Assembly Instructions: Bencher Skylark

Size: px
Start display at page:

Download "Assembly Instructions: Bencher Skylark"

Transcription

1 Assembly Instructions: Bencher Skylark Tools Required: Pop Rivet Tool Tape Measure Hex Wrenches Screwdriver Several Disposable Rags Two Saw Horses Several boxes or bowls to hold fasteners and small parts Sharpie Marker Pen or the Equivalent Acid Brush or stiff quarter-inch brush Assembly Note: The supplied Butter-It s-not conductive paste also is an effective antiseizing agent. A small amount of it should be put on the threads of all screws and bolts prior to putting lock washers and nuts on. This is especially so for the U-bolts and the boom to mast hardware. This will allow easy removal at a later date should it be necessary to do so. The small brush specified in the tools required list is the easiest way to apply the Butter- It s-not both on element assembly and on bolt and screw threads. Boom Assembly Refer to the boom drawings and be sure you understand it. There are three inner sleeves of 48 X 1 7/8 diameter, and 4 outer sleeves, 2 X 48. Each of the 7 boom pieces has holes precision drilled, and all holes should line up perfectly. Note that the 4 pieces of 2 lengths have letters, A, B and C, marked in black. The letters refer to the junction points, so there is Junction A, Junction B and Junction C. The inner tubes also have marked letters, in red. Take a 2 OD tube with the black letter A stenciled on end place the piece on a flat surface so that the A is upright and to the right end of the tube as you face it. Take the 1-7/8 tube with a red A stenciled on it, hold it so the red A is right side up, and slide the left end of that tube into the end of the 2 tube marked with a black A. Notice the hole left of the red A ; slide the inner tube so that the hole lines up with the hole in the outer sleeve. Pass a 2 ¾ bolt through the hole, and put a nut on it a few turns to hold the assembly captive.

2 Find the 2 outer sleeve with a black A stenciled on one end, and a black B stenciled on the other end. Slide the A end down over the 1-7/8 sleeve from the first section. Rotate until the holes line up, and pass a 2-3/4 bolt through and add a nut for a few turns. Take the 1-7/8 tube marked with a red B, holding it so the B is upright. Slide the left end of that tube into the right end of the existing assembly. Note that there are two sets of holes. Pass a 2 ¾ bolt through one set and add a few turns of a nut. Take the 2 tube marked with a black B on one end and a black C marked on the other. Slide the B end over the right end of the boom assembly, and line up the holes; pass a bolt though and put a nut on a few turns. The remaining section of 1 7/8 tubing should be marked with a red C. Hold the tubing so that the C is upright. Slide the left end of the tube into the assembly, line up the holes and put a temporary bolt through as before. The last piece of 2 tubing is marked C. With the C upright, slide the left end of the tube onto the assembly and use a temporary bolt and nut. This completes the initial assembly of the boom. There are seven aluminum element platforms. These are mounted at the seven element stations. In many cases, there is already a temporary bolt through the boom where the element platform will mount. When mounting these platforms it is necessary to remove the temporary bolt first. The platform station numbers are based one the distance from the reflector end of the boom in inches, starting at the A end of the boom. Stations are mounted so that the flat plate area is down. The first station is the 17 meter reflector, which is about 19 in from the end of the boom. Remove the temporary bolt and nut, slip an element platform over the boom tube, as shown in the picture, slide a 2 ¾ bolt through, add a lock washer and nut and tighten.

3 In the same manner, mount the other six element platforms. Use a tape measure to confirm the station element locations. Besides the first platform mounted at 19, platforms should be mounted at 46, 90, 94.5, , 177 inches and 183. Make sure that the stations are correct. Note that the first station may not be exactly 19 in from the end; this is OK. However, to measure the rest of the stations, place the 19 mark of your tape measure exactly centered on the hole of the first station. All other stations should be exactly correct. Element Assembly The integrity of this antenna depends on the stainless steel aviation grade pop rivets supplied. It is beyond the scope of this manual to cover how to pop rivet. Though the process is neat and simple, you do want to be sure you get it done right! If there is any question, get assistance from someone who has experience. Also, the internet has several different instructional aids. A short video on pop riveting is at: Do note that sometimes in pop riveting it is necessary to pull up on the rivet by squeezing the riveter handle, then releasing pressure on the handle, pushing the rivet tool down further and then squeezing the handle again. If you have never done pop riveting before it would be time well spent to try three or four rivets on a couple pieces of sheet metal. In assembling the elements, you will be using the enclosed packet of Butter-It s-not, which is a copper bearing grease paste. This insures a good electrical connection between element segments. Some people believe that copper bearing grease paste is a problem because of galvanic action. However, galvanic action requires dissimilar metals AND water or another liquid electrolyte. The grease in Butter-It s-not prevents water from getting involved, so there is no galvanic reaction. In any case, note that if Butter-It s-not gets on your clothes, it is virtually impossible to remove the stain. For this reason, we strongly recommend you wear clothing for which permanent stains will not be an issue. Also, you will want rags for wiping away excess

4 Butter-It s-not, and these rags are probably best thrown away when the project is completed. The Skylark has seven elements four for 12 meters, and three for 17 meters. One of the 17 meter elements is insulated in the middle this is the driven element. It should be assembled last. Note that all elements have their holes drilled in such a way that you can not make an error in assembling nested pieces, as long as you simply insure that the rivet holes for an outer tube and for an inner tube line up and have the same number of rivet holes. Do not open more than one element bag at a time. Open one bag, assemble that element per the instructions below, then progress to the next bag and the next element. The 12 meter elements are to be assembled first. All the twelve meter elements are identical except for tip length. Note that the 12 meter driven element is not split the design utilizes a solid element. Open the plastic sleeve for one of the 12 meter elements. Find the center tubing section, which is ¾ OD X 4, which is the largest piece and for which there is only one piece of that diameter. Take one of the 5/8 diameter by 36 pieces of tube from the sleeve, which should have three holes drilled at each end. Apply Butter-It s-not the outside of one end of this tube. Apply a small amount of the paste from the tip of the tube to a point parallel to the hole closest to the center of the tube, about 3 long. Insert the tube into the end of the ¾ tube, twisting as you slide it in so that the paste is smeared around the junction of the two tubes. Then, line up the three holes on the two pieces of tubing. Insert a pop rivet and set it with the tool, then put in the other two rivets.

