1 TABLE OF CONTENTS Specification Sections: Division 1: General Requirements o Section Summary of Work o Section Submittals SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY 1234 MARKET STREET, PHILADELPHIA, PA Division 5: Metals o Section Miscellaneous Fasteners Division 7: Thermal and Moisture Protection o Section Solid Phenolic Infill Panels SPECIFICATION FOR GLASS BLOCK AND SOLID PHENOLIC INFILL PANELS FOR BRISTOL STATION Division 9: Finishes o Section High-Performance Coatings-Anodizing Division 13: Special Construction o Section Glass Block Infill Panels Drawings: o A107 - Windscreen and Infill Panel Plans and Elevations o A108 - Windscreen and Infill Panel Elevations and Details ORIGINATOR: Matthias Hufnagel, RA Senior Project Architect Bridges and Buildings Department DATE: January 2018

2 PROJECT: Bristol Station

3 PART 1 GENERAL 1.01 Description of Work SECTION SUMMARY OF WORK A. The Work of this Contract shall include engineering services, fabrication, and delivery of prefabricated glass block and solid phenolic infill panels for a SEPTA station windscreens Related Sections A. Section Submittals B. Section Miscellaneous Fasteners C. Section Solid Phenolic Infill Panels D. Section High-Performance Coatings Anodizing E. Section Glass Block Infill Panels 1.03 Submittals A. All submittals shall be provided under the provisions of Section Submittals. PART 2 NOT USED PART 3 EXECUTION 3.01 Packing and Shipping A. The infill panels shall be shipped at one time as a complete package, with all components included. B. All components shall be packaged and shipped so as to protect the integrity and finish from any damage whatsoever. C. Label and Key all components and or packaging to the installation drawings. D. The Contractor shall be responsible for any applications/fees/ paperwork associated with any necessary approvals or permits required for roadway access Delivery A. The components shall be delivered at one time as a complete package. Summary of Work of 2

4 B. Delivery shall be made to SEPTA's work site only when the site is ready with suitable space for storage and provisions to protect materials during construction. C. SEPTA shall be given 72 hour notice prior to shipping Installation A. Site installation shall be done by SEPTA work forces. END OF SECTION Summary of Work of 2

5 PART 1 GENERAL 1.01 Description SECTION SUBMITTALS A. This section covers all submittals including shop drawing submission and concurrence requirements, along with installation drawings and further complements the requirements of the Agreement. Make submittals required by the Contract Documents, (utilizing the attached transmittal form) and revise and resubmit as necessary to establish compliance with the specified requirements. B. Submittals that are not required will not be reviewed by SEPTA. C. The Contractor may require subcontractors to provide drawings, installation diagrams, and similar information to help coordinate the Work, but such data shall remain between the Contractor and the subcontractors and will not be reviewed by SEPTA unless it is required by other pertinent sections of the Specifications Related Work A. Section Summary of Work B. Section Miscellaneous Fasteners C. Section Solid Phenolic Infill Panels D. Section High-Performance Coatings Anodizing E. Section Glass Block Infill Panels 1.03 Quality Assurance A. Coordination and Submittals 1. Prior to making each submittal, the Contractor shall carefully review and coordinate all aspects of each item being submitted. Shop drawings of systems containing closely related items and components must be submitted as a single submission showing the interrelationship of the components required for that system. 2. The Contractor shall verify prior to submission that each shop drawing is well-prepared and that the submittal conforms in all respects with the specified requirements. The drawings shall provide complete information regarding proper fabrication and installation. 3. The Contractor shall sign each submittal and affix a stamp with specific written indication that the Contractor has satisfied all responsibilities under the Contract Documents with respect to review of the submission. 4. Shop drawings shall be tailored to the specific project need including coordination of various trades and should include material descriptions, quantities, dimensions, design criteria and similar Submittals of 7

6 data to enable SEPTA to review information as required. The shop drawings must show clear and complete information for the fabrication and installation of materials. 5. Orient the plan(s) on the shop drawing(s) in the same manner as the plans on the Contract Drawings. 6. Shop drawings with reproduction(s) of the Contract Drawings will not be accepted. B. Responsibility: The Contractor is solely responsible and accountable for: 1. Means, methods, techniques, sequences and procedures, construction including fabrication, assembly, installation/erection, safety precautions and programs incidental to any submittal reviewed and approved by SEPTA. 2. Accuracy of all submittals and shop drawings and final installation. 3. Arranging submittals and shop drawing standards meetings with SEPTA and/or the Project Manager. 4. Numbering all submittals. Architectural product numbers shall be preceded with an A, likewise Structural products with an S. All re-submittals shall have an R and the number of the resubmission at the end. Example: A001, A-001-R Substitutions A. Or Equal Substitutions 1. Restricted Items: Where items of equipment and/or materials are specifically identified in the Specifications or on the Drawings by a manufacturer's name, model or catalogue number, only such specific items may be used. When several materials are specified by name for one use, the Contractor may select any of those specified. Materials specified by manufacturer s trade name shall comply with the manufacturer's printed Specifications and data. 2. Equals Considered: Whenever a material or article required is specified or shown on the plans by using the name of the proprietary product or of a particular manufacturer or vendor, any material or article which will, in the opinion of SEPTA's Project Manager, perform adequately the duties imposed by general design will be considered equal and satisfactory provided material or article so proposed is of equal substance and function in SEPTA's Project Manager's opinion. It shall not be purchased or installed without SEPTA's Project Manager's written approval. "Or Equal" requests will be considered only when substantiated by the Contractor's submittal of data documenting the "or equal" nature of material or article within ten (10) calendar days after the date of receipt of Notice to Proceed. B. Substitutions for Unavailability 1. Substitutions (may) be considered when a Product becomes unavailable through no fault of the Contractor. The Contractor shall document each request with complete data substantiating compliance of proposed Substitution with Contract Documents, or there is a clear benefit to SEPTA including cost. A request constitutes a representation that the Contractor: a. Has investigated proposed product and determined that it meets or exceeds the quality level of the specified product. b. Shall provide the same warranty for the substitution as for the specified product. c. Shall coordinate installation and make changes to other work which may be required for the Work to be complete with no additional cost to SEPTA. d. Shall waive claims for additional costs or time extension which may subsequently become apparent. Submittals of 7

7 1.05 Submittals e. Shall reimburse SEPTA for review or redesign services associated with re-approval by SEPTA. A. SEPTA s action for submittals will be indicated as follows: NO EXCEPTIONS TAKEN PROCEED AS NOTED: REVISE AND RESUBMIT FOR RECORD DO NOT PROCEED: REVISE AND RESUBMIT REJECTED NOT APPLICABLE B. Contractor shall submit shop drawings, installation drawings, catalog cuts, samples and substitution(s) for SEPTA review and approval. The Contractor shall coordinate between the contractor/fabricator/detailer and SEPTA and the Project Manager for each complex submittal requiring detailed coordination. C. Submittals will be reviewed by SEPTA. D. Submittals not in compliance with the Contract will be returned to the Contractor for revision. Any loss of time and additional costs associated with re-submittal(s) will the Contractor's responsibility. E. Each submission and re-submission shall give specific written notice on the transmittal of each variation that the shop drawings or samples may have from the requirements of the Contract Documents and, in addition, shall cause a specific notation to be made on each shop drawing submitted for review and approval of each such variation. F. Each re-submission(s) shall clearly identify and make specific notation(s) on each shop drawing concerning the: 1. Changes that are made as a result of SEPTA s Project Manager comments on the previous submittal(s). 2. Changes that are not made, but commented on by SEPTA s Project Manager on the previous submittal(s). The Contractor shall provide detailed explanation and justification as to why SEPTA s Project Manager's comments are not addressed. 3. Changes that are solely made by the Contractor, but not commented on by SEPTA s Project Manager on the previous submittal(s). The Contractor shall provide a detailed explanation and justification for such changes. 4. Each item being resubmitted shall have an R placed at the end of the submission number and shall also include what resubmission this is, such as 01, 02, etc. G. Submittals that are "Proceed as Noted" by SEPTA s Project Manager are for the purpose of expediting the fabrication of the intended work. The Contractor shall incorporate all corrections and resubmit to SEPTA the required copies of drawings within 10 days of the "Proceed as Noted" action. PART 2 PRODUCTS 2.01 Shop Drawings Submittals of 7

