Stage 2a Examination: Policy SWDP 45 Directions for Growth Outside the City Administrative Boundary

Size: px
Start display at page:

Download "Stage 2a Examination: Policy SWDP 45 Directions for Growth Outside the City Administrative Boundary"

Transcription

1 South Worcestershire Development Plan Stage 2a Examination: Policy SWDP 45 Directions for Growth Outside the City Administrative Boundary 1.0 Environment Agency (EA) 1.1 EA comments: The EA want the footnote, with respect to foul drainage, as agreed in the 23 February 2015 Statement of Common Ground, to be included. SWC response: The SWC agree with the EA on this matter. 2.0 Highways England (HE) SWDP45/1 2.1 HE comments: HE support the latest text for A(i), A(xi), A(xii) and A(xv). SWC response: Noted. SWDP45/2 2.2 HE comments: HE support the proposed uplift in the proposed number of dwellings to 2,150 (see B(ii)) as it would have the lowest overall additional impact upon the Strategic Road Network. HE also support B(ii) in terms of its reference to the Worcester Transport Strategy and the dualling of the A4440 Southern Link Road and the revised wording with respect to B(xi). SWC response: Noted. SWDP45/5 D(iii) 2.3 HE comments: The HE contend that there should be a requirement for SuDS in order to address the impacts of the development with regard to wider flood risk. SWC response: The Sustainable Drainage Systems policy is set out at SWDP 29. This is consistent with SWDP45/2, 45/3, 45/4 and 45/6. The SWC acknowledge that SuDS are required in SWDP45/1

2 xv but no specific scheme is set out, so including it here merely repeats policy set out in SWDP 29. SWDP45/6 2.4 HE comments: HE specifically support F(iv). SWC response: Noted. 2.0 David Lock Associates on behalf of Hallam Land Management (HLM) SWDP HLM comments: HLM considers that for reasons of consistency with SWDP45/1 (A(iii) refers), the policy for Temple Laugherne should include a policy diagram showing the broad distribution of land uses and various policy requirements. SWC response: Given the Statement of Common Ground (EX/632) includes a so called Parameters Plan (ref L-31, January 2015) it would seem logical and reasonable, for reasons of consistency, to include a diagram in SWDP45/2 B. 3.2 HLM comments: Assuming a policy diagram is included then part of the introductory text, i.e. individual masterplans / delivery plans (to be agreed with the local planning authority) and should be deleted. SWC response: The SWC at the hearing pointed out that this proposed allocation was not as advanced as SWDP45/1 but for consistency with other similar large-scale allocations, the policy reference to master planning could be deleted. Clearly that would address HLM concern about masterplans having to be agreed with the local planning authority. In 3.1 above the SWC have accepted the inclusion of the Parameters Plan as an indicative diagram within the written statement which would provide a possible indication of the disposition of land uses and transport connections within the allocation. The SWC suggest that SWDP45/2 could be amended to include a similar clause to SWDP45/1 iii.

3 SWDP45 A(i) & B (ii) 3.3 HLM comments: HLM no longer consider the need to revise the policy as it is dealt with in SWDP 4 and SWDP 7. Also, that infrastructure delivery is already factored into the Plan s housing trajectories and monitoring provisions. Second the revised wording reads as a commentary rather than policy. SWC response: With respect to the SWDP 4 and SWDP 7 duplication point, the SWC consider that SWDP45/1 and 45/2, due to their location and size, will have the greatest impact on the highway network and there would be serious implications for traffic congestion if development proceeded in advance of the necessary transport infrastructure to make it sustainable. With regard to the rate of delivery point, the trajectories and monitoring provision are not policy, so given the significant scale of SWDP45/1 and 45/2, the SWC consider specific wording is both appropriate and reasonable. SWDP45 (xi) 3.4 HLM comments: HLM contend that there was broad agreement with the SWC and Worcestershire County Council as the highway authority that a 60 mph spine road along the western edge of the site is not necessary to serve the planned development. Consequently, all references to a spine road should be deleted from the Plan. SWC response: SWDP45/2 currently includes the words the delivery of a spine road within the site between the A44 and the Martley Road. Furthermore, the allocation shown on the Policies Map indicates the broad alignment of a potentially policy compliant road along the western boundary. The SWC acknowledge that the detail of the Policies Map may infer a possible contradiction between it and the broad indications of land uses and transport connections indicated in the Parameters Plan. Further, the SWC accept that progress on discussions between WCC, HLM and Bloor Homes may suggest that the ultimate alignment of the required spine road may be more closely aligned to the Parameters Plan to the Policies Map. This matter however, has not been formally resolved such that the detailed alignment and associated design work is yet to be concluded. The SWC therefore

4 suggest that the wording of SWDP45/2 xi is subject to the following footnote: The status, alignment and design of the spine road referred to in Policy SWDP45/2 will be subject to the outcome of detailed modelling and design work to be agreed with the Highway Authority, alongside urban design and environmental considerations. In the event that the spine road follows the form identified on the policy diagram for SWDP45/2, the western boundary of the allocation will remain as shown on the Policies Map. The SWC would suggest that with the inclusion of the above footnote, the Policies Map can remain unchanged. SWDP45 (x) & (xi) 3.5 HLM comments: HLM contend that the CIL test, i.e. necessary and fairly and reasonably related in scale and kind to the development should be written into the policy. SWC response: The CIL test wording is now written into SWDP7 C and it is considered unnecessary to repeat that precise test here, particularly as it is clear that the Plan requires proportionate contributions directly related to the development. 3.6 HLM comments: HLM, in their tracked change version of SWDP45/2, agree that B(iii) should be deleted as it duplicates SWDP 15; that the retail parameters should be revised to be consistent with SWDP45/1; that the requirement for a site for Travellers is not justified; that reference to emergency services infrastructure should be deleted; and that the reference to a parking hub should also be deleted. SWC response: B(iii) does not add anything to SWDP 15 so could be deleted as it s duplication. The retail parameters, whilst different to SWDP45/1, are consistent in that 450 more dwellings and 15 ha more employment land is proposed to be allocated there. Further, for Worcester West there is already retail provision at Dines Green, which is easily accessible on foot and bicycle.