5 Detail of a pop riveted joint. Note that this element uses 4 pop rivets; some use 3, some 4, and some with different hole spacing to avoid assembly errors. Repeat with the other 5/8 tube at the other end of the 3/4 tube. Insert the ½ tube into the 5/8 tube. Apply Butter-It s-not, then rivet. Repeat on the other half element assembly. Insert the 3/8 tube into the ½ tube. Apply Butter-It s-not, then rivet. Repeat on the other half element assembly. Now, take the 5/8 end of one of the assemblies and insert it into the ¾ tube. Apply Butter-It s-not, then rivet. Repeat on the other half element assembly to the other side of the ¾ tube. This completes an element. Mark the element number on the tubing with the marker, and set the element aside. Assemble the other three 12 meter elements in the same way. Open the bag for element #1, the 17 meter reflector. Separate the tubes. Note that one 5/8 tubing has a red paint splash on it, and has the rivet holes in the middle of the element. This piece is the inside stiffener sleeve for the center of the element. Take one of the ¾ tubes, and slide it over the 5/8 piece, apply Butter-It s-not, and rivet. Now, using a marker such as a Sharpie Pen or the like, make two lines ½ from each side of the center of the element. Slide one of the plastic insulating sleeves down the element to that line. Because the sleeve has to go over two of the rivets it is not easy to slide at the end, and having the sleeve warmed in the sun or in hot water will surely make the operation much easier. Again, if you find it impossible to get the sleeve in place, it is permissible to cut a slit down the length of the sleeve and put the sleeve in place. Set the center section assembly aside, and assemble the rest of the element. Take one of the 5/8 tubes, and note that one end has four holes in it, the other end three holes. Note that the ½ tubes also have four holes on one end and three on the other. Insert the three hole end of the ½ tubes in to the three hole end, of the 5/8 tube, apply Butter-It s-not, and rivet. Insert the 3/8 tube into the four hole end, apply Butter-It s-not, and rivet. Now repeat procedure for the other side of the element. Complete the element by attaching the two tip assemblies to the center section, applying Butter-It s-not, and riveting. Mark the element #1, 17 Meter Reflector, and set aside. Repeat the complete procedure for Element #6, the 17 meter Director. Assembly of 17 meter driven element, #3:

6 Open the bag of tubing parts and separate. There are two 5/8 X 2 pieces of tubing, with a single hole at one end and no hole at the other end. Set these aside. Assemble each half element in the same way that you assembled the earlier elements. Now, take one of the 5/8 X 2 tubes. Smear a little Butter-It s-not around the end inside of the single hole set. Slide the tube into the end of one of the driven end halves, so that the holes line up. Center the hole with a pop-rivet tail. Take the white fiberglass insulator and slide it inside the assembly. While doing so, keep the pop-rivet tail through the hole so that the 5/8 tube does not get pushed in further. When the fiberglass insulator rod reaches the hole, partially withdraw the tail enough to let the insulator continue on in, but without permitting the inner aluminum tube to slide in. Align the holes, and put a #8 X 1 3/8 screw through the assembly. Put a lockwasher and nut on the screw and tighten, then put another nut on and also tighten.. Bring up the other half of the driven element to the other side, and assemble it in the same manner. Make sure that the pop rivets are in line on both sides of the driven element. Be sure there is no trace of Butter-It s-not on the center of the white insulator. If any found its way there, be extra sure it is all removed. This completes element assembly. Antenna Assembly Final assembly of the antenna is best done close to the base of the tower that the antenna will be mounted, as assembled antennas are difficult to move any distance. Put the boom across two saw horses, with the flat sides of the boom platforms up. On each element saddle, attach two element clamps, using the ¼ X 1 bolts, with lock washers and nuts. Note that the holes in the element clamps are NOT centered align the element clamps so that they are flush with the element saddles. For the moment, only put

7 the nuts on a few turns. See picture for detail note that the boom is tilted in the picture for clarity. Slide each element into the element clamp assembly, being sure to get the correct element at each station. Be sure the element is centered on the boom. Turn the pop rivets so that they are facing up. Then tighten the nuts holding each element. The 17 meter driven element should be done last. To mount the 17 meter driven element it will be necessary to temporarily remove the element clamps. Set the element on the saddle, with the screw length up, then re-attach the element clamps, using only a few threads on the nut. You will likely need to slide the insulator tubing pieces a little to get them to align underneath the element clamps. Be sure to get this right the balun will be feeding RF to the two screws making the element hot, so you want to be sure the element is clear of the element clamps and properly insulated. Picture of partially assembled driven elements. Note that the 12 meter element may or may not have a gap in the middle of the insulation this is unimportant. Make sure all the rivets are on top, then tighten all element-clamping screws. It is a good idea to have someone else check to be sure that all screws are tight.

8 Measure the length of each of the elements: Table Skylark Element Lengths 17 Meter Reflector Station inches 12 Meter Reflector Station inches 17 Meter Driven Station inches Special note driven element - this dimension does not include the space for the center insulator for this element be sure to add the open space for the overall dimension. 12 Meter Driver Station inches 12 Meter First Director Station inches 17 Meter Director Station inches 12 Meter Second Director Station inches Important Note Unlike traditional monoband yagis, the second director for 12 meters is supposed to be longer than the first director! Slide a PVC spacer over the ends of the driven element cell, set it close to the end of the 12 meter element, and tighten the locking screws. The locking screws are made of nylon, which does not do well in UV. To protect the screws, after they are tightened cover them well with electrical tape. Final Assembly Final assembly of the antenna is best done close to the base of the tower that the antenna will be mounted, as assembled antennas are difficult to move any distance.

9 Put the boom across two saw horses, with the flat sides of the boom platforms up. This makes assembly easier. However, note that the antenna will be mounted with the elements hanging DOWN not up, so you will be turning the antenna over. Place the boom to mast saddle over the boom, and align with the two holes at station 101 and Be sure that the flat side is on the side you want for when it goes onto your tower. Remember, Station 0 is the reflector end. Put two 2 ¾ screws through the boom and saddle, and add lock washers and a nut, tighten, then add another nut and tighten. Mount the 5 X 6 aluminum plate to the flat side of the boom to mast saddle, using the #10-32 X 3/8 round head screws and lock washers. Make sure the screws are tight. Insure that the four ¼ threaded holes all have clearance through the flat plate and the boom saddle. If they do not, align the plate so that they do. Screw the two ¼ X 1 ¼ hex head bolts into the bottom two holes of the flat side of the boom-to-mast plate. Screw the bolts in only far enough that the ends are flush with the boom saddle on the other side. The bolts will be still sticking out of the flat plate about 1. When you are installing the antenna on the mast, these bolts will be entering the key hole on the mast plate. Put the impedance matching coil across the feed point screws, with the coil on the side closer to the mast. Then add lock washers and nuts. Attach the balun, as shown below. Balun Mounting Detail Note that the antenna is upside down for this picture. The antenna is now ready to put up.

10 There are at least several different ways to get a yagi onto the mast at the top of the tower. For what it is worth, here is how we did ours: Install the Skylark mast plate on the mast at the desired level. Line up the plate so that it points at the desired direction, then tighten the u-bolts. Install, temporarily or permanently, a pulley at the top of the mast, with a rope through it that has at a minimum several hundred pounds of strength. Stand the antenna up on the boom so that it is leaning against the tower. Tie one end of the rope around the mast. Tie a short rope from the top end of the vertical boom loosely around the antenna raising rope. This will serve to keep the antenna from rotating out of control while it is being pulled up. While the antenna is being raised, the person at the top of the tower is responsible to keep the antenna pushed out enough from the tower that it does not bump into the tower. When the top end of the boom is high enough to reach the person at the top of the tower, he or she should remove the rope at the top end of the boom. Now, that person will maneuver the antenna around and into position, engage the two bolts on the antenna boom to mast plate into the keyholes on the mast plate and let the antenna drop into place. Tighten the two bolts, then screw in two more bolts in the lower holes. Put lock washers and nuts over all 4 bolts and tighten securely. Attach the coax and enjoy!

