1 3. Project Alternatives The following sections describe the project Alternatives analyzed in terms of the potential for environmental impact associated with each. The Background and Setting Chapter (Chapter 1) describes the history of the Northern Branch project, including the process by which the study arrived at the Build Alternatives No Build Alternative The No Build Alternative for the Northern Branch Corridor DEIS represents the current transportation network plus other reasonably foreseeable transportation improvements that will be implemented by the year The FTA defines the No Build as including only committed improvements, which typically includes the projects in the Transportation Improvement Program (TIP) or other local capital programs, plus other minor transit service expansions or adjustments. The No Build Alternative reflects conditions in the future if no new actions are taken from the proposed project. The existing transportation elements of the No Build Alternative for the Northern Branch Corridor DEIS include: Roadways o Limited access highways: Interstate 95/New Jersey Turnpike, Interstate 80/95, US Route 46, State Route 4, and the Palisades Interstate Parkway. o Local arterials/county and State routes: Tonnelle/Broad/Grand Avenues (variously State Route 93, County Route 501, and US Route 1/9), Central Boulevard (County Route 501), Bergen Boulevard (County Route 17), Palisade/Sylvan Avenues (State Routes 1 and 67), Edgewater Avenue (County Route 17), Fort Lee Road (County Route 12), Palisade Avenue (County Route 505), and Clinton Avenue (County Route 70) o Local roads Buses o Private bus operators such as Coach USA subsidiaries. o NJ TRANSIT Bus Service - The 2030 bus service plan for the study area is assumed to remain unchanged from the present due to: Capacity constraints at the Port Authority Bus Terminal and the George Washington Bridge Bus Terminal which limit the volume of people and equipment that can be processed as well at the number of platforms in use. Express Bus Lane (XBL) capacity at the Tunnel during the peaks hours approximately 1,800 buses use the XBL during this time, with an additional 1,000 buses using other lanes (PANYNJ estimate). NJ TRANSIT Bus Garage capacity limiting the ability of these facilities to handle the maintenance and storage of any significant expansion of fleet. Light Rail o NJ TRANSIT Hudson-Bergen Light Rail (HBLR) in operation to Tonnelle Avenue Station in North Bergen. o HBLR southern Bayonne extension. Commuter Rail o NJ TRANSIT Pascack Valley Line commuter rail service lies approximately three and one-half miles west of the study area, providing service to and from Secaucus Junction and Hoboken Terminal during the peak periods with limited midday service. o Meadowlands Commuter Rail an extension of the Pascack Valley Line and new station to serve the New Jersey Meadowlands area, including the Sports Complex, currently only operating during high-attendance events. Chapter 3: Project Alternatives 3-1

2 Port Authority Trans-Hudson (PATH) Service Trans-Hudson Ferry Service The committed transportation elements of the No Build Alternative for the Northern Branch Corridor DEIS include: Roadway Improvements o 69 th Street Bridge, a new bridge at 69 th Street in North Bergen to grade-separate the roadway over the CSX and NYS&W railroads. o US Route 1/9 widening Build Alternatives The Build Alternatives for the Northern Branch Corridor DEIS are comprised of an electric light rail system, an extension of the existing Hudson-Bergen Light Rail, which would operate along an existing rail right-of-way from North Bergen, Hudson County, to either Englewood or Tenafly in Bergen County, a distance of approximately eight or 12 miles, respectively (Refer to Figure 3-1). The notable differences between the Build Alternatives are the termination points. Light Rail to Englewood Route 4 begins in North Bergen and terminates at a proposed station located adjacent to NJ State Route 4, accessed via Nordhoff Place. This terminal station was selected because Route 4 is a major east-west route connecting the study area to New York City. A station with direct access from Route 4 is convenient for single-occupancy vehicle drivers and helps the project achieve its goals of drawing commuters from the local roadways onto transit. Light Rail to Tenafly (Preferred Alternative) includes the Englewood Route 4 Station and provides service through the town centers of both Englewood and Tenafly, terminating at a station located on the Tenafly-Cresskill border accessed via Piermont Road in Tenafly. This terminal station was selected because the land use development pattern begins to change north of Tenafly from denser older-suburban mixed use and small-lot residential to less dense residential with more open space. These suburban locations are typically auto-dependent and as a result are contributors to surface road congestion. Providing a station in Tenafly opens the northern suburbs to transit service, which helps the project achieve its goals of improving mobility and reducing roadway congestion. Additionally, this alternative provides service through the business districts of Englewood and Tenafly, providing job access and supporting economic development. The Northern Branch service as proposed will operate primarily on existing railroad right-of-way owned by the New York, Susquehanna & Western (NYS&W) in North Bergen and CSX Transportation (CSX) between North Bergen and either Englewood or Tenafly. Discussions with NYS&W and CSX regarding the use of the existing right-of-way and sharing the right-of-way with freight service have commenced and will continue through the design phase. The Light Rail to Tenafly (Preferred Alternative) was developed in the 1999 West Shore Region Study Alternatives Analysis Report. While the study evaluated continuing the Northern Branch service to West Nyack in Orange County, New York, a northern terminus at Tenafly was deemed the most beneficial since right-of-way constraints made construction north of that municipality difficult and the demand forecasting model did not result in substantially higher ridership. Although no Preferred Alternative was identified in the October 2007 Notice of Intent (NOI), NJ TRANSIT subsequently announced its preference for the Light Rail to Tenafly alternative due to the infeasibility of the DMU alternatives (discussed in Chapter 1) and the ridership potential for an alternative reaching further north into Bergen County. Chapter 3: Project Alternatives 3-2

3 3-1 Light Rail to Tenafly (Preferred Alternative) Station Light Rail to Englewood Route 4

4 The Light Rail to Englewood Route 4 alternative was identified in the October 2007 NOI and the 2008 Final Scoping Document. The Englewood Route 4 terminus was included for evaluation for several reasons: Funding for the Northern Branch project remains uncertain. By terminating the project at Route 4, which is a major regional access road, the cost of constructing the project may be more easily funded with the limited resources available. Route 4 is a major regional access road and affords commuters in areas north of Englewood the opportunity to reach the transit system. Terminating the system at Route 4 does not preclude the future construction further north to Tenafly. The major features of the two Build Alternatives are shown in Table 3-1. Table 3-1: Project Element Summary Feature Light Rail to Tenafly Light Rail to Englewood (Preferred Alternative) Route 4 Track miles of double track 1.25 miles of single track 8 miles of double track Stations 9 5 New Viaduct 2 2 Culvert Improvements 4 4 Bridge Improvements 6 6 Substations 10 6 Grade Crossing Improvements Grade Crossing Closures (83 rd Street, North Bergen) 1 1 New Undergrade Bridge/Grade Crossing (85 th Street, North 1 1 Bergen) Vehicle Base Facility 1 1 Surface parking lots 5 3 Parking Garages private properties (23 acres) With VBF in and 7 public properties North Bergen (7 acres). Land Acquisition Source: Jacobs, With VBF in Englewood Project Element General Descriptions 25 private properties (24 acres) and 5 public properties (0.6 acres). 8 private properties (15 acres) and 6 public properties (7 acres). 13 private properties (17 acres) and 4 public properties (0.4 acres). The following section describes the right-of-way improvements required by the project Alternatives: Light Rail to Tenafly (Preferred Alternative) and Light Rail to Englewood Route 4. Immediately below is a brief description of the general corridor-wide improvements that would be required. This is followed by a detailed description of the improvements required for each alternative, by municipality. Chapter 3: Project Alternatives 3-4

5 Tracks Light Rail to Tenafly (Preferred Alternative) In general, the right-of-way would be restored to a two-track alignment, with the exception of the areas in downtown Englewood and downtown Tenafly, where a single track would be required. North of Central Avenue in Tenafly, at the northern end of the project, a third track would be provided to allow two tail tracks for the commuter service, and a through track for freight service. Along the length of the project, existing ties and rail would be removed, and new ballast, new ties and rails will be installed. Track work would end at the tail tracks in Tenafly. Light Rail to Englewood Route 4 The right-of-way would be restored to a two-track alignment. North of the Englewood Route 4 Station, at the northern end of the project, a turnback track is provided for the light rail service. A single track would be maintained for freight service north of the station. Along the length of the project, existing ties and rail would be removed, and new ballast, new ties and rails will be installed. Track work would end just north of the Englewood Route 4 Station. Catenary and Traction Power Substations Light Rail to Tenafly (Preferred Alternative) and Light Rail to Englewood Route 4 Catenary and traction power substations would be constructed along the entire length of the alignment. Overhead catenary required to power light rail vehicles is single-wire light rail catenary, as shown in Photo 1. The catenary draws its power from traction power substations, which serve to boost the strength of the electrical signal as it travels down the wire. Without substations, the electrical signal would weaken as the alignment proceeded north, eventually reaching the level that would not sustain the motors of the light rail vehicles. This phenomenon, called voltage drop, happens whenever electricity is transmitted over a distance. Electrical substations are metal rectangular structures, approximately 24 feet wide by 75 feet long and 14 feet in height; they are surrounded by a fence located approximately seven feet from the structure on three sides and 10 feet on the fourth side. The structures will be located within the footprint of the proposed station sites, which will be located at approximate one-mile intervals along the alignment. For station sites that do not have parking areas, the substation will be located along the right-of-way near the station site. The one exception to this placement is the substation located at 69 th Street in North Bergen. The distance between the beginning of the rail line at the existing Tonnelle Avenue Photo 1: Light Rail Catenary HBLR station and 91 st Street Station (the first Northern Branch station) is too great for the light rail to travel without a substation. As a result, a substation will be located at 69 th Street, under or near the new overgrade bridge proposed to be constructed as part of a different project sponsored by the NJ Department of Transportation (the 69 th Street bridge itself is not part of the Northern Branch project). Stations and Vehicle Base Facility Light Rail to Tenafly (Preferred Alternative) and Light Rail to Englewood Route 4 In general, all of the stations would feature platforms that would be 285 feet in length to serve three-car trains, would include waiting shelter facilities with ticket vending machines, and would be fully- Chapter 3: Project Alternatives 3-5

