL ~ 1 ~ 0.1 ~ Å FEL ~ 1 ~ 0.1 ~ units kev GW % fs mj % % % fs % 2 June

32 Target Running Schedule Operation Hours 2009: AMO, SXR 2010: AMO, SXR, XPP 2011: AMO, SXR, XPP, CXI 2012: AMO, SXR, XPP, CXI, XCS HEDS? 2 June

33 Startup - LCLS User Program Pre-Proposal Workshops 6/2008 Initial Call (AMO): ~6/2008 Proposals due, 1 st round: 9/1/2008 Notification to users: ~11/2008 Schedule setting: 1-3/ June

34 The User Interface to LCLS Start with LCLS web site Technical information Links to LCLS technical, administrative contacts Web-based proposal submission Proposal review Internal review for feasibility, safety concerns External review for scientific merit Beam time scheduling About 6 mo before experiment Welcome to LCLS User Admin staff handles documents, safety training Instrument support staff helps experiment work 2 June

35 Web site 2 June

36 User info 2 June

37 Proposal submission Web-based process Register, get password by Log into user site Input proposal information Basic admin, technical, safety info Upload proposal and supporting documents PDF format ONLY User site under test, opening very soon 2 June

38 Summary The LCLS construction is nearing completion 4 experimental instruments will be completed by 2012 First experiments in late 2009 Performance is expected to be very good First proposals solicited Summer June

LCLS-II-HE Instrumentation

LCLS-II-HE Instrumentation LCLS-II-HE Instrumentation Average Brightness (ph/s/mm 2 /mrad 2 /0.1%BW) LCLS-II-HE: Enabling New Experimental Capabilities Structural Dynamics at the Atomic Scale Expand the photon energy reach of LCLS-II

More information

FLASH at DESY. FLASH. Free-Electron Laser in Hamburg. The first soft X-ray FEL operating two undulator beamlines simultaneously

FLASH at DESY. FLASH. Free-Electron Laser in Hamburg. The first soft X-ray FEL operating two undulator beamlines simultaneously FLASH at DESY The first soft X-ray FEL operating two undulator beamlines simultaneously Katja Honkavaara, DESY for the FLASH team FEL Conference 2014, Basel 25-29 August, 2014 First Lasing FLASH2 > First

More information

THz Pump Beam for LCLS. Henrik Loos. LCLS Hard X-Ray Upgrade Workshop July 29-31, 2009

THz Pump Beam for LCLS. Henrik Loos. LCLS Hard X-Ray Upgrade Workshop July 29-31, 2009 Beam for LCLS Henrik Loos Workshop July 29-31, 29 1 1 Henrik Loos Overview Coherent Radiation Sources Timing THz Source Performance 2 2 Henrik Loos LCLS Layout 6 MeV 135 MeV 25 MeV 4.3 GeV 13.6 GeV σ z.83

More information

Photon Beamlines and Diagnostics at LCLS

Photon Beamlines and Diagnostics at LCLS SLAC-PUB-14348 Photon Beamlines and Diagnostics at LCLS S. Moeller¹*, J. Arthur¹, A. Brachmann¹, R. Coffee¹, F.-J. Decker¹, Y. Ding¹, D. Dowell¹, S. Edstrom¹, P. Emma¹, Y. Feng¹, A. Fisher¹, J. Frisch¹,

More information

LUSI Pulse Picker System

LUSI Pulse Picker System ENGINEERING SPECIFICATION DOCUMENT (ESD) Doc. No. SP-391-001-50 R0 LUSI SUB-SYSTEM DCO LUSI Pulse Picker System Rick Jackson Design Engineer, Author Signature Date Marc Campell DCO Design Engineer Signature

More information

Optics for next generation light sources

Optics for next generation light sources Optics for next generation light sources Anton Barty Centre for Free Electron Laser Science Hamburg, Germany Key issues Optical specifications Metrology (mirror surfaces) Metrology (wavefront, focal spot)

More information

R&D Toward Brighter X-ray FELs

R&D Toward Brighter X-ray FELs Some R&D Toward Brighter X-ray FELs Zhirong Huang (SLAC) March 6, 2012 FLS2012 Workshop, Jefferson Lab Outline Introduction Seeding for temporal coherence Hard x-rays Soft x-rays Push for higher power

More information

LCLS Injector Diagnostics. Henrik Loos. Diagnostics overview Transverse Beam Properties Longitudinal Beam Properties

LCLS Injector Diagnostics. Henrik Loos. Diagnostics overview Transverse Beam Properties Longitudinal Beam Properties Diagnostics overview Transverse Beam Properties Longitudinal Beam Properties LCLS Diagnostics Tasks Charge Toroids (Gun, Inj, BC, Und) Faraday cups (Gun & Inj) Trajectory & energy Stripline BPMs (Gun,

More information

X-Ray Transport, Diagnostic, & Commissioning Plans. LCLS Diagnostics and Commissioning Workshop

X-Ray Transport, Diagnostic, & Commissioning Plans. LCLS Diagnostics and Commissioning Workshop X-Ray Transport, Diagnostic, & Commissioning Plans LCLS Diagnostics and Commissioning Workshop *This work was performed under the auspices of the U.S. Department of Energy by the University of California,

