2

3 APPENDIX F BASELINE NOISE REPORT F BASELINE NOISE REPORT Contents Summary A Baseline Noise Report was prepared for Damhead Creek 2. This is presented in this Appendix in: F.1 Baseline Noise Report Damhead Creek 2 ES Volume 2 June 2009

4

5 APPENDIX F BASELINE NOISE REPORT F.1 Baseline Noise Report Damhead Creek 2 ES Volume 2 June 2009

6

7 SCOTTISH POWER (DCL) LTD DAMHEAD CREEK 2 BASELINE NOISE REPORT December 2007 Prepared by Parsons Brinckerhoff Ltd Queen Victoria House Redland Hill Bristol BS6 6US Prepared for ScottishPower (DCL) Ltd Damhead Creek Power Station Kingsnorth, Hoo St Werburgh, Rochester, Kent ME3 9TX

8

9 Report Title : Damhead Creek 2 Baseline Noise Report Job No : 62725A

10

11 CONTENTS Page 1 INTRODUCTION Background Site Description Legislative Guidance 2 2 METHODOLOGY General Noise Sensitive Receptors Background Monitoring 3 3 SURVEYS UNDERTAKEN Hour Control Spot Measurements 4 4 BASELINE RESULTS Hour Control Spot Measurements 5 REFERENCES: 6 APPENDIX 1 7 APPENDIX 2 8 APPENDIX 3 9 APPENDIX 4 10 APPENDIX 5 11

12

13 Damhead Creek 2 Baseline Noise Report EXECUTIVE SUMMARY Parsons Brinckerhoff Ltd (PB) has been commissioned by Scottish Power Ltd to undertake a survey to quantify the existing background noise levels in the area of the proposed Damhead Creek 2 Power Station. Measurements to quantify noise levels have been undertaken on the northern boundary of the proposed site and at nine of the nearest noise sensitive receptors. Noise from both the existing Damhead Creek CCGT Power Station and the existing Kingsnorth Power Station was audible at all of the noise sensitive receptor locations with the exception of the measurements taken at Sturdee Cottages. Noise from the auxiliary plant supplying Kingsnorth power station with coal was audible at most NSR locations. All Noise Sensitive Receptor locations were affected by aircraft noise. Damhead Creek 2 Prepared by Parsons Brinckerhoff Ltd December 2007 Page 1 for Scottish Power (DCL) Ltd

14

15 Damhead Creek 2 Baseline Noise Report 1 INTRODUCTION 1.1 Background ScottishPower (DCL) Limited (ScottishPower) proposes to construct and operate a Combined Cycle Gas Turbine (CCGT) Power Station (Damhead Creek 2). Damhead Creek 2 will constitute Phase 2 of the Damhead Creek Power Generation Development, Phase 1 of which is already in existence (the existing Damhead Creek CCGT Power Station) on the Hoo Peninsula, Kent Parsons Brinckerhoff Ltd. (PB) has been commissioned by ScottishPower to undertake a baseline noise survey of the area to quantify the existing noise levels at the nearest noise sensitive receptors. This report details the approach and findings. 1.2 Site Description The Damhead Creek 2 site is located on land immediately adjacent to the existing Damhead Creek CCGT Power Station that was commissioned in It lies approximately 3 km south-east of the A228, which connects the A2/M2 with the Isle of Grain, 9 km north-east of the city of Rochester and lies on the southern edge of the tongue of land between the Thames and Medway estuaries known as the Hoo Peninsula. The village of Hoo St Werburgh, the nearest settlement, lies 3 km to the west between the coast and A To the north and west of the Damhead Creek 2 site lies the Kingsnorth Business Park and to the south is the existing Kingsnorth Power Station. Land to the north east of the Damhead Creek 2 site is filled with pulverised fuel ash and is designated as a future development area under the Medway Local Plan. Much of this land is now encompassed by two outline planning applications to Medway Council for a business distribution and storage facility proposed by the Goodman Group that will include up to eight storage warehouses and associated infrastructure The Damhead Creek 2 site adjoins an extensive area of ecological mitigation land which has been established and maintained as part of the Damhead Creek Power Generation Development. 1.3 Legislative Guidance The guidance laid out in BS 7445:1991 Description and Measurement of Environmental Noise Parts 1 to 3 BSI, has been adhered to during the surveys undertaken. BS 7445 defines and prescribes best practice during the recording and reporting of environmental noise. It is inherently applied in all instances when making environmental noise measurements. 2 METHODOLOGY 2.1 General A background noise survey has been undertaken to quantify the existing noise levels at and around the existing Damhead Creek CCGT Power Station. The survey itself included the following measurement techniques: Damhead Creek 2 Prepared by Parsons Brinckerhoff Ltd December 2007 Page 2 for Scottish Power (DCL) Ltd

16 Damhead Creek 2 Baseline Noise Report A sound level meter was left unattended on the Damhead Creek 2 site for a period of 72-hours to establish the variation in noise levels over this period Spot measurements were taken at nine Noise Sensitive Receptors near to Damhead Creek A glossary of acoustics terminology is provided in Appendix Noise Sensitive Receptors The Noise Sensitive Receptors (NSR s) that have been identified are as follows: Tudor Farm, Polly Adams Cottage Riverview Cottage Tunbridge Hill Whitehall Farm Beluncle Farm Sturdee Cottages Eschol Lane / Jacobs Lane Nature Study Area Market Garden / Dog Kennels 2.3 Background Monitoring All noise monitoring was conducted in accordance with the guidance set out in BS 7445: 1991*. Measurements were made using Class 1 Sound Level Meters, which were calibrated and checked before and after each measurement period, with no change in level noted. The annual calibration certificates for the meters used are provided in Appendix C, which also shows the serial numbers of all the equipment used. Microphones were placed m above the ground, and at least 1.5m from any reflective surface. Note that the A-weighted frequency network and Fast (F) time weighting was used for all measurements Measurements took place over a typical weekday period between the 27 th and 30 th of November Weather conditions were conducive to successful monitoring, with zero precipitation and wind speeds less than 5ms -1. The ambient temperature was between 5 C and 10 C during the whole survey. A wind shield was used to minimise the effects of wind noise The site engineer was Philip Jordan (AMIOA) of PB. Damhead Creek 2 Prepared by Parsons Brinckerhoff Ltd December 2007 Page 3 for Scottish Power (DCL) Ltd

17 Damhead Creek 2 Baseline Noise Report 3 SURVEYS UNDERTAKEN Hour Control A sound level meter (Control) was left unattended for a period of 72-hours. The sound level meter was left in a weatherproof case with the external microphone at a height of 1.5m above ground level. The meter was set to log the following overall statistical parameters every 5 minutes: L A90, L Amax, L Aeq The Control was located at the north perimeter of the Damhead Creek 2 site next to the fence. The control location is shown in Figure 1, Appendix Spot Measurements Four measurements were taken during daytime and night-time periods with two measurements being taken during the evening period. All measurements were 10- minutes long and were synchronised with the control measurements. Measurements were taken in the following periods. Daytime Evening Night-time The following statistical parameters were recorded in third octave bands, L A10, L A90, L Amax, L Amin, L Aeq. Measurements were taken at all 10 NSR with the exception of Whitehall Farm The measurement locations are illustrated in Figure 1, Appendix 2. 4 BASELINE RESULTS Hour Control The variation in noise levels of the site have been quantified over a 72-hour period, the full results of the control measurements are presented in the 72-hour Control Chart, Appendix D. A summary of the 24-hour measurements is presented in Table 1. L Aeq L A90 Period Table 1: Summary of Control Data Noise levels at the control measurement location were dominated by noise from the existing Damhead Creek CCGT Power Station. Damhead Creek 2 Prepared by Parsons Brinckerhoff Ltd December 2007 Page 4 for Scottish Power (DCL) Ltd

18 Damhead Creek 2 Baseline Noise Report Noise levels were also affected by plant noise from the coal fields to the south of the proposed site The lowest L Aeq and L A90 measured were during the night-time period on 28 th November The existing Damhead Creek CCGT Power Station was operating at the minimal load at that moment in time. 4.2 Spot Measurements The full set of results for the spot measurements taken are shown in the Noise Monitoring Forms in Appendix 5. A summary of the measurements taken at each spot locations are presented in Table 2. Lowest Measurement Day Evening Night Location L Aeq L A90 L Aeq L A90 L Aeq L A Table 2: Summary of Lowest Spot Measurements Noise from both power stations was audible at all measurement locations with the exception of measurement location 7, Sturdee Cottages Auxiliary plant used to supply the existing Kingsnorth power station with coal was audible at most NSR locations Noise levels at measurement locations 6 and 7 were dominated by noise from road traffic travelling along Stoke Road during most daytime and evening measurements Noise levels at measurement location 2 were affected by noise from a nearby substation All measurement locations were affected by aircraft noise throughout the survey. Damhead Creek 2 Prepared by Parsons Brinckerhoff Ltd December 2007 Page 5 for Scottish Power (DCL) Ltd

19 Damhead Creek 2 Baseline Noise Report REFERENCES: * BS 7445: 1991 Description and Measurement of Environmental Noise" Parts 1 to 3, BSI Damhead Creek 2 Prepared by Parsons Brinckerhoff Ltd December 2007 Page 6 for Scottish Power (DCL) Ltd

