Power drill with 5/16 & 7/16 nut driver, 3/16 drill bit, framing square, tape measure and Sharpie.

Size: px
Start display at page:

Download "Power drill with 5/16 & 7/16 nut driver, 3/16 drill bit, framing square, tape measure and Sharpie."

Transcription

1 2012HL Complete System Congratulations! You have just purchased a 2012HL Complete System from Hydrofarm, manufactured by American Hydroponics. This system is a small example of what big commercial growers use for lettuce, herb and basil production. This system comes with everything from the standard system but also includes the NutriDose 1 which monitors your reservoir for nutrient and ph 24 hours per day, 7 days per week. This controller also comes with the PC Interface package allowing you to data-log and manage settings remotely. Tools and supplies required for assembly: Power drill with 5/16 & 7/16 nut driver, 3/16 drill bit, framing square, tape measure and Sharpie. 2012HL System components: (1) 20 x 12 steel table frame (2) 10 covered collectors with Drip Cap (2) 10 Feeder Manifolds with grommets, micro-tubes and 1 control valves (32) 12 Finishing Channels - Channels have 18 sites per channel (576 sites total) (8) 12 Nursery Channels - Channels have 72 sites per channel (576 sites total) (1) 150 gallon reservoir (1) Rio 32HF submersible pump (2) channel scrub brushes (1) 12 handle for scrub brush (1) Float Valve (1) Float Valve Plumbing Kit All necessary feed and return plumbing 2012HL Growing Supplies: 2) 5 gallon stock tanks with covers (for nutrients) (1) 1 gallon acid tank (for ph adjuster) (1) NutriTest Pro (350) Lettuce or Basil Bags (1) Cases of LC1-1 Oasis cubes (2) Gallons of 10% ph down (3) 8kg batches of Lettuce or Basil, 2-part nutrients (1) Packet of lettuce or basil seeds (roughly 3 months worth) 1

2 3Tray Propagation System with Bottom Heat Package: (1) Table Frame (3) AmHydro propagation trays with fill/drain fittings (1) 30 gallon reservoir with cover (1) Float Valve (1) Float Valve Plumb Kit (1) Timer TN311C (1) Collector with drain plumbing (1) Feeder Manifold with feed plumbing and pump (1) Quad Stat Thermostat (2) 44in by 22in heat mats (1) 44in x 46.5in piece of 3/4in plywood (1) 44in piece of 2x6 Required plastic and wire mesh for heat mats NutriDose 1 with Peristaltic Pump and PC Interface Package: (Complete System Package ONLY) (1) NutriDose 1 Controller (1) Triple Peristaltic Pump with necessary fittings and hoses (1) CF Probe (1) ph Probe (1) Power supply (1) 16oz of all buffers; ph4, ph7 and 27.7 calibration solution (1) Sample Pot with fittings (1) Rio 200 submersible pump (1) PC Interface (1) Power Supply (1) Serial cable (1) CompuGrow software (to be downloaded at manufacturers website) 2

3 10' 20' top rail 10' 138'' Table Assembly: Coupling 1' 6' 6' 6' 1' Figure 1 Look over the 20 bench frame diagrams and lay out materials to assemble frame as close to the final location as possible. Leave 12 between the collector end of table and the greenhouse side-wall (the lowest end of bench is closest the side wall). After all couplings are connected, confirm that all top rails are level. Use shims under bottom support rails for micro adjustments if need be " 35" Lay out bottom rails as per (Fig 1) about 6 apart. 37" Holes parallel with bottom rail Mark and install leg brackets to bottom rails with screws as per measurements provided. 46" 39" Lay out all leg sets as per (Fig 2) - tall to short. Orient them so bolt holes for top rails are parallel with bottom rail, then insert over leg brackets. Screw legs to bracket as per bracket detail. Note, pre-drilled top rail attaches to shortest legs. 46" Bracket 46" Figure 2 Slope toward outside of greenhouse Top Rail 32.5" 35" 37" 39" Bottom Rail 46" 46" 138" 46" 3

4 Once all legs are secured to bottom rail, hold both rail/leg assemblies upright (you ll need some help here) and bolt (hand tight) the first top rail between tallest legs. See (Fig 5). Notice on which side top rail is positioned. Use a framing square to square up top rail to legs and secure diagonal braces with screws (Fig 3). Secure pre-drilled top rail between shortest legs as per (Fig 5) to which collector will mount. Secure diagonal braces to collector legs and bottom rail. Notice on which side top rail is positioned (must be on outside of table frame). Use the Flat Phillips machine screws and tighten until screw head is flush (Fig 4). Proceed to attach remaining top rails as per diagram (Fig 5). Tighten all bolts. Diagonal Brace Top Rail Leg Figure 3 Adjust position of frame, short side, 1 from inside of greenhouse wall. (For ease of installing collector) Lock Washer Washers 1/4-20x2.5 Flat Phillips (make flush with top rail) Lock Washer Washer Figure 5 10' 20' top rail 10' Figure 4 138'' Coupling 1' 6' 6' 6' 1' Attach Manifolds and Covered Collectors: Collectors: Attach (1) 4 x4 brace 2.75 from top of each 32.5 leg. Set each pre assembled 10 collector on the 4 x4 braces and attach using clamps (not provided) or another human. Wear gloves when doing this as collector material can be sharp. 4

5 Use holes in top rail as pilot holes. Drill 3/16 holes through collector. Bend hinge back on collector to get at the inside. Attach to table frame using hardware provided: (14) 1.75 Pan head screws, (28) washers and (14) nuts. When doing this step, it is easiest to drill hole in collector than immediately install hardware to secure. Repeat this procedure as you move down the length of the table. After covered collectors are attached, 10 drip caps can be installed. Clean collector top rails with rubbing alcohol (household 3% is fine) to remove any oils or dust. Apply 3 pieces of 3M double stick tape to collector top rails (Figure 7a). Pan Head Screw 1.75 SS Washer #10 SS Loosen nuts that hold the collector top rail to legs (Figure 7b). Remove tape backing and push on drip cap until secure so the back end rests between leg and top rail. Washer #10 SS Nut 8-32 Re-tighten nuts to pinch and secure drip cap. Collector Top Rail FRONT VIEW Figure 7a 120 in Collector Top Rail TOP VIEW 3M Double stick tape (3 inch pieces) 12 in 44 in 76 in 108 in Figure 7b Drip Cap Channel slides all the way in to touch collector cover Hinge Drip Cap Leg 3M double stick tape Back end of drip cap Collector Top Rail Pinch drip cap between top rail and leg 5