More information

CXI 1 micron Precision Instrument Stand

CXI 1 micron Precision Instrument Stand Engineering specification Document (ESD) Doc. No. SP-391-001-44 R0 LUSI SUB-SYSTEM CXI Instrument Prepared by: Jean-Charles Castagna Design Engineer Signature Date Co-authored by: Paul Montanez CXI Lead

More information

Demonstration of exponential growth and saturation at VUV wavelengths at the TESLA Test Facility Free-Electron Laser. P. Castro for the TTF-FEL team

Demonstration of exponential growth and saturation at VUV wavelengths at the TESLA Test Facility Free-Electron Laser. P. Castro for the TTF-FEL team Demonstration of exponential growth and saturation at VUV wavelengths at the TESLA Test Facility Free-Electron Laser P. Castro for the TTF-FEL team 100 nm 1 Å FEL radiation TESLA Test Facility at DESY

More information

XTOD Layout and Diagnostic Systems. Facility Advisory Committee Meeting October 12-13, 2004

XTOD Layout and Diagnostic Systems. Facility Advisory Committee Meeting October 12-13, 2004 Facility Advisory Committee Meeting October 12-13, 24 This work was performed under the auspices of the U.S. Department of Energy by the University of California, Lawrence Livermore National Laboratory

More information

Nonintercepting Diagnostics for Transverse Beam Properties: from Rings to ERLs

Nonintercepting Diagnostics for Transverse Beam Properties: from Rings to ERLs Nonintercepting Diagnostics for Transverse Beam Properties: from Rings to ERLs Alex H. Lumpkin Accelerator Operations Division Advanced Photon Source Presented at Jefferson National Accelerator Laboratory

More information

X-ray Transport Optics and Diagnostics Commissioning Report

X-ray Transport Optics and Diagnostics Commissioning Report LCLS-TN-4-15 UCRL-PROC-27494 X-ray Transport Optics and Diagnostics Commissioning Report Richard M. Bionta, Lawrence Livermore National Laboratory. October 23, 24 LCLS Diagnostics and Commissioning Workshop,

More information

2D Detectors. Niels van Bakel August D Detectors

2D Detectors. Niels van Bakel August D Detectors 1 Outline Detector program XPP detector Requirements, Technical, Schedule, Status & Budget XCS detector Requirements, Technical, Schedule, Status & Budget CXI detector Requirements, Status DAQ Summary

More information

Outline of the proposed JLAMP VUV/soft X-ray FEL and the challenges for the photon beamlines and optics

Outline of the proposed JLAMP VUV/soft X-ray FEL and the challenges for the photon beamlines and optics Outline of the proposed JLAMP VUV/soft X-ray FEL and the challenges for the photon beamlines and optics J. Michael Klopf Jefferson Lab - Free Electron Laser Division Workshop on Future Light Sources SLAC

More information

Feedback Requirements for SASE FELS. Henrik Loos, SLAC IPAC 2010, Kyoto, Japan

Feedback Requirements for SASE FELS. Henrik Loos, SLAC IPAC 2010, Kyoto, Japan Feedback Requirements for SASE FELS Henrik Loos, SLAC, Kyoto, Japan 1 1 Henrik Loos Outline Stability requirements for SASE FELs Diagnostics for beam parameters Transverse: Beam position monitors Longitudinal:

More information

TECHNICAL CHALLENGES OF THE LCLS-II CW X-RAY FEL *

TECHNICAL CHALLENGES OF THE LCLS-II CW X-RAY FEL * TECHNICAL CHALLENGES OF THE LCLS-II CW X-RAY FEL * T.O. Raubenheimer # for the LCLS-II Collaboration, SLAC, Menlo Park, CA 94025, USA Abstract The LCLS-II will be a CW X-ray FEL upgrade to the existing

More information

ELECTRON BEAM DIAGNOSTICS AND FEEDBACK FOR THE LCLS-II*

ELECTRON BEAM DIAGNOSTICS AND FEEDBACK FOR THE LCLS-II* THB04 Proceedings of FEL2014, Basel, Switzerland ELECTRON BEAM DIAGNOSTICS AND FEEDBACK FOR THE LCLS-II* Josef Frisch, Paul Emma, Alan Fisher, Patrick Krejcik, Henrik Loos, Timothy Maxwell, Tor Raubenheimer,

More information

Beam Diagnostics, Low Level RF and Feedback for Room Temperature FELs. Josef Frisch Pohang, March 14, 2011

Beam Diagnostics, Low Level RF and Feedback for Room Temperature FELs. Josef Frisch Pohang, March 14, 2011 Beam Diagnostics, Low Level RF and Feedback for Room Temperature FELs Josef Frisch Pohang, March 14, 2011 Room Temperature / Superconducting Very different pulse structures RT: single bunch or short bursts

More information

3 General layout of the XFEL Facility

3 General layout of the XFEL Facility 3 General layout of the XFEL Facility 3.1 Introduction The present chapter provides an overview of the whole European X-Ray Free-Electron Laser (XFEL) Facility layout, enumerating its main components and

More information

On-line spectrometer for FEL radiation at

On-line spectrometer for FEL radiation at On-line spectrometer for FEL radiation at FERMI@ELETTRA Fabio Frassetto 1, Luca Poletto 1, Daniele Cocco 2, Marco Zangrando 3 1 CNR/INFM Laboratory for Ultraviolet and X-Ray Optical Research & Department