20 APPENDIX 1 Glossary of Acoustics Terminology

21 APPENDIX A: Decibel (db) Sound Pressure Level (SPL) GLOSSARY OF ACOUSTICS TERMINOLOGY The decibel scale is used in relation to sound because it is a logarithmic rather than a linear scale. The decibel scale compares the level of a sound relative to another. The human ear can detect a wide range of sound pressures, typically between 2x10-5 and 200 Pa, so the logarithmic scale is used to quantify these levels using a more manageable range of values. The Sound Pressure Level has units of decibels, and compares the level of a sound to the smallest sound pressure generally perceptible by the human ear, or the reference pressure. It is defined as follows: SPL (db) = 20 Log 10 (P/P ref ) where P = Sound Pressure (in Pa) P ref = Reference Pressure 2x10-5 Pa An SPL of 0dB suggests the Sound Pressure is equal to the reference pressure. This is known as the threshold of hearing. An SPL of 140dB represents the threshold of pain. Loudness Sound Power Level (SWL) The loudness of a sound is subjective, and differs from person to person. The human ear perceives loudness in a logarithmic fashion, hence the suitability of the decibel scale. Generally, a perceived doubling or halving of loudness will correspond to an increase or decrease in SPL of 10dB. Note that a doubling of sound energy corresponds to an increase in SPL of only 3dB. The Sound Power Level defines the rate at which sound energy is emitted by a source, and is also expressed in db. It is defined as follows: SWL (db) = 10 Log 10 (W/W ref ) where W = Sound Power (in Watts) W ref = Reference Power 1 picowatt A-Weighting Equivalent Continuous Level (L eq,t ) The human ear can detect a wide range of frequencies, from 20Hz to 20kHz, but it is more sensitive to some frequencies than others. Generally, the ear is most sensitive to frequencies in the range 1 to 4 khz. The A-weighting is a filter that can be applied to measured results at varying frequencies, to mimic the frequency response of the human ear, and therefore better represent the likely perceived loudness of the sound. SPL readings with the A-weighting applied are represented in db(a). The Equivalent Continuous Level represents a theoretical continuous sound, over a stated time period, T, which contains the same amount of energy as a number of sound events occurring within that time, or a source that fluctuates in level. For example, a noise source with an SPL of 80 db(a) operating for two hours during an eight-hour working day, has an equivalent A-weighted continuous level over eight hours of 74 db, or L Aeq,8hrs = 74 db. The time period over which the L eq is calculated should always be stated. Maximum Sound Level (L max ) Minimum Sound Level (L min ) L 90 or L A90 and other percentile measures The maximum sound level, L max (or L Amax if A-weighted) is the highest SPL that occurs during a given event or time period. Similarly, the minimum sound level, L min (or L Amin if A-weighted) is the lowest SPL that occurs during a given event or time period. This represents the SPL which is exceeded 90% of the time, expressed in db or db(a). L A90 is used to quantify background noise levels (see below). Other percentiles exist and are used for various types of noise assessment. These include L 01, L 10, L 50, L 99.

22 Noise Ambient Noise Specific Noise Initial Noise Residual Noise Background Noise Noise Sensitive Receptors (NSR's) Octave Octave/Third Octave Bands Point Source Line Source Area source A noise can be described as an unwanted sound. Noise can cause nuisance. The totally encompassing sound in a given situation, at a given time, including noises from any source in any direction. A component of the ambient noise, associated with the specific source under investigation. Ambient prevailing noise in an area before any changes to the existing noise climate This is the ambient noise minus the specific noise, i.e. the remaining noise when the specific noise source is removed. This is defined as the L A90 of the residual noise. Any identified receptor likely to be affected by noise. These are generally human receptors, which may include residential dwellings, work places, schools, hospitals, and recreational spaces. In reference to the frequency of a sound, an octave describes the difference between a given frequency and that which is double that frequency, e.g. 125Hz to 500Hz, or 4kHz to 8kHz. A sound made up of more than one frequency can be described using a frequency spectrum, which shows the relative magnitude of the different frequencies within it. The possible range of frequencies is continuous, but can be split up into discrete bands, often an octave or third-octave in width. Each octave band is referred to by its centre frequency, generally 63Hz, 125Hz, 250Hz, 500Hz, 1kHz etc. A theoretical source of sound, with zero size and mass, often used as an approximation to model small sources. Sound from a point source radiates spherically in all directions. A theoretical source of sound, with length only, often used to model long, thin sound sources, such as roads. A real or theoretical source that radiates as a plane. Sound from an area source radiates plane waves rather than spherical waves, particularly if the area source is large relative to the wavelength of the sound produced.

23 APPENDIX 2 Measurements Location Map

24

25 Noise Monitoring Locations, Damhead Creek 2 Power Station Location of proposed CCGT plant Residential Monitoring Location Long term Monitoring Location A

26

27 APPENDIX 3 Calibration Certificates

28

29 CERTIFICATE OF CALI BRATION ISSUED BY AV CALIBRATION LTD Date of issue 31 January 2007 Certificate No AV Calibration Ltd 13c Old Bridge Way Shefford Bedfordshire SG17 5HQ England Telephone (01462) Fax (01462) Page 1 of 2 pages CLIENT F.A.O. Acoustics Noise & Vibration Ltd Beaufort Court 17 Roebuck Way Milton Keynes MK5 8HL John Gregory REF. Order No Job No UKAS07/01026/02 DATE OF RECEIPT 24 January 2007 PROCEDURE AV Calibration Engineer's Handbook, Section 2 IDENTIFICATION Sound calibrator Rion type NC-74 serial number , with one-inch housing and adapter type NC for half-inch microphone. CALIBRATED ON 30 January 2007 PREVIOUS Calibrated on 19 December 2005 CALIBRATION Certificate No issued by UKAS laboratory No 0653 This certificate is issued in accordance with the laboratory accreditation requirements of the United Kingdom Accreditation Service. It provides traceability of measurement to recognised national standards, and to units of measurement realised at the National Physical Laboratory or other recognised national standards laboratories. This certificate mav not be reoroduced other than in full. exceot with the orior written aooroval of the issuina laboratorv.

30 CERTIFICATE OF CALIBRATION ISSUED BY AV CALIBRATION LTD Date of issue 13 February 2007 Certificate No b AV Calibration Ltd 13c Old Bridge Way Shefford Bedfordshire SG17 5HQ England Telephone (01462) Fax (01462) lab@avcalib.co.uk Page 1 of 8 pages Approved Signato G.Parry CLIENT F.A.O. REF. Acoustics Noise & Vibration Ltd Beaufort Court 17 Roebuck Way Milton Keynes Buckinghamshire MK5 8HL John Gregory Order No Job No UKAS07/02040/01 DATE OF RECEIPT 6 February 2007 PROCEDURE IDENTIFICATION CALIBRATED ON 13 February 2007 AV Calibration Engineer's Handbook, Section 3: verification of sound level meters to BS 7580:Part 1 : 1997 Sound level meter Rion type NA-27 [serial no ] connected via an extension lead type EC-04 and preamplifier type NH-20 [serial no to a half-inch microphone type UC-53A [serial no fitted with a foam windshield type WS-02. Associated calibrator Rion type NC-74 [serial no with one-inch housing and adapter type NC for half-inch microphone. PREVIOUS Calibrated on 21 January 2005 CALIBRATION Certificate No issued by UKAS laboratory No 0653 This certificate is issued in accordance with the laboratory accreditation requirements of the United Kingdom Accreditation Service. It provides traceability of measurement to recognised national standards, and to units of measurement realised at the National Physical Laboratory or other recognised national standards laboratories. This certificate may not be reproduced other than in full, except with the prior written approval of the issuing laboratory.

31 u Measurement Systems CERTIFICATE OF CALIBRATION Certificate Number CAL Date of Issue 25 April 2006 Customer Parsons Brinckerhoff Ltd Manufacturer TY pe SLM Calibrator Rion NC-74 Serial Number This equipment has been calibrated and tested for compliance with Manufacturer's Performance Specifications. Notes Conditions Atmospheric Pressure kpa Temperature 21.7 "C Relative Humidity 41.3 % ANV Measurement Systems' Calibration Laboratory electroacoustic test equipment is fully traceable to national standards. Additional electronic and ancillary equipment used in the procedures has been calibrated to a certified degree of accuracy that ensures that any additional uncertainties are minimal. Tests were carried out in controlled environmental conditions to the extent that extraneous environmental factors will have had no substantial effect on the measured parameters in comparison to the tolerances required to unequivocally determine compliance with the manufacturer's specifications. The total expanded measurement uncertainties associated with the calibration equipment and procedures provide a confidence of approximately 95% in the results. The assessment of uncertainty has been carried out in accordance with national and international guidance upon the calculation of uncertainties in metrology. ANV Measurement Systems recommended calibration interval is 12 months. flv Signed ,... Position.. DIec~e oate.2s.,/.+ IP.6. ACOUSTICS NOISE AND VIBRATION LIMITED. REGISTERED IN ENGLAND NO REGISTERED OFFICE AS ABOVE.