6 (2) of the 4 x 4 L-braces Have been modified with an extra hole (3 holes on one side verses 2). Attach (1) of these on Leg 2, 7.5 down from the top of the leg. Make sure the side with the three holes is facing up. Attach Use 2 front holes for nylon tie the other L-brace on Leg 3, 8.25 down from the top of the leg. Dry fit the return plumbing together No Glue If your system is on gravel, the reservoir may be sitting below grade, or just below bottom rails. If this is the case, return plumbing pitch will be greater. Install the first L-brace on Leg 2 and rest the other end of the drain plumbing on top of the reservoir. Secure the other L-brace on leg 3 just under the return plumbing. After L-braces are attached, glue the two pieces of return plumbing so the Tee s line up with the drains. Cut the (2) 1 pieces of 1.5 flexible tubing at the top in three places, about 1/2 down. Push tubing on drain and thread until you hit nut. Secure with hose clamp. Cut other end of tubing allowing at least 1 of tubing material to insert into open Tee. Secure return plumbing assembly with 11 nylon ties using the two front holes on the L-braces. Collector Toprail Leg 4 x4 Brace Flex Tubing Cleanout 6

7 Manifolds: Insert ball valve/union piece to manifolds. Insert grommets into manifold holes (20 per manifold) and attach manifolds with nylon ties provided (manifold goes UNDER top rail). Each manifold gets (6) nylon ties and is attached to high end of table as shown. Microtube Grommet Manifold Insert microtube to middle of manifold 39 Legs Nylon Ties 11 Nylon Tie six per 10 manifold Assemble manifold supply plumbing: Follow the illustrations below to glue (7) pieces of supply plumbing to (2) manifolds. Dry fit all connections together before gluing. Use 3/4 metal clamps provided to secure fill plumbing to legs. A 1 2 B 2 1 C 3 3 D E F G 6 To Manifolds 5 Fill Manifold End View C B D A F G Pump 7

8 Fill Manifold Top View A B C D E Once all plumbing is dry fitted together, glue all (7) sections together. Fill Manifold Side View B C A D E F 8

9 Channel Layout and Micro Tubes: Channel will come with fill hole for 1/4 microtube pre drilled. You will receive (32) finishing channel with a fill hole on each end so they can be installed in either direction, along with (8) nursery channel. Lay Channel on table frame so plant sites are staggered as shown in illustration. Microtube Manifold Insert microtube to middle of manifold Grommet Once all the channels are on the table, space them out evenly. (20) channel will fit in each 10 modular covered collector. Lift hinge of covered collector and insert channel all the way to the back of the covered collector. The pitch of the table frame, length of channel inserted into the collector and the drip cap, work together to eliminate drip-back leaking. Keep the drip cap clean between harvests. Insert all 40 microtubes into grommets. Use soapy water or plumbers grease to make insertion easy. Insert microtube to the middle of the manifold. Not to far as flow can be restricted. Insert the other end of the microtube into the fill hole on the channel. Diagonals End Caps come with the system but are rarely required. They can be installed if you are growing very large plants and roots make it to the uphill end of the channels. Most growers have not needed them. The best glue for attaching the end caps is called Contact Adhesive 600 made by Weld-on (#10077). If you cannot source, we can send you a pint. 9

10 Float Valve Installation: 1. Remove reservoir and tubing nut. Insert valve body through the existing 7/16 valve hole. Make sure sealing washer is on the inside of the reservoir. Secure with reservoir nut. note: If there is no pre-drilled hole, fill up your reservoir and turn on pump. Once the system equalizes (same amount of water is feeding your system as returning to your reservoir) mark the water level and drill a 7/16 hole for float valve. If the pump turns off, reservoir will not overflow. 2. Loosely screw on tubing nut with compression fittings. Stick the 1/4 tubing coming from your Float Valve Plumb Kit into the tubing nut about 3/4 of an inch. Fasten tubing until tight. 3. Adjust wing nut if needed 4. Turn on needle valve attached to your Float Valve Plumb Kit and you are ready to grow. Sealing Washer Reservoir Compression fittings Wing Nut Valve Body Reservoir nut Tubing Nut Micro Tube to Float Valve Plumb Kit 10

11 Plumbing Kit Installation: 1. If not already pre assembled, screw threaded valve tee into custom hose bib until it is well seated. Teflon tape is supplied for a water tight seal. (Figure a). 2. Screw custom hose bib onto closest hose bib on your house or in your greenhouse. You will still be able to use house hose bib (Figure b). 3. If supply tube is not long enough, you will have to purchase a length that will suit your needs. You can go 100 if you like. 4. Slide brass nut over 1/4 supply tube as in (Figure a). 5. Slide plastic compression fitting over 1/4 supply tube. IMPORTANT (be sure short taper is toward the threaded valve tee.) 6. Slip brass ferrule into 1/4 supply tube until it is seated. (be sure end of 1/4 supply tube is cut square). 7. Push 1/4 supply tube into threaded valve tee and tighten brass nut finger tight. 8. Turn house hose bib on and then threaded valve. Continue tightening brass nut until there are no leaks. Too tight will crush plastic ferrule. You now have a float valve hooked up. Threaded valve Brass ferrule Brass nut Plastic compression fitting 11

12 Crop Turn Technology (CTT): A Crop Turn is a number determined by how many plants you can harvest, per finishing hole, per year. The 2012HL System is designed for (26) crop turns per year at (6) week cycles (2 weeks in propagation, 2 weeks in nursery and 2 weeks in finishing). That means, that from the day you plant a seed it will take 42 days before you harvest. Out of each finishing hole you will harvest (26) plants per year. With (576) finishing sites in your system, that s (14,976) plants per year. Not bad for a 240 square foot system. The initial stages of growing with an NFT system, requires mastering important variables in order to achieve (26) crop turns per year. Most growers start at about (13) crop turns per year and increase as experience is gained. The bottom line is, plant s do not like fluctuations. The more stable you can make your environment (temperature, RH, Conductivity, ph, etc...), the more yield you can achieve. Stage one: Propagation Propagation is the first step and is key to a successful operation. Always add 10% to your propagation number to account for loss. If your goal is (26) CT per year, you want to plant ( % = 317) per week. To make it easy, plant two whole flats (324) sites, so you don t have to break up the oasis. Week 1: Plant (324) seeds. Week 2: Plant (324) seeds. Stage two: Nursery In week 3, you need to move (288) plants to nursery channel. Take the strongest looking plants and discard the rest. Week 3: Move (288) seedling to nursery. Plant (324) seeds. Week 4: Move (288) seedling to nursery. Plant (324) seeds. Stage Three: Finishing Week 5: Move (288) nursery plants to finishing channels. Move (288) seedlings to nursery channels. Plant (324) seeds. Week 6: Move (288) nursery plants to finishing channels. Move (288) seedlings to nursery channels. Plant (324) seeds. End of week 6, beginning of week 7: Harvest (288) plants. Move (288) nursery plants to finishing channels. Move (288) seedlings to nursery channels. Plant (324) seeds. From this point on, you should be Harvesting (288) plants, moving (288) nursery plants to finishing channels, moving (288) seedlings to nursery channels and planting (324) seeds every week. 12

