SolarEdge System Installation Guide

Similar documents
SolarEdge. Installation Guide. For Europe, APAC, Australia & South Africa Version 3.3

SolarEdge. Extended Power. Commercial Inverter. Installation Guide. For Europe, APAC,& South Africa Version 1.0

SolarEdge Built-in Revenue Grade Meter Troubleshooting

Single Phase Inverter with compact technology. Installation Guide. For Europe, APAC,& South Africa Version 1.2

SolarEdge. Compact Residential Solution Installation Guide. For Europe, APAC,& South Africa Version 1.0

SolarEdge. Immersion Heater Controller Installation Guide. For Europe, APAC & South Africa Version 1.6

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

SolarEdge. StorEdge Interface Installation Guide. For the S1/S2 StorEdge Interface with LG Chem Batteries and Single Phase non-hd-wave Inverters

Operating Instructions

SolarEdge. StorEdge Installation Guide. For Smart Energy Management using the StorEdge Interface. For Europe, APAC & South Africa. Version 1.

RiverSurveyor S5/M9 & HydroSurveyor Second Generation Power & Communications Module (PCM) Jan 23, 2014

TROUBLESHOOTING GUIDE

HANDLING AND SAFETY INSTRUCTIONS

SolarEdge. Modbus Meter Installation Guide. Europe and APAC Version 1.0

Remote Control Learn Button Receiver Input Connections

Electrical devices may only be mounted and connected by electrically skilled persons.

LINE POWER SUPPLIES Low-Loss Supplies for Line Powered EnOcean Modules

Dry Contact Sensor. Communications cable - RJ-45 jack to sensor using UTP Cat 5 wire. Power source: powered by the unit. No additional power needed.

PhotoVu Digital Picture Frame Service & Repair Guide

INSTALLATION INSTRUCTIONS

idcv Isolated Digital Voltmeter User Manual

RS232 Communication Between a Sunny Boy 2500U and a PC. Technical Note

DynaRound Hatch Guard System Installation Instructions

Dry Contact Sensor

TC 60 THERMOCOMPUTER TC 60. prog. start stop. Operating Instructions

Ethernet Gateway User Manual

Operating Instructions

SISTEMA ELEVATÓRIO ETV 460A

Dry Contact Sensor DCS15 User Manual

BV4115. RF Packet Transmitter. Product specification. February ByVac 2007 ByVac Page 1 of 5

OPERATING MANUAL SERIES SMTBM BRUSHLESS SINGLE AXIS MODULE

Wireless Bridge Module for DXR2.E

LED wdali MC Switch Input Modul Set - User Manual

Owner s Manual Installation and Operating Instructions

Models 7008, 7034, 7035, 7035R & 7041 Planar Blind-Mate Connectors, dc to 40.0 GHz

SVT Tab and Service Visibility Tool Job Aid

USER MANUAL HIGH INTERCEPT LOW NOISE AMPLIFIER (HILNA TM ) V1

SolarEdge. SolarEdge Electricity Meter Installation Guide. For North America Version 1.0

Single Phase Inverter with HD-Wave Technology Installation Guide. For North America Version 1.1

ACM1281 NFC Reader Module Reference Information

C&E Mobility Policy (Standard)

Disclaimers. Important Notice. FCC Compliance. Disclaimers

AIR CONDITIONER REMOTE CONTROLLER ILLUSTRATION CS406-R51E

Ten-Tec Model RX-366 Subreceiver 565/566 Subreceiver Installation and Operation Manual-74467

VM1AT-R1 INDUSTRIAL MICROCONTROLLER

.,Plc..d,~t l~ucjio PA300 DIGITAL BASS PROCESSOR USER'S MANUAL. 2 Why use the DIGITAL BASS PROCESSOR? 2 About the PWM Subsonic Filter

VIP-200. Point to Point Extension Configuration Quick Start Guide. Video over IP Extender and Matrix System

Figure 1: View, connection compartment closed

RZ251W. Remote Sensing & Zoning Installation Guide. Quick Reference. Wireless Range

Nordic ID AR82 User Guide Version 1.2 NORDIC ID AR82 USER GUIDE

Spectracom GSG ecall Test Suite

Electrical devices may only be mounted and connected by electrically skilled persons.

RSB Service Bulletin No.. RSB--E4--003/12

Flash Image Rotator Web Part

Specification for a communicating Panelboard system to monitor, control and maintain LV electrical installations

SolarEdge. Data Logger Installation Guide. For North America Version 1.1

Connection tariffs

WS-400 BASE STATION FOR WIRELESS INTERCOM WITH FOUR TX/RX MODULES USER MANUAL

CB-030S Circuit Board

E-Jobsheet Tablet Application Functionality

Lite-On offers a broad range of discrete infrared components for application such as remote control, IR wireless data

Altis Flight Manager. PC application for AerobTec devices. AerobTec Altis v3 User Manual 1

Acceptance and verification PCI tests according to MIL-STD

PaperStream IP (TWAIN x64) change history

PaperStream IP (TWAIN) change history

Pre-Installation Preparation Job Aid

2015 Chevrolet Corvette Corvette Service Manual Body Systems Vehicle Access Repair Instructions Document ID:

User Guide. ACC Mobile 3 Preview App for ios

Maxon Motor & Motor Controller Manual

SolarEdge. StorEdge Solution with Backup Installation Guide. For North America Version 1.3

The UNIVERSITY of NORTH CAROLINA at CHAPEL HILL

-Three Phase Inverter with Synergy Technology Installation MAN

Upgrading to PlanetPress Suite Version 5

SeeGull CW Transmitter User Guide

Application Note AN-2097 Evaluation Kit for the S7500 CW Tunable Laser

Damocles 1208 MANUAL. Damocles Damocles 1208 Manual. Input status LED indicators. Inputs Not connected

NanoDrop One/One C Printing

Universal input/output controller

Service Update 7. PaperStream IP (TWAIN x64) for SP Series. change history. Version Version Version

Not intended for use with life support equipment. Radian GS8048A Inverter/Charger GS4048A GSLC175-PV-120/240 GS Load Center GSLC175PV1-120/240

Enabling the Bluetooth Low Energy Direct Test Mode (DTM) with BlueNRG-MS

Documentation of the PIC32 Pin Finder

High Level Design Circuit CitEE. Irere Kwihangana Lauren Mahle Jaclyn Nord

XDS Pro-4 Network Data Sheet

CAR ASYST - Quick Start Guide MAIN MENU

Xerox 8160/8142 Wide Format Color

IR Emitter and Detector Product Data Sheet LTE-R38386AS-ZF Spec No.: DS Effective Date: 09/14/2016 LITE-ON DCC RELEASE

The WHO e-atlas of disaster risk for the European Region Instructions for use

Big Kahuna Assembly Instructions

IR Emitter and Detector Product Data Sheet LTE-C9511-E Spec No.: DS Effective Date: 07/05/2014 LITE-ON DCC RELEASE

RE926S-SimonXT WiFi IGM

Martel LC-110H Loop Calibrator and HART Communications/Diagnostics

Axon Signal Unit Installation Manual

Tension meter dynaline HF45/LPT

ADS ECHO Qstart Quick Reference Guide. 340 The Bridge Street, Suite 204 Huntsville, Alabama (256)

PS 430 FOUR CHANNEL REMOTE SPEAKER STATION

E-Learning, DC drives DCS800 Hardware Options, part 1 Size D1 D4. ABB Group February 2, 2010 Slide 1 DCS800_HARDWARE_OPTIONS_01R0101

Super ABC Plug-in kit for Pacman or Ms Pacman

S-400 Series User Guide

Transcription:

SlarEdge System Installatin Guide Fr Eurpe, APAC and Suth Africa Versin 4.0

Disclaimers Disclaimers Imprtant Ntice Cpyright SlarEdge Inc. All rights reserved. N part f this dcument may be reprduced, stred in a retrieval system r transmitted, in any frm r by any means, electrnic, mechanical, phtgraphic, magnetic r therwise, withut the prir written permissin f SlarEdge Inc. The material furnished in this dcument is believed t be accurate and reliable. Hwever, SlarEdge assumes n respnsibility fr the use f this material. SlarEdge reserves the right t make changes t the material at any time and withut ntice. Yu may refer t the SlarEdge web site (www.slaredge.cm) fr the mst updated versin. All cmpany and brand prducts and service names are trademarks r registered trademarks f their respective hlders. Patent marking ntice: see http://www.slaredge.cm/patent The general terms and cnditins f delivery f SlarEdge shall apply. The cntent f these dcuments is cntinually reviewed and amended, where necessary. Hwever, discrepancies cannt be excluded. N guarantee is made fr the cmpleteness f these dcuments. The images cntained in this dcument are fr illustrative purpses nly and may vary depending n prduct mdels. Emissin Cmpliance This equipment has been tested and fund t cmply with the limits applied by the lcal regulatins. These limits are designed t prvide reasnable prtectin against harmful interference in a residential installatin. This equipment generates, uses and can radiate radi frequency energy and, if nt installed and used in accrdance with the instructins, may cause harmful interference t radi cmmunicatins. Hwever, there is n guarantee that interference will nt ccur in a particular installatin. If this equipment des cause harmful interference t radi r televisin receptin, which can be determined by turning the equipment ff and n, yu are encuraged t try t crrect the interference by ne r mre f the fllwing measures: Rerient r relcate the receiving antenna. Increase the separatin between the equipment and the receiver. Cnnect the equipment int an utlet n a circuit different frm that t which the receiver is cnnected. Cnsult the dealer r an experienced radi/tv technician fr help. Changes r mdificatins nt expressly apprved by the party respnsible fr cmpliance may vid the user s authrity t perate the equipment. 1

Supprt and Cntact Infrmatin Supprt and Cntact Infrmatin If yu have technical prblems cncerning SlarEdge prducts, please cntact us: Cuntry Phne E-Mail Australia (+61) 1800 465 567 supprt@slaredge.net.au APAC (Asia Pacific)(+972) 073 240 3118 supprt-asia@slaredge.cm Belgium (+32) 0800-76633 supprt@slaredge.be Netherlands (+31) 0800-7105 supprt@slaredge.nl China (+86) 21 6212 5536 supprt_china@slaredge.cm DACH & Rest f Eurpe (+49) 089 454 59730 supprt@slaredge.de France (+33) 0800 917410 supprt@slaredge.fr Italy (+39) 0422 053700 supprt@slaredge.it Japan (+81) 03 6262 1223 supprt@slaredge.jp New Zealand (+64) 0800 144 875 supprt@slaredge.net.au US & Canada (+1) 510 498 3200 ussupprt@slaredge.cm United Kingdm (+44) 0800 028 1183 supprt-uk@slaredge.cm Greece (+49) 89 454 59730 Israel (+972) 073 240 3122 Middle East & Africa (+972) 073 240 3118 Suth Africa (+27) 0800 982 659 supprt@slaredge.cm Turkey (+90) 216 706 1929 Wrldwide (+972) 073 240 3118 Befre cntact, make sure t have the fllwing infrmatin at hand: Mdel and serial number f the prduct in questin. The errr indicated n the LCD screen r n the mnitring platfrm r by the LED, if there is such an indicatin. System cnfiguratin infrmatin, including the type and number f mdules cnnected and the number and length f strings. The cmmunicatin methd t the SlarEdge server, if the site is cnnected. The inverter sftware versin as appears in the ID status screen. 2

Revisin Histry Revisin Histry Versin 4.0 (July 2018) Update f prduct names Remval f grunding cable cnnected t the DIN rail in the DC Safety Unit. Hardware change - new enclsure, interfaces and cmmunicatin bard Additin f cnfiguratin via SetApp. Additin f pssibility t use cmpatible cnnectrs frm third-party manufacturers Update regarding use f extensin cables in pwer ptimizerinstallatin guidelines Recmmendatin t munt the pwer ptimizer in a lcatin prtected frm direct sunlight Pwer ptimizer clearance - n clearance is required n the munting bracket side Additin f cautin - installatin in saline envirnment Clearance fr three phase inverters installed side-by-side, single rw f inverters utdrs: 5 cm / 2 Additin f reference t trubleshting undetected devices applicatin nte Trque fr cnnecting DC strings t the fuse hlders in the DC Safety Unit: 3.4 N*M / 30 lb*in Additin f link t the Designer web page Updated warning abut sealing unused pwer ptimizer input cnnectrs Output safe vltage is 1V (±0.1V) Additin f link t Three Phase Inverters fr Delta Grids applicatin nte Additin f RS485-2 supprt Versin 3.3 (Aug. 2017) Updated the Safety sectin: New warning - The Safety Switch meets all requirements fr a cdecmpliant installatin f this system. The DC Discnnect Switch discnnects bth the psitive and negative cnductrs. In Supprted AC Grids, added: Grund cnnectin is required fr all grids In Pwer Optimizer Installatin chapter: Updated string extensin cable length Added infrmatin fr cnnecting multiple mdules in parallel t an ptimizer Remved reference t racking mdels and their grunding methds Remved mentining f tracker In inverter Installatin chapter: Added nte abut cpper cnductrs Remved previus interface panel descriptin and images, and type 1 bracket In Inverter Interfaces - updated ON/OFF switch descriptin Added a cautin abut nt altering the DC Safety Unit enclsure: SlarEdge des nt permit pening r puncturing the Safety Switch in any lcatin ther than the pre-defined drill guide lcatins, r therwise altering the cnstructin f the enclsure, as this may cmprmise safety and will vid the warranty. Reference t hrizntal munting applicatin nte Updated clearance specificatins Cnnectin t/frm the Cnnectin Unit: 3

Versin 3.3 (Aug. 2017) AC grunding t bus bar instead f terminal blck - updated instructins and Cnnectin Unit mdel images String fusing requirement nte updated: Fuses needed fr 4 strings r mre (instead f 3). Added cnduit sealing requirement In Cmmissining chapter: Updated the activatin sequence Updated menu infrmatin descriptins Remved RS232 reference In Cnfiguratin Menu Optins: Cmmunicatin sectin: Remved RS232 Cnf Added GSM Cnf Pwer Cntrl sectin: Remved Phase Balance link and inf Add link t P(Q) diagram applicatin nte Maintenance sectin: Added links t applicatin ntes (Upgrading the inverter using SD card; Islatin fault trubleshting; Arc fault detectin) Remved Optimizer Cnf Status Screens updates: Meter status screen - added Pwer and Energy lines Telemetry status screen - updated GSM status screen - new Cmmunicatin ptins - updated Inverter cver remval sequence - updated RS485-E ptin - new Added link t Arc Detectin applicatin nte Trubleshting: Errr cdes mved t a separate dcument. A link was added t the manual. Slave Detect and Slave List - updated Mechanical specificatins - remved type 1 bracket External fan replacement - updated Updated the technical specificatin dcument Explained whichptimizerinstallatin steps t skip when using smart mdules. Added RS485 slave detect feature Remved USB 4

Cntents Cntents Disclaimers 1 Imprtant Ntice 1 Emissin Cmpliance 1 Supprt and Cntact Infrmatin 2 Revisin Histry 3 Versin 4.0 (July 2018) 3 Versin 3.3 (Aug. 2017) 3 Cntents 5 HANDLING AND SAFETY INSTRUCTIONS 8 Safety Symbls Infrmatin 8 IMPORTANT SAFETY INSTRUCTIONS 9 Chapter 1: Intrducing the SlarEdge Pwer Harvesting System 11 Pwer Optimizer 11 Inverter 11 Mnitring Platfrm 12 Installatin Prcedure 13 Installatin Equipment List 13 Inverter Transprt and Strage 13 Chapter 2: Installing the Pwer Optimizers 14 Safety 14 Installatin Guidelines 15 Step 1: Munting the Pwer Optimizers 16 Step 2: Cnnecting a PV Mdule t a Pwer Optimizer 16 Step 3: Cnnecting Pwer Optimizers in Strings 17 Step 4: Verifying Prper Pwer Optimizer Cnnectin 18 Chapter 3: Installing the Inverter 19 Inverter Package Cntents 19 Identifying the Inverter 19 Inverter Interfaces 19 Munting the Inverter 21 Chapter 4: Cnnecting the AC and the Strings t the Inverter 24 Grid Cnnectin Guidelines 24 Cnnecting the AC Grid t the Inverter 24 Cnnecting the Strings t the Inverter 26 Selecting a Residual Current Device (RCD) 27 Chapter 5: Cmmissining the Installatin 28 Step 1: Activating the System 28 Step 2: Pairing Pwer Optimizers t the Inverter 30 Step 3: Verifying Prper Activatin 31 Step 4: Reprting and Mnitring Installatin Data 31 The Mnitring System 32 Prviding Installatin Infrmatin 32 Mapper Applicatin 32 5

Cntents Creating a Site in the Mnitring Platfrm 33 Paper Template 33 Chapter 6: User Interface 34 LCD User Buttns 34 Inverter Cnfiguratin Setup Mde 35 Cnfiguring the Inverter Using the Internal LCD User Buttns 35 Cnfiguring the Inverter Using the LCD Light Buttn 38 Cnfiguratin Menu Optins 40 Cuntry and Grid 40 Language 40 Cmmunicatin 40 Pwer Cntrl 43 Display 44 Maintenance 44 Infrmatin 44 Status Screens - Operatinal Mde 45 Initial Status 45 Main Inverter Status 45 Energy Meter Status 45 Telemetry Status 46 ID Status 46 Server Cmmunicatin Status 47 IP Status 47 ZigBee Status 48 Wi-Fi Status 48 GSM Status 48 Cmmunicatin Prts Status 49 Smart Energy Management Status 49 Fan Status 50 Pwer Cntrl Status 50 Chapter 7: Setting Up Cmmunicatin 52 Cmmunicatin Optins 52 Ethernet 52 RS485 52 Wi-Fi 53 Cellular 53 ZigBee 53 Cmmunicatin Cnnectrs 54 Remving the Inverter Cver 55 Creating an Ethernet (LAN) Cnnectin 55 Creating an RS485 Bus Cnnectin 58 Verifying the Cnnectin 61 Appendix A: Errrs and Trubleshting 62 Trubleshting Cmmunicatin 62 Trubleshting Ethernet Cmmunicatin 62 6