32 Measurement Systems CERTIFICATE OF CALIBRATION Certificate Number CAL Date of Issue 27 February 2006 Customer Parsns Brinkerhoff Limited Manufacturer TY pe Serial Number Sound Level Meter Rion NA Pre Amplifier Rion NH Microphone Rion UC-53A This equipment has been calibrated and tested for compliance with Manufacturer's Performance Specifications. Notes Conditions Measured Value Atmospheric Pressure kpa Temperature 21.3 "C Relative Humidity 31.3 % ANV Measurement Systems' Calibration Laboratory electroacoustic test equipment is fully traceable to national standards. Additional electronic and ancillary equipment used in the procedures has been calibrated to a certified degree of accuracy that ensures that any additional uncertainties are minimal. Tests were carried out in controlled environmental conditions to the extent that extraneous environmental factors will have had no substantial effect on the measured parameters in comparison to the tolerances required to unequivocally determine compliance with the manufacturer's specifications. The total expanded measurement uncertainties associated with the calibration equipment and procedures provide a confidence of approximately 95% in the results. The assessment of uncertainty has been carried out in accordance with national and international guidance upon the calculation of uncertainties in metrology. ANV Measurement Systems recommended calibration interval is 12 months. Dl KA3C Position Date.~3/2-/0.6. HASTINGS HOUSE, AUCKLAND PARK, MILTON KEYNES, MKI IBU St El infoanoise-and-vibration.co.uk L! ACOUSTICS NOISE AND VIBRATION LIMITED. REGISTERED IN ENGLAND NO REGISTERED OFFICE AS ABOVE.

33

34

35 APPENDIX 4 72-Hour Control Chart

36

37 72-Hour Control Chart :30 15:30 17:30 19:30 21:30 23:30 01:30 03:30 05:30 07:30 09:30 11:30 13:30 15:30 17:30 19:30 21:30 23:30 01:30 03:30 05:30 07:30 09:30 11:30 13:30 15:30 17:30 19:30 21:30 23:30 01:30 03:30 05:30 07:30 09:30 11:30 Time Noise Level (db) LA90 LAeq

38

39 APPENDIX 5 Noise Monitoring Form

40

41 Noise Monitoring Form Project: Damhead Creek 2 Job Number: 62725A Location: 1 - Tudor Farm Nov-07 Rion NA-27 Philip Jordan Equipment: 93.9 db Engineer: Mild, Dry with low wind Speeds Pre-Calibration Level: 93.9 db General Weather Description: Post-Calibration Level: Measurement Period Weather Date Wind Temp Statistical Noise Levels / db(a) Elapsed End L eq (ºC) Start Speed Direction L max L min L 10 L 90 Description of Audible Noise (m/s) from : :10 <1 SW : :10 <1 SW : :55 <4 SW : :20 <4 SW : :20 <2 SW : :50 <1 NE : :20 <1 NE : :21 <2 SE : :55 <4 S : :45 <5 SW Beeping from coal field, power plant noise RTN Power plant noise, RTN aircraft and beeping and crashing and banging from coal field. Power plant noise, aircraft and road traffic noise. Beeping from vehicles on coal fields. Power plant noise, Road Traffic and Aircraft Noise Power plant noise, Road Traffic and Aircraft Noise Distant traffic and aircraft noise. Power plant noise, dog barking. Power plant noise, Road Traffic and Aircraft Noise Distant power plant noise Distant power plant noise, Distant RTN, bleeping from coa Distant power plant noise.

42 Noise Monitoring Form Project: Location: Damhead Creek 2 Job Number: 62725A 1 - Tudor Farm Date: Nov-07 Equipment: Pre-Calibration Level: Post-Calibration Level: Rion NA-27 Engineer: Philip Jordan 93.9 db General Weather Description: Mild, Dry with low wind Speeds 93.9 db

43 Noise Monitoring Form Project: Location: Damhead Creek 2 Job Number: 62725A 2 - Polly Adams Cottage Date: Nov-07 Equipment: Pre-Calibration Level: Post-Calibration Level: Rion NA db 93.9 db Engineer: Philip Jordan General Weather Description: Mild, Dry with low wind Speeds Measurement Period Weather Statistical Noise Levels / db(a) Date Start Elapsed End Wind Temp Speed Direction (ºC) (m/s) from L max L min L eq L 10 L 90 Description of Audible Noise : :35 <1 SW Noise from nearby sub station distant aircraft noise : :30 <1 SW Distant power plant noise, RTN aircraft and beeping and : :15 <4 SW Power plant noise, road traffic and aircraft noise. Sub : :40 <4 SW Power plant noise, road traffic and aircraft noise. Sub : :45 <2 SW Power plant noise, road traffic and aircraft noise. Sub : :10 <1 NE Power plant noise, road traffic and aircraft noise. Sub : :40 <1 NE Noise from sub station,. Road traffic and distant power plan : :40 <2 SE Distant power plant noise : :20 <4 S Distant power plant noise : :30 <5 SW Increased power plant noise compared with previous meas

44 Noise Monitoring Form Project: Location: Damhead Creek 2 Job Number: 62725A 2 - Polly Adams Cottage Date: Nov-07 Equipment: Pre-Calibration Level: Post-Calibration Level: Rion NA db 93.9 db Engineer: Philip Jordan General Weather Description: Mild, Dry with low wind Speeds

45 Noise Monitoring Form Project: Location: Damhead Creek 2 Job Number: 62725A 3 - Riverview Cottage Date: Nov-07 Equipment: Pre-Calibration Level: Post-Calibration Level: Rion NA-27 Engineer: Philip Jordan 93.9 db General Weather Description: Mild, Dry with low wind Speeds 93.9 db Measurement Period Weather Statistical Noise Levels / db(a) Wind Date Start Elapsed End Speed Direction Temp (m/s) from (ºC) L max L min L eq L 10 L 90 Description of Audible Noise : :55 <1 SW : :50 <1 SW : :30 <4 SW : :05 <4 SW : :00 <2 SW : :05 <1 NE : :55 <1 NE : :55 <2 SE : :15 <4 S : :00 <5 SW RTN and power plant noise dog barking. Power plant noise, road traffic and aircraft noise. Beeping Power plant noise, vehicles on coal field. Road traffic and People talking, Dog barking, power plant noise, Road traffic noise. Power plant noise, dog barking. Dog barking, road traffic and aircraft noise. Road traffic and aircraft noise. Power plant noise. Power plant noise and aircraft noise Power plant noise Power plant noise, increased wind speeds.

46 Noise Monitoring Form Project: Location: Damhead Creek 2 Job Number: 62725A 5 - Stoke Road leading to Whitehall Farm Date: Nov-07 Equipment: Pre-Calibration Level: Post-Calibration Level: Rion NA db 93.9 db Engineer: Philip Jordan General Weather Description: Mild, Dry with low wind Speeds Measurement Period Weather Statistical Noise Levels / db(a) Date Start Elapsed End Wind Temp Speed Direction (ºC) (m/s) from L max L min L eq L 10 L : :25 <1 SW : :10 <1 SW : :45 <4 SW : :20 <4 SW : :20 <2 SW : :50 <1 NE : :15 <1 NE : :15 <2 SE : :45 <4 S : :15 <5 SW Description of Audible Noise Power plant noise, beeping from coal field. Power plant noise, difficult to define. Road traffic noise Power plant noise, aircraft noise and road traffic noise Bird song, aircraft noise, road traffic noise. Power plant noise, distant aircraft noise Road traffic and aircraft noise, bird song. Power plant noise, road traffic and aircraft noise. Power plant noise distant road traffic noise Power plant noise distant road traffic and aircraft noise Power plant noise distant road traffic noise

47 Noise Monitoring Form Project: Location: Damhead Creek 2 Job Number: 62725A 5 - Stoke Road leading to Whitehall Farm Date: Nov-07 Equipment: Pre-Calibration Level: Post-Calibration Level: Rion NA-27 Engineer: Philip Jordan 93.9 db General Weather Description: Mild, Dry with low wind Speeds 93.9 db

48 Noise Monitoring Form Project: Location: Damhead Creek 2 Job Number: 6 - Beluncle Farm Date: 62725A Nov-07 Equipment: Pre-Calibration Level: Post-Calibration Level: Rion NA-27 Engineer: Philip Jordan 93.9 db General Weather Description: Mild, Dry with low wind Speeds 93.9 db Measurement Period Weather Statistical Noise Levels / db(a) Date Start Elapsed End Wind Temp Speed Direction (ºC) (m/s) from L max L min L eq L 10 L 90 Description of Audible Noise : :41 <1 SW RTN and noise from power plants difficult to define : :45 <1 SW Hum from Kingsnorth and damhead, distant coal stores : :00 <4 SW RTN and Kingsnorth and Damhead Creek, Aircraft noise : :20 <4 SW Noise from power stations, beeping from diggers and : :25 <2 SW Distant RTN Hum from both power stations, : :30 <1 NE RTN and Aircraft noise : :15 <1 NE RTN, aircraft noise and banging and clanging (Coal) : :10 <2 SE Distant RTN hum from kingsnorth, freight train and : :10 <4 S Power plant noise from both power stations : :10 <5 SW RTN and power plant noise

49 Noise Monitoring Form Project: Location: Damhead Creek 2 Job Number: 62725A 6 - Beluncle Farm Date: Nov-07 Equipment: Pre-Calibration Level: Post-Calibration Level: Rion NA-27 Engineer: Philip Jordan 93.9 db General Weather Description: Mild, Dry with low wind Speeds 93.9 db

50 Noise Monitoring Form Project: Location: Damhead Creek 2 Job Number: 62725A 7 - Sturdee Cottages Date: Nov-07 Equipment: Pre-Calibration Level: Post-Calibration Level: Rion NA db 93.9 db Engineer: Philip Jordan General Weather Description: Mild, Dry with low wind Speeds Measurement Period Weather Statistical Noise Levels / db(a) Date Start Elapsed End Wind Temp Speed Direction (ºC) (m/s) from L max L min L eq L 10 L 90 Description of Audible Noise : :05 <1 SW RTN : :00 <1 SW Distant and Close RTN, overflying planes : :15 <4 SW RTN and Aircraft Noise : :35 <4 SW RTN and Aircraft Noise : :40 <2 SW Distant RTN, wind in bushes : :45 <1 NE RTN from immediate roads : :30 <1 NE RTN and Aircraft noise : :25 <2 SE Minimal RTN, breeze through bushes : :25 <4 S Aircraft noise, just hear noise from kingsnorth : :25 <5 SW RTN noise