Directive Systems & Engineering 2702 Rodgers Terrace Haymarket, VA

Directive Systems & Engineering 2702 Rodgers Terrace Haymarket, VA Directive Systems & Engineering 2702 Rodgers Terrace Haymarket, VA 20169 1628 www.directivesystems.com 703 754 3876 K1JX DESIGNED 6 ELEMENT 50 MHZ YAGI, DSEJX6 50 INTRODUCTION The Directive Systems DSEJX6-50

More information

M2 Antenna Systems, Inc. Model No: 10-30LP8

M2 Antenna Systems, Inc. Model No: 10-30LP8 M2 Antenna Systems, Inc. Model No: 10-30LP8 SPECIFICATIONS: Model... 10-30LP8 Frequency Range... 10-30 MHz Continuous *Gain free space / 65... 5.2 dbi / 10.5 dbi 10-30 Front to back... 15 db 10-30 MHz

More information

Cushcraft. Amateur Radio Antennas LFA-6M5EL. 6 Meter 5 Element Loop Feed Antenna INSTRUCTION MANUAL

Cushcraft. Amateur Radio Antennas LFA-6M5EL. 6 Meter 5 Element Loop Feed Antenna INSTRUCTION MANUAL Cushcraft Amateur Radio Antennas LFA-6M5EL 6 Meter 5 Element Loop Feed Antenna INSTRUCTION MANUAL CAUTION: Read All Instructions Before Operating Equipment VERSION 1A Cushcraft Amateur Radio Antennas 308

More information

M2 Antenna Systems, Inc. Model No: 20M6-125

M2 Antenna Systems, Inc. Model No: 20M6-125 M2 Antenna Systems, Inc. Model No: 20M6-125 SPECIFICATIONS: Model... 20M6-125 Frequency Range... 14.0 14.350 MHz *Gain, (FS) / Over gnd... 11.19dBi / 16.6dBi @70 Front to back... 25 db Typical Beamwidth...

More information

M2 Antenna Systems, Inc. Model No: 10-30LP8

M2 Antenna Systems, Inc. Model No: 10-30LP8 M2 Antenna Systems, Inc. Model No: 10-30LP8 VSWR 2:1 TYPICAL VSWR @ 70 FT. 2:1 1.5:1 1.5:1 1.2:1 1.2:1 10 14 MHz 11 12 13 17 15 16 18 19 20 21 22 23 24 25 26 27 28 29 30 SPECIFICATIONS: Model...10-30LP8

More information

DB Duo-Monoband Beam 7 - Element, 12 and 17 Meter INSTRUCTION MANUAL. General Description

DB Duo-Monoband Beam 7 - Element, 12 and 17 Meter INSTRUCTION MANUAL. General Description 308 Industrial Park Road Starkville, MS 39759 USA Ph: (662) 323-9538 FAX: (662) 323-6551 DB- 1217 Duo-Monoband Beam 7 - Element, 12 and 17 Meter INSTRUCTION MANUAL General Description The Hy-Gain DB-1217

More information

M2 Antenna Systems, Inc. Model No: KT31WARC

M2 Antenna Systems, Inc. Model No: KT31WARC M2 Antenna Systems, Inc. Model No: KT31WARC SPECIFICATIONS: Model... KT31WARC Frequency Range... 10.1-10.15 MHz **Selectable Frequency Range... 14.0-14.35 MHz **Selectable... (175 KHz / 2:1 VSWR Nominal)

More information

Cushcraft. Amateur Radio Antennas DB-46M8EL. Dual band 6 and 4 Meter, 8 Element Beam Antenna INSTRUCTION MANUAL

Cushcraft. Amateur Radio Antennas DB-46M8EL. Dual band 6 and 4 Meter, 8 Element Beam Antenna INSTRUCTION MANUAL Cushcraft Amateur Radio Antennas DB-46M8EL Dual band 6 and 4 Meter, 8 Element Beam Antenna INSTRUCTION MANUAL CAUTION: Read All Instructions Before Operating Equipment VERSION 1B Cushcraft Amateur Radio

More information

M2 Antenna Systems, Inc. Model No: 20M5LD

M2 Antenna Systems, Inc. Model No: 20M5LD M2 Antenna Systems, Inc. Model No: 20M5LD SPECIFICATIONS: Model... 20M5LD Frequency Range... 14.0 14.350 MHz *Gain (Full Band)... 10.2 dbi Typical Front to back... 23 db Typical Beamwidth... E=50 / H=66

More information

M2 Antenna Systems, Inc. Model No: 2M4

M2 Antenna Systems, Inc. Model No: 2M4 M2 Antenna Systems, Inc. Model No: 2M4 SPECIFICATIONS: Model... 2M4 Frequency Range... 144 To 148 MHz *Gain... 9.6 dbi Front to back... 20 db Typical Beamwidth... E=54 H=74 Feed type... T Match Feed Impedance....

More information

M2 Antenna Systems, Inc. Model No: YAGI ANTENNA

M2 Antenna Systems, Inc. Model No: YAGI ANTENNA M Antenna Systems, Inc. Model No: 4.5-7 YAGI ANTENNA SPECIFICATIONS: Model... 4.5-7 Frequency Range... 4.0 To 4.5 MHz *Gain... 0 To 7 dbi Front to back... 0 db over the rear 80 Beamwidth... E=44 H=50 typical

More information

TZ-RD-1740 Rotary Dipole Instruction Manual

TZ-RD-1740 Rotary Dipole Instruction Manual TZ-RD-1740 17/40m Rotary Dipole Instruction Manual The TZ-RD-1740 is a loaded dipole antenna for the 40m band and a full size rotary dipole for the 17m band. The antenna uses an aluminium radiating section

More information

M2 Antenna Systems, Inc. Model No: 40M3L

M2 Antenna Systems, Inc. Model No: 40M3L M2 Antenna Systems, Inc. Model No: 40M3L SPECIFICATIONS: Model... 40M3L Frequency Range... 7.0-7.3 MHz X 150 khz Gain... 6.6 dbi Front to back... 23 db Beamwidth... E=62 Feed type... Hair pin match Feed

More information

M2 Antenna Systems, Inc. Model No: 2M7

M2 Antenna Systems, Inc. Model No: 2M7 M2 Antenna Systems, Inc. Model No: 2M7 SPECIFICATIONS: Model... 2M7 Frequency Range... 144 To 148 MHz *Gain... 12.3 dbi Front to back... 20 db Typical Beamwidth... E=43 H=50 Feed type... T Match Feed Impedance....

More information

This manual will aid in the assembly of the FireBall V90 and FireBall X90. The assembly of both machines will be identical, unless specified.