Cntents Trubleshting RS485 Cmmunicatin 63 Additinal Trubleshting 63 Pwer Optimizer Trubleshting 64 Appendix B: Mechanical Specificatins 66 Appendix C: Cnnecting the AC and DC Strings t the DC Safety Unit 67 Cnnecting the AC Grid t the Inverter 68 Cnnecting the Strings t the DC Safety Unit 69 Appendix D: SafeDC 71 Appendix E: External Fan Maintenance and Replacement 72 Fan Maintenance 72 External Fan Replacement 72 Appendix F: Replacing and Adding System Cmpnents 74 Replacing an Inverter 74 Replacing the DC Safety Unit 75 Remving the DC Safety Unit 75 Installing a New DC Safety Unit 76 Cnnecting the DC Safety Unit t the Inverter 76 Adding, Remving, r Replacing Pwer Optimizers 77 Technical Specificatins - Single Phase Inverters Technical Specificatins - Three Phase Inverters 78 82 7

HANDLING AND SAFETY INSTRUCTIONS HANDLING AND SAFETY INSTRUCTIONS During installatin, testing and inspectin, adherence t all the handling and safety instructins is mandatry. Failure t d s may result in injury r lss f life and damage t the equipment. Safety Symbls Infrmatin The fllwing safety symbls are used in this dcument. Familiarize yurself with the symbls and their meaning befre installing r perating the system. WARNING! Dentes a hazard. It calls attentin t a prcedure that, if nt crrectly perfrmed r adhered t, culd result in injury r lss f life. D nt prceed beynd a warning nte until the indicated cnditins are fully understd and met. CAUTION! Dentes a hazard. It calls attentin t a prcedure that, if nt crrectly perfrmed r adhered t, culd result in damage r destructin f the prduct. D nt prceed beynd a cautin sign until the indicated cnditins are fully understd and met. NOTE Dentes additinal infrmatin abut the current subject. IMPORTANT SAFETY FEATURE Dentes infrmatin abut safety issues. Dispsal requirements under the Waste Electrical and Electrnic Equipment (WEEE) regulatins: NOTE Discard this prduct accrding t lcal regulatins r send it back t SlarEdge. 8

IMPORTANT SAFETY INSTRUCTIONS SAVE THESE INSTRUCTIONS WARNING! IMPORTANT SAFETY INSTRUCTIONS The inverter cver must be pened nly after shutting ff the inverter ON/OFF switch lcated at the bttm f the inverter. This disables the DC vltage inside the inverter. Wait five minutes befre pening the cver. Otherwise, there is a risk f electric shck frm energy stred in the capacitrs. WARNING! Befre perating the inverter, ensure that the inverter AC pwer cable and wall utlet are grunded prperly. This prduct must be cnnected t a grunded, metal, permanent wiring system, r an equipment-grunding cnductr must be run with the circuit cnductrs and cnnected t the equipment grunding terminal r lead n the prduct. WARNING! Opening the inverter and repairing r testing under pwer must be perfrmed nly by qualified service persnnel familiar with this inverter. WARNING! D nt tuch the PV panels r any rail system cnnected when the inverter switch is ON, unless grunded. WARNING! SafeDC cmplies with IEC60947-3 when installing the system with a wrst case SafeDC vltage (under fault cnditins) < 120V. The wrst case vltage is defined as: Vc,max+ (String Length-1)*1V, where: Vc,max = Maximum Vc (at lwest temperature) f the PV mdule in the string (fr a string with multiple mdule mdels, use the max value) String Length = number f pwer ptimizers in the string CAUTION! This unit must be perated accrding t the technical specificatin datasheet prvided with the unit. CAUTION! HEAVY OBJECT. T avid muscle strain r back injury, use prper lifting techniques, and if required - a lifting aid. NOTE The inverter is IP65 rated. Unused cnduit penings and glands shuld be sealed with apprpriate seals. NOTE Use PV mdules rated accrding t IEC 61730 class A. 9

IMPORTANT SAFETY INSTRUCTIONS NOTE The symbl appears at grunding pints n the SlarEdge equipment. This symbl is als used in this manual. NOTE A SlarEdge inverter may be installed in a site with a generatr, hwever must nt perate at the same time as the generatr. Operating an inverter and a generatr simultaneusly will vid the warranty. SlarEdge requires installing a physical r electrnic interlck, which will prevent the generatr and inverter frm perating simultaneusly. Interlck prcurement, installatin, maintenance and supprt are the respnsibility f the installer. Damage t the inverter due t incrrect interlck installatin r use f an interlck that is incmpatible with the SlarEdge system will render the SlarEdge warranty invalid. NOTE The fllwing warning symbls appear n the inverter warning label: Risk f electric shck Risk f electric shck frm energy stred in the capacitr. D nt remve cver until 5 minutes after discnnecting all surces f supply. Ht surface T reduce the risk f burns, d nt tuch. 10

Chapter 1: Intrducing the SlarEdge Pwer Harvesting System Chapter 1: Intrducing the SlarEdge Pwer Harvesting System The SlarEdge pwer harvesting slutin maximizes the pwer utput frm any type f slar Phtvltaic (PV) installatin while reducing the average cst per watt. The fllwing sectins describe each f the system s cmpnents. Pwer Optimizer Figure 1: The SlarEdge pwer harvesting system cmpnents The pwer ptimizers are DC-DC cnverters cnnected t PV mdules in rder t maximize pwer harvesting by perfrming independent Maximum Pwer Pint Tracking (MPPT) at the mdule level. The pwer ptimizers regulate the string vltage at a cnstant level, regardless f string length and envirnmental cnditins. The pwer ptimizers include a safety vltage functin that autmatically reduces the utput f each pwer ptimizer t 1 Vdc in the fllwing cases: During fault cnditins The pwer ptimizers are discnnected frm the inverter The inverter ON/OFF switch is turned OFF The safety switch n the DC Safety Unit is turned OFF The inverter AC breaker is turned OFF Each pwer ptimizer als transmits mdule perfrmance data ver the DC pwer line t the inverter. Tw types f pwer ptimizers are available: Mdule Add-n pwer ptimizer cnnected t ne r mre mdules Smart mdules - the pwer ptimizer is embedded int a mdule Inverter The inverter efficiently cnverts DC pwer frm the mdules int AC pwer that can be fed int the main AC service f the site and frm there t the grid. The inverter als receives the mnitring data frm each pwer ptimizer and transmits it t a central server (the mnitring platfrm; requires Internet cnnectin). 11

Mnitring Platfrm Sme inverters are available with an ptinal DC Safety Unit. The DC Safety Unit has a manually perated switch fr discnnecting the DC pwer f a SlarEdge system. The DC Safety Unit is lcated belw the inverter and is cnnected t the inverter with AC and DC wires. Mnitring Platfrm The mnitring platfrm enables mnitring the technical and financial perfrmance f ne r mre SlarEdge sites. It prvides past and present infrmatin n the system perfrmance bth at the system and mdule levels. 12

Installatin Prcedure The fllwing is the prcedure fr installing and setting up a new SlarEdge site. Many f these als apply t mdificatin f an existing site. 1. Cnnecting Pwer Optimizers in Strings, page 17. 2. Recrding pwer ptimizer serial numbers (ptinal), page 32. 3. Munting the inverter, page 21. 4. Cnnecting the AC and the Strings t the Inverter, page 24, r Cnnecting the AC and the String t the DC Safety Unit, page 67. 5. Cmmissining and activating the installatin, page 28. 6. Cnnecting the inverter t the mnitring platfrm, page 33. 7. Cnfiguring the inverter, page 34. Installatin Equipment List Standard tls can be used during the installatin f the SlarEdge system. The fllwing is a recmmendatin f the equipment needed fr installatin: Allen screwdriver fr 5mm screw type fr the inverter cver, DC Safety Unit cver (if applicable), and inverter side screws Allen screwdriver fr M5/M6/M8 screw types Standard flat-head screwdrivers set Nn-cntact vltage detectr Crdless drill r screwdriver and bits suitable fr the surface n which the inverter will be installed. Use f an impact driver is nt recmmended. Apprpriate munting hardware (fr example: stainless blts, nuts, and washers) fr attaching: the munting bracket t the munting surface MC4 crimper Wire cutters Wire strippers Vltmeter Fr installing the cmmunicatin ptins, yu may als need the fllwing: Fr Ethernet: Fr RS485: CAT5/6 twisted pair Ethernet cable with RJ45 cnnectr. If using a CAT5/6 cable spl: RJ45 plug and RJ45 crimper Fur- r six-wire shielded twisted pair cable. Watchmaker precisin screwdriver set Inverter Transprt and Strage Chapter 1: Intrducing the SlarEdge Pwer Harvesting System Transprt the inverter in its riginal packaging, facing up and withut expsing it t unnecessary shcks. If the riginal package is n lnger available, use a similar bx that can withstand the weight f the inverter (refer t the inverter weight in the specificatin datasheet prvided with the unit), has a handle system and can be clsed fully. Stre the inverter in a dry place where ambient temperatures are -25 C - +65 C / -13 F - 149 F. 13

Chapter 2: Installing the Pwer Optimizers Chapter 2: Installing the Pwer Optimizers Safety The fllwing ntes and warnings apply when installing the pwer ptimizers. Sme f the fllwing may nt be applicable t smart mdules: WARNING! When mdifying an existing installatin, turn OFF the inverter ON/OFF switch, the Cnnectin Unit and the AC circuit breaker n the main AC distributin panel. CAUTION! Pwer ptimizers are IP68/NEMA6P rated. Chse a munting lcatin where ptimizers will nt be submerged in water. CAUTION! This unit must be perated accrding t the perating specificatins prvided with the unit. CAUTION! Cutting the pwer ptimizer input r utput cable cnnectr is prhibited and will vid the warranty. CAUTION! All PV mdules must be cnnected t a pwer ptimizer. CAUTION! If yu intend t munt the ptimizers directly t the mdule r mdule frame, first cnsult the mdule manufacturer fr guidance regarding the munting lcatin and the impact, if any, n mdule warranty. Drilling hles in the mdule frame shuld be dne accrding t the mdule manufacturer instructins. CAUTION! Installing a SlarEdge system withut ensuring cmpatibility f the mdule cnnectrs with the ptimizer cnnectrs may be unsafe and culd cause functinality prblems such as grund faults, resulting in inverter shut dwn. T ensure mechanical cmpatibility f the pwer ptimizers cnnectrs with the PV mdules cnnectrs t which they are cnnected: Use identical cnnectrs frm the same manufacturer and f the same type n bth the pwer ptimizers and n the mdules; r Verify that the cnnectrs are cmpatible in the fllwing way: The mdule cnnectr manufacturer shuld explicitly verify cmpatibility with the SlarEdge ptimizer cnnectr; and A third-party test reprt by ne f the listed external labs (TUV, VDE, Bureau Veritas UL, CSA, InterTek) shuld be btained, verifying the cmpatibility f the cnnectrs. IMPORTANT SAFETY FEATURE Mdules with SlarEdge pwer ptimizers are safe. They carry nly a lw safety vltage befre the inverter is turned ON. As lng as the pwer ptimizers are nt cnnected t the inverter r the inverter is turned OFF, each pwer ptimizer will utput a safe vltage f 1V. 14

Installatin Guidelines Frame-munted pwer ptimizers are munted directly n the mdule frame, regardless f racking system (rail-less r with rails). Fr installatin f frame-munted pwer ptimizers, refer t http://www.slaredge.cm/sites/default/files/installing_ frame_munted_pwer_ptimizers.pdf. The steps in this chapter refer t mdule add-n pwer ptimizers. Fr smart mdules, start frm Step 3: Cnnecting Pwer Optimizers in Strings n page 17. Als refer t the dcumentatin supplied with the smart mdules. The pwer ptimizer can be placed in any rientatin. If cnnecting mre mdules than ptimizer inputs in parallel, use a branch cable. Sme cmmercial pwer ptimizer mdels have a dual input. Psitin the pwer ptimizer clse enugh t its mdule s that their cables can be cnnected. Make sure t use pwer ptimizers that have the required utput cnductr length: Minimize the use f extensins between pwer ptimizers. Chapter 2: Installing the Pwer Optimizers Yu can use extensin cables between rws and frm the end f string t the inverter. D nt use extensin cables between the mdules and the pwer ptimizers, r between tw pwer ptimizers within a string. The minimum and maximum string length guidelines are stated in the pwer ptimizer datasheets. Refer t the Designer fr string length verificatin. The Designer is available n the SlarEdge website at http://www.slaredge.cm/prducts/installer-tls/site-designer#/. Cmpletely shaded mdules may cause their pwer ptimizers t temprarily shut dwn. This will nt affect the perfrmance f the ther pwer ptimizers in the string, as lng as the minimum number f unshaded pwer ptimizers cnnected in a string f mdules is met. If under typical cnditins fewer than the minimum ptimizers are cnnected t unshaded mdules, add mre ptimizers t the string. T allw fr heat dissipatin, maintain a 2.5 cm / 1" clearance distance between the pwer ptimizer and ther surfaces, n all sides except the munting bracket side. NOTE Figure 2: Pwer ptimizer clearance The images cntained herein are fr illustrative purpses nly and may vary depending n prduct mdels. 15

Step 1: Munting the Pwer Optimizers Step 1: Munting the Pwer Optimizers Fr each f the pwer ptimizers1: 1. Determine the pwer ptimizer munting lcatin and use the pwer ptimizer munting brackets t attach the pwer ptimizer t the supprt structure. It is recmmended t munt the pwerptimizer in a lcatin prtected frm direct sunlight. Fr frame-munted pwer ptimizers fllw the instructins supplied with the ptimizers, r refer t https://www.slaredge.cm/sites/default/files/installing_ frame_munted_pwer_ptimizers.pdf. 2. If required, mark the munting hle lcatins and drill the hle. CAUTION! D nt drill thrugh the pwer ptimizer r thrugh the munting hles. The drilling vibratins can damage the pwer ptimizer and will vid the warranty. 3. Attach each pwer ptimizer t the rack using M6 (1/4'') stainless steel blts, nuts and washers r ther apprpriate munting hardware. Apply trque f 9.5 N*m / 7 lb*ft. 4. Verify that each pwer ptimizer is securely attached t the mdule supprt structure. 5. Recrd pwer ptimizer serial numbers and lcatins, as described in Step 4: Reprting and Mnitring Installatin Data n page 31. Step 2: Cnnecting a PV Mdule t a Pwer Optimizer NOTE Images are fr illustratin purpses nly. Refer t the label n the prduct t identify the plus and minus input and utput cnnectrs. Fr each f the pwerptimizers: Cnnect the Plus (+) utput cnnectr f the mdule t the Plus (+) input cnnectr f the pwer ptimizer. Cnnect the Minus (-) utput cnnectr f the mdule t the Minus (-) input cnnectr f the pwer ptimizer. Figure 3: Pwer ptimizer cnnectrs 1Nt applicable t smart mdules. 16

Chapter 2: Installing the Pwer Optimizers Step 3: Cnnecting Pwer Optimizers in Strings Yu can cnstruct parallel strings f unequal length, that is, the number f pwer ptimizers in each string des nt have t be the same. The minimum and maximum string lengths are specified in the pwer ptimizer datasheets. Refer t the Designer fr string length verificatin. NOTE Use at least 11 AWG/ 4 mm² DC cables. The ttal cnductr length f the string (excluding pwer ptimizers cnductrs; including hme runs and necessary extensins between ptimizers) shuld nt exceed the fllwing: Inverter mdel Three phase up t SE25K Three phase SE25K and abve Ttal cnductr length ( frm DC+ t DC- f the inverter) 1000 ft. /300 m 2300 ft./ 700 m 1. Cnnect the Minus (-) utput cnnectr f the string s first pwer ptimizer t the Plus (+) utput cnnectr f the string s secnd pwer ptimizer. 2. Cnnect the rest f the pwer ptimizers in the string in the same manner. WARNING! If using a dual-input pwer ptimizer and sme inputs are nt used, seal the unused input cnnectrs with the supplied pair f seals. Figure 4: Pwer ptimizers cnnected in series 3. If yu intend t mnitr the installatin, using the mnitring platfrm, recrd the physical lcatin f each pwer ptimizer, as described in Prviding Installatin Infrmatin n page 32. 17