51 Noise Monitoring Form Project: Location: Damhead Creek 2 Job Number: 62725A 7 - Sturdee Cottages Date: Nov-07 Equipment: Pre-Calibration Level: Post-Calibration Level: Rion NA-27 Engineer: Philip Jordan 93.9 db General Weather Description: Mild, Dry with low wind Speeds 93.9 db

52 Noise Monitoring Form Project: Location: Damhead Creek 2 Job Number: 8 - Eschol Lane / Jacobs Lane Date: 62725A Nov-07 Equipment: Pre-Calibration Level: Post-Calibration Level: Rion NA-27 Engineer: Philip Jordan 93.9 db General Weather Description: Mild, Dry with low wind Speeds 93.9 db Measurement Period Weather Statistical Noise Levels / db(a) Date Start Elapsed End Wind Temp Speed Direction (ºC) (m/s) from L max L min L eq L 10 L 90 Description of Audible Noise : :25 <1 SW Power plant noise, aircraft noise and noise from : :20 <1 SW Hz hum from Kingsnorth power station overflying : :30 <4 SW Noise from kingsnorth Dock. Aircraft Noise : :50 <4 SW Aircraft, postman Kingsnorth hum, kingsnorth dock : :00 <2 SW Distant RTN, Aircraft, Noise from Kingsnorth Dock : :05 <1 NE RTN and Aircraft noise : :50 <1 NE Distant RTN, Aircraft : :40 <2 SE Distant RTN : :40 <4 S Hum from Kingsnorth power station and aircraft : :40 <5 SW Aircraft and Road traffic noise

53 Noise Monitoring Form Project: Location: Damhead Creek 2 Job Number: 62725A 9 - Nature Study Area Date: Nov-07 Equipment: Pre-Calibration Level: Post-Calibration Level: Rion NA-27 Engineer: Philip Jordan 93.9 db General Weather Description: Mild, Dry with low wind Speeds 93.9 db Measurement Period Weather Statistical Noise Levels / db(a) Date Start Elapsed End Wind Temp Speed Direction (ºC) (m/s) from L max L min L eq L 10 L 90 Description of Audible Noise : :50 <1 SW Kingsnorth power station hum, vehicles entering and : :35 <1 SW Hum from power station, HGV and light traffic entering : :45 <4 SW RTN and Aircraft noise, buzzing, humming : :00 <4 SW Hum from power station. Traffic entering and leaving : :15 <2 SW Kingsnorth hum, aircraft noise : :20 <1 NE RTN and Aircraft noise, HGV's enter/exiting Kingsnorth : :05 <1 NE Distant RTN, aircraft noise : :55 <2 SE Distant RTN and aircraft noise. Hum from power station : :55 <4 S Power station hum and aircraft noise : :55 <5 SW RTN and power station noise wind through bushes

54 Noise Monitoring Form Project: Location: Damhead Creek 2 Job Number: 62725A 9 - Nature Study Area Date: Nov-07 Equipment: Pre-Calibration Level: Post-Calibration Level: Rion NA-27 Engineer: Philip Jordan 93.9 db General Weather Description: Mild, Dry with low wind Speeds 93.9 db

55 Noise Monitoring Form Project: Location: Damhead Creek 2 Job Number: 62725A 10 - Market Garden / Dog Kennels Date: Nov-07 Equipment: Pre-Calibration Level: Post-Calibration Level: Rion NA-27 Engineer: Philip Jordan 93.9 db General Weather Description: Mild, Dry with low wind Speeds 93.9 db Measurement Period Weather Statistical Noise Levels / db(a) Date Start Elapsed End Wind Temp Speed Direction (ºC) (m/s) from L max L min L eq L 10 L 90 Description of Audible Noise : :10 <1 SW Kingsnorth power station : :50 <1 SW Noise from Kingsnorth power station, Plane and Road : :00 <4 SW Aircraft noise, distant RTN and Kingsnorth power station : :25 <4 SW Aircraft noise, barking dog, beeping, distant RTN : :30 <2 SW Distant Road and aircraft noise Kingsnorth and Dock : :35 <1 NE Noise from kingsnorth dock, banging. RTN and aircraft : :20 <1 NE Distant RTN, noise from dock, HGV movements aircraft : :10 <2 SE Noise from dock breeze through bushes : :10 <4 S Power plant noise : :10 <5 SW Distant RTN and aircraft noise

56 Noise Monitoring Form Project: Location: Damhead Creek 2 Job Number: 62725A 10 - Market Garden / Dog Kennels Date: Nov-07 Equipment: Pre-Calibration Level: Post-Calibration Level: Rion NA-27 Engineer: Philip Jordan 93.9 db General Weather Description: Mild, Dry with low wind Speeds 93.9 db

University of York Heslington East Campus Details of Noise Modelling and Noise Survey. Report ref AAc/ /R01

University of York Heslington East Campus Details of Noise Modelling and Noise Survey. Report ref AAc/ /R01 Heslington East Campus Details of Noise Modelling and Noise Survey Report ref Heslington East Campus Details of Noise Modelling and Noise Survey January 2008 Arup Acoustics Admiral House, Rose Wharf, 78

More information

BASELINE NOISE MONITORING SURVEY

BASELINE NOISE MONITORING SURVEY t m s environment ltd TMS Environment Ltd 53 Broomhill Drive Tallaght Dublin 24 Phone: +353-1-4626710 Fax: +353-1-4626714 Web: www.tmsenv.ie BASELINE NOISE MONITORING SURVEY UNIVERSITY COLLEGE DUBLIN Report

More information

Pfizer Ireland Pharmaceuticals

Pfizer Ireland Pharmaceuticals Allegro Acoustics Limited, Unit 2A Riverside, Tallaght Business Park, Tallaght, Dublin 24 Tel/Fax: +33 () 1 4148 Pfizer Ireland Pharmaceuticals Pfizer Grange Castle, Grange Castle Business Park, Clondalkin,

More information

TECHNICAL REPORT 2016 IEL ENVIRONMENTAL NOISE SURVEY OF THE DAIRYGOLD CASTLEFARM FACILITY, MITCHELSTOWN, CO. CORK.

TECHNICAL REPORT 2016 IEL ENVIRONMENTAL NOISE SURVEY OF THE DAIRYGOLD CASTLEFARM FACILITY, MITCHELSTOWN, CO. CORK. TECHNICAL REPORT 16 IEL ENVIRONMENTAL NOISE SURVEY OF THE DAIRYGOLD CASTLEFARM FACILITY, MITCHELSTOWN, CO. CORK. FOR Gabriel Kelly Group Environmental Manager Dairygold Food ingredients Castlefarm Mitchelstown

More information

NOISE IMPACT ASSESSMENT 2016

NOISE IMPACT ASSESSMENT 2016 Panther Environmental Solutions Ltd, Unit 4, Innovation Centre, Institute of Technology, Green Road, Carlow, Ireland. Mobile: 087-8519284 Telephone /Fax: 059-9134222 Email: info@pantherwms.com Website:

More information

Roche Ireland Limited

Roche Ireland Limited Limited Clarecastle, Co. Clare Monitoring Report Industrial Emissions Licence Number P0012-05 Report Date: 1 st February 17 Fitz Scientific Unit 35A, Boyne Business Park, Drogheda, Co. Louth Report No.

More information

Offaly County Council

Offaly County Council Derryclure Landfill Facility, Derryclure, Co. Offaly Annual Monitoring Report Waste Licence Reg. No. W0029-04 Report Date: th October 15 Fitz Scientific Unit 35A, Boyne Business Park, Drogheda, Co. Louth

More information

REPORT PERIOD: JANUARY 01 MARCH

REPORT PERIOD: JANUARY 01 MARCH QUARTERLY NOISE MONITORING REPORT FOR EAST GALWAY LANDFILL REPORT PERIOD: JANUARY 01 MARCH 31 2018 IE LICENCE REF. NO. W0178-02 APRIL 2018 QUARTERLY NOISE MONITORING REPORT FOR EAST GALWAY LANDFILL REPORT

More information

Roche Ireland Limited

Roche Ireland Limited Roche Ireland Limited Clarecastle, Co. Clare Environmental Noise Monitoring Report Industrial Emissions Licence Number P0012-05 Report Date: 6 th October 17 Fitz Scientific Unit 35A, Boyne Business Park,

More information

ABERDEEN HARBOUR EXPANSION PROJECT November Volume 3: Technical Appendices

ABERDEEN HARBOUR EXPANSION PROJECT November Volume 3: Technical Appendices ABERDEEN HARBOUR EXPANSION PROJECT November 2015 Volume 3: Technical Appendices Appendix 20-B BASELINE NOISE SURVEY 20-B BASELINE NOISE SURVEY Noise Sensitive Receptors A desk-based study and site walkover

More information

Sheringham Shoal Cawston, Norfolk. Substation Noise Assessment Summary

Sheringham Shoal Cawston, Norfolk. Substation Noise Assessment Summary Sheringham Shoal Cawston, Norfolk Substation Noise Assessment Summary Document title: Substation Noise Assessment Summary Status: Final Date: 13 March 2015 Project name: Sheringham Shoal, Cawston, Norfolk

More information

Liddell Coal Operations

Liddell Coal Operations Liddell Coal Operations Environmental Noise Monitoring February 2018 Prepared for Liddell Coal Operations Pty Ltd Page i Liddell Coal Operations Environmental Noise Monitoring February 2018 Reference:

More information

Muswellbrook Coal Company

Muswellbrook Coal Company Muswellbrook Coal Company Environmental ise Monitoring May 2015 Prepared for Muswellbrook Coal Page i Muswellbrook Coal Company Environmental ise Monitoring May 2015 Reference: Report date: 18 June 2015

More information

CENTRAL WASTE MANAGEMENT FACILITY, INAGH, CO. CLARE. ENVIRONMENTAL NOISE MONITORING MAY 2017.