6 compliant with the Americans with Disabilities Act of 1990 (ADA). Platform height would be 13 inches above the ground. Figures showing the station locations are found at the end of this chapter and site plans are located in Appendix B. A vehicle base facility (VBF) would be constructed for the project in either North Bergen or Englewood Route 4. The VBF would have seven yard tracks enclosed with a proposed storage shed and an eighth track (which is the easternmost track) would have a car wash facility. The VBF has a capacity to store seven three-car consists for a total capacity of 21 cars, not including the car wash track, which adds capacity for another three-car consist. Maintenance would be performed at the existing HBLR maintenance facility in Jersey City North Bergen Light Rail to Tenafly (Preferred Alternative) and Light Rail to Englewood Route 4 Rail Right-of-Way The southern limit of the project begins at the northern limits of the HBLR Tonnelle Avenue Station. Two structural elements are required to bring the light rail onto the Northern Branch tracks. A new 1,500-foot viaduct connection from the existing HBLR terminus at Tonnelle Avenue would be constructed to extend over the HBLR loop track, the CSX North Bergen Yard, the CSX Northern Branch, and the NYS&W Main Line (Refer to Figure 1 in Appendix B). The second structural element is a viaduct, approximately 3,000 feet in length, which will take the light rail vehicles over the existing rail yard in North Bergen (Refer to Figure 2 in Appendix B). This structure is required to maintain physical separation between the light rail vehicles and the heavy rail vehicles that may be moving in the rail yard below. The viaduct would require right-of-way from the NYS&W, and aerial easements from both NYS&W and CSX. In addition, the existing NYS&W Main Line and passing siding would require relocation. Crossovers are also provided to maintain connections from the NYS&W Main Line to storage tracks to the south, and to provide for future connections to the proposed West Side Yard and Industrial Track. This acquisition will be coordinated with CSX and NYS&W. As part of the project, the grade crossing at 83 rd Street would be closed off and replaced with a new grade crossing at 85 th Street, extending 85 th Street to West Side Avenue (Refer to Figure 3 in Appendix B). At 85 th Street a new 50-foot long by 42-foot wide single-span structure would be constructed to carry the West Shore River Line railroad over the roadway grade crossing and the Northern Branch alignment. The ground is elevated on the west side of the Northern Branch at this location, requiring a large amount of rock to be removed to construct the new street. The at-grade crossings at 91 st Street and Fairview Avenue/95 th Street would remain, and crossing gates would be installed. At the right-of-way crossing of Bellmans Creek north of the 91 st Street Station the existing culvert would be replaced. In-stream work would likely be required and sheeting would likely be used to support the railroad while constructing the new footings. The current bridge that carries the railroad alignment, known as the NYS&W Edgewater Branch Bridge, would be reconstructed to improve the vertical clearance necessary for the catenary associated with the light rail vehicles. The right-of-way crosses Bellmans Creek a second time; the existing bridge would be replaced to accommodate two tracks. In-stream work would likely be required; cofferdams would likely be used to construct the new substructure. A substation will be located under or near the new undergrade bridge at 69 th Street, a project under the jurisdiction of the NJ Department of Transportation. This is the only substation not associated with a station site location. Chapter 3: Project Alternatives 3-6

7 North Bergen Vehicle Base Facility A vehicle base facility (VBF) would be constructed on the west side of the right-of-way south of the viaduct to the HBLR Tonnelle Avenue Station (Refer to Figure 1 in Appendix B). To access the VBF, light rail vehicles would bypass the viaduct to the Tonnelle Avenue Station, and continue south along the right-of-way. Seven yard tracks are enclosed with a proposed storage shed and the eighth track (which is the easternmost track) has a car wash facility. 91 st Street Station A new station would be constructed at 91 st Street (Refer to Figure 4 in Appendix B). Side platforms would be constructed to serve both tracks at this station. The track crossing for pedestrians would be atgrade adjacent to the roadway grade crossing. Station parking of approximately 40 spaces would be located east of the tracks, south of 91 st Street, on a property currently occupied by a parking lot for a recently constructed Walmart. A traction power substation will be located within the proposed parking area of the station site Fairview Light Rail to Tenafly (Preferred Alternative) and Light Rail to Englewood Route 4 Rail Right-of-Way The passenger rail alignment would enter the Borough of Fairview briefly. While the replacement track would be designed to accommodate a future station in Fairview, no other notable improvements are proposed. At the border of Fairview and Ridgefield the alignment passes over Wolf Creek on an existing two-track bridge. The bridge would remain in place with only minor rehabilitation; no in-stream work is anticipated to be required Ridgefield Light Rail to Tenafly (Preferred Alternative) and Light Rail to Englewood Route 4 Rail Right-of-Way An existing pedestrian overhead crossing at Pleasantview Terrace would remain, as would a driveway near Wolf Creek that currently crosses the alignment. A driveway near Wolf Creek, connecting to Railroad Avenue would receive crossing gates. Linden Avenue also currently crosses the alignment, providing access to a site west of the alignment that is not currently being used. Flashers and fourquadrant gates are proposed at this location. Ridgefield Station The Ridgefield Station would be constructed west of Route 1/9 (Broad Avenue), south of Hendricks Causeway (Refer to Figure 5 in Appendix B). Side platforms would be constructed to serve both tracks at this station. A pedestrian-only track crossing would be provided at this location. Vehicular access would be from Remsen Place. An approximately 350-space surface parking area would be provided on a site currently occupied by a recently-constructed commercial/retail center. A traction power substation will be located within the proposed parking area of the station site Palisades Park Light Rail to Tenafly (Preferred Alternative) and Light Rail to Englewood Route 4 Rail Right-of-Way Just north of the border of Palisades Park, an existing culvert would be widened to accommodate the twotrack alignment. In-stream work would likely be required; sheeting is proposed for use to support the Chapter 3: Project Alternatives 3-7

8 railroad while constructing the new footings. At the Palisades Park/Leonia border adjacent to Overpeck County Park, a new double- track bridge would be constructed over an unnamed tributary to Overpeck Creek. In-stream work would likely be required; cofferdams would likely be used to construct the new substructure. The at-grade crossings of West Ruby Avenue, Roosevelt Place, and West Central Boulevard would have flashers and four-quadrant gates installed. Palisades Park Station The proposed station in Palisades Park would be located north of Ruby Avenue, south of Fairview Street, and west of Grand Avenue (Refer to Figure 6 in Appendix B). Side platforms would be constructed to serve both tracks at this station. A pedestrian-only track crossing would be provided at this location. Vehicular access would be from West Ruby Avenue and Fairview Street. A mix of industrial and commercial buildings currently occupies the site. An approximately 320-space parking area would be provided. A traction power substation will be located within the proposed parking area of the station site Leonia Light Rail to Tenafly (Preferred Alternative) and Light Rail to Englewood Route 4 Rail Right-of-Way Within Leonia, the Fort Lee Road crossing would remain at-grade, as would the pedestrian crossing at Leonia High School. At the Fort Lee grade crossing, flashers and four-quadrant gates would be installed. At the pedestrian crossing at the high school, pedestrian gates and flashers would be installed, as well as fencing of adjacent right-of-way, and removal of adjacent vegetation. As part of a separate project, Bergen County is realigning the pedestrian path and access roads within Overpeck Park and providing a traffic signal at the Park Entrance on Fort Lee Road. These improvements are compatible with the improvements proposed for Leonia Station under both Alternatives. Leonia Station The Leonia Station is proposed north of Fort Lee Road, east of the right-of-way (Refer to Figure 7 in Appendix B). The track crossing for pedestrians and vehicles would be at Fort Lee Road. Side platforms would be constructed to serve both tracks at this station. A bus drop-off area would be located on Fort Lee Road. A traction power substation will be located at the edge of the parking area, near the right-ofway. Station parking for 550 vehicles would be accommodated in a six-story parking deck located above an existing parking lot associated with an office building (Kulite) located at Block 801 in a commercial/industrial area east of the Northern Branch right-of-way. The parking deck would be large enough to accommodate the project s need, as well as the existing parking for the Kulite business. Access to the parking deck would be from Willow Tree Road, which runs in a north-south direction between the right-of-way and Block Englewood Light Rail to Tenafly (Preferred Alternative) Rail Right-of-Way The bridge over a channel of Overpeck Creek would be widened and a culvert would be extended to accommodate the second track between Brookside Lane and Englewood Route 4 Station. Between West Forest Avenue and Englewood Avenue a new box culvert would be constructed. South of Hudson Avenue, north of Englewood Hospital, the existing bridge would be widened to carry the new second track over a stream. In-stream work is anticipated for all four elements; for the two culverts sheeting Chapter 3: Project Alternatives 3-8

9 would be used to support the railroad while constructing the new footings; for the two bridges, cofferdams would be used to construct the new substructures. From Palisade Avenue to Demarest Avenue, the alignment would be single-track as a result of the narrowing of the right-of-way through Englewood s town center. After Demarest Avenue, the alignment would return to two tracks. A new track interlocking would be constructed between West Forest and Englewood Avenues. The interlocking would permit the freight operator to make necessary maneuvers to service a customer on the eastern side of the right-of-way in Englewood. Currently, when this maneuver is made, the grade crossings at Englewood and Palisade Avenues in downtown Englewood are closed for several minutes. This situation is a source of community, traveler and business complaints to CSX and the City of Englewood. Mitigation or elimination of this situation has long been cited as a critical element in the use of the Northern Branch Corridor for passenger service. The proposed new interlocking improves operations by reducing the number of drills through the intersections. The at-grade crossings of Brookside Lane, West Forest Avenue, Englewood Avenue, Palisade Avenue, Demarest Avenue, Hamilton Avenue, Hudson Avenue, and Ivy Lane would have flashers and fourquadrant gates installed. Englewood Route 4 Station The Englewood Route 4 Station would be located under and south of Route 4 (Refer to Figure 8 in Appendix B). The station would have a center low-level platform. A pedestrian-only track crossing would be provided at this location. Surface parking of approximately 480 spaces would be located west of the right-of-way and Nordhoff Place, south of Route 4. Access to the station would be from Nordhoff Place. The site is currently occupied by an industrial building. A traction power substation will be located within the proposed parking area of the station site. Englewood Route 4 Vehicle Base Facility Optional A vehicle base facility is proposed in Englewood on the east side of the tracks between Brookside Avenue and Route 4 as an option to the North Bergen VBF location (Refer to Figure 9 in Appendix B). The components of the Englewood VBF would be identical to the facility proposed for North Bergen, and would include seven yard tracks enclosed within a proposed storage shed and an eighth track (which is the easternmost track) serving as a car wash facility. The yard has a capacity to store seven three-car consists for a total capacity of 21 cars, not including the car wash track, which adds capacity for another three-car consist. Englewood Town Center Station The Englewood Town Center station would be north of Englewood Avenue, south of Palisade Avenue (Refer to Figure 10 in Appendix B). The low-level station platform would be located on the eastern side of the single track. This station is designed to be a walk-on station so there would be no parking at this location associated with the project. A traction power substation will be located within the rail right-ofway in the vicinity of the station platform. Englewood Hospital Station The Englewood Hospital station would be located along Dean Street, across from the hospital (Refer to Figure 11 in Appendix B). Side platforms would be constructed to serve both tracks at this station. A pedestrian-only track crossing would be provided at this location. A passenger drop-off area with shortterm-only parking would be provided along Dean Street on the eastern side of the right-of-way. There would be no new parking at this location. A traction power substation will be located within the rail rightof-way in the vicinity of the station platforms. Chapter 3: Project Alternatives 3-9