Step 4: Verifying Prper Pwer Optimizer Cnnectin Step 4: Verifying Prper Pwer Optimizer Cnnectin When a mdule is cnnected t a pwer ptimizer, the pwer ptimizer utputs a safe vltage f 1V (±0.1V). Therefre, the ttal string vltage shuld equal 1V times the number f pwer ptimizers cnnected in series in the string. Fr example, if 10 pwer ptimizers are cnnected in a string, then 10V shuld be prduced. Make sure the PV mdules are expsed t sunlight during this prcess. The pwer ptimizer will nly turn ON if the PV mdule prvides at least 2W. In SlarEdge systems, due t the intrductin f pwerptimizers between the PV mdules and the inverter, the shrt circuit current I SC and the pen circuit vltage V OC hld different meanings frm thse in traditinal systems. Fr mre infrmatin abut the SlarEdge system s string vltage and current, refer t the V OC and I SC in SlarEdge Systems Technical Nte, available n the SlarEdge website at: http://www.slaredge.cm/files/pdfs/isc_and_vc_in_slaredge_systems_technical_ nte.pdf. T verify prper pwer ptimizer cnnectin: Measure the vltage f each string individually befre cnnecting it t the ther strings r t the inverter. Verify crrect plarity by measuring the string plarity with a vltmeter. Use a vltmeter with at least 0.1V measurement accuracy. NOTE Since the inverter is nt yet perating, yu may measure the string vltage and verify crrect plarity n the DC wires inside the Cnnectin Unit. Fr trubleshting pwer ptimizer peratin prblems, refer t Pwer Optimizer Trubleshting n page 64. 18

Chapter 3: Installing the Inverter Install the inverter either befre r after the mdules and pwerptimizers have been installed. CAUTION! D nt rest the cnnectrs at the bttm f the inverter n the grund, as it may damage them. T rest the inverter n the grund, lay it n its back, frnt r side. Inverter Package Cntents One inverter One munting bracket Tw Allen screws fr fastening the inverter t the munting bracket Installatin guide (with activatin card and instructins) Optinal (fr wireless cmmunicatin t mnitring platfrm) - RF antenna and munting bracket AC ferrite bead kit Identifying the Inverter Refer t the sticker n the inverter that specifies its Serial Number and its Electrical Ratings. Prvide the serial number when cntacting SlarEdge supprt. The serial number is als required when pening a new site in the mnitring platfrm. Inverter Interfaces Chapter 3: Installing the Inverter The fllwing figure shws the inverter cnnectrs and cmpnents, lcated at the bttm f the inverter. Figure 5: Inverter Interfaces AC utput: AC cable external gauge: Single phase inverters: PG21 (9-16mmdiameter) Three phase inverters: M32 (15-21mm diameter) DC inputs: Fr cnnectin f the PV installatin Tw cmmunicatin glands, fr cnnectin f inverter cmmunicatin ptins. Each gland has three penings. Refer t Setting Up Cmmunicatin n page 52 fr mre infrmatin. 19

Inverter Interfaces LCD light buttn: Pressing this buttn lights up the LCD fr 30 secnds. In additin, yu can press this buttn t view inverter status screens and access cnfiguratin menu ptins, as described Cnfiguring the Inverter Using the LCD Light Buttn n page 38. ON/OFF switch: Turning this switch ON (after the pwer ptimizers are paired with the inverter) starts the peratin f the pwer ptimizers, enables pwer prductin and allws the inverter t begin exprting pwer t the utility grid. Turning it OFF reduces the pwer ptimizer vltage t a lw safety vltage and inhibits exprtatin f pwer. When this switch is OFF, the inverter cntrl circuitry remains pwered up. WARNING! Fr inverters with manual Rapid Shutdwn (PVRSS) functinality - Upn PVRSS, the internal circuitry remains up, therefre the inverter cver must be pened nly after shutting ff the inverter ON/OFF switch. This disables the DC vltage inside the inverter. Wait five minutes befre pening the cver. Otherwise, there is a risk f electric shck frm energy stred in the capacitrs. LCD panel: displays inverter infrmatin and cnfiguratin parameters LCD LEDs: Three LEDs indicate the fllwing inverter statuses: Clr Descriptin Functinality Green Yellw Red Pwer prductin Mdule cmmunicatin and inverter shutdwn Fault All LEDs turn n while the inverter is being cnfigured. On - The inverter is prducing pwer. Blinking - Standby mde. The inverter is in Standby mde until its wrking vltage is reached. The inverter then enters Prductin mde and prduces pwer. Off - The inverter is nt prducing pwer. This may be during Night mde, when the inverter ON/OFF switch is OFF r when an errr ccurs. Blinking: Mnitring infrmatin is being received frm a pwer ptimizer. The inverter is being shut dwn. On - There is an errr. Refer t Errrs and Trubleshting n page 62 fr mre infrmatin. Blinking - The inverter is being shut dwn. Figure 6: Inverter frnt view 20

Chapter 3: Installing the Inverter DC Safety Unit (if applicable), including: ON/OFF switch: cnnects and discnnects the DC pwer f the system AC utput: Cable gland fr cnnectin t the grid DC input: Cable glands r MC4 cnnectrs fr cnnectin f the PV installatin Secndary grunding (ptinal): Cable gland fr grunding Munting the Inverter Figure 7: DC Safety Unit The inverter is typically munted vertically, and the instructins in this sectin are applicable fr vertical installatin. Sme three phase inverter mdels can be installed hrizntally (abve 10 tilt) as well as vertically, and at any tilt ver 10 up t 90. Fr infrmatin and instructins fr hrizntal munting refer t http://www.slaredge.cm/sites/default/files/applicatin_nte_hrizntal_munting_ f_three_phase_inverters.pdf. The inverter is supplied with a munting bracket. NOTE Figure 8: Munting bracket Make sure the munting surface r structure can supprt the weight f the inverter and bracket, and make sure that it spans the width f the bracket. CAUTION! HEAVY OBJECT. T avid muscle strain r back injury, use prper lifting techniques, and if required - a lifting aid. CAUTION! SlarEdge inverters can be installed at a minimum distance f 50 m/ 164 ft frm the shreline f an cean r ther saline envirnment, as lng as there are n direct salt water splashes n the inverter. 1. Determine the inverter munting lcatin, n a wall, stud framing r ple. It is recmmended t munt the inverter in a lcatin prtected frm direct sunlight. 2. T allw prper heat dissipatin, maintain the fllwing minimum clearance areas between the inverter and ther bjects: 21

Munting the Inverter If installing a single inverter: At least 20 cm (8") frm the tp and bttm f the inverter; if installing an inverter with a DC Safety Unit, make sure t leave sufficient clearance fr cable entry. 10 cm (4") frm the right and left f the inverter. Fr easy access t the fans (three phase inverters), a larger clearance is recmmended. If installing multiple inverters: When installing inverters ne abve the ther, leave at least 40 cm (16") between inverters. If installing an inverter with a DC Safety Unit, leave 20 cm (8") between the tp f an inverter and the bttm f a DC Safety Unit). When installing inverters side by side, fllw these clearance specificatins: Lcatin Indr Installatin Outdr Installatin Lcatins where the annual average high temperature 1 is belw 25 C / 77 F Lcatins where the annual average high temperature 1 is abve 25 C / 77 F 20 cm / 8" between inverters 40 cm / 16" between inverters 5 cm / 2" between inverters (if inverters are als installed ne abve the ther, maintain the indr installatin clearance) 3. Psitin the munting bracket against the wall/ple and mark the drilling hle lcatins (refer t Mechanical Specificatins n page 66 fr inverter and munting bracket dimensins): Ensure that the flat edge f the bracket is at the bttm, as in Figure 9. Use at least tw bracket hles. Additinal hles can be used t fix the bracket. Determine which and hw many hles t use accrding t munting surface type and material. 4. Drill the hles and munt the bracket. Verify that the bracket is firmly attached t the munting surface. NOTE When munting an inverter n an uneven surface, yu may use spacers/ washers behind the tp munting hle f the bracket. Depending n the angle, use the apprpriate size and number f spacers s that the bracket is perpendicular t the grund. Recmmended: a stainless steel 3/4" lng screw, with a 1/4" scket buttn head, tw jam nuts and three washers. 1 Annual average high temperature the average f the 12 mnthly average highs, fr example: Refer t http://www.weatherbase.cm/ t find the value in yur lcatin. 22

5. Chapter 3: Installing the Inverter Hang the inverter n the bracket (see Figure 9): Lift the inverter frm the sides, r hld it at the tp and bttm f the inverter t lift the unit int place. D nt lift hlding the Cnnectin UnitDC Safety Unit as it may be damaged. 6. Align the tw indentatins in the inverter enclsure with the tw triangular munting tabs f the bracket, and lwer the inverter until it rests n the bracket evenly. Figure 9: Hanging the inverter n the bracket 7. Secure the Cnnectin Unit bracket t the wall: 8. Fr inverters with DC Safety Unit - secure the DC Safety Unit bracket t the wall: Mark the lcatin f the bracket screw fr the DC Safety Unit and drill the hle. Fasten the bracket using a standard blt. Verify that the bracket is firmly attached t the munting surface. Figure 10: DC Safety Unit bracket 9. Insert the tw supplied screws thrugh the uter heat sink fin n bth sides f the inverter and int the bracket (see Figure 9). Tighten the screws with a trque f 4.0 N*m / 2.9 lb.*ft. 23

Chapter 4: Cnnecting the AC and the Strings t the Inverter Chapter 4: Cnnecting the AC and the Strings t the Inverter This chapter describes hw t cnnect the inverter t the AC grid, and t the strings f mdules with pwer ptimizers. If using an inverter with a DC Safety Unit, refer t the instructins in Cnnecting the AC and DC Strings t the DC Safety Unit n page 67. Refer t the technical specificatins prvided with the inverter. Grid Cnnectin Guidelines In mst cuntries, three phase inverters require neutral cnnectin at all times. In sme cuntries, the three phase inverters can be cnnected t delta grids; in ther cases, multiple single phase inverters can be used. Prir t system installatin, refer t: Three Phase Inverters fr Delta Grids applicatin nte at https://www.slaredge.cm/sites/default/files/se_three_phase_inverters_fr_ delta_grids.pdf Supprted Cuntries applicatin nte t cnfirm cmpatibility at http://www.slaredge.cm/sites/default/files/se_inverters_supprted_ cuntries.pdf; installing withut cnfirmatin may vid the inverter warranty. Fr mre wiring infrmatin refer t the SlarEdge Recmmended AC Wiring Applicatin Nte, available n the SlarEdge website at http://www.slaredge.cm/files/pdfs/applicatin-nte-recmmended-wiring.pdf. Cnnecting the AC Grid t the Inverter Use a three-wire cable fr a single phase cnnectin r a five-wire cable fr three phase cnnectin. The maximum wire size fr the input terminal blcks is 16mm². 1. Turn OFF the AC circuit breaker. 2. Open the inverter cver: Release the six Allen screws and carefully mve the cver hrizntally befre lwering it. CAUTION! When remving the cver, make sure nt t damage internal cmpnents. SlarEdge will nt be held respnsible fr any cmpnents damaged as a result f incautius cver remval. 24

3. Chapter 4: Cnnecting the AC and the Strings t the Inverter Strip 58 mm / 2.32'' f the external cable insulatin and strip 8 mm / 0.32'' f the internal wire insulatin. Figure 11: Insulatin stripping AC (3-wire cable) 4. Open the AC cable gland and insert the cable thrugh the gland (see ). WARNING! Turn OFF the AC befre cnnecting the AC terminals. If cnnecting equipment grunding wire, cnnect it befre cnnecting the AC Line and Neutral wires. 5. Fr SE25K, SE27.6K, and SE33.3K three phase inverters, attach the supplied Ferrite bead t the AC wires: a. Insert the AC wires thrugh the supplied bead. b. Cnnect the AC wires t the terminal blcks. c. Tighten the wires t the bead using the supplied T-wrap. Figure 12: Attaching a Ferrite bead 6. Depending n the inverter type (single phase r three phase), cnnect the AC, as fllws. Cnnect the PE (grunding) wire first. Single Phase Inverter Wire type Cnnect t terminal PE (grunding) Line Neutral L N 25

Cnnecting the Strings t the Inverter Wire type Cnnect t terminal Line 1 L1 Line 2 L2 Line 3 L3 PE (grunding) Neutral N Figure 13: AC Terminals NOTE If pwer cntrl is enabled, it is imprtant t respect the rder f grid lines cnnectin t the inverter. A 120deg phase difference shuld be kept between L1 t L2 and between L2 t L3 (L1-L2-L3 and nt, fr example L1-L3-L2). If the grid lines are nt in this rder, an errr is displayed n the LCD screen and the inverter will nt prduce pwer. 7. Cnnect the wires t the apprpriate terminal blck cnnectrs in the inverter. Tighten the terminal blck screws with a trque f 1.2-1.5 N*m / 0.88-1.1 lb*ft. 8. Check that the wires are fully inserted and cannt be pulled ut easily. 9. Tighten the AC cable gland with a trque f 2.8-3.3 N*m / 2.0-2.4 lb*ft. 10. Verify that there are n uncnnected wires t the inverter and that the unused terminal screws are tightened. Cnnecting the Strings t the Inverter Cnnect the string t the DC input pairs. If required, cnnect additinal strings in parallel using an external cmbiner bx/branch cables befre cnnecting t the inverter. NOTE Functinal electrical earthing f DC-side negative r psitive ples is prhibited because the inverter has n transfrmer. Grunding (earth grund) f mdule frames and munting equipment f the PV array mdules is acceptable. NOTE SlarEdge s fixed input vltage architecture enables the parallel strings t be f different lengths. Therefre, they d nt need t have the same number f pwer ptimizers, as lng as the length f each string is within the permitted range. Cnnect the DC cnnectrs f each string t the DC+ and DC- cnnectrs. 26

Figure 14: Inverter DC Cnnectins Selecting a Residual Current Device (RCD) IMPORTANT SAFETY FEATURE All SlarEdge inverters incrprate a certified internal Residual Current Device (RCD) in rder t prtect against pssible electrcutin and fire hazard in case f a malfunctin in the PV array, cables r inverter. There are 2 trip threshlds fr the RCD as required fr certificatin (DIN VDE 0126-1-1). The default value fr electrcutin prtectin is 30 ma, and fr slw rising current is 300 ma. NOTE Fr multiple inverters, an RCD per inverter is required. Chapter 4: Cnnecting the AC and the Strings t the Inverter If an external RCD is required by lcal regulatins, check which type f RCD is required fr the relevant electric cde. Install the residual-current device (RCD) in accrdance with the applicable lcal standards and directives. SlarEdge recmmends using a type-a RCD. The recmmended RCD value is 100mA r 300mA unless a lwer value is required by the specific lcal electric cdes. Fr extended pwer three phase inverters (SE25K, SE27.6K and SE33.3K) an RCD value f 300mA shuld be used. When required by lcal regulatins, the use f an RCD type B is permitted. In installatins where the lcal electric cde requires an RCD with a lwer leakage setting, the discharge current might result in nuisance tripping f the external RCD. The fllwing steps are recmmended t avid nuisance tripping f the external RCD: Select the apprpriate RCD fr crrect peratin f the installatin: An RCD with a rating f 30 ma may actually trip at a leakage as lw as 15 ma (accrding t IEC 61008). High quality RCDs will typically trip at a value clser t their rating. Cnfigure the trip vltage f the inverter's internal RCD t a lwer value than the trip current f the external RCD. The internal RCD will trip if the current is higher than the allwed current, but because the internal inverter RCD autmatically resets when the residual currents are lw it saves the manual reset. Fr detailed infrmatin, refer t the RCD Selectin fr SlarEdge Inverters Applicatin Nte, available n the SlarEdge website at http://www.slaredge.cm/sites/default/files/applicatin_nte_grund_fault_rcd.pdf. Demand Respnse Enabling Device (DRED) Accrding t the AS/NZS 4777.2 standard, SlarEdge inverters set t any Australia r New Zealand cuntry setting may require cnnecting an external Demand Respnse Enabling Device (DRED, prvided by the utility) t the inverter pwer reductin interface (PRI). Fr DRED cnnectin and cnfiguratin, refer t http://www.slaredge.cm/sites/default/files/dredcnnectin-applicatin-nte.pdf. 27

Chapter 5: Cmmissining the Installatin Chapter 5: Cmmissining the Installatin This chapter describes hw t activate the system, pair the pwerptimizers t the inverter and verify the prper functining f the system. Step 1: Activating the System 1. Verify that the inverter ON/OFF switch is OFF. 2. Verify that the DC Safety Unit (if applicable) is in the OFF psitin. 3. Remve the inverter cver: Open the inverter cver s six Allen screws and carefully pull the cver hrizntally befre lwering it. WARNING! ELECTRICAL SHOCK HAZARD. D nt tuch uninsulated wires when the inverter cver is remved. 4. Activate the inverter: a. Verify that the card S/N matches the inverter S/N. b. Insert the card int the "CARD" slt n the cmmunicatin bard. c. Turn ON the AC switch f the main circuit bard. d. LCD shws: Running Script...è Dne! If LCD shws: Failed: Figure 15: Activatin card Turn AC OFF and ON (reset), and repeat the activatin prcess. Use the activatin cde that appears n the certificatin inverter label t manually activate the inverter. If the prblem persists, cntact SlarEdge Supprt. NOTE Yu can use the activatin cde that appears n the certificatin inverter label t activate the inverter in case f a script errr r a missing activatin card. 5. Verify that the inverter is cnfigured t the prper cuntry: Press the LCD light buttn until reaching the ID status screen: 28

