ADDENDUM NO. 2. Furnace Bridge - Installation. Essex County, NY. July 29, 2015

Similar documents
shawprecastsolutions.com BEBO Arch Systems PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions.

City of Waltham Purchasing Department Waltham, Massachusetts ADDENDUM NO. 2

CHARLES COUNTY GOVERNMENT ITB NO ST. MARK S PUMP STATION UPGRADE

For crossing under a railroad, contact the specific railroad company's engineering department.

PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin

Section Meetings Section Material and Equipment. None Required

November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA. Y CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT

SECTION SUBMITTAL PROCEDURES

StormTrap Guide Specification. StormTrap SingleTrap on Pad Foundation Groundwater BELOW Invert Revised 11/21/18

TG Glazing Design-Build

Proposal PROJECT MANUAL P R O P E R T Y M A N A G E M E N T F A L L O N C O U N T Y. Baker, MT P.O. Box 846

BID DOCUMENTS FOR THE PURCHASE OF PRECAST CONCRETE BOX CULVERT

ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO.

StormTrap Guide Specification. StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17

580 - NOISE BARRIERS OPSS 580 INDEX

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA

CONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION

Procurement Department Bid Office Customer Center 1 st Floor, Room W. Church Street Jacksonville, Florida 32202

Can you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation web site

B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422

Suggested Reinforcement Detailing Practices Based on comments from R&D and ES ESS Committees

CHAPMAN GRIFFIN LANIER SUSSENBACH ARCHITECTS, INC. ARCHITECT S ADDENDUM NO. 06

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

JUNE 27, 2016 ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS SYRACUSE HANCOCK INTERNATIONAL AIRPORT CULVERT REPLACEMENT FOR RUNWAY 28 APPROACH ACCESS ROAD

State College of Florida, Manatee-Sarasota

THE TRANSPORTATION ISSUE

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges

HIGH TENSION CABLE BARRIER (HTCB)

SECTION G ESTIMATE OF QUANTITIES

PROCEDURE FOR PROCESSING WORKING DRAWINGS

Update: July 20, 2012

CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT

CITY OF NEW WESTMINSTER SECTION Westminster Pier Park ADDENDUM NO. 1 Landscape Contract

Working Drawing Manual

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES

1.01 NOTICE TO BIDDERS

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES

INVITATION FOR BID (IFB) IFB NO. GSWA

The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents, Inquiry No. 17-WDI-031.

MPA Project No. M545-C2 Project Title: New Berth 10 Project - Phase II Location: Conley Terminal, South Boston, Massachusetts

SECTION SCHEDULE OF VALUES PART 1 - GENERAL 1.1 THE REQUIREMENT A. This Section defines the process whereby the Schedule of Values (Lump Sum

OFFICE OF MANAGEMENT AND FINANCE

Answer: Qualification statement should be provided with the bid.

SECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts.

STATE OF TEXAS Agreement of Sale COUNTY OF TARRANT

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

Montclair, NJ ADDENDUM NO. 1 Issue Date: May 15, 2017

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS

B. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections

CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT CHABOT COLLEGE CAMPUS MASTER SIGN PROGRAM, PHASE 2 BID NO

A. Extent of structural precast concrete work is shown on drawings and in schedules.

James Luebke, PE Structural Development Engineer WisDOT Bureau of Structures

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

James W. Moore, PE / Brandon D. Enevold, PE / Kjersten E. Kuhta, PE Dylan J. Cunningham, PE / Jacob L. Deering, PE / Joel R.

Renewable Water Resources Greenville, South Carolina. CONTRACT DOCUMENTS Reedy River Basin Sewer Tunnel ADDENDUM III - CONTRACT REVISIONS.

ADDENDUM NO. 2. Germania Club Renovation Phase 2. Saginaw County Community Mental Health Authority WILLIAM A. KIBBE & ASSOCIATES, INC.

