C&E Mobility Policy (Standard)

Similar documents
October Inaccessible Electrical Facilities. Phase 2 Primary Lines (Lower Keys)

You Be The Chemist Challenge Official Competition Format

Pre-Installation Preparation Job Aid

b. Army Reserve Design Process Submittal Requirements (DPSR) c. USARC G-2/6 IT Design Whitepaper, 2 April 2012 ( ENCLOSURE 1)

Pool & Hot Tub Guide

NATF CIP Requirement R1 Guideline

SVT Tab and Service Visibility Tool Job Aid

COMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Community Development Department (248)

1.12 Equipment Manager

DynaRound Hatch Guard System Installation Instructions

RiverSurveyor S5/M9 & HydroSurveyor Second Generation Power & Communications Module (PCM) Jan 23, 2014

Connection tariffs

PhotoVu Digital Picture Frame Service & Repair Guide

Consult with this syllabus before asking questions regarding the course rules. There will no exceptions to these rules.

CAMPBELL COUNTY GILLETTE, WYOMING. Electrical Inspector Senior Electrical Inspector

Lite-On offers a broad range of discrete infrared components for application such as remote control, IR wireless data

INSTALLATION INSTRUCTIONS

Claim Amalgamation. Getting Started. Amalgamate means to join 2 or more cell claims into one cell claim. Before you start:

The Corporation of Delta COUNCIL REPORT Regular Meeting. File No.:

Desktop Teller Exception User Guide

APPENDIX B TRAFFIC IMPACT STUDY CRITERIA

PotashCorp Tier 1 Safety Standard FLAME RESISTANT CLOTHING (FRC)

Dorsey s Search. Name Address Home Telephone Work. Address. Property Owner s Signature

City of Sarasota Public Art Requirements Information Package

3400 to 3600MHz. Crown Recognised Spectrum Access in 3400 to 3600 MHz. The response of Alcatel-Lucent to Ofcom Spectrum Policy Group

Kennecott Utah Copper Corporation Safety and Health Standards

2017 NEC Significant Code Changes Part 1

INSTALLATION INSTRUCTIONS

Alberta Infrastructure. Digital Project Delivery COBie Requirements

MANUFACTURED HOME New Homes, Replacements, and Additions SUBMITTAL REQUIREMENTS

Beechcraft Bonanza HID Landing Light Assembly Kit

AccuBuild Version 9.3 Release 05/11/2015. Document Management Speed Performance Improvements

IR Emitter and Detector Product Data Sheet LTR-C5510-DC Spec No.: DS Effective Date: 09/24/2016 LITE-ON DCC RELEASE

.,Plc..d,~t l~ucjio PA300 DIGITAL BASS PROCESSOR USER'S MANUAL. 2 Why use the DIGITAL BASS PROCESSOR? 2 About the PWM Subsonic Filter

IR Emitter and Detector Product Data Sheet LTE-R38386AS-ZF Spec No.: DS Effective Date: 09/14/2016 LITE-ON DCC RELEASE

IR Emitter and Detector Product Data Sheet LTE-C9511-E Spec No.: DS Effective Date: 07/05/2014 LITE-ON DCC RELEASE

Installing a Squeak-Free Nascor Floor System

Consolidated Edison Company of New York. Developer Welcome Kit

Standard OPS-020 Avionics and Communications

SISTEMA ELEVATÓRIO ETV 460A

OPERATING MANUAL SERIES SMTBM BRUSHLESS SINGLE AXIS MODULE

WASHINGTON COUNTY OREGON

Infrared Product Data Sheet LTR-C950-TB-T LITE-ON DCC RELEASE

Supplementary Appendix to ARTC Track & Civil Code of Practice. Trackside Monuments ETD-11-01

Ethernet Gateway User Manual

DEVELOPMENT APPLICATION

2018 Print and DPI Annual Competition Rules

TRANSPORTADORA DE GAS DEL PERU

Hands-Free Music Tablet

RZ251W. Remote Sensing & Zoning Installation Guide. Quick Reference. Wireless Range

idcv Isolated Digital Voltmeter User Manual

Appendix D. Photography

Type Seating/Surface SF/student Details/Notes. Fixed seating; sloped or tiered floor Movable seats, fixed tables; two rows per riser.

