1 Agenda Item 6 English only OSPAR CONVENTION FOR THE PROTECTION OF THE MARINE ENVIRONMENT OF THE NORTH-EAST ATLANTIC MEETING OF THE BIODIVERSITY COMMITTEE (BDC) BONN: FEBRUARY 2005 OSPAR Database on Wind-farms Presented by the Secretariat This document presents the annual update of the OSPAR Database on Wind-farms with the map associated to it prepared by Germany, as well as draft revised Explanatory Notes to the database for their finalisation and adoption. Update of the database 1. In adopting the OSPAR Database on Wind-farms, BDC 2003 agreed that Contracting Parties should update their data periodically on an annual basis, starting on 15 July For doing so, the Secretariat sent a reminder to Contracting Parties on 5 November 2004 requesting Contracting Parties (a) to provide the new information on area covered by offshore wind-farms that BDC had agreed should be included in the data-base; (b) to up-date both the information on current status and, more generally, the information that had already been provided and was reflected in the reporting format. 3. The Secretariat presented to EIHA 2004 (EIHA 04/4/6) the OSPAR database of offshore wind-farms updated with information received from Belgium, Denmark, Ireland, Germany, the Netherlands and the UK before the meeting. In the lack of further notice from Sweden and Spain the Secretariat had assumed that their previous data remained valid. 4. EIHA 2004 invited Contracting Parties to send to the Secretariat by 6 December 2004, their corrections to the OSPAR Database on Wind-farms at Annex 1 to EIHA 04/4/6, including the coordinates for locations of their wind-farms in the form indicated by Germany in EIHA 04/4/2. In the light of contributions from Contracting Parties (Germany, Ireland, the Netherlands, UK) the Secretariat has updated the database as at Annex 1. However the Secretariat would like raise the following points: a. Belgium has reported as authorised under the column current status a wind-farm that says under notes authorisation suspended. Belgium has also reported on a dismissed application for a wind-farm by indicating refused under the column current status. At present this option is not considered by the Explanatory notes. Sweden has informed that currently there are nowindfarm in their part of the OSPAR maritime area and that the only application on which they had reported at Flanden bank has now been dismissed. The Secretariat has left and greyed these two entries that have been reported as dismissed applications indicating their current status as refused. There may be a value in keeping this information on the database when a wind-farm has previously been reported as application. If this is the case, BDC may wish to reflect in the Explanatory Notes in Annex 3 the possibility of using refused under the category current status as well as how to deal with applications temporarily suspended. b. the data submitted by Ireland does not follow the agreed reporting format. Therefore, Ireland would need to confirm the way in which the Secretariat has reflected on the database the information provided by them; c. Denmark has reported the year of authorisation under the column current status. This information has been inserted under notes in order to keep the number of possible status to the 5 agreed (when using the search option provided by an arrow in each column of the excel electronic version). In some cases the date of application is 2004 and Denmark and all the OSPAR Commission 1

2 Contracting Parties may wish to double check that the situation has not evolved from application to authorised or refused since the last reporting. Map of location of wind-farms in the OSPAR maritime area 5. With regard to the reflection of the total surface area occupied by each wind-farm in the OSPAR Database, BDC 2004 had agreed to report the latitude and longitude (in decimal degrees) of the points defining the polygon formed by the outermost elements of the wind farm. Contracting Parties which have offshore wind-farms had therefore been asked to report their coordinates accordingly. 6. Contracting Parties accepted the offer from Germany to assist the Secretariat in producing the OSPAR map associated with the OSPAR database of offshore wind-farms. However, in order to precisely reflect location and the total surface area of a wind-farm and its vertices, Germany explained that, subject to the agreement of Contracting Parties, the relevant geographical data should be collected differently: a. First, Germany recommended making use of the World Geodetic System 1984 (WGS84) which is adopted internationally as the single world wide datum for marine navigation. As an exception if WGS84 data is not available, Germany would also be able to take the European Datum 1950 (ED50) and convert it into WGS84. b. Secondly, the coordinates (latitude/longitude) of the vertices of offshore wind-farms should be provided in Degree Decimal with 5 digits: e.g N / E. Germany was of the view that 2 decimal places (e.g. 57,05 ) will not be enough to fully reflect the total surface of a wind-farm. 7. After discussion, EIHA agreed on a procedure for the production of the map associated with the OSPAR database so that Germany will submit it to the Secretariat in order to be presented together with the revised OSPAR Database to BDC The maps provided by Germany are attached as Annex 2. Due to the large-scale of the overall OSPAR map, the wind-farms are in some cases difficult to discern. Therefore, some additional more "regional maps" have been added. So, altogether 5 maps are enclosed. The maps include information presented by Belgium, Denmark, Germany, Ireland, the Netherlands, and the UK. As requested by BDC 2004, the map reflects the status of the wind-farms when reported by the corresponding Contracting Party. Revised Explanatory Notes with regard to Location 8. EIHA 2004 also agreed that the Secretariat should revise the Explanatory Notes to the Database in particular with regard to the submission of data on locations and present them to BDC 2005 for their adoption. This revised explanatory Notes at Annex 3 take good account of the recommendations made by Germany about submission of geographical data (see paragraph 6 and examples of calculations in EIHA 04/4/2) as well as of the possibility of inserting the option refused under the category current status. Action requested 9. BDC is invited to: a. adopt the OSPAR Database on Wind-farms at Annex 1 and advise the Secretariat on any corrections that should be made (see paragraph 4); b. examine the maps of locations of wind-farms in the OSPAR maritime area provided by Germany at Annex 2; c. accept the offer of Germany to produce the map in further updates of the database for offshore wind-farms in the OSPAR maritime area; d. adopt the draft revised Explanatory Notes at Annex 3; f. remind all Contracting Parties of the annual requirement to update their data in the OSPAR Database on Wind-farms by 15 July 2005 using the agreed reporting format and the agreed explanatory notes. OSPAR Commission 2

