Lincoln County Tax Appraisal Office Project No. RFB

Similar documents
ADDENDUM NO. 3, March 14, 2017 A.B.C. No

ADDENDUM TO RFP DOCUMENTS

COUNTY OF NORTHUMBERLAND Addendum No. 3 Request for Quotations To Renovate the Grafton Recreation Centre for a Licensed Child Care Centre

ADDENDUM #2 September 12, 2018

Addendum No. 1 page 1

CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017.

Commercial Infill Project Guide

Residential Construction Checklist Single and Two Family Construction

Company. Signed: Date:

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA

Chuck Caesar. VIA: /Webposting April 27, 2017

ADDENDUM #1. April 29, 2009

ADDENDUM 1. This Addendum forms part of and modifies Proposal Documents dated, October 31, 2018, with amendments and additions noted below.

SPARTAN DAY CAMP 4814 FREEDOM RING RD

HAMMEL ASSOCIATES ARCHITECTS, LLC 2 5 E A S T G R A N T S T R E E T, S U I T E L A N C A S T E R, P E N N S Y L V A N I A

Southeastern Pennsylvania Transportation Authority 1234 Market Street Philadelphia, PA

ADDENDUM NO. 2. The Bid Opening has not changed it remains December 8, 2016 AT 1:30 P.M.

12560 W. Cedar Drive Lakewood, CO Barry Himmelman President

Single-Family Dwelling Submittal Requirements

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO.

City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA Phone: Fax:

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS

REVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

CHICAGO LANDMARKS PERMIT APPLICATION AND PRE-PERMIT SUBMISSION REQUIREMENTS

COTTAGES AT OVERBROOK THE 'WOODSIDE' 541 LOWNDES HILL ROAD GREENVILLE, SC

SUBMITTAL REQUIREMENTS FOR COMMERCIAL SIGNAGE PROJECTS

PLAN SUBMITTAL REQUIREMENTS

Addendum. Windsor Hall Renovations Date: October 12, 2017 Addendum No: 3 GENERAL. 1! Addendum #4 will be issued 2:00 PM Tuesday October 17, 2017.

COVER SHEET A0.1 A0.1 COVER SHEET A1.1 FLOOR PLANS - FOUNDATION & MAIN LEVEL A1.2 FLOOR PLANS - UPPER LEVEL & ROOF A3.1 SECTIONS & INTERIOR ELEVATIONS

ADDENDUM TO RFQ/P DOCUMENTS PROJECT # ADDENDUM: #01

Exhibit A Project Identification. Exhibit B Project Charter / Project Intent. Exhibit C Project Scope. Exhibit C Project Schedule

Wayne State University. Prentis Building Renovation. NM Project Number: Niagara Murano 2215 Cole Street Birmingham, Michigan, 48009

4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118

APPLICATION FOR COMMERCIAL CONSTRUCTION FIRE AND LIFE SAFETY PLAN REVIEW PROJECT INFORMATION: Project phone: Project Address: City: State: Zip:

CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET

TO WHOM IT MAY CONCERN:

ADDENDUM NO. 3. Ellis County Elections Building

BUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT

REQUEST FOR PROPOSALS

Stantec Architecture Inc South Flores Street Suite 201 San Antonio TX Tel: (210) Fax: (210)

PITKIN COUNTY STANDARDS for ELECTRONIC DRAWINGS and DOCUMENTS SUBMISSION

IMPORTANT ADDITIONAL CONTRACTOR INFORMATION FROM THE OKLAHOMA TAX COMMISSION

Addendum No. 1 page 1

NIAGARA REGIONAL HOUSING MZE FILE NO

8 th April 2018 ADDENDUM NO. 1

City of Whitefish Planning & Building Department PO Box E 2 nd Street Whitefish, MT Phone: Fax:

WWRC, Inc W. 7th Clovis, NM (575) Fax (575) SIERRA MIDDLE SCHOOL ADDITION & RENOVATIONS ROSWELL INDEPENDENT SCHOOL DIST.

BUILDING PLANS. BUILDING DEPARTMENT

ADDENDUM THREE SPECIFICATIONS. Vincennes University Renovations of the Curtis G. Shake Learning Resources Center

The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents, Inquiry No. 17-WDI-031.

City of Whitefish 418 E 2 nd St PO Box 158 Whitefish, MT Phone: Fax:

Lincoln County Public Works Water and Sewer Submittal Application

ADDENDUM NO. 2. Germania Club Renovation Phase 2. Saginaw County Community Mental Health Authority WILLIAM A. KIBBE & ASSOCIATES, INC.

05BDB ADDENDUM 002. Thomas W. Wathen Business Division Building Renovation GENERAL ITEMS:

Lantz-Boggio Architects 5650 DTC Parkway, Suite 220 Englewood, CO UPPER LEVEL 113' - 4"

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions

Attached is Addendum No. 2 to SEPTA Sealed Bid APES, Install DC Stinger Distribution System - SEPTA Fern Rock Car House.