This manual will aid in the assembly of the FireBall V90 and FireBall X90. The assembly of both machines will be identical, unless specified. This manual will aid in the assembly of the FireBall V90 and FireBall X90. The assembly of both machines will be identical, unless specified. Step #1 Lay all parts out to verify quantities. (2) 2 x 25-1/4

More information

INSTALLATION INSTRUCTIONS 3 BULL BAR 99-04, 04 "HERITAGE" F-150/250LD 2WD, 97-04, 04 "HERITAGE" 4WD WD EXPEDITION/ WD EXPEDITION PART

INSTALLATION INSTRUCTIONS 3 BULL BAR 99-04, 04 HERITAGE F-150/250LD 2WD, 97-04, 04 HERITAGE 4WD WD EXPEDITION/ WD EXPEDITION PART INSTALLATION INSTRUCTIONS 3 BULL BAR PART #B-F1971;B-F2971 PARTS LIST: 1 Bull Bar 2 12-1.75mm x 130mm x 40mm Hex Bolts 1 Driver/Left Mounting Bracket 4 12-1.75mm x 35mm Hex Bolts 1 Passenger/Right Mounting

More information

INSTRUCTION MANUAL ORDER NO. V3R MODEL V3R. Collinear Gain Vertical for MHz

INSTRUCTION MANUAL ORDER NO. V3R MODEL V3R. Collinear Gain Vertical for MHz ORDER NO. V3R MODEL V3R Collinear Gain Vertical for 216-225 MHz INSTRUCTION MANUAL General Description The new Hy-Gain V3R VHF antenna is a collinear 5/8-wave omnidirectional vertical antenna for the 216-225

More information

PAC-12 Kit Contents. Tools Needed Soldering iron Phillips screwdriver Wire stripper Wrenches, 7/16 and 1/2 Terminal crimp tool Pliers Solder

PAC-12 Kit Contents. Tools Needed Soldering iron Phillips screwdriver Wire stripper Wrenches, 7/16 and 1/2 Terminal crimp tool Pliers Solder PAC-2 Kit Contents Part Quantity Screws: 8/32 x 3/8 Screws: 8-32 x 5/6 Screw: 8-32 x /4 #8 internal tooth washers #8 solder lug ring terminals Bolt: Aluminum, /4-20 x.5 /4 internal tooth washer Nut: Aluminum

More information

Assembly Instructions 10 X 10 Aluminum Frame Building

Assembly Instructions 10 X 10 Aluminum Frame Building Assembly Instructions 10 X 10 Aluminum Frame Building 27 97 9 8 47 36 74 52 10 10 X 10 Square Building W/ Dome Includes: The Steel Entry Door with a Dead Bolt Lock assembly and Aluminum Door Frame. Metal

More information

Technicians of Terror. This is the air valve we make to use with our air

Technicians of Terror.  This is the air valve we make to use with our air These are pictures of our scissor prop. Technicians of Terror http://www.halloweenfear.com/scissorprop.html props. This is the air valve we make to use with our air This pictures the duel door closer cylinders

More information

Assembly Instructions 10 X 10 Aluminum Roof Support

Assembly Instructions 10 X 10 Aluminum Roof Support Assembly Instructions 10 X 10 Aluminum Roof Support Aluminum Roof Support Bolt Package 16-5/16 X 2 ¼ SS Bolt 24-5/16 X 1 SS Bolt 40-5/16 SS Nylon Lock Nuts 16-5/16 SS Flat Washers 28-4 ½ Wood Screws 36-1

More information

INSTALLATION INSTRUCTIONS 3"/4 BENT END SIDEBARS FORD F-150 SUPERCREW PART # DZ /DZ

INSTALLATION INSTRUCTIONS 3/4 BENT END SIDEBARS FORD F-150 SUPERCREW PART # DZ /DZ INSTALLATION INSTRUCTIONS 09-12 FORD F-150 SUPERCREW PART # DZ 372697/DZ 372699 PARTS LIST: 1 Driver/Left Sidebar 4 1/2 Lock Washers 1 Sidebar 4 12mm x 32mm OD x 3mm Flat Washers 1 Driver/Left Mounting

More information

M2 Antenna Systems, Inc. Model No: 2MCP22

M2 Antenna Systems, Inc. Model No: 2MCP22 M2 Antenna Systems, Inc. Model No: 2MCP22 SPECIFICATIONS: Model... 2MCP22 Frequency Range... 144 To 148 MHz *Gain... 14.39 dbic Front to back... 25 db Typical Elipticity... >3db Beamwidth... 38 Feed type...

More information

Bushwacker Jeep Flat Style Fender Flares Rear Pair (JK Wrangler 2dr)

Bushwacker Jeep Flat Style Fender Flares Rear Pair (JK Wrangler 2dr) Bushwacker Jeep Flat Style Fender Flares Rear Pair (JK Wrangler 2dr) Note: These instructions involve cutting parts of your vehicle. Please read all instructions prior to starting. Installation Time: 3-4

More information

INSTALLATION INSTRUCTIONS GRILLE GUARD RAM 1500 PART # 5058/5058-2

INSTALLATION INSTRUCTIONS GRILLE GUARD RAM 1500 PART # 5058/5058-2 INSTALLATION INSTRUCTIONS GRILLE GUARD PART # 5058/5058-2 PARTS LIST: Qty Description Qty Description 1 Grille Guard 8 12-1.75mm x 35mm Hex Bolts 2 Upper Frame Mounting s (for trucks without tow hooks

More information

Spiderbeam Balun Construction Guide

Spiderbeam Balun Construction Guide BALUN CONSTRUCTION GUIDE Ver. 1.0 1 The components of the Balun Kit are in a plastic bag. Most of the components are inside the plastic case of the balun. The aluminum U-profile and the RG-142 Teflon Coax

More information

(6) Plastic Retainers. Passenger/Right. Passenger/Right Support Brackets

(6) Plastic Retainers. Passenger/Right. Passenger/Right Support Brackets PART#R102580 PARTS LIST: 1 Driver/Left HD Running Board 4 8mm Bolt/Nut Plates 1 Passenger/Right HD Running Board 4 8mm Plastic Retainers 2 Driver/Left & Center Mount Bracket 14 8mm-1.25 x 30mm Hex Bolts

More information

Bushwacker Jeep Flat Style Fender Flares Front Pair

Bushwacker Jeep Flat Style Fender Flares Front Pair Bushwacker Jeep Flat Style Fender Flares Front Pair Note: These instructions involve cutting parts of your vehicle. Please read all instructions prior to starting. Installation Time: 3-4 Hours Tools Required:

More information

Deck Mount Installation with Bench

Deck Mount Installation with Bench Deck Mount Installation with Bench 1. Mark track with square. 2. Cut tracks with saw. 3. Drill ¼ hole (if needed.) 4. Countersink track. 5. Countersink all track 6. File all track ends. ends. 7. Lay out

More information

M2 Antenna Systems, Inc. Model No: 10-30LP8-125

M2 Antenna Systems, Inc. Model No: 10-30LP8-125 M2 Antenna Systems, Inc. Model No: 10-30LP8-125 VSWR 2:1 TYPICAL VSWR @ 70 FT. 2:1 1.5:1 1.5:1 1.2:1 1.2:1 10 14 MHz 11 12 13 17 15 16 18 19 20 21 22 23 24 25 26 27 28 29 30 SPECIFICATIONS: Model...10-30LP8-125

More information

MI: (Secure this number someplace, for possible future need) SPECIFICATIONS:

MI: (Secure this number someplace, for possible future need) SPECIFICATIONS: 6C ASSEMBLY INSTRUCTIONS ANTENNA MODEL T6 MI: 030927 (Secure this number someplace, for possible future need) SPECIFICATIONS: FORWARD GAIN 5.1 dbd F:B RATIO 15-25 db (Rises with frequency) FREQUENCY COVERAGE

