Know how to apply hangings to walls and ceilings. Test criteria The learner can:
|
|
- Bridget Waters
- 5 years ago
- Views:
Transcription
1 Title: Know how to apply hangings to walls and ceilings Level: 3 Credit value: 7 Learning outcome The learner will: 1. describe methods used in wallpaper production and the trimming and jointing methods required Test criteria The learner can: 1.1 describe the following methods of production: wet embossing, laminating, dry embossing, heat expansion, particles onto wet adhesive 1.2 describe the following printing methods: block, screen, machine, wet, dry, embossing 1.3 identify the following types of pattern: set/straight match, drop/offset match, random/free match 1.4 identify the following paper types and outline their characteristics: pulps, anaglypta, washable, vinyl, duplex, simplex, fabric-backed vinyl, paper-backed fabrics, hand-print, paper-backed vinyl, warps/weftless, lincrusta, supadurables, flock, hessian, metallics, glass fibre, foil damp 1.5 describe appropriate locations for a range of paper types as in 1.3 above 1.6 describe methods of trimming for paper types, as in 1.3 above, and the tools and equipment required methods of trimming: pre-trimmed, remove selvedge tools and equipment: Ridgley straight edge and trimmer, metal straight edge and trimming knife, fabric-backed vinyl joint cutter, tape measure, folding ruler, plumb bob, spirit level, paperhanging shears, sponges, paperhanging brush, rubber rollers, felt rollers, spatulas, seam roller, trimming knives, paste brush, access equipment, pencil, paste table, buckets, troughs, protective strip (plastic for paper backed wide-width vinyls, zinc), chalk and line 1.7 describe the importance of accurate trimming when removing a selvedge CC 3015K Page 1 of 7 Version 1 ( )
2 1.8 describe the following methods of jointing, for paper types (as in 1.3 above), and the tools and equipment required when hanging, as in 1.6 above: butt joint, overlap, cut 1.9 identify the following international performance symbols: spongeable, washable, super-washable, scrubbable, moderate light fastness, good light fastness, strippable, peelable, ready pasted, paste-the-wall, free match, straight match, offset match, design/distance repeat, direction of hanging, co-ordinated fabric available, reverse alternate lengths 2. know how to select and prepare adhesives 2.1 state the papers for which the following adhesives are suitable: cellulose paste, starch paste, PVA, ready-mixed (heavy weight), proprietary (easy strip, light, medium, heavy), overlap, lincrusta glue 2.2 explain the advantages and disadvantages in relation to the range of adhesives as in 2.1 above: ease of application, adhesive properties, marking quality, mould inhibitor 2.3 describe how the factors listed below may affect the consistency of adhesives: incorrect preparation, paper type, paper weight, room/air temperature, surface 3. know how to apply papers to ceilings, walls and complex surfaces 2.4 describe how the following defects can occur due to incorrect consistency of adhesives: blisters, delamination, stretching 3.1 explain the factors to be considered when planning: ceilings, walls, staircases, sloping ceiling/dormer window, freestanding column/pillar, ceiling of above average span (i.e. 3m), alcove/niche/arch, starting point, finishing point, centring, doors, window reveals, features/obstacles, borders 3.2 specify the use of each of the following papers and pattern type papers: lining (two qualities), embossed, blown vinyl, standard (washable, vinyl), ready-pasted, borders pattern types: set/straight match, offset/drop match CC 3015K Page 2 of 7 Version 1 ( )
3 3.3 describe why lining is advisable in the following circumstances: solvent-painted wall, excessive making good, type of finishing paper 3.4 describe how to use the girthing and area methods of calculating the quantity of paper for the following pattern types: set/straight match, drop/offset match, random/free match 3.5 explain the following cutting considerations: pattern type (bold with prominent repeat, small or indefinite pattern), pattern match (set/straight, offset/drop), batches, wastage, shading 3.6 explain the reason for marking lines for each of the following occasions: first drop on wall, after internal/external angle, over and around reveals position: horizontal, vertical method: sprit level, plumb bob considerations: access required, light source, room dimensions, economy 3.7 describe how careless pasting can cause the following faults and their prevention and repair: dry edges, blistering, delaminating, joint gapping, paste staining, polishing, sheen patches, staining, tearing 3.8 explain the reasons for selecting concertina and end-to-end/lap folds, for horizontal and vertical lengths 3.9 describe the reasons for the following pasting methods in relation to the range of papers in 3.2 above: pasting machine, brush, roller, ready pasted 3.10 describe the appropriate use of shears, knife and straight edge, and casing wheel when trimming waste from ceiling length ends, in circumstances where the walls are to be either painted or papered 3.11 describe each of the following hanging processes in the listed circumstances processes: practical hanging and trimming of patterned (set/straight match, drop match) papers and with borders to walls only CC 3015K Page 3 of 7 Version 1 ( )