3 ID No Country Name Location Distance from coast Operator No of wind turbines Current Status Capacity in MW Foundation type Water depth (m) Height (m) EIA Remarks Be01 Belgium Seanergy 11/12,5 * Electrabel-Jan De Nul 50 authorised 100 monopile less than 10 m 118 yes authorisation suspended by council of state Block 1: N/ E; N/ E; N/ E; N/ E; Block 2: Be03 Belgium C-power II (2 options) N/ E; N/ E; N/ E; N/ E 27 C-power 60 authorised monopile?/gravity-based? 10 to 25 m 130 yes authorisation for project layout in 2 blocks, groundsurvey finished in september 2004 Be05 Belgium SPE Zeebrugge 0-15 m SPE Power Company 14 refused 28 monopile o-less than yes project situated half on the harbour/half in the sea, permit refused Dk05 Denmark Vindeby 54,97427 N/11,12288 E;54,96378 N/11,1377 E;54,96312 N/11,13261 E;54, N/11,12072 E; no Operational since 1989 Dk06 Denmark Tunø Knob 55,97097 N/10,35076 E;55,9703 N/10,35715 E;55,96311 N/10,35701 E;55, N/10,35061 E; no Dk07 Denmark Middelgrund 55,70516 N/12,66686 E;55,68882 N/12,66925 E;55,67412 N/12,66686 E; less than 10 m 110 yes Operational since 1991 Dk08 Denmark Horns Rev 55,50134 N/7,79511 E;55,5021 N/7,87488 E;55,46721 N/7,88344 E;55, N/7,80374 E; yes Dk09 Denmark Rødsand 54,57 N/11,67 E;54,56 N/11,76 E;54,53 N/11,76 E;54,53 N/11,67 E 10 Energi E2 72 operational 150 gravity-based less than 10 m 110 yes Operational since 2003 Dk10 Denmark Samsoe, Palludans Flak 55,73351 N/10,58332 E;55,722 N/10,58333 E;55,70921 N/10,58333 E; less than 10 m 105 yes Dk11 Denmark Frederikshavn 57,4457 N/10,56588 E;57,4437 N/10,5656 E;57,44199 N/10,56534 E; less than 10 m 125 Dk12 Denmark Grenaa Havn 1 Jysk Vindkraft 9 authorised 18 monopile less than 10 m 99,5 yes Authorised in 2002 Dk13 Denmark Roenland 56,66853 N/8,21489 E;56,66 N/8,219 E;56,65132 N/8,22416 E; monopile less than 10 m 120 yes De15 Germany Borkum-West De17 Germany DanTysk De18 Germany Borkum Riffgrund West De19 Germany Borkum Riffgrund De20 Germany Amrumbank West De21 Germany Nordsee Ost De22 Germany Meerwind De23 Germany Offshore-Bürgerpark Butendiek De24 Germany Weisse Bank 2010 De25 Germany Forseti De26 Germany Globaltech 1 De27 De28 Germany Germany Offshore North Sea Windpower De29 Germany Sandbank 24 De30 Germany Gode Wind De31 Germany Uthland 6,57333 E/ 54,00000 N; 6,57333 E/ 54,02670 N;6,62167 E/ 54,02670 N; 6,62333 E/ 54,00000 N; 6,57333 E/ 54,00000 N 43 PROKON Nord Energiesysteme GmbH 12 authorised max. 60 tripod 25 to yes Distance to nearest island 7,16444 E/ 55,23610 N; 7,20722 E/ 55,22940 N; 7,23333 E/ 55,12750 N; 7,24167 E/ 55,09420 N; 7,25056 E/ 55,06030 N; 7,18000 E/ 5,04220 N; 7,17194 E/ 55,05670 N; 7,17028 E/ 55,09190 N; 7,16889 E/ 55,12330 N; 7,16444 E/ 55,23610 N 69 GEO mbh 80 application max. 400 tripod 10 to 25/25 to yes 6,17903 E/ 54,07220 N; 6,28753 E/ 54,06030 N; 6,28937 E/ 54,02250 N; 6,18087 E/ 54,03450 N; 6,17903 E/ 54,07220 N 52 Energiekontor GmbH 80 authorised max. 280 monopile/tripod or other 25 to yes 6,49111 E/ 53,99440 N; 6,56000 E/ 53,99440 N; 6,61694 E/ 53,96080 N; 6,61694 E/ 53,94030 N; 6,54833 E/ 53,94030 N; 6,49139 E/ 53,97390 N; 6,49111 E/ 53,99440 N 34 PNE 2 Riff I GmbH 77 authorised max. 230 tripod/other 10 to 25/25 to yes Distance to nearest island 7,63767 E/ 54,53670 N; 7,77283 E/ 54,53670 N; 7,77283 E/ 54,50380 N; 7,63767 E/ 54,50380 N; 7,63767 E/ 54,53670 N 36 Amrumbank West GmbH 80 authorised max. 400 other 10 to yes Distance to nearest island 7,64056 E/ 54,47080 N; 7,73917 E/ 54,47190 N; 7,73972 E/ 54,46110 N; 7,72639 E/ 54,43420 N; 7,64028 E/ 54,40080 N; 7,64056 E/ 54,47080 N 30 WINKRA mbh 80 authorised monopile/tripod 10 to yes Distance to nearest island 7,48583 E/ 54,40580 N; 7,48900 E/ 54,40000 N;7,51250 E/ 54,34680 N; 7,48850 E/ 54,33570 N; 7,43750 E/ 54,34320 N; 7,40650 E/ 54,35520 N 7,40650 E/ 54,37950 N; 7,48583 E/ 54,40580 N; 7,64767 E/ 54,40000 N; 7,70417 E/ 54,41810 N; 7,72883 E/ 54,41320 N; 7,71367 E/ 54,37530 N; 7,66000 E/ 54,35400 N; 7,64500 E/ 54,38130 N; 7,64767 E/ 54,40000 N 22 Windland Energieerzeugungs GmbH 75 application monopile/tripod 10 to 25/25 to yes Distance to nearest island 7,80000 E/ 54,96670 N; 7,78435 E/ 54,96670 N; 7,73750 E/ 55,01050 N; 7,73751 E/ 55,04120 N; 7,78446 E/ 55,06760 N; 7,80000 E/ 55,06760 N;7,80000 E/ 54,96670 N 35 Butendiek GmbH 80 authorised 240 monopile 10 to yes Distance to nearest island 6,90000 E/ 55,31670 N; 7,03333 E/ 55,26670 N; 7,20000 E/ 55,00000 N; 7,36667 E/ 55,00000 N; 7,38333 E/ 54,80000 N; 7,33333 E/ 54,75000 N; 7,03333 E/ 54,81670 N; 6,93333 E/ 54,86670 N; 6,93333 E/ 55,00000 N; 6,90000 E/ 55,31670 N 60 Butendiek GmbH 540 application 2700 monopile/tripod 10 to 25/25 to no 5,52833 E/ 54,81670 N; 5,52833 E/ 54,81670 N; 5,55667 E/ 54,40000 N; 5,03000 E/ 54,62670 N; 5,02833 E/ 54,76500 N; 5,52833 E/ 54,81670 N; 5,91667 E/ 54,54830 N; 6,36167 E/ 54,25830 N; 5,95833 E/ 54,22670 N; 5,60333 E/ 54,38170 N; 5,91667 E/ 54,54830 N 75 PROKON Nord Energiesysteme GmbH 1750 application max tripod 25 to no Data given reflects the full application with possible future expansion phases. Coordinates and other data for the preceding pilot phase (max. 80 wind turbines)are currently not available as the application procedure is not yet in an advanced stage. Distance to nearest island. Data given reflects the full application with possible future expansion phases. Coordinates and other data for the preceding pilot phase (max. 80 wind turbines)are currently not available as the application procedure is not yet in an advanced stage.distance to nearest island. 6,31810 E/ 54,54100 N; 6,39033 E/ 54,54100 N; 6,42643 E/ 54,51290 N; 6,33032 E/ 54,45680 N;6,31810 E/ 54,48490 N; 6,31810 E/ 54,54100 N 100 Nordsee Windpower GmbH & Co.KG 80 application 360 tripod 25 to yes Distance to nearest island 6,74000 E/ 54,07370 N; 6,79183 E/ 54,07370 N; 6,79183 E/ 54,00170 N; 6,74000 E/ 54,00170 N; 6,74000 E/ 54,07370 N 40 ENOVA Offshore Projektentwicklungs- GmbH & Co.KG 48 application max. 240 monopile/tripod/other 25 to yes Distance to nearest island Hochsee Windpark Nordsee 6,36111 E/ 54,49860 N; 6,36111 E/ 54,39170 N; 6,24250 E/ 54,46940 N; 54 25" 6,36111 E/ 54,49860 N 90 EOS Offshore AG 80 application 360 tripod 25 to yes Distance to nearest island 6,80039 E/ 55,27980 N; 6,81294 E/ 55,29050 N; 6,84386 E/ 55,29410 N; 6,90953 E/ 55,11840 N; 6,87861 E/ 55,11420 N; 6,85975 E/ 55,12130 N;6,80039 E/ 55,27980 N 100 Sandbank 24 GmbH & Co.KG 80 authorised max. 280 tripod/monopile 10 to 25/25 to yes Distance to nearest island 6,94167 E/ 54,05170 N; 6,94167 E/ 54,07080 N; 7,02278 E/ 54,07080 N; 7,04694 E/ 54,05670 N; 7,04694 E/ 53,99940 N; 7,03083 E/ 53,99940 N; 6,94167 E/ 54,05170 N 45 Plambeck Neue Energien AG 80 application 320 monopile/tripod 25 to no Distance to nearest island 7,38333 E/ 55,00000 N; 7,53333 E/ 55,00000 N; 7,53333 E/ 54,89170 N; 7,38333 E/ 54,89170 N; 7,38333 E/ 55,00000 N 49 GEO mbh 80 application 400 tripod 25 to no Distance to nearest island De32 Germany Weiße Bank De33 Germany Jules Verne De34 Germany Ventotech Nord 1 De35 Germany Ventotech Nord 2 De36 Germany Nördlicher Grund Hochsee Windpark He De37 Germany dreiht 6,87917 E/ 54,77500 N; 6,84167 E/ 54,80420 N;6,83750 E/ 54,83750 N; 6,86667 E/ 54,87920 N; 6,89583 E/ 54,88170 N; 6,97083 E/ 54,84170 N;6,87917 E/ 54,77500 N 83 Energiekontor GmbH 170 application 595 other 25 to no 5,83198 E/ 54,89930 N; 6,17366 E/ 54,89930 N; 6,25699 E/ 54,74930 N; 5,83198 E/ 54,74930 N; 5,83198 E/ 54,89930 N 133 Plambeck Neue Energien AG 3000 application tripod/monopile 25 to no Data given reflects the full application with possible future expansion phases. Coordinates and other data for the preceding pilot phase (max. 80 wind turbines) are currently not available as the application procedure is not yet in an advanced stage. Distance to nearest island. Data given reflects the full application with possible future expansion phases. Coordinates and other data for the preceding pilot phase (max. 80 wind turbines)are currently not available as the application procedure is not yet in an advanced stage. Distance to nearest island. 5,85548 E/ 54,77900 N; 6,05650 E/ 54,77930 N; 5,89515 E/ 54,70210 N; 5,86034 E/ 54,72230 N; 5,85548 E/ 54,77900 N 130 Arcadis Consult GmbH 50 application 150 tripod 25 to no Distance to nearest island 6,10666 E/ 54,57030 N; 6,14561 E/ 54,59010 N; 6,32099 E/ 54,58550 N; 6,32221 E/ 54,57870 N; 6,19963 E/ 54,51640 N; 6,10666 E/ 54,57030 N 112 Arcadis Consult GmbH 50 application 150 tripod 25 to no Distance to nearest island 6,85103 E/ 55,08080 N; 6,98865 E/ 55,08080 N; 7,02500 E/ 55,00000 N; 6,88228 E/ 55,00000 N; 6,85103 E/ 55,08080 N 86 NEG Micon Deutschland Gmbh 80 application 360 monopile 25 to yes Distance to nearest island 6,13333 E/ 54,43690 N; 6,29167 E/ 54,32920 N; 6,13333 E/ 54,32920 N; 6,13333 E/ 54,43690 N 85 EOS Offshore AG 80 application 360 tripod 25 to yes Distance to nearest island