13 Crop Turn Technology (CTT): Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 1: Plant (324) seeds. Week 2: Plant (324) seeds. Week 3: Move (288) seedling to nursery. Plant (324) seeds. Week 1 Week 2 Week 3 13

14 Crop Turn Technology (CTT): Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 4: Move (288) seedling to nursery. Plant (324) seeds. Week 4 14

15 Crop Turn Technology (CTT): Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 5: Move (288) nursery plants to finishing channels. Move (288) seedlings to nursery channels. Plant (324) seeds. Week

16 Crop Turn Technology (CTT): Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 6: Move (288) nursery plants to finishing channels. Move (288) seedlings to nursery channels. Plant (324) seeds. Week

17 Crop Turn Technology (CTT): Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 End of week 6, begenning of week 7: Harvest (288) plants. Move (288) nursery plants to finishing channels. Move (288) seedlings to nursery channels. Plant (324) seeds. Market Week After crop is harvested, step 1, clean finishing gullys. Place channels back in system and proceed to step 2. Clean nursery channels and proceed to step 3. Reseed propagation and your ready for next week. 2 17

HydroCycle 4" Pro NFT Lettuce Systems

HydroCycle 4 Pro NFT Lettuce Systems HydroCycle 4" Pro NFT Lettuce Systems 110830 Hydroponic Table Kit* Designed to grow healthy plants without soil using mineral-nutrient solutions. 2016 Growers Supply All Rights Reserved. Reproduction is

More information

8.5 Ton Assembly Instructions

8.5 Ton Assembly Instructions 8.5 Ton Assembly Instructions Parts list for assembly. 6- Legs 2 1/2 Angle X 92 Long 6- Cone Supports 2 Angle X 60 Long 6-1 1/4 Angle X 27 1/4 Long. 12-1 1/4 Angles X 42 Long 6-1 Flat Straps 23 3/4 Long

More information

Assembly Instructions 10 X 10 Aluminum Roof Support

Assembly Instructions 10 X 10 Aluminum Roof Support Assembly Instructions 10 X 10 Aluminum Roof Support Aluminum Roof Support Bolt Package 16-5/16 X 2 ¼ SS Bolt 24-5/16 X 1 SS Bolt 40-5/16 SS Nylon Lock Nuts 16-5/16 SS Flat Washers 28-4 ½ Wood Screws 36-1

More information

Roll In W/L Dock PAGE 1

Roll In W/L Dock PAGE 1 Roll In W/L Dock PAGE 1 1 2 3/8 X 1 CARRIAGE BOLT SS 3/8 FLANGE NUT BRASS 3 4 1/2-13 X 1.25 SQ BOLT SS 1/2 SQ NUT BRASS 5 3/8-16 X 2.5" BOLT SS PAGE 2 6 7 BRACE BRKT SINGLE AXLE TUBE 8 9 3" AXLE WASHER

More information

General Array Layout Sketch

General Array Layout Sketch General Array Layout Sketch Cold TO Panels Hot FROM Panels OR Cold TO Panels Hot FROM Panels 1 Introduction This document describes how to install EZ series panels. The EZ series panels are designed to

More information

Assembly Instructions 10 X 10 Aluminum Frame Building

Assembly Instructions 10 X 10 Aluminum Frame Building Assembly Instructions 10 X 10 Aluminum Frame Building 27 97 9 8 47 36 74 52 10 10 X 10 Square Building W/ Dome Includes: The Steel Entry Door with a Dead Bolt Lock assembly and Aluminum Door Frame. Metal

More information

Hydraulic Clamp Carrier. Installation & Operation Manual

Hydraulic Clamp Carrier. Installation & Operation Manual Hydraulic Clamp Carrier Installation & Operation Manual Hydraulic Clamp Carrier Installation & Operation Manual Quick Machinery Company 8272 Peninsula Drive Kelseyville, CA 95451 phone: (707) 272-6719

More information

Motorized or Crank Operated Fortress Zipper Track Shade with Housing and Side Track Installation Instructions

Motorized or Crank Operated Fortress Zipper Track Shade with Housing and Side Track Installation Instructions Motorized or Crank Operated Fortress Zipper Track Shade with Housing and Side Track Installation Instructions Tools Needed Drill 3/8 Metal Drill Bit ¼ Masonry Drill Bit Measuring Tape Pencil 4 Level Phillips

More information

RBP-1215B-RX DODGE RAM QUAD CAB RX3

RBP-1215B-RX DODGE RAM QUAD CAB RX3 RBP-1215B-RX3 2002-2017 DODGE RAM 15-3500 QUAD CAB RX3 Passenger side RX-3 Side Step Drill Template Passenger side rear Modular Bracket (6) L Support Brackets Driver side rear Modular Bracket Driver side

More information

Instructions for the installation of Handy Well Pump Models HWP-E, HWP and HWP-L. **Read thoroughly before you start!**

Instructions for the installation of Handy Well Pump Models HWP-E, HWP and HWP-L. **Read thoroughly before you start!** Instructions for the installation of Handy Well Pump Models HWP-E, HWP and HWP-L. **Read thoroughly before you start!** Model HWP-E Model HWP Model HWP-L Congratulations! You have purchased a quality hand

More information

Hardware and Components:

Hardware and Components: Hardware and Components: (A) 4X 5/16 x 1 Carriage Bolt (B) 2X 5/16 x 2-1/4 Carriage Bolt (C) 2X 5/16 x 3-1/4 Hex Bolt (D) 2X 5/16 x 3/4 Hex Bolt (E) 2X 5/16 x 1-1/4 Hex Bolt (F) 5/16 x 2-1/4 Hex Bolt (G)

