Linfairn Wind Farm Addendum Chapter A13: Shadow Flicker

Size: px
Start display at page:

Download "Linfairn Wind Farm Addendum Chapter A13: Shadow Flicker"

Transcription

1 A13. SHADOW FLICKER 13.1 Introduction The purpose of this chapter is to review amendments to the Project design and to advise of any consequent alterations to potential shadow flicker impacts as previously reported in ES Chapter 13. The assessment has been carried out by SgurrEnergy Ltd Scope of the Assessment Study Area and Assessment Criteria There have been no updates to guidance, of relevance to the shadow flicker assessment, since the ES was submitted. Therefore the assessment criteria remain as detailed in Section of ES Chapter 13. Using the ReSoft WindFarm software, a potential shadow flicker impact map was produced for the revised layout of 17 WTGs (see Figure A13.1) which highlights proties potentially affected by the Project Consultation Responses The Section 36 application was submitted to the Scottish Government ECDU on 27 September 2013 with responses received in November and December No consultation responses were received in relation to shadow flicker Assessment Methodology Analysis Software Parameters The shadow flicker analysis was conducted using the Shadow Flicker module of the ReSoft WindFarm software. Please refer to Section of ES Chapter 13 which provides further detail Parameters used in the Analysis WTG dimensions and layout The modelling was undertaken based on the proposed 17 WTG layout and a WTG with a 101m rotor diameter and 76m hub height, which is a larger rotor diameter and lower hub height than originally modelled. 14/7048/001/GLA/O/R/001 Revision B1 Page 1 of 7

2 Shadow flicker potential impact area and receptor locations As identified in section of the ES, the shadow flicker impact is likely to be negligible beyond a distance of 10 rotor diameters. This is equal to 1,010m for a WTG with a 101m rotor diameter. Using the WindFarm software, a potential shadow flicker impact area map has been produced (Figure A13.1). As shown on the figure, only certain houses are predicted to be within this potential impact area. Consequently, only these proties would be expected to exience shadow flicker effects and therefore have been included in the modelling analysis. It should be noted that the amended Project design, with 17 WTGs, has a reduced impact area compared with the layout in the ES. Consequently, proty numbers 1, 2 and 3 which were considered in the ES Chapter 13, are no longer relevant to the shadow flicker assessment. Proty number 5 consists of non-residential outbuildings and has therefore been removed from the assessment. The numbering of proties remains consistent with the original ES. Window distribution, orientation and size The same approach was adopted as described in section of the ES Assessment Results WindFarm Shadow Flicker Analysis Results For each of the potential shadow flicker receptors, a total number of shadow flicker hours in a year was modelled. The results of this modelling are shown in Table A13-1. It should be noted that these results represent theoretical hours for which the individual receptor could potentially be affected by shadow flicker based on worse case scenario modelling. Again it should be noted that the results do not take into account factors that would reduce shadow flicker such as iods when there is insufficient sunshine due to cloud-cover, iods when the WTG is not rotating or screening from any existing vegetation and buildings. The sensitivity is considered to be High at the proties which are residential receptors. The results have been provided and then examined in relation to the guidance limits, as section of the ES, of 30 hours year or 30 minutes day on the worst affected day, based on an astronomical worst case scenario. 14/7048/001/GLA/O/R/001 Revision B1 Page 2 of 7

