TELEPHONE: (215) Addendum No. 01

Similar documents
TELEPHONE: (215) Addendum No. 1

SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5. February 25, 2013

Addendum #1 - Bid Package #

STEVE ENNIS ARCHITECT 1108 EAST JACKSON STREET MEDFORD, OREGON 97504

CHAPTER 5 ARCHITECTURE

ADDENDUM #1. April 29, 2009

Addendum. Windsor Hall Renovations Date: October 12, 2017 Addendum No: 3 GENERAL. 1! Addendum #4 will be issued 2:00 PM Tuesday October 17, 2017.

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON

PROJECT LOCATION BOZEMAN HIGH SCHOOL. ELECTRICAL ENGINEER: Van Dykken Engineering 37 Spanish Peak Drive Bozeman, MT Phone:

ADDENDUM NO. 1 November 10, 2016

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA

Architect s Supplemental Instructions (attachment to AIA Form G710)

The following information supplements and/or supersedes the bid documents issued on July 10, 2017.

ADDENDUM_04. > narrative objective Addendum 04 Revision Changes Defined. > narrative content. end of memo. 5Gstudio_collaborative.

Wayne State University. Prentis Building Renovation. NM Project Number: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009

D. Product Certificates: Signed by manufacturers of casework certifying that products furnished comply with requirements.

Specifications: Other: sign in sheet

Chapter 22 - Cabinets & Vanities

TELEPHONE: (215) Addendum No New Solomon Solis-Cohen Elementary School SDP Contracts No. B-075C, B-076C, B-077C and B-078C of 2017/18

The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents, Inquiry No. 17-WDI-031.

ID0.1 PALO VERDE 8000 WEST US HIGHWAY 290 AUSTIN, TX SHEET INDEX: CONTACT INFORMATION: DISCLOSURES: DOCUMENT GENERAL NOTES:

INSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN


Piping & Equipment Identification

SCI-FAB Product Specifications. Casework Section 1. Part 1 General

TELEPHONE: (215) Addendum No Cooling Plant Replacement SDP Contracts No. B-080C, B-081C and B-082 of 2017/18

NCIDQ Restroom Drawing. Answers to the most common questions about this drawing for the Practicum Qpractice

Addendum Number: 1 WT White HS Additions and Renovations, Dallas ISD

SECTION FINISH CARPENTRY. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI)

SERIES 300 SINGLE HUNG WINDOW INSTALLATION

April 7, City of Verona Adam Sayre, AICP Director of Planning & Development 111 Lincoln St. Verona, WI 53593

Product Guide Specification

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions

DOCUMENT NARRATIVE PETSMART # 3131 GREEN VALLEY SAHUARITA, ARIZONA Construction Change Directive #1 (CCD-1) / September 22, 2017

CSI Section DMI Light Gage Structural Steel Framing Systems. Blocking Fire Rated Pre-cut (Proprietary) Furring Wall Preservative Treated

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO

SERIES 300 SINGLE HUNG WITH FIN WINDOW INSTALLATION

12560 W. Cedar Drive Lakewood, CO Barry Himmelman President

WHITE W/OAK TRIM NATURAL MEDIUM NORTHPORT OAK

SECTION MANUFACTURED CASEWORK

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

HOENER ASSOCIATES INC. ARCHITECTS

3/4" HDWD 'B' VENEER 1'-10 5/8" SEE PLANS FOR DEPTH, WIDTH, AND GEOMETRY OF BENCH PLYWD (2 LAYERS) HDWD 'B' TRIM w/ EASED EDGES 3 1/2"

BUILDING PLANS. BUILDING DEPARTMENT

Tender No Section St. James - Assiniboia Centennial Pool Fitness Facility Addition Page 1

Kitchen and Bath Design Planner

ADDENDUM TO THE CONTRACT. for the GLACIER FIRE STATION KITCHEN AND CLASSROOM RENOVATION. Contract No. E16-181

Jan H: ARCHITECTURAL WOODWORK (06410-H)

CABINET INSTALLATION INSTRUCTIONS

3. In case of conflict between the Drawings, Specifications, and this Addendum, this Addendum shall govern.


C. Installation shall be by experienced carpenters. Coordinate with plumbing and electrical contractors.

A. It is preferred that all submittals to be submitted electronically in PDF format.

PROJECT: ARCHITECT S SUPPLEMENTAL INSTRUCTION NO.: 002 Marquis Newberg 3914 Hayes Street Newberg, Oregon OWNER ARCHITECT X CONSULTANT

TOILET ROOM ACCESSORIES Concrete Unit Masonry Carpentry Ceramic Tile Solid Plastic Toilet Partition.

***************************************************************************************************************

Hilton Americas Guestroom Conversion (19th Fl.) Invitation to Bid

SECTION ARCHITECTURAL WOOD CASEWORK

B. American Society for Testing and Materials (ASTM):

SECTION FINISH CARPENTRY PART 1 GENERAL. 1.1 SECTION INCLUDES A. Interior Finish Carpentry Work: 1. Refer to schedule at end of Section.

ADDENDUM NO. 2. The Bid Opening has not changed it remains December 8, 2016 AT 1:30 P.M.

Excavating, Backfilling, and Compaction for Utilities Piping (Plumbing).

SECTION 10520: FIRE EXTINGUISHERS AND CABINETS

ADDENDA ADDENDUM NO. 1 DATE: MARCH 1, 2016

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS FIBRE CEMENT CLADDING

TOGGLER Specialty Anchors

INTEX Millwork Solutions SECTION EXTERIOR PVC PERGOLAS (IBC Compliant)

CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017.