More information

1-Å FEL Oscillator with ERL Beams

1-Å FEL Oscillator with ERL Beams 1-Å FEL Oscillator with ERL Beams 29 th International FEL Conference August 26-31, BINP Novosibirsk, Russia Kwang-Je Kim, ANL Sven Reiche, UCLA Yuri Shvyd ko, ANL FELs for λ

More information

Zhirong Huang. May 12, 2011

Zhirong Huang. May 12, 2011 LCLS R&D Program Zhirong Huang May 12, 2011 LCLS 10 10 LCLS-II Light Sou urces at ~1 Å Peak Brightness (phot tons/s/mm 2 /mrad 2 /0.1%-BW) H.-D. Nuhn, H. Winnick storag e rings FWHM X-Ray Pulse Duration

More information

12/08/2003 H. Schlarb, DESY, Hamburg

12/08/2003 H. Schlarb, DESY, Hamburg K. Bane, F.-J. Decker, P. Emma, K. Hacker, L. Hendrickson,, C. L. O Connell, P. Krejcik,, H. Schlarb*, H. Smith, F. Stulle*, M. Stanek, SLAC, Stanford, CA 94025, USA * σ z NDR 6 mm 1.2 mm 3-stage compression

More information

J. Arthur, Stanford Linear Accelerator Center, Stanford, CA, USA S. Boutet, Stanford Linear Accelerator Center, Stanford, CA, USA J-C.

J. Arthur, Stanford Linear Accelerator Center, Stanford, CA, USA S. Boutet, Stanford Linear Accelerator Center, Stanford, CA, USA J-C. CONCEPTUAL DESIGN REPORT SLAC--R--852 Jully 2007 Prepared for the Department of Energy under contract number DE-AC03-76SF00515 By Stanford Linear Accelerator Center, Stanford University, CA Printed in

More information

FLASH: Status and upgrade

FLASH: Status and upgrade : Status and upgrade The User Facility Layout Performance and operational o a issues Upgrade Bart Faatz for the team DESY FEL 2009 Liverpool, UK August 23-28, 2009 at DESY > FEL user facility since summer

More information

Bioimaging of cells and tissues using accelerator-based sources

Bioimaging of cells and tissues using accelerator-based sources Analytical and Bioanalytical Chemistry Electronic Supplementary Material Bioimaging of cells and tissues using accelerator-based sources Cyril Petibois, Mariangela Cestelli Guidi Main features of Free

More information

Check the LCLS Project website to verify 2 of 7 that this is the correct version prior to use.

Check the LCLS Project website to verify 2 of 7 that this is the correct version prior to use. 1. Introduction: The XTOD Offset System (OMS) is designed to direct the LCLS FEL beam to the instruments and experimental stations, while substantially reducing the flux of unwanted radiation which accompanies

More information

Status, perspectives, and lessons from FLASH and European XFEL

Status, perspectives, and lessons from FLASH and European XFEL 2014 International Workshop on EUV and Soft X-ray Sources November 3-6, 2014 Dublin, Ireland Status, perspectives, and lessons from FLASH and European XFEL R. Brinkmann, E.A. Schneidmiller, J, Sekutowicz,

More information

X-ray FEL Oscillator (XFEL-O) Gun Requirements and R&D Overview FLS2010: WG5: High Brightness Guns March 1, 2010

X-ray FEL Oscillator (XFEL-O) Gun Requirements and R&D Overview FLS2010: WG5: High Brightness Guns March 1, 2010 X-ray FEL Oscillator (XFEL-O) Gun Requirements and R&D Overview FLS2010: WG5: High Brightness Guns March 1, 2010 Nick Sereno (APS/ASD) - Argonne National Laboratory (ANL) / Advanced Photon source (APS)

More information

CSPADs: how to operate them, which performance to expect and what kind of features are available

CSPADs: how to operate them, which performance to expect and what kind of features are available CSPADs: how to operate them, which performance to expect and what kind of features are available Gabriella Carini, Gabriel Blaj, Philip Hart, Sven Herrmann Cornell-SLAC Pixel Array Detector What is it?

More information

Femtosecond Synchronization of Laser Systems for the LCLS

Femtosecond Synchronization of Laser Systems for the LCLS Femtosecond Synchronization of Laser Systems for the LCLS, Lawrence Doolittle, Gang Huang, John W. Staples, Russell Wilcox (LBNL) John Arthur, Josef Frisch, William White (SLAC) 26 Aug 2010 FEL2010 1 Berkeley

More information

SwissFEL Design and Status

SwissFEL Design and Status SwissFEL Design and Status Hans H. Braun Mini Workshop on Compact X ray Free electron Lasers Eastern Forum of Science and Technology Shanghai July 19, 2010 SwissFEL, the next large facility at PSI SwissFEL

More information

Wisconsin FEL Initiative

Wisconsin FEL Initiative Wisconsin FEL Initiative Joseph Bisognano, Mark Bissen, Robert Bosch, Michael Green, Ken Jacobs, Hartmut Hoechst, Kevin J Kleman, Robert Legg, Ruben Reininger, Ralf Wehlitz, UW-Madison/SRC William Graves,