4 ID No Country Name Location De38 Germany TGB North De40 Germany WP Nordergründe De43 Germany WP Riffgat De48 Germany H2-20 De49 Germany BARD Offshore 1 De50 Germany Deutsche Bucht De51 Germany Austerngrund IE1 Ireland Arklow Bank Nl48 Netherlands Q7 WP Distance from coast Operator No of wind turbines Current Status Capacity in MW Foundation type Water depth (m) Height (m) EIA Remarks 6,27500 E/ 54,36670 N; 5,95000 E/ 54,57500 N;6,00833 E/ 54,60000 N; 6,35833 E/ 54,37500 N; 6,27500 E/ 54,36670 N; 5,91667 E/ 54,58330 N; 5,80000 E/ 54,64170 N; 5,60000 E/ 54,80830 N; 5,65000 E/ 54,82500 N; 5,98333 E/ 54,61670 N; 5,91667 E/ 54,58330 N 100 ep4 offshore GmbH 596 application max other 25 to 50? no Data given reflects the full application with possible expansion phases. Coordinates and other data for the preceding pilot phase (max. 80 wind turbines) are currently not available as the application procedure is not yet in an advanced stage. Distance to nearest island 8,15036 E/ 53,85290 N; 8,18386 E/ 53,83930 N; 8,18387 E/ 53,81250 N; 8,17759 E/ 53,81240 N; 8,14271 E/ 53,84840 N; 8,15036 E/ 53,85290 N 13 Energiekontor GmbH max. 25 application max. 125 monopile/tripod 10 to yes Distance to nearest island 6,43583 E/ 53,67700 N; 6,42750 E/ 53,69580 N; 6,53167 E/ 53,71080 N; 6,53917 E/ 53,69170 N; 6,43583 E/ 53,67700 N 14,5 ENOVA Offshore Projektentwicklungs- GmbH & Co.KG max. 44 application max. 220? 10 to to 180 no Distance to nearest island 4,07806 E/ 55,79810 N, 4,19389 E/ 55,77890 N; 4,19361 E/ 55,61780 N; 4,07806 E/ 55,66000 N; 4,07806 E/ 55,79810 N 200 GEO mbh 80 application 400 tripod 25 to no Hydrogen production. Planned start of construction in ,00633 E/ 54,43290 N, 6,00476 E/ 54,32000 N; 5,95051 E/ 54,31610 N; 5,95185 E/ 54,43000 N; 6,00633 E/ 54,43290 N 89 Bard Engineering GmbH 80 application max. 400 monopile/tripod/gravitybased/jacket 25 to no Distance to nearest island 5,78122 E/ 54,28650 N; 5,57436 E/ 54,37670 N; 5,78122 E/ 54,37670 N; 5,78122 E/ 54,28650 N 89 Offshore Windpark Deutsche Bucht GbR 80 application 400 gravity-based 25 to no Distance to nearest island 5,78122 E/ 54,39470 N; 5,59724 E/ 54,39470 N; 5,78122 E/ 54,49350 N; 5,78122 E/ 54,39470 N 103 Offshore Windpark Deutsche Bucht GbR 80 application 400 gravity-based 25 to no Distance to nearest island 52,78269 N/5,9975 W; 52,67472 N/5,96417 W; 52,91805 N/5,93417 W; 52,91445 N/5,8975 W 10 km Arklow Energy subleased from Sure Partners 7? 25.2 Intended extension of the wind farm to Mw within the same area when closest distance to shore will be not less than 7 km 52,60778 N/4,24033 E; 52,58514 N/4,26447 E; 52,60536 N/4,19544 E; 52,56897 N/4,24814 E; 52,57669 N/4,18436 E 23 km E-Connection B.V. 60 authorised 120 monopile 10 to yes The coordinates in decimal degrees were calculated based on ED50 figures Nl49 Netherlands Near Shore Windpark (demonstration park) 52,60461 N/4,49472 E; 52,57381 N/4,48756 E; 52,57411 N/4,43097 E; 52,63117 N/4,35183 E; 52,63514 N/4,37986 E; 52,62575 N/4,39453 E; 52,63944 N/4,41819 E 11 km Noordzeewind 36 authorised 100 monopile 10 to yes The coordinates in decimal degrees were calculated based on WGS84 figures Es14 Spain Trafalgar 7.5 E.H.N., S.A. 225 application 450 monopile 20 to 30 m unknown (pending) Se50 Sweden Fladen Göteborg En-y 60 refused Total 300 MW gravity-based 10 to yes Application refused because Fladen is a Natura 2000 site. 52,65892N/1,78065E; 52,65869N/1,80280E; 52,63201N/1,79434E; 2km Powergen Renewables 30 operational 76 monopile less than 10m 100 yes UK50 UK Scroby Sands 52,62875N/1,78609E; 52,62884N/1,77870E 53,43100N/3,42067W; 53,41000N/3,41383W; 53,40317N/3,47283W; 5km NWP Offshore Limited 30 operational 90 monopile less than 10m 130 yes UK51 UK North Hoyle 53,42467N/3,48000W 53,39117N/3,65300W; 53,38150N/3,61000W; 53,36433N/3,620833W; 8km NWP Offshore Limited 30 authorised 100 monopile less than 10m 130 yes UK52 UK Rhyl Flats 53,38000N/3,69050W; 53,38883N/3,68617W; 53,38250N/3,65783W 54,01167N/3,30450W; 53,9875N/3,25933W; 53,97083N/3,28467W; 7km Warwick Energy Limited 30 authorised 108 monopile 10 to 25 m 125 yes UK53 UK Barrow 53,99500N/3,33017W 54,78267N/3,68317W; 54,75217N/3,67617W; 54,76283N/3,70033W; 9.5km Natural Power Limited 60 authorised 216 monopile less than 10m 130 yes UK54 UK Robin Rigg 54,77267N/3,668W 51,47287N/1,10635E; 51,45300N/1,13128E; 51,44797N/1,08143E; 8.5km Global Renewable Energy Partners Limited 30 authorised 129 monopile less than 10m 140 yes UK55 UK Kentish Flats 51,46783N/1,05648E 53,50222N/3,18722W; 53,48194N/3,15000W; 53,47472N/3,18500W; 6.4km SeaScape Energy Limited 30 authorised 90 monopile less than 10m 130 yes UK56 UK Burbo Bank 53,49500N/3,22222W; 53,50194N/3,21888W 53,14664N/0,47845E; 53,12878N/0,47924E; 53,12684N/0,43088E; 5.2km AMEC Offshore Wind Power Limited 30 authorised 108 monopile less than 10m 150 yes UK57 UK Lynn 53,14344N/0,43036E 53,21297N/0,46017E; 53,16949N/0,46023E; 53,16947N/0,43273E; 5km Offshore Wind Power Limited 30 authorised 120 monopile less than 10m 145 yes UK58 UK Inner Dowsing 53,21295N/0,43265E 53,03297N/1,37812E; 52,97930N/1,39040E; 52,97758N/1,36988E; 6.5km Norfolk Offshore Wind Limited 30 authorised 108 monopile 10 to 25 metres 140 yes UK59 UK Cromer 53,03125N/1,35758E 51,74943N/1,24447E; 51,73573N/1,25634E; 51,71442N/1,20175E; 7km GE Wind Energy 30 authorised 108 monopile less than 10m 150 yes UK60 UK Gunfleet Sands 51,72819N/1,18982E 53,87493N/3,22781W; 53,87417N/3,16395W; 53,82921N/3,16550W; 7.1km Cirrus Energy 90 application 324 monopile/gravity based less than 10m/ yes UK61 UK Shell Flat 53,82996/3,22931W; 53,85087N/3,34354W mettes 51,4851N/3,8854W; 51,4806N/3,8835W; 51,4762N/3,8813W; 7km United Utilities Green Energy 30 application 108 monopile/gravity based less than 10m 130 yes UK62 UK Scarweather Sands 51,4896N/3,8751W; 51,4761N/3,869W; 51,4939N/3,8646W; 51,4759N/3,8565W; 51,4946N/3,8531W; 51,4754N/3,8435W; 51,4953N/3,8416W; 51,475N/3,8302W; 51,4943N/3,8345W; 51,4917N/3,8286W; 51,4876N/3,8267W; 51,4837N/3,8242W; 51,4798N/3,8213W; 51,4762N/3,8179W UK63 UK Blyth 55,13503N/1,48965W; 55,13725N/1,49083W 1km Blyth Offshore Wind Ltd 2 operational 4 drilled monopile less than 10m 91 yes Operational since 2000