5 The delivery of a Traveller site at Worcester West is considered necessary given the latest evidence and the fact that it is reasonable and more appropriate to meet such needs on the larger proposed allocations; it is also consistent with the approach for SWDP45/1. The SWC still contend that there is a need for emergency services infrastructure on the largest allocations and that is reflected in the Statement of Common Ground with West Mercia Police and the Herefordshire and Worcestershire Fire and Rescue Service. The SWC agree that there should no longer be a reference to parking hubs in the Plan. 4.0 Savills A(i) 4.1 Savills comments: Savills contend that the viability evidence for this site demonstrates that 40% affordable housing is not deliverable. SWC response: The SWC point to the revised site specific policy, i.e. SWDP45/1 on affordable housing, which now says up to 40% affordable housing. A(iv) 4.2 Savills comments: Savills contend that the maximum limit for retail provision should be 3,000 sq.m. and not 2,500 sq.m. SWC response: The SWC made an earlier change to increase the size of the largest unit to 2,000 sq.m. The 500 sq.m. balance would allow for a parade of approximately 7 retail outlets which is considered appropriate for the proposed Local centre. There is no evidence to suggest that an additional 500 sq.m. is appropriate or justified. A(vii) 4.3 Savills comments: Savills contend that there is no evidence to support / justify a Significant Gap to the east of Norton Road.

6 SWC response: The SWC maintain that Brockhill Village / Norton Barracks is a settlement in its own right (extant Wychavon District Local Plan and submission SWDP) and is not part of Worcester. The SWC therefore agree with Norton-Juxta-Kempsey Parish Council that this rural settlement should be safeguarded as practically as possible. Given that the 40% Green Infrastructure and Significant Gap are not mutually exclusive, there is clearly capacity to deliver the majority of the proposed allocation on the available land between Norton Road and the A38. The village has only just seen the completion of 74 dwellings next to St. Peter s Garden Centre and there is insufficient justification to warrant further expansion of what is a Category 3 rural settlement (Annex D). Notwithstanding the Significant Gap issue, the SWC contend that where it can be avoided, housing development should not be located immediately adjacent to the motorway. Also, the proposed allocation includes a requirement for formal sports provision and the Significant Gap (SG) land is an appropriate location for this, as indicated on the SWDP45/1 policy diagram. Finally, the proposed urban extension will become part of the city so the proposed SG will serve a similar purpose to the M5 Corridor policy in the extant Worcester City Local Plan. A(xv) Savills comments: Savills do not support the proposed Local Green Network (now referred to as Green Space in the Plan) buffer to the west of Norton Road and that the amenity and distance separation from existing properties should be considered at the detailed design stage. SWC response: The SWC contend that the setting of Brockhill Village / Norton Barracks settlement should be afforded reasonable protection in the Plan. The proposed Green Space buffer will not stop neighbouring communities from integrating, especially given the proposed main cycle / pedestrian link. In any event, the SWC consider that the most important visual connection to be secured in the Plan is that between the proposed urban extension and the city itself.

7 5.0 Pegasus Group on behalf of Robert Hitchins Ltd (RHL) SWDP45/5(i) 5.1 RHL comments: RHL support the amendment with regard to the affordable housing requirement, i.e. up to 40%. SWC response: The SWC agree that the revised wording is appropriate. SWDP45/5(v) 5.2 RHL comments: RHL contend that, as worded, there is a requirement for and entirely new vehicular access off Swinesherd Way. SWC response: The SWC agree that the word new is superfluous as the important matter is that the principle access is directly off the A4440 and, of course, to the satisfaction of the local highway authority. SWDP45/5(viii) 5.3 RHL comments: RHL contend that, as worded, the policy prioritises certain types of infrastructure over others. SWC response: The SWC disagree that this is the case and by using the word including it is clear that this is not an exhaustive list of infrastructure. As none of the cited infrastructure requirements are unique to this proposed allocation the proposed RHL wording is acceptable. 6.0 Planning Prospects on behalf of St. Modwen Developments (SMD) SWDP45/1(i) 6.1 SMD comments: SMD are concerned that the rate of delivery is dependent upon the implementation of elements of the Worcestershire Transport Strategy (WTS) to the west of the Ketch roundabout.

8 SWC response: The SWC consider that the wording, as currently drafted, is appropriate. Clearly the more the immediate highway infrastructure is improved the greater the likelihood of increased delivery. Of course the WTS is not simply about roads and other aspects of it need to be implemented in a timely fashion in order for development to be sustainable. SWDP45/1(ii) 6.2 SMD comments: SMD consider this to be unnecessary as it is covered elsewhere in the Plan. SWC response: The SWC agree that SWDP45/1(ii) does not add anything to SWDP 14, or SWDP 15. SWDP45/1(xi) 6.3 SMD comments: SMD contend that the requirement should only refer to part dualling of the A4440. SWC response: The SWC disagree, as the intention is eventually to dual the entire length of the A4440, albeit over several phases, not all of which are necessary in this Plan period. SWDP45/1(xv) 6.4 SMD comments: SMD contend that the requirement for SuDS duplicates SWDP 29. SWC response: The SWC agree. 6.5 SMD comments: SMD contend that the aims of this part of the policy are not cumulative. SWC response: The SWC agree that Green Infrastructure / Green Space can perform multiple functions. South Worcestershire Councils 6 July 2015

New Appendix Aa: Five-Year Housing Land Supply

New Appendix Aa: Five-Year Housing Land Supply Appendices: Main Modification SC-MM238 Add a new Appendix Aa after Appendix A. New Appendix Aa: Five-Year Housing Land Supply Five-year housing land supply will be calculated using the Liverpool methodology,

More information

Public School Facilities Element

Public School Facilities Element Public School Facilities Element GOAL 1: THROUGH PARTNERSHIPS AND EFFECTIVE COLLABORATION AMONG LOCAL GOVERNMENTS AND THE PINELLAS COUNTY SCHOOL DISTRICT, AND BECAUSE OF A SHARED COMMITMENT TO EDUCATIONAL

More information

strategic policies in the adopted development plan for South Cambridgeshire. Some

strategic policies in the adopted development plan for South Cambridgeshire. Some Strategic in adopted development plan for South Cambridgeshire According to the National Planning Policy Framework () a local planning authority should set out clearly the for their area (para 184). There

More information

IAASB Main Agenda (March, 2015) Auditing Disclosures Issues and Task Force Recommendations

IAASB Main Agenda (March, 2015) Auditing Disclosures Issues and Task Force Recommendations IAASB Main Agenda (March, 2015) Agenda Item 2-A Auditing Disclosures Issues and Task Force Recommendations Draft Minutes from the January 2015 IAASB Teleconference 1 Disclosures Issues and Revised Proposed