3 Table A13-1: Potential Shadow Flicker Occurrence at Identified Proties (WTG with 76 m Hub Height and 101 m Rotor Diameter) No. Name Co-ordinates Window Orientation (degrees from north) Days year* Max hrs day* Mean hrs day* Total hrs year* 4 Knockskae Linfairn Genoch Cottage *Theoretical modelled values As can be seen in Table A13-1, only one proty (proty number 6: Linfairn) is predicted to exience more than 30 hours of shadow flicker year, using worst case modelling. It is understood that the owner and occupier of proty 6 (Linfairn) has a financial interest in the project. Proties 4 (Knockskae) and 7 (Genoch Cottage) do not exceed 30 hours year. Proty 4 (Knockskae) is predicted to exience slightly over 30 minutes in the maximum hours day assessment. A summary of when shadow flicker is expected to occur at Proties 4, 6 and 7 is given in Table A13-2 below. Table A13-2: Timing of Shadow Flicker Occurrence at Key Proties (WTG with 76 m Hub Height and 101 m Rotor Diameter) Proty Distance to WTG (m) Potential Shadow Flicker Occurrence Time of the Year Time of the Day 4: Knockskae 695 Winter Late morning 6: Linfairn 837 Autumn, Winter Afternoon 7: Genoch Cottage 992 Autumn, Winter Afternoon Based on this worst case modelling exercise, proties 4 (Knockskae) and 6 (Linfairn) are both predicted to exience a maximum daily duration above 30 minutes day, specifically 0.6 hours (36 minutes) and 0.9 hours (54 minutes) respectively Potential Factors Reducing Shadow Flicker Impact There are a number of factors that are likely to reduce the incidence of shadow flicker. Details of these and annual average sunshine for the study area can be found in Section of the ES. The annual average sunshine, as the ES, was 25.1%. This was applied to the annual shadow flicker results for proties 4, 6 and 7. 14/7048/001/GLA/O/R/001 Revision B1 Page 3 of 7

4 The adjusted shadow flicker hours for individual proties are given in Table A13-3. Table A13-3: Adjusted Shadow Flicker Results based on Sunshine Hours (WTG with 76m Hub Height and 101m Rotor Diameter) Proty Total Shadow Flicker Hours Year (as modelled) Adjusted Shadow Flicker Hours 4: Knockskae : Linfairn : Genoch Cottage As can be seen, proty 6: Linfairn is predicted to exience 18.1 hours of shadow flicker year following the adjustment to account for sunshine hours. This equates to approximately 0.4% of the available daylight hours year, which is not considered to represent a significant impact. The adjusted shadow flicker hours for proties 4 and 7 are lower still and are likewise deemed insignificant impacts. This adjustment for sunshine hours results in a more realistic prediction of shadow flicker effect and duration. However, the adjusted results are still considered to be conservative because the modelling assumes a worst case scenario with regard to wind direction / WTG alignments and screening effects. In addition, the results are still based on a conservative window size, window orientation and minimum sun height. Accounting for sunshine hours and the other considerations discussed in the ES would also be expected to reduce the maximum daily duration of shadow flicker exienced at nearby proties 4 (Knockskae), 6 (Linfairn) and 7 (Genoch Cottage) Assessment of Effects Following assessment of the revised Project layout design and WTG dimensions, the potential magnitude of change in relation to shadow flicker is considered to be Negligible at the oational phase. Mitigation has however been provided to address the potential shadow flicker effects on the three proties identified above Mitigation Measures Mitigation includes software control on relevant WTGs during iods when conditions exist that could result in shadow flicker effects. The potential impact from shadow flicker will be monitored for 12 months after commissioning has been completed and a shadow flicker mitigation scheme will be submitted and approved as part of a suitable condition. This will address any potential significant effects on affected proties. 14/7048/001/GLA/O/R/001 Revision B1 Page 4 of 7

5 13.6 Summary of Effects Table A13-4 provides a summary of the potential effects associated with the revised Project. 14/7048/001/GLA/O/R/001 Revision B1 Page 5 of 7

6 Table A13-4: Summary of Effects Receptor Development Stage Sensitivity Magnitude of Change Predicted Effect Prior to Mitigation Mitigation Residual Effect Proty No. 4: Knockskae Proty No. 6: Linfairn. Proty No. 7: Genoch Cottage Oational Oational High High Software control on relevant WTGs during iods when conditions exist which could result in shadow flicker effects. Oational High 12 month monitoring scheme following commissioning of the Project. Shadow flicker mitigation scheme produced as part of any relevant condition. 14/7048/001/GLA/O/R/001 Revision B1 Page 6 of 7

