DEVELOPMENT OF LABORATORY PROCEDURE FOR MEASURING FRICTION OF HMA MIXTURES PHASE I

Size: px
Start display at page:

Download "DEVELOPMENT OF LABORATORY PROCEDURE FOR MEASURING FRICTION OF HMA MIXTURES PHASE I"

Transcription

1 NCAT Report DEVELOPMENT OF LABORATORY PROCEDURE FOR MEASURING FRICTION OF HMA MIXTURES PHASE I By Ray BrownB Timothy W. Vollor Douglas I. Hanson December Technology Parkway Auburn, AL 36830

2 DEVELOPMENT OF LABORATORY PROCEDURE FOR MEASURING FRICTION OF HMA MIXTURES PHASE I By Timothy W. Vollor Laboratory Manager National Center for Asphalt Technology Auburn University, Auburn, Alabama Douglas I. Hanson Research Engineer AMEC Tempe, Arizona Sponsored By Federal Highway Administration NCAT Report December 2006

3 DISCLAIMER The contents of this report reflect the views of the authors who are responsible for the facts and accuracy of the data presented herein. The contents do not necessarily reflect the official views or policies of the Federal Highway Administration or the National Center for Asphalt Technology. This report does not constitute a standard, specification, or regulation. - i -

4 TABLE OF CONTENTS INTRODUCTION...1 OBJECTIVE...1 TEST PROGRAM...2 Dynamic Friction Tester...2 Circular Track Meter...3 Laboratory Preparation of HMA Test Surface...4 Laboratory Mixing of the HMA...5 Two Methods Were Evaluated for Compaction...7 Method I: Compacting Slab Using Walk-Behind Vibratory Roller...7 Method II: Compacting Slab Using the Modified Hamburg Compactor...9 HMA Lab Polishing Equipment...14 Fabrication of Aggregate Polishing Test Machine...14 Dry and Wet Polishing Testing...18 NCAT Test Track Mean Profile Depth and Friction Evaluation...21 Laboratory and Field Friction Measurements Comparison...21 SUMMARY...23 RECOMMENDATIONS...24 REFERENCES ii -

5 DEVELOPMENT OF LABORATORY PROCEDURE FOR MEASURING FRICTION OF HMA MIXTURES PHASE I INTRODUCTION Timothy W. Vollor and Douglas I. Hanson Pavement friction during wet conditions continues to be a major safety concern for pavement design and maintenance. Friction is defined as the relationship between the vertical force and horizontal force developed as a tire slides along the pavement surface. Its magnitude mainly depends on the pavement surface characteristics and vehicle characteristics. Vehicle characteristics, such as speed, braking system and tire condition are not within the control of the highway road engineer. However, the highway engineer should provide pavement surface characteristics with sufficient friction to meet the design criteria. The skid resistance of pavements is commonly measured using ASTM E 274, Skid Resistance of Paved Surfaces Using a Full-Scale Tire. However, there are no standard test procedures for evaluating the friction of an HMA wearing course during the mix design process. There are two tests for evaluating the polishing properties of an aggregate: British portable skid resistance tester (ASTM Test Procedure D and E [Re-approved 2003]), and the acid insoluble residue test (ASTM D ). As a part of the testing on Phase I of the NCAT test track, surface characteristic tests were conducted each month on all sections to evaluate the degradation of the skid resistance with traffic. The testing was conducted by the Alabama DOT using a skid trailer meeting the requirements of ASTM E 274. Figure 1 shows the average results of that testing for like mixtures (above restricted zone (ARZ), below restricted zone (BFZ), through the restricted zone (TRZ), stone matrix asphalt (SMA), and open graded friction course (OGFC). It would be beneficial to develop a testing procedure and laboratory equipment that could be used to evaluate the frictional resistance of HMA mixtures in the laboratory that represents field measured results. OBJECTIVE The objective of this study was to design and build a prototype laboratory device and develop tentative laboratory procedures for evaluating the wet friction and/or aggregate polishing characteristics of HMA mixtures. 1

6 60.0 SMA Skid Number (64km/h) OGFC ARZ R 2 = BRZ R 2 = SMA R 2 = OGFC R 2 = TRZ R 2 = ESALs (millions) ARZ BRZ TRZ SMA OGFC Log. (ARZ) Log. (BRZ) Log. (TRZ) Log. (SMA) Log. (OGFC) SMA and OGFC Figure 1. Ribbed Tire Skid Number versus ESALs by Gradation Type (from data collect at NCAT Test Track) TEST PROGRAM The Japanese have developed a Dynamic Friction Tester (DF Tester) and Circular Track Meter (CT Meter) that can be used in combination to determine the International Friction Index (IFI) for an HMA pavement. The test procedures (as discussed below) for the two devices require a minimum surface area of inches by inches. A prototype laboratory testing machine will be fabricated that polishes the surface of an HMA surface, using rubber tires, similar to the polishing that occurs on roadway surfaces due to traffic. The polishing of the prototype machine should provide a laboratory prepared sample surface, similar to that provided under service, that can then be evaluated using the DF Tester and the CT Meter. Dynamic Friction Tester The Dynamic Friction Tester (DF Tester) (Figure 2) is specified by ASTM E The DF Tester has three rubber sliders that are spring mounted on a disk at a diameter of 350 mm (13.75 in). The disk is initially suspended above the pavement surface and is driven by a motor until the tangential speed of the sliders is 90 km/h (55 mph). Water is then applied to the test surface, the 2

7 motor is disengaged, and the disk is lowered. The three rubber sliders contact the surface and the friction force is measured by a transducer as the disk spins down. The friction force and the speed during the spin down are saved to a file. The DF Tester can be used to measure the friction as a function of speed over the range of zero to 90 km/h (0 to 55 mph). The entire operation is controlled by software in a laptop computer. The DF test system can be used to measure friction characteristics of laboratory manufactured samples that are at least 450 by 450 mm (17.75 by inches). Figure 2. Dynamic Friction Tester (DF Tester) Circular Track Meter Historically macrotexture has been measured using a volumetric technique. The technique consists of spreading a known volume of material (sand, glass beads, or grease) on the pavement and measuring the area covered. Dividing the volume of material used by the area covered provides the macrotexture depth or the Mean Texture Depth (MTD). This method is referred to as the sandpatch or greasepatch method. Originally the sandpatch method consisted of spreading a specified volume of Ottawa sand which passed the No. 50 sieve and was retained on the No. 100 sieve. The sand is spread with a spreading tool in a circular motion. The area of the circular patch of sand is determined by using the average of four equally spaced diameters. The current ASTM Standard E-965 calls for using glass spheres instead of sand. A variation of this method is used by NASA and is called the grease patch method in which the spreading material is grease. Recent advances in laser technology have resulted in automated equipment that can be used to compute the profile statistics for a pavement surface. One such device is the Circular Track Meter (CT Meter) (Figure 3). This test procedure is presented in ASTM E2157. The CT Meter uses a laser to measure the profile of a circle 284 mm (11.2 in) in diameter or 892 mm (35 in) in circumference. The profile is divided into eight segments of mm (4.4 in). The average MTD is determined for each of the segments of the circle. The reported MTD is the average of all eight-segment depths. The CT meter system can be used to measure the MTD characteristics of laboratory manufactured samples that are at least 450 by 450 mm (17.75 by inches). The friction result from the DF Tester at 20 km/h (12 mph) along with the Mean Texture Depth 3

8 (MTD) measurement from the CT meter can be used to calculate the IFI of a laboratory manufactured sample. Figure 3. Circular Track Meter (CT Meter) Laboratory Preparation of HMA Test Surface The DF tester and CT meter were selected to evaluate the HMA surface condition before and after the polishing of a Laboratory prepared HMA surface. The prototype polisher, described latter in this report, was designed with three wheels that tracked and polished a circular path that matched the circular path used by the DF tester and the CT meter in their evaluation of pavement surfaces. A laboratory method of preparing different HMA pavement surfaces for evaluation had to be developed. Two methods were investigated for making the HMA slabs for use with the polishing machine. One method used a walk-behind vibratory roller and the other used a modified Hamburg rolling wheel compactor. The walk-behind vibratory roller has been used in the past to produce large beams of HMA with good results. The standard rolling wheel Hamburg compactor has been used for constructing slabs to be used with the Hamburg rutting machine. However, the Hamburg slabs are smaller than the slabs needed for this investigation. The slab size requirements for this investigation were a minimum of inches by inches. This is the minimum size that the CT Meter and DF Tester need to evaluate a slab surface for friction and texture. Both methods of compaction were investigated to determine which would be the easiest to control the slab thicknesses, surface texture, and HMA properties. A coarse-graded 12.5 mm Superpave designed mix was selected for the construction of the slab during the first phase of this study. The mix design gradation is shown in Figure 4. 4

9 Percent Passing Superpave 12.5mm Sieve Size (mm) Figure 4. Mix Design Gradation Laboratory Mixing of the HMA A Hobart mixer, model number H600 (60qt.), was used to mix the HMA for the construction of the slab. The dough hook mixing blade supplied with the mixer (Figure 5) was used in the mixing process. The wire cage mixer (Figure 5) usually used for most HMA mixing was not strong enough to mix the heavy batch of HMA required for the slabs. A granite aggregate was used in all the HMA mixes for this investigation. Aggregates were blended in batches to provide the design gradation shown in Figure 4. The HMA mix weight was calculated to produce a slab 3 inches thick, with the desired air voids of 6.0% Each batch of aggregate was split and placed in two 5 gallon buckets for heating. PG67-22 asphalt cement was used for the binder. The asphalt cement was weighed placed in a gallon can for heating (weight of asphalt cement produced an asphalt content of 6%). The two 5 gallon steel buckets of aggregate to make up the total batch were placed in a 350 F oven overnight. This temperature and time was chosen to assure a constant temperature through out the aggregate before mixing. The gallon can of PG67-22 asphalt cement was heated to 310 F before mixing. The heated aggregate was placed in the mixing bowl as shown in Figure 6 and mixed for 15 seconds (dry mixing) before the heated asphalt cement was added. 5