More information

111628W FodderPro 2.0 Full Feed System Wall Mount

111628W FodderPro 2.0 Full Feed System Wall Mount 111628W FodderPro 2.0 Full Feed System Wall Mount "...grow your own nutrient-rich fodder..." WALL End View Shows Supply Manifold and Channels Side View with Channels and Manifolds Installed 2015 FarmTek

More information

WOLF PUP LOOM TM & WOLF PUP LT LOOM TM

WOLF PUP LOOM TM & WOLF PUP LT LOOM TM WOLF PUP LOOM TM & WOLF PUP LT LOOM TM Assembly Instructions FL3000 FL3006 FL3009 WOLF PUP WOLF PUP LT Find out more at schachtspindle.com Schacht Spindle Company 6101 Ben Place Boulder, CO 80301 p. 303.442.3212

More information

General Prisoner Transport Install Instructions PT-2-INST

General Prisoner Transport Install Instructions PT-2-INST General Prisoner Transport Install Instructions PT-2-INST 50 or 60 high x 80, 100 & 120 inch long / Double Compartment Inserts Also refer to PT-A-3XX instructions for vehicle specific mounting measurements

More information

HL295. **[Some items below and the next page may have been factory installed at the time of your MAGNATRAC order!] PARTS LIST 1930L

HL295. **[Some items below and the next page may have been factory installed at the time of your MAGNATRAC order!] PARTS LIST 1930L HL295 Hydro Loader Kit HL295 Version: 04.16 NOTE! Instructions if HL295 is purchased at the time of MAGNATRAC order: Skip Steps 1 thru Step 24, as these items have been factory installed. Start on Step

More information

INSTRUCTION BOOKLET #C0 Watch step by step installation instructions at: https://www.wallbedsbywilding.com/wallbed-installation-studio-series/ WARNING! ALL MURPHY/WALLBED SYSTEMS CONTAIN STORED ENERGY.

More information

For Wallbed models: KING SIZE INSTRUCTION BOOKLET #C1 Watch step by step installation instructions at: https://www.wallbedsbywilding.com/wallbed-installation-studio-series/ WARNING! ALL MURPHY/WALLBED

More information

INSTRUCTION BOOKLET #C10 Watch step by step installation instructions at: https://www.wallbedsbywilding.com/wallbed-installation-studio-series/ WARNING! ALL MURPHY/WALLBED SYSTEMS CONTAIN STORED ENERGY.

More information

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS 12/11/07 PAGE 1 OF 12 400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS Thank you for purchasing our product! *Please read these instructions

More information

Horizontal Cable Systems

Horizontal Cable Systems ALUMINUM RAILING INSTALLATION INSTRUCTIONS v2012 orizontal Cable Systems 1) Check Contents Of Packages: Verify that all parts have arrived and that they match the packing list. 1A) Coastal applications:

More information

FITTING GUIDE - RIGHT HAND SILL TANK 110/130

FITTING GUIDE - RIGHT HAND SILL TANK 110/130 FITTING GUIDE - RIGHT HAND SILL TANK 110/130 STEP 1 - RIGHT HAND SILL TANK 110/130 The brackets are designed to fit to pre existing holes in the chassis, however given the high precision and meticulous

More information

https://www.wallbedsbywilding.com/wallbed-installation-studio-series/

https://www.wallbedsbywilding.com/wallbed-installation-studio-series/ For Wallbed models: KING SIZE INSTRUCTION BOOKLET #C1 Watch step by step installation instructions at: https://www.wallbedsbywilding.com/wallbed-installation-studio-series/ WARNING! ALL MURPHY/WALLBED

More information

Installation for Full Size Polaris Ranger Crew Doors

Installation for Full Size Polaris Ranger Crew Doors Installation for Full Size Polaris Ranger Crew Doors Order of Installation: Heater Doors Wiper on to Windshield Windshield Top & Back Panel Note: Most of the steps in these instructions need to be repeated

More information

Side Mount INSTRUCTION BOOKLET #C122 BED STYLE: PARK CITY

Side Mount INSTRUCTION BOOKLET #C122 BED STYLE: PARK CITY Side Mount BED STYLE: PARK CITY INSTRUCTION BOOKLET #C1 WARNING! ALL MURPHY/WALLBED SYSTEMS CONTAIN STORED ENERGY. FAILURE TO USE AND FOLLOW THESE INSTRUCTIONS DURING THE INSTALLATION PROCESS COULD RESULT

More information

Sheet Metal Brake Plans for a 6' Sheet Metal Brake

Sheet Metal Brake Plans for a 6' Sheet Metal Brake Sheet Metal Brake Plans for a 6' Sheet Metal Brake,1752'8&7,21 Thank you for purchasing the sheet metal brake plans. The plans include a complete list of material needed and easy to follow steps to build

More information

Installation Instructions

Installation Instructions Installation Instructions Follow these simple instructions to install your OneDayCab! IMPORTANT: Unpack and check shipment for damage. Verify color, size and parts before demolition. Installation of interiors

More information

Thank you for purchasing our product! *Please read these instructions and follow them step by step.*

Thank you for purchasing our product! *Please read these instructions and follow them step by step.* 07/07/08.rev1 PAGE 1 OF 11 601AL VERTICAL 60120VL LIFT W/CHAIN DRIVE WINCH Thank you for purchasing our product! *Please read these instructions and follow them step by step.* Step 1. Separate and group

More information

HOUSE PARTS PACKED IN HOUSE BOX PARTS IN PLASTIC BAG (HARDWARE) PARTS IN SMALL PLASTIC BAG (FLOOR CLIPS) PARTS PACKED IN BUNDLE

HOUSE PARTS PACKED IN HOUSE BOX PARTS IN PLASTIC BAG (HARDWARE) PARTS IN SMALL PLASTIC BAG (FLOOR CLIPS) PARTS PACKED IN BUNDLE Check parts against this list before starting assembly. Refer to illustrations on pages 6 and 7 to view house parts. If any shortages are found, refer to Packing Slip for claim instructions. Item 3 5 6

More information

Hardware and Components:

Hardware and Components: Hardware and Components: (A) 5/16 x 2 Hex Bolt (B) 5/16 x 2-1/4 Hex Bolt (C) 5/16 x 2-1/2 Hex Bolt (D) 4X 5/16 x 3/4 Hex Bolt (E) 4X 5/16 x 1-1/4 Hex Bolt (F) 11X 5/16 Flat Washer (G) 12X 5/16 Nylock Nut

More information

Pneumatic Clamp Carrier. Installation & Operation Manual

Pneumatic Clamp Carrier. Installation & Operation Manual Pneumatic Clamp Carrier Installation & Operation Manual Pneumatic Clamp Carrier Installation & Operation Manual Quick Machinery Company 8272 Peninsula Drive Kelseyville, CA 95451 phone: (707) 272-6719

More information

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas) List of Contents Quantity Description 12 #10 x 1 ½ Flat Head Phillips Screw (see pg. 2) 2 #10 x ½ Pan Head Phillips Screw (see pg. 2) 8 ¼ x 2 ½ Lag Bolt (see pg. 2) 7 ¼ 20 x 5 / 8 Hex Head Bolt (see pg.