7 13.7 Statement of Significance The assessment has concluded that there will be no significant impacts on proties in the vicinity of the Project as a result of shadow flicker. 14/7048/001/GLA/O/R/001 Revision B1 Page 7 of 7

A10 Electronic Interference: Application 2 - LBHF

A10 Electronic Interference: Application 2 - LBHF A10 Electronic Interference: Application 2 - LBHF Addendum to the Environmental Statement Volume I January 2012 Introduction A10.1 This Chapter of the Addendum to the June 2011 Environmental Statement

More information

Appendix 8.2 Information to be Read in Conjunction with Visualisations

Appendix 8.2 Information to be Read in Conjunction with Visualisations Shepherds Rig Wind Farm EIA Report Appendix 8.2 Information to be Read in Conjunction with Visualisations Contents Contents i Introduction 1 Viewpoint Photography 1 Stitching of Panoramas and Post-Photographic

More information

Non-Technical Summary of Environmental Statement

Non-Technical Summary of Environmental Statement Non-Technical Summary of Environmental Statement Speedway World Cup Introduction This document is the Non-Technical Summary (NTS) of the Environmental Statement (ES) prepared for the proposed Speedway

More information

Control of noise from the operation of stationary systems

Control of noise from the operation of stationary systems Control of noise from the operation of stationary systems This factsheet aims to explain the objectives which are expected to be adopted and the measures that are expected to be put in place to control

More information

REVISED NOISE IMPACT STUDY

REVISED NOISE IMPACT STUDY REVISED NOISE IMPACT STUDY Benton Boarding and Daycare 5673 Fourth Line Road Ottawa, Ontario City of Ottawa File No. D07-12-13-0024 Integral DX Engineering Ltd. Page 2 of 24 TABLE OF CONTENTS 1.0 INTRODUCTION

More information

Control of Noise from the Operation of Stationary Systems

Control of Noise from the Operation of Stationary Systems Control of Noise from the Operation of Stationary Systems This factsheet explains the objectives that are expected to be adopted and the measures that are expected to be put in place to control the effects

More information

Noise Monitoring Program

Noise Monitoring Program for Document Table of Contents for... 1 1 Purpose... 3 1.1 Purpose... 3 2 Noise Impact Assessment Criteria... 3 2.1 Noise Criteria... 3 3 Measurement and Evaluation... 6 3.1 Monitoring Locations... 6 3.2

More information

Appendix 8.F Additional Great Crested Newt Survey 2009

Appendix 8.F Additional Great Crested Newt Survey 2009 Appendix 8.F Additional Great Crested Newt Survey 2009 Technical Note 1 Proposed Kelmarsh Wind Farm Additional Great Crested Newt Survey 2009 1. Introduction Entec UK Ltd (Entec) was commissioned by E.ON

More information

NOISE IMPACT STUDY. Benton Boarding and Daycare 5673 Fourth Line Road Ottawa, Ontario City of Ottawa File No. D

NOISE IMPACT STUDY. Benton Boarding and Daycare 5673 Fourth Line Road Ottawa, Ontario City of Ottawa File No. D NOISE IMPACT STUDY Benton Boarding and Daycare 5673 Fourth Line Road Ottawa, Ontario City of Ottawa File No. D07-12-13-0024 Page 2 of 23 TABLE OF CONTENTS 1.0 INTRODUCTION / BACKGROUND INFORMATION...6

More information

CHAPTER ELECTRIC AND MAGNETIC FIELDS

CHAPTER ELECTRIC AND MAGNETIC FIELDS CHAPTER 62-814 ELECTRIC AND MAGNETIC FIELDS 62-814.100 Intent, Findings, Basis of Standards, and Research Needs 62-814.200 Electric and Magnetic Fields; Definitions 62-814.300 General Technical Requirements