INSTALLATION MANUAL STORAGE

Kevin O'Connor Design Kevin O'Connor CKD, CBD, CID

RENOVATION OF THE FARMERS MARKET Reference Number:

Music Area Casework General 1.01 Summary Related Sections Definitions Qualifications and Quality Assurance

C. Samples for Initial Selection: Manufacturer's color charts showing the full range of colors available.

Can you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation web site

Installation Guide for Andersen 400 Series Tilt-Wash Transom and 200 Series Narroline Transom Windows

222 Edgewood Crescent (Strata Lot 48) The Sequoia. 226 Edgewood Crescent (Strata Lot 49) The Douglas

Copyright 2017 AIA MasterSpec Premium 05/17 PRODUCT MASTERSPEC LICENSED BY ARCOM TO WEREVER PRODUCTS, INC.

HIA AIR CARGO HAMILTON ADDENDUM #3. Addendum No. A03 (Architectural) o Text 1 page o SK-10a o SK-10b o SK-11

BUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT

ADDENDUM No. 4 Page 1 of 8 (includes attachment)

MTJ Outdoor Baggage Claim

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT

Cascade Ph: Casework Fax: Corp

Letter of Transmittal

SECTION CUSTOM CASEWORK

A. Product Data: For each electrical identification product indicated.

Montclair, NJ ADDENDUM NO. 2 Issue Date: June 18, Request for Proposal # 898 Finley Hall Renovation

Industrial Pipe Marking

SECTION LABORATORY CASEWORK AND EQUIPMENT

SECTION PAINTS AND COATINGS

Opus Cabinets with "H Storage Unit, continued

NARROW, MEDIUM AND WIDE STILE, THERMASTILE AND DURASTILE. Installation Instructions

Contents. E-Line Series (Wood Casework) K-Line Series (Wood Casework) D-Line Series (Wood Casework)

Project No: Date: 02 September To: The Des Plaines Public Library Issued by: Lisa Schmidt

Addendum. McKee and Associates Architecture and Interior Design. No. ONE Date: Project:

July 3, CASCO Project Managers St. Louis, Missouri PETSMART STORES. 13K Q Prototype Narrative (Delta 5) Bulletin No.

SECTION PROJECT COORDINATION VIA BIM

Closet System Installation Manual

Transcription:

THE SCHOOL DISTRICT OF PHILADELPHIA BOARD OF EDUCATION Office of Capital Programs 0 North Broad Street, Third Floor - Suite Philadelphia, PA 0-0 TELEPHONE: () 00-0 Addendum No. 0 Subject: Location: Potter Thomas Classroom Modernization Project B-0C, B-0C, B-0C of 0/ Potter Thomas Elementary School 00N. th Street This Addendum, dated February, 0, shall modify and become part of the Contract Documents for the work of this project. Any items not mentioned herein, or affected by, shall be performed strictly in accordance with the original documents.. Drawings and Specifications Revised by Narrative and by Drawing Reissue: Note drawing text deletions are shown with strikethrough, drawing text additions are shown in bold a. A0: 0,0,0,0,0,0 & NEW WORK: DETAIL IS REVISED, SEE A0 REV ISSUED WITH THIS ADDENDUM. b. A00: CASEWORK SCHEDULE: The Casework Schedule is revised as follows: THE BASIS OF DESIGN CABINET SHALL BE CAMPBELL RHEA EMPIRE FULL FLUSH OVERLAY WITH SOLID WOOD EDGING. DELETE REFERENCES TO SIGNATURE STYLE CABINETS. THE BASIS OF DESIGN MODEL FOR CABINET TYPE CT IS CHANGED TO, -/ (W) X (H) X -/ (D) CABINET TYPE CT IS ADDED. BASIS OF DESIGN MODEL FOR CT SHALL BE 0, -/ (W) X (H) X -/ (D); QUANTITY OF (TWO) RUIRED. THE QUANTITIES AND TYPES OF WALL RAILS AND COAT HOOKS ARE REVISED THE ABOVE CHANGES TO THE CASEWORK SCHEDULE ARE SHOWN IN THE REVISED A00-Rev DRAWING ISSUED WITH THIS ADDENDUM. PAGE OF

d. A00: WALL UIPMENT SCHEDULE: The Wall Equipment Schedule is revised as follows: DELETE ALL THE NOTES UNDER THE COMMENTS COLUMN OF THE SCHEDULE. Work in connection with Display Boards shall be conducted as follows: s SHALL BE SUPPLIED AND INSTALLED BY OTHERS UNDER THE DIRECTION OF THE SDP. PROVIDE BLOCKING FOR s AS NECESSARY AND AS INDICATED IN THE DRAWINGS. MARKERBOARDS AND S SHALL BE SUPPLIED BY THE SDP AND INSTALLED BY THE CONTRACTOR. THE CONTRACTOR SHALL COORDINATE WITH OTHER PRIME CONTRACTORS AND FIELD VERIFY FOR THE BOARDS AND ADVISE SDP OF ANY DISCREPANCY OR INTERFERENCES AFFECTING THE DESIGN INTENT. MARKERBOARD AND INSERTS SHALL BE SUPPLIED AND INSTALLED BY THE CONTRACTOR THE ABOVE CHANGES TO THE WALL UIPMENT SCHEDULE ARE SHOWN IN THE REVISED A00-Rev DRAWING ISSUED WITH THIS ADDENDUM. e. A00: CASEWORK DETAIL: Delete WALL CABINET & COAT HOOK details Add WALL CABINET & WALL HOOK DETAIL and WALL CABINET & WALL HOOK DETAIL, ENLARGED THE ABOVE CHANGES TO THE CASEWORK DETAILS ARE SHOWN IN THE REVISED A00-Rev DRAWING ISSUED WITH THIS ADDENDUM. f. A0: INTERIOR ELEVATIONS DETAILS,,,,, ARE REVISED, SEE A0 REV ISSUED WITH THIS ADDENDUM. g. A0: INTERIOR ELEVATIONS DETAILS,,, ARE REVISED, SEE A0 REV ISSUED WITH THIS ADDENDUM. h. A00: FINISH SCHEDULE: The Finish Schedule is revised as follows: DELETE REFERENCE TO LAMINATE FINISHES. NO LAMINATE FINISHES ARE RUIRED. PAGE OF