INSTALLATION INSTRUCTIONS

SolarEdge Built-in Revenue Grade Meter Troubleshooting

IR Emitter and Detector Product Data Sheet LTE-C9501 Spec No.: DS Effective Date: 01/08/2014 LITE-ON DCC RELEASE

Table of Contents. ilab Solutions: Core Facilities Core Usage Reporting

BLM-Alaska Yukon Lowlands - Kuskokwim Uplands - Lime Hills Rapid Ecoregional Assessment

HygroFlex HF4 Humidity Temperature Transmitters. User Guide

SolarEdge. Modbus Meter Installation Guide. Europe and APAC Version 1.0

Dry Contact Sensor DCS15 User Manual

LINE POWER SUPPLIES Low-Loss Supplies for Line Powered EnOcean Modules

Northern Powergrid Appendices A and B for ENA Engineering Recommendation G81 Part 1: Design and Planning

LAUREL SPRINGS APPLICATION FOR PROPERTY MODIFICATION

Communication Protocol Procedure

SAFETY AND INSTALLATION MANUAL BIFACIAL SOLAR MODULES

Application for Drive Technology

Application Note AN-2097 Evaluation Kit for the S7500 CW Tunable Laser

TROUBLESHOOTING GUIDE

Some Supplementary Review Information for ARMs

Upgrading to PlanetPress Suite Version 5

Specification for Learning and Qualifications for Physical Intervention Skills

Flash Image Rotator Web Part

OPERATOR S MANUAL BOP (M) (D) 100W, 200W, 400W BIPOLAR POWER SUPPLY

Application for Registration of Designated Radiation Equipment Class 3b and 4 Lasers

Application Package Checklist ITEMS MUST BE REVIEWED AND APPROVED BEFORE AUTHORIZATION IS GIVEN TO INTERCONNECT WITH UTILITY.

WS-400 BASE STATION FOR WIRELESS INTERCOM WITH FOUR TX/RX MODULES USER MANUAL

CB-030S Circuit Board

WiFi Lab C. Equipment Needs:

Unit 123 STAC Conditions of Contest Aug 2016

m LUCASEY SLELCD COMPANY Important! Please read all warnings and cautions before installing the mount. SLELCD DETAILED INSTRUCTIONS Page 1 of 6

Canterbury Artisan Festival 2017 Juried Craft Fair Application

21 st Century Shooting

Electrical devices may only be mounted and connected by electrically skilled persons.

Expiration Date: April 2000 October 1999 File name: draft-ietf-ospf-shortcut-abr-01.txt

SLATE LITE. handling fabrication and installation guide

Victorian Student Number Data Quality and Process Guidelines for Victorian Government Schools

Wireless Bridge Module for DXR2.E

ASSEMBLE ALUMINUM TOOLBOX

Automated Meters Frequently Asked Questions

Dry Contact Sensor. Communications cable - RJ-45 jack to sensor using UTP Cat 5 wire. Power source: powered by the unit. No additional power needed.

Acceptance and verification PCI tests according to MIL-STD

RS232 Communication Between a Sunny Boy 2500U and a PC. Technical Note

SolarEdge. SolarEdge Electricity Meter Installation Guide. For North America Version 1.0

NanoScan v2 Readme Version 2.7. Change log. v2.7 - Added information for new product Pyro/9/5-MIR.

Network Working Group. Category: Informational Cisco Systems A. Shaikh AT&T Labs (Research) April 2005

Specification for a communicating Panelboard system to monitor, control and maintain LV electrical installations

Transmission Substation Field Instructions

Standard Authorization Request Form

National Implementation Vendor Engineering Standards. June 26, 2018

Transcription:

C&E Mbility Plicy (Standard) Originated By: DOCUMENT # VERSION: ISSUE DATE: C&E Mbility Prgram Office ATT-CEM-14001 1 5/16/2014 Title: Upladed t VMT: Last Review Date: Next Review Due By: Raycap Equipment Placement Guidelines 5/16/2014 5/16/2015 Subject: Guidelines fr installatin lcatin f grund based Raycap devices (nn RRH/RRU) Date: 5/16/14 Cntact fr Questins: Glen Sparks (gs3219@att.cm) Overview: The bjective f this Plicy Letter is t prvide guidance n the prper lcatin f grund based Raycap surge prtectin devices lcated in shelters (rack munt units) r utdrs (NEMA enclsure units). The plicy includes devices used n rftps t prtect the DC plant. It des nt cver Raycap devices used t prtect RRH/RRUs as thse devices are nly available in utdr rated enclsures. Exceptins t the lcatin standards are als cvered in the plicy. The intent with exceptins is t avid the fllwing: Delays in launching sites (i.e., missing scheduled cmmercial launch dates) Additinal csts assciated with mving and/r replacing equipment Sites being flagged with discrepancies during audits (Ops site acceptance, third party audits, etc.) Audience: AT&T Equipment Engineers and Implementatin Prject Managers Turf vendrs and cntractrs perfrming installatin wrk AT&T Field Operatins persnnel perfrming Site Acceptance audits Third Party Auditrs Guidelines and exceptins are explained in the fllwing sectins: Sectin 1: lcatin f Raycap units indrs Sectin 2: exceptins fr indr sites Sectin 3: lcatin f Raycap at utdr sites Sectin 4: exceptins fr utdr sites Raycap data guides and installatin manuals may be fund n the CEMPO SharePint at the link belw. Dcuments are als psted n VMT CEMPO SharePint-Raycap Infrmatin NOTE: if at any time a site incurs damage due t incrrectly installed Raycaps and/r grunding practices the installatin must be crrected as sn as pssible Page 1 f 5