More information

Chapter 1: Introduction

Chapter 1: Introduction Chapter 1: Introduction Aim 1 Sustainable Development To guide e development of e Borough and its environs in such a way at a careful balance is maintained between economic, social and environmental aspirations

More information

THE WHARVES DEPTFORD EXCHANGE & EXPLORE - FOCUS SESSION MINI-REPORT. November December 2014 MOVING FORWARD

THE WHARVES DEPTFORD EXCHANGE & EXPLORE - FOCUS SESSION MINI-REPORT. November December 2014 MOVING FORWARD THE WHARVES DEPTFORD MOVING FORWARD THE WHARVES DEPTFORD EXCHANGE & EXPLORE - FOCUS SESSION MINI-REPORT November December 2014 2 The Wharves Deptford Exchange & Explore - Focus Sessions The Wharves Deptford

More information

Strategic Transport Forum 7 th December 2018

Strategic Transport Forum 7 th December 2018 Strategic Transport Forum 7 th December 2018 Agenda Item 4: Expressway and Connectivity Study Recommendation: It is recommended that the Forum: a) Write to the Secretary of State for Transport setting

More information

LAND AT LONG BUCKBY IMMEDIATE RESIDENTIAL LAND 0.42 ha

LAND AT LONG BUCKBY IMMEDIATE RESIDENTIAL LAND 0.42 ha LAND AT LONG BUCKBY IMMEDIATE RESIDENTIAL LAND 0.42 ha OPPORTUNITY TO ACQUIRE AN IMMEDIATE RESIDENTIAL DEVELOPMENT SITE BY INFORMAL TENDER. DEADLINE 12 NOON TUESDAY 16 th FEBRUARY 2016. LONG BUCKBY CONSENTED

More information

BEFORE THE QUEENSTOWN-LAKES DISTRICT COUNCIL PROPOSED DISTRICT PLAN HEARINGS PANEL. IN THE MATTER of the Resource Management Act 1991

BEFORE THE QUEENSTOWN-LAKES DISTRICT COUNCIL PROPOSED DISTRICT PLAN HEARINGS PANEL. IN THE MATTER of the Resource Management Act 1991 BEFORE THE QUEENSTOWN-LAKES DISTRICT COUNCIL PROPOSED DISTRICT PLAN HEARINGS PANEL IN THE MATTER of the Resource Management Act 1991 AND the Proposed District Plan STATEMENT OF EVIDENCE OF TIMOTHY CARR

More information

Variation of UK Broadband s spectrum access licence for 3.6 GHz spectrum

Variation of UK Broadband s spectrum access licence for 3.6 GHz spectrum Variation of UK Broadband s spectrum access licence for 3.6 GHz spectrum BT s response to the consultation published on 27 June 2018 8 August 2018 Comments should be addressed to: Chris Cheeseman, BT Group

More information

TechAmerica Europe comments for DAPIX on Pseudonymous Data and Profiling as per 19/12/2013 paper on Specific Issues of Chapters I-IV

TechAmerica Europe comments for DAPIX on Pseudonymous Data and Profiling as per 19/12/2013 paper on Specific Issues of Chapters I-IV Tech EUROPE TechAmerica Europe comments for DAPIX on Pseudonymous Data and Profiling as per 19/12/2013 paper on Specific Issues of Chapters I-IV Brussels, 14 January 2014 TechAmerica Europe represents

More information

Spectrum Utilization Policy in the Frequency Range MHZ

Spectrum Utilization Policy in the Frequency Range MHZ July 1998 Spectrum Management and Telecommunications Policy Spectrum Utilization Policy Spectrum Utilization Policy in the Frequency Range 944-960 MHZ Aussi disponible en français PS-944 INDUSTRY CANADA

More information

Index. 1 Introduction. 2 Executive Summary. 3 Long-Range Facility Master Plan

Index. 1 Introduction. 2 Executive Summary. 3 Long-Range Facility Master Plan Index 1 Introduction 2 Executive Summary Existing Facility Inventory and Assessment Preliminary Space Needs Projections Master Plan Conclusions Project Recommendations 3 Long-Range Facility Master Plan

More information

PROPORTIONATE EIA The Arcadis Perspective. David Hoare 18 July 2017

PROPORTIONATE EIA The Arcadis Perspective. David Hoare 18 July 2017 PROPORTIONATE EIA The Arcadis Perspective David Hoare 18 July 2017 PROPORTIONATE SCOPING Effective and Proportionate? We tend to produce a scoping table which summarises the main issues, whether they are

More information

Attachment #2 PPW133-07

Attachment #2 PPW133-07 Attachment #2 PPW133-07 Pg. 1 EXECUTIVE SUMMARY Environmental Assessment Study In January 2005, Regional staff retained to commence a Schedule C Environmental Assessment Study to identify the improvements

More information

Mapping rural services in the parishes of Leicestershire

Mapping rural services in the parishes of Leicestershire Mapping rural services in the parishes of Leicestershire Final Report September 2007 Produced by the Policy, Research and Information Team, Chief Executive s Department, Leicestershire County Council Contact

More information

BROADCASTING (RADIO MULTIPLEX SERVICES) BILL EXPLANATORY NOTES

BROADCASTING (RADIO MULTIPLEX SERVICES) BILL EXPLANATORY NOTES BROADCASTING (RADIO MULTIPLEX SERVICES) BILL EXPLANATORY NOTES What these notes do These Explanatory tes relate to the Broadcasting (Radio Multiplex Services) Bill as introduced in the House of. These

More information

UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT WASHINGTON, D.C October 23, 2003

UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT WASHINGTON, D.C October 23, 2003 UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT WASHINGTON, D.C. 20240 October 23, 2003 EMS TRANSMISSION 10/23/2003 Instruction Memorandum No. 2003-275 Change 1 Expires: 09/30/2004 In

More information

Statement on variation of 900 MHz and 1800 MHz Wireless Telegraphy Act licences

Statement on variation of 900 MHz and 1800 MHz Wireless Telegraphy Act licences Statement on variation of 900 MHz and 1800 MHz Wireless Telegraphy Act licences Statement Publication date: 06 January 2011 Contents Section Page 1 Executive summary 1 2 Introduction 2 3 Assessment of