10 Dough Hook Mixer Wire Cage Mixer Figure 5. Dough Hook and Wire Mixer Figure 6. Mixing Aggregates Prior to Adding Asphalt Cement The dry-mixing of the aggregate at a slow speed (approx. 30 rpm) was found to help eliminate segregation and produce a more uniform mix when the asphalt cement was added. After dry mixing for 15 seconds, the 2,444 grams of heated PG67-22 asphalt cement was added to the mixing bowl while the mixer continued to mix at slow speed. After the asphalt cement was completely added to the mix, the speed of the Hobart mixer was increased (approx. 60 rpm) and mixing continued for approximately 45 seconds or until complete mixing was accomplished. During the 45 second mixing period, a long spatula was used to scrape the sides of the bowl to assure that any fines and/or asphalt cement stuck to the sides of the bowl were included in the total mixing of the sample. The mixing process described in this paragraph produced acceptable mixing of the HMA with minimal time required. From visual inspection the HMA produced had minimal segregation of the aggregate and showed little evidence of uncoated aggregate in the 6

11 mix. Therefore, this mixing process and equipment was used to produce the HMA for all the slabs constructed during phase I. Two Methods Were Evaluated for Compaction Two methods were evaluated for compacting the mixture. The first method used was a walk behind vibratory roller and the second method utilized a modified Hamburg rolling wheel compactor. The best method was selected for compacting the remainder of the samples. Method 1. Compacting Slab Using Walk-Behind Vibratory Roller. A metal frame to confine the mixture during compaction was constructed using a 3.25 inch square metal beam. The metal beam was cut in lengths so the lengths could be bolted together to form a 24 inch square (inside dimensions) frame which was used to confine the HMA sample during compaction (Figure 7). Confining frame Spacer used to vary thickness of slab Figure 7. Frame and Spacer Spacers frames were constructed 24 inches square by 0.25 inches thick (see Figure 7) so that the compacted thickness could be varied by intervals of 0.25 inches. A solid steel plate 24 inches square by 0.25 inches thick was used as the base to compact the mix (Figure 8). Confining frame Spacers used to vary thickness of slab Solid Base Plate Figure 8. Square Mold (24" by 24") with Solid Base Plate 7

12 Using the spacers and the base plate, the thickness of the constructed slab can be varied by intervals of 0.25 inches from 3 inches thick to 0.25 inches thick. A double drum vibrator walkbehind roller (BOMAG BW65H) was used to compact the slab sample in the mold (Figure 9). The two drums of the BW65H roller were 22 inches wide. The mixing process described previously was used to mix the HMA sample for placement in the mold. The area where the compaction process took place was approximately 75 yards from the mix area. A wooden platform was constructed around the steel form to facilitate the compaction (Figure 9). BOMAG BW65H Wooden Platform Slanted ramp Figure 9. Wooden Platform Constructed Around Mold The HMA was transported in the mixing bowl by cart to the compaction area. Transportation of the HMA took approximately 5 minutes The HMA was immediately placed in the center area of mold. The HMA was then pushed out to the corners and smoothed out using a 4 inch by 14 inch rectangular trowel (Figure 10). 4 X14 Trowel Figure 10. Distributing Mix Evenly in Mold 8

13 Particular emphasis was placed on minimizing segregation and maintaining uniformity during the spreading and smoothing out of the mix in the mold before compaction started. The placement of the mix in the mold took another 10 to 15 minutes allowing an additional cooling period. The differential cooling and segregation of the mix during the placement process was difficult to control. The HMA was then compacted using the walk-behind BOMAG BW65H vibratory roller (Figure 9). The width of the roller drums were approximately 2 inches less than the inside dimensions of the mold making it difficult to maintain surface smoothness and prevent movement of material around in the mold. During rolling, one edge of the roller would roll on the surface of the metal frame causing the other edge to dig into the mix surface which resulted in tears and unevenness of the surface. The vibratory roller would shove mix in front of the roller and over the sides of the mold. The material had to be removed from the edges of the mold constantly in an effort to maintain surface smoothness on the slab. The removal of this material affected the weight of mix being placed in the mold to obtain designed air voids with the constructed thickness. The movement of material caused roughness and variable densities and surface texture in the slab. In order for the process to be successful a wider roller to completely span the 24 inch width of the mold was needed. Also a redesign of the mold to prevent the mix from being shoved out of the mold during the rolling process was needed. Construction of the HMA slabs using the vibratory rolling technique were discontinued due to the problems encountered. Method II. Compacting Slab Using the Modified Hamburg Compactor. The standard Hamburg compactor was designed to construct a slab11 inches by 15 inches which is the required size for use in the Hamburg rutting and moisture tester. The thickness of the slab can be varied in ¼ inch increments from 1/2 inch to 4 inches. The original rolling wheel used to compact the Hamburg slabs was 12 inches wide. Modifications to the compactor were necessary in order to compact a minimum size slab of inches square for use with the CT Meter and DF Tester. The frame of the Hamburg compactor was cut and widened to allow the 12 inches wide rolling wheel to be replaced with a 21 inch wide roller (Figure 11). Figure 11. Modifications to Frame and Roller of the Hamburg Compactor 9

14 A new platform was constructed to accommodate the mold for the compaction of the larger slabs (Figure 12). Figure 12. Larger Platform to Compact Slabs A new mold was fabricated to be used to construct a 20 inch square slab (Figure 13). Figure 13. New 20" by 20" Mold for Hamburg Compactor Spacers similar to those shown in Figures 7 and 8 were placed in the mold to obtain the desired slab thickness. Four by twenty inch steel plates were placed vertically on top of the HMA in the mold and perpendicular to the path of the roller as shown later. Both 3/8 and 1/8 inch thick plates were used to cover the slab before compaction. During compaction, the steel wheel roller moved across the top of these plates putting pressure on each individual plate. This resulted in a kneading action during compaction without shoving and/or moving the mix in front of the roller. The modified Hamburg compactor is shown in Figure

15 Figure 14. Modified Hamburg Compactor The mixing process described previously was used to mix the HMA sample for placement in the mold. The Hamburg compactor and the Hobart mixer were adjacent to each other; therefore the cooling of the mix during transportation from mixing to compaction was minimized. Trials were conducted to determine the best procedures to follow during the construction of the slab. The following procedures for the construction of the slabs were established as a result of the trials. After mixing, the HMA was dumped in the middle of a 1/2 inch thick iron sheet measuring 36 by 36 inches. The iron sheet was pre-heated using a blow torch in order to minimize heat loss in the HMA when placed on the plate. The HMA pile was then quartered using a quartering tool as shown in Figure 15. Separation paper was placed in the bottom of the mold to prevent the compacted HMA from sticking to bottom of mold. Quartering tool being placed in mold Quartered mix on hot plate Figure 15. Quartering Mix Using Tool The quartering tool was then removed and placed in the mold so that each quarter of the pile of HMA could be placed in a quarter of the mold for spreading (Figure 15). Once the HMA was 11

16 placed in the four quarters, the quartering tool was removed and the mix spread evenly. The placement and spreading of the HMA was done in quarters to minimize segregation of the HMA during this operation. Once the HMA was spread evenly in the mold, a separation paper was then placed on the un-compacted mix in the mold. Plates measuring 3/8 inches thick 4 inches high and 20 inches long were then placed in the vertical position on top of the mix (Figure 16) until they completely covered the mix and were fairly tight. The tightness of these plates was determined with experience. Basically, the plates needed to be tight enough not to wobble during rolling and not so tight as to prevent independent movement up and down of the individual plates during rolling. Figure 16. Placing Plates Vertical in Mold After the placement of the vertical plates, the HMA mold assembly was picked up and placed on the compaction platform in the Hamburg compactor. The compaction platform is equipped with a manual hydraulic lift that lifts the mold and sample in contact with the roller. The operator can control the pressure of the lift therefore controlling the pressure exerted by the roller on the sample. The first few passes of the roller were used to seat the plates so that they were even (Figure 17). Figure 17. Plates Seated with Light Pressure from Roller After the plates were seated, they were rolled while maintaining a 1000 to 1500 psi hydraulic pressure in the rams lifting the platform with the compaction mold. Rolling continued until the tops of the plates were level with the top of the mold (Figure 18). 12

17 Figure 18. Plates Rolled Down Flush with Top of Mold When the top of the plates were even with the top of the mold, the calculated volumetric properties met the design requirements. The compaction plates were then removed from the top of the slab. The surface of the slab in contact with the bottom of the mold during compaction was used as the test surface when obtaining texture and friction data. The top of the slab adjacent to the steel plates was not tested since it was believed to be slightly uneven and therefore would not simulate field samples. The mold and HMA slab were allowed to cool before removing the sides of the mold. While cooling, the separation paper was removed from the slab. Cooling of the slab in the mold was critical because the weight of the slab made it impossible to move when it was still hot without damaging the sample. In conclusion, the procedure and equipment used with the walk behind vibratory roller compaction process needs some modification in both the equipment and procedure if it to be used to produce acceptable HMA slabs. The quality and smoothness of the slabs could not be controlled with the equipment and procedures used in this investigation. The distance the HMA was transported from mixing to compaction site and the placing and spreading of the mix in the mold took too long and allowed time for mix cooling. The spreading and leveling procedures allowed excessive segregation to occur in the HMA. The walk behind vibratory compactor needed to be wide enough to span the width of the mold to control the smoothness and prevent shoving the mix around in the mold. The modified Hamburg compaction was selected as the method for making HMA slabs for this investigation. This method allowed better control on temperature loss in the mix. By quartering the mix and placing the HMA in the mold in quarters, segregation was minimized. Using the vertical plates with the Hamburg device allowed compaction with kneading action without moving the mix in the mold. Visual observations indicated that the production of the HMA slab 13