8 A. Scale and measurements: Shop drawings shall be made accurately to a scale sufficiently large to show all pertinent aspects of the item and its method of connection to the Work. B. Types of prints required: 1. Shop drawings shall be submitted in the form of (4) black line prints of each sheet. 2. Blueprints will not be acceptable 3. Xerox copies or PDF files will not be accepted. C. Review comments will be shown on one set of the drawings and will be returned to the Contractor. The Contractor may make and distribute such copies as are required for its purposes Installation Drawings A. Installation Drawings shall depict the various shelter components and how they are to be erected / installed. 1. The drawings shall be keyed to the component packaging. 2. The drawings shall call out type, quantity and spacing of all fasteners to be used and where. 3. The drawings shall call out the type of backer rod, caulk, sealant, etc. to be used and where. 4. Drawings notes shall be clear, descriptive and reference the components and packaging keying. 5. Provide a phone number and contact on the drawings for SEPTA installers to call for support if needed. 6. Reproductions of the shop drawings will not be accepted Manufacturer s Literature (Including Catalog Cuts) A. The Contractor shall submit only the original printed literature and product data sheets available from the manufacturer(s). B. Where contents of submitted literature from manufacturers includes data not pertinent to the submittal, the Contractor shall clearly show which portions of the contents are being submitted for review, if not clearly shown, the submittal shall be returned. C. The Contractor shall submit the number of copies, which are required to be returned, plus 3 copies for SEPTA's use and distribution Samples A. The Contractor shall provide sample(s) identical to the precise article proposed to be provided. Identify as described under "Identification of submittals" below. B. Number of samples required: 1. Unless otherwise specified, the Contractor shall submit samples in the quantity which is required to be returned, plus one which will be retained by SEPTA. 2. By pre-arrangement in specific cases a single sample may be submitted for review and, when approved, be installed in the Work at a location agreed upon by SEPTA. Submittals of 7

9 PART 3 EXECUTION 3.01 Identification of Submittals A. The Contractor shall consecutively number all submittals under "Transmittal". (The Contractor shall use attached submission transmittal for all submissions.) 1. When re-submittal(s) is made for any reason, the Contractor shall transmit under a new letter of transmittal with a new transmittal number. 2. On re-submittals, the Contractor shall cite the prior transmittal number(s) under "submission number". B. The Contractor shall maintain an accurate submittal log for the duration of the Work, showing current status of all submittals at all times. The Contractor shall make the submittal log available to SEPTA for review upon request Grouping of Submittals A. Unless otherwise specified, partial submittals shall not be permitted. The entire package shall be numbered, grouped and submitted under one transmittal. B. Partial and poorly prepared submittals will be rejected by SEPTA s Project Manager as not complying with the requirements of the Contract. The Contractor will be liable for delays so occasioned Timing of Submittals A. The Contractor shall package and send submittals within 30 days of the Notice to Proceed. B. In scheduling, the Contractor shall allow 10 calendar days for review and processing by SEPTA s Project Manager following its receipt of the submittal. This review time will be increased for the submittal(s) that are so extensive 10 calendar days of turn around period is unreasonable as determined by SEPTA and the Project Manager. This determination shall be binding on the Contractor. C. Continued submission of material and repetitious submittals which clearly fail to meet the requirements of the Contract Documents which may cause delays in the completion of the Contract and any such delays be the sole responsibility of the Contractor SEPTA s Review A. Review and Processing by SEPTA shall not relieve the Contractor from responsibility for errors, which may exist in the submitted data. B. Revisions: 1. The Contractor shall make required revisions as noted on initial submittal. 2. If the Contractor considers any required revision to be a change, it shall so notify SEPTA as provided for in the "Agreement". Such notification shall be made no later than 10 calendar days from the date of return of such submittals by SEPTA or its Project Manager to the Contractor. Submittals of 7

10 3. The review of the shop drawings waives the original contract requirements of the Contract Documents only if the Contractor clearly states and highlights the proposed deviation in a prominent fashion on the shop drawing itself, and only as specially stated in writing by SEPTA, that the Contract Document requirements are waived. END OF SECTION Submittals of 7

11 S U B M I S S I O N T R A N S M I T T A L Transmittal #: Project Name: Submission #: SEPTA Project #: Contract #: Contractor Name: Contractor's Authorized Signature Date: Submission Description: Shop Dwg. #: Ref. Dwg. #: Ref. Spec. Sec.: Names of Subcontractor/Supplier/Installer: Indicate if this is a substitution: Indicate if this is Engineering or Installation Submission: NO EXCEPTIONS TAKEN PROCEED AS NOTED; REVISE AND RESUBMIT FOR RECORD DO NOT PROCEED; REVISE AND RESUBMIT REJECTED NOT APPLICABLE Date Action Reviewer Date Final Action: Date: Name of Authority: Name of Individual: Copy to: Signature: Comments: (If additional space is needed, use reverse side of this form) Submittals of 7

12 PART 1 GENERAL 1.01 Description SECTION MISCELLANEOUS FASTENERS A. This section includes the manufacture and delivery of fasteners and related accessories as shown on the contract drawings and specified herein References A. General Fasteners 1. American Society for Testing & Materials (ASTM) a. ASTM A 967 Specification for Chemical Passivation Treatments for Stainless Steel Parts b. ASTM C Standard Specification for Steel Tapping Screws for Cold-Formed Steel Framing Connections c. ASTM F593 - Standard Specification for Stainless Steel Bolts, Hex Cap Screws and Studs d. ASTM F594 - Standard Specification for Stainless Steel Nuts Related Work A. Section Summary of Work B. Section Submittals C. Section Solid Phenolic Infill Panels D. Section Glass Block Infill Panels 1.04 Submittals A. Provide (4) copies of manufacturer's catalog cuts and product literature for every fastener and fastener accessory (nuts, washers, etc.) to be used for the shelter installation. B. Key fasteners, type and quantity to installation drawings Warranty A. The manufacturer shall provide manufacturers' standard warranties for all products. PART 2 PRODUCTS 2.01 Infill Panel Fasteners A. Infill Panels to Steel Windscreen Frames (by others): 316 Stainless Steel Tamper Resistant Tek- Screws sized for steel thickness and strength. Miscellaneous Fasteners of 2

13 2.02 General Fasteners A. Bolts, screws and other fastening devices shall be of approved types as required for the strength of the connections and shall be suitable for the conditions encountered. Washers shall be of the same metals as the fasteners. B. Exposed fasteners shall be 316 series stainless steel and shall utilize stainless steel washers with neoprene seals. C. Exposed fasteners shall be of a vandal resistant design, requiring specialized tools for assembly. D. Concealed fasteners shall be stainless steel (per ASTM F593 & F594). E. All fasteners shall be supplied by the fabricator/supplier. PART 3 EXECUTION 3.01 Shipping A. Label each bundle of fasteners to be delivered and separate for each shelter to be installed Installation A. Installation shall be by SEPTA work forces. END OF SECTION Miscellaneous Fasteners of 2