More information

Noise Mitigation Study Pilot Program Summary Report Contract No

Noise Mitigation Study Pilot Program Summary Report Contract No Ohio Turnpike Commission Noise Mitigation Study Pilot Program Summary Report Contract No. 71-08-02 Prepared For: Ohio Turnpike Commission 682 Prospect Street Berea, Ohio 44017 Prepared By: November 2009

More information

NOISE IMPACT ASSESSMENT 2016

NOISE IMPACT ASSESSMENT 2016 Panther Environmental Solutions Ltd, Unit 4, Innovation Centre, Institute of Technology, Green Road, Carlow, Ireland. Mobile: 087-8519284 Telephone /Fax: 059-9134222 Email: info@pantherwms.com Website:

More information

Antenna rotation variability and effects on antenna coupling for radar interference analysis

Antenna rotation variability and effects on antenna coupling for radar interference analysis Recommendation ITU-R M.269- (12/214) Antenna rotation variability and effects on antenna coupling for radar interference analysis M Series Mobile, radiodetermination, amateur and related satellite services

More information

IEEE c-00/11. IEEE Broadband Wireless Access Working Group <

IEEE c-00/11. IEEE Broadband Wireless Access Working Group < Project Title Date Submitted IEEE 802.16 Broadband Wireless Access Working Group Co-ordination Criteria for BWA Systems 2000-04-28 Source Philip Whitehead Radiant Networks PLC London

More information

DEP 2008 ELECTRIC AND MAGNETIC FIELDS CHAPTER ELECTRIC AND MAGNETIC FIELDS

DEP 2008 ELECTRIC AND MAGNETIC FIELDS CHAPTER ELECTRIC AND MAGNETIC FIELDS CHAPTER 62-814 ELECTRIC AND MAGNETIC FIELDS TABLE OF CONTENTS PAGE 62-814.100 Intent, Findings, Basis of Standards, and Research Needs. 2 62-814.200 Electric and Magnetic Fields; Definitions. 3 62-814.300

More information

Energy Networks Association

Energy Networks Association The Voice of the Networks Version 1 (ISSUED) Energy Networks Association Insert presentation title here ENA EREC P28 Issue 2 2018 Key Technical Modifications Grid Code and SQSS Mods Name Position Date

More information

Appendix 7-6 Collision Risk Assessment. Proposed Ardderroo Wind Farm, Co. Galway

Appendix 7-6 Collision Risk Assessment. Proposed Ardderroo Wind Farm, Co. Galway Appendix 7-6 Collision Risk Assessment Proposed Ardderroo Wind Farm, Co. Galway DOCUMENT DETAILS Client: Project title: Ardderroo Wind Farm Ltd. Proposed Ardderroo Wind Farm, Co. Galway Project Number:

More information

Assured Monitoring Group

Assured Monitoring Group Assured Monitoring Group YARRANLEA SOLAR FARM NOISE & VIBRATION IMPACT ASSESSMENT JANUARY 2017 I3 CONSULTING PTY LTD Project ID. 10734 R_1 DATE OF RELEASE: 15/02/2017 Table 1: Document approval Name Position

More information

WFPS1 WIND FARM POWER STATION GRID CODE PROVISIONS

WFPS1 WIND FARM POWER STATION GRID CODE PROVISIONS WFPS1 WIND FARM POWER STATION GRID CODE PROVISIONS WFPS1.1 INTRODUCTION 2 WFPS1.2 OBJECTIVE 2 WFPS1.3 SCOPE 3 WFPS1.4 FAULT RIDE THROUGH REQUIREMENTS 4 WFPS1.5 FREQUENCY REQUIREMENTS 5 WFPS1.6 VOLTAGE

More information

RECOMMENDATION ITU-R M * Definition of availability for radiocommunication circuits in the mobile-satellite service

RECOMMENDATION ITU-R M * Definition of availability for radiocommunication circuits in the mobile-satellite service Rec. ITU-R M.828-2 1 RECOMMENDATION ITU-R M.828-2 * Definition of availability for radiocommunication circuits in the mobile-satellite service (Question ITU-R 85/8) (1992-1994-2006) Scope This Recommendation

