ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS

Similar documents
SECTION PROJECT COORDINATION VIA BIM

ADDENDUM #1. April 29, 2009

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D

Addendum. Windsor Hall Renovations Date: October 12, 2017 Addendum No: 3 GENERAL. 1! Addendum #4 will be issued 2:00 PM Tuesday October 17, 2017.

ADDENDUM No. 4 Page 1 of 8 (includes attachment)

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA

TRIBAL BUILDING AND DEVELOPMENT Plan Check Submittal

Answer: Only to ChurchWoods, LLC.

Residential Room Addition / Remodel Submittal Requirement Checklist

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING

INVITATION TO TENDER ITT No. PS FIRE HALL 5 + HOUSING CONSTRUCTION. ADDENDUM No. 2 and AMENDMENT No. 2

ADDENDUM #2 September 12, 2018

TELEPHONE: (215) Addendum No Cooling Plant Replacement SDP Contracts No. B-080C, B-081C and B-082 of 2017/18

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL

MTJ Outdoor Baggage Claim

ADDENDUM NO. 2. Germania Club Renovation Phase 2. Saginaw County Community Mental Health Authority WILLIAM A. KIBBE & ASSOCIATES, INC.

4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design

State College of Florida, Manatee-Sarasota

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible.

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions

SECTION PROJECT MANAGEMENT AND COORDINATION

9. Pay for the power consumed until the project has been accepted as substantially complete.

Residential Construction Checklist Single and Two Family Construction

Wayne State University. Prentis Building Renovation. NM Project Number: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT

SECTION D BIM COORDINATION DRAWINGS - CONTRACTORS

CYPRESS FAIRBANKS MEDICAL CENTER HOSPITAL

BUILDING PLAN REVIEW REQUIREMENTS

HOENER ASSOCIATES INC. ARCHITECTS

Addendum #1 - Bid Package #

Notre Dame High Addition/Renovation Addendum 3 Page 1

The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents, Inquiry No. 17-WDI-031.

ADDENDA ADDENDUM NO. 1 DATE: MARCH 1, 2016

Hall of Waters List of Historic Drawings

Commercial Infill Project Guide

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA

03/7/12 Issuance UTD Section Page 1 of 5 Electrical General

HAMMEL ASSOCIATES ARCHITECTS, LLC 2 5 E A S T G R A N T S T R E E T, S U I T E L A N C A S T E R, P E N N S Y L V A N I A

Bid No. B14-02 Building 100 HVAC Improvements

HUSSEY GAY BELL SAVANNAH, GEORGIA

Addendum to Description of Services for Building and Planning, Digital Design. The Association of of Consulting Engineers

State College Area School District

ADDENDUM 1. This Addendum forms part of and modifies Proposal Documents dated, October 31, 2018, with amendments and additions noted below.

05BDB ADDENDUM 002. Thomas W. Wathen Business Division Building Renovation GENERAL ITEMS:

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT

Procurement Department Bid Office Customer Center 1 st Floor, Room W. Church Street Jacksonville, Florida 32202

Request for Information 0026

1. Land survey Work. 2. Civil and Structural engineering services.

PMA ONLINE TRAINING. Commercial Drawings. One Hour Continuing Education

MSU Barnard Hall 105 Cleanroom Installation PPA # Page 1

To the Drawings and/or Specifications for. Board of Education of Harford County Lancaster, PA 17603

DOCUMENT LIST OF DRAWINGS, TABLES AND SCHEDULES

INDEX OF SHEETS FLAMING GORGE RANGER DISTRICT OFFICE ADDITION REGION 4 INTERMOUNTAIN REGION ASHLEY NATIONAL FOREST DRAWING SHEET INDEX

Owner / Architect Certification of Complete Documentation for the Additions and Remodels Conditional Approval Review

ADDENDUM NO. 1 November 10, 2016

DOCUMENT SUBMITTAL REQUIREMENTS FOR AN ALTERATION OR ADDITION TO AN EXISTING SINGLE-FAMILY DWELLING OR MULTI-FAMILY DWELLING

Marshall Truck Station Laboratory Addition Project No. TZ MnDOT

Permits (Submitted to Permit Counter) APPLICATION CHECKLIST

1.01 NOTICE TO BIDDERS

July 3, CASCO Project Managers St. Louis, Missouri PETSMART STORES. 13K Q Prototype Narrative (Delta 5) Bulletin No.