14 PART 1 GENERAL 1.01 Description SECTION SOLID PHENOLIC INFILL PANELS A. This section includes fabrication and delivery of pre-cut, framed solid phenolic infill panels as specified herein. B. The contractor shall supply all materials and labor for a complete project, which shall include, but not necessarily be limited to solid phenolic panels, anodized frame, stainless steel fasteners, caulks, tapes, and other items required for a complete structural and watertight installation References A. ASTM International (American Society for Testing Materials): 1. ASTM B Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes 2. ASTM D792 Standard Test Methods for Density and Specific Gravity (Relative Density) of Plastics by Displacement. 3. ASTM E84 Standard Test Method for Surface Burning Characteristics of Building Materials. B. European National Standards (EN): 1. EN Decorative High-Pressure Laminates (HPL) Sheets Based on Thermosetting Resins. Determination of Properties Related Work A. Section Summary of Work B. Section Submittals C. Section Miscellaneous Fasteners D. Section High Performance Coatings-Anodizing 1.04 Submittals A. Submit under the provisions of Section Submittals. B. Solid Phenolic Panels 1. Submit (2) samples of each type of panel illustrating thickness, color, and face pattern. These samples may be used in the mock-up. 2. Submit (4) copies of manufacturer's product data. C. Framed Infill Panel Solid Phenolic Infill Panels of 5

15 1. Submit for review and approval, a scaled mockup of system: 18"x18" min. Mockup shall show a corner aluminum sub-frame assembly fastened into a solid substrate on two sides. Substrate need not be steel HSS. Mockup shall show material finishes, fastener pattern, sealants, backer rods and shims between grid system and substrate as well as any shims or tape between aluminum frame and phenolic panel. Approved mockup shall serve as quality standard for final construction. Refer to notes and drawings this sheet. 2. Submit (3) 6" samples of each type of glazing tape, caulk, backer rod, and stainless steel fasteners. 3. Submit (4) copies of shop drawings: a. Shop drawings shall include plans, elevations, sections and details of the system. All welds, sealants and anchor details shall be clearly indicated. b. Note gauges of brake metal, finishes of frames and hardware and dimensions (if applicable) of work to be performed by other trades. c. Label fastening devices as to type and spacing. 4. Product Data - Submit (4) copies of each of the following: a. Product literature, catalog cuts, MSDS and specifications for grid system, foam tapes, backer rods, sealants and fasteners. b. Submit proposed manufacturer's catalog cuts and specifications that clearly illustrate and describe the submitted wall system. c. Provide installation instructions for setting the panels into the structure. d. Provide manufacturers' standard finishes and color information for all products for the SEPTA Project Manager to select from. D. Quality Assurance Submittals: Submit the following: 1. Test Reports: Submit certified test reports showing compliance with specified performance characteristics and physical properties. 2. Certificates: a. Qualification Certificates: Submit certificate indicating compliance with qualification requirements in Quality Assurance article. b. Product certificates signed by manufacturer certifying materials comply with specified performance characteristics and criteria and physical requirements. c. Manufacturer's Instructions: Manufacturer's installation instructions. d. Warranty: Warranty documents specified herein Quality Assurance A. Qualifications: 1. Manufacturer Qualifications: Manufacturer producing product in ISO 9001 certified facility, capable of providing field service representation during fabrication and approving application method Delivery, Storage and Handling A. General: Comply with the boiler plate of the purchase requisition. B. Delivery: Deliver materials in manufacturer's original, unopened, undamaged containers with identification labels intact. Solid Phenolic Infill Panels of 5

16 1. Protect components during fabrication and packing from abuse, stains, discoloration, and corrosion. 2. Provide protective interleaving between contact areas of exposed surfaces to prevent abrasion during shipment, storage, and handling. 3. Group panels by type and color and mark boxes and containers accordingly. 4. Ship to SEPTA location as shown on purchase order. C. Storage and Protection: Store materials protected from exposure to harmful weather conditions, at temperature and humidity conditions recommended by manufacturer Warranty A. Project Warranty: Panels shall be warranted for a ten (10) year period against color loss and loss of specified physical and mechanical properties of the panel specified when the product is fabricated and installed in accordance with manufacturer's requirements. B. Manufacturer's Warranty: Submit, for Owner's acceptance, manufacturer's standard warranty document executed by authorized company official. Manufacturer's warranty is in addition to, and not a limitation of, other rights Owner may have under Contract Documents. PART 2 PRODUCTS 2.01 Solid Phenolic Wall Panels A. Acceptable Manufacturer: Trespa North America, or Approved Equal B. Acceptable Products: Trespa Meteon Panels, Solid Phenolic Panels with color face on both sides, or approved equal. C. Performance Characteristics 1. All materials must be class "A" fire resistant rated. 2. All materials must not be affected by moisture. 3. All panels must be vandal and graffiti resistant. Graffiti removal with common cleaners shall have no effect on panel finish and or color. 4. Panel colors shall be UV stable. D. Quality Criteria 1. Modulus of Elasticity: 1,200,000 psi (8000 N/mm2) minimum per DIN Tensile Strength: 13,000 psi (90 N/mm2) per DIN Flexural Strength: 16,000 psi (110 N/mm2) minimum per DIN Surface Impact Resistance: 9 lbf (40 N) index minimum per EN (11). 5. Scratch Resistance: 0.79 lbf (3.5 N) index minimum per EN (14). 6. Fire Performance: Maximum flamespread index of 5 per ASTM E84 (Type I, Class A). 7. Smoke Development Index: Water Absorption: Less than 1.0% per EN (7). 9. Porosity: Nonporous surface and edges. 10. Microbial Characteristics: Will not support microorganic growth. 11. Cleanability: Resists dirt pickup and is easily cleaned. Solid Phenolic Infill Panels of 5

17 12. Color Stability: 4-5 grey scale per ISO 105 A02-87 (3000 hr xenon lamp test) Sub-Framed Infill Panel A. The sub-frame shall be composed of extruded aluminum members (6065 or 6105, T-5 or T-6). The framed infill panel shall be designed to slip into and fasten to a steel windscreen frame. Provide 1/8 neoprene gasket material to isolate the aluminum sub-frame and the steel windscreen frame. B. The extruded members shall have no sharp edges. C. Dissimilar metals shall be isolated from each other using gaskets or other suitable materials to protect against galvanic reactions. D. Fasteners 1. Bolts, anchors and other fastening devices shall be of approved types as required for the strength of the connections and shall be suitable for the conditions encountered. Washers shall be of the same metals as the fasteners. 2. All fasteners shall be 316 series stainless steel and exposed fasteners shall utilize stainless steel washers with neoprene seals. 3. Exposed fasteners shall be of a vandal resistant design, requiring specialized tools for assembly. 4. Fasteners shall be stainless steel tek screws. Refer to section for details. E. Finish 1. Refer to Section Color shall be clear anodized. F. Sealant 1. #795 as manufactured by Dow Corning Corp W. Salzburg Rd. Midland, MI 48686, (989) , or approved equal. 2. Sealant color shall be clear. G. Foam Tape 1. VHB Series 4952, Low Surface Energy Double Sided Foam Tape as manufactured by 3M, 3M Center, St. Paul, MN , (888) , or approved equal. H. Backer Rods 1. All construction seals shall be backed by self-expanding closed cell polyethylene rods oversized 50% of joint width of a type recommended by the sealant manufacturer as being compatible with the sealant Fabrication A. Fabricate solid phenolic infill panels in accordance with manufacturer's recommendations and approved submittals. B. The system shall be designed to be watertight at design pressure. Only condensate water shall be allowed to appear on the interior or framing members Solid Phenolic Infill Panels of 5