Residential Room Additions


Travis County ESD #1. Building Plan Submittals. Information Bulletin. Fire Marshal Hancock

ADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION

Merrick Pet Care New Distribution Center Hereford, Texas

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design

City of Thousand Oaks

GRICE-TRIVERS JOINT VENTURE ARCHITECTS PAGE 1 PROJECT NO

INDEX OF SHEETS FLAMING GORGE RANGER DISTRICT OFFICE ADDITION REGION 4 INTERMOUNTAIN REGION ASHLEY NATIONAL FOREST DRAWING SHEET INDEX

Owner / Architect Certification of Complete Documentation for the Additions and Remodels Conditional Approval Review

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible.

HIA AIR CARGO HAMILTON ADDENDUM #3. Addendum No. A03 (Architectural) o Text 1 page o SK-10a o SK-10b o SK-11

ARCHITECTURAL REVIEW COMMITTEE TOWN APARTMENT CONSTRUCTION SUBMITTAL FORM AND APPLICATION

Architectural Design Process

ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI)

ADDENDUM NO. 1 REQUEST FOR QUALIFICATIONS (RFQ) AND REQUEST FOR PROPOSALS (RFP) FOR. RFQ/RFP No. 15P40. Campus Center East HVAC Unit Replacement

CITY OF SCHENECTADY NEW YORK CITY PLANNING COMMISSION

TO: All Recipients Date: March 20, 2015

State College Area School District

Bid No. B14-02 Building 100 HVAC Improvements

Requ est fo r sea led bids for an addition to Be ave r Lake Bathhouse

DESIGN REVIEW BOARD APPLICATION EXTERIOR PLAN / LANDSCAPE PLAN

CITY OF RICHMOND Notice of Public Opening. Contract: Richmond Speed Skating Oval Interior/ Exterior Signage Package

REVISIONS TO SPECIFICATION SECTIONS: Section Allowances: 12. Replace paragraphs 1.05, A and B with the following:

SUBMITTAL REQUIREMENTS FOR COMMERCIAL BUILDING PROJECTS

Montclair, NJ ADDENDUM NO. 1 Issue Date: May 15, 2017

SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5. February 25, 2013

TRIBAL BUILDING AND DEVELOPMENT Plan Check Submittal

MSU Barnard Hall 105 Cleanroom Installation PPA # Page 1

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

Answer: Qualification statement should be provided with the bid.

KidsAbility Guelph Hub Renovation ADDENDUM #2 Project No.:

APPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) DEVELOPMENT PLAN

COMMERCIAL / INDUSTRIAL APPLICATION FOR PLAN EXAMINATION AND BUILDING PERMIT

RENOVATION OF THE FARMERS MARKET Reference Number:

The following information supplements and/or supersedes the bid documents issued on July 10, 2017.

Tri-County Commercial Application Checklist

FIRE STATION NO TH STREET NORTH ST. PETERSBURG, FL M-1 SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION HVAC SYMBOL LEGEND

CS2.0 COVER SHEET VOL. 2

APPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT

Answer: Only to ChurchWoods, LLC.

Transcription:

Red Bike Architecture, PLLC James M. Ratliff, Architect, NCARB P.O. Box 574, Rutherford College, NC 28671-0574 Phone: 828-413-2276 Email: ratliffarch@outlook.com Addendum #1 July 3, 2018 Project: Interior Renovation For: Lincoln County Tax Appraisal Office Project No. RFB 2018-0712 100 East Main Street (Third Floor), Lincolnton, NC 28092 Bid Date: Thursday, July 12, 2018 at 2:00 pm The information contained in this Addendum, clarifies, modifies, supplements, and supersedes the information contained in the Construction Drawings and Project Manual. Item 1: Item 2: Item 3: Reference: Drawing Sheet A-4 Moved wall at door D07 (Appr. 5 Office front wall) and moved door D08 to allow for 18 clearance on pull side of door D08. See attached Revised Drawing Sheet A-4. Reference: Drawing Sheet E-1 Light fixture Type D was not included in the Light Fixture Symbol Legend & Schedule. See attached the Revised Light Fixture Symbol Legend & Schedule. Reference: Protection of Server Equipment During Work See attached recommendations for the steps to be taken to ensure uninterrupted operation of the county s computer servers during the renovation from Watts Engineers, PLLC, Scott Lane, PE. Attachments: Revised Drawing Sheet A-4 dated July 3, 2018. Revised Light Fixture Symbol Legend & Schedule. Protection of Server Equipment Letter from Watts Engineers, PLLC Pre-Bid Meeting Minutes. Pre-Bid Meeting Attendance Sheet. Bidders List. Page 1 of 1