. Questions and Clarifications. Question: Will another manufacture besides Campbell Rhea be accepted? Response: Campbell Rhea is the Basis of Design manufacturer. Manufacturers providing equal products may be submitted for review. Question: Can MBE/WBE requirements be reduced to a combined goal? Response: Combined /0% Goal already included in the Bidding Documents.. Question: Please provide a spec for Electrostatic painting. Response: Specification SECTION 0: ELECTROSTATIC PAINTING is already included in the Technical Specifications.. Question: Spec 000 Visual Display,..A, Markerboard and Tackboard infills by GC, plans say by SDP. Who is responsible for them? Response: See Item (d) of this Addendum. Question: Please confirm all visual display boards supplied by SDP will be delivered to each location by the SDP. Response: Yes, Owner supplied visual display boards will be delivered to the school.. Question: Reference spec. 000 ; Owner supplied visual display units, par.. B. please provide manufacturers installation details Response: Proceed on the basis that the Owner supplied visual display units are similar in type to those listed in specification section 0 00 VISUAL DISPLAY UNITS and install in accordance with the manufacturer s instructions as described in the specifications.. Question: Reference Supplementary Conditions section, photographs. Please consider deleting this section from scope of work as it does not seem appropriate or necessary for these type of projects. Response: : Already deleted by Section 0 00 MODIFICATIONS TO THE GENERAL AND SUPPLEMENTARY CONDITIONS. Question: Is there a basement/crawlspace below the first floor in which to access floor drain piping? Or is excavation required at the floor drains? Response: First floor is slab on grade construction, there is no crawlspace or basement. PAGE OF

. Question: What is the difference between the meanings of the (R) Remove and the (RR) Remove and Replace tags? The work descriptions appear to be identical, with new fixtures going back where the old ones were removed in both cases Response: The work is identical. Remove existing fixtures as indicated by (R) or (RR). Provide new replacement fixtures in accordance with the Keynotes and the Fixture Schedule. END OF ADDENDUM NO. Attachment(s) Drawings A0 Rev A00-Rev A0-Rev A0-Rev PAGE OF

GENERAL NOTES A B TB-. TB-. TB-. TB- FIRST A0 0 TB-. TH- MB- A CB. CS CW CW TH-. CW CW CW 0A CT CB. CS TH-. CW CW CW CW CT 0A A TB-. TB- TH- A0 0 SECOND 0 MB- TB-. TB- TB-. TB-. TB- TB-. TH- A0 THIRD 0 TB-. MB- A CB. CS CW TH-. CW CW CW CW 0A CT. SURFACES NOT PREVIOUSLY FIELD PAINTED SHALL NOT BE PAINTED U.N.O AND SHALL BE PROTECTED FROM PAINT APPLIED TO ADJACENT SURFACES.. FROM EXISTING SURFACES TO REMAIN, INCLUDING THOSE ON THE INTERIOR OF CABINETS AND CLOSETS, REMOVE TAPE, ADHESIVE RESIDUE, INK RESIDUE, CRAYON RESIDUE, STAPLES AND SIMILAR SURFACE IMPERFECTIONS AND MARKS. WHERE EXISTING SURFACES ARE TO REMAIN UNPAINTED OR ARE NOT REFINISHED THOROUGHLY CLEAN THE SURFACE. SURFACES TO RECEIVE THOROUGH CLEANING SHALL INCLUDE BUT ARE NOT LIMITED TO WINDOW GLAZING, METAL WINDOW FRAMES, WALL BASE, ROOM UIPMENT AND ROOM FIXTURES AND