18 C. All phenolic panels shall be framed in a two-piece extruded aluminum sub-frame that will fit into the steel windscreen opening(s). Provide gasket material to isolate the dissimilar metals of the subframe and windscreen frame. PART 3 EXECUTION 3.01 Shipping A. Take care to package so as to protect the phenolic infill panels and aluminum sub-frames from damage during shipping. All aluminum shall be protected with strippable film. B. Package, label and ship products to SEPTA as outlined above and in the boiler plate of the bid documents Installation A. Installation shall be by SEPTA work forces Field Quality Requirements A. Manufacturer's Field Services: 1. Manufacturer shall provide phone support as required. END OF SECTION Solid Phenolic Infill Panels of 5

19 PART 1 GENERAL 1.01 Description SECTION HIGH PERFORMANCE COATINGS - ANODIZING A. The work of this section consists of anodizing the fabrication(s) as shown on the drawings and described herein. B. The Contractor shall be responsible to assure that all metal is free of all contaminates, and has been properly prepared for anodizing. C. The Contractor shall be responsible for all materials and labor as required for a complete finished system Submittals A. The Contractor shall be responsible for supplying all manufacturer s technical data and MSDS (Material Safety Data Sheets) sheets on all preparation and products used. B. The Contractor shall supply (1) finish sample, 12 square and/or long which will show adequately the quality of finish. The final delivered product s finishes shall be judged against this sample Quality Control A. The Prime Contractor shall be responsible for coordinating all component finishes, and shall assure that the components / fabrications are packaged and shipped properly to assure that the finish is not damaged while in storage and / or in transit. B. The Prime Contractor shall assure that anodizing shall not be permitted on contaminated and / or blemished surfaces. All anodizing shall be free of drips, runs and splatters. The anodized finish must meet architectural finish standards or it shall be rejected. C. If different Sub-Contractors are required, then the Prime Contractor shall be responsible to assure a complete and coordinated finish. D. During the drying process the aluminum shall be protected from damage by individually hanging, bracing, laying, and / or standing to assure that the surfaces are not marred and that surfaces do not stick to adjacent surfaces. All items shall be dried for a period long enough to assure that the surface can withstand stacking prior to bundling. All items shall have spacers placed between adjacent components to assure damage does not occur during storage and / or shipping. If items must be strapped, the use of protective pads must be utilized where the strapping may mar the finish. PART 2 PRODUCTS High Performance Coatings of 2

20 2.01 Anodized Finish A. Clean aluminum of any surface dirt or grease with alkaline and/or acid cleaner. B. Etch aluminum in hot solution of sodium hydroxide to remove minor surface imperfections and remove a thin layer off the surface to create a matte finish. C. Provide Anodic Finish: Class 1 AA-M10-C22-A41 1. Mechanical Finish: Non-Specular as Fabricated 2. Chemical Finish: Etched, Medium Matte 3. Anodic Coating: Architectural Class I 4. Coating Thickness: 0.7mil, conforming to AAMA PART 3 EXECUTION 3.01 Not Used END OF SECTION High Performance Coatings of 2

21 PART 1 GENERAL 1.01 Description SECTION GLASS BLOCK INFILL PANELS A. This section includes the fabrication and delivery of pre-assembled glass block infill panels as specified herein and in the drawings. B. The contractor shall supply all materials and labor for a complete project, which shall include, but not necessarily be limited to glass block units, anodized grid system, stainless steel fasteners, caulks, tapes, and other items required for a complete structural and watertight installation References A. International Building Code, Latest Edition. B. ASTM - American Society for Testing and Materials. 1. ASTM A380 - Standard Practice for Cleaning, Descaling and Passivation of Stainless Steel Parts, Equipment and Systems. 2. ASTM A967 - Standard Specification for Chemical Passivation Treatments for Stainless Steel Parts. 3. ASTM B221 - Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles and Tubes. 4. ASTM B766 - Standard Specification for Electrodeposited Coatings of Cadmium. 5. ASTM F593 - Standard Specification for Stainless Steel Bolts, Hex Cap Screws and Studs. 6. ASTM F594 - Standard Specification for Stainless Steel Nuts. C. AAMA - American Architectural Manufacturers Association 1. AAMA Voluntary Guide Specification and Inspection Methods for Integral Color Anodic Finishes for Architectural Aluminum. D. ANSI Type 316 Stainless Steel 1.03 Related Work A. Section Summary of Work B. Section Submittals C. Section Miscellaneous Fasteners D. Section High Performance Coatings Anodizing 1.04 Submittals A. Submit under the provisions of Section Submittals. Glass Block Infill Panels of 5

22 B. Solid Glass Blocks 1. Submit (2) samples of each type of standard glass unit illustrating size variations, design, and face pattern. These samples may be used in the mock-up. 2. Submit (4) copies of manufacturer's product data. C. Glass Block Grid System 1. Submit for review and approval, a full-scale mockup of grid system: 18"x18" min. Mockup shall show at least one complete opening of aluminum grid members fastened to a solid substrate on two sides. Substrate need not be steel HSS. Mockup shall show material finishes, fastener pattern, sealants, backer rods and shims between grid system and substrate. Mockup shall include at least (1) glass block unit. Approved mockup shall serve as quality standard for final construction. Refer to notes and drawings this sheet. 2. Submit (3) 6" samples of each type of glazing tape, caulk, backer rod, and stainless steel fasteners. 3. Submit (4) copies of shop drawings: a. Shop drawings shall include plans, elevations, sections and details of the system. All welds, sealants and anchor details shall be clearly indicated. b. Note gauges of brake metal, finishes of frames and hardware and dimensions (if applicable) of work to be performed by other trades. c. Label fastening devices as to type and spacing. 4. Product Data - Submit (4) copies of each of the following: a. Product literature, catalog cuts, MSDS and specifications for grid system, foam tapes, backer rods, sealants and fasteners. b. Submit proposed manufacturer's catalog cuts and specifications that clearly illustrate and describe the submitted wall system. c. Provide installation instructions for setting the grid system into the structure and for setting the glass units into the grid system. d. Provide manufacturers' standard finishes and color information for all products for the SEPTA Project Manager to select from. D. Manufacturer of aluminum grid system shall provide back-up engineering calculations, which support their system design per conformance to code and design criteria as described in the specification and drawings. All support data including but not limited to shop drawings and structural calculations must be prepared and sealed by a Pennsylvania licensed structural engineer. The support data, shop drawings and calculations must be submitted to SEPTA for review and approval prior to fabrication Quality Assurance A. The manufacturer for this project must demonstrate experience in the manufacture of aluminum framed systems of the general type and function as shown on the contract drawings and specified herein Delivery, Storage and Handling A. All glass block infill panels shall be factory assembled. Glass Block Infill Panels of 5

