HIA AIR CARGO HAMILTON ADDENDUM #3. Addendum No. A03 (Architectural) o Text 1 page o SK-10a o SK-10b o SK-11

Similar documents
Montclair, NJ ADDENDUM NO. 1 Issue Date: May 15, 2017

Addendum. Windsor Hall Renovations Date: October 12, 2017 Addendum No: 3 GENERAL. 1! Addendum #4 will be issued 2:00 PM Tuesday October 17, 2017.

RENOVATION OF THE FARMERS MARKET Reference Number:

A101 CARVER, MINNESOTA S.P B C D E F G FLOOR PLAN CARVER PARK AND RIDE 1 FLOOR PLAN

The following information supplements and/or supersedes the bid documents issued on July 10, 2017.

This specification describes the minimum requirements for structural steel drawings.

Addendum No.: 001 Date: 3/15/2016. Canyon ISD City View Elementary Additions Project No.:

HAYES VALLEY PLAYGROUND AND CLUBHOUSE PROJECT NO.: SAN FRANCISCO PARKS AND RECREATIONS SAN FRANCISCO, CA

B. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.

ADDENDUM No. 4 Page 1 of 8 (includes attachment)

ADDENDUM #1. April 29, 2009

Dimension Below are the critical settings in AutoCAD. Other software should follow the same settings.

1. Attached is a copy of addendum #4 issued by Diamond Schmitt Architects, dated

ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI)

1.1 The Electronic Word Programs used for the Project Manual shall be Microsoft Word.

ADDENDUM NO. 2. Germania Club Renovation Phase 2. Saginaw County Community Mental Health Authority WILLIAM A. KIBBE & ASSOCIATES, INC.

NIAGARA REGIONAL HOUSING MZE FILE NO

ADDENDUM NO. 3, March 14, 2017 A.B.C. No

KS SERIES - VERTICAL INSTALLATION

SERIES 300 SINGLE HUNG WINDOW INSTALLATION

THE CHURCH OF J ESUS CHRIST OF LATTER-DAY SAINTS BISHOPS' STOREHOUSE THE CHURCH OF OF LATTER-DAY SAINTS HOME STORAGE CENTER BISHOPS' STOREHOUSE

ADDENDUM #01. PROJECT: Saint Mary s University Student Centre Reorganization PROJECT N o : DATE:

Extrusions GB-3-IN01. Updated: Scale: REV: - This Drawing is Protected by Copyright Altus NZ Ltd.

ADDENDUM NO. 1 November 10, 2016

DBP Technical Data Series Rev. 0 Jan. 1, Pre Assembled Door Canopies

STEVE ENNIS ARCHITECT 1108 EAST JACKSON STREET MEDFORD, OREGON 97504

Request for Information 0026

SERIES 300 SINGLE HUNG WITH FIN WINDOW INSTALLATION

ACME 50 Application Guide

400 SERIES VERTICAL INSTALLATION

Single-Family Dwelling Submittal Requirements

AAMA Voluntary Guideline For Engineering Analysis of Window and Sliding Glass Door Anchorage Systems

TG Glazing Design-Build

Architect. Architect.

Notre Dame High Addition/Renovation Addendum 3 Page 1

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT

INSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN

DW HORIZONTAL INSTALLATION

SUPERIOR COURT OF CALIFORNIA NORTH BUTTE COUNTY COURTHOUSE JBCP201205BR ADDENDUM NO. 5. February 25, 2013

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D

1.01 NOTICE TO BIDDERS

.1 Comply with the General Conditions of the Contract, Supplementary General Conditions and the requirements of Division 1.

Installation Instruction 3-D Model 3D 03/01/17. 0 Flush Siding Horizontal System N/C WPS, Inc.

CHAPMAN GRIFFIN LANIER SUSSENBACH ARCHITECTS, INC. ARCHITECT S ADDENDUM NO. 06

HOENER ASSOCIATES INC. ARCHITECTS

Carpentry/Carpenter CIP Task Grid

PERFORMANCE TEST REPORT. Rendered to: GLASSCRAFT DOOR COMPANY. PRODUCT TYPE: 6' x 8' Double Inswing Hardwood Door with Half Circle Transom

WALL TO FABRICATED FLOOR

2. All work and materials shall be in full accordance with Local and State ordinance and with any prevailing rules and regulations.

A-308 SITE 75A. Gensler 2020 K Street, Northwest Suite 200 Washington DC Telephone Facsimile

ADMINISTRATION DEPARTMENT Plant Management Division. An Inventory of Its State Office Building Drawings

Material List for Log Complete Packages

Bidders and Others to Whom Bidding Documents have been issued by the Architect and/or CM.

