City of Waltham Purchasing Department Waltham, Massachusetts ADDENDUM NO. 2

Similar documents
ADDENDUM NO. 2. Furnace Bridge - Installation. Essex County, NY. July 29, 2015

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA

Montclair, NJ ADDENDUM NO. 1 Issue Date: May 15, 2017

PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM Miraloma ES & Sunnyside ES Green Schoolyard ADDENDUM NO. 1

ADDENDUM #1. April 29, 2009

APPENDIX FENCE GENERAL NOTES

REGIONAL TRANSIT AUTHORITY PUBLIC NOTICE. IFB Rail Expansion (Streetcar) Rampart Street. Addendum IV

CITY OF NEW WESTMINSTER SECTION Westminster Pier Park ADDENDUM NO. 1 Landscape Contract

CHARLES COUNTY GOVERNMENT ITB NO ST. MARK S PUMP STATION UPGRADE

INDEX OF SHEETS FLAMING GORGE RANGER DISTRICT OFFICE ADDITION REGION 4 INTERMOUNTAIN REGION ASHLEY NATIONAL FOREST DRAWING SHEET INDEX

ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO.

CHAPTER 1: TITLE SHEET and GENERAL LAYOUT

RENOVATION TO STUDENT SERVICES/HOUSING FROM HOSPITAL DAKOTA STATE UNIVERSITY MADISON, SOUTH DAKOTA

The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents, Inquiry No. 17-WDI-031.

ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI)

Project: # Solano Community College District

CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT CHABOT COLLEGE CAMPUS MASTER SIGN PROGRAM, PHASE 2 BID NO

SECTION CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP

CONTINUOUS COUNTERPOISE ON POLES

Maintenance of Traffic sequence of operations including any phasing and detour maps;

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.:

Gate Installation Instructions

Residential & Industrial Fence

MADISON METROPOLITAN SEWERAGE DISTRICT MADISON, WISCONSIN PUMPING STATION 15 REHABILITATION CITY OF MADISON PLANNING COMMISION SUBMITTAL

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA

I. GENERAL: The Bidding and Contract Documents for Riverside North Parking Lot are modified as described in this Addendum.

W 869 SN 303 S. Paterson Street, Ste. 1 Madison, WI ph Structural Engineering: /Users/paulcuta/Desktop/1603 Finals/1603

PROCEDURE FOR PROCESSING WORKING DRAWINGS

I. MINUTES OF THE PRE-BID CONFERENCE

ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

INVITATION FOR BID (IFB) IFB NO. GSWA

Proposal PROJECT MANUAL P R O P E R T Y M A N A G E M E N T F A L L O N C O U N T Y. Baker, MT P.O. Box 846

STANDARD BID ITEM NUMBERS

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM SOTA-AAS HIGH SCHOOL MODERNIZATION ADDENDUM NO. 2

HOENER ASSOCIATES INC. ARCHITECTS

Specifications: Other: sign in sheet

November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA. Y CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT

Geothermal Conversion - North Distribution Utilities Pkg. 2 Ball State University, Muncie IN

Renewable Water Resources Greenville, South Carolina. CONTRACT DOCUMENTS Reedy River Basin Sewer Tunnel ADDENDUM III - CONTRACT REVISIONS.

Miscellaneous. Demolition

Procurement Department Bid Office Customer Center 1 st Floor, Room W. Church Street Jacksonville, Florida 32202

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections

10930 W. Sam Houston Parkway N., Suite 900

BID ADDENDUM NO. 4 ITB/004/16/KL CITY OF WINTER SPRINGS WTP NO. 1 WATER QUALITY IMPROVEMENTS

Anticipated schedule, Page 2. Change the Contract Term from 635 Days to be 1,127 Days.