18 with the modified Hamburg compaction process was much improved over the walk behind vibratory roller method. HMA Lab Polishing Equipment The lab HMA polisher was designed using the following goals: a. Test aggregates propensity to polish in the conditions in which the aggregate is being used. If the intended use is in an Open Graded Friction Coarse (OGFC), the polishing propensity will be tested using the aggregate in an OGFC. If the aggregate is to be used in a coarse graded Superpave designed mix, the aggregate s propensity to polish will be tested in a coarse graded Superpave mix. This will be addressed by making HMA slabs with different HMA mixes to be used in the polishing test. b. The texture and friction of the polished surface should be evaluated before and after polishing using the CT Meter and the DF Tester. c. It would be beneficial to have the polishing done by rolling wheels similar to polishing by vehicular wheels. d. This device should be able to polish aggregate in an HMA in the field as well as in the laboratory. e. Automatic turn off when polishing is complete. f. Be capable of varying the normal load and speed of polisher. g. Minimize the cost of the equipment to make it affordable as laboratory equipment. Fabrication of Aggregate Polishing Test Machine The CT meter and DF tester evaluates the texture and friction within the outer portion of an 11-3/16 inch diameter circle. Therefore, as a minimum, the polishing device has to polish this area. The polishing device was designed to use 8 X 3 inch caster wheels attached to a turntable so that the wheels tracked in an 11-3/16 inches diameter circle. The friction of the caster wheels on the surface of the HMA slab polishes the aggregate in the HMA slab similar to the way the vehicular tires polish the aggregate in an HMA pavement surface on a highway. In order to mount the casters and wheels in a circle to track the desired diameter, space restrictions allowed three wheels to be mounted (Figure 19). The casters were equipped with ball bearings that allowed the wheels to line up with the 11-3/16 inch diameter circular path (Figure 19). Circular iron plates were constructed to be placed on the turntable to change the weight on the three wheels thus changing the normal load on the three wheels (Figure 19). A square tube-like shaft was used to connect the motor shaft and penned with a slotted hole for movement up and down (Figure 20). The wheels and turntable were free to move up and down so that the weight on the wheels could be varied by adding or subtracting circular iron plates. 14

19 Square Tube shaft Circular Iron Plates Ball Bearings on casters Wheels Figure 19. Abrasion Wheel Assembly Motor Shaft Pinned Square Shaft Figure 20. Square Shaft Attached to Motor Shaft A square shaft that was attached to the circular motor shaft was inserted within a square shaft mounted to the turntable (Figure 21). The square shaft transferred the torque from the motor to turn the turntable while allowing the shaft to freely move up and down during test. This would allow weight added to the turntable to be transferred to the wheels. 15

20 Square shaft attached to motor Square receiver attached to turntable Figure 21. Square Shaft Fitting Through Square Shaft Attached to Turntable The motor used to turn the wheel was an electric ½ horse-power motor requiring 110 volts (Figure 22). The motor drove a gear box that allowed better torque at low speeds. The motor was controlled by a Baldor motor speed controller that allowed the input of variable speed control (Figure 22). An Omega digital counter with a laser light pick-up was used to count the revolutions of the turntable automatically (Figure 22). The Omega counter was programmed to input the desired number of revolutions and when that number of revolutions was obtained the Omega counter turned off the power to the motor. ½ Horse Power Motor Baldor Motor Speed Control Gear Reduction Box Omega Digital Counter Figure 22. Motor and Controls on Polisher 16

21 A water spray system was added in order to spray water on the surface being polished. Water was needed in order to wash away abraded particles to allow polishing of the aggregates and also to simulate wet conditions. The water was sprayed on the surface using ¼ inch PVC pipe connected to a water supply. The PVC pipe was attached to the frame on three sides (Figure 23). Small holes were drilled into the PVC pipe that directed application of water onto the surface of the slab (Figure 23). Figure 23. Water Spray System The pressure at the water source was adjusted to control the amount of water being sprayed on the surface. An electric cutoff valve was added between the source and the spray. The electric cutoff was connected to the Omega counter so that when the desired revolutions were obtained the Omega counter would cut off both the electric motor which powered the wheels and the water to the spray system. The frame to support the systems was covered with mesh for safety (Figure 24). Figure 24. Protective Wire Mesh 17

22 Rollers were installed on the rear of the frame to allow ease in moving the polisher. A top hinged door was placed on the front of the machine to allow a 20 by 20 inch slab to be inserted by rolling the polisher over a slab to be tested (Figure 25). Figure 25. Slab Placed in Slotted Area at Bottom of Polishing Machine Dry and Wet Polishing Testing The initial testing with the polishing machine was first attempted on a dry HMA surface using three rubber pneumatic tires and then using three Bronco UV wheels. Initial observations on the rubber pneumatic tires showed excessive tire wear. It is believed that the wheel heated up to a point where the rubber was softened and balled up on the surface being polished. The balled up rubber on the surface caused the wheels to lose contact with the HMA surface thus stopping the polishing action. Therefore the use of the rubber pneumatic wheels on a dry surface was discontinued. The Bronco wheels (Gray) were tried on the dry surface. The Bronco wheels are hard rubber (75-80 Durometer) solid wheels which were much more abrasive resistant. During the operation of the polisher using the bronco wheels, a fine dust material was abraded from the surface of the wheels and deposited and ground into the surface of the HMA being polished. Efforts were unsuccessful to air blow and /or brush these particles off the surface. It is believed that the presence of these particles affected the polishing action of the wheels on the surface of the HMA and therefore would not give realistic results. Therefore dry testing was discontinued. A water spray system described previously was added to remove the abraded material on the surface and to simulate minimum friction under wet surface conditions. The water spray system was successful. Using the polishing device with the water spray system, HMA slabs were polished using 5 different sets of wheels. The five wheel types used are shown in Table 1. 18

23 Table 1. Experimental Set up Wheel Number Wheel Material Description Pneumatic Wheel Payductile Iron Wheel, Steel Miratek Polyurethane 95 Shore, Red Bronco mold-on Wheel, Gray Phenolic Resin Wheel, Black Dia IN. Wheel Tread Width IN. Catalog # Wheel with Bearings Capacity Approx. Weight of Wheels Normal Load LBS. LBS. LBS UW / UD UT UV / Five sets of three wheels were mounted on the polish device and evaluated for their characteristics of polishing the surface of an HMA. New slabs constructed to the same specifications were used with each set of wheels. The slabs were polished using cycle periods of 5, 15, 35, 75, and 95 thousand cycles. The normal load used during all tests in this phase was 105 pounds. The tire pressure for the pneumatic tires was maintained at 50 psi. This is lower than typical truck tires but higher than automobile tires and is probably a good average number for all traffic that would be expected to polish a roadway (pressure could not be controlled in the solid tires). At the end of each cycle period the polishing device was stopped and the slab was removed, dried and its surface was evaluated for texture and friction using the ASTM E 2157 Circular Track Meter (CT Meter) for texture and ASTM E 1911 Dynamic Friction Tester (DF Tester) for friction. The texture and friction measurements were made in a direction parallel and perpendicular to the direction of the roller during the compaction of the slab. The average of the parallel and perpendicular results was used to calculate International Friction Index (F 60 ). It has been shown that the DF Tester value at miles/hour (20 km/h) together with a texture measurement provides a good estimate of the friction number of IFI (8). The International Friction Index (F 60 ) was used to compare the polishing characteristics of the five types of wheels. The F 60 is calculated using the surface texture and the surface friction. The equation for calculating the F 60 is as follows: MPD = DFT20 e F Where F 60 DFT 20 MPD International Friction Index Friction number obtained at 20 km/h using the DF Tester Mean profile depth obtained from CT Meter 19

24 A plot of F60 verses number of cycles for the five sets of wheels tested are shown in Figure 26. F60 Friction No THREE WHEEL POLISHING DEVICE y = Ln(x) Pneumatic R 2 = y = Ln(x) Red R 2 = y = Ln(x) Black R 2 = y = Ln(x) Gray R 2 = y = Ln(x) Steel R 2 = Cycles in Thousands Black wheel wet Red wheel wet Gray wheel wet Steel wheel wet Pneumatic Black Wet Log. (Red wheel wet) Log. (Black wheel wet) Log. (Gray wheel wet) Log. (Steel wheel wet) Log. (Pneumatic Black Wet) Figure 26. IFI (F 60 ) Measurements Versus Cycles for Five sets of wheels The F60 values plotted are the average of the values obtained parallel and perpendicular to the direction of the roller during the making of the HMA slab. The shape of the curve produced with each of the five sets of wheels are reasonable showing a high rate of friction loss between 0 and 10,000 cycles of the wheels. An explanation for the high rate of friction loss on initial cycles would be that the exposed aggregate initially had sharp edges which gave higher friction values; however, these sharp edges were worn away rapidly by the abrasive action of the wheels causing a rapid reduction of friction. It is also possible that some of the aggregate particles on the surface were reoriented such that a flatter surface was exposed reducing surface friction. The curves showed a slower rate of friction loss occurring with additional cycles for the remainder of the cycles. An explanation for the slower rate of friction loss would be that the initial removal of the sharp edges and reorienting of the surface aggregate gave a more stable surface for the abrasion and polishing action of the wheels. The Natural Log (ln) equation and R-value found for each of the five curves are also shown on Figure 26. As shown in Table 1, five wheel types were evaluated for this study. One of the needs of this project was to determine which wheel types provided a reasonable comparison to what has been observed in the field. The use of the steel wheel in the polishing test resulted in a severe abrasion (Figure 27) to the HMA surface and not a polishing of the surface which occurs with the other four sets of wheels and which occurs on HMA roadways. 20