More information

CESRTA Low Emittance Tuning Instrumentation: x-ray Beam Size Monitor

CESRTA Low Emittance Tuning Instrumentation: x-ray Beam Size Monitor CESRTA Low Emittance Tuning Instrumentation: x-ray Beam Size Monitor xbsm group: (those who sit in the tunnel) J. Alexander, N. Eggert, J. Flanagan, W. Hopkins, B. Kreis, M. McDonald, D. Peterson, N. Rider

More information

Physics Requirements Document Document Title: SCRF 1.3 GHz Cryomodule Document Number: LCLSII-4.1-PR-0146-R0 Page 1 of 7

Physics Requirements Document Document Title: SCRF 1.3 GHz Cryomodule Document Number: LCLSII-4.1-PR-0146-R0 Page 1 of 7 Document Number: LCLSII-4.1-PR-0146-R0 Page 1 of 7 Document Approval: Originator: Tor Raubenheimer, Physics Support Lead Date Approved Approver: Marc Ross, Cryogenic System Manager Approver: Jose Chan,

More information

Photon Diagnostics. FLASH User Workshop 08.

Photon Diagnostics. FLASH User Workshop 08. Photon Diagnostics FLASH User Workshop 08 Kai.Tiedtke@desy.de Outline What kind of diagnostic tools do user need to make efficient use of FLASH? intensity (New GMD) beam position intensity profile on the

More information

Eliminating the microbunching-instabilityinduced sideband in a soft x-ray self-seeding free-electron laser

Eliminating the microbunching-instabilityinduced sideband in a soft x-ray self-seeding free-electron laser Eliminating the microbunching-instabilityinduced sideband in a soft x-ray self-seeding free-electron laser Chao Feng, Haixiao Deng, kaiqing Zhang Shanghai Institute of Applied Physics, CAS OUTLINE 31 2

More information

NIST EUVL Metrology Programs

NIST EUVL Metrology Programs NIST EUVL Metrology Programs S.Grantham, C. Tarrio, R.E. Vest, Y. Barad, S. Kulin, K. Liu and T.B. Lucatorto National Institute of Standards and Technology (NIST) Gaithersburg, MD USA L. Klebanoff and

More information

Does the short pulse mode need energy recovery?

Does the short pulse mode need energy recovery? Does the short pulse mode need energy recovery? Rep. rate Beam power @ 5GeV 1nC @ 100MHz 500MW Absolutely 1nC @ 10MHz 1nC @ 1MHz 50MW 5MW Maybe 1nC @ 100kHz 0.5MW No Most applications we have heard about

More information

Undulator K-Parameter Measurements at LCLS

Undulator K-Parameter Measurements at LCLS Undulator K-Parameter Measurements at LCLS J. Welch, A. Brachmann, F-J. Decker, Y. Ding, P. Emma, A. Fisher, J. Frisch, Z. Huang, R. Iverson, H. Loos, H-D. Nuhn, P. Stefan, D. Ratner, J. Turner, J. Wu,

More information

Physics Requirements for the CXI 0.1 micron Sample Chamber

Physics Requirements for the CXI 0.1 micron Sample Chamber PHYSICS REQUIREMENT DOCUMENT (PRD) Doc. No. SP-391-000-20 R1 LUSI SUB-SYSTEM Coherent X-Ray Imaging Physics Requirements for the Sébastien Boutet CXI Scientist, Author Signature Date Paul Montanez CXI

More information

Seeding at LCLS FEL. J. Welch, (SLAC) J. Welch (SLAC), Joint DESY and University of Hamburg Accelerator Physics Seminar, Feb. 5, 2013, DESY Hamburg

Seeding at LCLS FEL. J. Welch, (SLAC) J. Welch (SLAC), Joint DESY and University of Hamburg Accelerator Physics Seminar, Feb. 5, 2013, DESY Hamburg Seeding at LCLS FEL J. Welch, (SLAC) Acknowledgements SLAC ANL J. Amann, J. Arthur, A. Brachmann, F.-J. Decker, Y. Ding, Y. Feng, J. Frisch, D. Fritz, J. Hastings, Z. Huang, R. Iverson, J. Krzywinski,

More information

Electron Beam Diagnosis Using K-edge Absorp8on of Laser-Compton Photons

Electron Beam Diagnosis Using K-edge Absorp8on of Laser-Compton Photons LLNL-PRES-740689 Electron Beam Diagnosis Using K-edge Absorp8on of Laser-Compton Photons Y. Hwang 1, D. J. Gibson 2, R. A. Marsh 2, T. Tajima 1, C. P. J. Barty 1 1 University of California, Irvine 2 Lawrence

More information

H. Weise, Deutsches Elektronen-Synchrotron, Hamburg, Germany for the XFEL Group

H. Weise, Deutsches Elektronen-Synchrotron, Hamburg, Germany for the XFEL Group 7+(7(6/$;)(/352-(&7 H. Weise, Deutsches Elektronen-Synchrotron, Hamburg, Germany for the XFEL Group $EVWUDFW The overall layout of the X-Ray FEL to be built in international collaboration at DESY will

More information

Status of the Electron Beam Transverse Diagnostics with Optical Diffraction Radiation at FLASH

Status of the Electron Beam Transverse Diagnostics with Optical Diffraction Radiation at FLASH Status of the Electron Beam Transverse Diagnostics with Optical Diffraction Radiation at FLASH M. Castellano, E. Chiadroni, A. Cianchi, K. Honkavaara, G. Kube DESY FLASH Seminar Hamburg, 05/09/2006 Work