More information

User Instructions Multiline Otter Scoreboard Caddy Assembly

User Instructions Multiline Otter Scoreboard Caddy Assembly List of parts: User Instructions Multiline Otter Scoreboard Caddy Assembly Single Caddy Double Caddy 1 1 Base assembly with attached wheels 2 4 1 1 2 4 4 8 10 20 12 Uprights (60 or 74 aluminum extrusion)

More information

Horizontal Cable Systems

Horizontal Cable Systems ALUMINUM RAILING INSTALLATION INSTRUCTIONS Horizontal Cable Systems 1) Check Contents Of Packages: Verify that all parts have arrived and that they match the packing list. 1A) Coastal applications: Confirm

More information

installation instructions WC Frame 1180mm with Dual Flush Cistern

installation instructions WC Frame 1180mm with Dual Flush Cistern installation instructions WC Frame 1180mm with Dual Flush Cistern (C,D,E) K F/G N L M 12 13 14 16 1 2 11 A 5 6 Q O Y 3 C 10 E D B P,Z,AA R T V S 4 U 2 No. Part no. Description Quantity A WC Frame with

More information

installation instructions

installation instructions installation instructions Easi-Plan WC Frame 820mm with Dual Flush Cistern ref: EPWC-05-1005 Easi-Plan WC Frame 980mm with Dual Flush Cistern ref: EPWC-05-1505 EASI-PLAN installation instructions Parts

More information

SE5a Instrument Board part 2 - rev 1.1

SE5a Instrument Board part 2 - rev 1.1 SE5a Instrument Board part 2 - rev 1.1 Fuel (Petrol) Valve This valve uses two circular name plates, eight brass screws, one black plastic base, copper wire and two black plastic risers. You can pick any

More information

Cabinet Mount Lifter Instructions

Cabinet Mount Lifter Instructions PART LIST 2 @ Side Pivot Arms 1 @ Coupler Tube 1 @ Left Hand Bracket 1 @ Right Hand Bracket 2 @ Cover Support Arms w/ Foam Grip 1 set of Cover Saver 4 @ 4 Wood Screw 8 @ 1 Wood Screw 12 @ 1 Black Tek Screw

More information

JK Front Crusher Flares

JK Front Crusher Flares INSTALLATION INSTRUCTIONS INST-17-03-030_A JK Front Crusher Flares IMPORTANT: Thank you for purchasing this Poison Spyder product. Please read through this entire document before proceeding with installation.

More information

Queen Wingback Bed King Wingback Bed

Queen Wingback Bed King Wingback Bed Parts and Hardware List A. Side Rails with Attachment Hooks 2 pcs B. Foot Rail 1 pc C. Head Rail 1 pc D. Center Support Slat 1 pc E. Leg Supports 3 pcs F. Support Slats 4 pcs G. Flat Washers 8 pcs H. Lock

More information

Installation Instructions - Model V4JSD 1

Installation Instructions - Model V4JSD 1 Installation Instructions - Model V4JSD 1 Support Assemblies: Parts list: (Note see enclosed cut sheet for quantities and dimensional information) A vertical structural member (1 ½ x 1 ½ modular frame)

More information

GlideRite Retractable Cover System For Hot Spot Spas (SE & SLX only)

GlideRite Retractable Cover System For Hot Spot Spas (SE & SLX only) List of Contents Quantity Description 12 #10 x 1 ½ Flat Head Phillips Screw (see pg. 2) 2 #10 x ½ Pan Head Phillips Screw (see pg. 2) 8 ¼ x 2 ½ Lag Bolt (see pg. 2) 7 ¼ 20 x 5 / 8 Hex Head Bolt (see pg.

More information

08+ KAWASAKI KLR PD NERF

08+ KAWASAKI KLR PD NERF 08+ KAWASAKI KLR PD NERF 0505-1299 Before you begin, place the bike on a hard level surface where you have room to work. Lay out the parts included in this kit and compare to the parts list on page 5 of

More information

www.wildmanconstruction.com Changing your toilet is an easy project that should take half a day or less. The most common toilet has a separate tank that mounts on top of the bowl. These instructions apply

More information

Inspection. Assembly Install the springs. 1. Discard the 0-rings. 2. Clean all parts in cleaning solvent.

Inspection. Assembly Install the springs. 1. Discard the 0-rings. 2. Clean all parts in cleaning solvent. 6010-34 Inspection 3. Install the springs. 1. Discard the 0-rings. 2. Clean all parts in cleaning solvent. 3. If spring test equipment is available, check the tension of each spring according to the specifications

More information

18000 HDL FOUR POST LIFT LB CAPACITY INSTALLATION AND OWNER'S MANUAL

18000 HDL FOUR POST LIFT LB CAPACITY INSTALLATION AND OWNER'S MANUAL 18000 HDL FOUR POST LIFT 18000 LB CAPACITY INSTALLATION AND OWNER'S MANUAL WARNING! Do not raise a vehicle unless the front stops are in place, the parking brake is set, and the wheels are chocked. Stay

More information

Fodder-Pro Feed System

Fodder-Pro Feed System 110846 Fodder-Pro Feed System 110846 Fodder-Pro Feed System* "...grow your own nutrient-rich fodder..." 2012 FarmTek All Rights Reserved. Reproduction is prohibited without permission. *Actual system may

More information

Quick Hoops Seedling and Micro Green Bench Instruction Manual

Quick Hoops Seedling and Micro Green Bench Instruction Manual Quick Hoops Seedling and Micro Green Bench Instruction Manual 955 Benton Ave., Winslow, ME 04901 Phone: 1-877-564-6697 Fax: 1-800-738-6314 Email: service@johnnyseeds.com Web Site: Johnnyseeds.com This