5 Annex 2 1

6 2

7 3

8 Annex 3 Draft revised Explanatory Notes to the Reporting Format for the OSPAR Database on Offshore Wind-farms (Source: Annex 3 of Annex 7 to BDC 2003) When filling in the reporting format, Contracting Parties are kindly requested to adhere to the following terminology : 1. The column Name should reflect the name (or other designation) of each offshore windmill installation ( wind-farm ) under the jurisdiction of the Contracting Party concerned, as used by the competent national authority. Note: The term wind-turbine is used to describe each separate structure that carries rotors or equivalent equipment to capture wind energy. It includes the whole structure from the foundation to the top of the rotor or equivalent equipment. The term wind-farm is used to describe a group of one or more wind-turbines, which is physically separated from other such groups and/or which is regarded by the competent national authority as a separate unit for regulatory purposes. 2. The column Location should be completed by giving the decimal degrees of longitude and latitude in each sub-column and in this order of the points defining the polygon formed by the outermost elements of the wind farm (. Ddecimal degrees should be calculated by dividing minutes of a degree by 60 and adding to it seconds of a degree divided by 3 600, and expressing the result to five two decimal places (Example 1: will be / /3600 = ; Example 2: will be /60 = ). Contracting Parties should make use of the World Geodetic System 1984 (WGS84). As an exception if WGS84 data is not available, data can be presented in the European Datum 1950 (ED50) for its conversion into WGS84. Where there are several wind-turbines in a wind-farm, the coordinates of the approximate centre of the wind-farm should be given. Note: This information will enables the creation by Germany of GIS maps maps which reflect the total surface of the wind-farms reported. The map and will enable the location of wind-farms to be compared easily with GIS descriptions of routes that may be relevant from a biodiversity point of view (bird migration routes, spawning grounds etc). There may be a case in future for collecting information on the total surface area between the most widely separated windturbines in a wind-farm, since this may be of interest, for example since fishermen will not usually be allowed to fish among the wind-turbines. 3. The column Distance from the coast should give the shortest distance in km between the nearest coast and the wind-turbine closest to the coast. Note: This information may be important for assessing the impact on landscape and bird migration. 4. The column No of wind turbines refers to the number of wind-turbines in the wind-farm. Note: The aim of the database is not to create an endless listing of individual wind-turbines, but there may be a need to identify single units in some cases. 5. In completing the column Current status, the terms used should be limited to the following phases: application cases where a formal application for permission to construct or operate has been filed but a decision is still pending; authorised cases where permission to construct or operate has been given, but operations have not started; 1 OSPAR Commission

9 refused cases where a formal application for permission to construct or operate has been dismissed. operational cases where at least one wind-turbine in the wind-farm is operating; operating (and related words) should be understood to be a level of activity where some energy is supplied from the wind-farm to land; out of service cases where operation of all the wind-turbines in the wind-farm has temporarily ceased; decommissioned cases where all operations in the wind-farm have permanently ceased. Any more detailed comments on dates of expected authorisation, dates of expected operation, reasons for not being in service, planned reuse or future removal of the wind-farm should be made under the heading Remarks ; 6. The column Capacity in MW refers to the maximum possible operational output of the windfarm when working at full capacity. Note: There may be a case in future to create a further heading for the actual annual average output in MWh, in order to estimate the scale of the actual activity, and thus its impact of the activities on marine biodiversity, which would the be reflected in vibration, noise, etc. 7. In the column Foundation type, the descriptions should be limited to: monopile, tripod, gravity-based, pre-existing structure (this includes any re-used oil and gas installations), other (this includes floating structures) Any further details should be given in the column Remarks. 8. In the column Water depth, the depth of the water at the site should be described broadly in one of the following five ranges: less than 10 m, 10 to 25 m, 25 to 50 m, 50 to 100 m over 100 m. 9. In the column Height, there should be given the height in metres above mean sea level of the highest point reached by a rotor blade during its rotation. If some other part of the structure is higher, its height should then be the one given. 10. In the column Environmental Impact Information, Contracting Parties should answer yes or no as to whether available information exists on the assessment or evaluation of the environmental impact of the wind-farm before approval was granted and/or on its monitoring during construction, operation and decommissioning. If yes, a brief reference to the documentation available should be given under the column Remarks. 2 OSPAR Commission

Technical aspects of Offshore Wind Farms

Technical aspects of Offshore Wind Farms Consultations of the Guide to OWF Michał Gronert DNV - Independent foundation since 1864 offices countries employees, out of which 76% have academic degree Offshore Wind Energy - compilation of DNV competencies

More information

Transformers for Offshore Wind Platforms: Expected Problems and Possible Approaches

Transformers for Offshore Wind Platforms: Expected Problems and Possible Approaches Transformers for Offshore Wind Platforms: Expected Problems and Possible Approaches Boris Valov (ISET/IWES, GERMANY) Abstract--In the near future the power of 12 out of 21 wind farms in Baltic Sea and

More information

VISION MISSION ABOUT A2SEA. Stay ahead in taking wind power offshore and the future of energy in a sustainable direction.

VISION MISSION ABOUT A2SEA. Stay ahead in taking wind power offshore and the future of energy in a sustainable direction. COMPANY BROCHURE ABOUT A2SEA VISION Stay ahead in taking wind power offshore and the future of energy in a sustainable direction. MISSION To provide the offshore wind industry with safer, sustainable,

More information

DONG ENERGY LEADING THE ENERGY TRANSFORMATION

DONG ENERGY LEADING THE ENERGY TRANSFORMATION Public DONG ENERGY LEADING THE ENERGY TRANSFORMATION Rena Paziorek, Local Stakeholder Manager Annual Plenary Meeting Wadden Sea Forum Wilhelmshaven, 1.&2. November 2017 0 We have become too green for our

More information

CHALLENGE OFFSHORE TEST SITE RESEARCH

CHALLENGE OFFSHORE TEST SITE RESEARCH CHALLENGE OFFSHORE TEST SITE RESEARCH Initiating further offshore wind energy test site research in Germany after alpha ventus Fraunhofer Institute for Wind Energy and Energy System Technology IWES Bernhard

More information

How not to Build an Offshore Wind Farm Bronwyn Sutton 04 October 2016

How not to Build an Offshore Wind Farm Bronwyn Sutton 04 October 2016 How not to Build an Offshore Wind Farm Bronwyn Sutton 04 October 2016 SgurrEnergy Engineering consultancy, renewables focus Established in Scotland in 2002; joined Wood Group in 2010 Global network of

More information

2017 Vattenfall Horns Rev 3 Substation Diving Works Messenger Wire and Cap installation J-Tubes

2017 Vattenfall Horns Rev 3 Substation Diving Works Messenger Wire and Cap installation J-Tubes REFERANCE LIST 2017 Vattenfall Horns Rev 3 Substation Diving Works Messenger Wire and Cap installation J-Tubes 2017 Vattenfall Horns Rev 3 Substation ROV Inspection J-Tubes 2017 DONG Energy Race Bank Diving

More information

Walney Wind Farm. Track record

Walney Wind Farm. Track record Walney Wind Farm Track record 2016 Applied system Topside Intershield 300 @ 175μm Intershield 300 @ 175μm Interthane 870 @ 60μm Jacket Interzone 954 @ 300μm Interzone 954 @ 300μm Interthane 990 @ 80μm

More information

Baltic Marine Environment Protection Commission

Baltic Marine Environment Protection Commission Baltic Marine Environment Protection Commission Ad hoc Seal Expert Group Berlin, Germany, 2-4 December 2015 SEAL 9-2015, 5-1 Document title Development of a HELCOM database for seals Code 5-1 Category

More information

Opening of the meeting. General Assembly meeting. 4. Final report Final report Final report

Opening of the meeting. General Assembly meeting. 4. Final report Final report Final report General Assembly meeting Opening of the meeting.opening of the meeting by Iain McSween.Approval of the agenda 3.Approval of the minutes of GA meeting held on 4 September 008 Chaired by Mr Iain MacSween

More information

NURTURING OFFSHORE WIND MARKETS GOOD PRACTICES FOR INTERNATIONAL STANDARDISATION

NURTURING OFFSHORE WIND MARKETS GOOD PRACTICES FOR INTERNATIONAL STANDARDISATION NURTURING OFFSHORE WIND MARKETS GOOD PRACTICES FOR INTERNATIONAL STANDARDISATION Summary for POLICY MAKERS SUMMARY FOR POLICY MAKERS The fast pace of offshore wind development has resulted in remarkable