More information

OWA Floating LiDAR Roadmap Supplementary Guidance Note

OWA Floating LiDAR Roadmap Supplementary Guidance Note OWA Floating LiDAR Roadmap Supplementary Guidance Note List of abbreviations Abbreviation FLS IEA FL Recommended Practices KPI OEM OPDACA OSACA OWA OWA FL Roadmap Meaning Floating LiDAR System IEA Wind

More information

TPS 49 EDITION 2 JUNE 2009

TPS 49 EDITION 2 JUNE 2009 TPS 49 EDITION 2 JUNE 2009 Interim arrangements & guidance on the interpretation of IEC 61672 Sound Level Meters - Periodic Tests CONTENTS SECTION PAGE 1 Purpose and duration 2 2 Statement 2 3 Specific

More information

DESIGN PRACTICE NOTE DESIGN/REVIEW REQUIREMENTS FOR TRACTION BONDING PLAN

DESIGN PRACTICE NOTE DESIGN/REVIEW REQUIREMENTS FOR TRACTION BONDING PLAN Approval Amendment Record Approval Date Version Description 01/04/2014 1 Initial Issue under MTM PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 1 of 7 Table of Contents

More information

Power Quality Requirements for Connection to the Transmission System

Power Quality Requirements for Connection to the Transmission System Power Quality Requirements for Connection to the Transmission System Revision: 1.0 Date: September 2015 Introduction and Purpose of this Document The purpose of this document is to provide clarity to Customers

More information

AC Voltage- Pipeline Safety and Corrosion MEA 2015

AC Voltage- Pipeline Safety and Corrosion MEA 2015 AC Voltage- Pipeline Safety and Corrosion MEA 2015 WHAT ARE THE CONCERNS ASSOCIATED WITH AC VOLTAGES ON PIPELINES? AC concerns Induced AC Faults Lightning Capacitive coupling Safety Code Induced AC Corrosion

More information

Wireless Facility Peer Engineering Review

Wireless Facility Peer Engineering Review Page 1 of 11 Wireless Facility Peer Engineering Review Regarding Verizon Wireless Application 2750 Dwight Way, Berkeley, CA August 10, 2015 Page 2 of 11 Introduction RCC Consultants, Inc. has been engaged

More information

MRO Delay Line. Performance of Beam Compressor for Agilent Laser Head INT-406-VEN The Cambridge Delay Line Team. rev 0.

MRO Delay Line. Performance of Beam Compressor for Agilent Laser Head INT-406-VEN The Cambridge Delay Line Team. rev 0. MRO Delay Line Performance of Beam Compressor for Agilent Laser Head INT-406-VEN-0123 The Cambridge Delay Line Team rev 0.45 1 April 2011 Cavendish Laboratory Madingley Road Cambridge CB3 0HE UK Change

More information

Template Planning Condition on Amplitude Modulation Noise Guidance Notes

Template Planning Condition on Amplitude Modulation Noise Guidance Notes www.renewableuk.com Template Planning Condition on Amplitude Modulation Noise Guidance Notes December 2013 Template Planning Condition on Amplitude Noise Guidance Notes Modulation Introduction Introduction

More information

January 2012 Noise Impact Assessment Report for Proposed Cable Tow System For Wakeboarding & Water-skiing Grand Canal Dock, Dublin 4

January 2012 Noise Impact Assessment Report for Proposed Cable Tow System For Wakeboarding & Water-skiing Grand Canal Dock, Dublin 4 January 2012 Noise Impact Assessment Report for Proposed Cable Tow System For Wakeboarding & Water-skiing Grand Canal Dock, Dublin 4 MALONE O REGAN 2B Richview Office Park, Clonskeagh, Dublin 14. Tel:

More information

Solar control devices; balance between thermal performance and daylight

Solar control devices; balance between thermal performance and daylight International Conference Passive and Low Energy Cooling 991 Solar control devices; balance between thermal performance and daylight M. Mehrotra Architectural Association, Graduate School, London ABSTRACT