23 B. Prior to delivery, verify that steel frame openings and grid system dimension are compatible for installation. C. Verify that field conditions are acceptable and are ready to receive work prior to delivery. D. Package, label and deliver all components in marked containers/boxes with all items keyed to installation layout drawings and instructions. E. Provide protective film on all aluminum grid pieces. F. Provide sufficient packing and protection to minimize damage during shipping and handling 1.07 Warranty A. The manufacturer of the grid system shall provide a warranty for five years against frame failure. PART 2 PRODUCTS 2.01 Materials A. Glass Block Infill Panels 1. Solid Glass Blocks a. 8"x8"x1 1/2" Clear, Solid Glass Blocks. b. Glass Block Units shall not have the additive Mirabilite or any other element that may cause discoloration from environmental conditions. 2. Glass Block Grid System a. Pre-Assembled Series 2100GL GridLock System as manufactured by Extech-Voegele, 200 Bridge St., Pittsburgh, PA 15223, (800) , or approved equal. b. The contract drawings are based on a modified version of the Easy Grid System as manufactured by Extech-Voegele; as a means to establish a set of minimum standards and quality. Other systems may be acceptable and shall be considered. c. The structural grid shall be composed of extruded aluminum members (6065 or 6105, T-5 or T-6). Once the grid and glass block units are assembled they shall be structurally drawn together using a stainless steel threaded rod at key locations to hold the blocks and grid system together for shipping and installation. The threaded stainless steel rod shall be an integral part of the finished design/system and the entire assembly shall be fabricated at the factory. The grid and glass block panel system shall be designed to slip into and fasten to a steel windscreen frame. d. The extruded members shall have no sharp edges. e. The horizontal and vertical members shall fasten to each other in a manner that requires no tools, or simple hand tools. Site welding shall not be accepted. f. The leading edges of the grid extrusions shall be recessed 1/4" max behind the faces of the glass units on the exterior side. g. The leading edge of the grid extrusion shall not project more than ½ beyond the face of the block on the opposite face. h. The grid extrusions shall not have a face width of greater than 3/8. i. Dissimilar metals shall be isolated from each other using gaskets or other suitable materials to protect against galvanic reactions. Glass Block Infill Panels of 5

24 3. Fasteners a. Bolts, anchors and other fastening devices shall be of approved types as required for the strength of the connections and shall be suitable for the conditions encountered. Washers shall be of the same metals as the fasteners. b. Exposed fasteners not covered by glass block shall be 316 series stainless steel and shall utilize stainless steel washers with neoprene seals. c. Exposed fasteners shall be of a vandal resistant design, requiring specialized tools for assembly. d. Fasteners shall be stainless steel tek screws. Refer to section for details. e. All fasteners for the glass block infill panels shall be supplied by the system manufacturer. 4. Finish Refer to Section a. Color shall be clear anodized. 5. Sealant a. #795 as manufactured by Dow Corning Corp W. Salzburg Rd. Midland, MI 48686, (989) , or approved equal. b. Sealant color shall be clear. 6. Foam Tape a. VHB Series 4952, Low Surface Energy Double Sided Foam Tape as manufactured by 3M, 3M Center, St. Paul, MN , (888) , or approved equal. 7. Backer Rods a. All construction seals shall be backed by self-expanding closed cell polyethylene rods oversized 50% of joint width of a type recommended by the sealant manufacturer as being compatible with the sealant. 8. Gaskets a. Gaskets shall be TPV foam with a polyethylene jacket as manufactured by Amesbury or approved equal. Gaskets must be factory installed. Field installed gaskets are not permitted Fabrication Performance Characteristics A. Integral Grid Framing 1. Design, engineer and fabricate per IBC for a basic wind speed (3 sec. gust) of 95 mph, Exposure Category B, Importance Category II. 2. Design of framing system shall provide for expansion and contraction of component materials caused by a surface temperature range of -10 degrees F to 120 degrees F, without causing excessive buckling stresses on the glass block infill, failure of joint seals, undue stress on structural elements of the structure or any reduction in system performance. 3. The system shall be designed to be watertight at design pressure. Only condensate water shall be allowed to appear on the interior or framing members. 4. The system shall be designed so as to allow the replacement of any one block in (2) minutes or less including removal of existing glass unit and replacement without the use of special tools, sealants or solvents. PART 3 EXECUTION 3.01 Installation A. Installation shall be by SEPTA work forces. Glass Block Infill Panels of 5

25 3.02 Field Quality Requirements A. Manufacturer's Field Services 1. Manufacturer shall provide phone support as required. END OF SECTION Glass Block Infill Panels of 5

SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY 1234 MARKET STREET, PHILADELPHIA, PA 19107

SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY 1234 MARKET STREET, PHILADELPHIA, PA 19107 TABLE OF CONTENTS Specification Sections: Division 1: General Requirements o Section 01010 Summary of Work o Section 01300 - Submittals SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY 1234 MARKET STREET,

More information

Section Meetings Section Material and Equipment. None Required

Section Meetings Section Material and Equipment. None Required January 2000 Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK PART 2 PRODUCTS The General Conditions of the Contract, General Requirements and Supplemental

More information

4. Metal roof jacks at penetrations and attachments

4. Metal roof jacks at penetrations and attachments - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - SECTION 07 61 00 METAL SHINGLE ROOFING - - - - - - - - - - -

More information

SHEET METAL FLASHING AND TRIM Christ on the Mountain

SHEET METAL FLASHING AND TRIM Christ on the Mountain SECTION 076200 - SHEET METAL FLASHING AND TRIM PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Compatibly with the bumping of flashings and trim as identified in the Membrane Roofing Section 075000.

More information

GUIDELINE SPECIFICATIONS

GUIDELINE SPECIFICATIONS GUIDELINE SPECIFICATIONS GORDON MILLENNIUM DECORATIVE METAL COLUMN COVERS DIVISION 05 7500 or DIVISION 09 2000 Note To Specifier: Column Covers are a finished, decorative product and should be installed

More information

b. B aluminum and aluminum-alloy extruded bar, rod, wire, shape and tube

b. B aluminum and aluminum-alloy extruded bar, rod, wire, shape and tube MODEL 240I SECTION 08120 FLUSH ALUMINUM DOORS AND FRAMES PART I GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required to deliver and install aluminum doors, frames,

More information

SECTION SHEET METAL FLASHING AND TRIM

SECTION SHEET METAL FLASHING AND TRIM SECTION 07620 PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Formed roof drainage sheet metal fabrications. 2. Formed low-slope roof sheet metal fabrications. 1.2 SUBMITTALS A. Shop Drawings: Show

More information

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia BULLETIN NO. 6 TO THE PLANS AND SPECIFICATIONS FOR JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia EwingCole Architects.Engineers.Interior Designers.Planners

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

STANDARD SPECIFICATION FOR STEEL FRAMING FOR RAILROAD SHELTERS

STANDARD SPECIFICATION FOR STEEL FRAMING FOR RAILROAD SHELTERS SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY 1234 MARKET STREET, PHILADELPHIA, PA 19107 STANDARD SPECIFICATION FOR STEEL FRAMING FOR RAILROAD SHELTERS REVISION DATE SPECIFICATION # F-S-306_ DATE:

More information

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES SECTION 01340 SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES PART 1 - GENERAL 1.1 REQUIREMENTS INCLUDED A. Contractor shall submit to the Architect/Engineer for review and exception, if any, such working

More information

Series Sloped glazed Curtain wall. Installation Instructions

Series Sloped glazed Curtain wall. Installation Instructions Series 5600 Sloped glazed Curtain wall Installation Instructions Part NO. Y308 February 2013 SECTION TABLE OF CONTENTS PAGE I. General Notes & Guidelines. 3-4 II. Gutter and Mullion Assembly.. 5 III. End

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01334 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.01 SUMMARY A. Submit to the ENGINEER for review, such working drawings, shop drawings, test reports and data on materials and equipment

More information

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES DIVISION 1 GENERAL REQUIREMENTS SECTION 01 33 00 PART 1 - GENERAL 1.1 SUMMARY A. This section includes administrative and procedural requirements for submittals required for performance of the work, including

More information

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

A. Action Submittals: Written and graphic information that requires Engineer's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

East Central College

East Central College SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration SECTION 01 340 - SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA If project is not administered in PRISM, coordinate use of Exhibit 6 submittal schedule with this section. SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 REQUIREMENTS INCLUDED

More information

SECTION BULLET- RESISTANT DOORS

SECTION BULLET- RESISTANT DOORS 1 SECTION 08 3950 BULLET- RESISTANT DOORS PART 1- GENERAL 1.01 SUMMARY A. This Section Includes: 1. Bullet- resistant steel door and frame systems. 2. Door hardware for bullet- resistant steel door and

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 01 3300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

A. Action Submittals: Written and graphic information that requires Architect's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals. SECTION 01300 PART 1 GENERAL 1.1 SECTION INCLUDES A. Description of Requirements B. Submittal Procedures C. Specific Submittal Requirements D. Action on Submittals E. Repetitive Review 1.2 DESCRIPTION

More information

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER.