CHAPTER 5 ARCHITECTURE

CARRIER OVERHANG 1'-0" MAX PANEL LENGTH 3'-0" MIN - 16'-0" MAX (RECOMMENDED) SPECIFICATIONS (unless noted otherwise)

ENTRY DOOR TEST REPORT. Rendered to: The Vistawall Group

DHS-500 IMPACT SYSTEM INSTALLATION MANUAL

TO: All Recipients Date: March 20, 2015

Panel Grille Suspended Ceiling Installation Guide

BUILDING PLANS. BUILDING DEPARTMENT

COTTAGES AT OVERBROOK THE 'WOODSIDE' 541 LOWNDES HILL ROAD GREENVILLE, SC

Can you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation web site

900 SERIES WALL PANELS

PERFORMANCE TEST REPORT. Rendered to: GLASSCRAFT DOOR COMPANY

Guide Specification Section Interior Aluminum Doors and Frames

SECTION B INDEX STOREFRONT FRAMING SYSTEMS

Installation Guide for E-Series/Eagle Clad Mechanically Fastened Windows

KS42 MF SERIES - HORIZONTAL INSTALLATION

SECTION FRAMELESS GLASS SLIDING BI-FOLD SHOWER DOOR HARDWARE

PMA ONLINE TRAINING. Commercial Drawings. One Hour Continuing Education

INSTALLATION INSTRUCTIONS SIDELITE ASSEMBLY SERIES 900 TERRACE DOOR AND SERIES 925 PATIO DOOR

INSTALLATION INSTRUCTIONS SERIES 487 CENTER GLAZED WITH 1-1/2" TRIM OFFICE PARTITIONS

YSD 400 Sliding Door System Installation Manual

The following items are updated to reflect revisions and are hereby incorporated into the Inquiry Documents, Inquiry No. 17-WDI-031.

DOCUMENT LIST OF DRAWINGS, TABLES AND SCHEDULES

UNIFIED FACILITIES GUIDE SPECIFICATIONS

ADDENDUM_04. > narrative objective Addendum 04 Revision Changes Defined. > narrative content. end of memo. 5Gstudio_collaborative.

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

ADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION

Non-Reinforced Joining Guide (1-Way Vertical or Horizontal) for Andersen 200 Series Tilt-Wash Double-Hung Windows and Complementary Products

HOLLOW METAL DOOR/WINDOW SYSTEM FOR THERMALSAFE CF WALLS WINDOW ASEMBLY GUIDE PIONEERING INSULATED METAL PANEL TECHNOLOGY

MULTI-STORY FIRE STOPPING ASSEMBLY FRAMED OPENING JAMB (LOW CELL) INDEX SHEET

Wood Squares Installation Guide

Chevy Chase Club June 30, 2008 Bowie Gridley Architects

ARCHITECTURE CADD Course Syllabus

BUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT

Architecture Firm ID 439 Contract Design I Due: May 4, 2015

State College Area School District

Door Canopy. PDL Building Products Industrial Parkway, N. Olmsted, OH Phone:

Single-Hung Windows Premium Atlantic Aluminum

Eagle clad double-hung window installation instructions

INSTALLATION INSTRUCTIONS

GENERAL INSTALLATION GUIDELINES

April 7, City of Verona Adam Sayre, AICP Director of Planning & Development 111 Lincoln St. Verona, WI 53593

DOCUMENT SUBMITTAL REQUIREMENTS FOR AN ALTERATION OR ADDITION TO AN EXISTING SINGLE-FAMILY DWELLING OR MULTI-FAMILY DWELLING

GENERAL INSTALLATION GUIDELINES

TAS 201, TAS 202, TAS 203 and ASTM E330 PERFORMANCE TEST REPORT. Rendered to: DIAMOND DOOR PRODUCTS

Unit 9. Wall and Ceiling Framing

L:\Document Control\DR Drafting\Records\Royce\Facades\Plank\US BenchmarkTM By Kingspan 40% RGB Gold 2013.jpg FACADES - BRICK INDEX SHEET

Dura-Lock Roof System

Transcription:

HIA AIR CARGO HAMILTON ADDENDUM # (This Addendum consists of six () pages) Cover sheet Schedule time lines for Architectural Precast, Miscellaneous Metals, Insulated Metal Panels, Roofing and Aluminum Curtain Walls, Windows and Glazing (in original RFP it was noted that the schedule would be issued in an addendum). Addendum No. A0 (Architectural) o Text 1 page o o SK-10b o SK-11