Chapter 5: Cmmissining the Installatin I D : # # # # # # # # # # D S P 1 / 2 : 1. 0 2 1 0 / 1. 0 0 3 4 C P U : 0 0 0 3. 1 9 x x C u n t r y : E S P 6. If required, perfrm the fllwing additinal steps befre clsing the inverter cver: Cuntry settings r inverter cnfiguratin using the internal LCD user buttns refer t Cuntry and Grid n page 40. Cmmunicatin ptins cnnectin refer t Setting Up Cmmunicatin n page 52. 7. Clse the inverter cver by tightening the screws with a trque f 9.0 N*m/ 6.6 lb*ft. Fr prper sealing, first tighten the crner screws and then the tw central screws. The fllwing figure illustrates recmmended rder: Figure 16: Tightening rder f the screws 8. Turn ON the DC Safety Unit (if applicable). If an additinal external DC switch is installed between the pwer ptimizers and the inverter(s) then turn it ON. A status screen similar t the fllwing appears n the LCD panel: V a c [ V ] V d c [ V ] P a c [ w ] 2 4 0. 7 1 4. 1 0. 0 P _ O K : 0 0 0 / 0 0 0 < S _ O K > - - - - - - - - - - - - - - - O F F 9. Verify that the fllwing infrmatin appears n the LCD panel: P_OK: Appears nly upn pairing prcess cmpletin and first telemetry receptin frm the pwer ptimizers. Indicates cnnectin t the pwer ptimizers and that at least ne pwer ptimizer is sending mnitring data. 000/000: Appears nly upn first telemetry receptin frm the pwer ptimizers. Indicates the number f pwer ptimizers that have been paired t this inverter. S_OK: The cnnectin t the SlarEdge mnitring platfrm is successful (shuld appear nly if the inverter is cnnected t the server). Vac [V]: The grid AC utput vltage. Verify the crrect value. Vdc [V]: The DC input vltage f the lngest string cnnected t the inverter. There shuld be a safety vltage f 1V fr each pwer ptimizer in the string. 29

Step 2: Pairing Pwer Optimizers t the Inverter NOTE A measurement errr n the inverter LCD f ±3 V is acceptable. Pac [w]: The AC utput pwer (shuld be 0.0 since the inverter is OFF). OFF: The inverter ON/OFF switch is in the OFF psitin. Step 2: Pairing Pwer Optimizers t the Inverter Once all cnnectins are made, all the pwer ptimizers must be lgically paired t their inverter. The pwer ptimizers d nt start prducing pwer until they are paired. This step describes hw t assign each inverter t the pwer ptimizers frm which it will prduce pwer. Perfrm this step when the mdules are expsed t sunlight. If the string length is changed r a pwer ptimizer is replaced, repeat the pairing prcess. 1. Perfrm pairing: Press and hld dwn the inverter LCD Light buttn fr abut 10 secnds. The fllwing message is displayed: K e e p h l d i n g b u t t n f r p a i r i n g, r e l e a s e t e n t e r m e n u... R e m a i n i n g : 3 s e c Keep hlding fr 5 secnds until the fllwing is displayed: P a i r i n g T u r n S w i t c h T O n 2. Turn the inverter ON/OFF switch t ON within 5 secnds. If yu wait lnger than 5 secnds the inverter exits the pairing mde. The fllwing message is displayed indicating that the inverter is perfrming the pairing: P a i r i n g R e m a i n i n g [ s e c ] : 1 8 0 3. Wait fr the cmpletin f the pairing (remaining secnds is 0). If pairing fails, an errr is displayed. In this case, repeat the pairing steps, and refer t Pwer Optimizer Trubleshting n page 64. If the prblem persists, cntact SlarEdge Supprt. When pairing succeeds, the fllwing message is displayed: P a i r i n g P a i r i n g C m p l e t e d The system startup prcess begins: Since the inverter is ON, the pwer ptimizers start prducing pwer and the inverter starts cnverting AC. WARNING! When yu turn ON the inverter ON/OFF switch, the DC cables carry a high vltage and the pwer ptimizers n lnger utput a safe 1V utput. When the inverter starts cnverting pwer after the initial cnnectin t the AC, the inverter enters Wakeup mde until its wrking vltage is reached. This mde is indicated by the flickering green inverter LED. 30

While the inverter is in Wakeup mde, it mnitrs the grid and verifies crrect grid vltage and frequency. The fllwing message is displayed: W a k i n g U p... R e m a i n i n g : 0 5 1 S e c The cuntdwn indicates the secnds remaining until entering the Prductin mde. This time is in accrdance with lcal regulatins and is typically between three t five minutes. When cuntdwn is cmplete, the inverter enters Prductin mde and prduces pwer. The steadily lit green inverter LED indicates this mde. Step 3: Verifying Prper Activatin After the wake-up time is ver, a status screen similar t the fllwing appears n the inverter LCD panel: V a c [ V ] V d c [ V ] P a c [ W ] 2 4 0. 7 3 7 1. 9 2 3 4 9. 3 P _ O K : X X X / Y Y Y < S _ O K >................. O N 1. Verify the fllwing: The green inverter LED is steadily lit. The ON/OFF indicatr n the LCD panel reads ON. P_OK: XXX/YYY: There is a cnnectin t the pwer ptimizers and at least ne pwer ptimizer is sending mnitring data. Optimizers send telemetries in a frequency f up t 10 minutes. Initially after pairing, bth XXX and YYY values shw 000 and the values increase as paired pwer ptimizers are reprted. NOTE It may take up t 20 minutes fr all pwer ptimizers t transmit their telemetries and t be cunted n the LCD screen. S_OK appears, if the inverter is cnnected t the SlarEdge mnitring platfrm. Vac [V] specifies the measured grid AC utput vltage. Vdc [v] specifies the DC input vltage, which shuld be apprximately the inverter DC vltage (mdel dependent; refer t the inverter datasheet) Pac [W] specifies the AC utput pwer prduced. 2. Take nte f the serial number n the inverter label using the detachable 2D barcde sticker n each device. This infrmatin is used in the SlarEdge mnitring platfrm t identify this inverter. Yur SlarEdge pwer harvesting system is nw peratinal. Step 4: Reprting and Mnitring Installatin Data NOTE Chapter 5: Cmmissining the Installatin This step requires cnnecting ne f the cmmunicatin ptins. Refer t Setting Up Cmmunicatin n page 52. 31

The Mnitring System The Mnitring System The mnitring platfrm enables accessing site infrmatin, including up-t-date infrmatin viewed in a physical r lgical view. The mnitring platfrm is described in detail in the Mnitring Platfrm User Guide, available n the SlarEdge website at http://www.slaredge.cm/files/pdfs/slaredge-mnitring-platfrm-user-guide.pdf. The mnitring platfrm can display lgical and physical layuts f the installed system, as fllws: Lgical Layut: Shws a schematic lgical layut f the cmpnents in the system, such as: inverters, strings and mdules, as well as their electrical cnnectivity. This view enables yu t see which mdules are cnnected in each string, which strings are cnnected t each inverter, and s n. Physical Layut: Shws a schematic physical layut f the cmpnents in the system, such as: inverters, strings and mdules, as well as their electrical cnnectivity. This view enables a bird s eye view f the actual lcatin f a system cmpnent. Using the platfrm, yu can: View the latest perfrmance f specific cmpnents. Find under-perfrming cmpnents, such as mdules, by cmparing their perfrmance t that f ther cmpnents f the same type. Pinpint the lcatin f alerted cmpnents using the physical layut. See hw cmpnents are cnnected t each ther. Pair pwer ptimizers remtely. T display a lgical layut, insert the inverter serial number in the new site created in the applicatin. When the cmmunicatin between the inverter and the mnitring server is established, the lgical layut is displayed. T display a physical layut, yu need t map the lcatins f the installed pwer ptimizers. T generate a physical mapping, use either the Site Mapper applicatin r the physical layut editr in the mnitring platfrm. The lgical and physical mapping can be used fr debugging a prblem using the mnitring platfrm. If yu d nt reprt the physical and lgical mapping f the installed pwer ptimizers t SlarEdge, the mnitring platfrm will shw the lgical layut indicating which pwer ptimizers are cnnected t which inverter, but will nt shw strings r the physical lcatin f pwer ptimizers. The inverter may be cnnected t the mnitring platfrm via LAN r by using a ZigBee Gateway system r a Cellular Plug-in. Alternatively, yu can use RS485 chain (bus) cnnectin t cnnect multiple SlarEdge devices t ne inverter that is already cnnected t the server, in a master/slave cnfiguratin. Refer t Setting Up Cmmunicatin n page 52. Prviding Installatin Infrmatin Use ne f the fllwing methds t cnnect yur PV system t the mnitring platfrm. Mapper Applicatin Andrid Use the Mapper smart-phne applicatin t scan the pwer ptimizer and inverter 2D bar-cdes, and map the system physical layut in the mnitring platfrm.this applicatin is integrated with the mnitring platfrm and enables: Simple n-site registratin f new systems. Creating, editing and verifying system physical layut. Scanning and assigning the pwer ptimizer serial number t the crrect lcatin in the system physical layut. Fr detailed infrmatin, refer t the Mapper dem mvies: 32

Chapter 5: Cmmissining the Installatin Creating new sites using the Mapper mbile applicatin Mapping pwer ptimizers using the Mapper mbile applicatin iphne Use the Mapper smartphne applicatin t scan the pwer ptimizer and inverter 2D bar-cdes. This applicatin creates an XML file that can be upladed t the mnitring platfrm during site registratin. The Mapper can be dwnladed frm the applicatin stres. Fr detailed infrmatin, refer t the Mapper Sftware Guide r t the Site Mapper dem mvie, available n the SlarEdge website at http://www.slaredge.cm/grups/installer-tls/site-mapper. Creating a Site in the Mnitring Platfrm Create the site in the mnitring platfrm using the registratin frm available at https://mnitring.slaredge.cm/slaredge-web/p/lgin. Fill ut all required infrmatin in the frm, which includes infrmatin abut yur installatin, as well as details abut its lgical and physical mapping. Paper Template Fill ut the Physical Layut Template (dwnladable frm the SlarEdge site) using the detachable 2D barcde stickers n each pwer ptimizer. Once the frm is cmpleted, scan it and uplad the scanned file t the mnitring platfrm during site registratin. Fr an example paper template, refer t http://www.slaredge.cm/files/pdfs/physicallayut-template.pdf. 33

Chapter 6: User Interface Chapter 6: User Interface LCD User Buttns Fur buttns are lcated inside the inverter abve the LCD panel and are used fr cntrlling the LCD menus, as shwn belw: Figure 17: LCD Internal menu buttns Use the fur user buttns t cntrl the LCD panel menus: Esc: Mves the cursr (>) t the beginning f the currently displayed parameter; ges t the previus menu, and cancels a value change with a lng press (until Abrted is displayed). Up (1) and Dwn (2): Mves the cursr frm ne menu ptin t anther, mves amng the characters f a displayed parameter, and tggles between pssible characters when setting a value. Enter (3): Selects a menu ptin and accepts a value change with a lng press (until Applied is displayed). Use the three rightmst buttns fr entering the digits 123 when entering the Setup mde passwrd 12312312. The LCD screen displays status infrmatin f the system and varius menus fr cnfiguratin ptins. The LCD panel and buttns are used during the fllwing prcesses: Operatinal mde: The LCD panel allws checking fr prper system peratin. Refer t Status Screens - Operatinal Mde n page 45 fr a descriptin f this ptin.use the LCD light buttn t tggle thrugh the infrmative displays Setup mde: Upn installatin, an installer may perfrm basic cnfiguratin, as described in Inverter Cnfiguratin Setup Mde n page 35. Errr messages: In the event f a prblem, an errr message may be displayed n the LCD panel. Fr mre infrmatin, refer t http://www.slaredge.cm/sites/default/files/seinverter-installatin-guide-errr-cdes.pdf and Inverter Cnfiguratin Setup Mde n page 35. 34

Chapter 6: User Interface Inverter Cnfiguratin Setup Mde Yu can cnfigure the inverter using ne f the fllwing: The internal LCD user buttns. When using this ptin, the inverter cver is remved. The external LCD light buttn. When using this ptin, remving the inverter cver is nt required. This ptin f cnfiguratin includes a less detailed set f menus. Cnfiguring the Inverter Using the Internal LCD User Buttns After inverter installatin, an installer may perfrm basic system cnfiguratin. Cnfiguratin is dne when the inverter is in Setup mde. T enter Setup mde: 1. Turn the inverter ON/OFF switch t OFF (AC remains ON). WARNING! If the inverter was perating prperly (pwer was prduced by the pwer ptimizers), the fllwing message is displayed. D C V O L T A G E N O T S A F E D O N O T D I S C O N N E C T V D C : 7 2. 0 This message is displayed until the DC vltage is safe (50V). D nt pen the cver until the vltage is safe r until at least five minutes have passed. 2. Press the Enter buttn fr at least 5 secnds. The fllwing message is displayed: P l e a s e e n t e r P a s s w r d * * * * * * * * 3. Use the three rightmst internal LCD user buttns t type in the fllwing passwrd: 12312312. The fllwing menu is displayed: C u n t r y < I t a l y > L a n g u a g e < E n g > C m m u n i c a t i n P w e r C n t r l D i s p l a y M a i n t e n a n c e I n f r m a t i n The inverter is nw in Setup mde and all its LEDs are lit. The inverter autmatically exits Setup mde if n buttns are pressed fr mre than 2 minutes. 35

Cnfiguring the Inverter Using the Internal LCD User Buttns The fllwing shws a hierarchical tree f the menu ptins, which are described in Cnfiguratin Menu Optins n page 40. Actual menus may vary frm shwn depending n the firmware versin f the inverter and n the cuntry. 36

Chapter 6: User Interface Main menu: C u n t r y < I t a l y > L a n g u a g e < E n g > C m m u n i c a t i n P w e r C n t r l D i s p l a y M a i n t e n a n c e I n f r m a t i n Cuntry: G e r m a n y + S p a i n F r a n c e... Language: E n g l i s h G e r m a n S p a n i s h F r e n c h I t a l i a n Cmmunicatin1: S e r v e r < L A N > L A N C n f R S 4 8 5 1 C n f < S > Z i g B e e C n f < S > W i - F i C n f < N / A > C e l l u l a r C n f G P I O C n f < M T R > Pwer Cntrl 2: Display: T e m p e r a t u r e < C > L C D O n T i m e < 3 0 > T L M O n T i m e < 1 5 > Maintenance: D a t e a n d T i m e R e s e t C u n t e r s F a c t r y R e s e t 1If ZigBee is cnnected, the Wi-Fi Cnf menu is nt displayed. If ZigBee is nt cnnected, ZigBee Cnf and Wi-Fi Cnf are bth displayed with <N/A>. 2Phase Balance is applicable t single phase inverters nly. 37

Cnfiguring the Inverter Using the LCD Light Buttn F W U p g r a d e D i a g n s t i c s G r i d P r t e c t i n B a r d R e p l a c e m e n t Infrmatin: V e r s i n s E r r r L g W a r n i n g l g H a r d w a r e I D s Cnfiguring the Inverter Using the LCD Light Buttn Use the LCD light buttn fr cmmunicatin setup and fr displaying the Errr lg and Warning Lg withut having t pen the Inverter cver. There are fewer menus available when using this cnfiguratin ptin; hwever, the functinality f these menus is the same as when using the internal LCD user buttns. 1. Turn the inverter ON/OFF switch t OFF. 2. Press and hld dwn the LCD light buttn until the fllwing message is displayed: K e e p h l d i n g b u t t n f r p a i r i n g, r e l e a s e t e n t e r m e n u... R e m a i n i n g : 3 s e c Releasing the buttn displays the fllwing menu: O p t i m i z e r p a i r i n g L a n g u a g e < e n g > C m m u n i c a t i n M a i n t e n a n c e I n f r m a t i n E x i t 3. Shrt-press (ne secnd) t scrll dwn t the next menu ptin, and lng-press (three secnds) t select the item. Yu can use the Exit ptin in these menus t mve up ne menu level r t exit the Setup mde frm the main menu. 38

Chapter 6: User Interface The fllwing shws a hierarchical tree f the menu ptins that appear when using the LCD light buttn: Main menu: O p t i m i z e r p a i r i n g L a n g u a g e < e n g > C m m u n i c a t i n M a i n t e n a n c e I n f r m a t i n E x i t Language: E n g l i s h G e r m a n S p a n i s h F r e n c h I t a l i a n E x i t Cmmunicatin1: S e r v e r < L A N > L A N C n f R S 4 8 5 1 C n f < S > Z i g B e e C n f < S > W i - F i C n f < N / A > G P I O C n f < M T R > R S 2 3 2 C n f C e l l u l a r C n f E x i t Infrmatin: V e r s i n s E r r r L g W a r n i n g l g H a r d w a r e I D s E x i t 1If Wi-Fi is cnnected, the ZigBee Cnf menu is nt displayed, and vice versa. 39

Cnfiguratin Menu Optins Maintenance: D a t e a n d T i m e R e s e t C u n t e r s F a c t r y R e s e t S W U p g r a d e - S D C a r d M a n u a l A F C I T e s t D i a g n s t i c s G r i d P r t e c t i n B a r d R e p l a c e m e n t E x i t The ptins presented in these menus are described in the next sectin. Cnfiguratin Menu Optins This sectin describes hw t use the LCD menus fr cnfiguring the inverter. Cnfiguratin is nly available when the inverter ON/OFF switch is OFF. Use either the internal LCD user buttns r the external LCD light buttn t mve between and select menu ptins. Cuntry and Grid Cnfiguring the cuntry and grid is available using the internal user buttns nly. 1. Select the Cuntry ptin t specify the cuntry r regin in which the inverter is installed and the grid t which it is cnnected. This parameter may arrive pre-cnfigured. If s, verify that it is set t the prper cuntry r regin. WARNING! The inverter must be cnfigured t the prper cuntry/ regin in rder t ensure that it cmplies with the cuntry grid cde and functins prperly with the cuntry grids. A list f cuntries is displayed. If n cuntry is cnfigured, the value is <NONE>. NOTE If an inverter is nt cnfigured t any cuntry, it will nt prduce energy, and the fllwing message will be displayed n the LCD: N Cuntry Selected A plus sign (+) near the cuntry indicates that anther menu will be displayed after selectin. 2. Cnfirm yur cuntry selectin in the cnfirmatin screen: Tggle t YES and press Enter. Language 1. Select the Language ptin t set the language in which the LCD shuld display. 2. Cnfirm yur language selectin in the cnfirmatin screen: Tggle t YES and press Enter. Cmmunicatin 1. Select the Cmmunicatin ptin t define and cnfigure: The cmmunicatin ptin used by the inverter t cmmunicate with the SlarEdge mnitring platfrm The cmmunicatin ptin used t cmmunicate between multiple SlarEdge devices r ther external nn-slaredge devices, such as energy meters r lggers. 40