10 Light Rail to Englewood Route 4 Rail Right-of-Way The bridge over a channel of Overpeck Creek would be widened and a culvert would be extended to accommodate the second track between Brookside Lane and Englewood Route 4 Station. In-stream work is anticipated for both elements; for the culvert sheeting would be used to support the railroad while constructing the new footings; for the bridge, cofferdams would be used to construct the new substructures. The at-grade crossings of Brookside Lane, West Forest Avenue, Englewood Avenue, Palisade Avenue, Demarest Avenue, Hamilton Avenue, Hudson Avenue, and Ivy Lane would have flashers and fourquadrant gates installed. Englewood Route 4 Station The Englewood Route 4 Station would be located under and south of Route 4 (Refer to Figure 8 in Appendix B). The station would have a center low-level platform. A pedestrian-only track crossing would be provided at this location. Surface parking of approximately 870 spaces would be located west of the right-of-way and Nordhoff Place, south of Route 4. Access to the station would be from Nordhoff Place. The site is currently occupied by an industrial building. A traction power substation will be located within the proposed parking area of the station site. Englewood Route 4 Vehicle Base Facility Optional A vehicle base facility is proposed in Englewood on the east side of the tracks between Brookside Avenue and Route 4 as an option to the North Bergen VBF location (Refer to Figure 9 in Appendix B). The components of the Englewood VBF would be identical to the facility proposed for North Bergen, and would include seven yard tracks enclosed within a proposed storage shed and an eighth track (which is the easternmost track) serving as a car wash facility. The yard has a capacity to store seven three-car consists for a total capacity of 21 cars, not including the car wash track, which adds capacity for another three-car consist Tenafly Light Rail to Tenafly (Preferred Alternative) Rail Right-of-Way The alignment through Tenafly is double-track except for the section between Westervelt Avenue and Jay Street (through the town center), where the right-of-way width narrows and the alignment is reduced to a single track. After Jay Street, the alignment returns to two tracks. North of Central Avenue, at the border of Creskill, the alignment widens to three tracks to provide a through track for freight service and two tail tracks at the terminus of the proposed passenger rail service. The limit of project work is approximately 500 feet into Cresskill to permit extension of the signal system to beyond Union Avenue which would allow for the switch operation at the Tenafly siding. The at-grade crossings of Westervelt Avenue, West Clinton Avenue, Washington Street, Riveredge Road/Jay Street, and Central Avenue would have flashers and four-quadrant gates installed. The access road to Railroad Avenue appears closed; fencing will be installed to eliminate the crossing. Tenafly Town Center Station The Tenafly Town Center station would be located south of West Clinton Avenue behind the Clinton Inn (Refer to Figure 12 in Appendix B). The low-level station platform would be located on the western side of the single track. A passenger drop-off area with short-term-only parking would be provided on the west side of the right-of-way south of West Clinton Avenue on a site currently used for municipal Chapter 3: Project Alternatives 3-10

11 parking. No commuter parking would be provided at this station. A traction power substation will be located within the rail right-of-way in the vicinity of the station platform. Tenafly North Station The Tenafly North Station would be located along Piermont Road, south of the Cresskill border (Refer to Figure 13 in Appendix B). The station would have a low-level center-island platform. A pedestrian-only track crossing would be provided at this location. Parking of approximately 570 spaces would be located in a new surface parking lot east of Piermont Road, bordered by Piermont Road, Hudson Avenue, Madison Avenue, and North Summit Street. Vehicular access would be from Hudson Avenue, Madison Avenue, and North Summit Street. The site currently houses commercial and industrial uses, and educational and residential uses. Light Rail to Englewood Route 4 Rail Right-of-Way The at-grade crossings of Westervelt Avenue, West Clinton Avenue, Washington Street, Riveredge Road/Jay Street, and Central Avenue would have flashers and four-quadrant gates installed. The access road to Railroad Avenue appears closed; fencing will be installed to eliminate the crossing Areas North of Tenafly Light Rail to Tenafly (Preferred Alternative) and Light Rail to Englewood Route 4 Rail Right-of-Way The limitations of the light rail vehicle require that it be separated temporally from freight service. As a result, freight service will operate overnight while light rail passenger service will operate during the day. To minimize noise impacts, Quiet Zones (discussed in Chapter 12: Noise) and associated flashers and four-quadrant gates are proposed for 11 crossings: Cresskill East Madison Avenue, Union Avenue, Pedestrian Crossing at W. Morningside Demarest Hardenburgh Avenue Closter Demarest Avenue, High Street, Closter Dock Road, Blanch Avenue Norwood Broadway Avenue Northvale Paris Avenue, Pierron Street Summary of Physical Alignment Improvements Table 3-2 summarizes the physical alignment improvements proposed for the Build Alternatives. The summary is also grouped by municipality. Table 3-2: Physical Alignment Improvements Project Element NORTH BERGEN Viaduct Viaduct Location Tonnelle Avenue HBLR Terminal to Northern Branch over existing HBLR loop track and train yard. 69 th Street to 83 rd Street Light Rail to Tenafly (Preferred Alternative) Improvement Road Closure 83 rd Street Road to be closed Light Rail to Englewood Route 4 1,500-foot viaduct to connect HBLR to the Northern Branch alignment. Viaduct would curve northwest from Tonnelle Avenue 3,000-foot viaduct to bring the light rail vehicles over the existing rail yard in North Bergen Chapter 3: Project Alternatives 3-11

12 Table 3-2: Physical Alignment Improvements (continued) Project Element Location Light Rail to Tenafly (Preferred Light Rail to Alternative) Improvement Englewood Route 4 New Undergrade Bridge and Grade Crossing 85 th Street, under CSX River Line Northern Branch to cross 85 th Street at-grade; crossing gates to be installed; 85 th Street to be extended to West Side Avenue; and new single span bridge to carry CSX over 85 th Street. Grade Crossing 91 st Street Crossing gates Culvert Bellmans Creek, North of 91 st Street Replace existing culvert Overhead Bridge NYS&W Edgewater Branch Bridge Reconstruct bridge Grade Crossing Fairview Avenue/95 th Street Crossing gates Bridge Bellmans Creek Border of North Bergen and Widen bridge to accommodate second track Fairview Substation 69 th Street Substation below bridge or within ROW North Bergen Yard VBF West side of right-of-way, south of viaduct to Tonnelle Avenue 7 yard tracks and an eighth track with a car wash facility (One of two potential alternate VBF sites) 91 st Street Station 91 st Street, west of Tonnelle 40 parking spaces in existing commercial parking lot; Low-level Avenue platform; substation in parking lot FAIRVIEW Bridge RIDGEFIELD Wolf Creek, Border of Fairview and Ridgefield Tie replacement and minor structure rehabilitation Grade Crossing Driveway (near Wolf Creek) to Railroad Ave Crossing gates Grade Crossing Linden Avenue Four-quadrant gates and flashers Ridgefield Station West of Route 1/9 (Broad Avenue), 350 parking spaces; Low-level platform; south of Hendricks Causeway substation in parking lot PALISADES PARK Culvert Stream, South of W. Ruby Avenue Extend culvert to accommodate second track Grade Crossing West Ruby Avenue Four-quadrant gates and flashers Grade Crossing Roosevelt Place Four-quadrant gates and flashers Grade Crossing West Central Boulevard Four-quadrant gates and flashers. Bridge Stream, Border of Palisades Park and Leonia Widen bridge to accommodate second track Palisades Park Station LEONIA West of Grand Avenue, between Ruby Avenue and Fairview Street 320 parking spaces; Low-level platform; substation in parking lot Grade Crossing Fort Lee Road Four-quadrant gates and cantilevered mounted flashers Grade Crossing Pedestrian Crossing at Leonia High School Pedestrian gates, flashers, fencing, and removal of vegetation Leonia Station North of Fort Lee Road, east of 550 parking spaces (deck) ; Low-level platform; right-of-way substation in parking lot ENGLEWOOD Bridge Concrete channel, between I-95 and Brookside Lane Widen bridge to accommodate second track Grade Crossing Brookside Lane Four-quadrant gates and flashers Culvert Stream, between Brookside Lane and Englewood Route 4 Station Extend culvert to accommodate second track Grade Crossing West Forest Avenue Four-quadrant gates and flashers Box Culvert West Forest Avenue to Englewood Avenue New box culvert No Improvement Chapter 3: Project Alternatives 3-12

13 Table 3-2: Physical Alignment Improvements (continued) Project Element Location Light Rail to Tenafly (Preferred Alternative) Improvement Light Rail to Englewood Route 4 Interlocking Between West Forest Avenue and Englewood Avenue New Interlocking Grade Crossing Englewood Avenue Four-quadrant gates and flashers Grade Crossing Palisade Avenue Four-quadrant gates, flashers, and pedestrian gates Grade Crossing Demarest Avenue Four-quadrant gates and flashers Grade Crossing Hamilton Avenue Four-quadrant gates and flashers Bridge Stream, north of Englewood Widen bridge to accommodate Hospital Station second track Grade Crossing Hudson Avenue Four-quadrant gates and flashers Grade Crossing Ivy Lane Four-quadrant gates and flashers Under and south of Route 4, 480 parking spaces; Low-level Englewood Route parking would be west of right-ofway substation in parking lot platform; 4 Station Englewood VBF East of right-of-way between Brookside Ave and Route 4 Englewood Town North of Englewood Ave, south of No parking; Low-level platform; Center Station Englewood Hospital Station TENAFLY Palisade Ave Dean Street, across from the hospital No Improvement No Improvement 870 parking spaces; Lowlevel platform; substation in parking lot 7 yard tracks and an eighth track with a car wash facility (Optional: alternate site to North Bergen VBF site) substation in ROW No parking; Low-level platform; substation in ROW No Improvement No Improvement Grade Crossing Westervelt Avenue Four-quadrant gates. Grade Crossing West Clinton Avenue Four-quadrant gates, pedestrian gates, and cantilevered mounted flashers Grade Crossing Washington Street Four-quadrant gates and flashers Grade Crossing Riveredge Road / Jay Street Four-quadrant gates and flashers Grade Crossing Central Avenue Four-quadrant gates and flashers Grade Crossing Access road to Railroad Avenue Appears closed, install fencing to eliminate crossing Tenafly Town South of West Clinton Ave, behind No parking; Low-level platform; Center Station the Clinton Inn substation in ROW No Improvement Piermont Road, just south of the 570 parking spaces; Low-level Tenafly North Creskill border, bounded by platform; Station Hudson Ave, Madison Ave, and substation in parking lot North Summit St No Improvement NORTH OF TENAFLY Grade Crossing East Madison Avenue, Cresskill Four-quadrant gates and cantilevered mounted flashers Grade Crossing Union Avenue, Cresskill Four-quadrant gates and cantilevered mounted flashers Grade Crossing Pedestrian Crossing at W. Morningside, Cresskill Pedestrian gates, flashers, fencing, and removal of vegetation Grade Crossing Hardenburgh Avenue, Demarest Four-quadrant gates and flashers Grade Crossing Demarest Avenue, Closter Four-quadrant gates and flashers Grade Crossing High Street, Closter Four-quadrant gates and flashers Grade Crossing Closter Dock Road, Closter Four-quadrant gates, flashers, and close secondary driveway Grade Crossing Blanch Avenue, Closter Four-quadrant gates and flashers Grade Crossing Broadway Avenue, Norwood Four-quadrant gates and flashers Grade Crossing Paris Avenue, Northvale Four-quadrant gates and flashers Grade Crossing Access road to Pierron Street, Northvale Four-quadrant gates and flashers Source: Jacobs, Chapter 3: Project Alternatives 3-13