4 with: internal and external angles, sockets/switches/ceiling rose, window reveals using: cutting methods (star cut and half star cut, mitres) to: ceilings, walls, stairwells including: three of the following (at least one of which must be hung with a matching patterned paper): sloping ceiling/dormer window, free-standing column/pillar, ceiling of above average span (i.e. 3m), alcove/ niche/arch 3.12 describe working practices relating to the following health and safety issues: the Work at Height Regulations, sharp blades, electrical safety, COSHH 3.13 explain the causes of the following defects and how they can be prevented: creasing, inaccurate angle cutting, loss of emboss, mould growth, overlapping, poor matching, shading, tearing 3.14 state the implications of not maintaining the following paperhanging tools in a clean and cared for condition: tape measure, folding ruler, plumb bob, spirit level, paperhanging shears, sponges, paperhanging brush, trimming knives, caulker, pencil, spatulas, access equipment, paste brush, buckets, rubbish containers/bags, metal straight edge and trimming knife, chalk and line, troughs, paste table 4. know how to hang wide-width vinyls 4.1 explain the reasons for checking the suitability of the surface in relation to the need to make good and prime, when hanging paper-backed and fabric-backed papers 4.2 explain the implications and importance of each stage in the following manufacturers instructions: surface preparation, material type, internal angles, adhesive type and application method, directional hanging advice, process of cutting from rolls (descending order), use of full width material (no off-cuts or out-of-sequence drops), shading checks, use of spatula, jointing methods, health and safety advice 4.3 state the maintenance and cleaning of wide-width vinyls CC 3015K Page 4 of 7 Version 1 ( )
5 4.4 explain the cause(s) of the following defects and how they can be prevented: shading, springing joints, surface marking/staining 5. know how to hang specialist papers 5.1 explain the reasons for checking the suitability of the surface in relation to the need to make good, prime and line, when hanging the following specialist papers: Paper-backed fabric, lincrusta, hand print, flock or other decorative specialist papers (e.g. warps/weftless, supadurables, hessian, metallics, glass fibre) etc. 5.2 compare the following advantages and disadvantages for specifying the use of each specialist paper as in 5.1 above: decorative, cost, ease of application, textured, durability 5.3 explain the factors to be considered when planning the following: walls, starting point, finishing point, internal and external angles, doors, features and obstacles, window reveals, joints 5.4 describe how to use the girthing and area methods of calculating the quantity of paper for the specialist papers as in 5.1 above 5.5 explain the following cutting considerations: batches, shading, pattern type, pattern match (set/straight, offset/drop), wastage 5.6 describe how careless pasting can cause the following faults in relation to the specialist paper as in 5.1 above, and their prevention and repair: dry edges, blistering, delaminating, joint gapping, paste staining, polishing, staining, tearing 5.7 explain the implications and importance of each stage in the following manufacturers instructions for specialist papers: surface preparation, material type, shading checks, adhesive type and application method, process of cutting from rolls, directional hanging advice, jointing methods, internal angles, health and safety advice CC 3015K Page 5 of 7 Version 1 ( )
6 5.8 explain the cause(s) of the following defects that occur with specialist papers and how they can be prevented: loose edges, loose fibres, polished areas, delamination, blisters, tears, overlaps, open joints, irregular cutting, inaccurate matching, flattening of emboss, staining/surface marking, corners incorrectly negotiated 5.9 explain the selection of the following methods of trimming for each of the specialist papers as in 5.1 above: knife and straight edge, shears, casing wheel, Ridgeley track and trimmer, knife and self healing board 5.10 explain why trimming techniques for lincrusta differ from techniques used for other specialist papers. 6. know how to store materials 6.1 describe how the physical considerations of racks, wrapping and dust relate to the correct storage of specialist, wide-width and standard papers and the range of adhesives 6.2 describe how the atmospheric considerations of temperature, dampness and direct sunlight relate to the storage of specialist, wide-width and standard papers and the range of adhesives 6.3 state the reasons why a wallhanging may be supplied with a selvedge and the recommendation to store it on end CC 3015K Page 6 of 7 Version 1 ( )
7 Additional information about the unit: Unit purpose and aim(s) The aim of this unit is to provide the learner with the knowledge to: prepare for and hang wallcoverings. Unit expiry date 30 June 2015 Details of the relationship between the unit and relevant national occupational standards or other professional standards or curricula (if appropriate) Test requirements or guidance specified by a sector or regulatory body (if appropriate) Support for the unit from an SSC or other appropriate body (if appropriate) Location of the unit within the subject/sector classification system Name of the organisation submitting the unit Availability for use The knowledge developed by the learner will enable them to: identify materials for suitability prepare materials install wallcoverings. This unit contributes towards the knowledge and understanding required for the following NOS units: VR 343 Hang wallcoverings to complex surfaces VR 337 Hang wide-width vinyls Key skills This unit contributes towards the key skills in the following areas: Communication 2.2 Application of number 2.1, 2.2 Problem solving 2.1, 2.2, 2.3 To be tested in the academic and capability forum Endorsed by ConstructionSkills 05 Construction, Planning and the Built Env Building and Construction Construction Awards Alliance (CAA) Private/owned unit Unit available from 1 August 2008 Unit guided learning hours CC 3015K Page 7 of 7 Version 1 ( )
Level 3 Diploma in Painting and Decorating ( ) January 2014 Version 2.2
QUALIFICATION HANDBOOK Level 3 Diploma in Painting and Decorating (6707-33) January 2014 Version 2.2 Qualification at a glance Subject area City & Guilds number 6707 Construction Age group approved 16-18,
More informationTest criteria The learner can:
Title: Know how to produce specialist decorative finishes 2 Level: 2 Credit value: 3 Learning outcome The learner will: 1. know how to produce quality finish ground coats for painted decorative work 2.