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER. SECTION 01300 - PART 1 - GENERAL 1.1 GENERAL A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER. B. Unless otherwise noted, within 14 days after the date of commencement as stated in

More information

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 013300 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

2016 Specification Treads, Base, Stringers and other Amenities Wausau Tile Precast Epoxy Terrazzo

2016 Specification Treads, Base, Stringers and other Amenities Wausau Tile Precast Epoxy Terrazzo 2016 Specification Treads, Base, Stringers and other Amenities 09400 Wausau Tile Precast Epoxy Terrazzo PART 1 - GENERAL 1.1 SUMMARY A. Perform all work required to complete, as indicated by the Contract

More information

SECTION INTERIOR SIGNAGE

SECTION INTERIOR SIGNAGE SECTION 10 14 02 INTERIOR SIGNAGE PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.1 DESCRIPTION A. This specification defines the general requirements and procedures for submittals. A submittal is information

More information

SECTION STRUCTURAL STEEL. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION STRUCTURAL STEEL. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 051200 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

A. Extent of structural precast concrete work is shown on drawings and in schedules.

A. Extent of structural precast concrete work is shown on drawings and in schedules. SECTION 03 41 00 - STRUCTURAL PRECAST CONCRETE PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 specification

More information

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS SECTION 01300 SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and other Division-1 Specification Sections,

More information

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 General

More information

SECTION METAL FABRICATIONS

SECTION METAL FABRICATIONS SECTION 05100 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for metal fabrications, including minimum requirements for fabricator, and galvanizing. 1.02 REFERENCE STANDARDS A. ASTM

More information

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal City of Winnipeg Brady Road Landfill Site Section 01300 New Entrance and Scale Facility Page 1 of 4 SUBMITTALS 1. SHOP DRAWINGS 1.1 General.1 Arrange for the preparation of clearly identified Shop Drawings

More information

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS PART 1 GENERAL 1.01 Scope of Work A. Provide material, accessories, tools, equipment and labor as required for the complete fabrication

More information

SERIES 300 SINGLE HUNG WITH FIN WINDOW INSTALLATION

SERIES 300 SINGLE HUNG WITH FIN WINDOW INSTALLATION IMPORTANT INFORMATION: WHETHER IT BE LOCATION OR INSTALLATION TYPE, NOT ALL WINDOW TYPES CAN BE INSTALLED IN ALL AREAS OR WALL CONDITIONS. CONSULT YOUR LOCAL BUILDING CODE DEPARTMENT FOR ANY REGULATIONS

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 013300 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply

More information

Suggested Specification for Preparing Hot-Dip Galvanized Steel Surfaces for Painting Revised February 2002

Suggested Specification for Preparing Hot-Dip Galvanized Steel Surfaces for Painting Revised February 2002 Suggested Specification for Preparing Hot-Dip Galvanized Steel Surfaces for Painting Revised February 2002 This suggested specification is provided as a guide to preparing a quality document calling for

More information

SECTION SHEET METAL FLASHING AND TRIM

SECTION SHEET METAL FLASHING AND TRIM SECTION 07620 SHEET METAL FLASHING AND TRIM PART 1 GENERAL 1.1 SUMMARY A. Section includes flashings and counterflashings, sheet metal roofing and fabricated sheet metal items, as indicated in Schedule.

More information

AMPCO PRODUCTS, INC. TECHNICAL SPECIFICATIONS SOLID PHENOLIC CORE TOILET COMPARTMENTS

AMPCO PRODUCTS, INC. TECHNICAL SPECIFICATIONS SOLID PHENOLIC CORE TOILET COMPARTMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS TECHNICAL SPECIFICATIONS SOLID PHENOLIC CORE TOILET COMPARTMENTS A. Drawings and General Provisions of Contract, including General and Supplementary Conditions and

More information

DHS-500 IMPACT SYSTEM INSTALLATION MANUAL

DHS-500 IMPACT SYSTEM INSTALLATION MANUAL DHS-500 IMPACT SYSTEM INSTALLATION MANUAL TABLE OF CONTENTS SECTION PAGE GENERAL NOTES 3 EXTRUSION & PARTS IDENTIFICATION 4-5 DETERMINE FRAME SIZE 6 FABRICATE VERTICAL MULLIONS & FILLERS 7-8 FABRICATE

More information

SECTION FOLDING GLASS PANEL PARTITIONS

SECTION FOLDING GLASS PANEL PARTITIONS SECTION 10 22 26.35 FOLDING GLASS PANEL PARTITIONS USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED FOLDING GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY, MOUNTING BRACKETS, MOUNTING

More information

B. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.

B. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form. McKee and Associates Architecture and Interior Design Addendum No. THREE Date: 12.11.17 Project: A NEW BUILDING FOR THE GREATER LIMESTONE COUNTY CHAMBER OF COMMERCE ATHENS, ALABAMA A3.1 GENERAL PROJECT

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

SECTION Display Case Door Series 1301-CM

SECTION Display Case Door Series 1301-CM 1 SECTION 12 3559 Display Case Door Series 1301-CM PART 1 - GENERAL 1.01 SUMMARY A. This section includes: 1. Display Case Glass Doors. 2. Sidelites. B. Related work in other sections: 1. 08 8000- Glazing

More information

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 01 33 00 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

INSTALLATION INSTRUCTIONS SIDELITE ASSEMBLY SERIES 900 TERRACE DOOR AND SERIES 925 PATIO DOOR

INSTALLATION INSTRUCTIONS SIDELITE ASSEMBLY SERIES 900 TERRACE DOOR AND SERIES 925 PATIO DOOR INSTALLATION INSTRUCTIONS SIDELITE ASSEMBLY SERIES 900 TERRACE DOOR AND SERIES 925 PATIO DOOR Phone: (800) 262-5151 Fax: (866) 262-3299 crlaurence.com usalum.com crl-arch.com 11M0292 HANDLING, STORAGE,

More information

SECTION MANUFACTURED CASEWORK

SECTION MANUFACTURED CASEWORK 1 GENERAL 1.1 SECTION INCLUDES SECTION 12300 MANUFACTURED CASEWORK A. Work required to complete the manufactured casework indicated by the Contract Documents, and the items necessary for its proper installation.