14 Electric Light Rail Vehicles The vehicles proposed to be used are already in use on the existing Hudson- Bergen Light Rail system and are shown in Photo 2. The vehicle provides seating for 68 passengers and a total capacity of 150 passengers. The vehicles are known as low-floor vehicles, requiring a platform height of 13 inches above the ground. The two Build Alternatives would use a combination of twoand three-car trains to accommodate projected ridership. The light rail vehicles do not meet the Federal Railroad Administration s (FRA) structural requirements, as defined in 49 CFR Part 238, for vehicles operating in mixed traffic with freight trains. Accordingly, the light rail must operate with either a physical or temporal separation from the freight operation. The two Build Alternatives are assumed to operate between the hours of 5:30 a.m. and 10:30 p.m., allowing the freight providers to use the alignment between 11:00 p.m. and 5:00 a.m. Photo 2: HBLR Vehicle Operating Plan The operating plan assumes that in 2030 the Hudson-Bergen Light Rail service operates with three-car consists between Tonnelle Avenue and Hoboken and two-car consists between Tonnelle Avenue and West Side Avenue, requiring a total of 12 additional vehicles beyond the 52 vehicles currently in the HBLR fleet. These 12 additional HBLR vehicles are not included in the capital costs for this project since they will be needed to accommodate ridership grown on the existing HBLR service. Light Rail to Tenafly (Preferred Alternative) The service for the Northern Branch is assumed to operate daily from 5:30 a.m. to 10:30 p.m. Three-car trains (maximum consist size) are assumed, with 68 seats per car, from Tenafly to Hoboken; two-car trains are assumed to operate between Englewood Route 4 and Jersey City. Each service is assumed to operate on headways of 12 minutes in the peak period and 24 minutes in the off-peak period. Accordingly, south of Englewood Route 4 the service would effectively be six minutes in the peak period and 12 minutes in the off-peak period. It is assumed that CSX will continue to operate freight service at levels similar to those currently in operation. However, under this alternative, the freight services would be provided at night after the light rail service shuts down. Travel times for the Northern Branch light rail service are presented in Table 3-3. From Tenafly North, the train would take 21 minutes to reach Tonnelle Avenue, 25 minutes to reach Port Imperial in Weehawken, and 37 minutes to reach Hoboken. Table 3-3 also shows times from the other stations. To accommodate the projected riders from the Northern Branch, an additional 13 HBLR vehicles (which includes a 20 percent spare factor) would be required. Peak service would require eight three-car train sets between Tenafly North and Hoboken and 10 two-car train sets between Englewood Route 4 and West Side Avenue. Off-peak service between Tenafly North and Hoboken would require five three-car train sets while Englewood Route 4 to West Side Avenue would require six two-car trains. Light Rail to Englewood Route 4 The service for the Northern Branch is assumed to operate daily from 5:30 a.m. to 10:30 p.m. Three-car trains (maximum consist size) are assumed, with 68 seats per car, from Englewood Route 4 to Hoboken; two-car trains are assumed to operate between Englewood Route 4 and Jersey City. Each service is Chapter 3: Project Alternatives 3-14

15 assumed to operate on headways of 12 minutes in the peak period and 24 minutes in the off-peak period. Accordingly, the service would effectively be six minutes in the peak period and 12 minutes in the offpeak period. It is assumed that CSX will continue to operate freight service at levels similar to those currently in operation. However, under this alternative, the freight services would be provided at night after the light rail service shuts down. Table 3-3: Northern Branch Corridor Light Rail Travel Times (Minutes) Light Rail to Tenafly (Preferred Alternative) Station Stop Incremental Time Cumulative Time Travel Time to Port Imperial, Weehawken Travel Time to Hoboken Tenafly North :25 0:37 Tenafly Center 0:02 0:02 0:23 0:35 Englewood Hospital 0:03 0:05 0:20 0:32 Englewood Center 0:02 0:07 0:18 0:30 Englewood Rt. 4 0:02 0:09 0:16 0:28 Leonia 0:02 0:11 0:14 0:26 Palisades Park 0:02 0:13 0:12 0:24 Ridgefield 0:02 0:15 0:10 0:22 91st Street 0:03 0:18 0:07 0:19 Tonnelle Avenue 0:03 0:21 0:04 0:16 Source: Jacobs, 2008 Travel times for the Northern Branch light rail service are presented in Table 3-4. From Englewood Route 4, the train would take 12 minutes to reach Tonnelle Avenue, 16 minutes to reach Port Imperial in Weehawken, and 28 minutes to reach Hoboken. Table 3-4 also shows times from the other stations. Table 3-4: Northern Branch Corridor Light Rail Travel Times (Minutes) Light Rail to Englewood Route 4 Station Stop Incremental Time Cumulative Time Travel Time to Port Imperial, Weehawken Travel Time to Hoboken Englewood Rt :16 0:28 Leonia 0:02 0:02 0:14 0:26 Palisades Park 0:02 0:04 0:12 0:24 Ridgefield 0:02 0:06 0:10 0:22 91st Street 0:03 0:09 0:07 0:19 Tonnelle Avenue 0:03 0:12 0:04 0:16 Source: Jacobs, 2008 To accommodate the projected riders from the Northern Branch an additional six HBLR vehicles (which includes a 20 percent spare factor) would be required. Peak service would require six three-car train sets between Englewood Route 4 and Hoboken and 10 two-car train sets between Englewood Route 4 and West Side Avenue. Off-peak service would require four train sets to Hoboken and six train sets to West Side Avenue Ridership Description of Ridership Ridership for the Northern Branch Alternatives was estimated by NJ TRANSIT using the North Jersey Transit Demand Forecasting Model (NJTDFM). The NJTDFM is a regional forecasting model that has Chapter 3: Project Alternatives 3-15

16 been utilized for transit forecasting for other NJ TRANSIT projects. A description of the model and the process to provide the forecast in this DEIS is available upon request. The model was used to estimate total LRT riders by zone to each station. NJ TRANSIT then used data from the model (such as percentage of people that would walk, drive, carpool, be dropped off, or take the bus based upon distance from each station, and the type and density of development) to estimate how people would travel to each station. This produced an initial parking demand at each station. The station locations were then reviewed to determine the maximum amount of parking that could be reasonably provided at each location, without overwhelming the communities. The model was then constrained with these maximum parking numbers, and a second iteration of the forecasting model was run. This resulted in adjustments to individual access modes to each station and a final, revised parking demand at each station. The Northern Branch Corridor 2030 forecast year is consistent with regional long-range population and employment forecasts developed by the North Jersey Transportation Planning Authority (NJTPA), the Metropolitan Planning Organization (MPO) for the Northern Branch Corridor study area. The use of 2030 is also consistent with other transit planning work being undertaken by NJ TRANSIT, including the Lackawanna Cut-off, Monmouth-Ocean Middlesex (MOM) Rail Corridor, West Trenton Line, and the Access to the Region s Core (ARC) project. Light Rail to Tenafly (Preferred Alternative) Light Rail to Tenafly (Preferred Alternative) is projected to carry a total of 11,900 passengers each day, with a total of 23,800 daily trips (Refer to Table 3-5). Of that total, 4,400 would be new transit riders (8,800 daily trips); which is typically commuters who previously drove. The remaining riders are transfers from other modes of transit. Table 3-5: Projected Northern Branch Daily Passengers, Trips and New Transit Trips Boardings and Alightings Station Light Rail to Tenafly (Preferred Alternative) Light Rail to Englewood Route 4 Tenafly North 1, Tenafly Center 1, Englewood Hospital Englewood Town Center 1, Englewood Route ,750 Leonia 3,200 3,895 Palisades Park 1,745 1,700 Ridgefield 1,440 1,460 91st Street 1,040 1,155 TOTAL Passengers 11,900 9,960 TOTAL Daily Trips 23,800 19,920 New Transit Trips 8,800 6,600 Source: NJ TRANSIT, 2008 As a result of the required coordination with freight rail, Light Rail to Tenafly (Preferred Alternative) would stop running at 10:30 p.m. to allow the freight service to operate in the overnight hours. To test the impact of the shortened operating hours, ridership demand for longer operating hours (5:30 a.m. to 1:00 a.m.) was also developed by NJ TRANSIT using the NJTDFM. In this scenario, ridership demand increases by approximately 17 percent to 28,000 trips per day due to the longer service hours. However, peak period ridership is not affected. Chapter 3: Project Alternatives 3-16

17 Light Rail to Englewood Route 4 Light Rail to Englewood Route 4 is projected to carry a total of 9,960 passengers each day, with a total of 19,920 daily trips. Of that total, 3,300 would be new transit riders (6,600 daily trips); that is, commuters who previously drove and, under this alternative, would use transit service. The remaining riders are transfers from other modes of transit. Light Rail to Englewood Route 4 serves fewer riders as a function of the length of the service and the number of communities served. Although many commuters from northern Englewood and Tenafly would drive to the Englewood Route 4 Station, there would still be a large percentage that would choose a different commuting method Cost Analysis Capital Costs A capital cost model was developed for the Northern Branch project following the guidance contained in FTA s Standard Cost Categories for Capital Projects, revised May Unit costs included in the model have been developed based on recent experience with the design and cost estimating of capital cost elements on other projects. Costs have been developed based on NJ TRANSIT experience and are reported in 2008 dollars escalated to year of expenditure (refer to Table 3-6). The right-of-way costs reflect the estimated cost for property associated with stations and parking facilities. The cost for the CSX and NYS&W rights-of-way is not included in these estimates. Table 3-6: Capital Costs by Alternative (costs in 2008 dollars, in millions) Cost Item Light Rail to Tenafly Light Rail to Englewood (Preferred Alternative) Route 4 Guideway and Track Elements Stations, Stops, Terminals, Intermodals Support Facilities: Yards, Shops, Admin Buildings Sitework & Special Conditions Systems ROW, Land, Existing Improvements Professional Services Unallocated Contingency Finance Charges SUBTOTAL (2008 $) Escalation CONSTRUCTION TOTAL Vehicles PROJECT TOTAL Total Project Miles 12 miles 8 miles Capital Cost / Mile Source: Gannett-Fleming/HNTB, 2008 As shown in Table 3-6, the total project cost to construct the Light Rail to Tenafly (Preferred Alternative) is just over 25 percent more than Light Rail to Englewood Route 4; however, Light Rail to Tenafly (Preferred Alternative) travels 33 percent further. Comparing the total project cost by project mile, the cost per mile would be less for the Light Rail to Tenafly (Preferred Alternative) than Light Rail to Englewood Route 4, million and million per mile, respectively. The source of funding for construction of this project has not been identified at this time. Chapter 3: Project Alternatives 3-17

18 Annual Operating and Maintenance Costs and Revenue An operating and maintenance cost (O&M) model was developed following the guidance contained in Procedures and Technical Method for Transit Project Planning, Section 2.4, Operating and Maintenance Cost, Federal Transit Administration, September 1990, as revised. The principles of this guidance were applied to prepare the O&M cost model for the Northern Branch Project, which was developed to a level of detail appropriate for the concept-level work performed in this study. The output of the demand forecasts and operating plans was used as input to the O&M cost model, in the form of operating statistics. Development of the model involved identifying costs that vary with service levels, and then attributing each variable cost to the service characteristics to which it is most closely tied. Refinements were made to the operating cost model to reflect the actual experience of the existing HBLR system. The HBLR operation was summarized based on car and train hours and miles, overall costs and several standard operating ratios (cost/mile, cost/hour, miles/hours of service). These service statistics were then compared against the preliminary estimates for the proposed project alternatives. The line item unit costs by category and/or the service quantities in the cost model were adjusted to more accurately reflect the needs of a light rail service operating on the Northern Branch. At the end of this effort, the costs to operate and maintain each of the alternatives were estimated and are summarized in Table 3-7. Annual revenue for each of the Build Alternatives was developed based on the ridership forecasts and assumptions for fares and parking rates. The annual revenue includes revenue loss from Commuter Rail and HBLR but does not consider revenue loss from bus. Revenue recovery is the total revenue (fares and parking fees) divided by the total operating and maintenance costs, expressed as a percentage. The operating subsidy is the total operating and maintenance costs minus the revenue. Table 3-7 summarizes each of these items by alternative. Both Build Alternatives are predicted to operate at similar revenue recovery rates, between 36.17% and 36.54%. Light Rail to Tenafly (Preferred Alternative) has higher annual operating and maintenance costs, but has higher annual revenue. When comparing the annual operating subsidy between the two Build Alternatives, when the subsidy is calculated per mile, the subsidy per mile is approximately the same. Thus the main difference between the alternatives is the distance over which the light rail would operate. Table 3-7: Annual Costs and Revenue by Alternative (costs in 2008 dollars, in millions) Item Light Rail to Tenafly Light Rail to Englewood (Preferred Alternative) Route 4 Annual Operating and Maintenance Costs $23.5 $15.6 Annual Revenue $8.5 $5.7 Annual Revenue Recovery 36.17% 36.54% Annual Operating Subsidy $15.0 $9.9 Total Project Miles 12 miles 8 miles Annual Operating Subsidy / Mile $1.25 $1.25 Source: Jacobs, The source of funding for annual operation and maintenance costs has not been identified at this time. Chapter 3: Project Alternatives 3-18

19 6 9 t h S t NORTH BERGEN HUDSON-BERGEN LIGHT RAIL (HBLR) CONNECTION G r a n t o n A v e 6 7 t h S t Northern Branch Corridor Figure 3-2 T o n n e l l e A v e. Ber g e n C o u n t y N e w Y o r k N e w J er s e y M a n h a t t a n R o u s s o L n W. S i d e A v e. I H u d s o n C o u n t y P r o p o s e d N o r t h e r n B r a n c h A l i g n m e n t H u d s o n - B e rge n L i g h t R a i l N J M e a d o w l a n d s D i s t r i c t T o w n s h i p o f N o r t h B e r g e n T o n e l l e A v e S t ati o n F r e i g h t O n l y S t r u c t u r e : L R T F l y o v e r M u n i c i p a l B o u n d ary / N J M e a d o w l a n d s D i s t r i c t P r o p o s e d VBF T o w n o f S e c a u c u s 5 1 s t S t. T o n n e l l e A v e n u e S t a t i o n I Miles 4 8 t h S t. B e r g e n T p k e.