More information

INSTALLATION INSTRUCTIONS 6 OVAL BENT END SIDEBARS DODGE RAM 1500, CREW CAB PART#: /241533B

INSTALLATION INSTRUCTIONS 6 OVAL BENT END SIDEBARS DODGE RAM 1500, CREW CAB PART#: /241533B PARTS LIST: 1 Driver/Left Sidebar 24 8mm x 24mm x 2mm Flat Washers 1 Passenger/Right Sidebar 12 8mm Lock Washers 3 Driver/left, Passenger Center and Rear 6 8mm Hex Nuts 3 INSTALLATION INSTRUCTIONS 6 OVAL

More information

JK-65 Five Element 6M Yagi

JK-65 Five Element 6M Yagi JK-65 Five Element 6M Yagi PO Box 266, Croton Falls, NY 10519-0266 845.228.8700 (TEL) 845.279.5526 (FAX) info@jkantennas.com Page 1 of 8 JK Antennas Limited Warranty and Liability JK Antennas ( Manufacturer

More information

BABY WOLF LOOM. Assembly Instructions for Knocked-Down Looms

BABY WOLF LOOM. Assembly Instructions for Knocked-Down Looms BABY WOLF LOOM Assembly Instructions for Knocked-Down Looms BEFORE YOU BEGIN Please read through the directions before beginning to assemble your loom. Unpack the loom parts carefully. Do not throw away

More information

Assembly Instructions for the 10N6RDB Antenna

Assembly Instructions for the 10N6RDB Antenna Assembly Instructions for the 10N6RDB Antenna The 10N6RDB antenna comes from the factory almost completely assembled. All you have to do is install the 1/2 inch Aluminum tubing at both ends of the 10 Meter

More information

M2 Antenna Systems, Inc. Model No: 40M2L

M2 Antenna Systems, Inc. Model No: 40M2L M2 Antenna Systems, Inc. Model No: 40M2L SPECIFICATIONS: Model...40M2L Frequency Range...6.9-10 MHz X 150 khz Gain...5.5 dbi Front to back...13 15 db Beamwidth...E=74 Feed type...hair pin match Feed Impedance....50

More information

M2 Antenna Systems, Inc. Model No: 450CP26

M2 Antenna Systems, Inc. Model No: 450CP26 M2 Antenna Systems, Inc. Model No: 450CP26 SPECIFICATIONS: Model... 450CP26 Frequency Range... 445 To 455 mhz *Gain... 16.5 dbi Front to back... 21 db Typical Beamwidth... 30 Circular Feed type... T Match

More information

Slide the stock rubber tank mount caps onto the ends of the CS-1 tank mount:

Slide the stock rubber tank mount caps onto the ends of the CS-1 tank mount: RYCA CS-1 BODY PARTS INSTALLATION GUIDE [The CS-1 installation guides should be used as supplements to the videos found on our Youtube Channel. There is no strict order to the build process, but it is

More information

TIRE RACK INSTALLATION INSTRUCTIONS Dodge Sprinter

TIRE RACK INSTALLATION INSTRUCTIONS Dodge Sprinter Aluminess Products Inc 9402 Wheatlands Ct. #A Santee, CA 92071 619-449-9930 TIRE RACK INSTALLATION INSTRUCTIONS 07-11 Dodge Sprinter Please read before beginning Stainless steel hardware may bind together

More information

Chain Drive Vise. Installation Instructions. (revised 05/04/2016)

Chain Drive Vise. Installation Instructions. (revised 05/04/2016) Chain Drive Vise Installation Instructions (revised 05/04/2016) Lie-Nielsen Chain Drive Vise Instructions Table of Contents page About Your Chain Drive Vise 3 Parts List 4 Exploded Parts Diagram 5 step

More information

GRILLE GUARD SPRINTER VAN (EXCLUDES X4) INCLUDES MERCEDES, FREIGHTLINER AND DODGE PARTS LIST:

GRILLE GUARD SPRINTER VAN (EXCLUDES X4) INCLUDES MERCEDES, FREIGHTLINER AND DODGE PARTS LIST: PARTS LIST: 1 Grille Guard 8 12mm Hex Nuts 1 Driver/Left Side Frame Mounting Bracket 2 10-1.50mm x 25mm Button Head Bolts 1 Passenger/Right Side Frame Mounting Bracket 4 10mm x 20mm OD x 2mm Flat Washers

More information

PACKING LIST MACO V-5000

PACKING LIST MACO V-5000 PACKING LIST MACO V-5000 PART QTY O.D. SIZE LENGTH DESCRIPTION CHECKLIST T47P 4 5/8.050 36 Aluminum Tubing _ T43P 1 7/8.050 48 Aluminum Tubing _ T18P 1 3/4.050 48 Aluminum Tubing _ T15P 1 5/8.050 48 Aluminum

More information

M2 Antenna Systems, Inc. Model No: 450CP34

M2 Antenna Systems, Inc. Model No: 450CP34 M2 Antenna Systems, Inc. Model No: 450CP34 SPECIFICATIONS: Model... 450CP34 Frequency Range... 435 To 455 mhz *Gain... 16.0 dbi Front to back... 22 db Typical Beamwidth... 28 Circular Feed type... T Match

More information

Easy Step by Step Manual

Easy Step by Step Manual Easy Step by Step Manual Teletower Mini XL Wall-Floor installation The tower packages #1-#2-#3 Open Base Package #1 for the main tower parts. Here you see the three tower tubes (H-Head, M-Middle, F-Feed)

More information

INSTRUCTION MANUAL. Model VB-215DX MECHANICAL DESIGN GENERAL DESCRIPTION ELECTRICAL DESIGN. 2 Meter 15 Element Yagi for SSB/CW

INSTRUCTION MANUAL. Model VB-215DX MECHANICAL DESIGN GENERAL DESCRIPTION ELECTRICAL DESIGN. 2 Meter 15 Element Yagi for SSB/CW Model VB-215DX 2 Meter 15 Element Yagi for SSB/CW INSTRUCTION MANUAL GENERAL DESCRIPTION The Hy-Gain Model 215DX is a high performance yagi antenna for SSB/CW DXing in the Amateur 2 meter band. It features

More information

C-3S, C-3S/D, C-3S/H, C3S/HH

C-3S, C-3S/D, C-3S/H, C3S/HH Strike Force Classic 3-Band C-3S, C-3S/D, C-3S/H, C3S/HH 20, 15 and 10 Meter (plus 17 & 12) Multi-monoband Yagi Antenna FREQUENCY COVERAGE: 13.950-14.400; 21.000-21.450; 1.1 MHz of 10 Meters (VSWR

More information

LJ element beam for 10 or 12 meters INSTRUCTION MANUAL. CAUTION: Read All Instructions Before Operating Equipment

LJ element beam for 10 or 12 meters INSTRUCTION MANUAL. CAUTION: Read All Instructions Before Operating Equipment LJ-113 3 element beam for 10 or 1 meters INSTRUCTION MANUAL CAUTION: Read All Instructions Before Operating Equipment 308 Industrial Park Road Starkville, MS 39759 USA Tel: 66-33-9538 Fax: 66-33-6551 VERSION

More information

M2 Antenna Systems, Inc. Model No: 436CP30

M2 Antenna Systems, Inc. Model No: 436CP30 M2 Antenna Systems, Inc. Model No: 436CP30 SPECIFICATIONS: Model... 436CP30 Frequency Range... 432 To 440 MHz *Gain... 15.50 dbic Front to back... 18 db Typical Elipticity... 1.5 db Typical Beamwidth...