FITTINGS.. ALL PREVIOUSLY PAINTED SURFACES INCLUDING BUT NOT LIMITED TO WALLS, CEILINGS, SOFFITS, BEAMS, COLUMNS, CLOSET INTERIORS, EXPOSED DUCTWORK, DOORS, DOOR AND WINDOW FRAMES, TRIM, AND SHELVING SYSTEMS SHALL BE REPAINTED U.N.O. SEE FINISH SCHEDULE FOR COLORS.. ALL PREVIOUSLY VARNISHED SURFACES INCLUDING BUT NOT LIMITED TO DOORS, CASEWORK, SILLS, TRIM AND SHELVING SHALL BE PREPARED AND REVARNISHED WITH CLEAR VARNISH.. WHERE DOORS AND DOOR FRAMES OCCUR BETWEEN AREAS IN THE SCOPE OF WORK AND AREAS NOT IN THE SCOPE OF WORK REFINISH BOTH SIDES.. EXISTING AND NEW PIPES, INSULATED PIPES, WIREMOLD, CONDUIT, AND SURFACE-MOUNTED JUNCTION BOXES AND THE LIKE SHALL BE PAINTED TO MATCH WALL BEYOND, SEE FINISH SCHEDULE FOR WALL COLOR.. EXISTING FLOOR TO BE PREPARED TO RECEIVE NEW SCHEDULED FLOORING. REMOVE ALL LOOSE MATERIAL AND CREATE A LEVEL SURFACE. OFFICE OF CAPITAL PROGRAMS 0 NORTH BROAD STREET PHILADELPHIA, PA 0-0 () 00-0 () 00 - (fax) www.philasd.org SEAL: NAME (LICENSED PROFESSIONAL) STATE AND LICENSE NO: THE SHEWARD PARTNERSHIP, LLC www.theshewardpartnership.com t...0 f...0 PES DATE XX/XX/0XX 00 Chestnut Street Philadelphia, PA 0 PRINCETON ENGINEERING SERVICES, PC 0 Morgan Lane - Suite 0, Plainsboro, NJ 0 t. 0..00 www.princetonengineering.services MB- TH- TB- 0A CT 0A CT MB- TH- TB- MB- TH- TB- 0A KEYNOTES CT C TB-. TB-. FIRST 0 A0 CW CW CW TH- CW CW CW CW CW TH-. CW CW CW CW A0 SECOND 0 TB-. TB-. 0 THIRD 0 A0 CW TH-. CW CW CW CW PREPARE AND ELECTROSTATICALLY PAINT UNIT VENTILATORS AND ASSOCIATED PIPE ENCLOSURES CLEAN AND REMOVE ALL LOOSE MATERIAL FROM BUILT-IN AND FREESTANDING STORAGE FURNITURE REINSTALL PREVIOUS SANITIZER DISPENSER RETAIN EXISTING ROLLER SHADE FOR EACH WINDOW IN ROOM NEW SINK AT EXISTING PLUMBING. SEE PLUMBING DRAWINGS REINSTALL PREVIOUS PAPER TOWEL AND SOAP DISPENSERS REINSTALL PREVIOUS TOILET ACCESSORIES INCLUDING SOAP DISPENSERS, PAPER TOWEL DISPENSERS, TOILET PAPER DISPENSERS, AND MIRRORS TB- TB-. CS CB. CS CB. TB-. TB-. TB- TB- TB-. TB-. CS CB. CORRIDOR 00A NEW SINK AND CASEWORK NEW CUBBIES,SEE DETIAL DRAWINGS 0 NEW STORAGE CABINET NEW VCT FLOOR TILE NEW STANDARD FOUNTAIN,SEE PLUMBING DRAWINGS D 0 & 0 NEW WORK SCALE: /" = '-0" 0 & 0 NEW WORK SCALE: /" = '-0" 0 & 0 NEW WORK SCALE: /" = '-0" NEW MIRROR REFURBISH EXISTING WOOD CASEWORK & PROVIDE NEW TOP PREPARE WALL FOR REPAINTING A PROVIDE FINISHED END PANEL TO CUBBIES/BASE CABINET WHERE EXPOSED,TYP. BID DOCUMENT SUBMISSION JANUARY, 0 0 CW TH- CW LEGEND CW WALL-MOUNTED EDUCATIONAL SURFACE MB- TB- CW CW MB-X TB-X TH-X TT-X MARKERBOARD TACK TRACK // ADDENDUM NO. DATE REVISION E TB-. TB-. AUTISTIC SUPPORT & SPECIAL EDUCATION A0 CS CB CW B TOILET B CT CT CT *X INDICATES TYPE, SEE WALL UIPMENT SCHEDULE INTERACTIVE PANEL BOARD, NIC CASEWORK SEE ELEVATIONS AND CASEWORK SCHEDULE FOR TYPES EXISTING UNIT VENTILATOR AND PIPE ENCLOSURE SCHOOL & LOCATION POTTER-THOMAS SCHOOL 00N. th Streets, PROJECT TITLE CLASSROOM MODERNIZATION DRAWING TITLE 0,0,0,0,0,0 & NEW WORK DRAWING SCALE As Indicated LOCATION NO. XXXX DRAWN BY AGK FILE NO. XXX CHECKED BY GJC F TB- TB-. GC: EC: PC: B-0 C OF 0 / B-0 C OF 0 / B-0 C OF 0 / NEW WORK SCALE: /" = '-0" DRAWING NO. A0 SHEET 0 OF