More information

Chemicals Risk Management and Critical Raw Materials

Chemicals Risk Management and Critical Raw Materials Chemicals Risk Management and Critical Raw Materials A Member State s perspective from the Netherlands Jan-Karel Kwisthout NL Competent Authority for REACH Critical Raw Materials and REACH, Brussels, 17

More information

M A R K E T L E D P R O P O SA LS

M A R K E T L E D P R O P O SA LS 1 M A R K E T L E D P R O P O SA LS A submission or request initiated and submitted by a private sector proponent to government, where the specific proposal has not been requested by the government: All

More information

Kordia Submission on Preparing for 5G in New Zealand. 8 May 2018

Kordia Submission on Preparing for 5G in New Zealand. 8 May 2018 Kordia Submission on Preparing for 5G in New Zealand 8 May 2018 RELEASED: 8 MAY 2018 KORDIA SUBMISSION ON PREPARING FOR 5G IN NEW ZEALAND REV NO: V1.1 Table of Contents 1. Introduction...1 2. Kordia Submission

More information

2. As such, Proponents of Antenna Systems do not require permitting of any kind from the Town.

2. As such, Proponents of Antenna Systems do not require permitting of any kind from the Town. Subject: Antenna Systems Policy Number: Date Developed: 2008/09 Date Approved: April 8, 2009 Lead Department: Planning and Development Date Modified: (if applicable) November 26, 2014 A. PROTOCOL STATEMENT:

More information

April 30, Andreas Bergman Chair International Public Sector Accounting Standards Board 529 Fifth Avenue, 6th Floor New York, NY USA

April 30, Andreas Bergman Chair International Public Sector Accounting Standards Board 529 Fifth Avenue, 6th Floor New York, NY USA April 30, 2013 Andreas Bergman Chair International Public Sector Accounting Standards Board 529 Fifth Avenue, 6th Floor New York, NY 10017 USA By electronic submission Dear Mr. Bergmann, Re.: Conceptual

More information

RADIO SPECTRUM COMMITTEE

RADIO SPECTRUM COMMITTEE EUROPEAN COMMISSION Information Society and Media Directorate-General Electronic Communications Radio Spectrum Policy Brussels, 7 June 2007 DG INFSO/B4 RSCOM07-04 Final PUBLIC DOCUMENT RADIO SPECTRUM COMMITTEE

More information

Re: Examination Guideline: Patentability of Inventions involving Computer Programs

Re: Examination Guideline: Patentability of Inventions involving Computer Programs Lumley House 3-11 Hunter Street PO Box 1925 Wellington 6001 New Zealand Tel: 04 496-6555 Fax: 04 496-6550 www.businessnz.org.nz 14 March 2011 Computer Program Examination Guidelines Ministry of Economic

More information

EYDON PARISH COUNCIL

EYDON PARISH COUNCIL EYDON PARISH COUNCIL Minutes of the Meeting of Eydon Parish Council held from 7.30pm, Tuesday 14 th of February 2017 in the Village Hall, High Street, Eydon. 1. Councillors present: Cllrs K Simmons (Chairman),

More information

Agenda Item 4: Transport Strategy: Vision and Objectives

Agenda Item 4: Transport Strategy: Vision and Objectives Strategic Transport Forum 16 th March 2018 englandseconomicheartland@b uckscc.gov.uk Agenda Item 4: Transport Strategy: Vision and Objectives Recommendation: It is recommended that the meeting consider

More information

HABITATS REGULATIONS ASSESSMENT St. Anne s on the Sea Neighbourhood Plan Addendum to Screening Opinion OCTOBER 2016

HABITATS REGULATIONS ASSESSMENT St. Anne s on the Sea Neighbourhood Plan Addendum to Screening Opinion OCTOBER 2016 HABITATS REGULATIONS ASSESSMENT St. Anne s on the Sea Neighbourhood Plan Addendum to Screening Opinion OCTOBER 2016 CONTACTS JO WEAVER Senior Ecologist dd +44 (0)1453 423124 m +44 (0)7809 549186 e jo.weaver@arcadis.com

More information

Chapter 3 Business and Industrial Development

Chapter 3 Business and Industrial Development Chapter 3 Business and Industrial Development Existing Business/Industrial Development Bayview Ridge is a unique area with respect to economic development opportunities. The growth of industry around the

More information

ANNEX TO QUALCOMM COMMENTS ON THE DRAFT IMT ROADMAP

ANNEX TO QUALCOMM COMMENTS ON THE DRAFT IMT ROADMAP ANNEX 1 ANNEX TO QUALCOMM COMMENTS ON THE DRAFT IMT ROADMAP 2.2 IMT700 2.2.1 The Authority invites industry views on Option 1 (ITU Region 3) Note: This comment is valid for both IMT700 and IMT800 (From

More information

Coldra Woods Hotel by Celtic Manor and Starbucks Drive Thru Restaurant. Dormouse Method Statement

Coldra Woods Hotel by Celtic Manor and Starbucks Drive Thru Restaurant. Dormouse Method Statement Coldra Woods Hotel by Celtic Manor and Starbucks Drive Thru Restaurant Broadhall (Coldra Woods) Ltd; Coldra Manor Resort and Idris Davies Ltd. Tel: 01225 783674 Email: shughes@environgauge.com St. John

More information

ANSI-ASC-C63 Interpretation Request Form

ANSI-ASC-C63 Interpretation Request Form ANSI-ASC-C6 Interpretation Request Form This form shall be used for submission of Interpretation Requests related to ANSI-IEEE standards that are within the responsibility of ANSI- ASC-C6. The eight parts

More information

Canadian Standards Association Mississauga, Ontario To the Part I Committee

Canadian Standards Association Mississauga, Ontario To the Part I Committee Canadian Standards Association Mississauga, Ontario To the Part I Committee Subject No. 3130 Chair: R. Leduc Date: December 24, 2003 Title: Receptacles in Residential Occupancies, Rules 26-710, 26-712,

More information

Getting the evidence: Using research in policy making

Getting the evidence: Using research in policy making Getting the evidence: Using research in policy making REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 586-I Session 2002-2003: 16 April 2003 LONDON: The Stationery Office 14.00 Two volumes not to be sold

More information

Personal Medical Services (PMS) Contract Review Update

Personal Medical Services (PMS) Contract Review Update Personal Medical Services (PMS) Contract Review Update 1. Introduction NHS England commenced the Personal Medical Services (PMS) Review process across the North West London (NWL) Collaboration of CCGs

More information

Herts Valleys Clinical Commissioning Group. Review of NHS Herts Valleys CCG Constitution