More information

IMO. Resolution A.977(24) Adopted on 1 December 2005 (Agenda item 9) SHIPS ROUTEING

IMO. Resolution A.977(24) Adopted on 1 December 2005 (Agenda item 9) SHIPS ROUTEING INTERNATIONAL MARITIME ORGANIZATION E IMO ASSEMBLY 24th session Agenda item 9 A 24/Res.977 27 January 2006 Original: ENGLISH Resolution A.977(24) Adopted on 1 December 2005 (Agenda item 9) SHIPS ROUTEING

More information

Driving Cost Reductions in Offshore Wind THE LEANWIND PROJECT FINAL PUBLICATION

Driving Cost Reductions in Offshore Wind THE LEANWIND PROJECT FINAL PUBLICATION Driving Cost Reductions in Offshore Wind THE LEANWIND PROJECT FINAL PUBLICATION This project has received funding from the European Union s Co-funded by the Intelligent Energy Europe Seventh Programme

More information

CONTENTS. Supplements. Supplement 1 Selected project references

CONTENTS. Supplements. Supplement 1 Selected project references CAPABILITY STATEMENT Consultancy Services within Offshore Wind Energy WWW.RAMBOLL.DK 1 CONTENTS 1. Introduction 2 2. The ramboll group 2 3. Ramboll offshore wind 2 4. Consultancy services 2 4.1 Project

More information

Seagreen Wind Energy Limited C/o SSE Renewables 1 Waterloo Street Glasgow G2 6AY

Seagreen Wind Energy Limited C/o SSE Renewables 1 Waterloo Street Glasgow G2 6AY Date: 30 th March 2018 Ref: A4MR-SEAG-Z-LGL810-SLE-548 Dr. Nicola Bain Marine Renewables Section Leader Licensing Operations Team Marine Scotland Marine Laboratory 375 Victoria Road Aberdeen AB11 9DB Seagreen

More information

HEAVY LIFT SOFT SLING SOLUTIONS ON- & OFFSHORE WIND INDUSTRY

HEAVY LIFT SOFT SLING SOLUTIONS ON- & OFFSHORE WIND INDUSTRY HEAVY LIFT SOFT SLING SOLUTIONS ON- & OFFSHORE WIND INDUSTRY VERSION 2018 LIFT-TEX INDUSTRIE B.V. We from Lift-Tex Industrie B.V., a Heavy Lift synthetic fibre round sling manufacture company based in

More information

Offshore Grid Development in the North Seas ENTSO-E views

Offshore Grid Development in the North Seas ENTSO-E views Offshore Grid Development in the North Seas ENTSO-E views European Network of Transmission System Operators for Electricity Offshore Grid Development in the North Seas Country The connection and integration

More information

Seeing Suction Buckets and Large Monopiles Cut Offshore Wind s Expenses

Seeing Suction Buckets and Large Monopiles Cut Offshore Wind s Expenses Seeing Suction Buckets and Large Monopiles Cut Offshore Wind s Expenses Everyone knows that offshore wind energy costs need to continue to come down in order to gain more of the energy market from less

More information

Offshore Cable Installation. November 2010 John Davies Global Marine Systems Limited

Offshore Cable Installation. November 2010 John Davies Global Marine Systems Limited Offshore Cable Installation November 2010 John Davies Global Marine Systems Limited Services and Markets - Overview Both directly and through our Partnerships & Joint Ventures, we offer a wide range of

More information

The future of offshore wind in the US

The future of offshore wind in the US The future of offshore wind in the US One of these things is not like the other Why is the adoption of the European Model not the best path forwards for the US offshore wind market? Arup specialists explore

More information

North East England: Offshore wind market opportunities

North East England: Offshore wind market opportunities North East England: Offshore wind market opportunities 1 UK overview The UK offshore wind programme is the largest in the world, and is expected to form around half of the European market in the next 10

More information

Accelerating the Deployment of Offshore Renewable Energy Technologies. IEA Implementing Agreement on Renewable Energy Technology Deployment

Accelerating the Deployment of Offshore Renewable Energy Technologies. IEA Implementing Agreement on Renewable Energy Technology Deployment Accelerating the Deployment of Offshore Renewable Energy Technologies IEA Implementing Agreement on Renewable Energy Technology Deployment Background RETD The mission of RETD is to accelerate the large-scale

More information

Challenges in the Construction of Offshore Wind Structures. Dr Ned Minns IT Power UK

Challenges in the Construction of Offshore Wind Structures. Dr Ned Minns IT Power UK Challenges in the Construction of Offshore Wind Structures Dr Ned Minns IT Power UK Foundations - Options Floating >60m

More information

OFFSHORE SOLUTIONS FOR WIND TURBINE SUPPORTING STRUCTURES

OFFSHORE SOLUTIONS FOR WIND TURBINE SUPPORTING STRUCTURES OFFSHORE SOLUTIONS FOR WIND TURBINE SUPPORTING STRUCTURES Author: Prof. Ing. F.G. Cesari/D. Mostacci Organization: Industrial Engineering Dpt., Bologna University REFERENCE ELEVATIONS We have to consider

More information

NEW AND AMENDED TRAFFIC SEPARATION SCHEMES

NEW AND AMENDED TRAFFIC SEPARATION SCHEMES E 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: +44 (0)20 7735 7611 Fax: +44 (0)20 7587 3210 NEW AND AMENDED TRAFFIC SEPARATION SCHEMES COLREG.2/Circ.67 20 May 2016 1 The Maritime Safety Committee, at

More information

Torgeir Ramstad Managing Director, Fred. Olsen United. European projects: Being part of the global supply chain

Torgeir Ramstad Managing Director, Fred. Olsen United. European projects: Being part of the global supply chain Torgeir Ramstad Managing Director, Fred. Olsen United European projects: Being part of the global supply chain European projects: being part of the global supply chain Torgeir Ramstad, Managing Director

More information

REVISED QUESTIONNAIRE ON SHORE-BASED FACILITIES FOR THE GLOBAL MARITIME DISTRESS AND SAFETY SYSTEM (GMDSS)

REVISED QUESTIONNAIRE ON SHORE-BASED FACILITIES FOR THE GLOBAL MARITIME DISTRESS AND SAFETY SYSTEM (GMDSS) E 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: +44 (0)20 7735 7611 Fax: +44 (0)20 7587 3210 MSC.1/Circ.1382/Rev.2 24 June 2013 REVISED QUESTIONNAIRE ON SHORE-BASED FACILITIES FOR THE GLOBAL MARITIME DISTRESS

More information

Offshore Renewable. Energy Conversion platforms Coordination. Action

Offshore Renewable. Energy Conversion platforms Coordination. Action Offshore Renewable Energy Conversion platforms Coordination Action Jochen Bard Head of Marine Energy Systems Fraunhofer Institute for Wind Energy and Energy System Technology, Germany. www.iwes.fraunhofer.de

More information

Offshore Renewable Energy Conversion platforms - Coordination Action

Offshore Renewable Energy Conversion platforms - Coordination Action Offshore Renewable Energy Conversion platforms - Coordination Action a European coordination action on the combined offshore wind and ocean energy resources, platform technologies and markets Jochen Bard,

More information

DONG ENERGY LEADING THE ENERGY TRANSFORMATION INNOVATION IN OFFSHORE WIND POWER

DONG ENERGY LEADING THE ENERGY TRANSFORMATION INNOVATION IN OFFSHORE WIND POWER DONG ENERGY LEADING THE ENERGY TRANSFORMATION INNOVATION IN OFFSHORE WIND POWER Financing private and public research - A developer's research perspective 26 October, 2016 by Christina Aabo Wind Energy

More information

Walney Offshore Wind Farm

Walney Offshore Wind Farm Walney Offshore Wind Farm Ørsted Welcome to Walney Walney Offshore Wind Farm has been fully operational since 2012 and consists of two stages: Walney 1 and Walney 2. Each of the stages comprises of 51

More information

Proposal for a COUNCIL DECISION

Proposal for a COUNCIL DECISION EUROPEAN COMMISSION Brussels, 23.5.2017 COM(2017) 273 final 2017/0110 (NLE) Proposal for a COUNCIL DECISION on the position to be adopted, on behalf of the European Union, in the European Committee for

More information

TNO division Defense, Security and Safety. Report numbers TNO

TNO division Defense, Security and Safety. Report numbers TNO Organisation Report name TNO division Defense, Security and Safety Final report WE@SEA project ROBIN Lite bird radar development aimed at maritime bird migration monitoring Report numbers WE@SEA 2005-022

More information

BASELINE SURVEY, VISUAL - STANDARD

BASELINE SURVEY, VISUAL - STANDARD BASELINE SURVEY, VISUAL - STANDARD Introduction As stated in SEPA s policy and in the Fish Farm Manual (1998), scientific data are required by SEPA in order to assess the existing condition on the site