2. Select Server t set which cmmunicatin methd is used t cmmunicate between devices and the mnitring platfrm. Refer t Setting Up Cmmunicatin n page 52 fr a full descriptin f these cmmunicatin ptins. NOTE The Server menu shws nly the cmmunicatin ptins installed in the inverter. Chapter 6: User Interface The fllwing shws a hierarchical tree f the menu ptins in the Cmmunicatin menu. Fr detailed infrmatin abut all the cnfiguratin ptins, refer t the Cmmunicatin Optins Applicatin Nte, available n the SlarEdge website at http://www.slaredge.cm/files/pdfs/slaredge-cmmunicatin_ptins_applicatin_ nte_v2_250_and_abve.pdf. 41

Cmmunicatin Cmmunicatin1,2: S e r v e r < L A N > L A N C n f R S 4 8 5 1 C n f < S > Z i g B e e C n f < S > W i - F i C n f < N / A > C e l l u l a r C n f G P I O C n f < M T R > Server: L A N R S 4 8 5 Z i g b e e W i - F i C e l l u l a r N n e LAN Cnf: I P C n f i g S e t D H C P < e n > S e t I P S e t M a s k S e t G a t e w a y S e t D N S S e t S e r v e r A d d r S e t S e r v e r P r t M d b u s T C P < D i s > RS485-1 Cnf: D e v i c e T y p e < S E > P r t c l < M > D e v i c e I D < 1 > S l a v e D e t e c t < # > C l u s t e r S L V D e t e c t L n g S l a v e D e t e c t < # > S l a v e L i s t < # > M u l t i - I n v. S e t ZigBee Cnf. (enabled nly if the ZigBee internal card is cnnected): D e v i c e T y p e < S E > P r t c l < M P S > D e v i c e I D < 1 > P A N I D S c a n C h a n n e l 1If ZigBee is cnnected, the Wi-Fi Cnf menu is nt displayed. If ZigBee is nt cnnected, ZigBee Cnf and Wi-Fi Cnf are bth displayed with <N/A> and their menus are nt accessible. 2When using the SlarEdge GSM prducts, RS232 Cnf menu is unavailable. 42

Chapter 6: User Interface L a d Z B D e f a u l t s Wi-Fi Cnf (enabled nly if the internal card is cnnected): S c a n N e t w r k s S e t k e y L a d D e f a u l t s RS232 Cnf1: D e v i c e T y p e < S E > P r t c l < G S M > S e t A P N S e t M d e m T y p e S e t U s e r N a m e S e t P a s s w r d GPIO Cnf: D e v i c e T y p e < R R C R > Pwer Cntrl Pwer cntrl ptins are detailed in the Pwer Cntrl Applicatin Nte, available n the SlarEdge website at http://www.slaredge.cm/files/pdfs/applicatin_nte_pwer_cntrl_cnfiguratin.pdf. The Grid Cntrl ptin may be disabled. Enabling it pens additinal ptins in the menu. The Energy Manager ptin is used fr setting pwer exprt limitatin, as described in the Exprt Limitatin Applicatin Nte, available n the SlarEdge website at http://www.slaredge.cm/files/pdfs/prducts/feed-in_limitatin_applicatin_ nte.pdf. Fr P(Q) diagram refer t https://www.slaredge.cm/sites/default/files/applicatin_ nte_p_q_diagram_f_se_inverters_en_and_na.pdf NOTE SlarEdge inverters with Grid Supprt functinality (as marked n the inverter certificatin label), are cmpliant with UL 1741 Supplement A. The functinality is built int the inverter and n additinal external device is required. 1When using the SlarEdge GSM prducts this menu is unavailable. 43

Display Display Select Display t set the fllwing: T e m p e r a t u r e < C > L C D O n T i m e < 3 0 > T L M O n T i m e < 1 5 > Temperature: Select Celsius r Fahrenheit units. LCD On Time <30>: The number f secnds that the LCD backlight is ON after pressing the LCD light buttn. Set a value within the range f 10-120 secnds. TLM On Time <15>: The number f minutes that the LCD backlight is ON while viewing the Telemetry windw. Set a value within the range f 1-120 minutes. Maintenance Select Maintenance t set the fllwing ptins: D a t e a n d T i m e R e s e t C u n t e r s F a c t r y R e s e t F W U p g r a d e D i a g n s t i c s G r i d P r t e c t i n B a r d R e p l a c e m e n t Infrmatin Select Infrmatin t display the fllwing ptins: V e r s i n s E r r r L g W a r n i n g l g H a r d w a r e I D s Versins: Displays inverter firmware versins: ID: The inverter ID. DSP 1/2: The DSP digital cntrl bard firmware versin CPU: The cmmunicatin bard firmware versin NOTE Please have these numbers ready when yu cntact SlarEdge Supprt. Errr Lg: Displays the last five errrs. Warning Lg: Displays the last five warnings. Hardware IDs: Displays the fllwing HW serial numbers (if exist, and cnnected t the inverter): ID: the inverter's ID RGM1 (Revenue Grade Meter): Energy Meter with Mdbus Cnnectin RGM2: A secnd external Energy Meter with Mdbus Cnnectin ZB: ZigBee MAC address Cell: MEID (CDMA) r IMEI (GSM) WiFi: Wi-Fi MAC address 44

Chapter 6: User Interface Status Screens - Operatinal Mde During nrmal peratin pressing the external LCD light buttn turns n the LCD backlight. Additinal presses display the fllwing screens ne after the ther. Initial Status V a c [ V ] V d c [ V ] P a c [ W ] 2 4 0. 7 3 7 1. 9 2 3 4 9. 3 P _ O K : X X X / Y Y Y < S _ O K > - - - - - - - - - - - - - - - - O N Vac [V]: The AC utput vltage Vdc [V]: The DC input vltage Pac [W]: The AC utput pwer P_OK: XXX/YYY: There is a cnnectin t the pwer ptimizers and at least ne pwer ptimizer is sending mnitring data. XXX is the number f pwer ptimizers fr which telemetries have been received in the last tw hurs. YYY is the number f paired pwer ptimizers identified during the mst recent pairing prcess. If XXX and YYY are nt equal, there may be a prblem in ne r mre pwer ptimizers. S_OK: The cnnectin t the SlarEdge mnitring platfrm is successful (appears nly if the inverter is cnnected t the server). ON/OFF: Indicates the psitin f the inverter ON/OFF switch. Main Inverter Status V a c [ V ] V d c [ V ] P a c [ W ] 2 4 0. 7 3 7 1. 9 3 2 1 0. 0 F a c [ H z ] O P s _ O k T e m p 5 0. 0 1 1 2 8. 2 Vac [V]: The AC utput vltage. Vdc [V]: The DC input vltage. Pac [W]: The AC utput pwer. Fac [Hz]: The AC utput frequency. OPs_Ok: Number f ptimizers sending telemetries (indicating that they are paired) Temp [C r F]: The inverter heat sink temperature Energy Meter Status Displays the ttal energy prduced during the last day, mnth, year and since inverter installatin. D a y [ W h ] : 0. 0 M n t h [ K W h ] : 0. 0 Y e a r [ K W h ] : 0. 0 T t a l [ K W h ] : 0. 0 Day: since midnight Mnth: since 1st f the current mnth until tday (inclusive) Year: since January 1st until tday (inclusive) 45

Telemetry Status If a meter is cnnected t the inverter, the fllwing status screen, shwing the pwer and energy readings, is displayed in additin t the abve screen. If the meter is set t Exprt +Imprt, there are tw status screens, with the first line displaying: "Exprt Meter" r "Imprt Meter". The fllwing is an example f an exprt meter status: E x p r t M e t e r S t a t u s : < O K / E r r r # > P w e r [ W ] : E n e r g y [ W h ] : x x x x x. x X X X X X. X Status: Displays OK if the meter is cmmunicating with the cmmunicatin bard. <Errr message>: If there is a meter errr, it is displayed in this line. Pwer (W): Depending n the meter type cnnected t the inverter, this line displays the exprted r imprted pwer in Watts. Energy (Wh): The ttal energy read by the meter, in Watt/hur. The value displayed in this line depends n the meter type cnnected t the inverter and its lcatin: If a bidirectinal meter is cnnected at the cnsumptin pint, this value is the cnsumed energy. If the meter is installed at the prductin cnnectin pint, this value is the energy prduced by the site. If the meter is installed at the grid cnnectin pint, this value is the energy exprted t the grid. If the inverter is cnnected t the SlarEdge server, this value will als be displayed in the mnitring platfrm. NOTE This data is accumulated accrding t an internal real-time clck. Telemetry Status This screen displays the last pwer ptimizer telemetry received. The display changes as each pwer ptimizer sends its telemetry. In rder t verify prper installatin, the installer may view the Telemetry windw fr sme time in rder t bserve the pwer ptimizers' reprt prcess. M d u l e : 1 0 2 8 8 0 6 3 1 B E n e r g y [ W h ] : 5 6. 7 V d c _ O [ V ] : 4 0. 0 V d c _ I [ V ] : 3 8. 3 I _ i n [ A ] : 7. 8 T e m p [ C ] : 2 8. 0 Mdule: Pwer ptimizer serial number Energy: pwer ptimizer energy Vdc_O: Pwer ptimizer utput vltage Vdc_I: Pwer ptimizer input vltage (mdule vltage) I_in: Pwer ptimizer input current Temp: Pwer ptimizer temperature ID Status This screen displays the inverter sftware versin and the cuntry t which the inverter is cnfigured. 46

Chapter 6: User Interface I D : # # # # # # # # # # D S P 1 / 2 : 1. 0 2 1 0 / 1. 0 0 3 4 C P U : 0 0 0 3. 1 9 x x C u n t r y : E S P ID: The inverter ID. DSP 1/2: The DSP digital cntrl bard firmware versin CPU: The cmmunicatin bard firmware versin Cuntry: the current cuntry setting Server Cmmunicatin Status S e r v e r : L A N < S _ O K > S t a t u s : < O K > x x x x x x x x < E R R O R M E S S A G E > NOTE If the cnnectin methd is CDMA (referred t as "Cellular" in the status screens) r GSM, the server screen is replaced with the Cellular r GSM status screens (see Status Screens - Operatinal Mde n page 45 and GSM Status n page 48). Server: The methd f cnnectin t the SlarEdge mnitring platfrm. S_OK: The cnnectin t the SlarEdge mnitring platfrm is successful (shuld appear nly if the inverter is cnnected t the server). Status: Displays OK if the inverter established successful cnnectin and cmmunicatin with the specified server prt/device (LAN, RS485, Wi-Fi r ZigBee Plug-in). xxxxxxxx: Eight-bit Ethernet cmmunicatin cnnectin status: A string f 1s and 0s is displayed. 1 indicates OK, 0 indicates an errr. Fr a list f the pssible errrs and hw t trublesht them, refer t Trubleshting Cmmunicatin n page 62 Errr message, accrding t failure. Refer t http://www.slaredge.cm/sites/default/files/se-inverter-installatin-guide-errrcdes.pdf. IP Status This screen describes the Ethernet cnfiguratin: IP, Mask, Gateway and MAC address (Media Access Cntrl) f the Inverter. I P 1 9 2. 1 6 8. 2. 1 1 9 M S K 2 5 5. 2 5 5. 2 5 5. 0 G W 1 9 2. 1 6 8. 2. 1 M A C 0-2 7-0 2-0 0-3 9-3 6 47

ZigBee Status ZigBee Status This screen describes the ZigBee cnfiguratin: P A N : X X X X X C H : X X / X X X X R S S I : < L > M I D : X X X X X X RSSI: The receive signal strength indicatin f the clsest ZigBee in the system. L = lw, M = medium, H = high and (-) = n signal. PAN ID: The ZigBee transceiver PAN ID (Persnal Area Netwrk Identificatin), the ID uniquely represents a device in a Zigbee netwrk. Ch.: The ZigBee transceiver channel ID: The ZigBee transceiver ID MID: The Master ID f the crdinatr (master) ZigBee Plug-in. This field is shwn nly in devices with ruter (slave) ZigBee cards, and after a successful ZigBee assciatin. If a ZigBee Plug-in is nt cnnected, a N ZigBee message is displayed instead f the MID field. Wi-Fi Status This screen describes the Wi-Fi cnfiguratin: I P : 1 9 2. 1 6 8. 2. 1 1 9 G W : 1 9 2. 1 6 8. 2. 1 S S I D : x x x x x x x x R S S I : < L / M / H / - > IP: The DHCP prvided address GW: The gateway IP address SSID: Service Set Identifier - the name f a wireless lcal area netwrk (WLAN). All wireless devices n a WLAN must emply the same SSID in rder t cmmunicate with each ther. RSSI: The receive signal strength indicatin f the clsest Wi-Fi in the SlarEdge system. L = lw, M = medium, H = high and - = n signal. GSM Status If a GSM Plug-in is cnnected, this screen replaces the Server status screen: S e r v e r : C e l l < S _ O K > S t a t u s : < O K > M N O : < x x x x x x x > S i g : 5 < E r r r m e s s a g e > Server: The methd f cmmunicatin t the SlarEdge mnitring platfrm. Shuld display Cell. Status: Displays OK if the inverter established a successful physical cnnectin t the mdem. S_OK: The last cmmunicatin t the SlarEdge mnitring platfrm was successful (appears if the inverter is cnnected t the platfrm). If S_OK is nt displayed, refer t Status Screens - Operatinal Mde n page 45. MNO: The mbile netwrk peratr name Sig: The signal strength, received frm the mdem. A value between 0-5, (0 = n signal; 5 = excellent signal) Errr message: per cmmunicatin cnnectin status failure 48

Chapter 6: User Interface Cmmunicatin Prts Status D e v P r t # # R S 4 8 5-1 < S E > < S > < - - > Z i g B e e < S E > < M P S > < - - > ##: The ttal number f slaves detected n the specific prt Dev: The type f device that was cnfigured t a specific prt (based n the prt s functinality), as fllws: SE: SlarEdge device (default) LGR: Nn-SlarEdge lgger MLT: Multiple devices, such as meters and batteries HA: Hme autmatin devices (fr Smart Energy) PROT: The prtcl type t which the prt is set: Fr a SlarEdge device: RS485 prtcl S: SlarEdge slave M: SlarEdge master P2P: ZigBee pint-t-pint ZigBee prtcl MPM: ZigBee multipint master (fr the ZigBee gateway r fr lad management by the inverter) MPS: ZigBee multipint slave (fr a ZigBee ruter card) Fr electricity meters, refer t the applicatin nte - Cnnecting an Electricity Meter t SlarEdge Devices at http://www.slaredge.cm/files/pdfs/slaredge-meterinstallatin-guide.pdf. SS: SunSpec - fr a nn-slaredge lgger (mnitring and cntrl) Smart Energy Management Status This screen is displayed nly when Smart Energy Management is enabled. The screen shws energy details f the site: S i t e L i m i t : S i t e P r d : S i t e E x p r t : S e l f - c n s u m e : 7. 0 k W 1 0. 0 k W 4. 0 k W 6. 0 k W Site Limit: The limit that was defined fr the site Site Prd: The pwer prduced by the site Site Exprt: The pwer that is fed int the grid Self-cnsume: The PV pwer cnsumed by the site Fr mre infrmatin, refer t the Exprt Limitatin Applicatin Nte, available n the SlarEdge website at http://www.slaredge.cm/files/pdfs/prducts/feed-in_limitatin_ applicatin_nte.pdf. 49

Fan Status Fan Status This screen is applicable t inverters equipped with external r internal fans, and prvides infrmatin abut the fan status: F a n S t a t u s : F a n 1 : N t W r k i n g F a n 2 : O p e r a t i n g r F a n S t a t u s : I n t : N t W r k i n g E x t : O p e r a t i n g Each fan can have ne f the fllwing statuses: Operating: Fan OK Nt Wrking: This status may indicate a system errr and nt necessarily a faulty fan. Turning AC OFF and ON again may clear this status. If the status des nt change, replace the fan. Fr mre infrmatin, refer t External Fan Maintenance and Replacement n page 72. Pwer Cntrl Status This screen is displayed nly when Pwer Cntrl is enabled (available frm cmmunicatin bard (CPU) firmware versin 2.7xx/3.7xx and later). P W R C T R L : R E M O T E P W R L i m i t : 1 0. 0 4 k W C s P h i : 0. 9 P w e r P r d : 7 0 0 0 W PWR CTRL: The pwer cntrl status: REMOTE - Cmmunicatin with the RRCR r smart energy manager is cnfirmed/validated. LOCAL - The pwer is cntrlled lcally (e.g. by a fixed limit), r this inverter limits the PV pwer prductin t its relative prtin f the feed-in pwer limit, as a result f discnnected cmmunicatin with the smart energy manager. If this status appears, check the cmmunicatin t the smart energy manager r the cmmunicatin t the meter. PWR Limit: The inverter maximum utput pwer set by ne f the pwer limiting ptins: RRCR Smart energy manager (Feed-in limitatin) P(f) P(U) Q(U) Cs Phi: The rati between active t reactive pwer Pwer Prd: The pwer prduced by the inverter 50