25 Figure 27. Abrasion of Surface by Steel Wheel As a result of this study the steel wheels are not recommended for use to simulate traffic polishing of the roadway surface and therefore no further evaluation of the steel wheels were considered. The other four set of wheels did exhibit polishing of the HMA surface and can be used for this purpose. NCAT Test Track Mean Profile Depth and Friction Evaluation Part of the testing program while applying traffic on the NCAT Test Track requires that Friction and Mean Profile Depth (MPD) measurements be taken on each section of the 1.7 mile oval track. This data was used to track and evaluate the change in surface characteristics of the track surface during application of traffic. The test track was divided into 46 sections, 200 feet long. Each section was constructed using individual HMA mixes and designs specified by the sponsor of the individual sections. Laboratory and Field Friction Measurements Comparison Three 200 feet sections from the NCAT Track were selected for comparison with the laboratory results obtained using the Three Wheel Polishing Device. Sections E 04, E 06 and S 09, which had the same aggregate type and similar aggregate gradation with the laboratory compacted slabs were selected. Mixture properties of these sections are listed in Table 2. Friction, texture, and IFI results were compared for three sections on the test track and the three wheel polishing machine. Five sets of wheels, having different characteristics, were evaluated for polishing the slab. The results are shown in Table 3. As shown, there are differences between the track and laboratory results for the friction device (DF Tester), the texture meter (CT Meter), and the calculated IFI. No statistical analysis of the results could be performed due to the limited amount of data and the methods used in collecting the data. 21

26 Table 2. Mixture Properties of Test Track Sections Sections E 04 E 06 S 09 Aggregate Type Granite Granite Granite ¾ ½ / No No No No No No No Asphalt Content Table 3 also shows that the variability of the results with the polishing device was generally less than the variability of the results measured at the track. Part of the reason for this difference in variation is that the results of the polishing device were obtained from a number of tests on one sample whereas the results in the field were obtained at a number of locations generally resulting in more field variability. The friction and texture results from the samples polished in the laboratory can be seen more as a measure of test repeatability whereas the results from the field are more a measure of mixture and test variability. The very low variability seen from samples polished in the laboratory is the result of using average numbers from one sample to get results. It is shown in Table 3 that the pneumatic tire provides texture and friction results on polished laboratory samples closer to that observed in the field. Hence, all future work should probably be done with a pneumatic tire to provide better comparison to the field results. Work is still needed to determine optimum tire pressure, number of cycles, wheel load, etc. to get results from the laboratory procedure that compare better with field measured values. The texture difference between the laboratory prepared and field compacted samples is likely due to the method of compaction and thus orientation of the aggregate particles in the surface. A roller was tried in the laboratory but with little success. It is believed that the laboratory roller would help to orient the aggregate particles more like those after field compaction. More work is needed to determine a laboratory procedure that better correlates with the texture in the field. This may require that additional effort be used to develop acceptable procedures with the laboratory vibratory compactor. 22

27 Table 3. Comparison of Texture, Friction and IFI Measurements on the NCAT Test Track and With the Three Wheel Polishing Device Surface CT Meter DF Tester IFI with end of test period* ASTM E 2157 STD DEV ASTM E 1911 STD DEV E1911 EO4 test section* EO6 test section* S09 test section* PNEUMATIC wheel test slab** STEEL WHEEL test slab** RED WHEEL test slab** GRAY WHEEL test slab** BLACK WHEEL test slab** *Track section results are at 8 million axle passes ** slab surfaces results are at 95,000 cycles of the three wheel Polishing device SUMMARY The primary objective of this project was to look at the potential of developing a polishing test in the laboratory that would allow for measurement of the effect of polishing on the texture and friction of HMA samples. Based on this limited study a device was developed that does show potential for polishing laboratory samples but additional work is needed to make the method more similar to that observed in the field. A summary of the findings of this study are provided below: a. A three wheel polishing device was developed to allow for polishing of laboratory prepared slabs and testing for texture and friction. b. The polisher is equipped with automatic cut off that can be programmed to stop the equipment at any required number of cycles. c. The normal load and speed of the polisher can be adjusted. 23

28 d. The cost of the polisher should not exceed $10,000. e. The results with the pneumatic tires appeared to simulate the results seen in the field better than the solid tires evaluated. f. Procedures and equipment were developed to construct an HMA slab in the laboratory that simulated field samples and that was compatible with the three wheel polishing machine. g. The CT meter and the DF tester were shown to be capable of being used to measure the texture and friction of the polished surface on the laboratory manufactured HMA slab. h. Results indicate the lab HMA polisher produces curves with a similar shape to those plotted using results from the Test Track indicating the potential for this device to be used to predict texture and friction of laboratory compacted samples. i. The polisher has the potential to be used on field compacted mixture if needed. RECOMMENDATIONS Based on this limited study the following recommendations are warranted: 1. Further development of the polisher is needed to determine the optimum load and speed of the polishing tires. 2. Laboratory samples using 2003 and 2006 NCAT track mixes should be tested and compared with results from those mixes during trafficking on the track. Investigate differences in friction and surface texture between laboratory prepared and field compacted samples. 3. Investigate instrumentation to the shaft of the Three Wheel Polishing device to determine if the change in torque on the shaft can be related to change of friction during polishing. 24

29 REFERENCES 1. American Society for Testing and Materials Measuring Pavement Surface Frictional Properties Using the Dynamic Friction Tester ASMT Standard Test Method E- 1911, Book of ASTM Standards, Volume 04.03, Philadelphia, PA (1999) 2. American Society for Testing and Materials Standard Test Method for Measuring Pavement Macrotexture Properties Using the Circular Track Meter ASTM Standard Test Method E , Book of ASTM Standards, Volume 04.03, Philadelphia, PA (1999) 3. American Society for Testing and Materials Accelerated Polishing of Aggregates Using the British Wheel ASTM Standard Test Method D-3319, Book of ASTM Standards, Volume 04.03, Philadelphia, PA (1999) 4. American Society for Testing and Materials Measuring Surface Friction Properties Using the British Pendulum Tester ASTM Standard Test Method E-303, Book of ASTM Standards, Volume 04.03, Philadelphia, PA (1999) 5. American Society for Testing and Materials Insoluble Residue in Carbonate Aggregates ASMT Standard Test Method D-3042, Book of ASTM Standards, Volume 04.03, Philadelphia, PA (1999) 6. American Society for Testing and Materials Skid Resistant of Paved Surfaces Using a Full-Scale Tire ASMT Standard Test Method E-274, Book of ASTM Standards, Volume 04.03, Philadelphia, PA (1999) 7. American Society for Testing and Materials Measuring Pavement Macrotexture Depth Using a Volumetric Technique ASTM Standard Test Method E-965, Book of ASTM Standards, Volume 04.03, Philadelphia, PA (1999) 8. Henry, J.J., Hironari Abe, Shulchi Kameyama, Akinori Tamai, Atsushi Kasahara, Kazuo Saito Determination of the International Friction Index (IFI) Using the Circular Texture Meter (CTM) and the Dynamic Friction Tester (DFT). PIRAC 109,

Commonwealth of Pennsylvania PA Test Method No. 517 Department of Transportation October Pages LABORATORY TESTING SECTION. Method of Test for

Commonwealth of Pennsylvania PA Test Method No. 517 Department of Transportation October Pages LABORATORY TESTING SECTION. Method of Test for Commonwealth of Pennsylvania PA Test Method No. 517 Department of Transportation 10 Pages 1. SCOPE LABORATORY TESTING SECTION Method of Test for DETERMINATION OF ACCELERATED POLISH OF COARSE AGGREGATE

More information

ACCELERATED POLISH TEST FOR COARSE AGGREGATE

ACCELERATED POLISH TEST FOR COARSE AGGREGATE Test Procedure for ACCELERATED POLISH TEST FOR COARSE AGGREGATE TxDOT Designation: Tex-438-A Effective Date: August 1999 1. SCOPE 1.1 Use this method to estimate the polish and relative wear of coarse

More information

METHOD OF TEST FOR DETERMINATION OF THE SEVERITY OF A SEGREGATED ASPHALT PAVEMENT SURFACE

METHOD OF TEST FOR DETERMINATION OF THE SEVERITY OF A SEGREGATED ASPHALT PAVEMENT SURFACE Laboratory Testing Manual Date: 09 08 01 Page 1 of 7 METHOD OF TEST FOR DETERMINATION OF THE SEVERITY OF A SEGREGATED ASPHALT PAVEMENT SURFACE 1. SCOPE 1.1 This procedure 1 covers the method for determining

More information

-_if-;reliminary STUDY IN THE DEVELOPMENT OF A METHOD FOR / EVALUATING THE RELATIVE POLISHING CHARACTERISTICS OF I BITUMINOUS PAVING MIXTURES