More informationPlease read through the entire document before starting your installation process to better understand what is required.
1 P a g e How s It Hanging? Step-by-Step Guide for Hanging your Wallpaper Walls Republic offers a richer and wider selection of designs, textures and colours than ever before found in the wallpaper world,
More informationPOWER VLIES STRETCH 160
Product Information Manufacturer: Architects Paper A brand of A.S. Création Tapeten AG Südstr. 47 51645 Gummersbach www.architects-paper.com Product Name POWER VLIES STRETCH 160 Quick Start Guide - The
More informationInstalling GEKKOTEX Self Adhesive Wallcovering
Preparations Installing GEKKOTEX Self Adhesive Wallcovering Before applying GEKKOTEX, the underlying surface has to be smooth, solid and dry and should have a uniform, white colour. Remove old wallpaper,
More informationIf you intend to hang lining paper and haven't yet then see our guide to hanging lining paper.
Welcome to our guide to hanging wallpaper, we have split this tutorial into two parts, in this part we will cover roll calculation, wall preparation, order of hanging, marking out and cutting the lengths.
More informationTRADE OF PAINTING & DECORATING
TRADE OF PAINTING & DECORATING PHASE 2 Module 4 Wall Coverings UNIT: 3 Lining and FinishPaper (Ceiling) Table of Contents Introduction... 1 Learning Outcomes... 1 1.0 Prepare surface in preparation for
More informationInstalling Digital Wallcoverings
Installing Digital Wallcoverings Hints & Tips Muraspec Digital (Hints & Tips) 1 BEFORE YOU START Make sure that your image is intact and has not been damaged in transit. For best results, use only Murabond
More informationEntry 3 Skills for Working Life ( )
Entry 3 Skills for Working Life (4807-03) August 2014 Version 1.0 www.cityandguilds.com August 2014 Version 1.0 Unit recording documents for Painting and decorating (Units 401-405) City & Guilds Believe
More informationWallpaper. the Right Way. Wallpaper is trendy again, both with designers, who are speccing it more often, and
Wallpaper the Right Way Installed correctly, this wall covering should last a lifetime and come off easily once it has worn out its welcome By John Clift Wallpaper is trendy again, both with designers,
More informationHOW TO SELECT & USE A ROLLER
HOW TO SELECT & USE A ROLLER www.paintaids.co.nz 1 select the right roller The two most important things for a great paint finish are: a good quality paint, and the right roller sleeve to match the paint
More informationInstallation Instructions Palladium 3D Hi Impact Wall System, Partial Height with Color Matched Caulk Joints
Please read all instructions before installing Palladium 3D Hi Impact Wall System.. Before installation: a. Acclimate rigid sheet, Palladium 3D boards, adhesives and wall substrates to room temperature
More informationWELDING. Section nine 9.1 CORRECT TOOLS
Section nine 9.1 CORRECT TOOLS WELDING Polyflor strongly recommends vinyl sheet and 608mm vinyl tile floorings are welded, this includes the internal and external joints when the vinyl sheet is site cove
More informationLED Thin Frame Fixed Frame Screen User Guide
LED Thin Frame Fixed Frame Screen User Guide INTRODUCTION INTRODUCTION WARNING - Sharp Edges This product may contain sharp edges, please handle with care. Protective gloves are recommended. WARNING -
More informationElara NanoEdge Fixed Frame Screen User Guide
Elara NanoEdge Fixed Frame Screen User Guide INTRODUCTION INTRODUCTION WARNING This product may contain sharp edges, please handle with care. Protective gloves are recommended. A minimum of two people
More informationWallgard 1,3 product
INSTALLATION INSTRUCTIONS Wallgard 1,3 product October 2015 GENERAL Application can be done to smooth, dry, clean, sound walls of concrete, plaster, hardboard, plywood and fibreboard. Board material must
More informationInstallation Instructions
Aspex Digitally Printed Wall Art PL PREMIUM HEAVY DUTY ADHESIVE ASPEX WALL ART DOUBLE SIDED FOAM TAPE Installation of Aspex Digitally Printed Wall Art with Foam Tape and PL Premium Adhesive. Maximum size
More informationRev. 05/16 01 ACRYLIC INSTALLATION GUIDE
Rev. 05/16 01 ACRYLIC INSTALLATION GUIDE Contents 1.0 Inspection 3 2.0 Storage 3 3.0 Handling 3 4.0 Planning & Preparation 3 5.0 Panels 4 6.0 Accessories 4 7.0 Tools & Fixings 4 8.0 Fitting Tips 5 9.0
More informationVERTICAL STILE ABOVE HORIZONTAL TRIM VERTICAL STILE BELOW COVE BASE ADHESIVE. 1" [25.4mm] BASE DETAIL
Please Read All sheet will be provided in stock sizes for field cutting. All trims will be provided in 8-0 stock lengths for field cutting. CEILING TRIM 1" [25.4mm] Acrovyn Interiors vinyl acrylic wall