CENTRAL WASTE MANAGEMENT FACILITY, INAGH, CO. CLARE. ENVIRONMENTAL NOISE MONITORING MAY 2017. CENTRAL WASTE MANAGEMENT FACILITY, INAGH, CO. CLARE. ENVIRONMENTAL NOISE MONITORING MAY 2017. Prepared for: CLARE COUNTY COUNCIL ÁRAS CONTAE AN CHLÁIR NEW ROAD ENNIS CO. CLARE 3156 May 16 th, 2017 EPA

More information

Appendix G Noise and Vibration Assessment

Appendix G Noise and Vibration Assessment Appendix G Noise and Vibration Assessment Annex G1: Noise Perception and Terminology Annex G2: Baseline Noise Monitoring Annex G3: Construction Information Annex G4: Operational Information Annex G1: Noise

More information

Liddell Coal Operations

Liddell Coal Operations Liddell Coal Operations Environmental Noise Monitoring May 2018 Prepared for Liddell Coal Operations Pty Ltd Page i Liddell Coal Operations Environmental Noise Monitoring May 2018 Reference: Report date:

More information

Environment Protection Authority (EPA), Industrial Noise Policy (INP) 2000;

Environment Protection Authority (EPA), Industrial Noise Policy (INP) 2000; 15 December 2017 Suite 6, Level 1, 146 Hunter Street Newcastle NSW 2300 PO Box 506 Pere Riini Quarry Manager Hanson Construction Materials Pty Ltd Level 5, 75 George Street Parramatta, NSW 2150 Newcastle,

More information

McGill Environmental Ltd.

McGill Environmental Ltd. McGill Environmental Ltd. Coom, Glenville, Co. Cork Environmental Noise Survey Report Date: 7 th October 2016 For inspection purposes only. KD Environmental Ltd. 1 Swiftbrook Glen, Virginia, Co. Cavan

More information

Ashton Coal. Environmental Noise Monitoring May Prepared for Ashton Coal Operations Pty Ltd

Ashton Coal. Environmental Noise Monitoring May Prepared for Ashton Coal Operations Pty Ltd Ashton Coal Environmental Noise Monitoring May 2018 Prepared for Ashton Coal Operations Pty Ltd Page i Ashton Coal Environmental Noise Monitoring May 2018 Reference: Report date: 5 June 2018 Prepared for

More information

W For inspection purposes only. This report shall not be reproduced except in full, without the approval of BnM Environmental.

W For inspection purposes only. This report shall not be reproduced except in full, without the approval of BnM Environmental. ANNUAL MONITORING OF ENVIRONMENTAL NOISE AT THE BORD NA MóNA KILBERRY COMPOST FACILITY IN COMPLIANCE WITH IED LICENCE, NO. W0198-01 For the Attention of: Site Work & Report Prepared by: Anua File Ref:

More information

Rehab Glassco. Unit 4, Osberstown Industrial Park, Caragh Road, Naas, Co. Kildare. For inspection purposes only.

Rehab Glassco. Unit 4, Osberstown Industrial Park, Caragh Road, Naas, Co. Kildare. For inspection purposes only. Air I Noise I Water I Soil I Environmental Consultancy www.axisenv.ie Unit 5 Caherdavin Business Centre, Ennis Road, Limerick Unit 4, Osberstown Industrial Park, Caragh Road, Naas, Co. Kildare Environmental

More information

Attended Noise Monitoring Program

Attended Noise Monitoring Program 1 November 2018 Ref: 171356/8121 Muswellbrook Coal Company PO Box 123 Muswellbrook NSW 2333 RE: OCTOBER 2018 NOISE MONITORING RESULTS MUSWELLBROOK COAL MINE This letter report presents the results of noise

More information

OneSteel Recycling Hexham Quarterly Noise Monitoring Report Q2 2017

OneSteel Recycling Hexham Quarterly Noise Monitoring Report Q2 2017 OneSteel Recycling Pty Ltd 14-Jul-2017 60493017 OneSteel Recycling Hexham Quarterly Noise Monitoring Report Q2 2017 NATA ACCREDITATION No. 2778 (14391) Accredited for compliance with ISO/IEC 17025 Testing

More information

Electricity Supply to Africa and Developing Economies. Challenges and opportunities. Planning for the future in uncertain times

Electricity Supply to Africa and Developing Economies. Challenges and opportunities. Planning for the future in uncertain times Electricity Supply to Africa and Developing Economies. Challenges and opportunities. Planning for the future in uncertain times 765 kv Substation Acoustic Noise Impact Study by Predictive Software and

More information

Muswellbrook Coal Company

Muswellbrook Coal Company Muswellbrook Coal Company Environmental Noise Monitoring November 2015 Prepared for Muswellbrook Coal Page i Muswellbrook Coal Company Environmental Noise Monitoring November 2015 Reference: Report date:

More information

Review of Baseline Noise Monitoring results and Establishment of Noise Criteria

Review of Baseline Noise Monitoring results and Establishment of Noise Criteria Appendix G Review of Baseline Noise Monitoring results and Establishment of Noise Criteria Environmental Management Plan G May 2014 Colton Coal Mine Aldershot, Queensland Review of Baseline Noise Monitoring

More information

Glassco Recycling. Unit 4, Osberstown Industrial Park, Caragh Road, Naas, Co. Kildare. For inspection purposes only.

Glassco Recycling. Unit 4, Osberstown Industrial Park, Caragh Road, Naas, Co. Kildare. For inspection purposes only. Air I Noise I Water I Soil I Environmental Consultancy www.axisenv.ie Unit 5 Caherdavin Business Centre, Ennis Road, Limerick. info@axisenv.ie 00353 61 324587 Unit 4, Osberstown Industrial Park, Caragh

More information

Bloomfield Colliery. Quarterly Noise Monitoring. and Compliance Assessment September Report Number Q R2.

Bloomfield Colliery. Quarterly Noise Monitoring. and Compliance Assessment September Report Number Q R2. Bloomfield Colliery Quarterly Noise Monitoring and Compliance Assessment September 2015 Report Number Q59 630.01053-R2 15 October 2015 Bloomfield Collieries Four Mile Creek Road Ashtonfield NSW 2323 Version:

More information

ENVIRONMENTAL NOISE MONITORING QUARTER 1, Northparkes Mines PO Box 995 Parkes NSW 2870

ENVIRONMENTAL NOISE MONITORING QUARTER 1, Northparkes Mines PO Box 995 Parkes NSW 2870 ENVIRONMENTAL NOISE MONITORING QUARTER 1, 2018 s PO Box 995 Parkes NSW 2870 Job No: J38252 Report issued: 25 June 2018 ESP ENVIRONMENTAL & SAFETY PROFESSIONALS A division of Enviro-Net Australia Pty. Ltd.

More information

Environmental Noise Assessment Cambourne to Cambridge options

Environmental Noise Assessment Cambourne to Cambridge options Environmental Noise Assessment Cambourne to Cambridge options CLIENT: Cambridgeshire County Council Major Infrastructure Delivery Box No SH1311 Shire Hall Cambridge CB3 0AP CONTACT: Tim Watkins REPORTED

More information

Environment Protection Authority (EPA), Industrial Noise Policy (INP) 2000;

Environment Protection Authority (EPA), Industrial Noise Policy (INP) 2000; 10 October 2017 Suite 6, Level 1,, 146 Hunter Street Newcastle NSW 2300 PO Box 506 Pere Riini Quarry Manager Hanson Construction Materials Pty Ltd Level 5, 75 George Street Parramatta, NSW 2150 Newcastle,

More information

Bickerdike Allen Partners

Bickerdike Allen Partners 25 CHURCH ROAD, SE19 ENTERTAINMENT NOISE ASSESSMENT Report to Kayode Falebita Kingsway International Christian Centre 3 Hancock Road Bromley-By-Bow London E3 3DA A9540/R01-A-HT 26/07/2012 CONTENTS Page

More information

Soltec (Ireland) Limited Mullingar Business Park, Mullingar, Co Westmeath. Annual Noise Report

Soltec (Ireland) Limited Mullingar Business Park, Mullingar, Co Westmeath. Annual Noise Report Mullingar Business Park, Mullingar, Co Westmeath. Annual Noise Report 2013 Licence Number: W0115-01 Report Date: 09 th July 2013 Report Number: 3220-13-03 Version 0 AXIS environmental services 40 Coolraine

More information

Boggabri Coal Mine. Environmental Noise Monitoring October Prepared for Boggabri Coal Operations Pty Ltd

Boggabri Coal Mine. Environmental Noise Monitoring October Prepared for Boggabri Coal Operations Pty Ltd Boggabri Coal Mine Environmental Noise Monitoring October 2017 Prepared for Boggabri Coal Operations Pty Ltd Page i Boggabri Coal Mine Environmental Noise Monitoring October 2017 Reference: Report date:

More information

Appendix 8. Draft Post Construction Noise Monitoring Protocol

Appendix 8. Draft Post Construction Noise Monitoring Protocol Appendix 8 Draft Post Construction Noise Monitoring Protocol DRAFT CPV Valley Energy Center Prepared for: CPV Valley, LLC 50 Braintree Hill Office Park, Suite 300 Braintree, Massachusetts 02184 Prepared

More information

Liddell Coal Operations

Liddell Coal Operations Liddell Coal Operations Environmental Noise Monitoring April 2016 Prepared for Liddell Coal Operations Pty Ltd Page i Liddell Coal Operations Environmental Noise Monitoring April 2016 Reference: Report

More information

Orora Pty Ltd. B9 Paper Mill EPL Compliance Quarterly noise monitoring report. 11 August Doc no QM-RP-1-0

Orora Pty Ltd. B9 Paper Mill EPL Compliance Quarterly noise monitoring report. 11 August Doc no QM-RP-1-0 Orora Pty Ltd B9 Paper Mill EPL Compliance Quarterly noise monitoring report 11 August 16 Doc no. 102-QM-RP-1-0 Orora Pty Ltd B9 Paper Mill - EPL Compliance Title Document no. Quarterly noise monitoring

More information

Orora Pty Ltd. B9 Paper Mill EPL Compliance Quarterly noise monitoring report. 20 June Doc no QM-RP-4-0

Orora Pty Ltd. B9 Paper Mill EPL Compliance Quarterly noise monitoring report. 20 June Doc no QM-RP-4-0 Orora Pty Ltd B9 Paper Mill EPL Compliance Quarterly noise monitoring report 20 June 2017 Doc no. 102-QM-RP-4-0 Orora Pty Ltd B9 Paper Mill - EPL Compliance Title Document no. Quarterly noise monitoring

More information

Protocol for Ambient Level Noise Monitoring

Protocol for Ambient Level Noise Monitoring July 2015 Protocol for Ambient Level Noise Monitoring L pressure =10.log [10 (Lp/10) - 10 (LpBackground/10) ] L pressure = 10.log [10 (Lp/10) - 10 (LpBackground/10) ] CENTRAL POLLUTION CONTROL BOARD P

More information

Assured Monitoring Group

Assured Monitoring Group Assured Monitoring Group YARRANLEA SOLAR FARM NOISE & VIBRATION IMPACT ASSESSMENT JANUARY 2017 I3 CONSULTING PTY LTD Project ID. 10734 R_1 DATE OF RELEASE: 15/02/2017 Table 1: Document approval Name Position

More information

Attended Noise Monitoring Program

Attended Noise Monitoring Program 16 May 2018 Ref: 171356/7853 Muswellbrook Coal Company PO Box 123 Muswellbrook NSW 2333 RE: MAY 2018 NOISE MONITORING RESULTS MUSWELLBROOK COAL MINE This letter report presents the results of noise compliance

More information

Fundamentals of Environmental Noise Monitoring CENAC

Fundamentals of Environmental Noise Monitoring CENAC Fundamentals of Environmental Noise Monitoring CENAC Dr. Colin Novak Akoustik Engineering Limited April 03, 2013 Akoustik Engineering Limited Akoustik Engineering Limited is the sales and technical representative

More information

Muswellbrook Coal Company

Muswellbrook Coal Company Muswellbrook Coal Company June, 12 Environmental Noise Monitoring Prepared for Muswellbrook Coal Muswellbrook Coal Company June, 12 Environmental Noise Monitoring Reference: Report date: 9 August 12 Prepared

More information

Quarterly Noise Monitoring Report Austar Coal Mine Middle Road, Paxton NSW January 2007

Quarterly Noise Monitoring Report Austar Coal Mine Middle Road, Paxton NSW January 2007 REPORT 30-1664R1R0 Quarterly Noise Monitoring Report Austar Coal Mine Middle Road, Paxton NSW January 2007 PREPARED FOR P.O Box 806 Cessnock NSW 2325 14 MAY 2007 Quarterly Noise Monitoring Report Austar

More information

Xtratherm Limited Kells Road, Navan, Co Meath

Xtratherm Limited Kells Road, Navan, Co Meath Air I Noise I Water I Soil I Environmental Consultancy www.axisenv.ie Unit 5 Caherdavin Business Centre Ennis Road Limerick Kells Road, Navan, Co Meath Annual Environmental Noise Survey 2017 IPPC Licence

More information

ITV CORONATION STREET PRODUCTION FACILITY, TRAFFORD WHARF ROAD ASSESSMENT OF POTENTIAL NOISE & VIBRATION IMPACT OF PROPOSED METROLINK LINE

ITV CORONATION STREET PRODUCTION FACILITY, TRAFFORD WHARF ROAD ASSESSMENT OF POTENTIAL NOISE & VIBRATION IMPACT OF PROPOSED METROLINK LINE ITV CORONATION STREET PRODUCTION FACILITY, TRAFFORD WHARF ROAD ASSESSMENT OF POTENTIAL NOISE & VIBRATION IMPACT OF PROPOSED METROLINK LINE On behalf of: ITV plc Report No. 22396.01v1 October 2014 ITV CORONATION

More information

Boggabri Coal Mine. Environmental Noise Monitoring June Prepared for Boggabri Coal Operations Pty Ltd

Boggabri Coal Mine. Environmental Noise Monitoring June Prepared for Boggabri Coal Operations Pty Ltd Boggabri Coal Mine Environmental Noise Monitoring June 2017 Prepared for Boggabri Coal Operations Pty Ltd Page i Boggabri Coal Mine Environmental Noise Monitoring June 2017 Reference: Report date: 5 July

More information

Mackas Sand Pty Ltd ENVIRONMENTAL NOISE MONITORING JULY 2013

Mackas Sand Pty Ltd ENVIRONMENTAL NOISE MONITORING JULY 2013 Mackas Sand Pty Ltd ENVIRONMENTAL NOISE MONITORING JULY 2013 September 2013 Mackas Sand Pty Ltd ENVIRONMENTAL NOISE MONITORING JULY 2013 September 2013 Prepared by on behalf of Mackas Sand Pty Ltd Project

More information

THE ANV MEASUREMENT SYSTEMS SOUND INSULATION TESTING SYSTEM INSTRUCTION MANUAL FOR FIELD TESTING OF WALLS, FLOORS & STAIRS

THE ANV MEASUREMENT SYSTEMS SOUND INSULATION TESTING SYSTEM INSTRUCTION MANUAL FOR FIELD TESTING OF WALLS, FLOORS & STAIRS THE ANV MEASUREMENT SYSTEMS SOUND INSULATION TESTING SYSTEM INSTRUCTION MANUAL FOR FIELD TESTING OF WALLS, FLOORS & STAIRS HASTINGS HOUSE, AUCKLAND PARK, MILTON KEYNES, MK1 1BU 01908 642846 01908 642814

More information

Noise Assessment for Planning Purposes - as per TAN11

Noise Assessment for Planning Purposes - as per TAN11 Noise Assessment for Planning Purposes - as per TAN11 Report No: 1703035R01A Report Status: Final Report (Amended) Dated: 23 October 2017 Purchase order No: n/a Prepared for: Garep Demirci 73 Spencer David

More information

Mackas Sand Pty Ltd ENVIRONMENTAL NOISE MONITORING AUGUST 2014

Mackas Sand Pty Ltd ENVIRONMENTAL NOISE MONITORING AUGUST 2014 Mackas Sand Pty Ltd ENVIRONMENTAL NOISE MONITORING AUGUST 2014 Mackas Sand Pty Ltd ENVIRONMENTAL NOISE MONITORING AUGUST 2014 Prepared by Umwelt (Australia) Pty Limited on behalf of Mackas Sand Pty Ltd

More information

Noise and Ground-Borne Vibration Monitoring

Noise and Ground-Borne Vibration Monitoring 69 Noise and Vibration Study Noise and Ground-Borne Vibration Monitoring Labrador City, Newfoundland Nov, 07 Iron Ore Company of Canada TABLE OF CONTENTS 1.0 INTRODUCTION... 2 1.1 Study Objectives... 2

More information

Attended Noise Monitoring - Quarter Ending September 2013

Attended Noise Monitoring - Quarter Ending September 2013 Unity Mining Level 10, 350 Collins St Melbourne VIC 3000 Version: Page 2 PREPARED BY: ABN 29 001 584 612 Units 7-8, 26-28 Napier Close Deakin ACT 2600 Australia (PO Box 9344 Deakin ACT 2600 Australia)

More information

Boggabri Coal Mine. Environmental Noise Monitoring August Prepared for Boggabri Coal Operations Pty Ltd

Boggabri Coal Mine. Environmental Noise Monitoring August Prepared for Boggabri Coal Operations Pty Ltd Boggabri Coal Mine Environmental Noise Monitoring August 2018 Prepared for Boggabri Coal Operations Pty Ltd Page i Boggabri Coal Mine Environmental Noise Monitoring August 2018 Reference: Report date:

More information

ISO INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 1996-2 Second edition 2007-03-15 Acoustics Description, measurement and assessment of environmental noise Part 2: Determination of environmental noise levels Acoustique Description,

More information

Noise Monitoring Report For. Schloetter (Ireland) Ltd. Naas Enterprise Park, Naas, Co. Kildare