ADDENDUM NO. 02 July 31, 2012

This specification describes the minimum technical requirements for drawings, as applicable to all disciplines.

CHAPTER 5 ARCHITECTURE

A/E REVIEW CHECKLIST HVAC

OCPS Submittal Register for Product Data and Shop Drawing Reviews

Quality Control Checklist - Design Drawings

Community & Economic Development Department Planning Division Frederick Street PO Box 8805 Moreno Valley, CA SUBMITAL REQUIREMENTS

U of I Facilities Standards Updates for 2017

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO

February 18, Re: Zephyr Lakes Amenity Center Zephyrhills, Florida

BUILDING STANDARDS BUILDING AND DEVELOPMENT PERMIT APPLICATION DRAWING REQUIREMENTS

TO WHOM IT MAY CONCERN:

HANSCOM FIELD ARFF AND CBP BUILDING

Customer Connection Guide Updates Effective May 2017

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

James W. Moore, PE / Brandon D. Enevold, PE / Kjersten E. Kuhta, PE Dylan J. Cunningham, PE / Jacob L. Deering, PE / Joel R.

Bestall Collaborative Limited Planning Environment Construction Management Development

SPARTAN DAY CAMP 4814 FREEDOM RING RD

CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017.

Stantec Architecture Inc South Flores Street Suite 201 San Antonio TX Tel: (210) Fax: (210)

PROJECT: ARCHITECT S SUPPLEMENTAL INSTRUCTION NO.: 002 Marquis Newberg 3914 Hayes Street Newberg, Oregon OWNER ARCHITECT X CONSULTANT

KidsAbility Guelph Hub Renovation ADDENDUM #2 Project No.:

November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA. Y CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT

Industrial Pipe Marking

April 7, City of Verona Adam Sayre, AICP Director of Planning & Development 111 Lincoln St. Verona, WI 53593

NEW SEVICE CENTER BOB HART CHEVROLET. 495 S. 7th St. E:\RE Smith New Logo.jpg VINITA, OK RE SMITH BOB HART CHEVROLET NEW SERVICE CENTER

This Revision No. 01 becomes as fully a part of the first issued documents as if originally issued therewith or originally contained therein.

Travis County ESD #1. Building Plan Submittals. Information Bulletin. Fire Marshal Hancock

Spec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN

This is being reviewed, additional comment to follow Marmoleum tile has been removed and replaced with a biobased VCT.

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA

12560 W. Cedar Drive Lakewood, CO Barry Himmelman President

Design Deliverables. Summary. A. Expectations for Design Deliverables:

FAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services. ADDENDUM #4 December 5, 2014

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

SECTION EMERGENCY RESPONDER RADIO COVERAGE SYSTEMS

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS

Transcription:

ADDENDUM NO. TWO To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS Prepared By: ARCHITECT Bhide & Hall Architects, P.A. 1329-C Kingsley Ave. Orange Park, FL 32073 Certificate No. AAC000569 Date: June 28, 2016 Index: Number Discipline Topic 1 Non-Technical RFI #001 Reply 2 Architectural Architectural drawing revisions Attachment A 3 Civil Civil Engineering drawing revisions Attachment B 4 Structural Structural Engineering drawing revisions Attachment C 5 Mechanical Mechanical Engineering drawing revisions Attachment D 6 Fire Protection Fire Protection Engineering drawing revisions Attachment E 7 Electrical Electrical Engineering drawing revisions Attachment F 8 Technology Technology Engineering drawing revisions Attachment G 9 Specifications Specification Section 07 84 00, Firestopping added 10 Specifications Specification Section 33 32 19, City of Palm Coast Standard Pump Station added 11 Specifications Multiple Electrical specification sections modified. 12 Specifications Specification Section 27 00 10 revised. 13 Specifications Specification Section 27 05 00 revised. 10 ITEMS TOTAL Item No. 1, RFI #001 reply. Responses to RFI #001 submitted by Bidders is attached. Question: What are the sizes of the utility pipes, what is the method of insulation, what is the method of excavation depth? Answer: The sizes of the utility pipes are in question are specified on the Civil Engineering drawings. The means and methods for the installation of these utilities shall be determined by the Contractor. Page 1 of 3