More informationinstallation manual m y w a l l a r t. c o m
installation manual Step 1 Step 2 Acclimate panels for 48 hours in the environment and temperature they will be installed in. Step 3 Install over relatively smooth flat surfaces, all major holes or major
More informationLayout and Fitting. Chapter 6 Layout and Fitting
6 Layout and Fitting A. RESILIENT SHEET FLOORING Layout and Fitting There are three general methods of fitting resilient sheet flooring into a room: freehand knifing, direct (or straight) scribing and
More informationLoose Lay Luxury Vinyl Plank
Loose Lay Luxury Vinyl Plank FLEX COLLECTION Installation & maintenance * PLEASE READ CAREFULLY * Installation, maintenance & warranty guideline for loose lay luxury vinyl products. Adherence to This guideline
More informationAPPLICATION OF JAC FILMS
1. Important points For reliable results, JAC films are best applied to smooth, dry and clean surfaces (metal, glass, paintwork, plastic etc.). It is essential to ensure that the surface is free from dirt
More informationLayout and Fitting. Chapter 6 Layout and Fitting 6. 1
6 Layout and Fitting Chapter 6 Layout and Fitting 6. 1 Layout and Fitting A. RESILIENT SHEET FLOORING There are three general methods of fitting resilient sheet flooring into a room: freehand knifing,
More informationScotchBlue Painter s Tapes & Scotch Masking Tapes
ScotchBlue Painter s Tapes & Scotch Masking Tapes Choose the right tape for the job. When choosing a painter s tape, consider these factors to determine the right product for your project. Surface and
More informationTHE B6 HEEL BEAD SEAL SECURITY GLAZING SYSTEM
THE B6 GLAZING SYSTEM GLAZING SYSTEMS FOR JUNE 2009 THE B6 HEEL BEAD SEAL SECURITY GLAZING SYSTEM Page 1 DESCRIPTION The B6 Heel Bead Seal Security Glazing System is suitable for installing all types of
More informationINSTALLATION INSTRUCTIONS
DIRECT MOUNT INSTALLATION Ceilume Signature Ceiling Tiles can be installed directly to ceilings or walls using staples, finishing nails, adhesive or certain combinations of these. The installation method
More informationInstalling 3M DI-NOC Architectural Finishes on Doors
Installation Guide Revision C, September 2017 Introduction The purpose of this installation guide is to establish a 3M-recommended procedure for installing 3M DI-NOC Architectural Finishes (the Product
More informationFABRICATING ARBOR. koroseal.com/arbor Arbor Veneered Components
Arbor Veneered Components Arbor natural wood veneer can be applied to any substrate and is flexible enough to be formed around the tightest radii providing the ultimate wood finish. From vertical wall
More informationRoll Out Vinyl Installation Guide
Sub-floor Requirements The contractor performing the installation of the performance vinyl flooring must ensure the proper quality of the sub-floor. The sub-floor must be clean, smooth, permanently dry,
More informationHow to install Magic Metal
How to install Magic Metal First you need the following tools: Glue: Indoor Out Door Carpet Glue 3 gallon pail. A few rollers (the thinner nap the better) a pan with liner. A good utility knife with extra
More informationmethod of build Komfire-75 partitioning system 75mm Steel Stud & Plasterboard Partitioning System with Square Aluminium Cover Trims KOMFORT
821 811 342 821 835 853 863 840 12.5mm Plasterboard 837 75mm Steel Stud & Plasterboard Partitioning System with Square Aluminium Cover Trims Note: For clarity the cavity infill has not been shown 854 342
More informationInstallation Instructions Stainless Steel Wall Panels
Please read all instructions before installing wall panels. Always plan before you place! 1. Before installation: a. Acclimate Stain Steel Panels, Trim, adhesives and wall substrates to room temperature
More informationplasterdesign trade range cornice
plasterdesign trade range cornice Plaster Design s Trade Range Cornice has been developed with ease of installation in mind, from the easy to transport 2.4 metre lengths, to the purpose made mitre guides
More informationMaking Double Fold Straight of Grain Quilt Binding
Making Double Fold Straight of Grain Quilt Binding Tools and Supplies: Cutting mat, rotary cutter with a sharp blade, walking foot, 6x24 ruler, seam allowance guide, pencil, quilting gloves Be sure your
More informationTAPES & ADHESIVES 2014
TAPES & ADHESIVES 2014 1 Stanley has been the professional tradesman s champion since 1843. Insight, invention and innovation have always been at the heart of everything we do. From creating classics like