Herts Valleys Clinical Commissioning Group. Review of NHS Herts Valleys CCG Constitution Herts Valleys Clinical Commissioning Group Review of NHS Herts Valleys CCG s constitution Agenda Item: 14 REPORT TO: HVCCG Board DATE of MEETING: 30 January 2014 SUBJECT: Review of NHS Herts Valleys CCG

More information

METHODOLOGY NOTE Population and Dwelling Stock Estimates, , and 2015-Based Population and Dwelling Stock Forecasts,

METHODOLOGY NOTE Population and Dwelling Stock Estimates, , and 2015-Based Population and Dwelling Stock Forecasts, METHODOLOGY NOTE Population and Dwelling Stock Estimates, 2011-2015, and 2015-Based Population and Dwelling Stock Forecasts, 2015-2036 JULY 2017 1 Cambridgeshire Research Group is the brand name for Cambridgeshire

More information

Imagine Bothell Comprehensive Plan

Imagine Bothell Comprehensive Plan City of Bothell Planning Commission Recommendation The Planning Commission considered proposed amendments to the on February 19 and March 5, 2014, and March 11, 2015 (as part of an integrated review of

More information

Kevin McShane Transport Planner The Studio 555 Lisburn Road BELFAST BT9 7GQ. Tel /

Kevin McShane Transport Planner The Studio 555 Lisburn Road BELFAST BT9 7GQ. Tel / Kevin McShane Transport Planner The Studio 555 Lisburn Road BELFAST BT9 7GQ Tel 00442895 609798 / 00447872 386516 email mcshanek@btinternet.com Our Ref 13-106 20 January 2015 Ms Nicole Thompson DoE Strategic

More information

Airwave response to the Ofcom Fixed. Wireless Spectrum Strategy Consultation. Redacted Version

Airwave response to the Ofcom Fixed. Wireless Spectrum Strategy Consultation. Redacted Version Airwave response to the Ofcom Fixed Wireless Spectrum Strategy Consultation Redacted Version Uncontrolled when Printed Date of Issue: 14/09/2016 TABLE OF CONTENTS 1. Airwave Response... 3 Page 2 of 23

More information

8th Floor, 125 London Wall, London EC2Y 5AS Tel: +44 (0) Fax: +44 (0)

8th Floor, 125 London Wall, London EC2Y 5AS Tel: +44 (0) Fax: +44 (0) Mr Jean-Paul Gauzès President of the EFRAG Board European Financial Reporting Advisory Group 35 Square de Meeûs B-1000 Brussels Belgium E-mail: commentletters@efrag.org 10 January 2018 Dear Jean-Paul Thank

More information

Detail Design For Pavement Rehabilitation on Trunk Highway 14 From Tracy to Revere

Detail Design For Pavement Rehabilitation on Trunk Highway 14 From Tracy to Revere Detail Design For Pavement Rehabilitation on Trunk Highway 14 From Tracy to Revere Section 1 Introduction and Intersection Information State Project (SP) 6401-37 on MN Highway 14 SP 6401-37 is a Bituminous

More information

Submission Draft South District Plan

Submission Draft South District Plan Submission Draft South District Plan Project 17-023 31 March 2017 Revision A Prepared by Dickson Rothschild 9 Argyle Place Millers Point NSW Dickson Rothschild 17-023 Page 1 of 36 Rev Description DATE

More information

Using Multimodal Performance Measures to Prioritize Improvements on US 101 in San Luis Obispo County

Using Multimodal Performance Measures to Prioritize Improvements on US 101 in San Luis Obispo County Portland State University PDXScholar TREC Friday Seminar Series Transportation Research and Education Center (TREC) 4-24-2015 Using Multimodal Performance Measures to Prioritize Improvements on US 101

More information

Orkney Electricity Network Reinforcement Stakeholder Consultation Response. August 2014

Orkney Electricity Network Reinforcement Stakeholder Consultation Response. August 2014 Orkney Electricity Network Reinforcement August 2014 Introduction In February 2014 Scottish and Southern Energy Power Distribution 1 (SSEPD) undertook a stakeholder consultation Connecting Orkney: Electricity

More information

The Church of Jesus Christ of Latter-day Saints Trust Board (LDS) Aitutaki Enua Society Incorporated (Aitutaki Enua)

The Church of Jesus Christ of Latter-day Saints Trust Board (LDS) Aitutaki Enua Society Incorporated (Aitutaki Enua) BEFORE THE INDEPENDENT HEARINGS PANEL IN THE MATTER OF: The Proposed Auckland Unitary Plan SUBMITTERS: The Church of Jesus Christ of Latter-day Saints Trust Board (LDS) The Federation of Islamic Associations

More information

North York Moors National Park Authority

North York Moors National Park Authority Item 13 North York Moors National Park Authority 1 October 2018 Government Consultations on: i) Permitted Development rights for Shale Gas Exploration; ii) Inclusion of Shale Gas Production Projects in

More information

World Trade Center Memorial and Redevelopment Plan Historic Resources Report July PROJECT SITE DOCUMENTATION UNDER STIPULATIONS 1 AND 5

World Trade Center Memorial and Redevelopment Plan Historic Resources Report July PROJECT SITE DOCUMENTATION UNDER STIPULATIONS 1 AND 5 World Trade Center Memorial and Redevelopment Plan Historic Resources Report July 2006 INTRODUCTION This report on Historic Resources for the World Trade Center Memorial and Redevelopment Plan (Approved

More information

A10 Electronic Interference: Application 2 - LBHF

A10 Electronic Interference: Application 2 - LBHF A10 Electronic Interference: Application 2 - LBHF Addendum to the Environmental Statement Volume I January 2012 Introduction A10.1 This Chapter of the Addendum to the June 2011 Environmental Statement

More information

Mr Hans Hoogervorst Chairman International Accounting Standards Board 30 Cannon Street London EC4M 6XH United Kingdom

Mr Hans Hoogervorst Chairman International Accounting Standards Board 30 Cannon Street London EC4M 6XH United Kingdom Mr Hans Hoogervorst Chairman International Accounting Standards Board 30 Cannon Street London EC4M 6XH United Kingdom Sent by email: Commentletters@ifrs.org Brussels, 19 February 2016 Subject: The Federation