GENERAL NOTES CASEWORK SCHEDULE Type Mark Description Model Manufacturer Width Depth Height Count Comments WALL UIPMENT SCHEDULE Type Mark Description Width Height Count Comments. NEW/EXISTING INTERACTIVE PANEL BOARDS AND MOUNTING POSTS AND BRACKETS ARE PROVIDED BY OTHERS. INSTALLATION OF INTERACTIVE PANEL BOARDS AND MOUNTING HARDWARE IS BY OTHERS. OFFICE OF CAPITAL PROGRAMS 0 NORTH BROAD STREET PHILADELPHIA, PA 0-0 A B C NEW PARTITION SCALE: " = '-0" A ACOUSTIC SEALANT CONCRETE BEAM BEYOND EXISTING WOODEN FRAME MTL CHANNEL /" MTL STUDS @ " O.C. ABUSE RESISTANT /" GWB MTL CHANNEL ACOUSTIC SEALANT SCHEDULED FLOOR FINISH C Coat Hook on Wood C. Coat Hook on Wood C. Coat Hook on Wood C. Coat Hook on Wood C. Coat Hook on Wood C. Coat Hook on Wood M M M M M M C Student Cubby M C Student Cubby M C Base Storage Cubby M C. Base Storage Cubby 0M CB Wood Base Cabinet M CB Wood Base Cabinet CM CB. Wood Base Cabinet EM CB. Wood Base Cabinet DM Wood Filler Panel N/A CS Wood Base Cabinet M CS ADA Slanted Panel 0M CT CT Wood Tall Storage Cabinet Wood Tall Storage Cabinet 0 CW Wood Wall Case CW Wall Case 0 CW Wood Wall Case ' - " 0' - " 0' - " with M- Hooks mounted to wood ledger, () hooks per unit. See dwgs on 0 hooks A00. Dimensions in casework schedule refer to wood ledger. #000 Maple Natural. EPCO CH0-ZBN- Brushed Nickel Hooks. ' - " 0' - " 0' - " with M- Hooks mounted to wood ledger, () hooks per unit. See dwgs on hooks A00. Dimensions in casework schedule refer to wood ledger. #000 Maple Natural. EPCO CH0-ZBN- Brushed Nickel Hooks. ' - " 0' - " 0' - " with M- Hooks mounted to wood ledger, () hooks per unit. See dwgs on hooks A00. Dimensions in casework schedule refer to wood ledger. #000 Maple Natural. EPCO CH0-ZBN- Brushed Nickel Hooks. ' - " 0' - " 0' - " with M- Hooks mounted to wood ledger, () hooks per unit. See dwgs on hooks A00. Dimensions in casework schedule refer to wood ledger. #000 Maple Natural. EPCO CH0-ZBN- Brushed Nickel Hooks. ' - 0" 0' - " 0' - " with M- Hooks mounted to wood ledger, () hooks per unit. See dwgs on hooks A00. Dimensions in casework schedule refer to wood ledger. #000 Maple Natural. EPCO CH0-ZBN- Brushed Nickel Hooks. ' - 0" 0' - " 0' - " with M- Hooks mounted to wood ledger, () hooks per unit. See dwgs on hooks A00. Dimensions in casework schedule refer to wood ledger. #000 Maple Natural. EPCO CH0-ZBN- Brushed Nickel Hooks. ' - /" ' - 0" ' - " See dwgs C on A00 and interior elevations for modified dimensions. Empire Maple #000 Maple Natural ' - /" ' - 0" ' - " See dwgs C on A00 and interior elevations for modified dimensions. Empire Maple #000 Maple Natural ' - " ' - " ' - 0" See dwgs C on A00 and interior elevations for modified dimensions. Empire Maple #000 Maple Natural ' - " ' - " ' - 0" See dwgs C. on A00 and interior elevations for modified dimensions. Empire Maple #000 Maple Natural -- -- -- ' - " ' - /" ' - 0" M-HEIGHT-".SEE DRG AT A00 Empire Maple #000 Maple Natural ' - " ' - /" ' - " M-WIDTH-" AND HEIGHT =".SEE DRG CB AT A00, Empire Maple #000 Maple Natural ' - /" ' - /" ' - " M-HEIGHT-". SEE DRG CB.AT A00, Empire Maple #000 Maple Natural ' - " ' - /" ' - " M-WIDTH-, HEIGHT=". SEE DRG CB. AT A00, Empire Maple #000 Maple Natural 0 V.I.F. See interior elevation for location.#000 Maple Natural ' - /" ' - /" ' - 0" M-HEIGHT=".SEE DRG CS AT A00, Empire Maple #000 Maple Natural ' - " ' - /" ' - " 0 M-CLEARANCE=0",TOTAL WIDTH=". SEE DRG CS AT A00,Empire Maple #000 Maple Natural ' - /" ' - 0 /" ' - 0" 0 #000 Maple Natural ' - /" ' - 0 /" ' - 0" #000 Maple Natural ' - " ' - " ' - /" SEE DRG CW AT A00, Empire Maple #000 Maple Natural ' - " ' - " ' - /" SEE DRG CW AT A00,Empire Maple #000 Maple Natural ' - 0" ' - " ' - /" SEE DRG CW AT A00, Empire Maple #000 Maple Natural INTERACTIVE PANEL BOARD ' - " SEE WALL UIPMENT NOTE MB- MARKERBOARD ' - 0" ' - 0" SEE WALL UIPMENT NOTE MB- MARKERBOARD ' - 0" ' - 0" SEE WALL UIPMENT NOTE MB- MARKERBOARD ' - 0" ' - 0" SEE WALL UIPMENT NOTE TB- ' - 0" ' - 0" SEE WALL UIPMENT NOTE TB-. ' - 0" ' - " SEE WALL UIPMENT NOTE TB- ' - 0" ' - 0" SEE WALL UIPMENT NOTE TB-. ' - 0" ' - 0" 0 SEE WALL UIPMENT NOTE TB- ' - 0" ' - 0" SEE WALL UIPMENT NOTE TB- ' - 0" ' - 0" SEE WALL UIPMENT NOTE TB-. ' - 0" ' - " SEE WALL UIPMENT NOTE TB-. ' - 0" ' - 