More information

DESIGN REVIEW PROCESS AND APPLICATION

DESIGN REVIEW PROCESS AND APPLICATION DESIGN REVIEW PROCESS AND APPLICATION Design review is the first step in the process of any construction project requiring permits. The Community Redevelopment Agency (CRA) Board is responsible for ensuring

More information

Seagreen Wind Energy Limited C/o SSE Renewables 1 Waterloo Street Glasgow G2 6AY

Seagreen Wind Energy Limited C/o SSE Renewables 1 Waterloo Street Glasgow G2 6AY Date: 30 th March 2018 Ref: A4MR-SEAG-Z-LGL810-SLE-548 Dr. Nicola Bain Marine Renewables Section Leader Licensing Operations Team Marine Scotland Marine Laboratory 375 Victoria Road Aberdeen AB11 9DB Seagreen

More information

Site Name. Bird Dimensions Species Hen harrier = data input required length (m) 0.55 = model calculates value wing span (m) 1.

Site Name. Bird Dimensions Species Hen harrier = data input required length (m) 0.55 = model calculates value wing span (m) 1. Site Name Loch Urr Bird Dimensions Species Hen harrier = data input required length (m) 0.55 = model calculates value wing span (m) 1.4 speed (m/sec) 8 Turbine Dimensions Height of tower (m) 80 Blade length

More information

City of Keizer Floodplain/Greenway Development Application

City of Keizer Floodplain/Greenway Development Application City of Keizer Floodplain/Greenway Development Application If there are any questions about this application, who should be contacted (Agent)? Name: Address: Daytime Phone Number(s): Fax: Email: 1. Applicant

More information

Galloper Wind Farm Limited. Galloper Wind Farm Project Environmental Statement Chapter 1 Introduction October 2011 Document Reference 5.2.

Galloper Wind Farm Limited. Galloper Wind Farm Project Environmental Statement Chapter 1 Introduction October 2011 Document Reference 5.2. Galloper Wind Farm Limited Galloper Wind Farm Project Environmental Statement Chapter 1 Introduction October 2011 Document Reference 5.2.1 Document title Galloper Wind Farm Project Environmental Statement

More information

REPORT ITU-R M Impact of radar detection requirements of dynamic frequency selection on 5 GHz wireless access system receivers

REPORT ITU-R M Impact of radar detection requirements of dynamic frequency selection on 5 GHz wireless access system receivers Rep. ITU-R M.2034 1 REPORT ITU-R M.2034 Impact of radar detection requirements of dynamic frequency selection on 5 GHz wireless access system receivers (2003) 1 Introduction Recommendation ITU-R M.1652

More information

APPENDIX M NOISE ANALYSIS

APPENDIX M NOISE ANALYSIS APPENDIX M NOISE ANALYSIS McCORMICK RANKIN CORPORATION 2655 North Sheridan Way, Suite 300 Mississauga, Ontario, L5K 2P8 Tel: (905)823-8500 Fax: (905) 823-8503 E-mail: mrc@mrc.ca Website: www.mrc.ca MEMO

More information

When surge arres t ers are installed close to a power transformer, overvoltage TRANSFORMER IN GRID ABSTRACT KEYWORDS

When surge arres t ers are installed close to a power transformer, overvoltage TRANSFORMER IN GRID ABSTRACT KEYWORDS TRANSFORMER IN GRID When surge arres t ers are installed close to a power transformer, they provide protection against lightning overvoltage ABSTRACT The aim of this research article is to determine the

More information

Recommended Changes to the Public Hearing Draft Zoning Ordinance

Recommended Changes to the Public Hearing Draft Zoning Ordinance DATE: December 6, 2016 TO: Village of Oak Park FROM: Arista Strungys SUBJECT: Recommended Changes Recommended Changes to the Public Hearing Draft Zoning Ordinance ZONING MAP» Edit to remove right-of-way