More information

Pneumatic Clamp Carrier. Installation & Operation Manual

Pneumatic Clamp Carrier. Installation & Operation Manual Pneumatic Clamp Carrier Installation & Operation Manual Pneumatic Clamp Carrier Installation & Operation Manual Quick Machinery Company 8272 Peninsula Drive Kelseyville, CA 95451 phone: (707) 272-6719

More information

INSTRUCTION BOOKLET #34. For Wallbed models: KING SIZE SIERRA WITH STORAGE HEADBOARD

INSTRUCTION BOOKLET #34. For Wallbed models: KING SIZE SIERRA WITH STORAGE HEADBOARD For Wallbed models: KING SIZE SIERRA WITH STORAGE HEADBOARD INSTRUCTION BOOKLET #34 WARNING! ALL MURPHY/WALLBED SYSTEMS CONTAIN STORED ENERGY. FAILURE TO USE AND FOLLOW THESE INSTRUCTIONS DURING THE INSTALLATION

More information

10 x 10 Flat Top Two Tone Pergola

10 x 10 Flat Top Two Tone Pergola 0 x 0 Flat Top Two Tone Pergola Models: Bordeaux ASSEMBLY GUIDE OPTIONAL ACCESSORIES Arch Kit System ( Arches) Privacy Fence Panel System ( Panels & Middle Post) Bolt Down Bracket Kit ( for Pergola) Ver.0-00

More information

11 6 Round Building Assembly Instructions

11 6 Round Building Assembly Instructions 11 6 Round Building Assembly Instructions 11 6 Round Building Hardware List 1. Pro Rib Brite White 36 Wide X 68 Long (Siding Steel) 11 2. Top Wall Wheel Ring 3 3. Base Ring 3 4. 1 ½ X 68 Aluminum Tubes

More information

WARNING: Prior to installation, turn the power off to the vending machine and unplug it from its power source. Also, make sure to level the machine.

WARNING: Prior to installation, turn the power off to the vending machine and unplug it from its power source. Also, make sure to level the machine. Installation of Gum and Mint Tray for National 147, 157, 167 Important Note: Please read all instructions thoroughly before continuing with installation of kit. If you are having problems installing the

More information

The GAK using Ziv s GAK in the box

The GAK using Ziv s GAK in the box The GAK using Ziv s GAK in the box By Webslinger The Gonzo Air Kit or GAK has been around for a long time as a "Do-It-Yourself" performance modification. This is probably the least expensive way to increase

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS Accessory FABRIC REAR DOORS (5P) P/N 0SR90-HL4-211B (BLACK) P/N 0SR90-HL4-211C (CAMO) Application SXS1000M5P/M5D Honda Dealer: Please give a copy of these instructions to your

More information

10 x 10 Arch Top Pergola

10 x 10 Arch Top Pergola 0 x 0 Arch Top Pergola I N S T A L L A T I O N G U I D E O P T I O N A L A C C E S S O R I E S Privacy Fence Panel System ( Panels & Middle Post Included) Bolt Down Bracket Kit (Set of ) Additional Shade

More information

Parts list continues on Page 2 HOUSE PARTS PACKED IN HOUSE BOX PARTS IN SMALL PLASTIC BAG (HARDWARE) POST PARTS PACKED IN THIS BOX (LARGE PLASTIC BAG)

Parts list continues on Page 2 HOUSE PARTS PACKED IN HOUSE BOX PARTS IN SMALL PLASTIC BAG (HARDWARE) POST PARTS PACKED IN THIS BOX (LARGE PLASTIC BAG) Form 05-07 Instructions and Parts List MSS- Martin Safety System NOTES: () A complete system is packed in two boxes post box and house box. House box contains hardware for both post and house assembly.

More information

PLAYLAND 72 SPIRAL SLIDE 3.5 Posts, 3.5 Posts / 48 Grid and 5 Posts

PLAYLAND 72 SPIRAL SLIDE 3.5 Posts, 3.5 Posts / 48 Grid and 5 Posts PLAYLAND 72 SPIRAL SLIDE 3.5 Posts, 3.5 Posts / 48 Grid and 5 Posts USER GROUP: 2-12 RECOMMENDED CREW: 2 people TOOLS REQUIRED: T-30 TORX tool (supplied by manufacturer) T-45 TORX tool (supplied by manufacturer)

More information

Taurean Sectional Garage Door INSTALLATION INSTRUCTIONS

Taurean Sectional Garage Door INSTALLATION INSTRUCTIONS BEFORE YOU BEGIN MAKE SURE THESE INSTRUCTIONS ARE READ AND UNDERSTOOD COMPLETELY. THESE INSTRUCTIONS ARE INTENDED FOR PROFESSIONAL GARAGE DOOR INSTALLERS. ALL REFERENCES ARE TAKEN FROM THE INSIDE LOOKING

More information

Range height adjustable assembly

Range height adjustable assembly Table of contents Digital handset operation 3 Height adjustable bench kit 4-5 Cable carrier 6 Ganging tray and ganging rail 7 Height adjustable return frame kit 8 Cable entry pole 9 24 and 30 d worksurfaces

More information

TABLE OF CONTENTS REQUIRED TOOLS

TABLE OF CONTENTS REQUIRED TOOLS TABLE OF CONTENTS SECTION SECTION TITLE PAGE NO. 1 2 3 4 5 Assembling Mounting Structure Installing Bicycle Supports Mounting Rack to Wall Adding Sections Customizing Rack Configuration REQUIRED TOOLS

More information

ATLANTIS RAIL Contact Information

ATLANTIS RAIL Contact Information ATLANTIS RAIL Contact Information Customer Service (800) 541-6829 (508) 732-9191 Spectrum System Installation Instructions Atlantis Rail s Spectrum System is an easy to install, universal cable railing

More information

ULTRA SPACE SAVER SQUARED Installation Instructions

ULTRA SPACE SAVER SQUARED Installation Instructions Installation Instructions The Ultra Space Saver Squared has several steps for installation. Note that the single and double sided setups and parts are different. Make sure you follow the instructions according

More information

BABY WOLF LOOM. Assembly Instructions for Knocked-Down Looms

BABY WOLF LOOM. Assembly Instructions for Knocked-Down Looms BABY WOLF LOOM Assembly Instructions for Knocked-Down Looms BEFORE YOU BEGIN Please read through the directions before beginning to assemble your loom. Unpack the loom parts carefully. Do not throw away

More information

1) Place the reactor stand on a sturdy bench with the bottom plate facing toward the front.