More informationPressed Flowers. Materials: Directions: Pressed flowers Heavyweight paper Picture frame Craft glue Small paint brush Tweezers
Pressed Flowers Pressed flowers Heavyweight paper Picture frame Craft glue Small paint brush Tweezers 1. Pressed flowers can be purchased online or you can easily press them yourself. Begin by folding
More informationInstallation Instructions
www.marlite.com Effective Date 03/01/2018 ARTIZAN FRP, SYMMETRIX FRP, ENVUE FRP, STANDARD FRP Installation Instructions Statements expressed in this technical bulletin are recommendations for the application
More informationRepairs. Chapter 10 Repairs 10. 1
10 Repairs Chapter 10 Repairs 10. 1 Repairs As an installer, you will probably be called upon to repair damage to a resilient floor. Here are some of the most common problems and the recommended repairs
More informationQCF Unit and Assessment Specification
QCF Unit and Assessment Specification Unit title Ofqual Unit code Forming and Assembling Pipework Systems T/600/5855 SQA Unit code FT2X 60 SSC Ref Unit 82 History of changes Publication date: March 2012
More informationUNIT TITLE: KNOWLEDGE OF APPLYING FILLERS AND FOUNDATION MATERIALS
UNIT REF: PO0205K UNIT TITLE: KNOWLEDGE OF APPLYING FILLERS AND FOUNDATION MATERIALS Level: 2 Route: Knowledge Credit Value: 6 GLH: 45 Mapping: This unit is mapped to the IMI NOS PO2 and PO5 Rationale:
More informationINSTALLATION GUIDE Twinback
INSTALLATION GUIDE Twinback Fundamentals Subfloor preparation 1. Always check before fitting the carpet supplied does correspond to the requested specifications (colour, width...) 2. Provide for a detailed
More informationFlash Coving. Chapter 8 Flash Coving 8. 1
8 Flash Coving Chapter 8 Flash Coving 8. 1 Flash Coving A. TOOLS In addition to the normal tools (knives, dividers, recess scribers, straightedges, rollers, trowels, etc.), other tools are also needed
More informationInsulating Aluminium Windows
Insulating Aluminium Windows The Problem Aluminium windows are great for low maintenance, but they re absolutely terrible for letting heat in and out, with the frames being very thermally conductive as
More informationProducing platework components and assemblies
Unit 823 Producing platework components and assemblies UAN: R/600/5880 Level: Level 2 Credit value: 14 GLH: 64 Relationship to NOS: Endorsement by a sector or regulatory body: Aim: This unit has been derived
More informationWindowSeal. Installation Instructions. Prep & General Conditions
Prep & General Conditions All surfaces must be clean, dust free, smooth and dry. Do not apply over sealants or uncured caulks containing solvents or plasticizers. This includes most silicones and polyurethane
More informationsuspended ceiling tile INSTALLATION INSTRUCTIONS
suspended ceiling tile easy as 1-2-3 Remove existing ceiling tiles (if applicable) and pop any Ceilume Ceiling Tile style into place in the drop ceiling. In perimeter and border situations where the T-bar
More informationMUDGUN Drywall Finishing System
Watch the demonstration video online at hydetools.com MUDGUN Drywall Finishing System Quick Start Guide Hyde Tools, Inc. / A Hyde Group Company / 800-872-4933 / custrelations@hydetools.com / hydetools.com
More informationTape Measure Metal Clippers Screw Bit Set With Extensions
IMPORTANT: Read through instructions thoroughly before beginning to replace any damaged material. Minor damage can be fixed with a fiberglass repair kit and color matched paint. Tools Required Tape Measure
More informationWall Installations. Chapter 16 Wall Installations 16. 1
16 Wall Installations Chapter 16 Wall Installations 16. 1 Alterna Premium Groutable Tile Create decorative backsplashes, accent walls, or other focal points with any size Alterna 16" x 16", 8" x 16", 8"
More informationCollapsible Book Cradle These instruction copyright Tara O Brien, 2014
Collapsible Book Cradle These instruction copyright Tara O Brien, 2014 Materials: book board covering material - we ve used tyvek and buckram pva 3BT (Board Thickness) jig the height of the cradle book
More informationsuspended ceiling tile INSTALLATION INSTRUCTIONS
suspended ceiling tile easy as 1-2-3 Remove existing ceiling tiles (if applicable) and pop any Ceilume Ceiling Tile style into place in the drop ceiling. In perimeter and border situations where the T-bar
More informationSEMPEO SQA Unit Code FP42 04 Producing Composite Mouldings using Wet Lay-up Techniques
Producing Composite Mouldings using Wet Lay-up Techniques Overview This standard covers a broad range of basic competences that you need to produce composite mouldings using wet-lay up laminating techniques.