More information

Breakout Session 3: Mirror Update. 2007/4/ /22 Peter M. Stefan LCLS Facility Advisory Committee (FAC) Meeting

Breakout Session 3: Mirror Update. 2007/4/ /22 Peter M. Stefan LCLS Facility Advisory Committee (FAC) Meeting Breakout Session 3: Mirror Update 2007/4/16-17 1/22 Peter M. Stefan LCLS Facility Advisory Committee (FAC) Meeting stefan@slac.stanford.edu Breakout Session 3: Mirror Update Overall Offset Mirror System

More information

Design of Photon Beamlines at the European XFEL

Design of Photon Beamlines at the European XFEL Design of Photon Beamlines at the European XFEL Harald Sinn (THOCI1) FEL 2010 Malmö August 26, 2010 Construction progress at the European XFEL www.xfel.eu Experimental Hall in Schenefeld Injector building

More information

THE ORION PHOTOINJECTOR: STATUS and RESULTS

THE ORION PHOTOINJECTOR: STATUS and RESULTS THE ORION PHOTOINJECTOR: STATUS and RESULTS Dennis T. Palmer SLAC / ARDB ICFA Sardinia 4 July 2002 1. Introduction 2. Beam Dynamics Simulations 3. Photoinjector 1. RF Gun 2. Solenoidal Magnet 3. Diagnostics

More information

X-ray Detectors at DESY

X-ray Detectors at DESY X-ray Detectors at DESY (Contribution given at the FEL2006 meeting in Berlin) DESY The European XFEL Time structure: difference with others Electron bunch trains; up to 3000 bunches in 600 μsec, repeated

More information

Shintake Monitor Nanometer Beam Size Measurement and Beam Tuning

Shintake Monitor Nanometer Beam Size Measurement and Beam Tuning Shintake Monitor Nanometer Beam Size Measurement and Beam Tuning Technology and Instrumentation in Particle Physics 2011 Chicago, June 11 Jacqueline Yan, M.Oroku, Y. Yamaguchi T. Yamanaka, Y. Kamiya, T.

More information

arxiv: v1 [physics.acc-ph] 20 Jan 2010

arxiv: v1 [physics.acc-ph] 20 Jan 2010 DEUTSCHES ELEKTRONEN-SYNCHROTRON Ein Forschungszentrum der Helmholtz-Gemeinschaft DESY 10-004 arxiv:1001.3510v1 [physics.acc-ph] 20 Jan 2010 January 2010 Scheme for femtosecond-resolution pump-probe experiments

More information

Overview of performance and improvements to fixed exit double crystal monochromators at Diamond. Andrew Dent, Physical Science Coordinator, DLS

Overview of performance and improvements to fixed exit double crystal monochromators at Diamond. Andrew Dent, Physical Science Coordinator, DLS Overview of performance and improvements to fixed exit double crystal monochromators at Diamond Andrew Dent, Physical Science Coordinator, DLS Overview Diffraction limit Geometric magnification Source

More information

DESIGN REVIEW REPORT. Distribution: Attachments: Review Slides Design Checklist Calculations Other

DESIGN REVIEW REPORT. Distribution: Attachments: Review Slides Design Checklist Calculations Other DESIGN REVIEW REPORT Report No. TR-391-003-10 The Design Review Report Shall include at a minimum: The title of the item or system; A description of the item; Design Review Report Number; The type of design

More information

Laser systems for science instruments

Laser systems for science instruments European XFEL Users Meeting 27-20 January 2016, Main Auditorium (Bldg. 5), DESY, Hamburg Laser systems for science instruments M. J. Lederer WP78, European XFEL GmbH, Albert-Einstein-Ring 19, 22761 Hamburg,

More information

THz meets X-rays: Matthias C. Hoffmann, LCLS Laser Science & Technology Division SLAC National Accelerator Laboratory, Menlo Park, CA, 94025

THz meets X-rays: Matthias C. Hoffmann, LCLS Laser Science & Technology Division SLAC National Accelerator Laboratory, Menlo Park, CA, 94025 THz meets X-rays: Ultrafast X-ray Experiments Using Terahertz Excitation Matthias C. Hoffmann, LCLS Laser Science & Technology Division SLAC National Accelerator Laboratory, Menlo Park, CA, 94025 Overview

More information

Short-Pulse X-ray at the Advanced Photon Source Overview

Short-Pulse X-ray at the Advanced Photon Source Overview Short-Pulse X-ray at the Advanced Photon Source Overview Vadim Sajaev and Louis Emery Accelerator Operations and Physics Group Accelerator Systems Division Mini-workshop on Methods of Data Analysis in

More information

FLASH 2. FEL seminar. Charge: 0.5 nc. Juliane Rönsch-Schulenburg Overview of FLASH 2 Hamburg,

FLASH 2. FEL seminar. Charge: 0.5 nc. Juliane Rönsch-Schulenburg Overview of FLASH 2 Hamburg, FLASH 2 FEL seminar Juliane Rönsch-Schulenburg Overview of FLASH 2 Hamburg, 2016-03-22 Charge: 0.5 nc Overview 1. FLASH 2 Overview 1.Layout parameters 2. Operation FLASH2. 1.Lasing at wavelengths between