-_if-;reliminary STUDY IN THE DEVELOPMENT OF A METHOD FOR / EVALUATING THE RELATIVE POLISHING CHARACTERISTICS OF I BITUMINOUS PAVING MIXTURES -_if-;reliminary STUDY IN THE DEVELOPMENT OF A METHOD FOR / EVALUATING THE RELATIVE POLISHING CHARACTERISTICS OF I BITUMINOUS PAVING MIXTURES by Tom S. Patty Geologist II '{ ~d -- :_ Materials and Tests

More information

NEW TECHNOLOGY & APPROACHES TO ADDRESS PAVEMENT CONSTRUCTION ISSUES

NEW TECHNOLOGY & APPROACHES TO ADDRESS PAVEMENT CONSTRUCTION ISSUES NEW TECHNOLOGY & APPROACHES TO ADDRESS PAVEMENT CONSTRUCTION ISSUES NORTHEAST ASPHALT USER/PRODUCER GROUP OCTOBER 12,2006 CHUCK DEAHL BOMAG AMERICAS, INC. Pavement Construction Issues No Compaction In

More information

Evaluating the Laboratory Based Polishing of New Zealand Greywackes in Comparison to Melter Slag

Evaluating the Laboratory Based Polishing of New Zealand Greywackes in Comparison to Melter Slag Evaluating the Laboratory Based Polishing of New Zealand Greywackes in Comparison to Melter Slag Authors: Speaker: Ashkan Tatari Seosamh B. Costello Douglas J. Wilson David Hutchison Adelia D. Nataadmaja

More information

Tire/Pavement Noise 1

Tire/Pavement Noise 1 Tire/Pavement Noise 1 Nature of highway noise Tire/pavement! Generally the primary source at highway speeds (greater than 35 mph) " Level is dependent on vehicle type, vehicle speed and tire type! Other

More information

OPERATING PAVEMENT PROFILOGRAPH AND EVALUATING PROFILES

OPERATING PAVEMENT PROFILOGRAPH AND EVALUATING PROFILES Test Procedure for OPERATING PAVEMENT PROFILOGRAPH AND EVALUATING PROFILES Texas Department of Transportation TxDOT Designation: Tex-1000-S Effective Date: August 1999 1. SCOPE 1.1 This method covers the

More information

PREMIUM CONCRETE COUNTERTOP MIX INSTALLATION INSTRUCTIONS

PREMIUM CONCRETE COUNTERTOP MIX INSTALLATION INSTRUCTIONS PREMIUM CONCRETE COUNTERTOP MIX INSTALLATION INSTRUCTIONS High Strength Fast Setting Pourable Helpful Items: TCC Materials February 09 Version 2.0 Tools Required: Concrete mixer or ½ drill (600 RPM or

More information

IGGA Guide Specification: Dowel Bar Retrofit (DBR) Introduction

IGGA Guide Specification: Dowel Bar Retrofit (DBR) Introduction IGGA Guide Specification: Dowel Bar Retrofit (DBR) Introduction This standard developed by the International Grooving and Grinding Association (IGGA) specifies the procedures for construction of dowel

More information

Agricultural Mechanics and Technology Power Tool Safety Rules

Agricultural Mechanics and Technology Power Tool Safety Rules Agricultural Mechanics and Technology Power Tool Safety Rules Name: BAND SAW Use: Cutting curves, circles and irregular shapes. 1. Use clean SHARP blades. 2. The teeth should always point DOWN. 3. Adjust

More information

Seal Coats and Surface Treatments Fred J. Benson, Dean of Engineering A. and M. College of Texas College Station, Texas The construction, as here

Seal Coats and Surface Treatments Fred J. Benson, Dean of Engineering A. and M. College of Texas College Station, Texas The construction, as here Seal Coats and Surface Treatments Fred J. Benson, Dean of Engineering A. and M. College of Texas College Station, Texas The construction, as here discussed, consists of an application of bituminous material

More information

4.1. Foremen 4.2. Concrete plant manager 4.3. Concrete plant operator 4.4. Personnel performing saw cutting and joint sealing

4.1. Foremen 4.2. Concrete plant manager 4.3. Concrete plant operator 4.4. Personnel performing saw cutting and joint sealing 10-1. JOINTED PLAIN CONCRETE PAVEMENT GENERAL Summary This work includes constructing jointed plain concrete pavement. Comply with Section 40, "Concrete Pavement," of the Standard Specifications. Submittals

More information

FLIP TARP SINGLE & DOUBLE UNDERBODY TRAILERS

FLIP TARP SINGLE & DOUBLE UNDERBODY TRAILERS 1-800-248-7717 1002 N. 15th Street, Middlesboro, KY 40965 FLIP TARP SINGLE & DOUBLE UNDERBODY TRAILERS INSTALLATION INSTRUCTIONS Congratulations on your purchase of a Mountain Flip Tarp Trailer system.

More information

Industrial Contractors Supplies, Inc.

Industrial Contractors Supplies, Inc. Industrial Contractors Supplies, Inc. - Dust Director Division - 15061 Route 30, N. Huntingdon, PA 15642 Phone: 412. 824. 6933 Fax: 412. 824. 4704 www.dustdirector.com 5" & 7" SURFACE DUST GUARDS MANUAL

More information

30DC Speed Lathe Manual

30DC Speed Lathe Manual 30DC Speed Lathe Manual The Crozier Model 30DC Speed Lathe is our most popular model. It has many standard features not found on any other machine in its class or price range. Standard Features 3/4 HP

More information

N. 15th Street, Middlesboro, KY FLIP TARP DUMP BODY INSTALLATION INSTRUCTIONS

N. 15th Street, Middlesboro, KY FLIP TARP DUMP BODY INSTALLATION INSTRUCTIONS 1-800-248-7717 1002 N. 15th Street, Middlesboro, KY 40965 FLIP TARP DUMP BODY INSTALLATION INSTRUCTIONS Congratulations on your purchase of a Mountain Flip Tarp Dump Body tarping system. With tarping systems

More information

USE OF TEAR-OFF RECYCLED SHINGLES IN ASPHALT PAVEMENTS

USE OF TEAR-OFF RECYCLED SHINGLES IN ASPHALT PAVEMENTS USE OF TEAR-OFF RECYCLED SHINGLES IN ASPHALT PAVEMENTS Larry Shively The Shelly Company Ohio Asphalt Paving & North Central User Producer Group Conference Columbus, Oh February 2, 2011 Background 10 million

More information

Pneumatic Clamp Carrier. Installation & Operation Manual

Pneumatic Clamp Carrier. Installation & Operation Manual Pneumatic Clamp Carrier Installation & Operation Manual Pneumatic Clamp Carrier Installation & Operation Manual Quick Machinery Company 8272 Peninsula Drive Kelseyville, CA 95451 phone: (707) 272-6719

More information

Getting the Most Out of Airless Spray

Getting the Most Out of Airless Spray P Getting the Most Out of Airless Spray aint application using airless equipment is, and has been for many years, the method of choice for large industrial painting projects. Although the industry is aware

More information

White paper. Exploring metal finishing methods for 3D-printed parts

White paper. Exploring metal finishing methods for 3D-printed parts 01 Exploring metal finishing methods for 3D-printed parts 02 Overview Method tested Centrifugal disc Centrifugal barrel Media blasting Almost all metal parts whether forged, stamped, cast, machined or

More information

Hydraulic Clamp Carrier. Installation & Operation Manual

Hydraulic Clamp Carrier. Installation & Operation Manual Hydraulic Clamp Carrier Installation & Operation Manual Hydraulic Clamp Carrier Installation & Operation Manual Quick Machinery Company 8272 Peninsula Drive Kelseyville, CA 95451 phone: (707) 272-6719

More information

3 All Weather Paint. Product Bulletin January Second Drop Glass Beads

3 All Weather Paint. Product Bulletin January Second Drop Glass Beads 3 All Weather Paint Product Bulletin January 2010 Description 3M All Weather Paint is a traffic paint system consisting of high-build waterborne paint and 3M bonded core elements. 3M all weather paint

More information

owners manual CAUTION: Read Rules for Safe Operation and Instructions Carefully Safety Assembly Operation Maintenance Parts

owners manual CAUTION: Read Rules for Safe Operation and Instructions Carefully Safety Assembly Operation Maintenance Parts owners manual Model No. 45-0350 (ATV) 45-0351 (FARM) (45-0350 SHOWN) TANDEM AXLE CART CAUTION: Read Rules for Safe Operation and Instructions Carefully IMPORTANT! The wheel bearings are not pre lubricated.

More information

Pneumatic Clamp Carrier. Installation & Operation Manual

Pneumatic Clamp Carrier. Installation & Operation Manual Pneumatic Clamp Carrier Installation & Operation Manual Pneumatic Clamp Carrier Installation & Operation Manual Quick Machinery Company 8272 Peninsula Drive Kelseyville, CA 95451 phone: (707) 272-6719

More information

C U T T I N G C R O S S V I L L E P O R C E L A I N S T O N E

C U T T I N G C R O S S V I L L E P O R C E L A I N S T O N E C U T T I N G C R O S S V I L L E P O R C E L A I N S T O N E Wet saws are generally used when cutting tile. Crossville uses continuous rim diamond tip blades designed to cut porcelain tile and glass.