Item No. 2, Architectural drawing revisions Attachment A See attached revised architectural drawings and Revision Summary (Attachment A ) for modifications and/or clarifications to select drawings. Item No. 3, Civil Engineering drawing revisions Attachment B See attached revised civil engineering drawings and Revision Summary (Attachment B ) for modifications and/or clarifications to select drawings. Item No. 4, Structural Engineering drawing revisions Attachment C See attached revised structural engineering drawings and Revision Summary (Attachment C ) for modifications and/or clarifications to select drawings. Item No. 5, Mechanical Engineering drawing revisions Attachment D See attached revised mechanical engineering drawings and Revision Summary (Attachment D ) for modifications and/or clarifications to select drawings. Item No. 6, Fire Protection Engineering drawing revisions Attachment E See attached revised fire protection engineering drawings and Revision Summary (Attachment E ) for modifications and/or clarifications to select drawings. Item No. 7, Electrical Engineering drawing revisions Attachment F See attached revised electrical engineering drawings and Revision Summary (Attachment F ) for modifications and/or clarifications to select drawings. Item No. 8, Technology Engineering drawing revisions Attachment G See attached revised electrical engineering drawings and Revision Summary (Attachment G ) for modifications and/or clarifications to select drawings. Item No. 9, Specification Section 07 84 00, Firestopping added. Specification Section 07 84 00, Firestopping has been added to the specifications. The added Section is attached herewith. Item No. 10, Specification Section 33 32 19, City of Palm Coast Standard Pump Station added. Specification Section 33 32 19, City of Palm Coast Standard Pump Station has been added to the specifications to provide additional information regarding the Sanitary Sewer Lift Station included as part of Section 01 97 20, Allowances. The added Section is attached herewith. Item No. 11, Multiple electrical specification sections modified. The following electrical specification sections have been modified to correct and/or deleted erroneous specification section references: Section 26 05 19, Section 26 05 26, Section 26 24 13, Section 26 24 16, Section 26 28 13, Section 26 29 23, Section 26 32 13 and Section 26 36 00. The revised Sections are attached herewith. Page 2 of 3

Item No. 12, Specification Section 27 00 10, General Technology Provisions revised. Specification Section 27 00 10, General Technology Provisions has been revised to accommodate the G6 standards required by FLARNG. The revised Section is attached herewith. Item No. 13, Specification Section 27 05 00, Structured Cabling revised. Specification Section 27 05 00, Structured Cabling has been adjusted to change the cabling standard. END OF ADDENDUM NO. TWO Page 3 of 3

ADDENDUM NO. TWO Attachment A Architectural Drawing Revision Summary: G0.1 1. Revised and updated list of drawings for Mechanical, Electrical and Technology (Vol 2) disciplines to match sheets contained within the Volume 2 set of drawings. 1LS1 1. Symbol and notation for Type K fire extinguisher added to Life Safety Legend. 2. Removed northern fire alarm annunciator panel from Room 100, Lobby. A1.1 1. Gate access control keypad has been relocated to north side of roadway. 2. Dumpster enclosure size increased to allow for two dumpsters 3. Loading ramp on east side of property moved to west approximately 10 feet 4. Asphalt apron at loading ramp increased approximately 10 feet to the north 5. 12 foot wide asphalt driveway added at LP tank enclosure A1.2 1. Notation for gate latch and keeper hardware added to elevation of dumpster enclosure on Detail 9. 2. Elevation of dumpster enclosure on Detail 9 updated to match plan 3. Dumpster enclosure shown on Detail 8 enlarged to accommodate two dumpsters. A1.3 1. Detail 4 added to sheet to provide scope of work for gate access control keypad. 2. Proposed location of gate access control keypad has been added to gate plan located on this sheet. 1A2.3 1. Door 126A removed from the project. 2. Fire extinguisher cabinet located at door 136A has been relocated to the adjacent Corridor 5 (Room 134) wall. 3. Door 186B has been renumbered to Door 186A. 1A2.4 1. Exterior door 145B has been renumbered to door 145A. 1A2.5 1. Addition information added to steel columns at Room 137, Gear Lockers. 1A2.7 1. Door 186C has been renumbered to Door 186B. 1A2.8 1. Door 250A added to Room 250, Electrical 3. 1A3.1 1. Detail 2/Sheet 1A3.2 callout added to Elevation 1. 1A5.2 1. Elevation notation on Section 7 changed from SECOND FLOOR to TOP OF VAULT. 1A5.4 1. Pipe bollard and wall finish information added to Section 2. 1A6.1 1. Additional information included at Details 1 and 5 regarding extents of wall and valley flashing/underlayment. 2. Detail 5 in bottom right corner of drawing renumbered to Detail 6. 1A7.1 1. Additional dimensions included at ceiling dome in Room 101, Lobby. 2. Motorized projection screens added to Room 121. 1A7.2 1. Motorized projection screens added to Rooms 177 and 179. Page 1 of 2 1329-C Kingsley Avenue Orange Park Florida 32073