More information

Transformer Thermal Impact Assessment White Paper TPL Transmission System Planned Performance for Geomagnetic Disturbance Events

Transformer Thermal Impact Assessment White Paper TPL Transmission System Planned Performance for Geomagnetic Disturbance Events Transformer Thermal Impact Assessment White Paper TPL-007-2 Transmission System Planned Performance for Geomagnetic Disturbance Events Background Proposed TPL 007 2 includes requirements for entities to

More information

Low Frequency Demand Disconnection Summary

Low Frequency Demand Disconnection Summary Low Frequency Demand Disconnection Summary This article assesses the suitability of current low frequency protection on the network as more distributed generation is connected to WPD s network. DSOF June

More information

Black. LWECS Site Permit. Stearns County. Permit Section:

Black. LWECS Site Permit. Stearns County. Permit Section: PERMIT COMPLIANCE FILING Permittee: Permit Type: Project Location: Docket No: Permit Section: Date of Submission : Black Oak Wind,, LLC LWECS Site Permit Stearns County IP6853/WS-10-1240 and IP6866/WS-11-831

More information

2. As such, Proponents of Antenna Systems do not require permitting of any kind from the Town.

2. As such, Proponents of Antenna Systems do not require permitting of any kind from the Town. Subject: Antenna Systems Policy Number: Date Developed: 2008/09 Date Approved: April 8, 2009 Lead Department: Planning and Development Date Modified: (if applicable) November 26, 2014 A. PROTOCOL STATEMENT:

More information

January 15, File: A. Urban Systems Ltd Homer Street Vancouver, BC V6B 2W9. Attention: Tim Stevens. Dear Tim:

January 15, File: A. Urban Systems Ltd Homer Street Vancouver, BC V6B 2W9. Attention: Tim Stevens. Dear Tim: January 15, 2016 File: 0890-15A Urban Systems Ltd. 1090 Homer Street Vancouver, BC V6B 2W9 Attention: Tim Stevens Dear Tim: Re: Highway 1 - Admirals McKenzie Interchange Project Baseline Noise Monitoring

More information

Verizon Wireless Proposed Base Station (Site No Berkeley Bekins ) 2721 Shattuck Avenue Berkeley, California

Verizon Wireless Proposed Base Station (Site No Berkeley Bekins ) 2721 Shattuck Avenue Berkeley, California Statement of Hammett & Edison, Inc., Consulting Engineers The firm of Hammett & Edison, Inc., Consulting Engineers, has been retained on behalf of Verizon Wireless, a personal wireless telecommunications

More information

Design guide to separating distances during construction

Design guide to separating distances during construction Design guide to separating distances during construction For timber frame buildings and projects above 600m 2 total floor area Part 2 - Standard timber frame and construction process mitigation methods

More information

DESIGN OF A 45 CIRCUIT DUCT BANK

DESIGN OF A 45 CIRCUIT DUCT BANK DESIGN OF A 45 CIRCUIT DUCT BANK Mark COATES, ERA Technology Ltd, (UK), mark.coates@era.co.uk Liam G O SULLIVAN, EDF Energy Networks, (UK), liam.o sullivan@edfenergy.com ABSTRACT Bankside power station

More information

ISO INTERNATIONAL STANDARD. Petroleum and natural gas industries Offshore production installations Basic surface process safety systems

ISO INTERNATIONAL STANDARD. Petroleum and natural gas industries Offshore production installations Basic surface process safety systems INTERNATIONAL STANDARD ISO 10418 Second edition 2003-10-01 Petroleum and natural gas industries Offshore production installations Basic surface process safety systems Industries du pétrole et du gaz naturel

More information

Modify Section , Major Impact Services and Utilities, of Chapter (Civic Use Types):

Modify Section , Major Impact Services and Utilities, of Chapter (Civic Use Types): ORDINANCE NO. AN ORDINANCE CHANGING THE ZONING CODE FOR MENDOCINO COUNTY The Board of Supervisors of the County of Mendocino, State of California, ordains as follows: Pursuant to Division I of Title 20,