AT&T C&E Mbility Prgram Office Plicy Letter Sectin 1: Lcatin f Raycap units in shelters r tenant imprvement indr rms Indr sites (thse utilizing indr equipment) lcated in shelters r TI rms must use a rack munt Raycap. Current and previus mdels are shwn belw DC6-48-60-RM (CEQ 32405) DC12-48-60-RM (CEQ 32407) Current Rack Munt Raycap Previus Rack Munt Raycap (n lnger rderable) The rack munt units are t be installed in a FIF rack Lcate near the tp f the rack t prvide maximum prtectin f ther equipment and prvide the shrtest grunding path Rack may be a DC equipment nly (Raycap, stand-alne cnverter shelves, etc.) r a hybrid style rack cntaining bth DC and cmmunicatins equipment Grunding must be in accrdance with Plicy Letter ATT-CEM-13002, FIF Installatin & Grunding f 3G/4G RF and DC Equipment Rack munt units shall nt be installed in DC plant r battery racks Expses the DC plant t surge damage Limits grwth f the DC plant and batteries Increases amunt f wiring in the DC plant area In the event there is nt adequate rack space fr munting a Raycap, it is acceptable t wall munt a NEMA style utdr Raycap device under the fllwing cnditins: Preferred lcatin is near the Cell Reference Grund Bar (CRGB) t prvide maximum surge prtectin Utilize a Raycap that will accmmdate necessary grwth until rack space is available Prvide a prper wire ruting path between the Raycap and DC plant. It may be necessary t install vertical cable ladder n the wall t transitin frm the Raycap t the verhead cable ladder When used indrs, NEMA style Raycap devices are nt required t be sealed using cnventinal cnduit, glands r Rxtec entry prts prvided the cables and alarm wire are prperly secured prir t entering the Raycap It is strngly recmmended that Hybrid style racks (Item Master # NEQ 16971) be utilized fr indr Raycap installatins. The Hybrid rack will accmmdate up t 3 rack munt Raycaps alng with varius cmmunicatin equipment devices. Grunding methds, per ATT-TP-76416 and Plicy Letter ATT-CEM-13002, are fully cmpliant using the Hybrid rack Page 2 f 5

AT&T C&E Mbility Prgram Office Plicy Letter Sectin 2: Exceptins fr indr sites Indr Raycap devices nt installed per Sectin 1 are grandfathered under the fllwing cnditins: Units already installed may remain in their present lcatin until existing DC trunk cables are exhausted Example, if tw DC trunk cables are currently installed, the Raycap may remain in its present lcatin until mre than 6 RRH/RRUs are installed. When the 7 th (and beynd) RRH/RRU is installed, alng with new DC trunk cables, a new rack munt unit must be installed per Sectin 1 r the existing unit must be mved and cmply with Sectin 1 Units already installed are nt required t be relcated if any f the fllwing cnditins exist: Additinal csts will be incurred t mve units Cmmercial launch dates will be delayed DC trunk cables wuld require splicing t reach the new lcatin. DC trunk cables are nt t be spliced under any cnditins If Raycap units are nt installed but are n rder and the apprpriate FIF racks are nt n rder, every effrt must be made t rder & install the FIF rack withut jepardizing cmmercial launch dates If FIF racks cannt be rdered & installed in time t meet launch dates the Raycap may be installed in the DC plant frame (belw the DC plant) prvided the fllwing prvisins are made: Terminate the minimum number f DC drps in the plant and at the Raycap t meet the immediate requirements, such as 3 RRH/RRUs fr 1 st carrier Leave adequate DC trunk cable slack t allw mving the trunk cables t a FIF rack when the next expansin prject (2C, 3C, etc.) is installed Trunk cable slack may be ciled and temprarily secured t the DC plant frame rail r t the stringer (side) f the verhead cable rack prvided it des nt interfere with ther wiring r equipment Slack shall be secured with lacing crd DC drps between the plant and Raycap shall be the prper length and must be replaced if they are nt lng enugh t prperly reach the new FIF lcatin Apprved TelcFlex wire must be used between the DC plant and Raycap per AT-002-290-701 Grund wire shall be the prper length and must be replaced if it is nt lng enugh t prperly reach the new FIF lcatin Page 3 f 5