More information

SERIES 300 SINGLE HUNG WINDOW INSTALLATION

SERIES 300 SINGLE HUNG WINDOW INSTALLATION IMPORTANT INFORMATION: WHETHER IT BE LOCATION OR INSTALLATION TYPE, NOT ALL WINDOW TYPES CAN BE INSTALLED IN ALL AREAS OR WALL CONDITIONS. CONSULT YOUR LOCAL BUILDING CODE DEPARTMENT FOR ANY REGULATIONS

More information

C. Samples for Initial Selection: Manufacturer's color charts showing the full range of colors available.

C. Samples for Initial Selection: Manufacturer's color charts showing the full range of colors available. SECTION 105113 - METAL LOCKERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

TENANT IMPROVEMENT 16 FEBRUARY WEST 27TH STREET, 4TH FLOOR 100% CD OWNER/BID ADD 1-03/08/2018

TENANT IMPROVEMENT 16 FEBRUARY WEST 27TH STREET, 4TH FLOOR 100% CD OWNER/BID ADD 1-03/08/2018 SECTION 055000 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

1.04 QUALITY ASSURANCE

1.04 QUALITY ASSURANCE SECTION 07312 ARCHITECTURAL ASPHALT SHINGLES PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

Working Drawing Manual

Working Drawing Manual Working Drawing Manual 2012 Table of Contents Section 1 Working Drawing Types... 1 1.1 General... 1 Section 2 Processing Steps... 1 2.1 Project Manager... 1 2.2 Engineering Document Unit... 2 2.3 Contractor...

More information

Toll-Free

Toll-Free Primary applications for Ross DS Series Security Doors and Frames include government, industrial, commercial and residential properties where protection of people and property is of utmost concern and

More information

1.1 RELATED DOCUMENTS

1.1 RELATED DOCUMENTS SECTION 050505 -BEVEL RAIL ENDS PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the contract, including General and Supplementary Conditions and Division 01 Specification Sections

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01 33 23 - SHOP DRAWINGS, PRODUCT DATA, AND PART 1 - GENERAL 1.1 SUMMARY A. Products include, but are not limited to, the following construction submittals: 1. Shop Drawings. 2. Product Data. 3.

More information

INTEX Millwork Solutions SECTION EXTERIOR PVC PERGOLAS (IBC Compliant)

INTEX Millwork Solutions SECTION EXTERIOR PVC PERGOLAS (IBC Compliant) SECTION 066030 EXTERIOR PVC PERGOLAS (IBC Compliant) PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and other Contract Documents, listed in the agreement between the Owner and Contractor, apply to

More information

Design and Construction Standards SECTION ATHLETIC LOCKERS

Design and Construction Standards SECTION ATHLETIC LOCKERS SECTION 10505 ATHLETIC LOCKERS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. The provisions of the General Conditions, Supplementary Conditions, and the Sections included under Division 1, General Requirements,

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 101400 - SIGNAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and supplementary Conditions and Division-1 Specification Sections,

More information

Edgerail Aluminum Bridge Railing System Specification & Installation Instructions

Edgerail Aluminum Bridge Railing System Specification & Installation Instructions Edgerail System Specification & Installation Instructions Hill & Smith, Inc 1000 Buckeye Park Road Columbus, Ohio 43207 Tel: 614-340-6294 Fax: 614-340-6296 www.hillandsmith.com Section A System Specification

More information

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS:

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS: INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS: 013300 SUBMITTAL PROCEDURES 018116 CONSTRUCTION WASTE MANAGEMENT DIVISION 2 EXISTING CONDITIONS: 023000 EARTHWORK

More information

Product Guide Specification

Product Guide Specification Shield Casework February 2014 3421 Merriam Lane Overland Park, Kansas 66203 Phone 913-744-2183 Fax 913-384-3477 Website www.shieldcasework.com E-mail info@shieldcasework.com Product Guide Specification

More information

Storage and Installation of welded LL Hollow Metal Door Frames in Steel Studs

Storage and Installation of welded LL Hollow Metal Door Frames in Steel Studs Storage and Installation of welded LL Hollow Metal Door Frames in Steel Studs Introduction This guide specification is intended to stress the necessary precautions and requirements for receipt, storage,

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide submittals in accordance with the General Conditions as modified by the Supplementary Conditions,

More information

Window Frame Installation Instructions For Nail-on and Block Frames

Window Frame Installation Instructions For Nail-on and Block Frames General The key to any window or door installation is preparation. This extends from storage of the product to the final installation and to all points in between. Careful planning and attention to detail

More information

Ash Brook Golf Course Scotch Plains, New Jersey

Ash Brook Golf Course Scotch Plains, New Jersey SECTION 062013 - EXTERIOR FINISH CARPENTRY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

3400 Tectura Designs Precast Concrete

3400 Tectura Designs Precast Concrete 3400 Tectura Designs Precast Concrete PART 1 - GENERAL 1.1 SUMMARY A. Perform all work required to furnish and complete the proper installation of precast concrete. B. Types of Precast Concrete work include:

More information

A. ASTM D Standard Test Method for Rate of Burning and/or Extent and Time of Burning of Plastics in a Horizontal Position.

A. ASTM D Standard Test Method for Rate of Burning and/or Extent and Time of Burning of Plastics in a Horizontal Position. SECTION 074600 VINYL SIDING PART 1 GENERAL 1.1 SECTION INCLUDES A. Vinyl siding. B. Vinyl soffits. C. Accessories and trim. 1.2 RELATED SECTIONS A. Section 06100 - Framing and Sheathing. B. Section 07260

More information

SECTION 025 INDUSTRIAL PAINTING

SECTION 025 INDUSTRIAL PAINTING SECTION 025 INDUSTRIL PINTING Industrial painting, including all necessary preparation and application, except as modified in this Section, shall conform to the recommendations of the manufacturer of the

More information

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS DIVISION 1 - GENERAL REQUIREMENTS SECTION 01300 - SUBMITTALS PART 1 - GENERAL 1.1 STIPULATIONS A. The section "Special Requirements" forms a part of this section by this reference thereto and shall have

More information

PROJECT LOCATION SECTION PREFINISHED STEEL DOOR FRAMES

PROJECT LOCATION SECTION PREFINISHED STEEL DOOR FRAMES SECTION 08 1213.17 PART 1 - GENERAL 1.01 SECTION INCLUDES A. Prefinished steel door frames. B. [Sidelites] [, borrowed lites] [, and transom] assemblies. 1.02 RELATED REQUIREMENTS A. Section 06 2000 Finish

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS Thermally Broken Framing and Door Installation SL-450TB (2" x 4-1/2" with 1" Glazing) & SL-600TB (2" x 6" with 1" Glazing) IMPORTANT: Read all instructions before beginning installation.

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-08 51 69.10 (April 2006) ----------------------------- Preparing Activity: NAVFAC Replacing without change UFGS-08582 (August 2001) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

SECTION STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 05 12 00 - STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Large Scale CalArc Pavers for Sand-Set Pedestrian Use Installations

Large Scale CalArc Pavers for Sand-Set Pedestrian Use Installations The following specification refers to the Stepstone, Inc. product known as: Large Scale CalArc Pavers for Sand-Set Pedestrian Use Installations Large Scale CalArc Pavers are part of the California Architectural

More information

NARROW, MEDIUM AND WIDE STILE, THERMASTILE AND DURASTILE. Installation Instructions

NARROW, MEDIUM AND WIDE STILE, THERMASTILE AND DURASTILE. Installation Instructions NARROW, MEDIUM AND WIDE STILE, THERMASTILE AND DURASTILE Installation Instructions PART Y015 JUNE 2016 Table of Contents Section 1. GENERAL NOTES AND GUIDELINES... 2. DOOR HARDWARE A. Locks B. Push/Pulls

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-08 33 13 (May 2009) Change 2-11/12 --------------------------- Preparing Activity: USACE Nontechnical Title Revision (August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

B. Related Sections: The following Sections contain requirements that relate to this Section:

B. Related Sections: The following Sections contain requirements that relate to this Section: SECTION 07311 - ASPHALT SHINGLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