Noise Monitoring Report For. Schloetter (Ireland) Ltd. Naas Enterprise Park, Naas, Co. Kildare Bray (Co. Wicklow) 01 276 1428 Lisburn (Co. Antrim) 028 9262 6733 Birmingham (U.K.) 0121 673 1804 Blackrock (Co.Cork) 021 4536155 Noise Monitoring Report 2017 For Schloetter (Ireland) Ltd. Naas Enterprise

More information

Pipeline Blowdown Noise Levels

Pipeline Blowdown Noise Levels Pipeline Blowdown Noise Levels James Boland 1, Henrik Malker 2, Benjamin Hinze 3 1 SLR Consulting, Acoustics and Vibration, Brisbane, Australia 2 Atkins Global, Acoustics, London, United Kingdom 3 SLR

More information

PURPLE LINE EXTENSION SECTION 2 AMBIENT NOISE LEVEL REPORT METRO PROJECT RODEO STATION

PURPLE LINE EXTENSION SECTION 2 AMBIENT NOISE LEVEL REPORT METRO PROJECT RODEO STATION PURPLE LINE EXTENSION SECTION 2 AMBIENT NOISE LEVEL REPORT METRO PROJECT 865522 RODEO STATION Kleinfelder Section Table of Contents 1.0 Introduction... 4 2.0 Noise Measurement Procedure... 4 3.0 Noise

More information

Black. LWECS Site Permit. Stearns County. Permit Section:

Black. LWECS Site Permit. Stearns County. Permit Section: PERMIT COMPLIANCE FILING Permittee: Permit Type: Project Location: Docket No: Permit Section: Date of Submission : Black Oak Wind,, LLC LWECS Site Permit Stearns County IP6853/WS-10-1240 and IP6866/WS-11-831

More information

Noise Mitigation Study Pilot Program Summary Report Contract No

Noise Mitigation Study Pilot Program Summary Report Contract No Ohio Turnpike Commission Noise Mitigation Study Pilot Program Summary Report Contract No. 71-08-02 Prepared For: Ohio Turnpike Commission 682 Prospect Street Berea, Ohio 44017 Prepared By: November 2009

More information

79 First Avenue Mob: FIVE DOCK NSW 2046 VENTILATED ACOUSTIC ENCLOSURE NOISE EMISSION ASSESSMENT ACOUSTIC SERVICES & ADVICE

79 First Avenue Mob: FIVE DOCK NSW 2046 VENTILATED ACOUSTIC ENCLOSURE NOISE EMISSION ASSESSMENT ACOUSTIC SERVICES & ADVICE Head Office Postal Address T 02 9908 1270 Suite 9 PO Box 270 F 02 9908 1271 38-46 Albany St Neutral Bay 2089 E info@acousticdynamics.com.au St Leonards 2065 ABN: 36 105 797 715 W www.acousticdynamics.com.au

More information

SUMMARY REPORT OF NOISE MONITORING AT MEATH GREEN OCTOBER 2010 TO SEPTEMBER 2011

SUMMARY REPORT OF NOISE MONITORING AT MEATH GREEN OCTOBER 2010 TO SEPTEMBER 2011 Date: 9 June 2012 Ref: SUMMARY REPORT OF NOISE MONITORING AT MEATH GREEN OCTOBER 2010 TO SEPTEMBER 2011 Client: Gatwick Airport Limited Report Author :... Dr R. Peters Principal Consultant Approved by

More information

REPORT OF NOISE MONITORING OF TUTUR1C SID TRIAL AT EDINBURGH AIRPORT AUGUST TO NOVEMBER 2015 SITE 2: UPHALL

REPORT OF NOISE MONITORING OF TUTUR1C SID TRIAL AT EDINBURGH AIRPORT AUGUST TO NOVEMBER 2015 SITE 2: UPHALL Date: 09 March 2016 REPORT OF NOISE MONITORING OF TUTUR1C SID TRIAL AT EDINBURGH AIRPORT AUGUST TO NOVEMBER 2015 SITE 2: UPHALL Client: Edinburgh Limited Report Author:... Dr R. Peters Principal Consultant

More information

Portable Noise Monitoring Report March 5 - April 24, 2016 The Museum of Vancouver. Vancouver Airport Authority

Portable Noise Monitoring Report March 5 - April 24, 2016 The Museum of Vancouver. Vancouver Airport Authority Portable Noise Monitoring Report March 5 - April 24, 2016 The Museum of Vancouver Vancouver Airport Authority September 27, 2016 Table of Contents INTRODUCTION... 2 OBJECTIVES... 2 VANCOUVER: AIRCRAFT

More information

Orora Compliance Monitoring

Orora Compliance Monitoring Orora Compliance Monitoring ORORA LIMITED April 2016 Noise Monitoring 038900_20160506 A 6 May 2016 Orora Compliance Monitoring Project no: Document title: IA038900 April 2016 Noise Monitoring Document

More information

Black Butte Copper Project Mine Operating Permit Application (Revision 3)

Black Butte Copper Project Mine Operating Permit Application (Revision 3) Mine Operating Permit Application (Revision 3) APPENDIX J: Tintina Montana, Inc. July 17 MEMORANDUM DATE: October 7, 13 TO: FROM: RE: Allan Kirk / Geomin Resources Bob Jacko / Tintina Resources Sean Connolly

More information

January 2012 Noise Impact Assessment Report for Proposed Cable Tow System For Wakeboarding & Water-skiing Grand Canal Dock, Dublin 4

January 2012 Noise Impact Assessment Report for Proposed Cable Tow System For Wakeboarding & Water-skiing Grand Canal Dock, Dublin 4 January 2012 Noise Impact Assessment Report for Proposed Cable Tow System For Wakeboarding & Water-skiing Grand Canal Dock, Dublin 4 MALONE O REGAN 2B Richview Office Park, Clonskeagh, Dublin 14. Tel:

More information

Bloomfield Colliery. Quarterly Noise Monitoring and Compliance Assessment. September Report Number

Bloomfield Colliery. Quarterly Noise Monitoring and Compliance Assessment. September Report Number Report Number 630.01053 20 December 2016 Bloomfield Collieries Four Mile Creek Road Ashtonfield NSW 2323 Version: v1.0 Report Number 630.01053 20 December 2016 v1.0 Page 2 PREPARED BY: ABN 29 001 584 612

More information

Lion s Gate Secondary Wastewater Treatment Plant Pile Driving North Vancouver, BC. Final Report Rev 1

Lion s Gate Secondary Wastewater Treatment Plant Pile Driving North Vancouver, BC. Final Report Rev 1 Lion s Gate Secondary Wastewater Treatment Plant Pile Driving North Vancouver, BC Final Report Rev 1 Noise Impact Assessment RWDI # 1502274 SUBMITTED TO Paul Dufault Project Manager Metro Vancouver 4330

More information

Noise monitoring during drilling operations Lower Stumble Well Site Balcombe, West Sussex

Noise monitoring during drilling operations Lower Stumble Well Site Balcombe, West Sussex Noise monitoring during drilling operations Lower Stumble Well Site Balcombe, West Sussex Report ref. PJ3159/13181 Date August 13 Issued to Cuadrilla Resources Limited Issued by Peter Jackson MSc MIOA

More information

Public Hearing on Revisions to Lincoln County Zoning Ordinance

Public Hearing on Revisions to Lincoln County Zoning Ordinance November 21, 2016 William G. Beck Bill.Beck@woodsfuller.com Extension 601 Lincoln County Commission 104 N. Main Street Canton, SD 57013 Lincoln County State s Attorney s Office 104 N. Main Street, Suite

More information

Keystone Pipeline Phases 1 & 2 Acoustic Monitoring Report for Canadian Pump Stations

Keystone Pipeline Phases 1 & 2 Acoustic Monitoring Report for Canadian Pump Stations Revision 0 Keystone Project Document # RE-03 [2-4-22-2] ATCO Project # 763000 TransCanada Pipeline Ltd. Keystone Pipeline Project Keystone Pipeline Phases 1 & 2 Acoustic Monitoring Report for Canadian

More information

Orora Compliance Monitoring

Orora Compliance Monitoring Orora Compliance Monitoring ORORA LIMITED April Noise Monitoring 389_14 A 29 April 1 Orora Compliance Monitoring Project no: IA389 Document title: April Noise Monitoring Document no: 389_1429 Revision:

More information

Proposed Hydropower Archimedean Screw Osney Lock and Weir, Oxford. Noise Impact Assessment TECHNICAL REPORT

Proposed Hydropower Archimedean Screw Osney Lock and Weir, Oxford. Noise Impact Assessment TECHNICAL REPORT Proposed Hydropower Archimedean Screw Osney Lock and Weir, Oxford Noise Impact Assessment TECHNICAL REPORT Hydropower Archimedean Screw Noise Impact Assessment Prepared for: The Low Carbon Hub, 23 Park

More information

Bancroft & Piedmont Cellular Facility

Bancroft & Piedmont Cellular Facility Page 1 of 19 Environmental Noise Analysis Bancroft & Piedmont Cellular Facility Berkeley, California BAC Job # 2015-177 Prepared For: Complete Wireless Consulting Attn: Ms. Kim Le 2009 V Street Sacramento,

More information

MALONE O REGAN. Annual Noise Survey Powerstown Landfill Industrial Emission Licence No. W March 2016

MALONE O REGAN. Annual Noise Survey Powerstown Landfill Industrial Emission Licence No. W March 2016 MALONE O REGAN March 2016 Powerstown Landfill Industrial Emission Licence No. W0025-04 Annual Noise Survey 2015 2B Richview Office Park, Clonskeagh, Dublin 14. Tel: +353 01 2602655 Fax: +353 01 2602660

More information

NETWORK RAIL BORDERS RAILWAY OPERATIONAL NOISE AND VIBRATION (YEAR 1, ROUND 2) REP-003. September 2016

NETWORK RAIL BORDERS RAILWAY OPERATIONAL NOISE AND VIBRATION (YEAR 1, ROUND 2) REP-003. September 2016 Ref:15375 OPERATIONAL NOISE AND VIBRATION (YEAR 1, ROUND 2) 15375-REP-003 September 2016 Registered Office Park House 39 Bo ness Road Grangemouth Stirlingshire FK3 8AN Tel: +44 (0)1324 878822 Fax: +44

More information

M Sport Evaluation Centre ( MEC ) Dovenby Hall Estate

M Sport Evaluation Centre ( MEC ) Dovenby Hall Estate M Sport Evaluation Centre ( MEC ) Dovenby Hall Estate Noise Management Plan Date November 2014 Issue No 1 TABLE OF CONTENTS 1. Introduction/Purpose 2. Responsibility and Authority 3. Noise Monitoring 4.