More information

Score grid for SBO projects with a societal finality version January 2018

Score grid for SBO projects with a societal finality version January 2018 Score grid for SBO projects with a societal finality version January 2018 Scientific dimension (S) Scientific dimension S S1.1 Scientific added value relative to the international state of the art and

More information

Privacy Impact Assessment on use of CCTV

Privacy Impact Assessment on use of CCTV Appendix 2 Privacy Impact Assessment on use of CCTV CCTV is currently in the majority of the Council s leisure facilities, however this needs to be extended to areas not currently covered by CCTV. Background

More information

JOB PROFILE. Corporate Communications Team Leader (Change Programme) Stratford upon Avon

JOB PROFILE. Corporate Communications Team Leader (Change Programme) Stratford upon Avon JOB PROFILE POST TITLE: GRADE: DIRECTORATE: RESPONSIBLE TO: LOCATION: JOB PURPOSE: Digital Communications Officer (Change Programme) F Enabling Services Corporate Communications Team Leader (Change Programme)

More information

Digital Masterplanning Steve Turner, Arup

Digital Masterplanning Steve Turner, Arup 1 1 Digital Masterplanning Steve Turner, Arup Improving productivity and competitiveness. Cities are looking to harness digital technologies because they provide the potential to; deliver better outcomes,

More information

NHS Vale of York CCG TURNAROUND ACTION PLAN

NHS Vale of York CCG TURNAROUND ACTION PLAN NHS Vale of York CCG TURNAROUND ACTION PLAN Ref. Area Action Priority By When Progress Responsible Status 01. Underlying Financial TP Position The material underlying deficit position highlights the unsustainable

More information

Decision regarding PHARMAC s Implementation of Trans-Pacific Partnership (TPP) provisions and other Amendments to Application Processes

Decision regarding PHARMAC s Implementation of Trans-Pacific Partnership (TPP) provisions and other Amendments to Application Processes 8 December 2016 Decision regarding PHARMAC s Implementation of Trans-Pacific Partnership (TPP) provisions and other Amendments to Application Processes PHARMAC is pleased to announce that changes will

More information

Graham Hughes, Executive Director: Economy, Transport & Environment, Cambridgeshire County Council. Smarter Cambridgeshire Work stream

Graham Hughes, Executive Director: Economy, Transport & Environment, Cambridgeshire County Council. Smarter Cambridgeshire Work stream Report To: Greater Cambridge City Deal Executive Board 4 August 2015 Lead Officer: Workstream ref.: Graham Hughes, Executive Director: Economy, Transport & Environment, Cambridgeshire County Council D

More information

CHIEF ENGINEER PROCEDURE MANAGEMENT OF OVERLAPPING DESIGN AGREEMENT

CHIEF ENGINEER PROCEDURE MANAGEMENT OF OVERLAPPING DESIGN AGREEMENT Approval Amendment Record Approval Date Version Description 30/05/2014 1 Initial issue under MTM. This procedure supersedes the Overlapping Design Agreement, Application and Transfer Log documents L2-SIG-PRO-007,

More information

International Civil Aviation Organization ASSEMBLY 38TH SESSION EXECUTIVE COMMITTEE

International Civil Aviation Organization ASSEMBLY 38TH SESSION EXECUTIVE COMMITTEE International Civil Aviation Organization WORKING PAPER 10/9/13 English only Agenda Item 13: Aviation Security Policy ASSEMBLY 38TH SESSION EXECUTIVE COMMITTEE INNOVATION IN SECURITY DEVELOPMENT OF NEXT

More information

Score grid for SBO projects with an economic finality version January 2019

Score grid for SBO projects with an economic finality version January 2019 Score grid for SBO projects with an economic finality version January 2019 Scientific dimension (S) Scientific dimension S S1.1 Scientific added value relative to the international state of the art and

More information

National Grid s commitments when undertaking works in the UK. Our stakeholder, community and amenity policy

National Grid s commitments when undertaking works in the UK. Our stakeholder, community and amenity policy National Grid s commitments when undertaking works in the UK Our stakeholder, community and amenity policy Introduction This document describes the ten commitments we have made to the way we carry out

More information

DIRECT REFERRAL FROM CONSENT AUTHORITY OF RESOURCE CONSENT APPLICATION. of the Resource Management Act 1991 JOINT EXPERT WITNESS STATEMENT PLANNING

DIRECT REFERRAL FROM CONSENT AUTHORITY OF RESOURCE CONSENT APPLICATION. of the Resource Management Act 1991 JOINT EXPERT WITNESS STATEMENT PLANNING Planning Joint Witness Statement 11 DIRECT REFERRAL WAIHEKE MARINAS LTD (ENV 2013 AKL 00174) DIRECT REFERRAL FROM CONSENT AUTHORITY OF RESOURCE CONSENT APPLICATION IN THE MATTER of the Resource Management

More information

3 Economic Development

3 Economic Development 3 Economic Development Introduction: The Economic Development Element of the Comprehensive Plan is intended to guide the climate for enterprise and commercial exchange in Buckley and reinforce the overall

More information

Definition of Bulk Electric System Phase 2

Definition of Bulk Electric System Phase 2 Definition of Bulk Electric System Phase 2 NERC Industry Webinar Peter Heidrich, FRCC, Standard Drafting Team Chair June 26, 2013 Topics Phase 2 - Definition of Bulk Electric System (BES) Project Order

More information

KEY MAP PLAN AREA MAP. St. Albans Sub-Area Plan. Area Boundary

KEY MAP PLAN AREA MAP. St. Albans Sub-Area Plan. Area Boundary Richmond Official Community Plan CITY CENTRE AREA ST. ALBANS SUB-AREA PLAN Bylaw 7100 Schedule 2.10A ST. ALBANS SUB-AREA PLAN z ST. ALBANS SUB-AREA PLAN z ST. ALBANS SUB-AREA PLAN KEY MAP PLAN AREA MAP

More information

LAKE DISTRICT NATIONAL PARK LOCAL PLAN REVIEW: LIVING LAKES

LAKE DISTRICT NATIONAL PARK LOCAL PLAN REVIEW: LIVING LAKES 13 th July 2018 Lake District National Park Authority Murley Moss, Oxenholme Road Kendal LA9 7RL For the attention of Paula Allen Dear Ms Allen LAKE DISTRICT NATIONAL PARK LOCAL PLAN REVIEW: LIVING LAKES

More information

May 24, Sent via

May 24, Sent via Rogers Communications 333 Bloor Street East Toronto, Ontario M4W 1G9 Tel. (416) 935-7211 Fax (416) 935-7719 rwi_gr@rci.rogers.com Dawn Hunt Vice-President Regulatory May 24, 2013. Sent via email: spectrum.engineering@ic.gc.ca

More information

GVF Response to the public Consultation Process Published by ICASA:

GVF Response to the public Consultation Process Published by ICASA: GVF Response to the public Consultation Process Published by ICASA: Draft Frequency Migration Regulation And Frequency Migration Plan GG 35598 (vol 566) 17 August 2012 (ICASA notice 606) Introduction The

More information

Resource Management Act 1991 ( Act ) KAWARAU JET SERVICES HOLDINGS LIMITED. Appellant QUEENSTOWN LAKES DISTRICT COUNCIL.