OPEN PICKET PANEL AND GATE INSTALLATION INSTRUCTIONS

ADDENDA ADDENDUM NO. 1 DATE: MARCH 1, 2016

ADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON

Working Drawing Procedure

DESIGN REVIEW BOARD APPLICATION EXTERIOR PLAN / LANDSCAPE PLAN

LONCY LEAKE BASEBALL FIELD RENOVATION MESQUITE, TX PROJECT NO ISSUED FOR PROPOSALS

designmasterfence.com

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION

WAL-MART SUPERCENTER # ; Milwaukie, OR: SPECIFICATIONS. Revisions to Specification Fence

SECTION 19: Endwood Fusion Welded Gate Installation Guide

This addendum forms a part of the Contract Documents dated: August 10, 2012.

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions

Post & Rail. Includes: Crossbuck, 2-Rail, 3-Rail and 4-Rail POST SUPPORT OPTIONS

JUNE 27, 2016 ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS SYRACUSE HANCOCK INTERNATIONAL AIRPORT CULVERT REPLACEMENT FOR RUNWAY 28 APPROACH ACCESS ROAD

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

2. What are the estimated volumes for the Residuum Harvesting See response to Question 1

Vinyl Fence Products. Installation Guidelines. Hyde Park with H-Post Fence

Working Drawing Manual

580 - NOISE BARRIERS OPSS 580 INDEX

SECTION CHAIN LINK FENCE GALVANZED CHAIN LINK FABRIC ON GALVANIZED FRAMEWORK [Provided by Master Halco]

CHAPTER 10 MICHIGAN DESIGN MANUAL BRIDGE DESIGN (SI) SHOP DRAWING REVIEW TYPES OF SHOP DRAWINGS Structural Steel

TAS 201, TAS 202, TAS 203 and ASTM E330 PERFORMANCE TEST REPORT. Rendered to: DIAMOND DOOR PRODUCTS

APPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT

HIGH TENSION CABLE BARRIER (HTCB)

CHAPMAN GRIFFIN LANIER SUSSENBACH ARCHITECTS, INC. ARCHITECT S ADDENDUM NO. 06

PERFORMANCE TEST REPORT. Rendered to: GLASSCRAFT DOOR COMPANY

Software Services, Section 16748, Add as an attachment to this section Attachment A enclosed with this addendum.

ADDENDUM No. 1. RFP No Gallup Park Custom Playground Equipment Design. Due: Tuesday, August 4, 2015 by 10:00 a.m.

BOLOTA 316 OTHER PRODUCT RANGES SERVICE

AMERICAN NATIONAL STANDARD FOR AUXILIARY LOCKS SPONSOR BUILDERS HARDWARE MANUFACTURERS ASSOCIATION, INC.

i. Shoring layout. ii. Shoring sections and details (including anchor details, if required).

Addendum #1 - Bid Package #

RENOVATION OF THE FARMERS MARKET Reference Number:

SECTION STEEL LIGHTING STANDARDS. 1. Electrical conduit and fittings; Section

TECHNICAL CORRECTION October Process Industry Practices Structural. PIP STF05121 Fabrication and Installation of Anchor Bolts

ACORNWIRE.COM MESH PARTITIONS DIVISION 10 - SPECIALTIES WIRE MESH PARTITION FOLDING GATE

FENCING ASSEMBLY INSTRUCTIONS

Post & Rail Crossbuck

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO

ADDENDUM #2 September 12, 2018

Can you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation web site

Marshall Truck Station Laboratory Addition Project No. TZ MnDOT

ADDENDUM #01. PROJECT: Saint Mary s University Student Centre Reorganization PROJECT N o : DATE:

SECTION PRECAST CONCRETE STRUCTURES

Section B. DEADBOLT ENTRANCE SETS general information. Deadbolt & Mortise Entry Sets. A deadbolt entry set includes:

PRESSURE TREATED PINE Naturally Beautiful Wood Fencing

.1 Comply with the General Conditions of the Contract, Supplementary General Conditions and the requirements of Division 1.

CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017.

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)

A & F Wood Products, Inc 5665 Sterling Drive Howell, Michigan Phone: Fax: Toll Free:

PART MATERIALS. Section Fencing Materials. Description

Attached is Addendum No. 2 to SEPTA Sealed Bid APES, Install DC Stinger Distribution System - SEPTA Fern Rock Car House.