0" SEE WALL UIPMENT NOTE TH-. TH- TH-. TH- TH-0 TH- TH-0 ' - " ' - " SEE WALL UIPMENT NOTE ' - 0" ' - " SEE WALL UIPMENT NOTE ' - " ' - " SEE WALL UIPMENT NOTE ' - 0" ' - " SEE WALL UIPMENT NOTE 0' - 0" ' - " SEE WALL UIPMENT NOTE ' - 0" ' - " SEE WALL UIPMENT NOTE 0' - 0" ' - " SEE WALL UIPMENT NOTE SPECIALTY UIPMENT SCHEDULE MARK DESCRIPTION COUNT COMMENTS E HAND SANITIZER DISPENSER EXISTING TO BE REINSTALLED T SOAP DISPENSER EXISTING TO BE REINSTALLED T TOWEL DISPENSER EXISTING TO BE REINSTALLED T STAINLESS STEEL ANGLE FRAME MIRROR " X 0" MODEL NO: ASI #000,AMERICAN SPECIALTIES. ALL DATA AND POWER CONDUIT AT TEACHING WALLS TO BE INSTALLED BELOW TEACHING WALL BOARDS. DO NOT RUN VERTICAL CONDUIT BEHIND. COORDINATE W/ ELECTRICAL DWGS.. SEE FINISH SCHEDULE FOR CASEWORK COLOR SELECTIONS. WALL UIPMENT NOTES. s SHALL BE SUPPLIED AND INSTALLED BY OTHERS UNDER THE DIRECTION OF THE SDP. PROVIDE BLOCKING FOR s AS NECESSARY AND AS INDICATED IN THE DRAWINGS.. MARKERBOARDS AND S SHALL BE SUPPLIED BY THE SDP AND INSTALLED BY THE CONTRACTOR. THE CONTRACTOR SHALL COORDINATE WITH OTHER PRIME CONTRACTORS AND FIELD VERIFY FOR THE BOARDS AND ADVISE SDP OF ANY DISCREPANCY OR INTERFERENCES AFFECTING THE DESIGN INTENT. () 00-0 () 00 - (fax) www.philasd.org SEAL: NAME (LICENSED PROFESSIONAL) STATE AND LICENSE NO: THE SHEWARD PARTNERSHIP, LLC www.theshewardpartnership.com t...0 f...0 PES DATE XX/XX/0XX 00 Chestnut Street Philadelphia, PA 0 PRINCETON ENGINEERING SERVICES, PC 0 Morgan Lane - Suite 0, Plainsboro, NJ 0 t. 0..00 www.princetonengineering.services D ' - " DATA JACK SEE ELEC. DWGS. QUAD RECEPTACLE SEE ELEC. DWGS. POWER & DATA NEW/EXISTING INTERACTIVE PANEL BOARD (BY OTHERS) ' - 0" DATA & POWER LOCATIONS TEACHING WALL DETAIL SCALE: /" = '-0" 0' - "0' - /" WALL (BY OTHERS) CONAN SCETAWL MOTORIZED WALL MOUNT (BY OTHERS) PROVIDE CONCEALED BLOCKING AS R'D FOR MOUNTING BRACKETS FLOOR FINISH AS SCHEDULED TYPICAL POST MOUNTING " " NEW RAIL AND HOOK TYP. COAT HOOK DETAIL SCALE: " = '-0" NEW " PARTICLE BOARD RAIL W/ SOLID WOOD EDGING AND MAPLE VENEER WITH STAIN FINISH #0. FASTEN W/ CONCEALED FASTENERS NEW COAT HOOK, EPCO CH0-ZBN- NEW F.R.T WD BLOCKING FASTENED TO EXISTING WALL SHIM OR PLANE AS NECESSARY TO SIT FLUSH WITH WALL 0' - " C, C. PARTIAL ELEVATION OF THE COAT HOOK RAIL 0' - " ' - " ' - 0" 0' - 0" 0' - 0" 0" " " VENEER CORE PLYWOOD TOP & SIDE PANELS (TYP.) VENEER CORE PLYWOOD SHELVES, TYP. METAL COAT HOOK CENTERED IN BACK PANEL METAL COAT HOOK ONE EACH SIDE VENEER CORE PLYWOOD BACK & END PANELS MT. TO WALL VINYL BASE WHERE EXPOSED KINDERGARTEN STUDENT CUBBY C,C ' - " CUBBY SECTION AND FRONT ELEVATION SCALE: /" = '-0" ' - /" ' - /" C CABINET INTERIOR C WALL CABINET (SEE NOTE.) BID DOCUMENT SUBMISSION JANUARY, 0 0 // ADDENDUM E ' - 0" WOODEN DOOR " WOOD VENEERED RAIL TO MATCH CABINET,TYP. COAT HOOK @ " A.F.F X WD BLOCKING NO. DATE REVISION SCHOOL & LOCATION POTTER-THOMAS SCHOOL 00N. th Streets, F ' - " ' - /" " ' - /" /" FIRST-THIRD BASE CABINET CB,CB.,CB. BACKSPLASH " WIRE PULL (TYP.) WOODEN DOOR TYPICAL CASEWORK SECTION SCALE: /" = '-0" ' - " ' - /" 0' - /" ' - /" ' - 0" BACKSPLASH FIRST-THIRD ADA SINK BASE CS CASEWORK TO ACCOMODATE SINK ' - 0" ' - /" " ' - 0 /" /" KINDERGARTEN SINK BASE CS " BACKSPLASH SINK BASE " WIRE PULL (TYP.) VINYL BASE ' - 0" ' - /" " /" ' - 0 /" " KINDERGARTEN BASE CABINET CB BACKSPLASH " WIRE PULL (TYP.) WOODEN DOOR VINYL BASE ' - " " " ' - " " WIRE PULL WALL CABINET & COAT HOOK CW, C WOOD VENEERED RAIL TO MATCH CABINET, TYP. COAT HOOK, EPCO CH0-ZBN- WOODEN LEDGER ' - 0" ' - " " BACKSPLASH VINYL BASE BASE STORAGE CUBBY C " NOTE: WOOD VENEERED CLOSURE AT THE EXPOSED BLOCKING COAT HOOK @ " A.F.F WALL SURFACE. FASTEN CABINETS TO ADJACENT UNITS AND TO BACKING. FASTEN WALL CABINETS THROUGH BACK, NEAR TOP AND BOTTOM, AT ENDS AND NOT LESS THAN INCHES O.C. WITH NO. 0 SCREWS OR ANCHORS, AS APPROPRATE TO SUBSTRATE, SIZED FOR -INCH PENETRATION INTO WOOD FRAMING, BLOCKING, WALL STRUCTURE OR HANGING STRIPS. WALL CABINET & WALL HOOK DETAIL ENLARGED SCALE: " = '-0" PROJECT TITLE CLASSROOM MODERNIZATION DRAWING TITLE CASEWORK AND UIPMENT DRAWING SCALE As Indicated LOCATION NO. XXXX DRAWN BY AGK GC: EC: PC: DRAWING NO. FILE NO. XXX CHECKED BY GJC B-0 C OF 0 / B-0 C OF 0 / B-0 C OF 0 / A00 SHEET OF