1A7.4 1. Decorative star medallion removed from Detail 5. 2. Additional dimensions included at ceiling Details 1 and 2. 1A7.5 1. Motorized projection screens added to Rooms 203, 226, 227, and 106 (Assembly Hall). 2. Adjusted location of Room 220 room number for clarity. 3. Decorative star medallions removed (16 locations) from ceiling of Room 106, Assembly Hall. 1A7.6 1. Motorized projection screens added to Rooms 235, 238, and 258. 1A11.1 1. Door 126A eliminated from Door Schedule. 2. Door 168B renamed to Door 168A. 3. Finish of doors and frames for Doors 149A, 153A, and 157A have been changed from P, paint to FF, factory finish to match specifications. 1A11.2 1. Door 250A added to Door Schedule. 1A13.4 1. Added Type V designation to Detail 1 drawing title. 3A2.1 1. Additional dimensions included regarding distance between Unheated Storage Building and Loading Ramp shown on plan. END OF ADDENDUM NO. TWO ATTACHMENT A Page 2 of 2 1329-C Kingsley Avenue Orange Park Florida 32073

ADDENDUM NO. TWO Attachment B Civil Engineering Drawing Revision Summary: C2.0 1. Loading ramp on east side of property moved to west approximately 10 feet. 2. Asphalt apron at loading ramp increased approximately 10 feet to the north. 3. Addition dimensions added to loading ramp area. 4. 12 foot wide asphalt driveway added at LP tank enclosure. 5. Concrete equipment pad added at southwest corner of Maintenance Building for electrical transformer. C4.0 1. Loading ramp on east side of property moved to west approximately 10 feet. 2. Asphalt apron at loading ramp increased approximately 10 feet to the north. C5.0 1. Additional notation regarding sanitary sewer lift station scope of work added for clarity. 2. Location of water service entering Readiness Center has been moved slightly east to avoid conflict with fire protection water line in the affected area. END OF ADDENDUM NO. TWO ATTACHMENT B Page 1 of 1

ADDENDUM NO. TWO Attachment C Structural Engineering Drawing Revision Summary: 1S1.1A 1S1.1B 1S1.1C 1S1.1D 1S1.2A 1S1.2B 1. Add section cut 10/S3.8 near column grid A.6-4. 2. Add Plan Note 21, Refer to Sheet S3.3 for Contractor Selected options for pipes crossing footings. 3. Delete door 126A into Women Shower room. 1. Add section cut 10/S3.8 near column grid F-3. 2. Add Plan Note 21, Refer to Sheet S3.3 for Contractor Selected options for pipes crossing footings. 1. Add Plan Note 21, Refer to Sheet S3.3 for Contractor Selected options for pipes crossing footings. 1. Add Plan Note 21, Refer to Sheet S3.3 for Contractor Selected options for pipes crossing footings. 1. Add section cut 10/S3.8 near column grid A.6-4. 1. Add section cut 10/S3.8 near column grid F-3. 2. Add door to Electrical room neat column grid F-3. 2S1.1 1. Add Plan Note 8, Refer to Sheet S3.3 for Contractor Selected options for pipes crossing footings. END OF ADDENDUM NO. TWO ATTACHMENT C Page 1 of 1