More information3 Simple Steps to a Beautiful Tile Surface. Tec Skill Set How-To Project Guide Floor Tile 1. PREPARE THE SURFACE 2. SET THE TILE. Reverso en español
Reverso en español Tec Skill Set How-To Project Guide Floor Tile 3 Simple Steps to a Beautiful Tile Surface 1. PREPARE THE SURFACE 2. SET THE TILE 3. Grout AND CAULK H.B. Fuller Construction Products Inc.
More informationThere are three primary units to this box: two three-sided trays (one made to fit over the other) and one case that wraps around the trays.
Instructions for Basic Drop-Spine Box by Sandra Liddell Reese There are three primary units to this box: two three-sided trays (one made to fit over the other) and one case that wraps around the trays.
More informationDie Cutting an Introduction
Die-cutting Exam expectations Die-cutting is a regular topic in the examination paper. Although the question only attracts a small numbers of marks it is an area which few candidates score. Die Cutting
More informationRegulated Qualifications unit and Assessment Specification
Regulated Qualifications unit and Assessment Specification Unit title Produce Enamelled Surfaces for Precious Metal Objects Using Advanced Techniques Regulator unit D/503/1453 code SQA unit code H2TC 53
More informationYOUR PROJECT : CLIENT REQUEST : AMBIENCE : SCANDINAVIAN DECORATOR REPLY :
YOUR PROJECT : CLIENT REQUEST : Hello, We need to re-think the interior of our Sitting Room to create a whole new atmosphere: modern, warm and welcoming. We love indirect lighting and would consider carpet
More informationFinishing Plasterboard
Finishing Plasterboard 4.1 Levels of Finish 346 Australian Standard Requirements 346 Level 3 Finish 347 Level 4 Finish 347 Level 5 Finish 347 4.2 Back-Blocking 348 Back-Blocking Requirements 349 Back-Blocking
More informationChapter 5. Installation procedures. Installation procedures 24. Topics. Notes. 5.5 Flash coving General recommendations 25
Installation procedures 24 Chapter 5 Installation procedures Topics 5.1 General recommendations 25 5.2 Preparation 25 5.3 Seaming 25 5.5 Flash coving 26 5.6 Forming corners 26 5.7 Seam grooving 28 5.4
More informationINSTALLATION INSTRUCTIONS
VESDURA VINYL PLANKS 3MM PVC GLUE DOWN - OAK COLLECTION Safety First CAUTION Asbestos Warning in existing floor. Do not sand, dry scrape, bead blast or mechanically pulverize existing resilient flooring.
More informationINSTALLATION GUIDE. TRANZFORM Sound TRANZFORM Space
INSTALLATION GUIDE TRANZFORM Sound TRANZFORM Space Cornell Iron Works, Inc. 100 Elmwood Ave. Crestwood Industrial Park Mountain Top, PA 18707 Phone: 800.233.8366 or 570.474.6773 Fax: 800.526.0841 INSTALLATION
More informationProcessing Guidelines ORAFOL Films for Aircraft Applications
Page 1 of 11 Description This document describes the application and removal procedures for ORAFOL films for aircraft applications, in particular ORAJET 3967AC and ORACAL 970AC ORAFOL offers a wide range
More informationButyl Flash. Installation Instructions. Prep & General Conditions
Prep & General Conditions All surfaces must be clean, dust free, smooth and dry. Do not apply over sealants or uncured caulks containing plasticizers or solvents. This includes most silicones and polyurethane
More informationlay it on me sketch layouts
scrapbook s lay it on me sketch layouts featured products/ Chatterbox Happy Garden papers Scenic Route Loveland papers Crate Paper Sweet Branch papers BasicGrey painted brads Crate Paper brads and rub-ons
More informationCove and Cornice Decorative room features
GYPROC Cove and Cornice Decorative room features 1 2 3 4 1 2 3 4 Gyproc Cove with one Cornice Strip on ceiling and wall. Gyproc Cove with twocornice Strips on ceiling and wall. Gyproc Cove with one Cornice
More informationRhinoArt Decor Polystyrene Mouldings
C Art 12/8/08 2:31 PM Page 2 RhinoArt Decor Polystyrene Mouldings CORNICES Made of high density POLYSTYRENE for a perfectly smooth surface. RhinoArt Decor adhesive covers 8-10 linear metres per kg. 62
More information3555 Scarlet Oak Blvd. St. Louis, MO FAX:
I. INSTALLATION TOOLS A. Utility Knife B. Scissors C. Sand Paper and/or File D. Fabric Tucking Tools (available from Fabric Wall) 1. Rocker Tool 2. Flat Blade with round edge 3. Bent Blade with round edge
More informationStep by Step Wing Bagging
Step by Step Wing Bagging By Evan Shaw 073 589 9339 evanevshaw@gmail.com Preparing the Leading Edge 1. Cut cores. (Cutting of wing cores is covered in another article elsewhere) 2. Sand the LE to a nice