1) Place the reactor stand on a sturdy bench with the bottom plate facing toward the front. Assembly Instructions for ChemRxnHub Reactor Systems 1) Place the reactor stand on a sturdy bench with the bottom plate facing toward the front. Loosen knobs on the right and left using 2 hands of the

More information

10 x 10 Flat Top Pergola

10 x 10 Flat Top Pergola 0 x 0 Flat Top Pergola A S S E M B L Y G U I D E Models: Venetian, Tuscany, Luxor, Acadia O P T I O N A L A C C E S S O R I E S Arch Kit System ( Arches) Privacy Fence Panel System ( Panels & Middle Post)

More information

6' Wide Premium Greenhouse Benches

6' Wide Premium Greenhouse Benches 6' Wide Premium Greenhouse Benches Premium Greenhouse Bench with Rolling Top 2015 FarmTek All Rights Reserved. Reproduction is prohibited without permission. STK# DIMENSIONS 112416R6X08 6' W x 3' H x 8'

More information

ClearSpan Hydroponic Table Kit

ClearSpan Hydroponic Table Kit ClearSpan Hydroponic Table Kit Hydroponic Table Kit (The 109314 (4' x 16') model is shown.) Designed to grow healthy plants without soil using mineral-nutrient solutions. 2009 ClearSpan All Rights Reserved.

More information

Intercooler Shroud and Belt Cover for WRX

Intercooler Shroud and Belt Cover for WRX Intercooler Shroud and Belt Cover for 2015+ WRX 2016-05-18 Thank you for purchasing this PERRIN product for your car! Installation of this product should only be performed by persons experienced with installation

More information

Hawko Zhaga Systems Installation Instructions

Hawko Zhaga Systems Installation Instructions Hawko Zhaga Systems Installation Instructions Contents Wire Suspension Installation 4 Recessed Brackets 6 Fixed Suspension Rods 8 Swivel Suspension Rods 10 Surface Mount Ceiling 12 Surface Mount Wall

More information

FodderPro 2.0 Mini Feed System

FodderPro 2.0 Mini Feed System 111763 FodderPro 2.0 Mini Feed System "...grow your own nutrient-rich fodder..." 2015 FarmTek All Rights Reserved. Reproduction is prohibited without permission. *Actual system may differ slightly from

More information

Oxford Stalls Installation Instructions

Oxford Stalls Installation Instructions Oxford Stalls Installation Instructions RAMM Horse Fencing and Stalls 13150 Airport Hwy. Swanton, OH 43558-9615 1-800-434-8456 Rev. 8/15/17 Before You Start Typical stall sizes are 10 x 10, 12 x 12 or

More information

#4 Phillips Driver Bit 1/8, 4mm, 5.5mm & 8mm (5/16 ) Allen Wrench. Safety Glasses

#4 Phillips Driver Bit 1/8, 4mm, 5.5mm & 8mm (5/16 ) Allen Wrench. Safety Glasses ATLANTIS RAIL Contact Information: Atlantis Rail Systems 70 Armstrong Road 3900 Civic Center Drive Plymouth, MA 02360 North Las Vegas, NV 89030 (800) 541-6829 or (508) 732-9191 (508) 732-9798 www.atlantisrail.com

More information

Tools and Tips: ( 1 )

Tools and Tips: ( 1 ) Tools and Tips: As you build instructions will show in my many picture manual how to assemble. You can use your own methods as you desire, my results are very good. A smooth, flat work surface is very

More information

Assembly Instructions: Bencher Skylark

Assembly Instructions: Bencher Skylark Assembly Instructions: Bencher Skylark Tools Required: Pop Rivet Tool Tape Measure Hex Wrenches Screwdriver Several Disposable Rags Two Saw Horses Several boxes or bowls to hold fasteners and small parts

More information

Adjustable Hammered Dulcimer Stand

Adjustable Hammered Dulcimer Stand Adjustable Hammered Dulcimer Stand Musicmaker s Kits (Hwy 36 behind Joseph s Restaurant) P.O. Box 2117 Stillwater MN 55082 651 439 9120 www.harpkit.com PARTS LIST: 1 Set of Assembly Instructions A. 2 front

More information

Face Mount to Through-the-Post Mount

Face Mount to Through-the-Post Mount Face Mount to Through-the- Mount Cable Runs through Two Corners When going around two corners, it s necessary to tension the cable from both ends as shown in Deck 4. Use the 672 series The tensioning devices

More information

(6) Plastic Retainers. Passenger/Right. Passenger/Right Support Brackets

(6) Plastic Retainers. Passenger/Right. Passenger/Right Support Brackets PART#R102580 PARTS LIST: 1 Driver/Left HD Running Board 4 8mm Bolt/Nut Plates 1 Passenger/Right HD Running Board 4 8mm Plastic Retainers 2 Driver/Left & Center Mount Bracket 14 8mm-1.25 x 30mm Hex Bolts

More information

For additional assistance call

For additional assistance call The following pages will help guide you through the process of assembling your new 48 custom prize wheel. Choose an assembly area with plenty of room to lay your pieces on the floor and also a bench or

More information

FLOE DOCK FURNITURE WARNING ASSEMBLY INSTRUCTIONS

FLOE DOCK FURNITURE WARNING ASSEMBLY INSTRUCTIONS FLOE DOCK FURNITURE ASSEMBLY INSTRUCTIONS KIT P/N 510-00400-02 KIT P/N 510-00405-02 KIT P/N 510-00406-02 KIT P/N 510-00410-02 WARNING IT IS THE INSTALLER S RESPONSIBILITY TO PROPERLY INSTALL this chair

More information

JK Rear Inner Fenders

JK Rear Inner Fenders INSTALLATION INSTRUCTIONS INST-17-05-080_A JK Rear Inner Fenders IMPORTANT: Thank you for purchasing this Poison Spyder product. Please read through this entire document before proceeding with installation.

More information

Fiber Splice Box (FSB-D) Installation Instructions

Fiber Splice Box (FSB-D) Installation Instructions Fiber Splice Box (FSB-D) Installation Instructions Table of Contents General Product Information... 1.0 Safety Precautions... 2.0 Tools Required... 3.0 Package Contents... 4.0 Installing the Product Unpacking...