Resource Management Act 1991 ( Act ) KAWARAU JET SERVICES HOLDINGS LIMITED. Appellant QUEENSTOWN LAKES DISTRICT COUNCIL. IN THE ENVIRONMENT COURT AT CHRISTCHURCH ENV-2018-CHC-0000 UNDER THE IN THE MATTER OF Resource Management Act 1991 ( Act ) An appeal under Schedule 1, Clause 14(1), of the Act BETWEEN KAWARAU JET SERVICES

More information

Spectrum for audio PMSE. Use of the 694 to 703 MHz band

Spectrum for audio PMSE. Use of the 694 to 703 MHz band Spectrum for audio PMSE Use of the 694 to 703 MHz band Statement: Publication Date: 24 November 2017 About this document This statement sets out our decision to allow Programme Making and Special Events

More information

STEERING GROUP PROJECT MANAGER REPORTS

STEERING GROUP PROJECT MANAGER REPORTS STEERING GROUP PROJECT MANAGER REPORTS Project Manager Report: July 2014 A short overview of activities undertaken since the last Steering Group meeting and overview of planned activities over the next

More information

Update on relevant points discussed at 27 th Madrid Forum. Walter Boltz

Update on relevant points discussed at 27 th Madrid Forum. Walter Boltz Update on relevant points discussed at 27 th Madrid Forum Walter Boltz Main topics of interest Energy Union Security of Supply European Gas Target Model Gas Quality Harmonisation Role of the Gas Regional

More information

Developing the Arts in Ireland. Arts Council Strategic Overview

Developing the Arts in Ireland. Arts Council Strategic Overview Developing the Arts in Ireland Arts Council Strategic Overview 2011 2013 1 Mission Statement The mission of the Arts Council is to develop the arts by supporting artists of all disciplines to make work

More information

Intimate Communications Hub Interface Specification Report to Secretary of State

Intimate Communications Hub Interface Specification Report to Secretary of State Intimate Communications Hub Interface Specification Report to Secretary of State DCC V1.0 28/02/14 Page 1 of 14 Executive Summary 1. DCC is required in accordance with the terms of its Licence to produce,

More information

Site Plan/Building Permit Review

Site Plan/Building Permit Review Part 6 Site Plan/Building Permit Review 1.6.01 When Site Plan Review Applies 1.6.02 Optional Pre- Application Site Plan/Building Permit Review (hereafter referred to as Site Plan Review) shall be required

More information

Quarterly Activities Report for Quarter Ended 31 March 2010

Quarterly Activities Report for Quarter Ended 31 March 2010 Quarterly Activities Report for Quarter Ended 31 March 2010 30 April 2010 Highlights Substantial increase (up 46%) in Maryborough coking coal resource to 83Mt Indicated and Inferred (9.5Mt Indicated, 73.5Mt

More information

CCG 360 o Stakeholder Survey

CCG 360 o Stakeholder Survey July 2017 CCG 360 o Stakeholder Survey National report NHS England Publications Gateway Reference: 06878 Ipsos 16-072895-01 Version 1 Internal Use Only MORI This Terms work was and carried Conditions out

More information

THE MATTER : BEFORE THE SCHOOL

THE MATTER : BEFORE THE SCHOOL : IN THE MATTER : BEFORE THE SCHOOL : ETHICS COMMISSION OF : : Docket No.: C04-01 JUDY FERRARO, : KEANSBURG BOARD OF EDUCATION : MONMOUTH COUNTY : DECISION : PROCEDURAL HISTORY This matter arises from

More information

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C. 20554 In the Matter of ) ) Amendment of Sections 90.20(d)(34) and 90.265 ) PS Docket No. 13-229 of the Commission s Rules to Facilitate the

More information

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS 11.01.00 Preliminary Site Plan Approval 11.01.01 Intent and Purpose 11.01.02 Review 11.01.03 Application 11.01.04 Development Site to be Unified 11.01.05

More information

THE EXECUTIVE BOARD OF DELFT UNIVERSITY OF TECHNOLOGY

THE EXECUTIVE BOARD OF DELFT UNIVERSITY OF TECHNOLOGY TU Delft student and visitor regulations for the use of buildings, grounds and facilities 1 THE EXECUTIVE BOARD OF DELFT UNIVERSITY OF TECHNOLOGY In consideration of the need for rules and regulations

More information

MUNICIPAL CENSUS MANUAL. Workbook

MUNICIPAL CENSUS MANUAL. Workbook MUNICIPAL CENSUS MANUAL Workbook Prepared by: Strategic Policy and Planning Branch Alberta Municipal Affairs November 2018 CONTENTS MUNICIPAL CENSUS MANUAL REVIEW... 2 AN INTRODUCTION... 2 WHAT IS BEING

More information

Submission by Free TV Limited

Submission by Free TV Limited Submission by Free TV Limited Australian Communications and Media Authority Amendments to the Technical Planning Guidelines for the planning of individual services that use the Broadcasting Services Bands

More information

Justice Select Committee: Inquiry on EU Data Protection Framework Proposals

Justice Select Committee: Inquiry on EU Data Protection Framework Proposals Justice Select Committee: Inquiry on EU Data Protection Framework Proposals Response by the Wellcome Trust KEY POINTS The Government must make the protection of research one of their priorities in negotiations

More information

Harmonizing the ANSI-C12.1(2008) EMC Tests. Harmonizing the ANSI-C12.1(2008) EMC Tests

Harmonizing the ANSI-C12.1(2008) EMC Tests. Harmonizing the ANSI-C12.1(2008) EMC Tests Harmonizing the ANSI-C12.1(2008) EMC Tests Subcommittee 1 (Emissions) Subcommittee 5 (Immunity) Joint Task Force on C12.1 June 17, 2013 1 The Accredited Standards Committee C63 presents Harmonizing the