More information

Offshore Renewable Energy Conversion platforms - Coordination Action

Offshore Renewable Energy Conversion platforms - Coordination Action Offshore Renewable Energy Conversion platforms - Coordination Action a European coordination action on the combined offshore wind and ocean energy resources, technologies and markets Jochen Bard Project

More information

Passion at work. Renewables

Passion at work. Renewables Passion at work Renewables Our profile Driven by Our profile challenges Seaway Heavy Lifting is a leading offshore contractor in the global Oil & Gas and Renewables industry, offering tailored T&I and

More information

MENCK GmbH. Nils Raab. Presented to: German American Chamber of Commerce

MENCK GmbH. Nils Raab. Presented to: German American Chamber of Commerce MENCK GmbH 150 Years of Experience with Construction Equipment Applied for Decades in the Offshore Industries Presented to: German American Chamber of Commerce Nils Raab Sales Manager MENCK GmbH Febuary

More information

Introductory remarks

Introductory remarks Introductory remarks This document is a draft of a permit for Gaz System to construct a natural gas pipeline on the Danish continental shelf in the Baltic Sea. It should be emphasised that it has not yet

More information

GH Marine & Offshore Wind Current Activities and Future Perspectives. Lucy Craig, Director Lisbon, 24 th November 2008 WavEC Symposium

GH Marine & Offshore Wind Current Activities and Future Perspectives. Lucy Craig, Director Lisbon, 24 th November 2008 WavEC Symposium GH Marine & Offshore Wind Current Activities and Future Perspectives Lucy Craig, Director Lisbon, 24 th November 2008 WavEC Symposium Content - Introduction to GH - Offshore wind - The challenges of deep

More information

The WindFloat Project

The WindFloat Project The WindFloat Project WindFloat 2 MW Floating Offshore Wind WavEC Workshop 13 th of November, 2015 Agenda 1. Why Floating Offshore Wind? 2. WindFloat Technology 3. The WF1 Project (Demonstration Phase)

More information

Outcome of HELCOM workshop on fisheries data (CG FISHDATA )

Outcome of HELCOM workshop on fisheries data (CG FISHDATA ) Baltic Marine Environment Protection Commission Correspondence group for fisheries data Warsaw, Poland, 22 May 2018 CG FISHDATA 2-2018 Outcome of HELCOM workshop on fisheries data (CG FISHDATA 2-2018)

More information

USE OF THE RCDS MODE OF ECDIS (Submissions by Australia and Norway to IMO MSC/78)

USE OF THE RCDS MODE OF ECDIS (Submissions by Australia and Norway to IMO MSC/78) IHB File No. S3/8152 CIRCULAR LETTER 21/2004 22 March 2004 USE OF THE RCDS MODE OF ECDIS (Submissions by Australia and Norway to IMO MSC/78) Ref: 1. WEND Letter 1/2004, dated 1 st February 2004 2. IMO

More information

NER300 Offshore Wind Park Nordsee One. Tobias Griesshaber Shareholder representative of Innogy SE on behalf of project Nordsee One GmbH

NER300 Offshore Wind Park Nordsee One. Tobias Griesshaber Shareholder representative of Innogy SE on behalf of project Nordsee One GmbH NER300 Offshore Wind Park Nordsee One Tobias Griesshaber Shareholder representative of Innogy SE on behalf of project Nordsee One GmbH Brussels, 15 December 2017 1 Agenda General project overview & timeline

More information

Environmental and non-technical impacts of lean principles applied to offshore wind farms

Environmental and non-technical impacts of lean principles applied to offshore wind farms Environmental and non-technical impacts of lean principles applied to offshore wind farms 28 th September 2016 Mihaela DRAGAN Environment & Planning Analyst, WindEurope Project supported within the Ocean

More information

Wind Turbine Decommissioning in the UK Offshore Zone

Wind Turbine Decommissioning in the UK Offshore Zone Wind Turbine Decommissioning in the UK Offshore Zone BWEA - Annual Conference 2001 Presented by Dan Pearson Presentation Introduction: Why this topic? Life Cycle of an Offshore Wind Turbine Decommissioning

More information

OSPAR Marine Litter Regional Action Plan Communication Plan. 1 Context

OSPAR Marine Litter Regional Action Plan Communication Plan. 1 Context OSPAR Marine Litter Regional Action Plan Communication Plan 1 Context OSPAR is the mechanism by which fifteen Governments of the western coasts and catchments of Europe, together with the European Union,

More information

ESPOO hearing. Danish Energy Agency TECHNICAL NOTE 2 NEARSHORE WIND FARMS: OMOE SOUTH AND JAM- MERLAND BAY

ESPOO hearing. Danish Energy Agency TECHNICAL NOTE 2 NEARSHORE WIND FARMS: OMOE SOUTH AND JAM- MERLAND BAY The Danish Energy Agency ESPOO hearing TECHNICAL NOTE 2 NEARSHORE WIND FARMS: OMOE SOUTH AND JAM- MERLAND BAY Client Consultant Danish Energy Agency Amaliegade 44 DK-1256 Copenhagen K Att.: Søren Keller

More information

East Anglia TWO and East Anglia ONE North. Summary and Approach to Site Selection

East Anglia TWO and East Anglia ONE North. Summary and Approach to Site Selection East Anglia TWO and East Anglia ONE North Summary and Approach to Site Selection 1 Introduction ScottishPower Renewables (SPR) has recently concluded work in order to inform our onshore site selection

More information

Threats affecting seabirds Coastal development in Greece

Threats affecting seabirds Coastal development in Greece Threats affecting seabirds Coastal development in Greece Danae Portolou, Konstantina Ntemiri Hellenic Ornithological Society Protecting Seabirds in the Mediterranean: Advancing the Marine Protected Area

More information

IMO. Resolution A.954(23) Adopted on 5 December 2003 (Agenda item 17) PROPER USE OF VHF CHANNELS AT SEA

IMO. Resolution A.954(23) Adopted on 5 December 2003 (Agenda item 17) PROPER USE OF VHF CHANNELS AT SEA INTERNATIONAL MARITIME ORGANIZATION E IMO ASSEMBLY 23rd session Agenda item 17 A 23/Res.954 26 February 2004 Original: ENGLISH Resolution A.954(23) Adopted on 5 December 2003 (Agenda item 17) PROPER USE

More information

the future of electricity

the future of electricity July 26, 2018 Ms. Aida Camacho-Welch, Secretary New Jersey Board of Public Utilities 44 South Clinton Avenue, 3rd Floor, Suite 314, CN350 Trenton, New Jersey 08625 Via First Class Mail and Email Rule.Comments@bpu.nj.gov

More information

Offshore Wind Floating Turbines

Offshore Wind Floating Turbines Offshore Wind Floating Turbines Dr. Stuart Bradley Strategy Manager, Offshore Renewables 2017 Energy Technologies Institute LLP The information in this document is the property of Energy Technologies Institute

More information

Strategic Ornithological Support Services. Project SOSS-02. A review of flight heights and avoidance rates of birds in relation to offshore wind farms

Strategic Ornithological Support Services. Project SOSS-02. A review of flight heights and avoidance rates of birds in relation to offshore wind farms BTO Research Report Number 618 Strategic Ornithological Support Services Project SOSS-02 A review of flight heights and avoidance rates of birds in relation to offshore wind farms Authors Aonghais S.C.P.

More information

Codex Committee on Fish and Fishery Products (31 st Session) Tromsø, Norway. (11-16 April 2011)

Codex Committee on Fish and Fishery Products (31 st Session) Tromsø, Norway. (11-16 April 2011) Codex Committee on Fish and Fishery Products (31 st Session) Tromsø, rway (11-16 April 2011) 14 October 2010 European Union comments on Circular Letter 2009/29-FFP - Part B.8 The European Union and its

More information

CAN JACKETS AND TRIPODS COMPETE WITH MONOPILES?