More information

TOOL LIST FOR TAILGATE HIDDEN LATCH & LINK ASSY FOR FORD FLARESIDE TRUCKS

TOOL LIST FOR TAILGATE HIDDEN LATCH & LINK ASSY FOR FORD FLARESIDE TRUCKS TOOL LIST FOR TAILGATE HIDDEN LATCH & LINK ASSY FOR 53-87 FORD FLARESIDE TRUCKS Vise Grip Clamps C-clamps Sharpie Marker Ball Peen Hammer Center Punch 3/8 or 1/2 Drill 5/32, 7/32, 9/32, and 3/8 Drill Bits

More information

JK M Hi-Q Coil Loaded Rotatable Dipole Version

JK M Hi-Q Coil Loaded Rotatable Dipole Version JK-401 40M Hi-Q Coil Loaded Rotatable Dipole 2018 Version 72 Grays Bridge Road, Unit D, Brookfield, CT 06804 845.228.8700 (TEL) 845.279.5526 (FAX) info@jkantennas.com LAST UPDATED: 02-01-2018 JK Antennas

More information

M2 Antenna Systems, Inc. Model No: 2M5WL

M2 Antenna Systems, Inc. Model No: 2M5WL M2 Antenna Systems, Inc. Model No: 2M5WL SPECIFICATIONS: Model... 2M5WL Frequency Range... 144 To 148 MHz *Gain... 16.84 dbi Front to back... 22 db Typical Beamwidth... E=26 H=29 Feed type... T Match Feed

More information

INSTRUCTION MANUAL VB-66DX. 6-Meter 6-Element Beam. Preparation For Assembly. General Description

INSTRUCTION MANUAL VB-66DX. 6-Meter 6-Element Beam. Preparation For Assembly. General Description VB-66DX 308 Industrial Park Road Starkville, MS 39759 USA Ph: (662) 323-9538 FAX: (662) 323-6551 6-Meter 6-Element Beam INSTRUCTION MANUAL General Description The Hy-Gain Model 66DX is a full sized 6-

More information

GlideRite Retractable Cover System For Hot Spot Spas (SE & SLX only)

GlideRite Retractable Cover System For Hot Spot Spas (SE & SLX only) List of Contents Quantity Description 12 #10 x 1 ½ Flat Head Phillips Screw (see pg. 2) 2 #10 x ½ Pan Head Phillips Screw (see pg. 2) 8 ¼ x 2 ½ Lag Bolt (see pg. 2) 7 ¼ 20 x 5 / 8 Hex Head Bolt (see pg.

More information

Original Gallery System

Original Gallery System GAllery System Art Displays Original Gallery System a Gallery System product Here s everything you need to know to get started with your Gallery System Art Hanging System GS getting started To install

More information

JK-404 GRANDE Four Element Full Size 40M Yagi

JK-404 GRANDE Four Element Full Size 40M Yagi JK-404 GRANDE Four Element Full Size 40M Yagi PO Box 266, Croton Falls, NY 10519-0266 845.228.8700 (TEL) 845.279.5526 (FAX) info@jkantennas.com JK Antennas Limited Warranty and Liability JK Antennas (

More information

INSTALLATION INSTRUCTIONS FOR FRONT CASTING DECK RAIL Ranger

INSTALLATION INSTRUCTIONS FOR FRONT CASTING DECK RAIL Ranger INSTALLATION INSTRUCTIONS FOR FRONT CASTING DECK RAIL Ranger TOOLS REQUIRED FOR INSTALLATION: Drill motor, (1) 5/16 inch drill bit, (1) 13/64 drill bit, (1) 3/16 inch hex wrench (1) 3/32 inch hex wrench.

More information

C4 Toe Rod Installation Document #: C4TR-1, sheet 1 of 6

C4 Toe Rod Installation Document #: C4TR-1, sheet 1 of 6 Document #: C4TR-1, sheet 1 of 6 READ ALL THE INSTRUCTIONS BEFORE BEGINNING INSTALLATION. There are two methods for installing the toe rods. You may find one more suitable to your situation OR you may

More information

8mm x 25mm "Z" Bolt Plates. (2) Tube Spacers. (2) 12mm Bolt Plates w/ Nut

8mm x 25mm Z Bolt Plates. (2) Tube Spacers. (2) 12mm Bolt Plates w/ Nut PARTS LIST: 1 Grille Guard 10 12mm Lock Washers 1 Driver/Left Side Frame Mounting Bracket 8 12mm Hex Nuts 1 Passenger/Right Side Frame Mounting Bracket 2 10-1.50mm x 25mm Button Head Bolts 1 Driver/Left

More information

User Instructions Multiline Otter Scoreboard Caddy Assembly

User Instructions Multiline Otter Scoreboard Caddy Assembly List of parts: User Instructions Multiline Otter Scoreboard Caddy Assembly Single Caddy Double Caddy 1 1 Base assembly with attached wheels 2 4 1 1 2 4 4 8 10 20 12 Uprights (60 or 74 aluminum extrusion)

More information

General Features. Low Profile. The SMART BOXX stands only 1.5 off of the bed of your truck so cargo space is maximized

General Features. Low Profile. The SMART BOXX stands only 1.5 off of the bed of your truck so cargo space is maximized General Features Low Profile. The SMART BOXX stands only 1.5 off of the bed of your truck so cargo space is maximized Two Sizes Short Box :74 L X 47 W X 7 T and Long Box 92 L X 47 W X 7 T All Aluminium

More information

Before returning this product to the store of purchase

Before returning this product to the store of purchase Before returning this product to the store of purchase Contact Dee Zee if you experience the following problems: Missing Parts Installation Problems/Questions Warranty Questions 1.800.779.2102 Hours of

More information

Hatchback Wing Riser Kit

Hatchback Wing Riser Kit Hatchback Wing Riser Kit 2015-06-11 Thank you for purchasing this PERRIN product for your car! Installation of this product should only be performed by persons experienced with installation of aftermarket

More information

Salter Industries Spiral Stair

Salter Industries Spiral Stair Salter Industries Spiral Stair The Leader in Spiral Staircases Continuous Sleeve Stair Installation Instructions TOOLS NEEDED: 1. Electric drill with hex chuck and Phillips bit 2. Drill bits 1/8", 1/4",

More information

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas) List of Contents Quantity Description 12 #10 x 1 ½ Flat Head Phillips Screw (see pg. 2) 2 #10 x ½ Pan Head Phillips Screw (see pg. 2) 8 ¼ x 2 ½ Lag Bolt (see pg. 2) 7 ¼ 20 x 5 / 8 Hex Head Bolt (see pg.