More information

The Potential for the Development of the X-Ray Free Electron Laser

The Potential for the Development of the X-Ray Free Electron Laser The Potential for the Development of the X-Ray Free Electron Laser TESLA-FEL 2004-02 E.L. Saldin, E.A. Schneidmiller, and M.V. Yurkov Deutsches Elektronen-Synchrotron (DESY), Notkestrasse 85, Hamburg,

More information

FLASH Upgrade. Decrease wavelength and/or increase brilliance

FLASH Upgrade. Decrease wavelength and/or increase brilliance FLASH Upgrade Far-Infrared (FIR) undulator Medium and long-term issues: Decrease wavelength and/or increase brilliance Enable quasi-simultanous operation at 2 wavelengths Provide more space for users Motivation:

More information

Yiping FENG DCO

Yiping FENG DCO LUSI Diagnostics and Common Optics Pop-in Profile/Wavefront Monitors Optics Review [sp39100004-1_xrpopinprofmon-prd] Yiping Feng LUSI Instrument Scientist February 10, 2009 Outline Introduction Performance

More information

x-ray Beam Size Monitor

x-ray Beam Size Monitor x-ray Beam Size Monitor J. Alexander, N. Eggert, J. Flanagan, W. Hopkins, B. Kreis, M. McDonald, D. Peterson, N. Rider Goals: 2 products: tuning tool with rapid feedback of beam height during LET measurements

More information

VUV-FEL User workshop, August 23-24, 2004

VUV-FEL User workshop, August 23-24, 2004 Layout of the user facility Kai Tiedtke Kai Tiedtke, HASYLAB@ VUV-FEL User workshop, August 23-24, 2004 Kai.Tiedtke@desy.de Kai Tiedtke, HASYLAB@ Outline Photon beam transport Layout of the experimental

More information

Introduction to the Physics of Free-Electron Lasers

Introduction to the Physics of Free-Electron Lasers Introduction to the Physics of Free-Electron Lasers 1 Outline Undulator Radiation Radiation from many particles The FEL Instability Advanced FEL concepts The X-Ray Free-Electron Laser For Angstrom level

More information

MPI Halbleiterlabor. MPI Semiconductor Laboratory. MPI mf

MPI Halbleiterlabor. MPI Semiconductor Laboratory. MPI mf MPI Halbleiterlabor MPI Semiconductor Laboratory MPI mf LCLS User Workshop, SLAC, Menlo Park, 18. 10. 2008 Lothar Strüder, MPI Halbleiterlabor and Universität Siegen 1 Prepared by 1. MPI-HLL (MPE and MPP)

More information

Precision RF Beam Position Monitors for Measuring Beam Position and Tilt Progress Report

Precision RF Beam Position Monitors for Measuring Beam Position and Tilt Progress Report Precision RF Beam Position Monitors for Measuring Beam Position and Tilt Progress Report UC Berkeley Senior Personnel Yury G. Kolomensky Collaborating Institutions Stanford Linear Accelerator Center: Marc

More information

Challenges of Optics for High Repetition Rate XFEL Source

Challenges of Optics for High Repetition Rate XFEL Source Challenges of Optics for High Repetition Rate XFEL Source Liubov Samoylova, European XFEL GmbH ACTOP11, DIAMOND, April 5 th, 2011 2 European XFEL photon transport system - overview X-ray optics for XFEL:

More information

BEAM DIAGNOSTICS AT THE VUV-FEL FACILITY

BEAM DIAGNOSTICS AT THE VUV-FEL FACILITY BEAM DIAGNOSTICS AT THE VUV-FEL FACILITY J. Feldhaus, D. Nölle, DESY, D-22607 Hamburg, Germany Abstract The free electron laser (FEL) at the TESLA Test facility at DESY, now called VUV-FEL, will be the

More information

Initial Beam Phasing of the SRF Cavities in LCLS-II

Initial Beam Phasing of the SRF Cavities in LCLS-II Introduction Initial Beam Phasing of the SRF Cavities in LCLS-II P. Emma Nov. 28, 2016 One of the more challenging aspects of commissioning the LCLS-II accelerator is in the initial phasing of the SRF

More information

Chromatic X-Ray imaging with a fine pitch CdTe sensor coupled to a large area photon counting pixel ASIC

Chromatic X-Ray imaging with a fine pitch CdTe sensor coupled to a large area photon counting pixel ASIC Chromatic X-Ray imaging with a fine pitch CdTe sensor coupled to a large area photon counting pixel ASIC R. Bellazzini a,b, G. Spandre a*, A. Brez a, M. Minuti a, M. Pinchera a and P. Mozzo b a INFN Pisa

More information

PoS(VERTEX2015)008. The LHCb VELO upgrade. Sophie Elizabeth Richards. University of Bristol

PoS(VERTEX2015)008. The LHCb VELO upgrade. Sophie Elizabeth Richards. University of Bristol University of Bristol E-mail: sophie.richards@bristol.ac.uk The upgrade of the LHCb experiment is planned for beginning of 2019 unitl the end of 2020. It will transform the experiment to a trigger-less

More information

Status of the Project

Status of the Project Status of the FERMI@Elettra Project Michele Svandrlik Elettra, Trieste, Italy IPAC 2012 New Orleans May 22 nd, 2012 OUTLINE FERMI@Elettra Overview Facility Performance Recent Progress Outlook and Conclusions

More information

Red Laser for Monitoring Light Source

Red Laser for Monitoring Light Source Red Laser for Monitoring Light Source Liyuan Zhang, Kejun Zhu and Ren-yuan Zhu Caltech Duncan Liu JPL CMS ECAL Week, CERN April 16, 22 A Brief History. Red Laser Specification. Result of Market Survey.