OFFICE OF CAPITAL PROGRAMS ' - /" ' - " ' - 0" 0 NORTH BROAD STREET PHILADELPHIA, PA 0-0 A TH- ' - " ' - 0" ' - 0" TH- ' - 0" ' - 0" ' - 0" ' - 0" ' - 0" () 00-0 () 00 - (fax) www.philasd.org SEAL: ' - " E ' - 0" CT C. CW ' - 0" ENTRY ELEVATION - RM 0 SCALE: /" = '-0" CW CW CW CW CW C. C C. C C. C C. C C ' - " ' - " ' - " ' - " ' - " T T CS ' - " ' - " ' - " CB. ' - 0" ' - " MB- TB- TEACHING WALL ELEVATION - RM 0 SCALE: /" = '-0" ' - " ' - 0" TB-. LEFT ELEVATION - RM 0 SCALE: /" = '-0" TB- ' - 0" ' - " TB-. REAR ELEVATION - RM 0 SCALE: /" = '-0" TB-. PAINT UNIT VENTILATOR PT- NAME (LICENSED PROFESSIONAL) STATE AND LICENSE NO: DATE XX/XX/0XX B ' - " ' - /" ' - " ' - " CB. ' - /" TH-. T T CW CW CW CW CW E C C. C C C. C C.C CS CT ' - " ' - " ' - " ' - " ' - " ' - " ' - " ENTRY ELEVATION - RM 0 SCALE: /" = '-0" ' - 0" ' - 0" ' - 0" ' - 0" TH- MB- TEACHING WALL ELEVATION - RM 0 SCALE: /" = '-0" ' - 0" TB- ' - " ' - 0" ' - " ' - 0" TB-. RIGHT ELEVATION - RM 0 SCALE: /" = '-0" ' - 0" TB-. PAINT PIPE ENCLOSURE P- ' - 0" ' - " ' - 0" ' - 0" TB-. TB-. PAINT UNIT VENTILATOR PT- REAR ELEVATION - RM 0 SCALE: /" = '-0" ' - 0" ' - " THE SHEWARD PARTNERSHIP, LLC www.theshewardpartnership.com t...0 f...0 PES 00 Chestnut Street Philadelphia, PA 0 PRINCETON ENGINEERING SERVICES, PC 0 Morgan Lane - Suite 0, Plainsboro, NJ 0 t. 0..00 www.princetonengineering.services C ' - " ' - 0" ' - /" ' - " TH-. CW CW CW CW CW C. C C C. C C. C C CT ' - " ' - " ' - " ' - " ' - " ENTRY ELEVATION - RM 0 SCALE: /" = '-0" T T CS ' - " ' - " ' - " ' - " ' - " 0' - " ' - " ' - /" CB. ' - " ' - 0" ' - " ' - 0" MB- ' - 0" ' - 0" TH- ' - 0" TB- ' - 0" TB-. ' - 0" TB-. PAINT PIPE ENCLOSURE P- 0 TEACHING WALL ELEVATION - RM 0 SCALE: /" = '-0" LEFT ELEVATION - RM 0 REAR ELEVATION - RM 0 SCALE: /" = '-0" SCALE: /" = '-0" ' - 0" ' - " ' - 0" ' - " ' - 0" ' - 0" TB- TB-. PAINT UNIT VENTILATOR,GRILLE AND PIPE ENCLOSURE PT- PAINT DUCT INSULATION BLACK D ' - " 0' - " ' - /" ' - " ' - " ' - " ' - " CB. T CS ' - " ' - " T ' - " TH-. CW CW CW CW CW CW C C. C C. C C. C C. C C.C. ' - " ' - " ' - " ' - " ' - " ' - 0" ' - 0" ' - /" CT E ' - 0" MB- ' - 0" ' - 0" TH- ' - 0" TB- ENTRY ELEVATION - RM 0 TEACHING WALL ELEVATION - RM 0 SCALE: /" = '-0" SCALE: /" = '-0" SCALE: /" = '-0" ' - " ' - 0" ' - " ' - 0" TB-. ' - 0" TB-. ' - " ' - 0" ' - 0" ' - 0" TB-. PAINT UNIT VENTILATOR,GRILLE AND PIPE ENCLOSURE PT- RIGHT ELEVATION - RM 0 REAR ELEVATION - RM 0 SCALE: /" = '-0" PAINT DUCT INSULATION BLACK TB- ' - 0" ' - " BID DOCUMENT SUBMISSION JANUARY, 0 0 ' - 0" E ' - " ' - /" ' - " CT ' - 0" TH-. CW CW CW CW CW C C. C C. C C. C C. C C. ' - " ' - " ' - " ' - " ' - " ' - " ' - " ENTRY ELEVATION - RM 0 SCALE: /" = '-0" SCALE: /" = '-0" T CS T 0' - " ' - " ' - " ' - " CB. ' - /" ' - " ' - 0" ' - " TH- MB- TB- ' - 0" ' - 0" ' - 0" ' - 0" TB-. ' - 0" TB-. ' - " ' - 0" ' - 0" ' - " ' - 0" ' - 0" TB- TEACHING WALL ELEVATION - RM 0 LEFT ELEVATION - RM 0 REAR ELEVATION - RM 0 SCALE: /" = '-0" 0 SCALE: /" = '-0" TB-. PAINT UNIT VENTILATOR, GRILLE AND PIPE ENCLOSURE PT- PAINT DUCT INSULATION BLACK // ADDENDUM NO. DATE REVISION SCHOOL & LOCATION POTTER-THOMAS SCHOOL 00N. th Streets, PROJECT TITLE CLASSROOM MODERNIZATION DRAWING TITLE INTERIOR ELEVATIONS ' - 0" F ' - " ' - " CB. ' - " ' - /" ' - 0" ' - 0" ' - 0" TH-. TH- T T CW CW CW CW CW MB- TB- CS ' - " ' - " C C C. C C. C C. ' - 0" C CT ' - " ' - " ' - " ' - " ' - " PAINT PIPE ENCLOSURE P- ' - " ' - 0" ' - " ' - 0" ' - 0" TB-. TB-. ' - " ' - 0" PAINT DUCT INSULATION BLACK ENTRY ELEVATION - RM 0 TEACHING WALL ELEVATION - RM 0 SCALE: /" = '-0" RIGHT ELEVATION - RM 0 SCALE: /" = '-0" REAR ELEVATION - RM 0 SCALE: /" = '-0" SCALE: /" = '-0" ' - 0" TB-. PAINT UNIT VENTILATOR,GRILLE AND PIPE ENCLOSURE PT- ' - 0" ' - " DRAWING SCALE As Indicated LOCATION NO. XXXX DRAWN BY AGK GC: EC: PC: DRAWING NO. FILE NO. XXX CHECKED BY GJC B-0 C OF 0 / B-0 C OF 0 / B-0 C OF 0 / A0 SHEET OF