20 91st STREET STATION LOCATION Northern Branch Corridor Figure 3-3 B o r o u g h o f F a i r v i e w Ber g e n C o u n t y 9 1 s t S t r e e t S t a t i o n T o w n s h i p o f N o r t h B e r g e n 9 1 s t S t. N e w Y o r k N e w J e r s e y M a n h a t t a n N o l a n A v e. I H u d s o n C o u n t y 8 9 t h S t. P r o p o s e d N o r t h e r n B ran c h A l i g n m e n t N J M e a d o w l a n d s D i s t r i c t T o n n e l l e A v e. P r o p o s e d S t ati o n P l atf o r m P ro po s e d P a r k i n g A r e a M u n i c i p a l B o u n d ary / N J M e ado w l a n d s D i s t r i c t Viaduct I Mles i

21 B r o a d A v e. Edg ewaterave. West G r a n d A v e. RIDGEFIELD STATION LOCATION Northern Branch Corridor Figure 3-4 C h u r c h S t. H e n d r i c k s C s w y. E d g e w a t e r A v e. Ber g e n C o u n t y N e w Y o r k N e w J e r s e y M a n h a t t a n I H u d s o n C o u n t y R i d g e f i e l d S t a t i o n P r o p o s e d N o r t h e rn Br a n c h A l i g n m e n t P ro po s e d S t a t i o n P l atf o r m M a r i o n P l. P r o p o s e d P a r k i n g A r e a N J M e ado w l a n d s D i s t ric t N J M e a d o w l a n d s D i s t r i c t L a n c a s t e r R d. I Miles R a i l r o a d A v e.

22 C o m m e r c i a l A v e. G r a n d A v e. R o o s e v e l t S t. C o l u m b u s A v e. PALISADES PARK STATION LOCATION Northern Branch Corridor Figure 3-5 B r i n k e r h o f f T e r r. W. H e n r y S t. H e n r y A v e. B e r g e n C o u n t y N e w Y o r k N e w J e r s e y W. H o m e s t e a d A v e..! P r o s p e c t S t. P a l i s a d e s P a r k S t a t i o n W. H a r w o o d A v e. I H u d s o n C o u n t y M a n h a t t a n F a i r v i e w S t. W. E d s a l l A v e. P r o p o s e d N o r t h e r n B r a n c h A l i g n m e n t W. R u b y A v e P r o p o s e d S t ati o n P l atf o r m P ro po s e d P a r k i n g A r e a M u n i c i p a l B o u n d a r y W. C o l u m b i a A v e. B o r o u g h o f P a l i s a d e s P a r k U. S. R o u t e 4 6 B o r o u g h o f R i d g e f i e l d L i n d e n A v e. I Miles

23 OVE R P E C K PAR K R OAD LELAND DRIVE LEONIA STATION LOCATION Northern Branch Corridor Figure 3-6 WIL L OW TR E E Ber g e n C o u n ty S C HOR AVE NUE.! N e w Y o r k N e w J e r s e y M a n h a t t a n I H u d s o n C o u n t y P r o p o s e d N o r t h e r n B r a n c h A l i g n m e n t P r o p o s e d S t ati o n P l atf o r m P r o p o s e d P a r k i n g A r e a M u n i c i p a l B o u n d ary FORT LEE ROAD G R AND AVE NUE PAR K WAY S TATION S TR E E T P R OS P E C S P R ING I Miles MAP L E S TR E E T

24 S D S. V a n B r u n t S t. S. D e a n S t. G r a n t S t. H o n e c k S t. ENGLEWOOD ROUTE 4 STATION LOCATION Northern Branch Corridor Figure 3-7 N o r d h o f f P l. B a n c k e r S t. Ber g e n C o u n ty V a n N o s t r a n d A v e. N e w Y o r k N e w J e r s e y P l a t f o r m e x t e n d s u n d e r R o u t e 4.! R o u t e 4 M a n h a t t a n E n g l e w o o d S t a t i o n R o u t e 4 I H u d s o n C o u n t y P r o p o s e d N o r t h e r n B r a n c h A l i g n m e n t S. D D e a n St S t. G r a n d A v e. P r o p o s e d S t ati o n P l atf o rm P r o p o s e d P a r k i n g A r e a M u n i c i p a l B o u n d ary W. S h e f f i e l d A v e. W. N o r d h o f f P l. Optional Vehicle Base Facility C e d a r L n. B r o o k s i d e A v e. C i t y o f E n g l e w o o d I n t e r s t a t e R o u t e 9 5 B o r o u g h o f L e o n i a I Miles

25 N. V a n B r u n t S t. P a r k P l. ENGLEWOOD TOWN CENTER STATION LOCATION Northern Branch Corridor Figure 3-8 Ber g e n C o u n ty E n g l e S t..! N e w Y o r k N e w J e r s e y P a l i s a d e A v e. M a n h a t t a n I H u d s o n C o u n t y H u m p h r e y S t. W. E n g l e w o o d A v e. S. V a n B r u n t S t. E n g l e w o o d T o w n C e n t e r S t a t i o n P r o p o s e d N o r t h e r n B r a n c h A l i g n m e n t P r o p o s e d S t ati o n P l atf o r m P r o p o s e d P a r k i n g A r e a M u n i c i p a l B o u n d a r y S. D e a n S t. G r a n d A v e. I Miles

26 H i g h w o o d A v e. N. D e a n S t. ENGLEWOOD HOSPITAL STATION LOCATION Northern Branch Corridor Figure 3-9 Ber g e n C o u n t y N e w Y o r k N e w J e r s e y.! D u r i e A v e. E n g l e w o o d H o s p i t a l & M e d i c a l C e n t e r I H u d s o n C o u n t y M a n h a t t a n E n g l e w o o d H o s p i t a l S t a t i o n P r o p o s e d N o r t h e r n B r a n c h A l i g n m e n t P r o p o s e d S t ati o n P l atf o r m B r o w n e s T e r r. P r o p o s e d P a r k i n g A r e a M u n i c i p a l B o u n d ary E n g l e S t. W. H a m i l t o n A v e. S l o c u m A v e. I Miles

27 D e a n D r. R i v e r e d g e R d. W. R a i l r o a d A v e. P i e r m o n t R d. H i g h w o o d A v e. TENAFLY TOWN CENTER STATION LOCATION C o u n t y R d. Northern Branch Corridor Figure 3-10 W a s h i n g t o n S t. Ber g e n C o u n ty W. C l i n t o n A v e. H i l l s i d e A v e.! M a n h a t t a n N e w Y o r k N e w J e r s e y I H u d s o n C o u n t y T e n a f l y T o w n C e n t e r S t a t i o n C l i n t o n I n n E. C l i n t o n A v e. P ro po s e d N o r t h e r n B r a n c h A l i g n m e n t P ro po s e d S t a t i o n P l atf o rm P r o p o s e d P a r k i n g A r e a M u n i c i p a l B o u n d ary F r a n k l i n S t. H u y l e r A v e. W e s t e r v e l t A v e. I Miles

28 B o r o u g h o f C r e s s k i l l B o r o u g h o f T e n a f l y J e r s e y A v e. T e n a f l y N o r t h S t a t i o n N. S u m m i t S t. TENAFLY NORTH STATION LOCATION Northern Branch Corridor Figure 3-11 A t w o o d A v e. M a d i s o n A v e. B e r g e n C o u n ty.! N e w Y o r k N e w J e r s e y H u d s o n A v e. I H u d s o n C o u n t y M a n h a t t a n P r o p o s e d N o r t h e r n B r a n c h A l i g n m e n t P r o p o s e d S t a t i o n P l atf o r m G r o v e S t. P r o p o s e d P a r k i n g A r e a M u n i c i p a l B o u n d ary P r o s p e c t T e r r. P i e r m o n t R d. M a h a n S t. C o u n t y R d. I Miles

King Mill Lambert DRI# 2035 Henry County, Georgia

King Mill Lambert DRI# 2035 Henry County, Georgia Transportation Analysis King Mill Lambert DRI# 2035 Henry County, Georgia Prepared for: The Alter Group, Ltd. Prepared by: Kimley-Horn and Associates, Inc. Norcross, GA Kimley-Horn and Associates, Inc.

More information

Appendix G. Visual Simulations and Illustrations

Appendix G. Visual Simulations and Illustrations Appendix G Visual Simulations and Illustrations 5TH AVE AV E N View ewshe ed 5 SHORELINE N 185TH ST egment B gment A 26 NE 185th Street Station (A1, A3, A5, A7, A10, A11) 25 24 23 22 21 NE 180TH ST 99

More information

APPENDIX F: TIER 2 SCREENING APPENDIX F TIER 2 SCREENING

APPENDIX F: TIER 2 SCREENING APPENDIX F TIER 2 SCREENING APPENDIX F: TIER 2 SCREENING APPENDIX F TIER 2 SCREENING Draft January 2013 TIER TWO SCREENING REPORT November 2012 Parsons Brinckerhoff DRAFT November 2012 1 Parsons Brinckerhoff DRAFT November 2012-2

More information

Attachment #2 PPW133-07

Attachment #2 PPW133-07 Attachment #2 PPW133-07 Pg. 1 EXECUTIVE SUMMARY Environmental Assessment Study In January 2005, Regional staff retained to commence a Schedule C Environmental Assessment Study to identify the improvements

More information

CTA Blue Line Forest Park Branch Feasibility/Vision Study

CTA Blue Line Forest Park Branch Feasibility/Vision Study CTA Blue Line Forest Park Branch Feasibility/Vision Study Overview of the Blue Line Feasibility / Vision Study!! PURPOSE! Determine long-term vision! Coordinate transit & highway improvements!! PROCESS!