More information

Wambo Coal Mine and Rail Spur

Wambo Coal Mine and Rail Spur Wambo Coal Mine and Rail Spur Quarter 1, 2013 Environmental Noise Monitoring Prepared for Wambo Coal Pty Limited Wambo Coal Mine and Rail Spur Quarter 1, 2013 Environmental Noise Monitoring Reference:

More information

WITHIN GENERATOR APPLICATIONS

WITHIN GENERATOR APPLICATIONS POWER SYSTEMS TOPICS 9 Measuring and Understanding Sound WITHIN GENERATOR APPLICATIONS INTRODUCTION When selecting a generator, there are many factors to consider so as not to negatively impact the existing

More information

SUMMARY REPORT OF NOISE MONITORING AT FELBRIDGE NOVEMBER 2010 TO OCTOBER 2011

SUMMARY REPORT OF NOISE MONITORING AT FELBRIDGE NOVEMBER 2010 TO OCTOBER 2011 Date: 24 June 2012 Ref: 00148/Felbridge/002/rp SUMMARY REPORT OF NOISE MONITORING AT FELBRIDGE NOVEMBER 2010 TO OCTOBER 2011 Client: Gatwick Airport Limited Report Author :... Dr R. Peters Principal Consultant

More information

Project: Mt Piper Power Station Ash Placement. Lamberts North Operational Noise Assessment March 2014

Project: Mt Piper Power Station Ash Placement. Lamberts North Operational Noise Assessment March 2014 Project: Mt Piper Power Station Ash Placement Lamberts North Operational Noise Assessment March 2014 Reference: 233710 Prepared for: EnergyAustralia NSW Revision: 2 25 March 2014 Mt Piper Power Station

More information

Appendix L Noise Technical Report. Rehabilitation and Restoration of the Longfellow Bridge

Appendix L Noise Technical Report. Rehabilitation and Restoration of the Longfellow Bridge Appendix L Noise Technical Report Rehabilitation and Restoration of the Longfellow Bridge Noise Technical Report Rehabilitation and Restoration of the Longfellow Bridge Boston, MA May, 2011* Prepared by

More information

R e p o r t th A u g u s t

R e p o r t th A u g u s t N o ise Mon it o r ing R e p o r t L e g a c y W a y T u n n e l M o n i t o r i n g P o s t C o m m is s i o n ing T es ts V e n ti la t ion S t a c ks Jun e 20 1 6 R e p o r t 3557 4 th A u g u s t 2

More information

Template Planning Condition on Amplitude Modulation Noise Guidance Notes

Template Planning Condition on Amplitude Modulation Noise Guidance Notes www.renewableuk.com Template Planning Condition on Amplitude Modulation Noise Guidance Notes December 2013 Template Planning Condition on Amplitude Noise Guidance Notes Modulation Introduction Introduction

More information

TECHNICAL NOTES. Sound Level Meter NA Higashimotomachi, Kokubunji, Tokyo , Japan

TECHNICAL NOTES. Sound Level Meter NA Higashimotomachi, Kokubunji, Tokyo , Japan TECHNICAL NOTES Sound Level Meter NA-28 3-20-41 Higashimotomachi, Kokubunji, Tokyo 185-8533, Japan http://www.rion.co.jp/english/ Organization of the NA-28 Documentation The documentation for the Sound

More information

Methods for rating and assessing industrial and commercial sound

Methods for rating and assessing industrial and commercial sound BS 4142:2014 BSI Standards Publication Methods for rating and assessing industrial and commercial sound BS 4142:2014 BRITISH STANDARD Publishing and copyright information The BSI copyright notice displayed

More information

Wambo Coal Mine and Rail Spur

Wambo Coal Mine and Rail Spur Wambo Coal Mine and Rail Spur Environmental Noise Monitoring September 2017 Prepared for Wambo Coal Pty Limited Page i Wambo Coal Mine and Rail Spur Environmental Noise Monitoring September 2017 Reference:

More information

APPENDIX K NAPIER PORT WHARF NO. 6 FUTURE PORT NOISE MAPS

APPENDIX K NAPIER PORT WHARF NO. 6 FUTURE PORT NOISE MAPS APPENDIX K NAPIER PORT WHARF NO. 6 FUTURE PORT NOISE MAPS PORT OF NAPIER WHARF 6 FUTURE PORT NOISE MAPS (2026) Rp 004 r02 2015784A 20 September 2016 84 Symonds Street PO Box 5811 Wellesley Street Auckland

More information

Environmental Noise Propagation

Environmental Noise Propagation Environmental Noise Propagation How loud is a 1-ton truck? That depends very much on how far away you are, and whether you are in front of a barrier or behind it. Many other factors affect the noise level,

More information

Engineering a Sustainable Future for Our Environment

Engineering a Sustainable Future for Our Environment NOISE COMPLIANCE REPORT FOR MULTIQUIP AGGREGATES 5152 OALLEN FORD ROAD, BUNGONIA Prepared for: Alexander Cox, Environmental Officer Multiquip Aggregates Prepared by: Peter Gangemi, Acoustic Engineer R

More information

WesPac Pittsburg Energy Infrastructure Project. Noise Assessment Report

WesPac Pittsburg Energy Infrastructure Project. Noise Assessment Report WesPac Pittsburg Energy Infrastructure Project Noise Assessment Report Prepared for WesPac Energy Pittsburg LLC And Oiltanking North America LLC Prepared by TRC 1200 Wall Street West, 2 nd Floor Lyndhurst,

More information

REPORT OF NOISE MONITORING AT HEVER FEBRUARY 2011 TO JANUARY 2012

REPORT OF NOISE MONITORING AT HEVER FEBRUARY 2011 TO JANUARY 2012 Date: 25 June 2012 Ref: REPORT OF NOISE MONITORING AT HEVER FEBRUARY 2011 TO JANUARY 2012 Client: Gatwick Airport Limited Report Author :... Dr R. Peters Principal Consultant Approved by :. A.V.H. Holdich

More information

Wambo Coal Mine and Rail Spur

Wambo Coal Mine and Rail Spur Wambo Coal Mine and Rail Spur Environmental Noise Monitoring November 2017 Prepared for Wambo Coal Pty Limited Page i Wambo Coal Mine and Rail Spur Environmental Noise Monitoring November 2017 Reference:

More information

Compliance Noise Survey & Assessment

Compliance Noise Survey & Assessment John Trotter Compliance Noise Survey & Assessment Duralie Coal October 2009 Issued October 2009 Vipac Engineers & Scientists Ltd Hunter Valley / Newcastle, NSW REPORT NO: 29N-09-0002-TRP-470219-0 PREPARED

More information

91 Street Earth Berm Removal in Edmonton, Alberta

91 Street Earth Berm Removal in Edmonton, Alberta aci Acoustical Consultants Inc. 5031-210 Street Edmonton, Alberta, Canada T6M 0A8 Phone: (780) 414-6373 www.aciacoustical.com Environmental Noise Monitoring For The 91 Street Earth Berm Removal in Edmonton,

More information

Standard Guide for Measurement of Outdoor A-Weighted Sound Levels 1

Standard Guide for Measurement of Outdoor A-Weighted Sound Levels 1 Designation: E 1014 84 (Reapproved 1995) e1 AMERICAN SOCIETY FOR TESTING AND MATERIALS 100 Barr Harbor Dr., West Conshohocken, PA 19428 Reprinted from the Annual Book of ASTM Standards. Copyright ASTM

More information

UC Berkeley Northside Relocation Cellular Facility

UC Berkeley Northside Relocation Cellular Facility Page 1 of 19 Environmental Noise Analysis UC Berkeley Northside Relocation Cellular Facility Berkeley, California BAC Job # 2015-290 Prepared For: Complete Wireless Consulting Attn: Kim Le 2009 V Street

More information

9 AIR - NOISE AND VIBRATION

9 AIR - NOISE AND VIBRATION 9 AIR - NOISE AND VIBRATION 9.1 INTRODUCTION 1 This chapter evaluates the noise and vibration impacts arising from the proposed 400 kv overhead line (OHL) and associated development including the extension

More information

Wambo Coal Mine and Rail Spur

Wambo Coal Mine and Rail Spur Wambo Coal Mine and Rail Spur Environmental Noise Monitoring August 2017 Prepared for Wambo Coal Pty Limited Page i Wambo Coal Mine and Rail Spur Environmental Noise Monitoring August 2017 Reference: Report

More information