WATTS ENGINEERS, PLLC 4876 US 64 Morganton, NC 28655 Phone (828) 584-3676 Fax (828) 584-3677 June 29, 2018 Red Bike Architecture, PLLC Mr. James M. Ratliff P.O. Box 574 Rutherford College, NC 28671 RE: Job #201740, Lincoln County Tax Appraisal Office, 100 East Main Street, Lincolnton, NC Following are our recommendations for the steps to be taken to ensure uninterrupted operation of the county s computer servers during this renovation/alterations project. 1) Install a plastic sheeting (min. 6 mil) complete enclosure around/above the servers and seal all seams with sheathing/building type seam tape. Include a zippered entry door (zip door) in the enclosure so that county IT employees can access the servers at any time. Consult with the county IT manager to determine the minimum enclosure dimensions so that free, working access to all sides of the servers is possible while inside. The enclosure shall be in place prior to the start of the work. 2) The existing return grill/duct in the server room from the existing rooftop air handler (E- AHU) should be removed prior to other work in the area so that dust is not drawn into the E-AHU. 3) Existing Zone 3-6 from E-AHU should initially be demo ed back to just where it enters the server room. From that point a temporary 16 round flex duct should be connected and routed to provide air conditioning to the servers inside the enclosure. Consult with the county IT manager to determine the best location for the attachment of the 16 supply air (in case direct cold air impingement against the servers is undesirable). Attach and seal the 16 flex to the enclosure material in a secure fashion. 4) Once the enclosure is sealed and air is being introduced into via the 16 flex duct, the mechanical contractor (MC) will most likely find that the zipper door will need to be left open a certain amount in order for the entering air to have a means of relief. To determine the proper amount the zipper should remain open, the MC shall simply adjust the zipper position so that the pressure inside the enclosure does not reach levels that would compromise the sheathing tape or the enclosure itself. 5) In the case that someone needs to enter the enclosure during construction, it is recommended that all cutting/patching/sanding work cease 30 minutes beforehand. This is due to the loss of pressure (and subsequent increase in the possibility of contamination with duct) that will occur inside the enclosure when the zipper door is fully opened. Please contact me with any questions or comments. Sincerely, WATTS Engineers, PLLC David S. Lane David S. Lane, P.E.

Red Bike Architecture, PLLC James M. Ratliff, Architect, NCARB P.O. Box 574, Rutherford College, NC 28671-0574 Phone: 828-413-2276 Email: ratliffarch@outlook.com Pre-Bid Meeting Minutes Project: Interior Renovation For: Lincoln County Tax Appraisal Office Project No. RFB 2018-0712 100 East Main Street (Third Floor), Lincolnton, NC 28092 A pre-bid meeting was held at 9:00 am on Tuesday, June 26, 2018 at the project location. In attendance: See attached Pre-Bid Meeting Attendance Sheet. The following items were discussed: 1.) Introduction of architect, engineers, and John Henry. 2.) Briefly went over the Project Manual, Directory of Parties, Bid Form, and Drawings. 3.) Discussed document copies are available from Accent Imaging. 4.) Owner has submitted drawings for building permit plan review. It will be the contractor s responsibility to apply and pay for the building permits. 5.) Discussed the scope of the project and the limited access for delivery of materials and equipment. Most items will have to be carried up the stairs. 6.) Work on the project can take place during regular business hours. 7.) Contractor will need to work with John Henry and the City of Lincolnton to close parking spaces and the sidewalk when placing the new HVAC Unit on the existing roof. 8.) Last addendum, if needed, will be issued by July 6, 2018. 9.) Discussed the work in the existing server room and how the equipment will have to be protected from dust and that the 68 degrees temperature in the server room will need to be maintained during the work. Watts Engineers will review and issue recommendations. 10.) Meeting adjourned. Attachments: Pre-Bid Meeting Attendance Sheet Page 1 of 1

Red Bike Architecture, PLLC Bidders List June 26, 2018 James M. Ratliff, Architect, NCARB PO Box 574, Rutherford College, NC 28671 Phone: 828-413-2276 Email: ratliffarch@outlook.com PROJECT Interior Renovation For: Lincoln County Tax Appraisal Office 100 East Main Street (Third Floor) LINCOLNTON, NC 28092 Contact Person: John Henry 704-736-8478 Office 704-736-8820 Fax E-mail: jhenry@lincolncounty.org Page 1 of 3

BIDDERS Neill Grading and Construction P.O. Box 3916 Hickory, N C 28603 (828) 324-6774 Office (828) 324-9632 Fax Contact Person: Scott Zanotti E-mail: scott@neillinc.com Wilkie Construction Company P.O. Box 1410 Lenoir, NC 28645 828-754-6431 Office 828-754-1653 Fax Contact Person: Lewis Herman E-mail: estimator@wilkie-const.com Moss-Marlow Building Co., Inc. P.O. Box 2423 Hickory, NC 28603 828-328-2333 Office 828-328-2156 Fax Contact Person: David Deal E-mail: ddeal@mossmarlow.com Page 2

Howard Construction Company of Lincolnton, Inc. 1452 South Aspen Street Lincolnton, NC 28092 704-735-7454 Office Contact Person: Tom Howard E-mail: thhoward2@gmail.com Page 3