More information

State Road A1A North Bridge over ICWW Bridge

State Road A1A North Bridge over ICWW Bridge Final Report State Road A1A North Bridge over ICWW Bridge Draft Design Traffic Technical Memorandum Contract Number: C-9H13 TWO 5 - Financial Project ID 249911-2-22-01 March 2016 Prepared for: Florida

More information

Article 4.0 Measurements and Exceptions

Article 4.0 Measurements and Exceptions This Article identifies and explains some of the more common forms of measurement used throughout this Ordinance. It also specifies exceptions to certain requirements of this Ordinance. Sec. 4.1 Measurements

More information

Diversion Analysis. Appendix K

Diversion Analysis. Appendix K Appendix K Appendix K Appendix K Project Description The Project includes the potential closure of the eastbound direction ramp for vehicular traffic at Washington Street and University Avenue. In addition,

More information

Appendix L Noise Technical Report. Rehabilitation and Restoration of the Longfellow Bridge

Appendix L Noise Technical Report. Rehabilitation and Restoration of the Longfellow Bridge Appendix L Noise Technical Report Rehabilitation and Restoration of the Longfellow Bridge Noise Technical Report Rehabilitation and Restoration of the Longfellow Bridge Boston, MA May, 2011* Prepared by

More information

Demolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway)

Demolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway) I-90/94 (Kennedy Expressway) at Ohio Street Structure Replacement and Rehabilitation Section Number 0303-474HB-R D-91-177-09 Contract 60F63 Cook County, Region One, District One City of Chicago Project

More information

Signal Patterns for Improving Light Rail Operation By Wintana Miller and Mark Madden DKS Associates

Signal Patterns for Improving Light Rail Operation By Wintana Miller and Mark Madden DKS Associates Signal Patterns for Improving Light Rail Operation By Wintana Miller and Mark Madden DKS Associates Abstract This paper describes the follow up to a pilot project to coordinate traffic signals with light

More information

Memorandum. Dear Ms. Allen,

Memorandum. Dear Ms. Allen, RhoadesPlanningGroup Memorandum To: Shannon Allen, AICP, Principal Planner From: Rhoades Planning Group Date: June 10, 2015 Re: Response to Incomplete Letter, 1900 Fourth Street Dear Ms. Allen, This letter

More information

Update on Traffic Results and Findings

Update on Traffic Results and Findings Los Angeles County Metropolitan Transportation Authority Update on Traffic Results and Findings presented to the Corridor Advisory Committee February 16, 2017 Traffic Presentation Topics 2 Traffic Volumes

More information

18. Endangered Species

18. Endangered Species Northern Branch Corridor SDEIS March 207 8. Endangered Species 8.. Chapter Overview 8... Introduction This chapter discusses the changes to the potential for project improvements to adversely affect threatened

More information

Non-Technical Summary of Environmental Statement

Non-Technical Summary of Environmental Statement Non-Technical Summary of Environmental Statement Speedway World Cup Introduction This document is the Non-Technical Summary (NTS) of the Environmental Statement (ES) prepared for the proposed Speedway

More information

TRAFFIC IMPACT STUDY. PROPOSED AMENDED MASTER PLAN AMENDED - H - ZONE Village of Ridgewood Bergen County, New Jersey

TRAFFIC IMPACT STUDY. PROPOSED AMENDED MASTER PLAN AMENDED - H - ZONE Village of Ridgewood Bergen County, New Jersey TRAFFIC IMPACT STUDY PROPOSED AMENDED MASTER PLAN AMENDED - H - ZONE Village of Ridgewood Bergen County, New Jersey Prepared For: The Valley Hospital 223 North Van Dien Avenue Ridgewood, New Jersey 07450

More information

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation (not including Local Aid) By Phase of Work

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation (not including Local Aid) By Phase of Work PROGRAM/PROJT NAME (COUNTY) ADA Curb Ramp Implementation (Various) STP $1,000,000 Airport Improvement Program (Various) STATE $4,000,000 Betterments, Dams (Various) Betterments, Roadway Preservation (Various)

More information

1.0 Introduction. 1.1 Introduction. 1.2 Project Background

1.0 Introduction. 1.1 Introduction. 1.2 Project Background 1.0 Introduction 1.1 Introduction This document is the Draft Environmental Impact Statement (DEIS) for the Port Authority of New York & New Jersey s (Port Authority) proposed Goethals Bridge Replacement

More information

Memorandum 1.0 Highway Traffic Noise

Memorandum 1.0 Highway Traffic Noise Memorandum Date: September 18, 2009 To: Chris Hiniker, SEH From: Stephen B. Platisha, P.E. Re: Updated CSAH 14 Noise Analysis The purpose of this memorandum is to provide the results of the revised traffic

More information

AMES INDUSTRIAL PARK AND OFFICE PLAZA

AMES INDUSTRIAL PARK AND OFFICE PLAZA SILICON VALLEY LEASED INVESTMENT OR OWNER/USER OPPORTUNITY FOR SALE ±177,820 SF MULTI-TENANT INDUSTRIAL PARK & OFFICE PLAZA MILPITAS, CALIFORNIA $18,200,000.00 OR $102.35 PSF BACK ON THE MARKET! BUILDING

More information

Exit 61 I-90 Interchange Modification Justification Study

Exit 61 I-90 Interchange Modification Justification Study Exit 61 I-90 Interchange Modification Justification Study Introduction Exit 61 is a diamond interchange providing the connection between Elk Vale Road and I-90. Figure 1 shows the location of Exit 61.

More information

Deep Creek Canyon US Highway 12

Deep Creek Canyon US Highway 12 Deep Creek Canyon US Highway 12 ABC Techniques in Rural Montana Jim Scoles Morrison-Maierle 1 Location Deep Creek Canyon US Highway 12 Helena National Forest Great Falls Map of mid MT showing Location

More information

SOUTH BAY CORPORATE CENTER

SOUTH BAY CORPORATE CENTER F O R L E A S E 1 9 2, 6 6 9 S F C o r p o r at e H e a d q u a r t e r s O f f i c e a n d R & D B u i l d i n G South Bay Corporate Center is a prominent office and R&D corporate headquarters facility

More information

Appendix D. Traffic Noise Analysis Report. I-94 St. Michael to Albertville Minnesota Department of Transportation

Appendix D. Traffic Noise Analysis Report. I-94 St. Michael to Albertville Minnesota Department of Transportation Appendix D Traffic Noise Analysis Report I-94 St. Michael to Albertville Minnesota Department of Transportation Traffic Noise Analysis Report I-94 St. Michael to Albertville Project SP 8680-172 Report

More information

Executive Director George Warrington highlighted the following from his monthly business report.

Executive Director George Warrington highlighted the following from his monthly business report. (N JT BOARD - 02/09/05) 35'"".I A 9 Minutes of the actions taken at the Open Session of the regularly scheduled Board of Directors' meetings of the New Jersey Transit Corporation (NJ TRANSIT), NJ TRANSIT

More information

Moorhead / Dilworth Fixed Route Expansion Study

Moorhead / Dilworth Fixed Route Expansion Study Moorhead / Dilworth Fixed Route Expansion Study Prepared for: MATBUS Prepared by: Fargo Moorhead Metropolitan Council of Governments April 2014 Introduction With growth in southeast Moorhead and Dilworth,

More information

Northern Branch Corridor DEIS December Appendix G: Wetland Delineation Report

Northern Branch Corridor DEIS December Appendix G: Wetland Delineation Report Northern Branch Corridor DEIS December 2011 Appendix G: Wetland Delineation Report WETLAND DELINEATION REPORT NORTHERN BRANCH CORRIDOR Prepared for: NJ TRANSIT Prepared by: Jacobs Engineering 299 Madison

More information

HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review

HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review Date: Application is hereby made for a Site Plan Review for a commercial or industrial use.

More information

PLANNING DIVISION COMMUNITY & NEIGHBORHOODS DEPARTMENT

PLANNING DIVISION COMMUNITY & NEIGHBORHOODS DEPARTMENT Staff Report PLANNING DIVISION COMMUNITY & NEIGHBORHOODS DEPARTMENT To: Salt Lake City Administrative Hearing Officer From: Casey Stewart; 801-535-6260 Date: Re: September 22, 2017 (for September 28 Administrative

More information

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS 11.01.00 Preliminary Site Plan Approval 11.01.01 Intent and Purpose 11.01.02 Review 11.01.03 Application 11.01.04 Development Site to be Unified 11.01.05

More information

Cotton Belt Corridor. Area Focus Group (AFG) Carrollton/Addison August 29, John Hoppie, Capital Planning

Cotton Belt Corridor. Area Focus Group (AFG) Carrollton/Addison August 29, John Hoppie, Capital Planning Cotton Belt Corridor Area Focus Group (AFG) Carrollton/Addison August 29, 2017 John Hoppie, Capital Planning 0 Agenda Design Update Alignment/Cross-section/Stations/Facilities Environmental Update Documentation

More information

Union Station Tunnel Overall DBE Goal Calculation

Union Station Tunnel Overall DBE Goal Calculation Bi-State Development Agency of the Missouri-Illinois Metropolitan District Union Station Tunnel Overall DBE Goal Calculation Federal Transit Administration Prepared by: Francoise Lyles-Wiggins Bi-State

More information

9-11 Commission to Address Emergency Preparedness

9-11 Commission to Address Emergency Preparedness MEDIA ADVISORY 9-11 Commission to Address Emergency Preparedness November 10, 2003 The National Commission on Terrorist Attacks Upon the United States (also known as the 9-11 Commission) will hold its

More information

Public School Facilities Element

Public School Facilities Element Public School Facilities Element GOAL 1: THROUGH PARTNERSHIPS AND EFFECTIVE COLLABORATION AMONG LOCAL GOVERNMENTS AND THE PINELLAS COUNTY SCHOOL DISTRICT, AND BECAUSE OF A SHARED COMMITMENT TO EDUCATIONAL

More information

MINUTES OF THE METROPOLITAN PLANNING ORGANIZATION MEETING HELD SEPTEMBER 24, 2014 AT 4 P.M. The Metropolitan Planning Organization met on

MINUTES OF THE METROPOLITAN PLANNING ORGANIZATION MEETING HELD SEPTEMBER 24, 2014 AT 4 P.M. The Metropolitan Planning Organization met on MINUTES OF THE METROPOLITAN PLANNING ORGANIZATION MEETING HELD SEPTEMBER 24, 2014 AT 4 P.M. The Metropolitan Planning Organization met on September 24, 2014, at 4 p.m., in the Council Chambers of the Municipal

More information

Site Plan/Building Permit Review

Site Plan/Building Permit Review Part 6 Site Plan/Building Permit Review 1.6.01 When Site Plan Review Applies 1.6.02 Optional Pre- Application Site Plan/Building Permit Review (hereafter referred to as Site Plan Review) shall be required

More information

Vulcan Materials Company - Sanger/Centerville Project, Fresno County - Traffic Impact Analysis

Vulcan Materials Company - Sanger/Centerville Project, Fresno County - Traffic Impact Analysis 3.0 TRAFFIC IMPACTS 3.1 TRIP GENERATION To assess the impacts that the project may have on the surrounding streets, the first step was to determine Project trip generation. Project trip generation is shown

More information

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS CITY OF LA MARQUE CHAPTER 2 -------------------------------------------- GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS CHAPTER 2 ------------------------------------------------

More information

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS INCORPORATED VILLAGE OF ROCKVILLE CENTRE BUILDING DEPARTMENT SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS Presubmission - Prior to a formal submission, the applicant should meet in person with

More information

SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT

SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT SINGLE-FAMILY SITE PLAN INFORMATION PACKET GENERAL INFORMATION This information packet explains how your application for a single-family site plan will