More information

Why Do We Saw Equipment Types Matching Equipment to the Project Blade Selection Ensuring Construction Quality When Things Don t Go Right The Sawing

Why Do We Saw Equipment Types Matching Equipment to the Project Blade Selection Ensuring Construction Quality When Things Don t Go Right The Sawing Why Do We Saw Equipment Types Matching Equipment to the Project Blade Selection Ensuring Construction Quality When Things Don t Go Right The Sawing Window Summary Controlled Cracking Uncontrolled Cracking

More information

ATT-57/95, REDUCING SAMPLES TO THE TESTING SIZE

ATT-57/95, REDUCING SAMPLES TO THE TESTING SIZE 1.0 Scope ATT-57/95, REDUCING SAMPLES TO THE TESTING SIZE 1.0 SCOPE This method describes the procedures for reducing samples using the splitting or quartering methods so that the reduced sample: a) meets

More information

Evaluation of In-Pavement Light Fixture Designs and Performance

Evaluation of In-Pavement Light Fixture Designs and Performance Evaluation of In-Pavement Light Fixture Designs and Performance Presented to: IES ALC Fall Technology Meeting By: Joseph Breen Date: Background In-Pavement Light Fixture Assemblies Utilize a Circle of

More information

Obtained from Omarshauntedtrail.com

Obtained from Omarshauntedtrail.com DaveintheGrave's Halloween Props Animated Crawling Skeleton Build a life-size skeleton torso that realistically crawls across the lawn one arm at a time. 1. Motor Base and Linkage Assembly BASE - I used

More information

SPECIFICATION FOR WATERBORNE TRAFFIC LINE PAINT

SPECIFICATION FOR WATERBORNE TRAFFIC LINE PAINT Page 1 of 5 ATTACHMENT I Commonwealth of Pennsylvania Department of Transportation SPECIFICATION FOR WATERBORNE TRAFFIC LINE PAINT August 14, 2006 1. SCOPE 1.1 Scope. This specification covers fast-drying

More information

No Ⅰ KRK universal printability tester No Ⅰ Print area Printing pressure Printing speeds Printing mode Print interval Temperature

No Ⅰ KRK universal printability tester No Ⅰ Print area Printing pressure Printing speeds Printing mode Print interval Temperature 1 2 3 4 5 6 7 8 KRK universal printability tester The recent trend is that printing quality is upgraded and use of offset print is diversified. To respond to the requirements in printability with various

More information

18000 HDL FOUR POST LIFT LB CAPACITY INSTALLATION AND OWNER'S MANUAL

18000 HDL FOUR POST LIFT LB CAPACITY INSTALLATION AND OWNER'S MANUAL 18000 HDL FOUR POST LIFT 18000 LB CAPACITY INSTALLATION AND OWNER'S MANUAL WARNING! Do not raise a vehicle unless the front stops are in place, the parking brake is set, and the wheels are chocked. Stay

More information

Getting the Most out of Airless Spray. Applicator Training Bulletin

Getting the Most out of Airless Spray. Applicator Training Bulletin Applicator Training Bulletin A number of factors, including tip selection, application pressure and applied thickness variability can affect the quality of an airless spray application job. Courtesy of

More information

Roller assembly (actual size)

Roller assembly (actual size) Roller assembly (actual size) 7 3.5 of 0.5 deg slope 3.5 of 0.5 deg slope 1.929 for PVC 1.950 for Aluminum 0.030 radial reduction 2.2 approx OD 6.5 11.875 Roller assembly consists of: a. 5/16 x 11.875

More information

CALIBRATION AND GRINDING OF CONCRETE BLOCKS THICKNESS

CALIBRATION AND GRINDING OF CONCRETE BLOCKS THICKNESS FINISHING LINE FOR CONCRETE BLOCKS AND SLABS CASSANI CALIBRATION AND GRINDING MACHINES, SERIES M50 BLOCK, FOR BLOCKS AND SLABS IN AGGLOMERATE CONCRETE M50 BLOCK MODEL TECHNICAL DATA Possibility to use

More information

HANDHOLE SEAT GRINDER

HANDHOLE SEAT GRINDER 1041-1601 HANDHOLE SEAT GRINDER OPERATING INSTRUCTIONS & SERVICE MANUAL Rev: A, 9/17/2007 TO REDUCE THE RISK OF INJURY AND EQUIPMENT DAMAGE USER MUST READ AND UNDERSTAND OPERATOR S MANUAL. Thomas C. Wilson,

More information

LU6X-130 Instructions and Parts List (including LU6X Basic) Operating Instructions

LU6X-130 Instructions and Parts List (including LU6X Basic) Operating Instructions LORTONE LU6X-130 Item # 061-092 LU6X Basic Item # 061-090 LU6X-130 Instructions and Parts List (including LU6X Basic) Operating Instructions Introduction The LU6X is one the most versatile pieces of equipment

More information

00108/00110 INSTRUCTION MANUAL

00108/00110 INSTRUCTION MANUAL 00108/00110 INSTRUCTION MANUAL Removable and Adjustable Mudflap System IMPORTANT! Exhaust Systems Note: Any modifications to the factory installed exhaust system may void your manufacturer s warranty.

More information

Central New York Rocket Team Challenge 2018 Rocket Assembly Instructions

Central New York Rocket Team Challenge 2018 Rocket Assembly Instructions Central New York Rocket Team Challenge 2018 Rocket Assembly Instructions Note: These instructions vary from those provided by the manufacturer of the rocket kits. There is also considerable varying discussion

More information

Chapter 25. Other Machining Processes. Materials Processing. MET Manufacturing Processes. Shaping Planing Broaching Sawing Filing

Chapter 25. Other Machining Processes. Materials Processing. MET Manufacturing Processes. Shaping Planing Broaching Sawing Filing MET 33800 Manufacturing Processes Chapter 25 Other Machining Processes Before you begin: Turn on the sound on your computer. There is audio to accompany this presentation. Other Machining Processes Shaping

More information

8-Ton Manual Splitter OWNER S MANUAL

8-Ton Manual Splitter OWNER S MANUAL 8-Ton Manual Splitter OWNER S MANUAL WARNING: Read carefully and understand all ASSEMBLY AND OPERATION INSTRUCTIONS before operating. Failure to follow the safety rules and other basic safety precautions

More information

Series 80 In-Line Mounted Centrifugal Pumps

Series 80 In-Line Mounted Centrifugal Pumps Bulletin B-G Bell & Gossett Series In-Line Mounted Centrifugal Pumps Applications Hydronic Heating & Cooling Systems Industrial Process General Service Pressure Boosting Advantages Close Coupled Space

More information

BEARING AND TYPES OF BEARING

BEARING AND TYPES OF BEARING BEARING AND TYPES OF BEARING In this article, you will learn about bearing and types of bearing. Generally, all types of machinery are provided with supports for rotating shafts, the supporting device

More information

Tools for Plumbing. Introduction

Tools for Plumbing. Introduction 2 Tools for Plumbing Introduction So far, we have studied the importance of plumbing system, its stages and the role and responsibilities of a plumber. We will now look at the various tools that help a

More information

GENERAL OPERATIONAL PRECAUTIONS PRECAUTIONS ON USING DISC GRINDER

GENERAL OPERATIONAL PRECAUTIONS PRECAUTIONS ON USING DISC GRINDER GENERAL OPERATIONAL PRECAUTIONS WARNING! When using electric tools, basic safety precautions should always be followed to reduce the risk of fire, electric shock and personal injury, including the following.

More information

1. Turn off or disconnect power to unit (machine). 2. Push IN the release bar on the quick change base plate. Locking latch will pivot downward.

1. Turn off or disconnect power to unit (machine). 2. Push IN the release bar on the quick change base plate. Locking latch will pivot downward. Figure 1 Miniature Quick Change Applicators, of the end feed type, are designed to crimp end feed strip terminals to prestripped wires. Each applicator is set up to accept the strip form of certain specific

More information

Shoulder Wedge Maker

Shoulder Wedge Maker Shoulder Wedge Maker 1.0 Purpose and Use of the TransTech Shoulder Wedge Maker The Shoulder Wedge Maker is used as a paver attachment tool to help construct a higher density, longer lasting, low angle

More information

SPECIAL PROVISION TO SPECIAL SPECIFICATION Reflectorized Pavement Markings with Retroreflective Requirements

SPECIAL PROVISION TO SPECIAL SPECIFICATION Reflectorized Pavement Markings with Retroreflective Requirements 2004 Specifications CSJ 0072-05-084, etc. & 0017-04-039, etc. SPECIAL PROVISION TO SPECIAL SPECIFICATION 6110---022 Reflectorized Pavement Markings with Retroreflective Requirements For this project, Special

More information

30AUTO Speed Lathe Manual

30AUTO Speed Lathe Manual 30AUTO Speed Lathe Manual Standard Features 3/4 HP Motor Air-Collet Closure 1800 RPM, Single Speed Electric Brake Cast Housing 5C Collets 3 Phase / 240 Volts DESCRIPTION: The Crozier Model 30AUTO Automotive

More information

00108/00110 INSTRUCTION MANUAL

00108/00110 INSTRUCTION MANUAL 00108/00110 INSTRUCTION MANUAL Removable and Adjustable Mudflap System IMPORTANT! Please Read this Instruction Booklet prior to assembly of your Rock Tamer Kit. IMPORTANT! Exhaust Systems Note: Any modifications

More information

CREATING FREE SURFACES ON HARD ROCKS USING ABRASIVE SUSPENSION WATER JET MANIPULATORS

CREATING FREE SURFACES ON HARD ROCKS USING ABRASIVE SUSPENSION WATER JET MANIPULATORS 2009 American WJTA Conference and Expo August 18-20, 2009 Houston, Texas Paper CREATING FREE SURFACES ON HARD ROCKS USING ABRASIVE SUSPENSION WATER JET MANIPULATORS Song S. Han Institute of Construction