Fr mre infrmatin, refer t the Pwer Cntrl Applicatin Nte, available n the SlarEdge website at http://www.slaredge.cm/files/pdfs/applicatin_nte_pwer_ cntrl_cnfiguratin.pdf. Chapter 6: User Interface 51

Chapter 7: Setting Up Cmmunicatin Chapter 7: Setting Up Cmmunicatin The inverter sends the fllwing infrmatin t the mnitring platfrm: Pwer ptimizer infrmatin received via the DC pwer lines (the PV utput circuit) Inverter infrmatin Infrmatin f any ther cnnected devices This chapter describes setting up cmmunicatin between: the inverter and the mnitring platfrm thrugh the Internet (wired/ wireless), r thrugh a cellular cnnectin multiple inverters fr a master/slave cnfiguratin Cmmunicatin setup is nt required fr pwer harvesting, hwever it is needed fr using the mnitring platfrm. CAUTION! When cnnecting the cmmunicatin cables, make sure that the ON/OFF switch at the bttm f the inverter (and the switch f the DC Safety Unit if applicable) is turned OFF, and the AC is turned OFF. When cnfiguring the cmmunicatin parameters, make sure that the ON/OFF switch (and the switch f the DC Safety Unit if applicable) is OFF, and the AC is turned ON. Cmmunicatin Optins The fllwing types f cmmunicatin can be used t transfer the mnitred infrmatin frm the inverter t the mnitring platfrm. Only cmmunicatin prducts ffered by SlarEdge are supprted. Always cnnect the cmmunicatin ptins when the relevant devices are pwered dwn - Cmmercial Gateway, inverter, etc. Ethernet Ethernet is used fr a LAN cnnectin. Fr cnnectin instructins refer t. RS485 RS485 is used fr the cnnectin f multiple SlarEdge devices n the same bus in a master-slave cnfiguratin. RS485 can als be used as an interface t external devices, such as meters and third party data lggers. RS485-1: Enables the cnnectin f multiple devices (inverters/cmmercial Gateway) ver the same bus, such that cnnecting nly ne device t the Internet is sufficient t prvide cmmunicatin services fr all the devices n the bus. RS485 Plug-in: The RS485 Plug-in prvides an additinal RS485 prt fr the inverter fr enhanced cmmunicatins. The kit cntains a mdule, which is installed n the cmmunicatin bard, and has a 3-pin RS485 terminal blck. This kit is prvided with an installatin guide, which shuld be reviewed prir t cnnectin see, https://www.slaredge.cm/sites/default/files/rs485_ expansin_kit_installatin_guide.pdf Fr cnnectin instructins refer t Creating an RS485 Bus Cnnectin n page 58. 52

Wi-Fi This cmmunicatin ptin enables using a Wi-Fi cnnectin fr cnnecting t the mnitring platfrm. The Wi-Fi statin is built int the inverter. An antenna is required and available frm SlarEdge fr cnnectin t the mnitring platfrm. The Wi-Fi ptin requires a Wi-Fi Plug-in and an external antenna, available frm SlarEdge in a kit, which can be purchased separately and assembled during system installatin. The Wi-Fi Plug-in kit is prvided with a user manual, which shuld be reviewed prir t cnnectin. Refer t http://www.slaredge.cm/sites/default/files/se_wifi_cmmunicatin_slutin_ installatin_guide.pdf Cellular This wireless cmmunicatin ptin (purchased separately) enables using a cellular cnnectin t cnnect ne r several devices (depending n the data plan used) t the mnitring platfrm. The GSM Plug-in is prvided with a user manual, which shuld be reviewed prir t cnnectin. Refer t https://www.slaredge.cm/sites/default/files/cellular_gsm_ installatin_guide.pdf Chapter 7: Setting Up Cmmunicatin ZigBee This ptin enables wireless cnnectin t ne r several Smart Energy prducts, which autmatically divert PV energy t hme appliances. This ptin enables wireless cnnectin, and requires a ZigBee Plug-in and an external antenna. ZigBee cnnectin is used fr: Mnitring - cnnectin f ne r several devices t a SlarEdge ZigBee Gateway, fr wireless cmmunicatin t the SlarEdge mnitring platfrm. The ZigBee Gateway is prvided with an installatin guide, which shuld be reviewed prir t cnnectin. Refer t https://www.slaredge.cm/sites/default/files/sezigbee-hme-gateway-installatin-guide.pdf. Smart Energy Management - wireless cnnectin t ne r several Smart Energy prducts, which autmatically divert PV energy t hme appliances. The Smart Energy prducts are prvided with an installatin guide, which shuld be reviewed prir t cnnectin. Refer t https://www.slaredge.cm/prducts/device-cntrl#/. The ZigBee Plug-in fr Smart Energy is prvided with an installatin guide, which shuld be reviewed prir t cnnectin. Refer t https://www.slaredge.cm/sites/default/files/se-device-cntrl-zigbee-mduleinstallatin-guide.pdf 53

Cmmunicatin Cnnectrs Cmmunicatin Cnnectrs Tw cmmunicatin glands are used fr cnnectin f the varius cmmunicatin ptins. Each gland has three penings. The table belw describes the functinality f each pening. Unused penings shuld remain sealed. Gland# Opening Functinality Cable Size (diameter) 1 (PG16) One small External antenna cable 2-4 mm Tw large Ethernet cnnectin (CAT5/6), ZigBee, r Wi-Fi 4.5-7 mm 2 (PG13.5) All three RS485, pwer reductin 2.5-5 mm Figure 18: Cmmunicatin Glands The cmmunicatin bard has a standard RJ45 terminal blck fr Ethernet cnnectin, and a 9-pin terminal blck fr RS485 cnnectin, as shwn belw: Figure 19: Internal cnnectrs 54

Chapter 7: Setting Up Cmmunicatin Remving the Inverter Cver If the inverter cver is nt already remved, use the fllwing prcedure fr cver remval. T remve the inverter cver 1. Turn the inverter ON/OFF switch t OFF. Wait 5 minutes fr the capacitrs t discharge. WARNING! If the inverter was perating prperly (pwer was prduced by the pwer ptimizers), the fllwing message is displayed. D C V O L T A G E N O T S A F E D O N O T D I S C O N N E C T V D C : 7 2. 0 This message is displayed until the DC vltage is safe (50V). D nt pen the cver until the vltage is safe r until at least five minutes have passed. 2. Turn the Cnnectin Unit (if applicable) t OFF. 3. Discnnect the AC t the inverter by turning OFF the circuit breakers n the distributin panel. 4. Open the inverter cver s six Allen screws and carefully pull the cver hrizntally befre lwering it. CAUTION! When remving the cver, make sure nt t damage the internal cmpnents. SlarEdge will nt be held respnsible fr any cmpnents damaged as a result f incautius cver remval. Creating an Ethernet (LAN) Cnnectin This cmmunicatin ptin enables using an Ethernet cnnectin t cnnect the inverter t the mnitring platfrm thrugh a LAN. Ethernet cable specificatins: Cable type a shielded Ethernet cable (Cat5/5E STP) may be used Maximum distance between the inverter and the ruter 100 m/ 330 ft. NOTE If using a cable lnger than 10 m / 33 ft in areas where there is a risk f induced vltage surges by lightning, it is recmmend t use external surge prtectin devices. Fr details refer t: http://www.slaredge.cm/files/pdfs/lightning_surge_ prtectin.pdf. 55

Creating an Ethernet (LAN) Cnnectin Figure 20: Example f Ethernet cnnectin T cnnect the Ethernet cable: 1. Remve the inverter cver. 2. Open the cmmunicatin gland #1. CAUTION! The gland includes a rubber waterprf fitting, which shuld be used t ensure prper sealing. 3. Remve the plastic seal frm ne f the large pening. 4. Remve the rubber fitting frm the gland and insert the CAT5/6 cable thrugh the gland and thrugh the gland pening in the inverter. 5. Push the cable int the cut pening f the rubber fitting. Figure 21: Rubber fitting CAT5/6 standard cables have eight wires (fur twisted pairs), as shwn in the diagram belw. Wire clrs may differ frm ne cable t anther. Yu can use either wiring standard, as lng as bth sides f the cable have the same pin-ut and clr-cding. RJ45 Pin # T568B Wire Clr 1 T568A 10Base-T Signal 100Base-TX Signal 1 White/Orange White/Green Transmit+ 2 Orange Green Transmit- 3 White/Green White/Orange Receive+ 1The inverter cnnectin des nt supprt RX/TX plarity change. Supprting crssver Ethernet cables depends n the switch capabilities. 56

Chapter 7: Setting Up Cmmunicatin RJ45 Pin # T568B Wire Clr 1 T568A 10Base-T Signal 100Base-TX Signal 4 Blue Blue Reserved 5 White/Blue White/Blue Reserved 6 Green Orange Received- 7 White/Brwn White/Brwn Reserved 8 Brwn Brwn Reserved Figure 22: Standard cable wiring 6. Use a pre-crimped cable t cnnect via gland #1 t the RJ45 plug n the inverter's cmmunicatin bard r, if using a spl f cable, cnnect as fllws: a. Insert the cable thrugh gland #1. b. Remve the cable s external insulatin using a crimping tl r cable cutter and expse eight wires. c. Insert the eight wires int an RJ45 cnnectr, as described in Figure 22. d. Use a crimping tl t crimp the cnnectr. e. Cnnect the Ethernet cnnectr t the RJ45 prt n the cmmunicatin bard. Figure 23: The RJ45 Ethernet cnnectin 7. Fr the switch/ruter side, use a pre-crimped cable r use a crimper t prepare an RJ45 cmmunicatin cnnectr: Insert the eight wires int the RJ45 cnnectr in the same rder as abve (Figure 22). 1The inverter cnnectin des nt supprt RX/TX plarity change. Supprting crssver Ethernet cables depends n the switch capabilities. 57

Creating an RS485 Bus Cnnectin 8. Cnnect the cable RJ45 cnnectr t the RJ45 prt f the Ethernet switch r ruter. Yu can cnnect mre than ne inverter t the same switch/ruter r t different switches/ruters, as needed. Each inverter sends its mnitred data independently t the mnitring platfrm. 9. The inverter is cnfigured by default t LAN. If recnfiguratin is required: a. Make sure the ON/OFF switch is OFF. b. Turn ON the AC t the inverter by turning ON the circuit breaker n the main distributin panel. c. Use the internal user buttns t cnfigure the cnnectin, as described in Cmmunicatin n page 40. NOTE If yur netwrk has a firewall, yu may need t cnfigure it t enable the cnnectin t the fllwing address: Destinatin Address: prd.slaredge.cm TCP Prt: 22222, 22221, r 80 (fr incming and utging data) 10. Verify the cnnectin, as described in Verifying the Cnnectin n page 61. Creating an RS485 Bus Cnnectin The RS485 ptin enables creating a bus f cnnected inverters, cnsisting f up t 31 slave inverters and 1 master inverter. Using this ptin, inverters are cnnected t each ther in a bus (chain), via their RS485 cnnectrs. The first and last inverters in the chain must be terminated as described n page 60. RS485 wiring specificatins: Cable type: Min. 3-wire shielded twisted pair (a shielded Ethernet cable (Cat5/5E STP) may be used) Wire crss-sectin area: 0.2-1 mm²/ 24-18 AWG (a CAT5 cable may be used) Maximum ndes: 32 Maximum distance between first and last devices: 1 km /3300 ft. NOTE If using a cable lnger than 10 m/33 ft in areas where there is a risk f induced vltage surges by lightning, it is recmmend t use external surge prtectin devices. Fr details refer t: https://www.slaredge.cm/sites/default/files/lightning_surge_prtectin.pdf. If grunded metal cnduit are used fr ruting the cmmunicatin wires, a lightning prtectin device is nt required. If nt using surge prtectin, cnnect the grunding wire t the first inverter in the RS485 chain; make sure the grunding wire is nt in cntact with ther wires. Fr inverters with a DC Safety Unit, cnnect the grunding wire t the grunding bus-bar in the DC Safety Unit. NOTE An additinal RS485 prt (RS485-Plug-in) is available frm SlarEdge, allwing cnfiguratin f multiple RS485 buses fr cmmunicatins in large sites; Refer t http://www.slaredge.cm/files/pdfs/rs485_expansin_kit_installatin_guide.pdf). The fllwing sectins describe hw t physically cnnect the RS485 bus and hw t cnfigure the bus. T cnnect the RS485 cmmunicatin bus: 58

1. Remve the inverter cver as described in Remving the Inverter Cver n page 55. 2. Remve the seal frm ne f the penings in cmmunicatin gland #2 and insert the wire thrugh the pening. 3. Pull ut the 9-pin RS485/RS232 terminal blck cnnectr, as shwn belw: Chapter 7: Setting Up Cmmunicatin Figure 24: The RS485 terminal blck 4. Lsen the screws f pins A(+), B(-), and G n the left f the RS485 terminal blck (RS485-1 r RS485-2). Figure 25: RS485 terminal blck 5. Insert the wire ends int the G, A and B pins shwn abve. Use Fur- r six-wire twisted pair cable fr this cnnectin. Yu can use any clr wire fr each f the A, B and G cnnectins, as lng as: The same clr wire is used fr all A pins the same clr fr all B pins and the same clr fr all G pins The wire fr G is nt frm the same twisted pair as A r B. 59

Creating an RS485 Bus Cnnectin 6. Fr creating an RS485 bus - cnnect all B, A and G pins in all inverters. The fllwing figure shws this cnnectin schema: NOTE Figure 26: Cnnecting the inverters in a chain D nt crss-cnnect B, A and G wires. 7. Tighten the terminal blck screws. 8. Check that the wires are fully inserted and cannt be pulled ut easily. 9. Push the RS485 terminal blck firmly all the way int the cnnectr n the right side f the cmmunicatin bard. 10. Terminate the first and last SlarEdge device in the chain by switching a terminatin DIP-switch inside the inverter t ON (mve the left switch up). The switch is lcated n the cmmunicatin bard and is marked SW7. NOTE Figure 27: RS485 terminatin switch Only the first and last SlarEdge devices in the chain shuld be terminated. The ther inverters in the chain shuld have the terminatin switch OFF (dwn psitin). 11. If nt using surge prtectin, cnnect the grunding wire t the first inverter in the RS485 chain; make sure the grunding wire is nt in cntact with ther wires. Fr inverters with a DC Safety Unit, cnnect the grunding wire t the grunding bus-bar in the DC Safety Unit. 60

Chapter 7: Setting Up Cmmunicatin T cnnect t the mnitring platfrm: 1. Designate a single inverter as the cnnectin pint between the RS485 bus and the SlarEdge mnitring platfrm. This inverter will serve as the master inverter. 2. Cnnect the master t the SlarEdge mnitring platfrm via the LAN r ZigBee cmmunicatin ptin. T cnfigure the RS485 cmmunicatin bus: All inverters are cnfigured by default as slaves. If recnfiguratin is required: 1. Make sure the ON/OFF switch is OFF. 2. Turn ON the AC t the inverter by turning ON the circuit breaker n the main distributin panel. WARNING! ELECTRICAL SHOCK HAZARD. D nt tuch uninsulated wires when the inverter cver is remved. 3. Use the internal buttns t cnfigure the cnnectin. T set the inverter designated as master, select the fllwing in the LCD menus: Cmmunicatin è Server è LAN, ZigBee r Wi-Fi RS485-1 Cnf. è Device Type è SlarEdge RS485-1 Cnf. è Prtcl è Master RS485-1 Cnf. è Slave Detect The system starts autmatic detectin f the slave inverters cnnected t the master inverter. The inverter shuld reprt the crrect number f slaves. If it des nt, verify the cnnectins and terminatins. 4. Verify the cnnectin f the master t the mnitring platfrm, as described in the next sectin. Verifying the Cnnectin After cnnecting and cnfiguring a cmmunicatin ptin, perfrm the fllwing steps t check that the cnnectin t the mnitring server has been successfully established. 1. Clse the inverter cver: Attach the inverter cver and secure it by tightening the screws with a trque f 9.0 N*m/ 6.6 lb.*ft. Fr prper sealing, first tighten the crner screws and then the tw central screws (see als Figure 16). 2. If nt already ON - Turn ON the AC t the inverter by turning ON the circuit breaker n the main distributin panel and turning n the DC Safety Unit (if applicable). 3. Wait fr the inverter t cnnect t the SlarEdge mnitring platfrm. This may take up t tw minutes. A status screen similar t the fllwing appears n the LCD panel: V a c [ V ] V d c [ V ] P a c [ w ] 2 4 0. 7 1 4. 1 0. 0 P _ O K : 0 0 0 / 0 0 0 < S _ O K > - - - - - - - - - - - - - - - O F F S_OK: Indicates that the cnnectin t the SlarEdge mnitring platfrm is successful. If S_OK is nt displayed, refer t Errrs and Trubleshting n page 62. 61