More information

SUSSEX COUNTY PLANNING BOARD MINUTES NOVEMBER 6, 2017

SUSSEX COUNTY PLANNING BOARD MINUTES NOVEMBER 6, 2017 SUSSEX COUNTY PLANNING BOARD MINUTES NOVEMBER 6, 2017 The meeting was called to order by Chairman Borisuk at 4:10 p.m. The meeting is held in compliance with the Open Public Meetings Act, NJSA 10:4-2 of

More information

STATE OF NEW JERSEY BOARD OF PUBLIC UTILITIES

STATE OF NEW JERSEY BOARD OF PUBLIC UTILITIES STATE OF NEW JERSEY BOARD OF PUBLIC UTILITIES : IN THE MATTER OF THE PETITION OF : PUBLIC SERVICE ELECTRIC AND GAS : COMPANY FOR A DETERMINATION : PURSUANT TO THE PROVISIONS OF : N.J.S.A. 0:D-1 : BPU DOCKET

More information

Plan Preparation Checklist

Plan Preparation Checklist Appendix D Plan Preparation Checklist It is the responsibility of the Designer to complete and submit this checklist along with all required drawings for OUC (EFP) Review. All drawings submitted for OUC

More information

Noise Mitigation Study Pilot Program Summary Report Contract No

Noise Mitigation Study Pilot Program Summary Report Contract No Ohio Turnpike Commission Noise Mitigation Study Pilot Program Summary Report Contract No. 71-08-02 Prepared For: Ohio Turnpike Commission 682 Prospect Street Berea, Ohio 44017 Prepared By: November 2009

More information

Welcome Public Open House

Welcome Public Open House Peachland Study Welcome Public Open House Preliminary Review of Alternate & Existing Route Options Peachland Study Open House Purpose & Objectives 1. Present possible options for meeting the current and

More information

2.8 NOISE. Chapter IX 2. Comments and Responses CONSTRUCTION NOISE. Comment

2.8 NOISE. Chapter IX 2. Comments and Responses CONSTRUCTION NOISE. Comment 2.8 NOISE 2.8.1 CONSTRUCTION NOISE The noise impacts are not adequately addressed or studied in the DEIR, as there appears to be no analysis at all of potential noise level increases as measured from locations

More information

FARM TO MARKET 1103 OPEN HOUSE PUBLIC MEETING. FM 1103 I-35 to Rodeo Dr

FARM TO MARKET 1103 OPEN HOUSE PUBLIC MEETING. FM 1103 I-35 to Rodeo Dr FARM TO MARKET 1103 OPEN HOUSE PUBLIC MEETING March 29, 2016 FM 1103 FROM: I-35 TO: RODEO DR COMAL & GUADALUPE COUNTY OPEN HOUSE PUBLIC MEETING March 29, 2016 5:00 p.m. 7:00 p.m. Barbara C Jordan Intermediate

More information

Preparing for an Uncertain Future:

Preparing for an Uncertain Future: : for a Greater Baltimore Region DRAFT Maximize2040 is an initiative of the Baltimore Regional Transportation Board, the metropolitan planning organization for the Baltimore region. 1 SCENARIO THINKING:

More information

This page is intentionally left blank

This page is intentionally left blank This page is intentionally left blank This page is intentionally left blank MnDOT Metro District Fact Sheet Mpls./St. Paul District Offices: Roseville-Water's Edge (HQ), Golden Valley, Oakdale mndot.gov/metro/

More information

Maintenance of Traffic sequence of operations including any phasing and detour maps;

Maintenance of Traffic sequence of operations including any phasing and detour maps; All Local-let projects are required to have a Stage 2 submittal to the LPA Manager for review. The only exceptions are 2-lane resurfacing, striping, guardrail, and raised pavement markers, unless otherwise

More information

GUIDELINES AND MINIMUM ACCEPTANCE CRITERIA FOR THE PREPARATION AND SUBMISSION OF PARKING MANAGEMENT PLANS (PMP) ARLINGTON COUNTY GOVERNMENT (ACG)

GUIDELINES AND MINIMUM ACCEPTANCE CRITERIA FOR THE PREPARATION AND SUBMISSION OF PARKING MANAGEMENT PLANS (PMP) ARLINGTON COUNTY GOVERNMENT (ACG) GUIDELINES AND MINIMUM ACCEPTANCE CRITERIA FOR THE PREPARATION AND SUBMISSION OF PARKING MANAGEMENT PLANS (PMP) TO ARLINGTON COUNTY GOVERNMENT (ACG) Effective Date: February 15, 2016 Prepared by: Arlington

More information

Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project

Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project Bureau of Engineering SURVEY DIVISION REQUEST FOR TOPOGRAPHIC SURVEY Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project Caltrans involvement (must

More information

RETAIL FOR LEASE. brewpub TRACY CORNELL AARON BENNETT

RETAIL FOR LEASE. brewpub TRACY CORNELL AARON BENNETT RETAIL FOR LEASE TRACY CORNELL 206.948.0630 tracyc@jshproperties.com AARON BENNETT 206.859.4500 aaronb@jshproperties.com the spring district The Spring District Brewpub will be the heart of this new 36-acre

More information

Amajor transportation infrastructure undertaking, billed

Amajor transportation infrastructure undertaking, billed PART 6 Central Artery/Tunnel Project: Boston s Engineering Marvel Where We Are Now Vijay Chandra, P.E. Senior Vice President Parsons Brinckerhoff Quade & Douglas, Inc. New York, New York This article is

More information

Proposed Action Hutch Mountain Communications Site Coconino National Forest June 2016

Proposed Action Hutch Mountain Communications Site Coconino National Forest June 2016 Proposed Action Hutch Mountain Communications Site Coconino National Forest June 2016 PURPOSE AND NEED The proposed Hutch Mountain Communications Site project is part of a broader wireless industry strategy

More information

TUSCAN VILLAGE - MASTERPLAN

TUSCAN VILLAGE - MASTERPLAN CONCEPTUAL MASTER PLAN FOR TUSCAN VILLAGE TUSCAN VILLAGE - MASTERPLAN 11-21-2017 Salem, New Hampshire PRELLWITZ CHILINSKI ASSOCIATES 221 Hampshire Street Cambridge MA 02139 t: 617-547-8120 f: 617-661-4986

More information

800 Lake Murray Blvd

800 Lake Murray Blvd Kinley Rd SITE VPD 13,200 Columbiana Dr Quail Valley Neighborhood 800 IRMO, SC 29063 FOR MORE INFORMATION: JP SCURRY, CCIM Vice President 803 401 4223 jp.scurry@colliers.com SCOTTIE SMITH Senior Brokerage

More information

1050 Page Mill Road Office Development

1050 Page Mill Road Office Development 1050 Page Mill Road Office Development Transportation Impact Analysis Prepared for: 1050 Page Mill Road Property, LLC April 15, 2015 Hexagon Office: 2 N. Second Street, Suite 400 San Jose, CA 95113 Hexagon

More information

Green Line Extension Project Station Design Meeting Washington Street & Union Square Stations

Green Line Extension Project Station Design Meeting Washington Street & Union Square Stations Green Line Extension Project Station Design Meeting Washington Street & Union Square Stations Wednesday, February 8, 2012 Holiday Inn 30 Washington Street, Somerville, MA 6:30 pm 8:30pm #1 June 22 nd and

More information

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.) 1. Identification CITY OF FENTON 301 South Leroy Street Fenton, Michigan 48430-2196 (810) 629-2261 FAX (810) 629-2004 Site Plan Review Application Project Name Applicant Name Address City/State/Zip Phone

More information

Noise Impact Analysis. NW Bethany Boulevard Improvement Project NW Bronson Road to NW West Union Road. November Washington County.

Noise Impact Analysis. NW Bethany Boulevard Improvement Project NW Bronson Road to NW West Union Road. November Washington County. Noise Impact Analysis NW Bethany Boulevard Improvement Project NW Bronson Road to NW West Union Road Washington County November 2011 Prepared for: Washington County Department of Land Use and Transportation

More information

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN N/A Waiver (1) Four (4) copies of application form. (2) Fifteen (15) copies of plan (3) Subdivision/site plan application fee & professional review escrow deposit (4) Variance application fee & professional

More information

Rail System Wireless Interconnect Between Traffic Signal and Train Control Cabinets

Rail System Wireless Interconnect Between Traffic Signal and Train Control Cabinets Rail System Wireless Interconnect Between Traffic Signal and Train Control Cabinets By: Marty Amundson, PE, TE, PTOE Eugene Bachtinov, P.E. Jonathan Hofert, PE, TE, PTOE Metro Provides Excellence in Service

More information

CONSTRUCTION NOISE MONITORING SUMMARY REPORT MAY 1 MAY 31, 2017

CONSTRUCTION NOISE MONITORING SUMMARY REPORT MAY 1 MAY 31, 2017 CONSTRUCTION NOISE MONITORING SUMMARY REPORT MAY 1 MAY 31, 2017 VIRGINIA AVENUE TUNNEL RECONSTRUCTION PROJECT WASHINGTON, DC Prepared for: CSX Transportation Prepared by: Gannett Fleming Inc. May 2017

More information

Service Recommendations

Service Recommendations Berkshire Regional Transit Authority REGIONAL TRANSIT PLAN Service Recommendations May 2015 Outline Introduction Study Process Service Recommendations Public comments Questions 2 Introduction URS Team

More information

DESIGN PUBLIC HEARING

DESIGN PUBLIC HEARING DESIGN PUBLIC HEARING JUNE 22, 2016 AT TOWN HALL AUDITORIUM 11 TOWN HOUSE ROAD WESTON, MASSACHUSETTS 7:00 PM FOR THE PROPOSED DEMOLITION OF LEGACY TOLL PLAZAS ALONG I-90 DISTRICT 6 PLAZAS 14, 15 AND 55

More information

LOT 1 PARKING FACILITY PLANNING COMMISSION HEARING Stadium Authority of the City of Pittsburgh April 5, 2016 WTW ARCHITECTS

LOT 1 PARKING FACILITY PLANNING COMMISSION HEARING Stadium Authority of the City of Pittsburgh April 5, 2016 WTW ARCHITECTS LOT 1 PARKING FACILITY PLANNING COMMISSION HEARING Stadium Authority of the City of Pittsburgh April 5, 2016 WTW ARCHITECTS Project Introduction Address: Chuck Noll Way & West General Robinson Street Zoning

More information

2015 GDOT PowerPoint. Title Page

2015 GDOT PowerPoint. Title Page Cartersville MPO Regional Travel Demand Model Update Joint Policy Committee (PC) and Technical Coordinating Committee (TCC) Meeting May 20, 1 BACKGROUND Federal legislation requires Long-Range Transportation

More information

WHITE PAPER BENEFITS OF OPTICOM GPS. Upgrading from Infrared to GPS Emergency Vehicle Preemption GLOB A L TRAFFIC TE CHNOLOGIE S

WHITE PAPER BENEFITS OF OPTICOM GPS. Upgrading from Infrared to GPS Emergency Vehicle Preemption GLOB A L TRAFFIC TE CHNOLOGIE S WHITE PAPER BENEFITS OF OPTICOM GPS Upgrading from Infrared to GPS Emergency Vehicle Preemption GLOB A L TRAFFIC TE CHNOLOGIE S 2 CONTENTS Overview 3 Operation 4 Advantages of Opticom GPS 5 Opticom GPS

More information

A. INTRODUCTION PRINCIPAL CONCLUSIONS

A. INTRODUCTION PRINCIPAL CONCLUSIONS Chapter 16: Traffic and Parking A. INTRODUCTION This chapter examines the potential traffic and parking impacts of the proposed development of the Fresh Kills Park project. The analysis of the proposed