CONVEYANCE PIPELINE AND PUMP STATION

ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

NIAGARA REGIONAL HOUSING MZE FILE NO

Anti-Trust Statement

SCHOOL BOARD OF BREVARD COUNTY PURCHASING DEPARTMENT 2700 JUDGE FRAN JAMIESON WAY VIERA, FL Estimated

SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR WELL MAINTENANCE SERVICES ADDENDUM NO.

MTJ Outdoor Baggage Claim

SECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents.

SUBSTATION SECURITY WALL INSTALLATION MANUAL

Precast Bridge. in only Eight Days. profile. Minimizing construction-related traffic delays and improving workzone

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Construction Tolerances - The following tolerances apply to cast-in-place structures:

TELEPHONE: (215) Addendum No New Solomon Solis-Cohen Elementary School SDP Contracts No. B-075C, B-076C, B-077C and B-078C of 2017/18

Article 1-2: Specification Section CLOSEOUT PROCEDURES: A, Warranty: Reference to Division shall be changed to

TABLE OF CONTENTS 1200 PLAN PREPARATION

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

STATE UNIVERSITY CONSTRUCTION FUND

Community Meeting UPDATE ON ASILOMAR LANDSLIDE RETAINING WALL PROJECT. City of Los Angeles Bureau of Engineering. August 24, 2016

SECTION ADDENDA EL DORADO IRRIGATION DISTRICT CARSON CREEK 2 LIFT STATION ADDENDUM NO. 1 JULY 12, 2017

I. GENERAL: The Bidding and Contract Documents for Riverside North Parking Lot are modified as described in this Addendum.

Answer: Only to ChurchWoods, LLC.

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA

PRACTICE NOTE NO: 13 Version 1 Amended March 2001 Page 1 of 6 PRECAST CONCRETE ELEMENT DESIGN RESPONSIBILITIES AND CONTRACTUAL ARRANGEMENTS

ADDENDUM No. 4 Page 1 of 8 (includes attachment)

Working Drawing Procedure

GNSS CONSTRUCTION INSPECTION EQUIPMENT

Addendum. Windsor Hall Renovations Date: October 12, 2017 Addendum No: 3 GENERAL. 1! Addendum #4 will be issued 2:00 PM Tuesday October 17, 2017.

ADDENDUM No. 1. RFP No Gallup Park Custom Playground Equipment Design. Due: Tuesday, August 4, 2015 by 10:00 a.m.

ADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION

1.1 RELATED DOCUMENTS

Maintenance of Traffic sequence of operations including any phasing and detour maps;

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA

How to Estimate the Cost of a. Precast Concrete Parking Structure

SECTION DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS

MINUTES OF MEETING. The following Questions were asked and answers were provided accordingly:

001: 2007 CEB STANDARD

ADDENDUM NO. 1. November 6, 2016 BIDDING AND CONTRACT DOCUMENTS FOR

The enclosed information is provided for consideration in the preparation of your response to the abovereferenced

WTP FILTERS REHABILITATION (FILTERS 1, 2, 3, & 7) CITY OF CARTERSVILLE

SPECIFICATIONS FOR THE MANUFACTURE AND DESIGN OF PRECAST THREE SIDED ARCH STRUCTURES, WINGWALLS AND HEADWALLS

Transcription:

ADDENDUM NO. 2 Furnace Bridge - Installation Essex County, NY July 29, 2015 TO ALL HOLDERS OF BIDDING DOCUMENTS: This Addendum, issued to bid document holders of record, indicates clarifications to the bid documents for the Furnace Bridge - Installation project. All clarifications described herein shall be incorporated into the Contractor s bid proposal. This Addendum is part of the Contract Documents. Adjustments required by each item shall be understood to apply to all document references affected by the clarifications described. 1. General: A copy of the Geotechnical Report for the project is attached to this Addendum for reference only. This report is provided for informational purposes and shall not be considered to be part of the contract documents. If distributed to others by the bidder or contractor, it must be delivered in its entirety only. It is the bidder s responsibility to determine if the information contained in this geotechnical report is adequate for bidding purposes. The bidders may make their own investigations, tests and analyses for use in bid preparation if additional information is required. Contractors will not be relieved of any of their obligations for performance of the work for the project, nor shall they be entitled to any additional compensation on the premise of differing subsurface conditions or soils types which may be encountered. Individual subsurface boring logs were prepared based upon the visual classifications and laboratory testing. The individual subsurface logs and keys explaining the terms used in their preparation are presented in the geotechnical report and should be reviewed for a description of the conditions encountered at the specific test boring locations. It should be understood that conditions are only known at the specific depths and locations sampled. Conditions at other depths and locations may differ. Determinations of earthwork quantities for bidding must not rely solely on the soil strata thicknesses measured at the discrete test boring locations completed for this investigation. The bidder should perform their own explorations as needed to obtain representative thicknesses of soil layers and strata as required to prepare their bids for the work. 2. General: The County has received bids for supply of the precast concrete materials for the project and has awarded the fabrication and delivery of such precast materials to The Fort Miller Co., Inc.. Bidders shall note the following delivery schedule for such Page 1 of 2

precast concrete materials and shall coordinate their schedule for the work accordingly: Three-sided rigid frame precast concrete bridge units - 9/15/15 Precast concrete retaining wall units - 9/21/15 3. General: Bidders shall note that the precast concrete materials supplier has determined that the precast concrete retaining wall system will consist of T-Wall units with the lowest tier of units adjacent to the cast-in-place concrete bridge footings and the precast concrete fascia bridge units having stem lengths of sixteen feet. Bidders shall adjust their earthwork quantities as required to accommodate these stem lengths. 4. General: Bidders shall note that the precast concrete materials supplier has determined that the precast concrete bridge system shall consist of six (6) HySpan units with estimated weights not to exceed 40 Tons per unit. 5. General: As noted in the Pre-Bid Meeting Minutes included in Addendum No. 1, modifications have been made to the stream channel reconstruction from the information currently indicated on the bidding documents. DELETE the drawing Cover Sheet and Drawing Nos. N-1, C-1 through C-4 and COE-1 and SUBSTITUTE THEREFORE the attached Cover Sheet and Drawing Nos. N-1, C-1 through C-5 and COE-1, all bearing the Revision date 7/29/15 and designation Issued with Addendum 2". Bidders shall include all costs for the stream channel reconstruction work in their Bid for the project. END OF ADDENDUM NO. 2 (attachments) Page 2 of 2

FURNACE BRIDGE ********************************************** GEOTECHNICAL INVESTIGATION REPORT

The following copy of the Geotechnical Report for the site included in this project is provided to the bidders for reference only. This report is provided for informational purposes and shall not be considered to be part of the contract documents. If distributed to others by the bidder or contractor, the report must be delivered in its entirety only. It is the bidder s responsibility to determine if the information contained in this geotechnical report is adequate for bidding purposes. The bidders may make their own investigations, tests and analyses for use in bid preparation if additional information is required. Contractors will not be relieved of any of their obligations for performance of the work for the project, nor shall they be entitled to any additional compensation on the premise of differing subsurface conditions or soil types which may be encountered. Individual subsurface boring logs were prepared based upon the visual classifications and laboratory testing. The individual subsurface logs and keys explaining the terms used in their preparation are presented in the geotechnical report and should be reviewed for a description of the conditions encountered at the specific test boring locations. It should be understood that conditions are only known at the specific depths and locations sampled. Conditions at other depths and locations may differ. Determinations of earthwork quantities for bidding must not rely solely on the soil strata thicknesses measured at the discrete test boring locations completed for these investigations. The bidder should perform their own explorations as needed to obtain representative thicknesses of soil layers and strata as required to prepare their bids for the work.