Appendix A: Errrs and Trubleshting Appendix A: Errrs and Trubleshting This appendix describes general system prblems, and hw t trublesht them. Fr further assistance, cntact SlarEdge Supprt. Fr infrmatin n the errr and warning messages that appear n the LCD panel when an errr ccurs, refer t http://www.slaredge.cm/sites/default/files/se-inverterinstallatin-guide-errrcdes.pdfhttps://www.slaredge.cm/sites/default/files/trubleshting_fr_se_ inverter_insallatin_guide_addendum_na.pdf. Trubleshting Cmmunicatin Trubleshting Ethernet Cmmunicatin When using Ethernet cmmunicatin, use the Server Cmmunicatin Status windw t identify the lcatin f the errr: S e r v e r : L A N < S _ O K > S t a t u s : < O K > x x x x x x x x < E R R O R M E S S A G E > xxxxxxxx is a string f 1s and 0s shwing an eight-bit cmmunicatin cnnectin status. 1 indicates OK and 0 indicates an errr. Bit Lcatin 1st Errr Message LAN Discnnected Cause and Trubleshting Physical cnnectin fault. Check the cable pinut assignment and cable cnnectin. Refer t Creating an Ethernet (LAN) Cnnectin n page 55 2nd DHCP Failed, r Invalid DHCP Cnfig IP settings issue. Check the ruter and inverter cnfiguratin. Cnsult yur netwrk IT. 3rd 4th Gateway Ping Failed G Server Ping Failed Ping t ruter failed. Check the physical cnnectin t the switch/ruter. Check that the link LED at the ruter /switch is lit (indicating phy-link). If OK - cntact yur netwrk IT, therwise replace the cable r change it frm crss t straight cnnectin. Ping t ggle.cm failed. Cnnect a laptp and check fr internet cnnectin. If internet access is unavailable, cntact yur IT admin r yur internet prvider. Fr Wi-Fi netwrks, ensure that username and passwrd are as defined in the internet prvider AP/ruter. 62

Appendix A: Errrs and Trubleshting Bit Lcatin 5th 6th 7th 8th Errr Message Server x Ping Failed Tcp Cnnect. Failed Cause and Trubleshting Ping r cnnectin t SlarEdge server failed. Check the SlarEdge server address, under LAN Cnf submenu: Address: prd.slaredge.cm Prt: 22222 Check with yur netwrk administratr whether a firewall r anther device is blcking transmissin. Trubleshting RS485 Cmmunicatin 1. If the message Master Nt Fund appears, check the cnnectins t the master device and fix if required. 2. If after slave detectin the number f slaves displayed in the master under RS485-X Cnf è Slave Detect is smaller than the actual number f slaves, use ne f the fllwing methds t identify missing slaves and trublesht cnnectivity prblems: Use the Lng slave Detect t retry cnnecting t slaves Analyze the Slave List t check fr missing slaves, and check their cnnectin Refer t https://www.slaredge.cm/sites/default/files/trubleshting_ undetected_rs485_devices.pdf Additinal Trubleshting 1. Check that the mdem r hub/ruter is functining prperly. 2. Check that the cnnectin t the internal cnnectr n the cmmunicatin bard is prperly dne. 3. Check that the selected cmmunicatin ptin is prperly cnfigured. 4. Use a methd independent f the SlarEdge device t check whether the netwrk and mdem are perating prperly. Fr example, cnnect a laptp t the Ethernet ruter and cnnect t the Internet. 5. Check whether a firewall r anther type f netwrk filter is blcking cmmunicatin. 63

Pwer Optimizer Trubleshting Pwer Optimizer Trubleshting If the inverter status screen indicates that nt all pwer ptimizers are paired r nt all are reprting (P_OK xxx/yyy, and x<y), thse ptimizers can be identified thrugh the LCD. Refer t https://www.slaredge.cm/sites/default/files/nn_reprting_pwer_ ptimizers.pdf Prblem Pairing failed String vltage is 0V String vltage nt 0V but lwer than number f ptimizers Pssible cause and trubleshting Pwer ptimizers are shaded. If yu cnnected the inverter t the mnitring platfrm, retry pairing remtely (during sunlight). Make sure t leave the inverter ON/OFF switch ON and that S_OK appears in the status screen. Pwer ptimizer (s) utput is discnnected. Cnnect all pwer ptimizer utputs. Pwer ptimizer(s) nt cnnected in the string. Cnnect all pwer ptimizers Mdule(s) nt cnnected prperly t pwer ptimizer inputs (nt applicable t smart mdules). Cnnect the mdules t the ptimizer inputs String reverse plarity. Check string plarity using a vltmeter and crrect if needed. 64

Appendix A: Errrs and Trubleshting Prblem String vltage is higher than number f ptimizers WARNING! If the measured vltage is t high, the installatin may nt have a safe lw vltage. PROCEED WITH CARE! A deviatin f ±1% per string is reasnable. Pssible cause and trubleshting Extra pwer ptimizer(s) cnnected in the string (nt applicable t smart mdules). Check if an extra pwer ptimizer is cnnected in the string. If nt prceed t next slutin. A mdule is cnnected directly t the string, withut a pwer ptimizer (nt applicable t smart mdules). Verify that nly pwer ptimizers are cnnected in the string and that n mdule utputs are cnnected withut a pwer ptimizer. If the prblem persists, prceed t the next step. Pwer ptimizer(s) malfunctin. Discnnect the wires cnnecting the pwer ptimizers in the string. Measure the utput vltage f each pwer ptimizer t lcate the pwer ptimizer that des nt utput 1V safety vltage. If a malfunctining pwer ptimizeris lcated, check its cnnectins, plarity, mdule, and vltage. Cntact SlarEdge Supprt. D nt cntinue befre finding the prblem and replacing the malfunctining pwer ptimizer. If a malfunctin cannt be bypassed r reslved, skip the malfunctining pwer ptimizer, thus cnnecting a shrter string. 65

Appendix B: Mechanical Specificatins Appendix B: Mechanical Specificatins Figure 28: Inverter with bracket - frnt, side and rear views Figure 29: Inverter munting bracket 66

Appendix C: Cnnecting the AC and DC Strings t the DC Safety Unit Sme inverter mdels are supplied with an integrated DC Safety Unit. This appendix describes hw t cnnect the AC grid and DC strings t the DC Safety Unit. The DC Safety Unit includes: Mechanical DC switch (2-ple discnnectin) DC surge prtectin (SPD, Type II) DC fuses (plus & minus; ptinal) Appendix C: Cnnecting the AC and DC Strings t the DC Safety Unit This appendix describes cnnectins t DC Safety Unit with r withut fuses. The fllwing figure illustrates the DC Safety Unit supplied with fuses. Figure 30: Inside the DC Safety Unit with fuses 67

Cnnecting the AC Grid t the Inverter Cnnecting the AC Grid t the Inverter Use a five-wire cable fr this cnnectin. The maximum wire size fr the input terminal blcks is 16 mm². T cnnect the AC grid t the inverter via the DC Safety Unit: 1. Turn OFF the fllwing: The inverter ON/OFF switch The AC circuit breaker The DC Safety Unit 2. Open the inverter cver: Release the Allen screws and carefully mve the cver hrizntally befre lwering it. CAUTION! When remving the cver, make sure nt t damage internal cmpnents. SlarEdge will nt be held respnsible fr any cmpnents damaged as a result f incautius cver remval. 3. Lsen the screws n the frnt cver f the DC Safety Unit, as shwn belw: 4. Remve the DC Safety Unit cver. Figure 31: Opening the DC Safety Unit cver 5. Strip 35 cm f the external cable insulatin and strip 8 mm f the internal wire insulatin. Figure 32: Insulatin stripping AC 6. Open the AC cable gland and insert the cable thrugh the gland (see Figure 30). 7. Cnnect the grunding wire t the equipment grunding terminal in the DC Safety Unit. NOTE Cnnect the equipment grunding befre cnnecting the AC wires t the AC terminal blck. 68

8. Appendix C: Cnnecting the AC and DC Strings t the DC Safety Unit Insert the remaining fur wires thrugh the AC cnduit t the inverter, and cnnect them t the apprpriate terminal blcks in the inverter accrding t the labels n the terminal blcks (N, L1, L2 and L3). Figure 33: AC Terminals 9. Tighten the screws f each terminal with a trque f 1.2-1.5 N*m / 0.88-1.1 lb*ft. 10. Check that the wires are fully inserted and cannt be pulled ut easily. 11. Tighten the AC cable gland with a trque f 5.0 N*m / 44 lb*in. 12. Verify that there are n uncnnected wires. 13. Make sure the SPDs are tightly attached t the DIN rail. NOTE If pwer cntrl is enabled, it is imprtant t respect the rder f grid lines cnnectin t the inverter. A 120deg phase difference shuld be kept between L1 t L2 and between L2 t L3 (L1-L2-L3 and nt, fr example L1-L3-L2). If the grid lines are nt in this rder, an errr is displayed n the LCD screen and the inverter will nt prduce pwer. Cnnecting the Strings t the DC Safety Unit Up t three strings may be cnnected in parallel t the DC input pairs f the switch. The terminals are suitable fr cnnectin f cpper cnductrs nly. T cnnect the strings t the DC Safety Unit: 1. Strip 8 mm f the DC wire insulatin. 2. Insert the wires int the DC input glands f the DC Safety Unit. 69

Cnnecting the Strings t the DC Safety Unit 3. Cnnect the DC wires accrding t the DC+ and DC- labels: Fr DC terminals withut fuses: Use a standard flat-blade screwdriver t cnnect the wires t the spring-clamp terminals. The screwdriver blade shuld fit freely in the terminal pening. T large a blade can crack the plastic husing. Insert the screwdriver and press the release mechanism and pen the clamp. Insert the cnductr int the rund pening and remve the screwdriver the wire is autmatically clamped. Figure 34: Spring-clamp terminals Fr DC terminals with fuses: Insert the wires int the side penings. Fasten the screws at the tp f the fuses. Apply trque f 3.4 N*M / 30 lb*in. 4. Verify that there are n uncnnected wires. Figure 35: DC cnnectin with fuses 5. Clse the DC Safety Unit cver: Attach the cver and secure it by tightening the fur screws with a trque f 1.2 N*m / 0.9 ft.*lb. 6. Ensure prper cable entry sealing: inspect the entire cable run and use standard sealants t avid water penetratin. 70

Appendix D: SafeDC When AC supply t the inverter is shut ff (by shutting ff the AC breaker at the site), r when the inverter ON/OFF switch is turned t OFF, the DC vltage drps t a safe vltage f 1V per ptimizer. The SlarEdge inverters are certified fr cmpliance with the fllwing standards as discnnectin devices fr PV generatrs, meaning that they can replace a DC discnnect: IEC 60947-3:1999 + Crrigendum: 1999 + A1:2001 + Crrigendum 1:2001 + A2:2005; DIN EN 60947-3 VDE 0660-107:2006-03 IEC 60364-7-712:2002-05 DIN VDE 0100-712:2006-06. In cmpliance with these standards, the discnnectin mechanism perates as fllws: 1. Turn the inverter ON/OFF switch, lcated at the bttm f the inverter, t OFF, r discnnect the AC by shutting ff the AC breaker at the site. The DC vltage displayed n the inverter LCD begins t decrease. If the AC breaker was shut ff, the LCD des nt display. In this case, wait five minutes. 2. When the DC vltage reaches a safe vltage, the PV cnnectrs at the input t the inverter can be discnnected. A galvanic separatin then exists between the PV array and the inverter. WARNING! SafeDC cmplies with IEC60947-3 when installing the system with a wrst case SafeDC vltage (under fault cnditins) < 120V. The wrst case vltage is defined as: Vc,max+ (String Length-1)*1V, where: Vc,max = Maximum Vc (at lwest temperature) f the PV mdule in the string (fr a string with multiple mdule mdels, use the max value) String Length = number f pwer ptimizers in the string Appendix D: SafeDC 71

Appendix E: External Fan Maintenance and Replacement Appendix E: External Fan Maintenance and Replacement The inverters have tw fans: ne is internal and the ther is accessible frm the utside f the inverter. A fan replacement kit is available frm SlarEdge. Fan Maintenance Figure 36: Inverter external fan 1. At least nce a year, pen the fan screen and clean the accumulated dust using a brush. 2. Check the Fan Status screen n the LCD (refer t Fan Status n page 50). 3. If ne f the fllwing ccurs, replace the fan as described belw: When the fan stps perating Fan status is Nt Wrking; Befre replacing the fan, turn the inverter AC OFF and ON and check if the status is cleared The fllwing Errr is displayed: F a n 2 F a i l u r e External Fan Replacement 1. Turn OFF the inverter ON/OFF switch, and wait until the LCD indicates that the DC vltage is safe (<50V), r wait five minutes befre cntinuing t the next step. WARNING! If yu cannt see the inverter panel, r if a malfunctin is indicated n the LCD panel, wait five minutes fr the input capacitrs f the inverter t discharge. 2. Turn OFF the DC Safety Unit (if applicable) and the AC breaker f the distributin panel. 3. Use a standard screwdriver t unfasten the single screw f the fan cver. 4. Open the fan dr. 5. Discnnect the fan cnnectr and remve the fan. 72

Appendix E: External Fan Maintenance and Replacement Figure 37: Fan cnnectr 6. Cnnect the fan cnnectr t the new fan. 7. Clse the fan dr and fasten the cver screw. 8. After pwering up the inverter, check the fan status screen as described in Fan Status n page 50. 73

Appendix F: Replacing and Adding System Cmpnents Appendix F: Replacing and Adding System Cmpnents This appendix includes replacement prcedures fr the SlarEdge system cmpnents. Fr inverter r DC Safety Unit replacement, typically nly the part t be replaced is supplied (nt bth inverter and DC Safety Unit). In this case, the DC Safety Unit shuld be discnnected frm the inverter as described herein. NOTE If yu are permanently disassembling the installatin r part f it, make sure t use the dispsal methds dictated by lcal regulatins. CAUTION! D nt remve the six screws n the DC metal panel as it may harm the inverter sealing and vid the warranty. Replacing an Inverter 1. Turn OFF the DC Safety Unit (if applicable). 2. Turn OFF the inverter ON/OFF switch, and wait until the LCD indicates that the DC vltage is safe (<50V), r wait five minutes befre cntinuing t the next step. WARNING! If yu cannt see the inverter panel, r if a malfunctin is indicated n the LCD panel, wait five minutes fr the input capacitrs f the inverter t discharge. 3. Discnnect the AC t the inverter by turning OFF the circuit breakers n the distributin panel. 4. Open the inverter cver as described in Remving the Inverter Cver n page 55. 5. Discnnect the DC plugs and AC wires frm the inverter. 6. Fr inverters with a DC Safety Unit, unscrew the tw cnduit nuts in the inverter securing the DC Safety Unit t the inverter. Figure 38: Cnduit nuts 74

7. Remve the screws securing the inverter t the munting bracket and remve the inverter frm the munting bracket. NOTE If yu remve the ld inverter and d nt immediately install a new ne, use insulatin tape t islate each f the AC and DC wires 8. Place the new inverter n the munting bracket; insert the screws securing the inverter t the munting bracket. 9. Fr inverters with a Cnnectin Unit, screwthe tw cnduit nuts in the inverter securing the DC Safety Unit t the inverter. 10. Cnnect all the wires t the inverter: Fllw the instructins f Installing the Inverter n page 19 and Cmmissining the Installatin n page 28. 11. Clse the DC Safety Unit cver (if applicable) and the inverter cver. Appendix F: Replacing and Adding System Cmpnents Replacing the DC Safety Unit Remving the DC Safety Unit 1. Turn OFF the inverter ON/OFF switch, and wait until the LCD indicates that the DC vltage is safe (<50V), r wait five minutes befre cntinuing t the next step. WARNING! If yu cannt see the inverter panel, r if a malfunctin is indicated n the LCD panel, wait five minutes fr the input capacitrs f the inverter t discharge. 2. Turn OFF the DC Safety Unit and the AC breaker f the distributin panel. 3. Open the inverter cver. 4. Discnnect the DC and AC wires frm the inverter. If there are ferrite beads n the DC and AC wires in the inverter, pen them and set aside. 5. Discnnect the RS485 cnnectr frm the inverter cmmunicatin bard. 6. Unscrew the tw cnduit nuts in the inverter securing the DC Safety Unit t the inverter, as shwn belw: Figure 39: Discnnecting the cnduits 7. Open the DC Safety Unit cver and discnnect the DC and AC wires. Unscrew the tw cnduit nuts securing the DC Safety Unit t the external cnduits. 75

Installing a New DC Safety Unit 8. If the DC Safety Unit bracket is screwed t the wall, release it. 9. Carefully remve the DC Safety Unit with its munting bracket frm the wall. Installing a New DC Safety Unit 1. Open the cnduit drill guides f the new DC Safety Unit. 2. Psitin the new DC Safety Unit belw the inverter and frm the inside f the inverter grab the AC and DC wires extending frm the switch cnduits. 3. Attach the DC Safety Unit with its bracket t the wall and slightly clse the screws. D nt ver tighten. 4. Securely screw the tw cnduit nuts nt the cnduit ends in the inverter. Verify prper cnduit sealing. Cnnecting the DC Safety Unit t the Inverter 1. If ferrite beads were remved frm the DC and AC wires, place them n the wires and clse them. Make sure the DC labeled ferrite bead is placed n the DC wires and the AC labeled ferrite bead is placed n the AC wires. 2. Cnnect the DC, as fllws: Cnnect the red wire t any f the DC+ terminals in the inverter. Cnnect the black wire t any f the DC- terminals in the inverter. Single phase 3-7.6kW inverter DC terminals Single phase 10-11.4 kw inverter DC terminals Three phase inverter DC terminals Figure 40: DC terminals 76