More information

The CoSAXS Beamline at MAX IV: A Small Angle X-Ray Scattering Beamline to Study Structure and Dynamics

The CoSAXS Beamline at MAX IV: A Small Angle X-Ray Scattering Beamline to Study Structure and Dynamics The CoSAXS Beamline at MAX IV: A Small Angle X-Ray Scattering Beamline to Study Structure and Dynamics SAS Sample Environment workshop, September 10-11 th, 2015- Lund tomas.plivelic@maxlab.lu.se Aims Take

More information

Beam Arrival Time Monitors. Josef Frisch, IBIC Sept. 15, 2015

Beam Arrival Time Monitors. Josef Frisch, IBIC Sept. 15, 2015 Beam Arrival Time Monitors Josef Frisch, IBIC Sept. 15, 2015 Arrival Time Monitors Timing is only meaningful relative to some reference, and in general what matters is the relative timing of two different

More information

LUCX - THZ PROGRAM: OVERVIEW AND PROSPECTS

LUCX - THZ PROGRAM: OVERVIEW AND PROSPECTS LUCX - THZ PROGRAM: OVERVIEW AND PROSPECTS A. Aryshev On behalf of QB group and THz collaboration 14 Outline THz project overview LUCX activity LUCX Projects Overview THz program LUCX Laser system LUCX

More information

Conceptual Design Report. 11 Electron Beam Diagnostics. Synopsis. Chapter 11 - Beam Instrumentation

Conceptual Design Report. 11 Electron Beam Diagnostics. Synopsis. Chapter 11 - Beam Instrumentation 11 Electron Beam Diagnostics Synopsis The FERMI beam diagnostics includes a complete set of instruments specifically designed to completely characterize the FERMI free electron beams. Measurements to be

More information

A Facility for Accelerator Physics and Test Beam Experiments

A Facility for Accelerator Physics and Test Beam Experiments A Facility for Accelerator Physics and Test Beam Experiments Experimental Program Advisory Committee Roger Erickson for the SABER Design Team December 4, 2006 The Problem: FFTB is gone! The Final Focus

More information

7.iv. Strategic plan for the facility for the next five years.

7.iv. Strategic plan for the facility for the next five years. 7.iv.Strategicplanforthefacilityforthenextfiveyears. Executive Summary... 2 1) New Instrumentation Initiatives... 4 a. Macromolecular Femtosecond Crystallography (MFX) Instrument in Hutch 4.5... 4 b. Serial

More information

High Repetition Rate Inverse Compton Scattering Source

High Repetition Rate Inverse Compton Scattering Source High Repetition Rate Inverse Compton Scattering Source W.S. Graves, F.X. Kaertner, D.E. Moncton March 2, 2010 Future Light Sources Workshop SLAC Charge from Organizers 1) Overview of the technology 2)

More information

CLARA: A new particle accelerator test facility for the UK

CLARA: A new particle accelerator test facility for the UK CLARA: A new particle accelerator test facility for the UK Jim Clarke STFC Daresbury Laboratory and The Cockcroft Institute on behalf of the CLARA & VELA Project Teams RHUL Particle Physics Seminar, 25

More information

FLASH Operation at DESY From a Test Accelerator to a User Facility

FLASH Operation at DESY From a Test Accelerator to a User Facility FLASH Operation at DESY From a Test Accelerator to a User Facility Michael Bieler FLASH Operation at DESY WAO2012, SLAC, Aug. 8, 2012 Vocabulary DESY: Deutsches Elektronen-Synchrotron, Hamburg, Germany

More information

Nano Beam Position Monitor

Nano Beam Position Monitor Introduction Transparent X-ray beam monitoring and imaging is a new enabling technology that will become the gold standard tool for beam characterisation at synchrotron radiation facilities. It allows

More information

Sub-ps (and sub-micrometer) developments at ELETTRA

Sub-ps (and sub-micrometer) developments at ELETTRA Sub-ps (and sub-micrometer) developments at ELETTRA Mario Ferianis SINCROTRONE TRIESTE, Italy The ELETTRA laboratory ELETTRA is a 3 rd generation synchrotron light source in Trieste (I) since 1993 up to

More information

Synchronization Overview

Synchronization Overview Synchronization Overview S. Simrock, DESY ERL Workshop 2005 Stefan Simrock DESY What is Synchronization Outline Synchronization Requirements for RF, Laser and Beam Timing stability RF amplitude and phase

More information

Attosecond Diagnostics of Muti GeV Electron Beams Using W Band Deflectors

Attosecond Diagnostics of Muti GeV Electron Beams Using W Band Deflectors Attosecond Diagnostics of Muti GeV Electron Beams Using W Band Deflectors V.A. Dolgashev, P. Emma, M. Dal Forno, A. Novokhatski, S. Weathersby SLAC National Accelerator Laboratory FEIS 2: Femtosecond Electron