AT&T C&E Mbility Prgram Office Plicy Letter Sectin 3: Lcatin f Raycap units at utdr sites Outdr sites (thse utilizing utdr equipment) must use an utdr rated Raycap device which is hused a NEMA enclsure. Examples f apprved mdels are shwn belw DC12-48-60-0-25E (CEQ 12659); equipped with bth 2 cnduit & gland fittings DC6-48-60-0-1B-01 (CEQ 10279); equipped with Rxtec entry prt DC6-48-60-0-1B-1E (CEQ 10506); equipped with 2 cnduit entry prts FC12PC6-10E (ANT 13887); 18 pair fiber & DC distributin nly, n DC surge prtectin Raycap devices are t be installed n a H-frame, wall, pipe, unistrut r ther acceptable munting surface that is cmpatible with the device Rack munt units are nt t be used at utdr sites regardless f munting lcatin unless they are in a dedicated cabinet, such as a Purcell FLX12, that cntains n ther equipment D nt install Raycap devices in cabinets cntaining cmmunicatins equipment such as BBUs, SIADs, etc. May expse cmmunicatins equipment t nise and pssible surge damage Des nt meet the grunding islatin requirements f ATT-TP-76416 Page 4 f 5

AT&T C&E Mbility Prgram Office Plicy Letter Sectin 4: Exceptins fr utdr sites Raycap devices at utdr sites nt installed per Sectin 3 are grandfathered under the fllwing cnditins: Units already installed may remain in their present lcatin until existing DC trunk cables are exhausted Example, if a rack munt Raycap has been installed in a cabinet, such as the DC plant r battery cabinet, and is equipped with tw DC trunk cables that are currently terminated, the Raycap may remain in its present lcatin until mre than 6 RRH/RRUs are installed. When the 7 th (and beynd) RRH/RRU is installed, alng with new DC trunk cables, a new utdr rated unit must be installed per Sectin 3 Units already installed are nt required t be relcated if any f the fllwing cnditins exist: Additinal csts will be incurred t mve units Cmmercial launch dates will be delayed DC trunk cables wuld require splicing t reach the new lcatin. DC trunk cables are nt t be spliced under any cnditins If rack munt Raycap units are nt installed but are n rder fr utdr sites, every effrt must be made t rder the crrect, utdr rates units withut jepardizing cmmercial launch dates. Rack munt (indr) units can then be re-assigned t indr sites If utdr rated Raycap devices (NEMA enclsure style) cannt be rdered & installed in time t meet launch dates the Raycap may be installed in the DC plant cabinet (belw the DC plant) r an unused space in the battery cabinet prvided the fllwing prvisins are made: Terminate the minimum number f DC drps in the plant and at the Raycap t meet the immediate requirements, such as 3 RRH/RRUs fr 1 st carrier Leave adequate DC trunk slack t allw mving the trunk cables t an utdr Raycap device when the next expansin prject (2C, 3C, etc.) is installed Trunk cable slack may be ciled and temprarily secured inside the DC plant r battery cabinet prvided it des nt interfere with ther wiring r equipment Slack shall be secured with lacing crd DC drps between the plant and Raycap shall be the prper length and must be replaced if they are nt lng enugh t prperly reach the new utdr Raycap device Apprved TelcFlex wire must be used between the DC plant and Raycap per AT-002-290-701 Grund wire shall be the prper length and must be replaced if it is nt lng enugh t prperly reach the new FIF lcatin Rack munt Raycap units may be installed in a Purcell FLX12 cabinet prvided n ther equipment is installed in the cabinet. Attentin shuld be made t the additinal space required fr the Purcell cabinet when cnsidering the verall lease ftprint needs, including future grwth Page 5 f 5