More information

Tools and Tips: ( 1 )

Tools and Tips: ( 1 ) Tools and Tips: As you build instructions will show in my many picture manual how to assemble. You can use your own methods as you desire, my results are very good. A smooth, flat work surface is very

More information

Preference Collection and Treatment Console INSTALLATION GUIDE

Preference Collection and Treatment Console INSTALLATION GUIDE Preference Collection 5580.69 and 5580.96 Treatment Console INSTALLATION GUIDE WARNING Failure to install the 5580 as described in this installation guide may cause the unit to collapse, resulting in serious

More information

Form No Assembly & Operating Instructions for: SAFETY PRECAUTIONS

Form No Assembly & Operating Instructions for: SAFETY PRECAUTIONS Form No. 0230 Assembly & Operating Instructions for: 833 20300 83 2220 837 0-0008 078 SHOP PRESS Max. Capacity: 2 Ton These instructions are intended for various shop presses. Some models are shipped assembled

More information

Deck Mount Installation with Bench

Deck Mount Installation with Bench Deck Mount Installation with Bench 1. Mark track with square. 2. Cut tracks with saw. 3. Drill ¼ hole (if needed.) 4. Countersink track. 5. Countersink all track 6. File all track ends. ends. 7. Lay out

More information

Hatchback Wing Riser Kit

Hatchback Wing Riser Kit Hatchback Wing Riser Kit 2015-06-11 Thank you for purchasing this PERRIN product for your car! Installation of this product should only be performed by persons experienced with installation of aftermarket

More information

Lumber Smith. Assembly Manual. If you are having problems assembling the saw and need assistance, please contact us at:

Lumber Smith. Assembly Manual. If you are having problems assembling the saw and need assistance, please contact us at: Lumber Smith Assembly Manual If you are having problems assembling the saw and need assistance, please contact us at: 804-577-7398 info@lumbersmith.com 1 Step 1 Safety Carefully read the Owners Manual.

More information

UNIT No FRAMELESS PIVOT SHOWER DOOR

UNIT No FRAMELESS PIVOT SHOWER DOOR INSTALLATION INSTRUCTIONS UNIT No. 3600 FRAMELESS PIVOT SHOWER DOOR NEED INSTALLATION HELP? Call 1-800-45-BASCO (452-2726) Monday - Friday 8:00 A.M. - 4:30 P.M. Eastern Time QCI0020 Rev. 3 Page 1 of 8

More information

Sunrise Deck Assembly Instructions for Kingston Left

Sunrise Deck Assembly Instructions for Kingston Left Sunrise Deck Assembly Instructions for Kingston Left It s easiest to build the deck frame first like it will be lying on its back and then after all 4 legs and horizontals are in place, tip the deck toward

More information

Model #SH & CH SH Pine CH Naturaline

Model #SH & CH SH Pine CH Naturaline Model #SH304-101 & CH304-101 Assembly Manual SH304-101 Pine CH304-101 Naturaline Component Parts A 2 ea. Angled Rail - 2 x 4 x 107-1/8" B 1 ea. Center Angled Rail - 2 x 4 x 107-1/8" C 9 ea. Rock Board

More information

Bulkhead Model Number and

Bulkhead Model Number and Bulkhead Model Number 96141-3-01 and 96142-3-01 Installing your ProMaster bulkhead is very clear cut following these instructions. Before cutting or drilling in the floor, verify the location of you gas

More information

American Morse Equipment

American Morse Equipment American Morse Equipment Thank you for purchasing an American Morse Porta Paddle-II Kit. We redesigned the original Porta Paddle for ease of assembly & provide all parts finished and ready for assembly,

More information

INSTRUCTION BOOKLET #C21. For Wallbed models: KING SIZE

INSTRUCTION BOOKLET #C21. For Wallbed models: KING SIZE For Wallbed models: KING SIZE INSTRUCTION BOOKLET #C1 WARNING! ALL MURPHY/WALLBED SYSTEMS CONTAIN STORED ENERGY. FAILURE TO USE AND FOLLOW THESE INSTRUCTIONS DURING THE INSTALLATION PROCESS COULD RESULT

More information

PRO CYC PRO CYC, INC. SYSTEM SUPER 1.5QS

PRO CYC PRO CYC, INC. SYSTEM SUPER 1.5QS Assembly Instructions System Super 1.5QS Congratulations on your decision to use the world s most advanced and user-friendly cyclorama system. We have taken a great deal of care to create and ship your

More information

Preference Collection 5543 Central Console INSTALLATION GUIDE

Preference Collection 5543 Central Console INSTALLATION GUIDE Preference Collection 5543 Central Console INSTALLATION GUIDE WARNING Failure to install the 5543 as described in this installation guide may cause the unit to collapse, resulting in serious injury to

More information

Salter Industries Spiral Stair

Salter Industries Spiral Stair Salter Industries Spiral Stair The Leader in Spiral Staircases Continuous Sleeve Stair Installation Instructions TOOLS NEEDED: 1. Electric drill with hex chuck and Phillips bit 2. Drill bits 1/8", 1/4",

More information

The Useless Machine. DIY Soldering Edition. Instruction Guide v0004

The Useless Machine. DIY Soldering Edition. Instruction Guide v0004 The Useless Machine DIY Soldering Edition Instruction Guide v0004 TM For the best outcome, follow each step in order. We recommend reading this guide entirely before you get started. Tools required: Soldering

More information

TYPHOON ASSEMBLY AND INSTALLATION INSTRUCTIONS

TYPHOON ASSEMBLY AND INSTALLATION INSTRUCTIONS TYPHOON ASSEMBLY AND INSTALLATION INSTRUCTIONS CORPORATE HEADQUARTERS WESTERN SALES AND MANUFACTURING PLANT P.O. Box 400 1017 SW Berg Parkway Canby, Oregon 97013 Phone: (503) 266-2231 Fax: (503) 266-4334

More information

Equilibrium. Conference Table. Installation Instruction. Revision B 11/07/16

Equilibrium. Conference Table. Installation Instruction. Revision B 11/07/16 Equilibrium Conference Table Installation Instruction Revision B 11/07/16 Equilibrium End User Agreement Enwork Equilibrium table bases must be installed directly onto a four inch minimum thickness concrete

More information

Heavy Duty Ceiling Tilt Mount Installation Manual

Heavy Duty Ceiling Tilt Mount Installation Manual HD-CTM-5580 Heavy Duty Ceiling Tilt Mount Installation Manual *This Installation requires a minimum of two people. For your safety: Read the complete instruction manual before starting an installation

More information