CAN JACKETS AND TRIPODS COMPETE WITH MONOPILES? Contribution to Copenhagen Offshore Wind, 26-28 October 05 Page 1 of 10 CAN JACKETS AND TRIPODS COMPETE WITH MONOPILES? Prof. Peter Schaumann 1, Cord Böker 1 1 Institute for Steel Construction, University

More information

SHAPING THE FUTURE OF OFFSHORE WIND

SHAPING THE FUTURE OF OFFSHORE WIND SHAPING THE FUTURE OF OFFSHORE WIND 2 Inspired by renewable energy innogy SE is a leading European energy company. With its three business divisions Grid & Infrastructure, Retail and Renewables, innogy

More information

Empire Wind Offshore Wind Farm OCS-A 0512

Empire Wind Offshore Wind Farm OCS-A 0512 Empire Wind Offshore Wind Farm OCS-A 0512 Fisheries Liaison & Outline Classification: Open Status: Draft Expiry date: 28-07-04 Page 1 of 13 Title: Empire Wind Fisheries Liaison & Outline Document no. :

More information

TREATY SERIES 2003 Nº 8

TREATY SERIES 2003 Nº 8 TREATY SERIES 2003 Nº 8 Annex V and Appendix 3 to the Convention for the Protection of the Marine Environment of the North-East Atlantic (OSPAR Convention) Adopted at Sintra on 23 July 1998 Ireland s Instrument

More information

ROUTEING OF SHIPS, SHIP REPORTING AND RELATED MATTERS. Establishment of a Mandatory Ship Reporting System in the

ROUTEING OF SHIPS, SHIP REPORTING AND RELATED MATTERS. Establishment of a Mandatory Ship Reporting System in the INTERNATIONAL MARITIME ORGANIZATION E SUB-COMMITTEE ON SAFETY OF NAVIGATION 48th session Agenda item 3 IMO NAV 48/3/2 11 April 2002 Original: ENGLISH ROUTEING OF SHIPS, SHIP REPORTING AND RELATED MATTERS

More information

OFFSHORE WIND ENGINEERING

OFFSHORE WIND ENGINEERING OFFSHORE WIND ENGINEERING Jan Rønberg Market Director Jasmin Bejdic Project Manager 1 AGENDA Introduction - COWI as Design Consultant Offshore Wind Farms - Foundation Design - BTM Offshore Wind - Processes

More information

Baltic Marine Environment Protection Commission

Baltic Marine Environment Protection Commission Baltic Marine Environment Protection Commission Working Group on the State of the Environment and Nature Conservation Tallinn, Estonia, 7-11 November, 2016 STATE & CONSERVATION 5-2016 Document title Identification

More information

Written Comment: Sydney Basin and Orpheus Graben Areas

Written Comment: Sydney Basin and Orpheus Graben Areas December 23, 2015 Written Comment: Sydney Basin and Orpheus Graben Areas Based on the draft Strategic Environmental Assessment 202 Brownlow Ave. Suite A305, Cambridge 1 Dartmouth, NS B3B 1T5 (902) 425-4774

More information

MINISTRY OF AGRICULTURE, LIVESTOCK & FISHERIES STATE DEPARTMENT OF FISHERIES AND BLUE ECONOMY

MINISTRY OF AGRICULTURE, LIVESTOCK & FISHERIES STATE DEPARTMENT OF FISHERIES AND BLUE ECONOMY MINISTRY OF AGRICULTURE, LIVESTOCK & FISHERIES STATE DEPARTMENT OF FISHERIES AND BLUE ECONOMY KENYA MARINE FISHERIES AND SOCIO-ECONOMIC DEVELOPMENT PROJECT (KEMFSED) TERMS OF REFERENCE For an Individual

More information

ISO INTERNATIONAL STANDARD. Nomenclature Specification for a nomenclature system for medical devices for the purpose of regulatory data exchange

ISO INTERNATIONAL STANDARD. Nomenclature Specification for a nomenclature system for medical devices for the purpose of regulatory data exchange INTERNATIONAL STANDARD ISO 15225 First edition 2000-09-15 Nomenclature Specification for a nomenclature system for medical devices for the purpose of regulatory data exchange Nomenclature Spécifications

More information

Extent of Consultation

Extent of Consultation Objective Parts 40A, 40C and 40D prescribe design, construction and equipment requirements for passenger ships that are not SOLAS ships, non-passenger ships that are not SOLAS ships and fishing ships.

More information

The offshore wind market deployment: forecasts for 2020, 2030 and impacts on the European supply chain development

The offshore wind market deployment: forecasts for 2020, 2030 and impacts on the European supply chain development Available online at www.sciencedirect.com Energy Procedia 24 (2012 ) 2 10 DeepWind, 19-20 January 2012, Trondheim, Norway The offshore wind market deployment: forecasts for 2020, 2030 and impacts on the

More information

WHY CHOOSE HFW? OFFSHORE CONSTRUCTION

WHY CHOOSE HFW? OFFSHORE CONSTRUCTION WHY CHOOSE HFW? OFFSHORE CONSTRUCTION THEY STRIKE THE IDEAL BALANCE OF KNOWING THE LAW, BEING PRACTICAL AND BEING COMMERCIALLY SENSIBLE. THEY WORK HARD TO GET THE BEST RESULT FOR YOU CHAMBERS 2017 HFW

More information

GsXQ(9)15s 54 06' 23N., 3 39' 73W. GmUVQ 54 04' 92N., 3 32' 15W. GsXVQ(9)10s 54 03' 68N., 3 39' 68W.

GsXQ(9)15s 54 06' 23N., 3 39' 73W. GmUVQ 54 04' 92N., 3 32' 15W. GsXVQ(9)10s 54 03' 68N., 3 39' 68W. Admiralty Leisure Folio SC5613 Irish Sea - Eastern Part The Notices to Mariners (NMs) listed below apply to the latest edition of SC5613 (3rd Edition) published on 21st May 2015. L3797/15 WALES West Coast

More information

AN OVERVIEW OF THE STATE OF MARINE SPATIAL PLANNING IN THE MEDITERRANEAN COUNTRIES MALTA REPORT

AN OVERVIEW OF THE STATE OF MARINE SPATIAL PLANNING IN THE MEDITERRANEAN COUNTRIES MALTA REPORT AN OVERVIEW OF THE STATE OF MARINE SPATIAL PLANNING IN THE MEDITERRANEAN COUNTRIES MALTA REPORT Malta Environment & Planning Authority May 2007 AN OVERVIEW OF THE STATE OF MARINE SPATIAL PLANNING IN THE

More information

RADIO SPECTRUM POLICY GROUP. Commission activities related to radio spectrum policy

RADIO SPECTRUM POLICY GROUP. Commission activities related to radio spectrum policy EUROPEAN COMMISSION Directorate-General for Communications Networks, Content and Technology Electronic Communications Networks and Services Radio Spectrum Policy Group RSPG Secretariat Brussels, 03 October

More information

Dinamarca el major acceso al Mar del Norte para proyectos offshore

Dinamarca el major acceso al Mar del Norte para proyectos offshore Dinamarca el major acceso al Mar del Norte para proyectos offshore Denmark - the best access to The North Sea Offshore projects Morten Basse Jensen, CEO, Offshoreenergy.dk AEE meeting, September 16 th

More information

Offshore Wind Supply Chain Opportunities with Innogy Renewables UK Ltd

Offshore Wind Supply Chain Opportunities with Innogy Renewables UK Ltd Offshore Wind Supply Chain Opportunities with Innogy Renewables UK Ltd Help us continue to shape the future of offshore wind innogy - shaping the future of offshore wind World leading operator of offshore

More information

An Energy Utility Perspective and Approach to Airborne Wind

An Energy Utility Perspective and Approach to Airborne Wind Setting the Pace in Renewable Energy An Energy Utility Perspective and Approach to Airborne Wind Kester Gunn Henrik Wall Freiburg 06.10.2017 Renewable energy is one of the three key pillars in E.ONs strategy

More information

CEN-CENELEC JWG10 'Energy-related products Material Efficiency Aspects for Ecodesign'

CEN-CENELEC JWG10 'Energy-related products Material Efficiency Aspects for Ecodesign' CEN-CENELEC JWG10 'Energy-related products Material Efficiency Aspects for Ecodesign' Proposed Project Teams: It is proposed that the following PTs be installed. The exact PT teams and the work they will

More information

Inter Array Cable Technology Development. Jeremy Featherstone Product Development Director JDR Cable Systems Ltd

Inter Array Cable Technology Development. Jeremy Featherstone Product Development Director JDR Cable Systems Ltd Inter Array Cable Technology Development Jeremy Featherstone Product Development Director JDR Cable Systems Ltd 2016 NSRI/ORE Subsea Technological Challenges in Offshore Wind Aberdeen 4 th October 2016

More information

RESOLUTION MSC.278(85) (adopted on 1 December 2008) ADOPTION OF THE NEW MANDATORY SHIP REPORTING SYSTEM "OFF THE COAST OF PORTUGAL - COPREP"

RESOLUTION MSC.278(85) (adopted on 1 December 2008) ADOPTION OF THE NEW MANDATORY SHIP REPORTING SYSTEM OFF THE COAST OF PORTUGAL - COPREP MSC 85/26/Add.1 RESOLUTION MSC.278(85) SYSTEM OFF THE COAST OF PORTUGAL COPREP THE MARITIME SAFETY COMMITTEE, RECALLING Article 28 of the Convention on the International Maritime Organization concerning

More information

Overview: The European offshore power grid

Overview: The European offshore power grid RGI Workshop Offshore Grid Infrastructure: Understanding cumulative impacts & Exploring Multi-Functionality and Environmental Monitoring Overview: The European offshore power grid Brussels, 9 December

More information

HELCOM-VASAB Maritime Spatial Planning Working Group Twelfth Meeting Gdansk, Poland, February 2016