Appendix F: Replacing and Adding System Cmpnents 3. Cnnect the AC wires accrding t the labels n the AC terminal blcks, as fllws: Wire type Cnnect t terminal PE (grunding) Grund Line Line Neutral N Single phase inverter AC terminals Wire type Cnnect t terminal Line 1 L1 Line 2 L2 Line 3 L3 PE (grunding) Neutral N Three Phase AC terminals 4. Tighten the screws f each terminal with a trque f 1.2-1.5 N*m / 0.88-1.1 lb.*ft. 5. Verify that there are n uncnnected wires at the utput f the DC Safety Unit and that any unused terminal screws are tightened. 6. Cnnect the DC and AC wires t the DC Safety Unit. Refer t Cnnecting the AC and the Strings t the Inverter n page 24. 7. Ensure prper cable entry sealing; inspect the entire cable run and use standard sealants t avid water penetratin. Adding, Remving, r Replacing Pwer Optimizers 1. Turn OFF the inverter ON/OFF switch, and wait until the LCD indicates that the DC vltage is safe (<50V), r wait five minutes befre cntinuing t the next step. 2. Turn OFF the WARNING! If yu cannt see the inverter panel, r if a malfunctin is indicated n the LCD panel, wait five minutes fr the input capacitrs f the inverter t discharge. 3. Discnnect and cnnect the necessary pwer ptimizers. 4. Perfrm pairing and ther prcedures described in Cmmissining the Installatin n page 28 n all inverters t which pwer ptimizers were added r frm which pwer ptimizers were remved. 5. In the mnitring platfrm, use the Replace buttn in the lgical layut tab (in site Admin). Replace the serial number f the remved pwer ptimizer with the serial number f the newly installed pwer ptimizer. Refer t https://www.slaredge.cm/sites/default/files/se-mnitring-prtal-site-admin.pdf 77

Technical Specificatins - Single Phase Inverters (Eurpe & APAC) Output SE2200 SE3000 SE3500 SE4000 SE4000-16A SE5000 SE6000 Unit Rated AC pwer utput 2200 3000 3500 4000 4000 5000 1 6000 VA Maximum AC pwer utput 2200 3000 3500 4000 4000 5000 1 6000 VA AC utput vltage (nminal) 220/230/240 Vac AC utput vltage range 184 264.5 Vac AC frequency(nminal) 50/60 ±5 Hz Maximum cntinuus utput current 12 16.5 2 19.5 2 22 16 27 27 A Max. cntinuus vercurrent prtectin 12 16.5 2 19.5 2 22 16 27 27 A Residual current detectr/ Residual current step detectr Inrush current AC (Peak/Duratin) 2.8/ 20 300/ 30 ma Max. utput fault current 38 A Pwer factr range 1 (adjustable frm -0.9 t +0.9) Ttal harmnic distrtin < 3% Prtective class Utility mnitring, islanding prtectin, cuntry cnfigurable threshlds Overvltage categry Class I Yes III Aac (rms) / ms 1Limited t 4600VA when the inverter is set t Suth Africa. 216A when the cuntry is set t Denmark, Prtugal, UK, r Pland. Fr ther cuntries, cntact SlarEdge. Technical Specificatins - Single Phase Inverters (Eurpe & APAC) MAN-01-00405-1.0 78

Technical Specificatins - Single Phase Inverters (Eurpe & APAC) SE2200 SE3000 SE3500 SE4000 SE4000-16A SE5000 SE6000 Unit Input Maximum DC pwer (Mdule STC) 2950 4050 4700 5400 5000 6750 8100 W Transfrmer-less, ungrunded Yes Maximum input vltage 500 Vdc Nminal DC input vltage 350 Vdc Maximum input current 8.5 11.5 13.5 15.5 15.5 19.5 23 Adc Maximum back-feed current 0 Adc Reverse-plarity prtectin Yes Grund-fault islatin detectin 600 kω Sensitivity Overvltage categry II Maximum inverter efficiency 97.6 % Eurpean weighted efficiency 97.6 97.6 97.5 97.5 97.5 97.4 97.4 % Night-time pwer cnsumptin < 2.5 W Additinal Features Supprted cmmunicatin interfaces 1 RS485, RS232, Ethernet, ZigBee (ptinal), Built-in GSM (ptinal) Smart Energy Management Exprt Limitatin, StrEdge applicatins Standard Cmpliance Safety IEC-62103 (EN50178), IEC-62109 Grid cnnectin standards VDE-AR-N-4105, VDE 0126-1-1, AS-4777, RD-1663, DK 5940 Emissins IEC61000-6-2, IEC61000-6-3, IEC61000-3-11, IEC61000-3-12, FCC part 15 class B RHS Yes 1 Refer t Datasheets -> Cmmunicatins categry in Dwnlads page fr specificatins f ptinal cmmunicatin ptins: http://www.slaredge.cm/grups/supprt/dwnlads 79 Technical Specificatins - Single Phase Inverters (Eurpe & APAC) MAN-01-00405-1.0

Technical Specificatins - Single Phase Inverters (Eurpe & APAC) SE2200 SE3000 SE3500 SE4000 SE4000-16A SE5000 SE6000 Unit Installatin Specificatins AC utput Cable Gland - diameter 9-16 mm DC input 1 MC4 pair 2 MC4 pairs Dimensins (W x L x H) 540 x 315 x 172 540 x 315 x 191 mm Weight 20.2 21.7 kg Cling Natural Cnvectin Nise (typical) < 50 dba Operating temperature range 1-20 - +50 (M40 versin -40 t + 50) C Maximum altitude 2000 m Operating humidity nn cndensing < 95 % Prtectin Rating / Envirnmental categry Pllutin degree classificatin (inside / utside) Bracket munted (bracket prvided) IP65 Outdr and Indr 2/3 1 Fr inverter pwer de-rating refer t the applicatin nte at the fllwing link: http://www.slaredge.cm/files/pdfs/se-temperature-derating-nte.pdf Technical Specificatins - Single Phase Inverters (Eurpe & APAC) MAN-01-00405-1.0 80

Technical Specificatins - Single Phase Inverters (Eurpe & APAC) Recmmended circuit breaker/ fuse size t use at the cnnectin pint f the SlarEdge inverter t the grid: Inverter Maximum Output Current (A) Maximum Suggested Fuse Rating (A) SE2200 12 16 SE3000 16.5 20 SE3500 19.5 25 SE4000 22 25 SE4000-16A 16 20 SE5000 27 32 SE6000 27 32 81 Technical Specificatins - Single Phase Inverters (Eurpe & APAC) MAN-01-00405-1.0

Technical Specificatins - Three Phase Inverters (Eurpe & APAC) SE4K - SE12.5K SE4K SE5K SE7K SE8K SE9K SE10K SE12.5K Unit Output Rated AC pwer utput 4000 1 5000 2 7000 8000 9000 10000 12500 VA Maximum AC pwer utput 4000 5000 2 7000 8000 9000 10000 12500 VA AC utput vltage line t line / line t neutral (nminal) 380/ 220; 400/ 230 Vac AC utput vltage range 184 264.5 Vac AC frequency 50/60 ± 5 Hz Maximum cntinuus utput current (per phase) Maximum cntinuus vercurrent prtectin Residual current detectr / Residual Current step detectr Grid supprted three phase 6.5 8 11.5 13 14.5 16 20 A 6.5 8 11.5 13 14.5 16 20 A 300 / 30 ma 3 / N / PE (WYE with Neutral) Inrush current AC (Peak/Duratin) 3/ 20 Maximum utput fault current 33 A Pwer factr range 1 (adjustable frm -0.9 t +0.9) Aac(rms) / ms 1 SE4K mdel is available in sme cuntries; refer t the Certificatins categry in http://www.slaredge.cm/grups/supprt/dwnlads 24985W when the cuntry is set t Australia; 4600W when the cuntry is set t Germany r the Czech Republic. Technical Specificatins - Three Phase Inverters (Eurpe & APAC) MAN-01-00239-1.1 82

SE4K - SE12.5K SE4K SE5K SE7K SE8K SE9K SE10K SE12.5K Unit Ttal harmnic distrtin < 3% Prtective class Utility mnitring, islanding prtectin, cnfigurable Pwer Factr, cuntry cnfigurable threshlds Overvltage categry Input Maximum DC pwer (Mdule STC) 5400 6750 9450 10800 12150 13500 16850 W Transfrmer-less, ungrunded Maximum input vltage 900 Vdc Nminal DC input vltage 750 Vdc Maximum input current 7 8.5 12 13.5 15 16.5 21 Adc Maximum back-feed current 0 Adc Reverse-plarity prtectin Grund-fault islatin detectin Overvltage categry Class I Yes III Yes Yes 700kΩ Sensitivity Maximum inverter efficiency 98 % Eurpean weighted efficiency 97.3 97.3 97.3 97.5 97.5 97.6 97.7 % Night-time pwer cnsumptin < 2.5 W II 83 Technical Specificatins - Three Phase Inverters (Eurpe & APAC) MAN-01-00239-1.1

SE4K - SE12.5K SE4K SE5K SE7K SE8K SE9K SE10K SE12.5K Unit Additinal Features Supprted cmmunicatin interfaces 1 RS485, Ethernet, ZigBee (ptinal), Wi-Fi (ptinal), Built-in GSM (ptinal) Smart Energy Management Exprt Limitatin, Hme Energy Management Standard Cmpliance Safety Grid cnnectin standards 2 Emissins WEEE, RHS Installatin Specificatins AC utput / Gland Diameter / Wire Crss Sectin DC input IEC-62103 (EN50178), IEC-62109 VDE 0126-1-1, VDE-AR-N-4105, AS-4777, G83 / G59 IEC61000-6-2, IEC61000-6-3, IEC61000-3-11, IEC61000-3-12, FCC part15 class B Yes 15-21 mm / Slid wire 2.5-16 mm 2, Stranded wire 2.5-10 mm 2 2 MC4 pairs Dimensins (WxLxH) 540 x 315 x 260 mm Weight 33.2 kg Operating temperature range 3-20 - +60 (M40 versin -40 t + 60) C Operating humidity nn cndensing < 95 % Cling Fan (user replaceable) 1 Refer t Datasheets > Cmmunicatins categry in Dwnlads page fr specificatins f ptinal cmmunicatin ptins: http://www.slaredge.cm/grups/supprt/dwnlads 2 Fr all standards refer t the Certificatins categry in http://www.slaredge.cm/grups/supprt/dwnlads. 3 Fr inverter pwer de-rating refer t the applicatin nte at the fllwing link: http://www.slaredge.cm/files/pdfs/se-temperature-derating-nte.pdf Technical Specificatins - Three Phase Inverters (Eurpe & APAC) MAN-01-00239-1.1 84

SE15K - SE33.3K SE4K SE5K SE7K SE8K SE9K SE10K SE12.5K Unit Nise (typical) < 50 1 dba Prtectin rating/ Envirnmental categry IP65 Outdr and indr Maximum altitude 2000 m Pllutin degree classificatin (inside/utside) Bracket munted (bracket prvided) SE15K - SE33.3K 2 Output 2/3 SE15K SE16K SE17K SE25K SE27.6K SE33.3K Unit Rated AC pwer utput 15000 16000 17000 25000 3 27600 33300 VA Maximum AC pwer utput 15000 16000 17000 25000 6 27600 33300 VA AC utput vltage line t line / line t neutral (nminal) 380/ 220; 400/ 230 480/277 Vac AC utput vltage range 184 264.5 244-305 Vac AC frequency 50/60 ± 5 Hz Maximum cntinuus utput current (per phase) 23 25.5 26 38 40 40 @277V A 1 Fr inverters with a nise level suitable fr residential envirnments refer t: http://www.slaredge.cm/files/pdfs/prducts/inverters/se-three-phase-indr-inverterdatasheet.pdf 2The SE33.3K mdel requires a medium vltage transfrmer. 324.99kVA in the UK 85 Technical Specificatins - Three Phase Inverters (Eurpe & APAC) MAN-01-00239-1.1

SE15K - SE33.3K SE15K SE16K SE17K SE25K SE27.6K SE33.3K Unit Maximum cntinuus vercurrent prtectin 23 25.5 26 38 40 40 A Residual current detectr / Residual Current step detectr 300 / 30 ma Grid supprted three phase 3 / N / PE (WYE with Neutral) V Inrush current AC (Peak/Duratin) 3/ 20 3.1/ 20 4.2/ 20 Aac(rms) / ms Maximum utput fault current 40 63 A Pwer factr range 1 (adjustable frm -0.9 t +0.9) 1 (adjustable frm -0.8 t +0.8) 1 Ttal harmnic distrtin < 3% Prtective class Utility mnitring, islanding prtectin, cnfigurable Pwer Factr, cuntry cnfigurable threshlds Overvltage categry Input Maximum DC pwer (Mdule STC) 20250 21600 22950 33750 37250 45000 W Transfrmer-less, ungrunded Maximum input vltage 900 1000 Vdc Nminal DC input vltage 750 840 Vdc Maximum input current 22 23 23 37 40 40 Adc Maximum back-feed current 0 Adc Class I Yes III Yes 1Fr SE27.6K - when set t Germany Pwer Factr is limited t 0.9. Technical Specificatins - Three Phase Inverters (Eurpe & APAC) MAN-01-00239-1.1 86

SE15K - SE33.3K SE15K SE16K SE17K SE25K SE27.6K SE33.3K Unit Reverse-plarity prtectin Yes Grund-fault islatin detectin 700kΩ Sensitivity 350kΩ Sensitivity 1 Overvltage categry III Maximum inverter efficiency 98 98.3 98.1 % Eurpean weighted efficiency 97.6 97.7 98 % Night-time pwer cnsumptin < 2.5 < 4 W Additinal Features Supprted cmmunicatin interfaces 2 RS485, Ethernet, ZigBee (ptinal), Wi-Fi (ptinal), Built-in GSM (ptinal) Smart Energy Management Exprt Limitatin, Hme Energy Management DC Safety Unit (ptinal) 2-ple Discnnectin N/A 1000V / 40A DC Surge Prtectin N/A Type II, field replaceable DC Fuses n Plus & Minus N/A Optinal, 20A Cmpliance N/A UTE-C15-712-1 Standard Cmpliance Safety IEC-62103 (EN50178), IEC-62109, AS3100 1Where permitted by lcal regulatins 2 Refer t Datasheets -> Cmmunicatins categry in Dwnlads page fr specificatins f ptinal cmmunicatin ptins: http://www.slaredge.cm/grups/supprt/dwnlads 87 Technical Specificatins - Three Phase Inverters (Eurpe & APAC) MAN-01-00239-1.1

SE15K - SE33.3K Grid cnnectin standards 1 Emissins WEEE, RHS Installatin Specificatins AC utput / Gland Diameter / Wire Crss Sectin SE15K SE16K SE17K SE25K SE27.6K SE33.3K Unit VDE-AR-N-4105, G59/3, AS-4777, EN 50438, VDE 0126-1-1, CEI-021, BDEW, CEI-016 2 ; IEC61000-6-2, IEC61000-6-3, IEC61000-3-11, IEC61000-3-12 Yes 15-21 mm / Slid wire 2.5-16 mm 2, 18-25mm / Slid wire 2.5-16 mm 2, Stranded wire 2.5-10 mm 2 Stranded wire 2.5-10 mm 2 DC input 2 MC4 pairs 3 MC4 pairs DC input with DC Safety Unit N/A Gland diameter 5-10 mm mm Wire crss sectin 0.5-13.5 mm 2 Dimensins (HxWxD) 540 x 315 x 260 mm Dimensins with Safety Unit (HxWxD) N/A 775 x 315 x 260 mm Weight 33.2 45 kg Weight with Safety Unit N/A 48 kg Operating temperature range 3-20 - +60 (M40 versin -40 t + 60) C Operating humidity nn cndensing < 95 % Cling Fan (user replaceable) Nise (typical) < 50 < 55 dba Prtectin rating/ Envirnmental categry IP65 Outdr and indr Maximum altitude 2000 m 1 Fr all standards refer t the Certificatins categry in http://www.slaredge.cm/grups/supprt/dwnlads. 2Mdels SE25K, SE27.6K and SE33.3K nly 3 Fr inverter pwer de-rating infrmatin, refer t the applicatin nte at the fllwing link: http://www.slaredge.cm/files/pdfs/se-temperature-derating-nte.pdf Technical Specificatins - Three Phase Inverters (Eurpe & APAC) MAN-01-00239-1.1 88

SE15K - SE33.3K Pllutin degree classificatin (inside/ utside) Bracket munted (bracket prvided) SE15K SE16K SE17K SE25K SE27.6K SE33.3K Unit 2/3 Recmmended circuit breaker/ fuse size t use at the cnnectin pint f the SlarEdge inverter t the grid: Inverter Maximum utput current (A) Minimum fuse Rating (A) Maximum fuse rating (A) SE4K 6.5 10 33 SE5K 8 10 33 SE7K 11.5 16 33 SE8K 13 20 33 SE9K 14.5 20 33 SE10K 16 20 33 SE12.5K 20 25 33 SE15K 23 32 40 SE16K 25.5 32 40 SE17K 26 32 40 SE25K 38 50 63 SE27.6K 40 50 63 SE33.3K 40 50 63 89 Technical Specificatins - Three Phase Inverters (Eurpe & APAC) MAN-01-00239-1.1

DC Safety Unit Specificatins (Optinal - SE25K-SE33.3K) DC Safety Unit Specificatins (Optinal - SE25K-SE33.3K) Feature 2-ple Discnnectin DC Surge Prtectin DC Fuses n Plus & Minus Weight Cmpliance Prtective Class Specificatin 1000V / 40A Type II, field replaceable Optinal, 20A 2.7 kg UTE-C15-712-1 Class II Technical Specificatins - Three Phase Inverters (Eurpe & APAC) MAN-01-00239-1.1 90