More information

BIPM Report to the AFRIMETS General Assembly. Andy Henson Director of International Liaison and Communications

BIPM Report to the AFRIMETS General Assembly. Andy Henson Director of International Liaison and Communications BIPM Report to the AFRIMETS General Assembly Andy Henson Director of International Liaison and Communications Towards a new SI New data published in the latest edition of Metrologia. CCM At least 3 experiments,

More information

RadioCentre s response to the BBC Trust review of the BBC s national radio stations in Northern Ireland, Scotland and Wales

RadioCentre s response to the BBC Trust review of the BBC s national radio stations in Northern Ireland, Scotland and Wales RadioCentre s response to the BBC Trust review of the BBC s national radio stations in Northern Ireland, Scotland and Wales 1. Executive summary 1.1. We welcome the fact that a significant degree of scrutiny

More information

PUBLIC ART POLICY AND PROCEDURES FOR REZONED DEVELOPMENTS

PUBLIC ART POLICY AND PROCEDURES FOR REZONED DEVELOPMENTS Land Use and Development Policies and Guidelines Community Services, 453 W. 12th Ave Vancouver, BC V5Y 1V4 604.873.7344 fax 873.7060 planning@city.vancouver.bc.ca PUBLIC ART POLICY AND PROCEDURES FOR REZONED

More information

Lewis-Clark State College No Date 2/87 Rev. Policy and Procedures Manual Page 1 of 7

Lewis-Clark State College No Date 2/87 Rev. Policy and Procedures Manual Page 1 of 7 Policy and Procedures Manual Page 1 of 7 1.0 Policy Statement 1.1 As a state supported public institution, Lewis-Clark State College's primary mission is teaching, research, and public service. The College

More information

Spectrum Allocation and Utilization Policy Regarding the Use of Certain Frequency Bands Below 1.7 GHz for a Range of Radio Applications

Spectrum Allocation and Utilization Policy Regarding the Use of Certain Frequency Bands Below 1.7 GHz for a Range of Radio Applications Issue 1 June 2009 Spectrum Management and Telecommunications Spectrum Utilization Policy Spectrum Allocation and Utilization Policy Regarding the Use of Certain Frequency Bands Below 1.7 GHz for a Range

More information

Consultation on Amendments to Industry Canada s Antenna Tower Siting Procedures

Consultation on Amendments to Industry Canada s Antenna Tower Siting Procedures February 2014 Consultation on Amendments to Industry Canada s Antenna Tower Siting Procedures Aussi disponible en français Contents 1. Intent... 1 2. Mandate... 1 3. Policy... 1 4. Background... 1 5. Review

More information

Motioned by Commissioner Culver, seconded by Commissioner Willey, to approve the June 28, 2017 Planning Commission action summary minutes.

Motioned by Commissioner Culver, seconded by Commissioner Willey, to approve the June 28, 2017 Planning Commission action summary minutes. Page 1 of 7 PLANNING COMMISSION MEETING Meeting Action Summary 6:30 p.m. Commissioners present: Carpenter, Culver, Sands, Sinclair, Struckhoff, Weaver, Willey Staff present: McCullough, Stogsdill, Crick,

More information

Ministry of Justice: Call for Evidence on EU Data Protection Proposals

Ministry of Justice: Call for Evidence on EU Data Protection Proposals Ministry of Justice: Call for Evidence on EU Data Protection Proposals Response by the Wellcome Trust KEY POINTS It is essential that Article 83 and associated derogations are maintained as the Regulation

More information

South West Public Engagement Protocol for Wind Energy

South West Public Engagement Protocol for Wind Energy South West Public Engagement Protocol for Wind Energy October 2004 South West Renewable Energy Agency Sterling House, Dix s Field, Exeter, EX1 1QA Tel: 01392 229394 Fax: 01392 229395 Email: admin@regensw.co.uk

More information

EXPLORATION DEVELOPMENT OPERATION CLOSURE

EXPLORATION DEVELOPMENT OPERATION CLOSURE i ABOUT THE INFOGRAPHIC THE MINERAL DEVELOPMENT CYCLE This is an interactive infographic that highlights key findings regarding risks and opportunities for building public confidence through the mineral

More information

GEAR 2030 WORKING GROUP 2 Roadmap on automated and connected vehicles

GEAR 2030 WORKING GROUP 2 Roadmap on automated and connected vehicles GEAR 2030 WORKING GROUP 2 Roadmap on automated and connected vehicles Europe has a very strong industrial basis on automotive technologies and systems. The sector provides jobs for 12 million people and

More information

NEIGHBOURHOOD NEW-SETTLEMENT JOBS HEALTHY CHILDREN BUSES SQUARES WALKING NEW-SETTLEMENT OFFICE SHOPS PLACES FIRST STREETS NEIGHBOURHOOD URBAN

NEIGHBOURHOOD NEW-SETTLEMENT JOBS HEALTHY CHILDREN BUSES SQUARES WALKING NEW-SETTLEMENT OFFICE SHOPS PLACES FIRST STREETS NEIGHBOURHOOD URBAN CREATING COMMUNITIES FIT FOR THE FUTURE PLACES FIRST URBAN CYCLING GARDEN HOME GROWTH WALKING PARK HEALTHY CHILDREN BUSES TOWN OFFICE MOBILITY ART VILLAGE DESIGN PUB SHOPS COUNTRYSIDE REGENERATION MARKET

More information

SCOTTISH GOVERNMENT RESPONSE TO THE REPORT BY THE MUSEUMS THINK TANK

SCOTTISH GOVERNMENT RESPONSE TO THE REPORT BY THE MUSEUMS THINK TANK SCOTTISH GOVERNMENT RESPONSE TO THE REPORT BY THE MUSEUMS THINK TANK SCOTTISH GOVERNMENT RESPONSE TO THE REPORT BY THE MUSEUMS THINK TANK Our museums and galleries are vital in telling the story of Scotland

More information

NHS South Kent Coast. Clinical Commissioning Group. Complaints, Comments and Compliments Policy

NHS South Kent Coast. Clinical Commissioning Group. Complaints, Comments and Compliments Policy NHS South Kent Coast Clinical Commissioning Group Complaints, Comments and Compliments Policy Version: Version 1.6 Ratified by: Date ratified: Name of originator/author: Name of responsible committee/individual:

More information