More information

arxiv:physics/ v1 [physics.acc-ph] 18 Jul 2003

arxiv:physics/ v1 [physics.acc-ph] 18 Jul 2003 DESY 03 091 ISSN 0418-9833 July 2003 arxiv:physics/0307092v1 [physics.acc-ph] 18 Jul 2003 Two-color FEL amplifier for femtosecond-resolution pump-probe experiments with GW-scale X-ray and optical pulses

More information

VIBRATING WIRE SENSORS FOR BEAM INSTRUMENTATION Suren Arutunian

VIBRATING WIRE SENSORS FOR BEAM INSTRUMENTATION Suren Arutunian VIBRATING WIRE SENSORS FOR BEAM INSTRUMENTATION Suren Arutunian Yerevan Physics Institute Yerevan Physics Institute S.Arutunian, VIBRATING WIRE SENSORS FOR BEAM INSTRUMENTATION BIW 2008, Lake Tahoe, USA

More information

SIMBOL-X. Peter Lechner MPI-HLL Project Review Schloss Ringberg, science background. mission. telescope.

SIMBOL-X. Peter Lechner MPI-HLL Project Review Schloss Ringberg, science background. mission. telescope. SIMBOL-X Peter Lechner MPI-HLL Project Review Schloss Ringberg, 24.04.07 science background mission telescope detector payload low energy detector science background science targets black holes astrophysics

More information

LCLS-II SXR Undulator Line Photon Energy Scanning

LCLS-II SXR Undulator Line Photon Energy Scanning LCLS-TN-18-4 LCLS-II SXR Undulator Line Photon Energy Scanning Heinz-Dieter Nuhn a a SLAC National Accelerator Laboratory, Stanford University, CA 94309-0210, USA ABSTRACT Operation of the LCLS-II undulator

More information

Wir schaffen Wissen heute für morgen

Wir schaffen Wissen heute für morgen Analyzing Wavefront and Spectrum of Hard X-ray Free-Electron Laser Radiation SLS (since 2001) Wir schaffen Wissen heute für morgen PSI: SLAC: SACLA: EuroXFEL: C. David, S. Rutishauser, P. Karvinen, I.

More information

ERL based FELs. Todd I Smith Hansen Experimental Physics Laboratories (HEPL) Stanford University Stanford, CA

ERL based FELs. Todd I Smith Hansen Experimental Physics Laboratories (HEPL) Stanford University Stanford, CA ERL based FELs Todd I Smith Hansen Experimental Physics Laboratories (HEPL) Stanford University Stanford, CA 94305-4085 Todd.Smith@Stanford.edu Electrostatic ERL-FELs University of California Santa Barbara

More information

Improvement in High-Frequency Properties of Beam Halo Monitor using Diamond Detectors for SPring-8 XFEL

Improvement in High-Frequency Properties of Beam Halo Monitor using Diamond Detectors for SPring-8 XFEL 32 nd International Free Electron Laser Conference FEL 2010 Improvement in High-Frequency Properties of Beam Halo Monitor using Diamond Detectors for SPring-8 XFEL August 26, 2010 Thursday, THOC4 1 Hideki

More information

Ultra-stable flashlamp-pumped laser *

Ultra-stable flashlamp-pumped laser * SLAC-PUB-10290 September 2002 Ultra-stable flashlamp-pumped laser * A. Brachmann, J. Clendenin, T.Galetto, T. Maruyama, J.Sodja, J. Turner, M. Woods Stanford Linear Accelerator Center, 2575 Sand Hill Rd.,

More information

ERLP Status. Mike Dykes

ERLP Status. Mike Dykes ERLP Status Mike Dykes Content ASTeC RF & Diagnostics Group Work of the Group 4GLS ERLP Photo-injector Accelerating Modules Summary High Power RF Engineering Andy Moss SRS Support; DIAMOND; ERLP; MICE;

More information

Stato del progetto RICH di LHCb. CSN1 Lecce, 24 settembre 2003

Stato del progetto RICH di LHCb. CSN1 Lecce, 24 settembre 2003 Stato del progetto RICH di LHCb CSN1 Lecce, 24 settembre 2003 LHCb RICH detectors Particle ID over 1 100 GeV/c provided by 2 RICH detectors RICH2: No major changes since RICH TDR PRR in february 2003 Superstructure

More information

Diagnostics for Free Electron Lasers. Josef Frisch

Diagnostics for Free Electron Lasers. Josef Frisch Diagnostics for Free Electron Lasers Josef Frisch Were you involved with LCLS lasing or did you only do the diagnostics? Can't construct a FEL with sufficient accuracy to allow it to lase when you turn

More information

FLASH performance after the upgrade. Josef Feldhaus

FLASH performance after the upgrade. Josef Feldhaus FLASH performance after the upgrade Josef Feldhaus European XFEL / HASYLAB Users Meeting DESY, January 27, 2011 Upgrade 2009 / 2010 > Upgrade shutdown: September 2009 February 2010 exchanged RF stations

More information

FLASH II: an Overview

FLASH II: an Overview FLASH II: an Overview 1. Layout. 2. Status 1. Civil Construction 2. E-beamline 3. Photon Beamline 3. Timeplan 4. Finances 5. Personnel Situation 6. Simultaneous Operation of FLASH1 and 2 FLASH II is a

More information