More information

INSTRUCTIONS *= RECOMMENDED += ACCEPTABLE N/A= NOT AN APPROVER INSTALLATION METHOD

INSTRUCTIONS *= RECOMMENDED += ACCEPTABLE N/A= NOT AN APPROVER INSTALLATION METHOD Topic BASE PREPARATION Base Preparation Recommended Installation Methods pg.1 Tools/Materials Required pg.4 Site Work pg.1 Base Options pg.1-2 INTERIOR 4-5 Interior Installation General Information pg.2

More information

HBS-AP ASSEMBLING INSTRUCTIONS

HBS-AP ASSEMBLING INSTRUCTIONS ALUMINIUM PIPEWORK - ALUMINIUM PIPEWORK - ALUMINIUM PIPEWORK 97 HBS-AP ASSEMBLING INSTRUCTIONS 1. INTRODUCTION 1.1. This manual is very easy to consult and we recommend reading it before starting work,

More information

Double Bar Plate Dowels for Saw-Cut Contraction Joints

Double Bar Plate Dowels for Saw-Cut Contraction Joints Double Bar Plate Dowels for Saw-Cut Contraction Joints Designed to Deliver More Serviceable Slabs Concrete slabs-on-ground must be able to withstand the repetitious, concentrated loads and abrasion of

More information

Dowel. Design. Performance-Based World of Concrete Official Show Issue. Lift-truck design changes require a new look at joint durability

Dowel. Design. Performance-Based World of Concrete Official Show Issue. Lift-truck design changes require a new look at joint durability 2007 World of Concrete Official Show Issue January 2007 Performance-Based Dowel Lift-truck design changes require a new look at joint durability Design By Wayne W. Walker and Jerry A. Holland S erviceability

More information

Basic Assembly For Conventional Series 9000 Structural Panels

Basic Assembly For Conventional Series 9000 Structural Panels Steelcase, Inc. Grand Rapids, MI 49501 U.S.A. 1-888-783-3522 Basic Assembly For Conventional Series 9000 Structural Panels NOTE: Assembly directions for curved panels are the same as standard panels. Tools

More information

Item 550 Chain Link Fence

Item 550 Chain Link Fence Item Chain Link Fence 1. DESCRIPTION 2. MATERIALS Furnish, install, remove, repair, or replace chain link fence and gates. Furnish certification from the chain link fence materials manufacturer stating

More information

REEL BLADE / BED KNIFE ADJUSTING & SHARPENING

REEL BLADE / BED KNIFE ADJUSTING & SHARPENING Here s a QR code image that can be used to access this document on a portable device. Reel Mower Cutting Fundamentals The reel mower s cutting ability is the result of the corner edges of the reel blade

More information

SAVE THIS FOR FUTURE REFERENCE THIS PRODUCT IS FOR PROFESSIONAL LABORATORY USE ONLY USER'S MANUAL

SAVE THIS FOR FUTURE REFERENCE   THIS PRODUCT IS FOR PROFESSIONAL LABORATORY USE ONLY USER'S MANUAL DENTAL, INC. TECHNICAL BULLETIN G801-022510 5860 FLYNN CREEK ROAD READ ALL INSTRUCTIONS P.O. BOX 106 BEFORE PROCEEDING COMPTCHE, CALIFORNIA, U.S.A. 95427-0106 SAVE THIS FOR FUTURE REFERENCE www.wellsdental.com

More information

Log Hauler. Senior Design Project. Department of Mechanical Engineering Trevor Kline 4/19/2011

Log Hauler. Senior Design Project. Department of Mechanical Engineering Trevor Kline 4/19/2011 Log Hauler Senior Design Project Department of Mechanical Engineering Trevor Kline 4/19/2011 Table of Contents BACKGROUND:... 3 INSPIRATION:... 3 PROPOSAL AND REQUIREMENTS:... 4 DESIGN:... 4 LOG SIZE:...

More information

Kossel Rev B Build Guide V1.0

Kossel Rev B Build Guide V1.0 Kossel Rev B Build Guide V1.0 1 Table of Contents: Step 1: BASE ASSEMBLY Gathering parts: Building the Corners and Base: Step 2: UPPER ASSEMBLY Building Upper: Step 3: VERTICAL RAIL INSTALLATION Building

More information

AMENDMENTS Manual of STANDARD SPECIFICATIONS. Adopted by Standard Specifications Committee. Amendment. No. 6. Published by

AMENDMENTS Manual of STANDARD SPECIFICATIONS. Adopted by Standard Specifications Committee. Amendment. No. 6. Published by AMENDMENTS to 2012 Manual of STANDARD SPECIFICATIONS Adopted by Standard Specifications Committee Amendment No. 6 Published by Utah LTAP Center Utah State University 8305 Old Main Hill Logan UT 84322-8205

More information

18600 Angular Momentum

18600 Angular Momentum 18600 Angular Momentum Experiment 1 - Collisions Involving Rotation Setup: Place the kit contents on a laboratory bench or table. Refer to Figure 1, Section A. Tip the angular momentum apparatus base on

More information

Owners Manual for. The Transcriptor. Skeleton Turntable

Owners Manual for. The Transcriptor. Skeleton Turntable Owners Manual for The Transcriptor Skeleton Turntable Owner's Manual for The Transcriptor Skeleton Turntable - 1 - E X C L U S I V E U N I T E D S T A T E S I M P O R T E R A N D D I S T R I B U T O R

More information

ELECTRIC TOOL CORPORATION

ELECTRIC TOOL CORPORATION Cat. No. -0 / Hex Demolition Hammer Cat. No. 0-0 Spline Rotary Hammer MILWAUKEE ELECTRIC TOOL CORPORATION W. LISBON ROAD BROOKFIELD, WISCONSIN 00-0 -9-00 d 000 -9-00 d SpecialTools Require Forcing discs

More information

Agri-Fab. Model No "ATV" DUMP CART H.D. 17 CU. FT. CAUTION: Read Rules for Safe Operation and Instructions Carefully

Agri-Fab. Model No ATV DUMP CART H.D. 17 CU. FT. CAUTION: Read Rules for Safe Operation and Instructions Carefully Agri-Fab owners manual Model No. 45-02172 190-521-100 "ATV" DUMP CART H.D. 17 CU. FT. CAUTION: Read Rules for Safe Operation and Instructions Carefully Assembly Operation Maintenance Repair Parts the fastest

More information

When Geogrids are buried in earth structures some damage occurs. It is necessary to allow for this damage during design.

When Geogrids are buried in earth structures some damage occurs. It is necessary to allow for this damage during design. Design Factors for E GRID Products: Site Damage 1: Background: When Geogrids are buried in earth structures some damage occurs. It is necessary to allow for this damage during design. To assess the allowances

More information

Quality Assurance Where does the Future Lead US. John D AngeloD Federal Highway Administration

Quality Assurance Where does the Future Lead US. John D AngeloD Federal Highway Administration Quality Assurance Where does the Future Lead US John D AngeloD Federal Highway Administration QA of the Past Material Testing Aggregate Gradations stock pile or cold feeds Binder Content volume measurement

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 2007 EDITION

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 2007 EDITION Sheet 1 of 7 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 2007 EDITION SECTION 502 PORTLAND CEMENT CONCRETE PAVEMENT (NON-QC/QA) Page 500-20, subsection 502.2.

More information

Ralphs-Pugh Co. I didn t know you did all that!

Ralphs-Pugh Co. I didn t know you did all that! Ralphs-Pugh Co. I didn t know you did all that! Ralphs-Pugh Co. The Ralphs-Pugh Company has been keeping industry on the move for over 50 years. We are an innovative supplier that distinguishes itself

More information

19-in. Mini-Rack Cabinet, Type 1

19-in. Mini-Rack Cabinet, Type 1 Spec-00466 19-in. DP FX (763) Mini-Rack 422-2588 422-2661 Cabinet, Components and Accessories Free-Stand Networking Cabinets 19-in. Mini-Rack Cabinet, Type 1 Industry Standards NEMA Type 1 EIA 310-D /

More information

STEEL RULE. Stock TRY SQUARE

STEEL RULE. Stock TRY SQUARE FITTING INTRODUCTION Fitting consists of a handwork involved in fitting together components usually performed at a bench equipped with a vice and hand tools. The matting components have a close relation

More information

The Basics of Screening

The Basics of Screening The Basics of Screening Joe Schlabach, VP of Marketing & Sales WHAT IS A VIBRATING SCREEN? 1 WHAT IS A VIBRATING SCREEN? A machine tool to separate aggregates by particle size by means of an exciting force

More information

HIGH THROUGHPUT MINIMUM SET-UP TIME BT-Z LARGE BAR PEELERS

HIGH THROUGHPUT MINIMUM SET-UP TIME BT-Z LARGE BAR PEELERS UPDATE ON HETRAN BT-Z LARGE BAR PEELERS: MAXIMIZING PRODUCTIVITY IRRESPECTIVE OF ALLOY, BAR OR TUBE DIAMETER! Copyright September 2013 All Rights Reserved REVOLUTIONARY WORLD-CLASS DESIGN EXTENSIVE RANGE

More information

Unit IV Drawing of rods, wires and tubes

Unit IV Drawing of rods, wires and tubes Introduction Unit IV Drawing of rods, wires and tubes Drawing is a process in which the material is pulled through a die by means of a tensile force. Usually the constant cross section is circular (bar,

More information

REPAIR INSTRUCTIONS. Cat. No Cat. No MILWAUKEE ELECTRIC TOOL CORPORATION. SDS Max Demolition Hammer. SDS Max Rotary Hammer

REPAIR INSTRUCTIONS. Cat. No Cat. No MILWAUKEE ELECTRIC TOOL CORPORATION. SDS Max Demolition Hammer. SDS Max Rotary Hammer Cat. No. 9-0 SDS Max Demolition Hammer Cat. No. -0 SDS Max Rotary Hammer MILWAUKEE ELECTRIC TOOL CORPORATION W. LISBON ROAD BROOKFIELD, WISCONSIN 00-0 8-9-0 d 000 8-9-0 d Special Tools Require Forcing

More information

CHAPTER 5 PREFORMED THERMOPLASTIC

CHAPTER 5 PREFORMED THERMOPLASTIC OBJECTIVES CHAPTER 5 PREFORMED THERMOPLASTIC 1) Preformed Thermoplastic 2) Components 3) Material Characteristics 4) Application Methods 5) Application Considerations 6) Inspection And Quality Control

More information

Installation Instructions for. Before You Begin TOOLS REQUIRED

Installation Instructions for. Before You Begin TOOLS REQUIRED Composite Railing System STEP-BY-STEP Installation Instructions for Spectrum Composite Railing Virtually maintenance free 20-year warranty EverNew Spectrum Railing system is designed to work with a number

More information

Falling Weight Deflectometer

Falling Weight Deflectometer elastic pavements ltd Manufacturer of highly specialist equipment Falling Weight Deflectometer Model ASTEC-120-2013-9G The device is used to measure the vertical deflection response of a surface to an

More information

MATERIAL COMBINATION NUMBER 2: Corrosive environment requiring harder, wear-resistant seating faces and resistance to dezincification.