More information

INSTALLATION INSTRUCTIONS 3 ROUND & 4 OVAL SIDEBAR (90-DEG BENT END) DODGE RAM MEGA CAB PART NUMBER SB1214S SB1214B

INSTALLATION INSTRUCTIONS 3 ROUND & 4 OVAL SIDEBAR (90-DEG BENT END) DODGE RAM MEGA CAB PART NUMBER SB1214S SB1214B INSTALLATION INSTRUCTIONS PART NUMBER SB1214S SB1214B PARTS LIST: Qty Description Qty Description 1 Driver/Left Sidebar 4 12mm x 32mm OD x 3mm Flat Washers 1 Passenger/Right Sidebar 4 12mm Lock Washers

More information

REP Design LLC. 193 Winding Ridge Rd, Southington, CT INSTALLATION INSTRUCTIONS:

REP Design LLC. 193 Winding Ridge Rd, Southington, CT INSTALLATION INSTRUCTIONS: REP Design LLC 193 Winding Ridge Rd, Southington, CT 06489 1-860.426.1894 n7emw@cox.net www.repdesign.us INSTALLATION INSTRUCTIONS: SHD-SO239 Super Heavy Duty SO-239Antenna Mounting System Thank you for

More information

Clearview Railing System Installation Instructions

Clearview Railing System Installation Instructions Clearview Railing System Installation Instructions Disclaimer: AGS Stainless, Inc. has its Clearview Railing Systems designed by a professional engineer to meet the requirements of the latest national

More information

HOUSE PARTS PACKED IN HOUSE BOX PARTS IN PLASTIC BAG (HARDWARE) PARTS IN SMALL PLASTIC BAG (FLOOR CLIPS) PARTS PACKED IN BUNDLE

HOUSE PARTS PACKED IN HOUSE BOX PARTS IN PLASTIC BAG (HARDWARE) PARTS IN SMALL PLASTIC BAG (FLOOR CLIPS) PARTS PACKED IN BUNDLE Check parts against this list before starting assembly. Refer to illustrations on pages 6 and 7 to view house parts. If any shortages are found, refer to Packing Slip for claim instructions. Item 3 5 6

More information

MantelMount. TM1A Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

MantelMount. TM1A Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS MantelMount TMA Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS TM Thank you for choosing the MantelMount television wall mount. Please read this entire manual before

More information

Bumper Sign INSTALLATION INSTRUCTIONS

Bumper Sign INSTALLATION INSTRUCTIONS Bumper Sign INSTALLATION INSTRUCTIONS BUMPERSIGN TOOL CHECKLIST SDS MAX Rotary Hammer Drill Marker/Pencil SDS MAX 1 Carbide Drill Bit Tape Measure Torque Wrench with ½ Drive Power Source Vacuum ½ Drive

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS TEL -866-XANATOS INSTALLATION INSTRUCTIONS PART#: 7D5000SS\7D500A GRILL GUARD FOR DODGE SPRINTER 07-09 PARTS LIST: 8 6 Grille Guard Driver/Left Frame Mounting Passenger/Right Frame Mounting Driver/Left

More information

TOOLS REQUIRED FOR ASSEMBLY. Rubber Mallet or Plastic Tip Hammer PARTS REQUIRED FOR ASSEMBLY OF SINGLE ENTRY STARTER.

TOOLS REQUIRED FOR ASSEMBLY. Rubber Mallet or Plastic Tip Hammer PARTS REQUIRED FOR ASSEMBLY OF SINGLE ENTRY STARTER. TOOLS REQUIRED FOR ASSEMBLY Rubber Mallet or Plastic Tip Hammer Top Cover Support PARTS REQUIRED FOR ASSEMBLY OF SINGLE ENTRY STARTER Back Stop Divider Closed 'L' Upright Slotted Reinforcement Support

More information

JK NAVASSA-5. 5-Band Yagi (20M/17M/15M/12M/10M) Optional 6M Add-on Kit Available

JK NAVASSA-5. 5-Band Yagi (20M/17M/15M/12M/10M) Optional 6M Add-on Kit Available JK NAVASSA-5 5-Band Yagi (20M/17M/15M/12M/10M) Optional 6M Add-on Kit Available 72 Grays Bridge Road, Unit D, Brookfield, CT 06804 845.228.8700 (TEL) 845.279.5526 (FAX) info@jkantennas.com Last Updated:

More information

Liberty Repair Catalogue

Liberty Repair Catalogue Liberty Repair Catalogue Manual # Replacement part L 01 L02 L 03 L 04 L 05 L 06 L 07 L 08 L 09 L 10 L 11 L 12 L 13 L 14 Replace arm end fitting Replace arm strop Replace canopy arm Replace canopy strut

More information

Introduction. Rocky Mountain Westy Swing Away Carrier Kit Installation Instructions

Introduction. Rocky Mountain Westy Swing Away Carrier Kit Installation Instructions Rocky Mountain Westy Swing Away Carrier Kit Installation Instructions Introduction Thank you for purchasing the Rocky Mountain Westy Swing Away Carrier Kit. We pride ourselves in the products we develop

More information

RBP-1215B-RX DODGE RAM QUAD CAB RX3

RBP-1215B-RX DODGE RAM QUAD CAB RX3 RBP-1215B-RX3 2002-2017 DODGE RAM 15-3500 QUAD CAB RX3 Passenger side RX-3 Side Step Drill Template Passenger side rear Modular Bracket (6) L Support Brackets Driver side rear Modular Bracket Driver side

More information

TABLE OF CONTENTS REQUIRED TOOLS

TABLE OF CONTENTS REQUIRED TOOLS TABLE OF CONTENTS SECTION SECTION TITLE PAGE NO. 1 2 3 4 5 Assembling Mounting Structure Installing Bicycle Supports Mounting Rack to Wall Adding Sections Customizing Rack Configuration REQUIRED TOOLS

More information

Passenger/Right Center and Rear Support Brackets. Driver/Left Center and

Passenger/Right Center and Rear Support Brackets. Driver/Left Center and PARTS LIST: 1 Driver/Left HD Running Board 24 8mm x 24mm OD x 2mm Flat Washers 1 Passenger/Right HD Running Board 12 s 3 Driver/Left front, passenger center/rear Support Brackets 6 8mm-1.25 Hex Nuts 3

More information

Hy-gain. Method 1 : Completely assemble the antenna on the ground then hoist it into position using a setup as shown in Figure 1.

Hy-gain. Method 1 : Completely assemble the antenna on the ground then hoist it into position using a setup as shown in Figure 1. Hy-gain The Hy-Gain TH6-DXX "Super Thunderbird" is a 6-element beam designed to operate on 10, 25 and 20 meters. It has four active elements on 10-meters and three active elements on 15 and 20 meters.