FLUOROPOLYMER COATED DUCT FOR CAUSTIC ENVIRONMENTS

FLUOROPOLYMER COATED DUCT FOR CAUSTIC ENVIRONMENTS DIVISION 23 FLUOROPOLYMER COATED DUCT FOR CAUSTIC ENVIRONMENTS Part I General 1.1 Related Documents A. All terms and general provisions of contract, General and Supplementary Conditions, and Specification

More information

Collins Engineers Palmetto Islands County Park Boardwalk Repairs 03/28/2014 SECTION ROUGH CARPENTRY

Collins Engineers Palmetto Islands County Park Boardwalk Repairs 03/28/2014 SECTION ROUGH CARPENTRY PART 1 GENERAL 1.1 RELATED SECTIONS SECTION 061000 ROUGH CARPENTRY A. Drawings and general provisions of the Construction Contract, including General Conditions and Division 1 Specification Sections, apply

More information

SECTION IDENTIFICATION FOR FIRE SUPPRESSION PIPING AND EQUIPMENT

SECTION IDENTIFICATION FOR FIRE SUPPRESSION PIPING AND EQUIPMENT SECTION 21 05 53 IDENTIFICATION FOR FIRE SUPPRESSION PIPING AND EQUIPMENT Display hidden notes to specifier. (Don't know how? Click Here) Copyright 2015-2015 ARCAT, Inc. - All rights reserved PART 1 GENERAL

More information

SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS SECTION 270536 - CABLE TRAYS FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

YSD 400 Sliding Door System Installation Manual

YSD 400 Sliding Door System Installation Manual System Installation Manual 2006 YKK AP America Inc. is a subsidiary of YKK Corporation of America. TABLE OF CONTENTS Installation Notes........................................ Page ii PARTS DESCRIPTION

More information

WOOD WOOD

WOOD WOOD 12655 - WOOD 12655-1 Part One - General WOOD 1.0 All materials used in the finishing shall be of the highest grade of their respective kinds. Materials shall be evenly and smoothly applied by skilled mechanics.

More information

INSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN

INSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN MINNEAPOLIS, MN 2-0- 2-- General Notes Abbreviations Deviations from Architectural Specifications Deviations from Architectural Drawings ALUM. = ALUMINUM B.O. = BY OTHERS CONT. = CONTINUOUS. = CLEARANCE

More information

EXTERIOR PAINTING

EXTERIOR PAINTING SECTION 099113 - EXTERIOR PAINTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Multi-Institutional Academic Health Science & Research Center Evansville, IN

Multi-Institutional Academic Health Science & Research Center Evansville, IN SECTION 06 1053 - MISCELLANEOUS ROUGH CARPENTRY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions Division 01 Specification

More information

1.1 SUMMARY. A. This Section includes the following: 1. Loose steel lintels. 2. Shelf angles. 3. Metal floor plate. 4. Pipe bollards.

1.1 SUMMARY. A. This Section includes the following: 1. Loose steel lintels. 2. Shelf angles. 3. Metal floor plate. 4. Pipe bollards. PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Loose steel lintels. 2. Shelf angles. 3. Metal floor plate. 4. Pipe bollards. B. See Division 5 Section "Pipe and Tube Railings"

More information

Thermally Broken Framing and Door Installation

Thermally Broken Framing and Door Installation INSTALLATION INSTRUCTIONS Thermally Broken Framing and Door Installation IMPORTANT: Read all instructions before beginning installation. These instructions are provided to help prevent installation problems

More information

Series Advanced and alternate. Installation Instructions

Series Advanced and alternate. Installation Instructions Series 5500 Advanced and alternate Installation Instructions Part NO. Y557 February 2013 TABLE OF CONTENTS SECTION S-5500 ADVANCED INSTALLATION INSTUCTIONS PAGE I. General Notes and Guidelines...... 3-4

More information

STANDARD SPECIFICATIONS SECTION SUBMITTAL PROCEDURES

STANDARD SPECIFICATIONS SECTION SUBMITTAL PROCEDURES STANDARD SPECIFICATIONS SECTION 01330 SUBMITTAL PROCEDURES PART 1 GENERAL 1.1 DESCRIPTION A. Section includes general requirements and procedures related to preparation and transmittal of Submittals to

More information

Solid Surface Fabrications

Solid Surface Fabrications USE THIS SECTION F WALL CLADDING AND MISCELLANEOUS FABRICATIONS OTHER THAN COUNTERTOPS. USE SECTION 06 61 18 F COUNTERTOPS. GENERAL NOTES TO SPECIFIER: THIS SPECIFICATION SECTION HAS BEEN PREPARED TO ASSIST

More information

Series 6000 Vinyl Single Hung

Series 6000 Vinyl Single Hung Series 6000 Horizontal Slider Series 6000 Vinyl Single Hung Contents List of Architectural Drawings...6000SH - 3 Elevations - Single Hung...6000SH - 4 Available Sizes - Single Hung...6000SH - 5 Series

More information

SECTION SIGNAGE

SECTION SIGNAGE SECTION 10 14 00 SIGNAGE PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division-1 specification section, apply

More information

INSTALLATION INSTRUCTIONS SERIES 487 CENTER GLAZED WITH 1-1/2" TRIM OFFICE PARTITIONS

INSTALLATION INSTRUCTIONS SERIES 487 CENTER GLAZED WITH 1-1/2 TRIM OFFICE PARTITIONS INSTALLATION INSTRUCTIONS SERIES 87 CENTER GLAZED WITH -/" TRIM OFFICE PARTITIONS Phone: (800) -6 Fax: (800) 58-7 crlaurence.com usalum.com crl-arch.com M056_Rev_D SERIES 87 OFFICE PARTITIONS CENTER GLAZED

More information

SECTION STEEL LIGHTING STANDARDS. 1. Electrical conduit and fittings; Section

SECTION STEEL LIGHTING STANDARDS. 1. Electrical conduit and fittings; Section 02760-1 of 5 SECTION 02760 STEEL LIGHTING STANDARDS 02760.01 GENERAL A. Description Steel lighting standards shall include, but not necessarily be limited to, furnishing and installing steel lighting poles,

More information

B. Terracotta Precast Facade Assembly consisting of single-leaf, through body color terracotta clay tiles.

B. Terracotta Precast Facade Assembly consisting of single-leaf, through body color terracotta clay tiles. SECTION 07 4229 TERRACOTTA CLAY TILE IN PRECAST SPECIFICTION FOR TERRART SOLID PART 1 GENERAL 1.1 SECTION INCLUDES A. Drawings and general provisions of the Contract, including General and Supplementary

More information

Section 914. JOINT AND WATERPROOFING MATERIALS

Section 914. JOINT AND WATERPROOFING MATERIALS 914.01 Section 914. JOINT AND WATERPROOFING MATERIALS 914.01. General Requirements. Joint and waterproofing material for use in concrete construction must meet the requirements of this section. 914.02.

More information

INS A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Unpacking the KSCR Splicing the KSCR (If Required)...

INS A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Unpacking the KSCR Splicing the KSCR (If Required)... INS-88.500-0A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE 1. Unpacking the KSCR... 2 2. Splicing the KSCR (If Required)... 4 3. Assemble Curb and Rail Corners... 5 4. Install Cross Bracing (If Required)...

More information

SECTION HOLLOW METAL DOORS AND FRAMES

SECTION HOLLOW METAL DOORS AND FRAMES SECTION 081113 HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Standard hollow metal doors and frames. 1.2 SUBMITTALS A. Product Data: Include construction details, material