HELCOM-VASAB Maritime Spatial Planning Working Group Twelfth Meeting Gdansk, Poland, February 2016 HELCOM-VASAB Maritime Spatial Planning Working Group Twelfth Meeting Gdansk, Poland, 24-25 February 2016 Document title Outcomes of recent HELCOM meetings and information on upcoming HELCOM meetings Code

More information

RESOLUTION MSC.229(82) (adopted on 5 December 2006) ADOPTION OF A NEW MANDATORY SHIP REPORTING SYSTEM "IN THE GALAPAGOS PARTICULARLY SENSITIVE SEA

RESOLUTION MSC.229(82) (adopted on 5 December 2006) ADOPTION OF A NEW MANDATORY SHIP REPORTING SYSTEM IN THE GALAPAGOS PARTICULARLY SENSITIVE SEA MSC 82/24/Add.2 RESOLUTION MSC.229(82) IN THE GALAPAGOS PARTICULARLY SENSITIVE SEA AREA (PSSA) (GALREP) THE MARITIME SAFETY COMMITTEE, RECALLING Article 28(b) of the Convention on the International Maritime

More information

UK offshore wind industry progress to cost reduction

UK offshore wind industry progress to cost reduction UK offshore wind industry progress to cost reduction Mike Newman, Innovation manager 30 September 2015 Agenda 1. Introduction to ORE Catapult 2. Cost Reduction Monitoring Framework (CRMF) 2014 3. CRMF

More information

Overview of Research Activities in the Project Countries

Overview of Research Activities in the Project Countries Overview of Research Activities in the Project Countries Doris Lorenz Consulting and Management Doris Lorenz and Maren Schätzke Doris Lorenz Consulting and Management fields of work: energy and climate

More information

GIS-based spatial decision support system for the optimum siting of offshore windfarms

GIS-based spatial decision support system for the optimum siting of offshore windfarms European Water 58: 337-343, 2017. 2017 E.W. Publications GIS-based spatial decision support system for the optimum siting of offshore windfarms E. Sourianos 1*, K. Kyriakou 1 and G.A. Hatiris 2,3 1 Department

More information

IHO Colours & Symbols Maintenance Working Group (C&SMWG) 15th Meeting, BSH, Rostock, Germany, 2-4 May 2005

IHO Colours & Symbols Maintenance Working Group (C&SMWG) 15th Meeting, BSH, Rostock, Germany, 2-4 May 2005 CSMWG15-INF2 IHO Colours & Symbols Maintenance Working Group (C&SMWG) 15th Meeting, BSH, Rostock, Germany, 2-4 May 2005 Ref: HA405/004/033-01 NOTE: this is an internal document of the UKHO and is supplied

More information

Annex C. DEA Pre-Application Meeting Records

Annex C. DEA Pre-Application Meeting Records Annex C DEA Pre-Application Meeting Records IOX Submarine Cable System Environmental Impact Assessment Pre-Application Meeting South Africa Department of Environmental Affairs 30 May 2018 Insert then

More information

WORLD TRADE ORGANIZATION

WORLD TRADE ORGANIZATION WORLD TRADE ORGANIZATION WT/DS291/R/Add.1 29 September 2006 (06-4232) Original: English EUROPEAN COMMUNITIES MEASURES AFFECTING THE APPROVAL AND MARKETING OF BIOTECH PRODUCTS Reports of the Panel Addendum

More information

Re-use & Decommissioning in The Netherlands: A Joint Effort

Re-use & Decommissioning in The Netherlands: A Joint Effort EUOAG Meeting Re-use & Decommissioning in The Netherlands: A Joint Effort 20 September 2017 Content Introduction EBN & NOGEPA Netherlands re-use & decommissioning landscape Netherlands Masterplan for Decommissioning

More information

For personal use only

For personal use only Company Announcement, October 11 th, 2017 First of Three Key Studies Approved: Kvanefjeld Maritime Safety Study The Danish Maritime Authority acting on behalf of the Government of Greenland has now approved

More information

Demand inspired research in offshore wind energy systems

Demand inspired research in offshore wind energy systems Demand inspired research in offshore wind energy systems Jos Beurskens We@Sea / ECN www.we-at at-sea.org / www.ecn.nl This presentation We@Sea programme and experiences Update R&D top priorities based

More information

IHB File No S3/8151/HSSC CIRCULAR LETTER 11/ February 2009

IHB File No S3/8151/HSSC CIRCULAR LETTER 11/ February 2009 CIRCULAR LETTER 11/2009 17 February 2009 REVIEW OF IHO TECHNICAL RESOLUTIONS BY THE COMMITTEE ON HYDROGRAPHIC REQUIREMENTS FOR INFORMATION SYSTEMS (CHRIS) 1 (GROUP 1 OF 4) Reference: IHB CL 93/2008 dated

More information

monopile gripper arms

monopile gripper arms monopile gripper arms (MGA) Fixing the position of the monopiles during lowering to the seabed for stability and safety Application + + Construction of Offshore Wind Farms (OWFs) Monopile Foundations Installation

More information

Night-time obstruction lighting for offshore (and onshore) wind farms and birds: demands from different interest groups

Night-time obstruction lighting for offshore (and onshore) wind farms and birds: demands from different interest groups Night-time obstruction lighting for offshore (and onshore) wind farms and birds: demands from different interest groups Development of concepts for the marking of offshore wind farms Sub-project: Ecological

More information

Marine Strategy Framework Directive (MSFD) Common Implementation Strategy (CIS)

Marine Strategy Framework Directive (MSFD) Common Implementation Strategy (CIS) Marine Strategy Framework Directive (MSFD) Common Implementation Strategy (CIS) Summary MSFD CIS work plan for 2012/2014 and beyond (As agreed by Marine Directors 5 June 2012) This document sets out the

More information

Performance-Based Safety Regulation

Performance-Based Safety Regulation Performance-Based Safety Regulation Peter Bjerager, DNV GL National Academy of Sciences, 15 April 2016 1 SAFER, SMARTER, GREENER DNV GL in brief We classify, certify, verify and test against regulatory

More information

-PILOT & Industry development -Decommissioning. Audrey Banner Head of Offshore Decommissioning Unit, DECC

-PILOT & Industry development -Decommissioning. Audrey Banner Head of Offshore Decommissioning Unit, DECC -PILOT & Industry development -Decommissioning Audrey Banner Head of Offshore Decommissioning Unit, DECC PILOT Joint Industry/Government Strategic Forum Membership includes; 8 members of the board of Oil

More information

FORT CUMBERLAND, EASTNEY, PORTSMOUTH PO4 9LD Telephone Facsimile

FORT CUMBERLAND, EASTNEY, PORTSMOUTH PO4 9LD Telephone Facsimile Offshore Energy SEA 2 Scoping The Department of Energy and Climate Change 4th Floor Atholl House 86-88 Guild Street Aberdeen AB11 6AR Our ref: DECC/SEA offshore 15 th April 2010 Dear Sir/Madam UK Offshore

More information

The WindFloat Project. February 2010

The WindFloat Project. February 2010 February 2010 Why Offshore Wind? Why Offshore Wind? Higher wind resource and less turbulence Large ocean areas available Best spots in wind onshore are becoming scarce Offshore wind, including deep offshore,

More information

Examples of needed amendments to STCW Code. Zbigniew Szozda. Report

Examples of needed amendments to STCW Code. Zbigniew Szozda. Report Improving the Safety at Sea through Maritime Education and Training Examples of needed amendments to STCW Code Zbigniew Szozda Maritime University of Szczecin, Poland Chairman, IMO Sub-committee on Stability

More information

SET-PLAN IMPLEMENTATION

SET-PLAN IMPLEMENTATION SET-PLAN IMPLEMENTATION The Steering Group of the SET-Plan in its last meeting on October 28 th, 2010 agreed to speed-up the execution of activities of the Implementation Plans (IPs) of the European Industrial

More information

Gwynt y Môr Offshore Wind Farm

Gwynt y Môr Offshore Wind Farm Gwynt y Môr Offshore Wind Farm Toby Edmonds Project Director, Gwynt y Môr Liverpool, 12 September 2012 Forward Looking Statement This presentation contains certain forward-looking statements within the

More information

RESOLUTION MSC.112(73) (adopted on 1 December 2000) ADOPTION OF THE REVISED PERFORMANCE STANDARDS FOR SHIPBORNE GLOBAL POSITIONING SYSTEM (GPS)

RESOLUTION MSC.112(73) (adopted on 1 December 2000) ADOPTION OF THE REVISED PERFORMANCE STANDARDS FOR SHIPBORNE GLOBAL POSITIONING SYSTEM (GPS) MSC 73/21/Add.3 RESOLUTION MSC.112(73) FOR SHIPBORNE GLOBAL POSITIONING SYSTEM THE MARITIME SAFETY COMMITTEE, RECALLING Article (28(b) of the Convention on the International Maritime Organization concerning