OFFICE OF CAPITAL PROGRAMS 0 NORTH BROAD STREET PHILADELPHIA, PA 0-0 A ' - " E ' - " ' - /" TH-. CW CW CW CW CW ' - 0" C C. C C. C C C. C C. CT ' - " ' - " ' - " ' - " ' - " ENTRY ELEVATION - RM 0 SCALE: /" = '-0" T T CS ' - " ' - " ' - " ' - " 0' - " ' - " ' - /" CB. PAINT PIPE ENCLOSURE P- ' - 0" ' - 0" ' - 0" TH- MB- TEACHING WALL ELEVATION - RM 0 SCALE: /" = '-0" ' - 0" TB- ' - " ' - 0" ' - " ' - 0" TB-. PAINT PIPE ENCLOSURE P- LEFT ELEVATION - RM 0 SCALE: /" = '-0" ' - 0" TB-. ' - 0" ' - " REAR ELEVATION - RM 0 SCALE: /" = '-0" ' - 0" ' - 0" TB-. TB-. PAINT UNIT VENTILATOR PT- ' - 0" ' - " () 00-0 () 00 - (fax) www.philasd.org SEAL: NAME (LICENSED PROFESSIONAL) STATE AND LICENSE NO: DATE XX/XX/0XX ' - 0" THE SHEWARD PARTNERSHIP, LLC www.theshewardpartnership.com t...0 f...0 00 Chestnut Street Philadelphia, PA 0 B ' - 0" ' - /" TH- ' - 0" ' - 0" ' - 0" TH- ' - " ' - 0" ' - 0" ' - 0" ' - 0" PES ' - " ' - " CB. T T CW CW CW CW CW CW C C. C C. C C. C C C. C CS ' - /" ' - " ' - " ' - " ' - " ' - " ' - " ' - " ENTRY ELEVATION - RM SCALE: /" = '-0" CT E MB- LEFT ELEVATION - RM SCALE: /" = '-0" TB- ' - 0" ' - " TB-. RIGHT ELEVATION - RM SCALE: /" = '-0" TB-. ' - 0" ' - " ' - " ' - 0" TB-. REAR ELEVATION - RM SCALE: /" = '-0" TB-. PRINCETON ENGINEERING SERVICES, PC 0 Morgan Lane - Suite 0, Plainsboro, NJ 0 t. 0..00 www.princetonengineering.services ' - 0" C ' - " E ' - /" CT ' - 0" ENTRY ELEVATION - RM SCALE: /" = '-0" TH-. CW CW CW CW CW C. C C C. C C. C C. C ' - " ' - " ' - " ' - " ' - " T CS T ' - " ' - " ' - " CB ' - " 0' - /" ' - /" ' - " ' - " ' - 0" TB-. TB-. ' - 0" ' - " PAINT PIPE ENCLOSURE P- ' - 0" ' - 0" ' - 0" MB- TH- TB- 0 LEFT ELEVATION - RM SCALE: /" = '-0" RIGHT ELEVATION - RM REAR ELEVATION - RM SCALE: /" = '-0" SCALE: /" = '-0" ' - " ' - 0" ' - " ' - 0" TB- ' - 0" TB-. ' - " ' - 0" D ' - " ' - " ' - 0" ' - " ' - 0" 0' - 0" ' - 0" TH-0 ' - 0" MB- TB- ' - " 0' - " ' - /" ' - " ' - " ' - 0" TH- CW CW CW CW CW CW C. C C C. C C. C C. C C C. ' - " ' - " ' - " ' - " ' - " ' - " ' - /" ' - /" ' - /" ' - 0" CT CT CT CS T ' - " ' - " T CB ' - " ' - 0" ' - 0" TEACHING WALL ELEVATION - RM LEFT ELEVATION - RM RIGHT ELEVATION - RM REAR ELEVATION - RM SCALE: /" = '-0" SCALE: /" = '-0" SCALE: /" = '-0" SCALE: /" = '-0" TB-. TB-. ' - 0" ' - " ' - 0" TB-. PAINT UNIT VENTILATOR PT- ' - 0" TB- ' - " ' - 0" BID DOCUMENT SUBMISSION JANUARY, 0 0 ' - 0" ' - 0" // ADDENDUM NO. DATE REVISION E TB-. TB- ' - 0" SCHOOL & LOCATION POTTER-THOMAS SCHOOL ' - " REAR ELEVATION RM 0 SCALE: /" = '-0" ' - " 00N. th Streets, PROJECT TITLE CLASSROOM MODERNIZATION DRAWING TITLE PAINT WALL ABOVE CERAMIC WALL TILE UPTO CEILING PAINT WALL ABOVE CERAMIC WALL TILE UPTO CEILING PAINT WALL ABOVE CERAMIC WALL TILE UPTO CEILING PAINT WALL ABOVE CERAMIC WALL TILE UPTO CEILING INTERIOR ELEVATIONS F FIRST FLOOR 0' - 0" ' - 0" ' - " ' - 0" NEW PARTITION WALL NEW CERAMIC WALL TILE REINSTALL EXISTING MIRROR (EXCEPT FOR RESTROOM IN CLASS 0 PROVIDE NEW MIRROR) EXISTING SINK ' - 0" REINSTALL PREVOIUS SOAP AND PAPER TOWEL DISPENSER NEW CERAMIC WALL TILE ' - 0" NEW CERAMIC WALL TILE ' - 0" ' - 0" ' - " NEW PARTITION WALL NEW CERAMIC WALL TILE DRAWING SCALE As Indicated LOCATION NO. XXXX DRAWN BY AGK GC: EC: PC: FILE NO. XXX CHECKED BY GJC B-0 C OF 0 / B-0 C OF 0 / B-0 C OF 0 / TYPICAL RESTROOM PARTITION ELEVATION RM 0,0,0 & 0 SCALE: /" = '-0" TYPICAL RESTROOM ENTRY WALL ELEVATION RM 0,0,0 & 0 SCALE: /" = '-0" SCALE: /" = '-0" 0 TYPICAL RESTROOM REAR WALL ELEVATION RM 0,0,0 & 0 TYPICAL RESTROOM FRONT WALL ELEVATION RM 0,0,0 & 0 SCALE: /" = '-0" DRAWING NO. A0 SHEET OF