MATERIAL COMBINATION NUMBER 2: Corrosive environment requiring harder, wear-resistant seating faces and resistance to dezincification. Cast Iron Slide Gates Spec Sheet General The contractor shall furnish and install the following cast iron slide gate assemblies as listed on the Gate Schedule and detailed on the manufacturer s drawings.

More information

Appendix D Answers To Chapter Review Questions

Appendix D Answers To Chapter Review Questions Appendix D Answers To Chapter Review Questions Chapter 1 Standard Practices 1. The purpose of pavement markings is to communicate information about the traveled roadway so motorists can safely reach their

More information

accidents which arise due to nonobservance and the safety information herein. SPECIFICATIONS

accidents which arise due to nonobservance and the safety information herein. SPECIFICATIONS 7 TON ELECTRIC LOG SPLITTER Model: 05620 CALIFORNIA PROPOSITION 65 WARNING: You can create dust when you cut, sand, drill or grind materials such as wood, paint, metal, concrete, cement, or other masonry.

More information

Rodney Hunt. A GA Industries Company Glydaseal Gates

Rodney Hunt. A GA Industries Company Glydaseal Gates Rodney Hunt A GA Industries Company Glydaseal Gates GUIDE BRONZE GUIDE BAR FRAME NUT POCKET SEAT FACING RESILIENT INVERT SEAT DISC GUIDE BAR ADJUSTMENT BOLT WITH LOCK NUT GUIDE BAR ATTACHING BOLT The Glydaseal

More information

OWNERS MANUAL. Model No UTILITY CART

OWNERS MANUAL. Model No UTILITY CART OWNERS MANUAL Model No. 45-00 UTILITY CART CAUTION: Read Rules for Safe Operation and Instructions Carefully Assembly Operation Maintenance Repair Parts PRINTED IN USA FORM NO. 46274 LOOSE PARTS IN CARTON

More information

INSTALLATION, OPERATION, LUBRICATION, AND MAINTENANCE OF NO. S B18 AND B24 SMOOTH ROLL CRUSHERS

INSTALLATION, OPERATION, LUBRICATION, AND MAINTENANCE OF NO. S B18 AND B24 SMOOTH ROLL CRUSHERS INSTALLATION, OPERATION, LUBRICATION, AND MAINTENANCE OF NO. S B18 AND B24 SMOOTH ROLL CRUSHERS I. INSTALLATION A. RIGID MOUNTING: Use two heavy WF or I-beams running parallel underneath at least eight

More information

Cowper From Steve Wolverton on the T&TTT forum, Feb 2005 For Reference Only Do not use to build a trailer. Check on Teardrop and Tiny Travel Trailers

Cowper From Steve Wolverton on the T&TTT forum, Feb 2005 For Reference Only Do not use to build a trailer. Check on Teardrop and Tiny Travel Trailers Cowper From Steve Wolverton on the T&TTT forum, Feb 2005 For Reference Only Do not use to build a trailer. Check on Teardrop and Tiny Travel Trailers for up to date building information; http://www.mikenchell.com/forums

More information

C. For cold-applied tape, the pavement temperature shall be at least 70 F.

C. For cold-applied tape, the pavement temperature shall be at least 70 F. SECTION 6100 - PAVEMENT MARKING (THERMOPLASTIC) PART 1 - GENERAL 1.01 SCOPE: This Section covers hot-applied, extruded thermoplastic and cold-applied tape for white and yellow pavement marking. Topics

More information

Zip Block MODEL ZB INSTALLATION INSTRUCTIONS

Zip Block MODEL ZB INSTALLATION INSTRUCTIONS Zip Block MODEL ZB 100-400 INSTALLATION INSTRUCTIONS 12BT EXPOSED SURFACE SEAL WIDTH Zip Block SEAL 3/4" ± 1/8" [19.05mm ± 3.18mm] BLOCKOUT EDGE 3 1/2" [88.90mm] MAXIMUM BLOCKOUT NOMINAL JOINT WIDTH EPOXY

More information

Model 511 Model 711 Model 821

Model 511 Model 711 Model 821 Stainless Steel Tru-Balance Model 511 Model 711 Model 821 Shown with front lift off shield removed The ultimate in reliable performance, capacity, versatility and sanitation for your sifting or screening

More information

table of contents Sliding Door Accessories Page Latches & Snuggers Stay Rollers Brackets & Stops

table of contents Sliding Door Accessories Page Latches & Snuggers Stay Rollers Brackets & Stops table of contents Square Track & Accessories Pages 4-7 Square Track Options Page 4 Light Duty Track Page 4 Square Track Brackets Page 5 Square Track Accessories Page 5 Square Track Trolleys Page 6-7 Offset

More information

Standard Product. Free-Stand Cabinets 19-in. Mini-Rack Cabinet, Components and Accessories

Standard Product. Free-Stand Cabinets 19-in. Mini-Rack Cabinet, Components and Accessories Spec-00466 F763.422.2661 763.422.2588 Free-Stand Cabinets 19-in. Mini-Rack Cabinet, Components and Accessories Free-Stand Cabinets 19-in. Mini-Rack Cabinet, Components and Accessories 19-in. Mini-Rack

More information

UNPACKING. Thank you for purchasing the Manual Capsule Filling Machine from KARISHMA PHARMA MACHINES.

UNPACKING. Thank you for purchasing the Manual Capsule Filling Machine from KARISHMA PHARMA MACHINES. UNPACKING Thank you for purchasing the Manual Capsule Filling Machine from KARISHMA PHARMA MACHINES. Please take sufficient time and read this manual carefully before you start installation and operation

More information

Procedure for Longworth Chuck construction

Procedure for Longworth Chuck construction Procedure for Longworth Chuck construction Overall construction The Longworth chuck is composed of three major components. Connected to the lathe spindle is some device that fastens to the first of two

More information

To Develop a Quality Control/Quality Assurance Plan For Hot Mix Asphalt. AASHTO PP qq

To Develop a Quality Control/Quality Assurance Plan For Hot Mix Asphalt. AASHTO PP qq 1. Introduction Proposed Standard Practice To Develop a Quality Control/Quality Assurance Plan For Hot Mix Asphalt AASHTO PP qq 1.1. This standard practice presents specific details necessary to effectively

More information

Thomas Scientific Swedesboro, NJ U.S.A.

Thomas Scientific Swedesboro, NJ U.S.A. Thomas Scientific Swedesboro, NJ 08085-0099 U.S.A. Wiley Mini Mill 3383-L10 (115 V, 60 HZ) USE AND CARE OF CATALOG NUMBER: 3383-L10 Wiley Mini Mill (115 V, 60 HZ) PRELIMINARY 1. Mill has been properly

More information

Sheet Metal Tools. by:prem Mahendranathan

Sheet Metal Tools. by:prem Mahendranathan Sheet Metal Tools by: SHEET METAL TOOL KIT SHEET METAL TOOLS Rivet Gun 3/32, 1/8, 5/32, 3/16",Cupped Set Mini Bucking Bar Footed Heel-Toe Bucking Bar Air Tool Oil Mechanics Tool Bag High-Speed Air Drill

More information

MODEL 2EA/2EB DOOR INSTALLATION INSTUCTIONS

MODEL 2EA/2EB DOOR INSTALLATION INSTUCTIONS Dover Roller Shutters wants to THANK YOU for your purchase of the 2EA/2EB Aluminum Roll-Up Door! BEFORE INSTALLATION Please carefully read the instruction manual completely. Carefully unpack the contents

More information

MOLDING LARGE SCALE MODEL TIRES

MOLDING LARGE SCALE MODEL TIRES JRH SCALE CARS www.jrhscalecars.com MOLDING LARGE SCALE MODEL TIRES Introduction One of the challenges in scratch-building scale models is making appropriate tires. Properly sized, properly scaled, historically

More information

N35 ALUMINIUM ROLL-UP DOOR INSTALLATION MANUAL

N35 ALUMINIUM ROLL-UP DOOR INSTALLATION MANUAL N35 ALUMINIUM ROLL-UP DOOR INSTALLATION MANUAL DOVER ROLLER SHUTTERS 295 COMMERCE WAY P.O. BOX 420 UPPER SANDUSKY, OH 43351 Dover Roller Shutters wants to THANK YOU for your purchase of the N35 Aluminum

More information