More informationRobert Bosch GmbH. Lounge light fixture
Lounge light fixture Nice and relaxing Lounge light fixture Light has an important effect on mood. This cool light fixture is perfect for creating a cosy lounge atmosphere. 1 Introduction This cool light
More informationGYPROC. Cove and Cornice Decorative room features....made easy
GYPROC Cove and Cornice Decorative room features...made easy 1 2 3 4 1 2 3 4 Gyproc Cove with one Cornice Strip on ceiling and wall. Gyproc Cove with two Cornice Strips on ceiling and wall. Gyproc Cornice
More informationB A T H R O O M G L A S S
mistley B A T H R O O M G L A S S vaug16 Page 2 Thank you for purchasing this Trinity shower screen. Please study these instructions carefully before assembly and installation and check all supplied parts
More informationNote. One - point Advice. To begin. Basic working method and markings. Fold along these lines. The printed surface should be
Note To begin Basic working method and markings Tools and materials needed -Ruler - scissors - blade cutter or "Exacto-knife" - awl or other pointed tool (for making a folding crease) - felt pen - pin
More informationThree layer Felt Roofing using cold applied adhesive
Three layer Felt Roofing using cold applied adhesive Useful tips - Skill level - Safety - Felt Roofing Materials - Tools and Equipment Laying a felt roof is within the capabilities of most diy people providing
More informationFive Star Panel Installation Instructions
Five Star Panel Installation Instructions How to Store Five Star Panels You will need to store FIVE STAR PANELS in dry place to prevent staining, deterioration and possibly void all warranties. Stand the
More informationInstallation Instructions. Conventional Wainscot Wall Padding Panels MODEL # RWC25321 RWC26321 RWC253X1 RWC263X1 RWC25321 RWC25XXX RWC26XXX
Conventional Wainscot Wall Padding Panels MODEL # RWC25321 RWC26321 RWC253X1 RWC263X1 RWC25321 RWC25XXX RWC26XXX Installation Instructions FOR CONVENTIONAL PANELS 07/05 SPT050026 CUSTOMIZED PADS We offer
More informationSyracuse University Library Department of Preservation and Conservation Manuals. Drop Spine Box
Drop Spine Box The "drop spine" box is a more rigid enclosure than the phase box. It is designed to protect vellum and significant bindings from wear, light and rapid environmental changes. All measurements
More informationShapes Siding. Perfection Shingles. Chalk Line
Snap a Chalk Line Shapes Siding Perfection Shingles Chalk Line To establish a straight reference line to guide the positioning of the starter strip and the first course of siding, snap a chalk line. starter
More informationInstallation Guide. Pionite Decorative Surfaces One Pionite Road, Auburn, Maine PIONITE ( )
Installation Guide A Subsidiary of Panolam Surface Systems SMPBRO00-012 6/14 Pionite decorative laminates are designed for finished interior surfaces which require high impact, wear and stain resistance
More informationOctober 2007 Greetings to Go Great Outdoors
October 2007 Greetings to Go Great Outdoors Materials: Great Outdoors Greetings To Go Wood Mounted Grass and Tree Line Stamp Set Wood Mounted Enjoy Stamp Wood Mounted Got Adventure? Stamp Club Stamp Wood
More informationMATERIALS FORMAT CODE NOTES
FLOORS IN BUILDINGS [421] LAYING FLOOR COVERINGS WITH ELECTRICAL PROPERTIES, Before laying the flooring, it is a good idea to inspect it and to identify any problems with the appearance. If there are visible
More informationTYPAR WEATHER PROTECTION SYSTEM TABLE OF CONTENTS. SPECIAL INSTALLATION CONSIDERATIONS Stucco** Brick** Stone Veneer** Wood Siding**
TYPAR WEATHER PROTECTION SYSTEM INSTALLATION GUIDE TABLE OF CONTENTS Table of Contents...01 Special Installation Considerations...01 Code Requirements...02 Approvals and Reports...02 Recommended Materials...02
More informationmaintenance-free free from painting easy to install Fixing Guide Cedral Lap
maintenance-free free from painting easy to install Fixing Guide Cedral Lap www.cedralsidings.com CONTENT Step by step guide to installing your Cedral façade Required materials and tools 1. Prepare wall(s)
More informationRadon 07 Installation Instructions & Parts List
Radon 07 Installation Instructions & Parts List Illustration Radon 07, H1 Handle Right Hand: Open Out 14/06/2016 Revision 1.1 Page 1 of 21 IMPORTANT This shower screen / enclosure must be installed by