Transcription:

City of Waltham Purchasing Department Waltham, Massachusetts 02452 ADDENDUM NO. 2 Plans & Specifications for: Elsie Turner Field & Graverson Playground, Waltham, MA TO: ALL PLAN HOLDERS This Addendum No. 2 is to modify, correct and/or supplement the Plans and Specifications. Bidders are hereby informed that Plans and Specifications for the above-mentioned project are modified, corrected and/or supplemented as follows and that Addendum No. 2 becomes a part of the Contract Documents. Addendum No. 2 consists of answers to Pre-bid questions, changes described in Items 1 through 15, and attachments 1 through 11. THE FOLLOWING REVISIONS ARE MADE A PART OF THIS CONTRACT. RECEIPT OF THIS ADDENDUM AND ALL ADDENDA MUST BE ACKNOWLEDGED AS RECEIVED IN THE FORM FOR GENERAL BID SECTION 00310 In accordance with documents prepared by: Carolyn Cooney & Associates ANSWERS TO PRE-BID AND WRITTEN QUESTIONS Q1. Will both projects be awarded to one Bidder? A1. Yes. Q2. Is preparation of a Work Order for electrical work part of the contract? A2. No. The City will apply for any necessary work orders. Q3. What are the two different colors to be used on the basketball court and tennis courts? A3. The basketball courts are to be grey and blue, color to be selected from manufacturer s standard color charts. The tennis courts are to be red and green, color to be selected from manufacturer s standard color charts. There are no custom colors required. Q4. Would a different retaining wall manufacturer or system be acceptable? A4. A different system will be considered equal if the following criteria are satisfied: 1. The block has the finish specified (split-face). 2. The block is 18 wide x 8 high, minimum. 3. The block has the specified compressive strength (4,000 psi) or greater and maximum absorption rate specified (7%) or less. Page 1 of 4

4. The Contractor provides a site specific wall design for the substituted system, stamped by a Structural Engineer registered in the State of MA. 5. The amount of excavation required is no greater than the amount of excavation required for the present design. Q5. Other than line striping, is any work to be done to the existing parking lot at Graverson? A5. There is no work to be done on the Graverson Parking lot except blacking out existing striping and restriping as shown on the Plans. New wood guardrail and signage is to be installed at the edge of the pavement. Demolition of the steel guardrail in the lawn shall be accomplished without damage to abutting pavement. Q6. Is the curb wall 2-6 deep throughout and not just at the fence post footings? A6. The concrete curb wall is 2-6 deep throughout. The detail reference is corrected by Item 3. GRAVERSON PLAYGROUND, REVISIONS ITEM NO. 1 ITEM NO. 2 ITEM NO. 3 Graverson Playground: Revise Specifications Section 02830, Welded Wire Fence, Paragraph 2.01 C. Gates, Hinges & Latches as follows: Delete Paragraph 2.01.C.2 in its entirety. Add 2.01.C.2 as follows: 2. Provide manufacturer s standard mortised lock and latch. Mortise cylinder locks shall have steel case and three keys. Latches shall be single or double throw, prepared for profile cylinder lock, right and left reversible latch bolt, dead bolt with two hardened steel roller inserts, operated by either handle or key. Provide aluminum handle on both sides. Graverson Playground: Revision to Gate Hardware, Detail 4, Double Gate, Drawing L.606. Addition of drop bar, revision to lock and latch detail. Replace Drawing L.606 with Drawing L.606 attached. Graverson Playground: Drawing L.607, revised to correct curb/wall detail reference. Replace Drawing L.607 with L.607 attached. ELSIE TURNER FIELD, REVISIONS ITEM NO. 4 Elsie Turner: Boring Log for Elsie Turner. This information is furnished to the Contractor for his/her information only. No guarantee is made concerning subsurface conditions. Refer to L.617 for boring locations. Page 2 of 4