ADDENDUM NO. TWO Attachment D Mechanical Engineering Drawing Revision Summary: M0.3 1. Revised VTU notes to indicate all 24V control power to the boxes from the transformers are by the controls contractor. M1.1 1. Added clearance dimensions for the chiller yard. M2.1 1. Added notes to clarify where ducts route into the attic space. M2.2 1. Added notes to clarify where ducts route into the attic space. M2.3 1. Relocate fan coil FCU-1S-1 to be located above the door. 2. Added note that all dampers are to be 24V and all 24V control power will be provided by the controls contractor. M2.5 1. Rerouted ductwork through the attic space. Clarified ducts located in the attic. M2.6 1. Rerouted ductwork through the attic space. Clarified ducts located in the attic. M2.7 1. Provided sizes for the VRF piping. M2.8 1. Provided sizes for the VRF piping. M2.9 1. Provided sizes for the VRF piping. M2.10 1. Provided sizes for the VRF piping. M2.11 1. Provided sizes for the VRF piping. M2.12 1. Provided sizes for the VRF piping. M2.14 1. Located AHU-2M above door. M3.1 1. Provided clarification for ductwork routed through the attic. M3.2 1. Provided clarification for ductwork routed through the attic. M3.4 1. Duct/structural coordination. M4.3 1. Boiler Detail added showing housekeeping pad. END OF ADDENDUM NO. TWO ATTACHMENT D Page 1 of 1

ADDENDUM NO. TWO Attachment E Fire Protection Engineering Drawing Revision Summary: F2.1 1. Added ansul system scope for second kitchen hood. END OF ADDENDUM NO. TWO ATTACHMENT E Page 1 of 1

ADDENDUM NO. TWO Attachment F Electrical Engineering Drawing Revision Summary: E1.1 1. Relocated irrigation pump and the controller. 2. Revised site lighting circuit. E2.1 1. All homerun circuit designations were revised to provide more appropriate breaker layout in panels. E2.2 1. All homerun circuit designations were revised to provide more appropriate breaker layout in panels. E2.3 1. All homerun circuit designations were revised to provide more appropriate breaker layout in panels. E2.4 1. All homerun circuit designations were revised to provide more appropriate breaker layout in panels. E2.5 1. All homerun circuit designations were revised to provide more appropriate breaker layout in panels. E2.6 1. All homerun circuit designations were revised to provide more appropriate breaker layout in panels. E2.9 1. Revised circuits for kitchen equipment. Revised circuit for coffee urn to match cutsheet. E2.10 1. Added note for coordination location water proof disconnect in elevator pit. E3.1 1. Revised and added general lighting notes. E3.2 1. Revised and added general lighting notes. 2. Correct lighting circuiting E3.3 1. Revised and added general lighting notes. 2. Relocated lighting relays E3.4 1. Revised and added general lighting notes. E3.5 1. Revised and added general lighting notes. E3.6 1. Revised and added general lighting notes. E4.1 1. Relocated fire alarm speakers E4.2 1. Relocated fire alarm speakers E4.3 1. Relocated fire alarm speakers E4.5 1. Relocated fire alarm speakers E4.6 1. Relocated fire alarm speakers E5.4 1. Panel changes per plan circuiting revisions. E5.5 1. Panel changes per plan circuiting revisions. E5.6 1. Panel changes per plan circuiting revisions. Page 1 of 2

Sheet Revision E5.7 1. Panel changes per plan circuiting revisions. E5.8 1. Panel changes per plan circuiting revisions. E5.9 1. Panel changes per plan circuiting revisions. E5.10 1. Panel changes per plan circuiting revisions. END OF ADDENDUM NO. TWO ATTACHMENT F Page 2 of 2

ADDENDUM NO. TWO Attachment G Technology Engineering Drawing Revision Summary: T2.2 1. Vault cable tray segments have been reduced due to a comment from owner. Note added to Technology symbol legend to refer to technology specifications for the guards G6 standard.2. T2.5 1. Vault cable tray segments have been reduced due to a comment from owner. Note added to Technology symbol legend to refer to technology specifications for the guards G6 standard. END OF ADDENDUM NO. TWO ATTACHMENT G Page 1 of 1