More informationWORK METHODS FOR THE RENOVAID WOOD RENOVATION SYSTEM
WORK METHODS FOR THE RENOVAID WOOD RENOVATION SYSTEM Durable maintenance of exteri joinery of all sts with the RENOVAID system can be subdivided into the following parts: V.(Vokomen) = Prevention of Wood
More informationWETFLOR INSTALLATION GUIDE
WETFLOR INSTALLATION GUIDE Pre-installation Prior to installation, Multipanel recommend that you visit our video section on www.multipanel.co.uk, where you will find a complete WetFlor animation. A sharp
More informationWayside Cottage Assembly Instructions By Laser Dollhouse Designs
Wayside Cottage Assembly Instructions By Laser Dollhouse Designs Parts for assembly Base Floor marked 1A thru 1L 13 post and 11 fences With one gate Walls 1A thru 1L and Alcove roof panels 3 lg and 1 sm
More informationTechnical Data Sheet Standard Sundeala FRB
Technical Data Sheet Standard Sundeala FRB Components and Materials Core panel substrate Surface Type Panel Gauge Frame Types Wood fibre insulation board Sundeala FRB - 100% recycled waste paper 9.3mm
More informationMake every component count.
Make every component count. Technical Bulletin Installation Instructions ABOUT THE MATERIAL The frame and material have been thoroughly tested for strength, durability and low maintenance, offering a never
More informationMay 2008 Greetings to Go Body & Soul
May 2008 Greetings to Go Body & Soul Materials: Body & Soul Greetings to Go Body & Soul CS Wood Mounted Stamp Set Body & Soul Unmounted Borders & Backgrounds and Fonts Body & Soul I Love Your Spirit Stamp
More informationINSTALLATION LAMTON INSTALLATION INSTRUCTIONS. Lamton Laminate Flooring with Underlay Attached Glueless Installation. Tools and Accessories
Lamton quality laminate flooring is manufactured to exacting standards for long life and lasting beauty. Following these simple procedures for installation and it will ensure many years of pride and satisfaction.
More informationCladding. Quick Installation Guide. HardiePlank Cladding with ColorPlus Technology. For façades that last longer. Simple. Reliable. Durable.
Cladding Quick Installation Guide HardiePlank Cladding with ColorPlus Technology. For façades that last longer. Simple. Reliable. Durable. Installation instructions This document is a step by step guide
More informationGrafiWrap Vehicle Wrapping
GrafiWrap Vehicle Wrapping What is GrafiWrap? GrafiWrap is the registered trade name for a combination of materials used in the wrapping of a vehicle. The GrafiWrap system is a sandwich made up of a cast
More informationInstallation guide. MS 14 Metal Siding
Installation guide MS 14 Metal Siding 2 CAUTION: The material may have sharp edges. We recommend using protection equipment, including safety boots, helmet, goggles and gloves. WARRANTY FOR THE WARRANTY
More informationAssembly Instructions
Assembly Instructions Thank you for downloading this special New Year s paper craft model. By following these instructions while referring to the names and numbers shown on the parts sheet, you can complete
More information1 SELECT suitable material. It takes time to cut a cab. Don t waste it on rubbish.
7 July 09 CUTTING A STANDARD CABOCHON A Standard Cabochon or CAB is an oval or round stone with one flat side and the other side having an even curved dome shape. Top of Cab It will have a narrow bevel
More informationapplication manual >> ductwork
application manual >> DUCTWORK application manual >> ductwork APPLICATION MANUAL DUCTWORK application manual >> ductwork 1 THERMAL INSULATION OF DUCTWORK 3» Measure surface dimension for insulating rectangular
More informationDubnium 11 Installation Instructions & Parts List
Dubnium 11 Installation Instructions & Parts List Illustration Dubnium, H1 Handle Right Hand: Open Out Page 1 of 25 IMPORTANT This shower screen / enclosure must be installed by suitably qualified individuals.
More informationTrebuchet Construction Instructions
Trebuchet Construction Instructions Follow these instructions step by step to create your trebuchet. Materials: Trebuchet Template (6 pages cardstock) Trebuchet Template (1 page paper) One unsharpened
More informationInstallation Instructions Palladium Wall Panels - Demountable Factory Finished Edges and Field Cut Edges
Please read all instructions before installing Palladium Wall Panel System. 1. Before installation: a. Acclimate Palladium Panels, reveals, adhesives and wall substrates to room temperature 24 hours before
More information