More information

Zen Toolworks CNC Carving Machine DIY Kit User Installation Manual

Zen Toolworks CNC Carving Machine DIY Kit User Installation Manual User Installation Manual Visit Us At: http://www.zentoolworks.com or http://www.zentoolworks.com/zenwiki/mediawiki Contact Us At: zentoolworks@gmail.com 1 P-01, Nema 17 Stepper Motor, 3 P-02, Motor Shaft

More information

The W3FF Portable Dipole

The W3FF Portable Dipole The W3FF Portable Dipole This is the antenna I designed for my 'walking portable' station. It is a dipole constructed out of the plastic plumbing pipe CPVC. There are telescoping whips at the ends of each

More information

SOCCER TABLE. Assembly Instructions

SOCCER TABLE. Assembly Instructions Updated: 5/4/16 SOCCER TABLE Assembly Instructions Table of Contents Parts Identifier... 3 Hardware Identifier. 4 Table Assembly Instructions... 5 Table Assembly Pictures..... 6, 7, 8 2 Page Parts Identifier

More information

INSTALLATION INSTRUCTIONS GRILLE GUARD 09-ON DODGE RAM PART #

INSTALLATION INSTRUCTIONS GRILLE GUARD 09-ON DODGE RAM PART # INSTALLATION INSTRUCTIONS GRILLE GUARD 09-ON DODGE RAM PART # PARTS LIST: Qty Description Qty Description 1 Grille Guard 8 12-1.75mm x 35mm Hex Bolts 2 Brackets (for trucks without 22 12mm x 30.1mm OD

More information

STANDARD GRAVITY BOX TARP INSTALLATION

STANDARD GRAVITY BOX TARP INSTALLATION OPERATORS MANUAL Rev. 9.9.2016 STANDARD GRAVITY BOX TARP INSTALLATION J. & M. Mfg. Co., Inc. 284 Railroad Street - P.O. Box 547 Fort Recovery, OH 45846 Ph: (419) 375-2376 Fax: (419) 375-2708 www.jm-inc.com

More information

Lumber Smith. Assembly Manual. If you are having problems assembling the saw and need assistance, please contact us at:

Lumber Smith. Assembly Manual. If you are having problems assembling the saw and need assistance, please contact us at: Lumber Smith Assembly Manual If you are having problems assembling the saw and need assistance, please contact us at: 804-577-7398 info@lumbersmith.com 1 Step 1 Safety Carefully read the Owners Manual.

More information

Mast and Antennas for Field Day & Emergencies

Mast and Antennas for Field Day & Emergencies Mast and Antennas for Field Day & Emergencies John A. Allocca, WB2LUA, July 2005 This is a 27 feet 1.5 diameter portable guyed mast with a 28 feet diameter footprint. It breaks down into four 6 feet sections

More information

THIS SHOULD TWEAK YOUR IMAGINATION

THIS SHOULD TWEAK YOUR IMAGINATION 10-27-05 THIS SHOULD TWEAK YOUR IMAGINATION SPECIFICATIONS FOR SINGLE ANTENNA MODEL NUMBER... 432EME-12 FREQUENCY... 430-436 MHz GAIN... 14.4 dbd FRONT TO BACK... 23 db VSWR... 1.2:1 TYPICAL BEAMWIDTH...

More information

Chain Drive Vise. Installation Instructions. (revised 11/29/2018)

Chain Drive Vise. Installation Instructions. (revised 11/29/2018) Chain Drive Vise Installation Instructions (revised 11/29/2018) Lie-Nielsen Chain Drive Vise Instructions Table of Contents page About Your Chain Drive Vise 3 Parts List 4 Exploded Parts Diagram 5 step

More information

INSTALLATION INSTRUCTIONS DODGE RAM 2 & 4WD 1500 PART # P5058

INSTALLATION INSTRUCTIONS DODGE RAM 2 & 4WD 1500 PART # P5058 INSTALLATION INSTRUCTIONS 2009-13 DODGE RAM 2 & 4WD 1500 PART # P5058 PARTS LIST: Qty Description Qty Description 1 Grille Guard 12 12-1.75mm Hex Nuts 2 Upper Frame Mounting s (for trucks without tow hooks

More information

ANTENNA EXPERTS. Website: AP MHz. 2.4 Meters 30dBi. Gain

ANTENNA EXPERTS.   Website:   AP MHz. 2.4 Meters 30dBi. Gain ANTENNA EXPERTS E-mail: info@antennaexperts.in Website: www.antennaexperts.in AP-180030 1700 1900 MHz. 2.4 Meters 30dBi. Gain INSTALLATION MANUAL GRID PARABOLIC ANTENNA NOTICE: Installation, maintenance

More information

Thor Audi A4/S4 Skid Plate Installation Instructions

Thor Audi A4/S4 Skid Plate Installation Instructions Thor Audi A4/S4 Skid Plate Installation Instructions Parts List: 1 Aluminum Skid Plate 2 Aluminum Side Wings 10 10mm Flat Washers 3 8mm Flat Washers 3 8mm Speed Clips 2 10x40mm Bolts 3 8x35mm Bolts 2 Rivet-nuts

More information

Installation Instructions

Installation Instructions Installation Instructions Follow these simple instructions to install your OneDayCab! IMPORTANT: Unpack and check shipment for damage. Verify color, size and parts before demolition. Installation of interiors

More information

RH-412 STEEL DOORS INSTALLATION INSTRUCTIONS

RH-412 STEEL DOORS INSTALLATION INSTRUCTIONS RH-412 STEEL DOORS INSTALLATION INSTRUCTIONS By following the steps outlined below, the assembly, installation and adjustment of the steel doors, will be a simple process. Let s start with the Driver Side.

More information

(W) INSTALLATION INSTRUCTIONS 3" ROUND & 4" OVAL SIDEBAR (90-DEG BENT END) DODGE RAM 1500 QUAD CAB PART #DZ /DZ /DZ /DZ

(W) INSTALLATION INSTRUCTIONS 3 ROUND & 4 OVAL SIDEBAR (90-DEG BENT END) DODGE RAM 1500 QUAD CAB PART #DZ /DZ /DZ /DZ (W) INSTALLATION INSTRUCTIONS 3" ROUND & 4" OVAL SIDEBAR (90-DEG BENT END) PART #DZ 372231/DZ 372233/DZ 372237/DZ 372239 PARTS LIST: 3" ROUND & 4" OVAL SIDEBAR (90-DEG BENT END) Qty Description Qty Description

More information

M2 Antenna Systems, Inc. Model No: 456CP34

M2 Antenna Systems, Inc. Model No: 456CP34 M2 Antenna Systems, Inc. Model No: 456CP34 SPECIFICATIONS: Model... 456CP34 Frequency Range... 435 To 470 mhz *Gain... 16.0 dbi Front to back... 23 db Typical Beamwidth... 30 Circular Feed type... T Match

More information

INSTALLATION INSTRUCTIONS RH 412 STEEL DOORS

INSTALLATION INSTRUCTIONS RH 412 STEEL DOORS By following the steps outlined below, the assembly, installation and adjustment of the steel doors, will be a simple process. Let s start with the Driver Side. Note: Having the hood open makes the job

More information

SwingSafe Swing-Away Mailbox Support Diagram

SwingSafe Swing-Away Mailbox Support Diagram SwingSafe Swing-Away Mailbox Support Diagram Wood Mounting Plates Top Arm (B) Muffler Clamps (A) Carriage Bolts and Nuts Bottom Arm 4-Foot U-Channel Post USPS Recommended 42-44 Height Ground Slope Hex

More information

00108/00110 INSTRUCTION MANUAL

00108/00110 INSTRUCTION MANUAL 00108/00110 INSTRUCTION MANUAL Removable and Adjustable Mudflap System IMPORTANT! Exhaust Systems Note: Any modifications to the factory installed exhaust system may void your manufacturer s warranty.

More information

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS 12/11/07 PAGE 1 OF 12 400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS Thank you for purchasing our product! *Please read these instructions

More information

General Array Layout Sketch

General Array Layout Sketch General Array Layout Sketch Cold TO Panels Hot FROM Panels OR Cold TO Panels Hot FROM Panels 1 Introduction This document describes how to install EZ series panels. The EZ series panels are designed to

More information