More information

IOWA ORNITHOLOGISTS' UNION - Birding Sites in Story County

IOWA ORNITHOLOGISTS' UNION - Birding Sites in Story County IOWA ORNITHOLOGISTS' UNION - Birding Sites in Story County Printed on 3/15/2019 Ada Hayden Park (ebird Hotspot) (Important Bird Area) GPS Coordinates: 42.0728262,-93.6245656 (Formerly Hallett s Quarry)

More information

New Haven-Hartford-Springfield Rail Program Meriden Public Involvement June 2013

New Haven-Hartford-Springfield Rail Program Meriden Public Involvement June 2013 New Haven-Hartford-Springfield Rail Program Meriden Public Involvement June 2013 N H H S M E R I D E N S T A T I O N 1 Program Goals: NHHS Rail Program Recap Enhanced regional rail service that accommodates

More information

Study Description. November 29, Overpass Road Alternatives Public Workshop

Study Description. November 29, Overpass Road Alternatives Public Workshop Overpass Road Alternatives Public Workshop November 29, 2012 Welcome to the Alternatives Public Workshop for proposed improvements to Overpass Road in Pasco County. Pasco County (the County), in coordination

More information

APPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) DEVELOPMENT PLAN

APPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) DEVELOPMENT PLAN 209 S. Main Street Marysville, Ohio 43040 Phone: (937) 645-7350 Fax: (937) 645-7351 www.marysvilleohio.org APPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) DEVELOPMENT PLAN *** IMPORTANT INFORMATION ~ Please

More information

ESCONDIDO VALLEY CENTER. 1346, 1352 & 1358 West Valley Parkway Escondido, California SAN DIEGO GROCERY-ANCHORED INVESTMENT OPPORTUNITY

ESCONDIDO VALLEY CENTER. 1346, 1352 & 1358 West Valley Parkway Escondido, California SAN DIEGO GROCERY-ANCHORED INVESTMENT OPPORTUNITY ESCONDIDO VALLEY CENTER 1346, 1352 & 1358 West Valley Parkway Escondido, California 92029 SAN DIEGO GROCERY-ANCHORED INVESTMENT OPPORTUNITY INVESTMENT ADVISORS ROB IPPOLITO T +1 858 875 5925 rippolito@ngkf.com

More information

Partly Cloudy Share your local photos on Patch #FortLeePatch

Partly Cloudy Share your local photos on Patch #FortLeePatch 1 of 14 11/5/2014 8:37 PM NOV 2014 Partly Cloudy Share your local photos on Patch #FortLeePatch The developer of the eastern half of the 16-acre property held a groundbreaking ceremony for its $500 million

More information

MONTHLY OPERATING REPORT

MONTHLY OPERATING REPORT LONG ISLAND RAIL ROAD MONTHLY OPERATING REPORT September 2010 Helena E. Williams President 09/27/10***** Page 15 FOR MONTH OF AUGUST 2010 2010 Data 2009 Data Performance Summary Annual YTD thru YTD thru

More information

MULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST

MULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST MULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST This application lists the content and format of the submittal requirements to initiate the Design Review process. An incomplete application will not be

More information

Radio Frequency Engineering Report. Proposed Raymond, ME Cellular Facility

Radio Frequency Engineering Report. Proposed Raymond, ME Cellular Facility Radio Frequency Engineering Report Proposed, ME Cellular Facility (Site No.: 3462 ) May 12, 2010 C Squared Systems, LLC 920 Candia Road Manchester, NH 03109 Phone: (603) 657-9702 Fax: (603) 657-9707 Support@csquaredsystems.com

More information

Appendix 6-F: Electric and Magnetic Field Study Report

Appendix 6-F: Electric and Magnetic Field Study Report Draft Environmental Impact Statement Cricket Valley Energy Project Dover, NY Appendix 6-F: Electric and Magnetic Field Study Report ELECTRIC & MAGNETIC FIELDS (EMFs) STUDY REPORT For the CRICKET VALLEY

More information

City of San José, California CITY COUNCIL POLICY

City of San José, California CITY COUNCIL POLICY City of San José, California CITY COUNCIL POLICY TITLE 1 1 of 6 EFFECTIVE DATE 1/22/91 REVISED DATE 9/16/03 APPROVED BY Council Action - January 22, 1991; August 11, 1992; August 20, 1996 (9d); September

More information

Precast Concrete Panels for Rapid Pavement Repair

Precast Concrete Panels for Rapid Pavement Repair Precast Concrete Panels for Rapid Pavement Repair Scott Shuler, Ph. D., P. E. Colorado State University Ft. Collins, CO 80523-1584 Gary Dewitt, P. E. Colorado Department of Transportation Evans, Colorado

More information

REPORT TO COUNCIL DORWICK DITCH PETITION REHABILITATION PROJECT JUNE 8, 2016

REPORT TO COUNCIL DORWICK DITCH PETITION REHABILITATION PROJECT JUNE 8, 2016 REPORT TO COUNCIL DORWICK DITCH PETITION REHABILITATION PROJECT JUNE 8, 2016 Based on a preliminary study by Euthenics, Inc. www.euthenics_inc.com 1 SECTION I GENERAL INFORMATION AND EXISTING CONDITIONS

More information

REGIONAL TRANSIT AUTHORITY RESOLUTION NO BACKGROUND AND COMMENTS. Agenda Item: No. 4. No. 7C-1

REGIONAL TRANSIT AUTHORITY RESOLUTION NO BACKGROUND AND COMMENTS. Agenda Item: No. 4. No. 7C-1 REGIONAL TRANSIT AUTHORITY RESOLUTION NO. 98-1 BACKGROUND AND COMMENTS Meeting: PGA Committee Board of Directors Date: 1/16/98 1/22/98 Agenda Item: No. 4 No. 7C-1 Staff Contact: Barbara Dougherty, Communications

More information

City of Colleyville Community Development Department. Site/Landscape Plan Application Packet

City of Colleyville Community Development Department. Site/Landscape Plan Application Packet City of Colleyville Community Development Department Site/Landscape Plan Application Packet 1 Development Application Fees City of Colleyville 100 Main Street Colleyville TX 76034 817.503.1050 Zoning Zoning

More information

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST YES* GENERAL SUBMISSION ITEMS Does the submission include: 1. Thirteen (13) copies of completed Application Form? 2. Thirteen (13) copies of the Preliminary

More information

Appendix B: Noise Study

Appendix B: Noise Study Appendix B: Noise Study creating remarkable solutions for a higher quality of life NOISE STUDY Interstate 55 Route PP to County Road 311 Prepared for: MoDOT PROJECT NO. J010956 November 2014 Prepared

More information

NOTICE OF REGULARLY SCHEDULED BOARD MEETINGS

NOTICE OF REGULARLY SCHEDULED BOARD MEETINGS NOTICE OF REGULARLY SCHEDULED BOARD MEETINGS NEW JERSEY TRANSIT CORPORATION NJ TRANSIT RAIL OPERATIONS, INC. NJ TRANSIT BUS OPERATIONS, INC. NJ TRANSIT MERCER, INC. NJ TRANSIT MORRIS, INC. TO WHOM IT MAY

More information

Survey Requirements. Design Guidelines and Standards. June Office of the University Architect

Survey Requirements. Design Guidelines and Standards. June Office of the University Architect Design Guidelines and Standards Survey Requirements June 2004 Office of the University Architect Construction Management P.O. Box 210181 Cincinnati, Ohio 45221-0181 Table of Contents Survey Requirements

More information

Update: July 20, 2012

Update: July 20, 2012 Location and Design Manual, Volume 3 ODOT Office of CADD and Mapping Services Update: July 20, 2012 ** NOTE: All metric references have been removed from this manual. ** PREFACE REVISIONS Glossary of Terms

More information

GREEN HILLS REGIONAL TRNASPORTION NEEDS ASSESSMENT CURRENT EFFECTIVE DATE JANUARY Produced by The Green Hills Regional Planning Commission

GREEN HILLS REGIONAL TRNASPORTION NEEDS ASSESSMENT CURRENT EFFECTIVE DATE JANUARY Produced by The Green Hills Regional Planning Commission GREEN HILLS REGIONAL TRNASPORTION NEEDS ASSESSMENT CURRENT EFFECTIVE DATE JANUARY 2009 Produced by The Green Hills Regional Planning Commission 1 County: Caldwell Source: RTP Needs Assessment 06 Rt: US

More information

Conceptual, Preliminary and Final Site Plan Review in Holladay City

Conceptual, Preliminary and Final Site Plan Review in Holladay City Conceptual, Preliminary and Final Site Plan Review in Holladay City The City of Holladay incorporated in December, 1999 and adopted its own zoning ordinance in May, 2000. All land use decisions are made

More information

The New Transit Oriented Town Center Development. metrocentreom.com 100 Painters Mill Road, Owings Mills, MD

The New Transit Oriented Town Center Development. metrocentreom.com 100 Painters Mill Road, Owings Mills, MD The New Transit Oriented Town Center Development metrocentreom.com 100 Painters Mill Road, Owings Mills, MD 21117 410.581.2520 * metrocentreom.com 100 Painters Mill Road, Owings Mills, MD 21117 410.581.2520

More information

RFQ No. 19-C668 for On-Call Consulting Services for the Capital Projects Program Addendum No. 04

RFQ No. 19-C668 for On-Call Consulting Services for the Capital Projects Program Addendum No. 04 Chair, Christina Fugazi, City of Stockton Vice Chair, Leo Zuber, City of Ripon Commissioner, Bob Johnson, City of Lodi Commissioner, Debby Moorhead, City of Manteca Commissioner, Bob Elliott, San Joaquin

More information

City of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT

City of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT City of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT There is a $200.00 non-refundable fee for each request. Requests must be completed and submitted to the Public Works Department, City of Hamilton,

More information

Legal Description & Site Plan Requirements and Layouts

Legal Description & Site Plan Requirements and Layouts Legal Description & Site Plan Requirements and Layouts Plot Plan * A plot plan shows the location of a house from an aerial view. * The site plan, also known as a plot or lot plan includes: 1. Site plan

More information

PLANNING AND DEVELOPMENT

PLANNING AND DEVELOPMENT OVERVIEW Effective January 1, 1992 all applications for multi-family residential and all non-residential building permits require site plan approval before permit issuance. All new developments and existing

More information

3.0 AFFECTED ENVIRONMENT

3.0 AFFECTED ENVIRONMENT 3.0 AFFECTED ENVIRONMENT 3.1 Visual Resources This section provides a discussion of the existing visual resources in the vicinity of the Imperial Valley Solar Energy Center South project site that could

More information

CONSTRUCTION NOISE MONITORING SUMMARY REPORT FEBRUARY 1 FEBRUARY 28, 2018

CONSTRUCTION NOISE MONITORING SUMMARY REPORT FEBRUARY 1 FEBRUARY 28, 2018 CONSTRUCTION NOISE MONITORING SUMMARY REPORT FEBRUARY 1 FEBRUARY 28, 2018 VIRGINIA AVENUE TUNNEL RECONSTRUCTION PROJECT WASHINGTON, DC Prepared for: CSX Transportation Prepared by: Gannett Fleming Inc.

More information

SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV

SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV COMMUNITY DEVELOPMENT DEPARTMENT 33325 8 th Avenue South Federal Way WA 98003 253-835-2607; Fax 253-835-2609 www.cityoffederalway.com SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV USE PROCESS

More information