Addendum No. A0 Page 1 of 2 Suite 10 Tel: 905-1-7777 Fax: 905-1-7717 www.chamberlain-online.com Project: Hamilton Air Cargo Logistics Facility Hanger Service Road, Hamilton, ON Date: September 2, 2014 Project No. 11402 The following information supplements and/or supersedes the id Documents issued on August 22, 2014. This addendum forms part of the Contract Documents and is to be read, interpreted, and coordinated with all other parts. The cost of all contained herein is to be included in the contract sum. The following revisions supersede the information contained in the original drawings and specifications issued for the above-named project to the extent referenced and shall become part thereof. Acknowledge receipt of this Addendum by inserting its number on the Tender Form. Failure to do so may subject bidder to disqualification. This Addendum consists of four pages Drawings: 1.1 A101 Ground Floor Plan 1.1.1 A vestibule added to Cargojet tenant between grid lines 1, 2 with grid lines A1, as attached sketch (SK-10). 1.1.2 Column protector has been added to the columns at grid lines 4/, 5/, / and 5/C 1.1. Charging stations have been added to Cargojet warehouse total of (8) located between grid lines E1-E&8, E1- E&8, E-D1&8, D1-D&8, D-C1&8, C1-C&8, 1-&8, C-1&2 and between C1-C&outside of washrooms wall. 1.1.4 At GC Manager office at ground floor, the door number is (120) 1.1.5 Scissor lifts at loading docks are 8.0 wide. The pits sizes to be confirmed with tenant 1.1. The scale pits sizes to be confirmed with tenant 1.2 A01 Door Schedule 1.2.1 Hollow metal door jamb and head details as attached sketch (SK-11) 1.2.2 The door spec. at GC Manager Office at ground floor (120) is: Door type G, width is 915mm, height is 202mm, door material is HM, thickness is 45mm, frame material is HM, frame type is A, no fire rating is required. 1.2. At door no.(100t), the frame type has been changed from HM to Steel 1.2.4 At door no. (11b), the door type has been changed from type H to type F 1.2.5 A new door at Cargojet vestibule has been added. The door no. is (), type K, 915mmW X 2128mm H, X 45mm thickness, door material is aluminium/glass, frame material is aluminium, with panic hardware, no fire rating is required, provide automatic door opener set in interior curtain wall as attached sketch (,SK- 10b) 1.2. Door no. (100q): The size has been changed from 18.0 W x12.0 H to 14.0 x 12.0 H 1.2.7 Door no. (100r): The size has been changed from 18.0 W x12.0 H to 14.0 x 12.0 H 1.2.8 Doors no. ((100a), (100b), (100c), (100d), (100e), (100f), (100g) and (100h); The size has been changed from 9.0 W x 10.0 H to 8.0 W x 10.0 H 1.2.9 Replace solid core wood doors with hollow metal doors 1. A02 Window& Room Schedule 1..1 Curtain wall () has been updated as attached sketch (SK-10b) 1..2 Interior curtain walls have been added (CW), (CW4) as attached sketch (,SK-10b) End of addendum no. A0 Rev. (Mar/0) Ext. - Form Q010

00 100 SEALANT (AS REQUIRED) POP RIVETS FRAMED OPENING SEE STRUCT.DWGS. ROD AT OTH SIDES FASTENER (AS REQUIRED) PREFINISHED CURTAIN WAL THERMALLY ROKEN FRAME WITH SEALED DOULE GLAZING ROD AT OTH SIDES CAP TRIM 4 CURTAIN WALL JAM DETAIL AT CJ VEST. 1 : 10 40 127 2 CONFIRM W/ CURTAIN WALL MANUFACTURER 2 127 CONFIRM W/ CURTAIN WALL MANUFACTURER 102 CONFIRM W/CURTAIN WALL MANUFACTURER 101a INTERIOR CURTAIN WALL CW4 PREFINISHED CURTAIN WALL THERMALLY ROKEN FRAME WITH SEALED DOULE GLAZING PLAN DETAIL AT VEST. 1 : 10 Suite 10 Tel: 905.1.7777 Fax: 905.1.7717 www.chamberlainipd.com Architects Constructors Managers NO. ISSUED DATE ADDENDUM NO. SEPTEME R 2,2014 1 2 00 8000 4 102a C:\11402\11402-Air Cargo-Hamilton- 2014.04.0_htanious.rvt STEEL FRAMING SEE STRUCT.DWGS HSS GIRT SEE STRUCT.DWGS -19mm STRUC. CEMENT OARD TYPE ARMOROC OR EQUAL -152mm STEEL JOIST -PREFIN. ALUMINUM CEILING TILES. COLOUR TO MATCH CURTAIN WALL MULLEON DOCUM. 101 2 SECTION DETAIL @CJ VEST. 1 : 50 2252 048 SECOND FLOOR 500 T/O GROUND FLOOR 0 A A1 400 5000 5000 400 STAIR NO.1 UP 102 WT5 00 1505 180 DOCUM. 101 8450 102b 8848 101a 45 00 500 2997 150 4 1 ENLARGED PLAN@CJ VEST. 1 : 100 1752 CW CW4 2 2 1 SK-10b 101b WT4 PROJECT NAME Hamilton International Air Cargo Logistics Facility PROJECT ADDRESS Hanger Service Road, Hamilton International Airport, Hamilton, ON SHEET NAME PROJECT NO.: 11402 DRAWN Y HT PLOT DATE 09/18/14 SCALE As indicated DRAWING:

GENERAL NOTES 1. EGIN LAYOUT OF CEILING TILES AT CENTER OF ROOMS AS SHOWN 2. CENTER LIGHT FIXTURES ON CEILING TILE. SEE ELECTRICAL DWGS. FOR DETAILED LIGHTING LAYOUT 4. SEE MECHANICAL DWGS. FOR DETAILED SUPPLY& RETURN LAYOUT Suite 10 Architects Constructors Managers 2 Tel: 905.1.7777 Fax: 905.1.7717 www.chamberlainipd.com NO. ISSUED DATE ADDENDUM NO. SEPTEME R 2,2014 PREFIN. ALUMINUM CEILING TILES. COLOUR TO MATCH CURTAIN WALL MULLEON 4 RCP AT SK-10b 1 : 50 C:\11402\11402-Air Cargo-Hamilton- 2014.04.0_htanious.rvt LEGEND : DOULE GLAZED : SINGLE GLAZED : TEMPERED GLASS 048 819 2077 715 715 158 CW4 INTERIOR CURTAIN WALL AT 048 819 2077 91 91 915 102 04 REFER TO DOOR SCHEDULE CW INTERIOR CURTAIN WALL AT 048 2077 819 929 929 49 879 101 914 929 REFER TO DOOR SCHEDULE CURTAIN WALL AT SOUTH ELEVATION PROJECT NAME Hamilton International Air Cargo Logistics Facility PROJECT ADDRESS Hanger Service Road, Hamilton International Airport, Hamilton, ON SHEET NAME PROJECT NO.: 11402 DRAWN Y HT PLOT DATE 09/2/14 SCALE As indicated DRAWING: SK-10b

"LOW PROFILE" THROUGH FASTENER POP RIVETS EXTERIOR CAP TRIM SEALANT (AS EQUIRED) FASTENER (AS REQUIRED) FRAMED OPENING SEE STRUCT.DWGS. DRIP FLASHING FIELD CUT FEMALE JOINTS WHERE REQUIRED INSULATED THERMALLY ROKEN FRAME SK-11 ROD AROUND DOOR FRAME OTH SIDES INSULATED DOOR 2 HOLLOW METAL DOOR HEAD DETAIL 1 : 5 POP RIVETS ROD AROUND DOOR FRAME OTH SIDES 100 INSULATED DOOR INSULATED THERMALLY ROKEN FRAME SEALANT (AS REQUIRED) FASTENER (AS REQUIRED) FRAMED OPENING SEE STRUCT.DWGS. 00 SK-11 1 HOLLOW METAL DOOR JAM DETAIL (TYP.) 1 : 5 GRID PROJECT NAME Suite 10 Tel: 905.1.7777 Fax: 905.1.7717 www.chamberlain-online.com Architects Constructors Managers PROJECT ADDRESS Hanger Service Road, Hamilton International Airport, Hamilton, ON SHEET NAME PROJECT NO.: DRAWN Y C:\11402\11402-Air Cargo-Hamilton- 2014.04.0_htanious.rvt Hamilton International Air Cargo Logistics Facility PLOT DATE SCALE 1 : 5 DRAWING: HOLLOW METAL DOOR FRAME DETAILS 11402 HT 09/22/14 SK-11 Revision Schedule NO. REVISIONS DATE 1 ADDENDUM NO. SEPTEMER 2,2014