ITEM NO. 5 ITEM NO. 6 ITEM NO. 7 Elsie Turner: Revise Specifications Section 02830, Welded Wire Fence, Paragraph 2.01 C. Gates, Hinges & Latches as follows: Delete Paragraph 2.01.C.2 in its entirety. Add 2.01.C.2 as follows: 2. Provide manufacturer s standard mortised lock and latch. Mortise cylinder locks shall have steel case and three keys. Latches shall be single or double throw, prepared for profile cylinder lock, right and left reversible latch bolt, dead bolt with two hardened steel roller inserts, operated by either handle or key. Provide aluminum handle on both sides. Elsie Turner: Revise Specifications Section 02832, Segmental Gravity Retaining Walls as follows: Paragraph 1.02 SCOPE OF WORK, A. Delete the following words: Single-depth and without soil reinforcement. Elsie Turner: Revise Specifications Section 02925 Lawns & Native Grasses as follows. Add Paragraph 2.01.A.4: 4. Seed mix #3 shall be Ecology Mix as supplied by Pennington Seed, or equal. Mix shall be composed of 80% Hard Fescue and 20% Chewings Fescue Mix. Seed at manufacturer s recommended rate. ITEM NO. 8 ITEM NO. 9 Elsie Turner: Revise Specification Appendix A as follows: Replace Appendix A Order of Conditions in its entirety with Appendix A Order of Conditions attached. Elsie Turner: Revision to clearing and removal/replacements of stone wall at retaining wall. Replace Drawing L.102 with Drawing L.102 attached. ITEM NO. 10 Elsie Turner: Revision to grading at retaining wall. Replace Drawing L.402 with Drawing L.402 attached. ITEM NO. 11 Elsie Turner: Additional area of seeding and additional seed mix. Replace Drawing L.502 with L.502 attached. ITEM NO. 12 Elsie Turner: Revision to Gate Hardware, Detail 4, Double Gate, Drawing L.608. Additions of drop bar, revision of lock and latch detail. Replace Drawing L.608 with Drawing L.608 attached. ITEM NO. 13 Elsie Turner: Revision to rebar size, Detail 1, Scoreboard Installation Detail, Drawing L.615. Replace Drawing L.615 with Drawing L.615 attached. Page 3 of 4

ITEM NO. 14 Elsie Turner: Revision to Drawing S-1 adds additional structure to gravity stone wall. Replace Drawing S-1 with revised Drawing S-1 attached. ITEM NO. 15 Elsie Turner: Revision to Gravel Trench Detail, Drawing C.1 Revise detail per attached SK-1. Attachments: 1. Graverson L.606 2. Graverson L.607 3. Elsie Turner: Boring Log 4. Elsie Turner: Appendix A-Order of Conditions 5. Elsie Turner: L.102 6. Elsie Turner: L.402 7. Elsie Turner: L.502 8. Elsie Turner: L.608 9. Elsie Turner: L.615 10. Elsie Turner: S.1 11. Elsie Turner: SK-1. END OF ADDENDUM NO. 2 Page 4 of 4

Appendix A - Revised Addendum No. 2 12/01/2017 Page 1 of 16

Appendix A - Revised Addendum No. 2 12/01/2017 Page 2 of 16

Appendix A - Revised Addendum No. 2 12/01/2017 Page 3 of 16

Appendix A - Revised Addendum No. 2 12/01/2017 Page 4 of 16

Appendix A - Revised Addendum No. 2 12/01/2017 Page 5 of 16

Appendix A - Revised Addendum No. 2 12/01/2017 Page 6 of 16

Appendix A - Revised Addendum No. 2 12/01/2017 Page 7 of 16

Appendix A - Revised Addendum No. 2 12/01/2017 Page 8 of 16

Appendix A - Revised Addendum No. 2 12/01/2017 Page 9 of 16

Appendix A - Revised Addendum No. 2 12/01/2017 Page 10 of 16

Appendix A - Revised Addendum No. 2 12/01/2017 Page 11 of 16

Appendix A - Revised Addendum No. 2 12/01/2017 Page 12 of 16

Appendix A - Revised Addendum No. 2 12/01/2017 Page 13 of 16

Appendix A - Revised Addendum No. 2 12/01/2017 Page 14 of 16

Appendix A - Revised Addendum No. 2 12/01/2017 Page 15 of 16

Appendix A - Revised Addendum No. 2 12/01/2017 Page 16 of 16