More information

Unit Auxiliary Transformer Overcurrent Relay Loadability During a Transmission Depressed Voltage Condition

Unit Auxiliary Transformer Overcurrent Relay Loadability During a Transmission Depressed Voltage Condition Unit Auxiliary Transformer Overcurrent Relay Loadability During a Transmission Depressed Voltage Condition NERC System Protection and Control Subcommittee March 2016 NERC Report Title Report Date I Table

More information

Boa Vista Wind Farm Ponta do Sol

Boa Vista Wind Farm Ponta do Sol Boa Vista Wind Farm Ponta do Sol COLLISION RISK ASSESSMENT REPORT Supplementary Environmental Information Version 2 Final 5 December 2009 Boa Vista Wind Farm Ponta do Sol COLLISION RISK ASSESSMENT REPORT

More information

View flat at a comfortable arm s length Enoch Hill Wind Farm Environmental Statement

View flat at a comfortable arm s length Enoch Hill Wind Farm Environmental Statement Photomontage View flat at a comfortable arm s length E255 385, N601 853 Horizontal field of view: 53.5º (planar projection) Eye level: 336.5m AOD Principal distance: 812.5mm Direction of view: 29º Paper

More information

SYNCHRONISING AND VOLTAGE SELECTION

SYNCHRONISING AND VOLTAGE SELECTION SYNCHRONISING AND VOLTAGE SELECTION This document is for Relevant Electrical Standards document only. Disclaimer NGG and NGET or their agents, servants or contractors do not accept any liability for any

More information

VISUALISATION STANDARDS

VISUALISATION STANDARDS VISUALISATION STANDARDS INTRODUCTION These standards have been produced to enable the Council to verify that photomontages submitted in support of planning applications and contained with Environmental

More information

1. Terrestrial propagation

1. Terrestrial propagation Rec. ITU-R P.844-1 1 RECOMMENDATION ITU-R P.844-1 * IONOSPHERIC FACTORS AFFECTING FREQUENCY SHARING IN THE VHF AND UHF BANDS (30 MHz-3 GHz) (Question ITU-R 218/3) (1992-1994) Rec. ITU-R PI.844-1 The ITU

More information

THE GRID CODE OC7.5 INTEGRAL EQUIPMENT TESTS GUIDANCE NOTES

THE GRID CODE OC7.5 INTEGRAL EQUIPMENT TESTS GUIDANCE NOTES THE GRID CODE OC7.5 INTEGRAL EQUIPMENT TESTS GUIDANCE NOTES Issue 9: May 2013 National Grid National Grid Registered Office National Grid Electricity Transmission plc Registered Office: 1-3 Strand London

More information

David J. Gellner, AICP, Principal Planner

David J. Gellner, AICP, Principal Planner Staff Report PLANNING DIVISION COMMUNITY & ECONOMIC DEVELOPMENT To: From: Salt Lake City Planning Commission David J. Gellner, AICP, Principal Planner - 801-535-6107 - david.gellner@slcgov.com Date: October

More information

Radar Signatures and Relations to Radar Cross Section. Mr P E R Galloway. Roke Manor Research Ltd, Romsey, Hampshire, United Kingdom

Radar Signatures and Relations to Radar Cross Section. Mr P E R Galloway. Roke Manor Research Ltd, Romsey, Hampshire, United Kingdom Radar Signatures and Relations to Radar Cross Section Mr P E R Galloway Roke Manor Research Ltd, Romsey, Hampshire, United Kingdom Philip.Galloway@roke.co.uk Abstract This paper addresses a number of effects

More information

LIMITS FOR TEMPORARY OVERVOLTAGES IN ENGLAND AND WALES NETWORK

LIMITS FOR TEMPORARY OVERVOLTAGES IN ENGLAND AND WALES NETWORK LIMITS FOR TEMPORARY OEROLTAGES IN ENGLAND AND WALES NETWORK This document is for internal and contract specific use only. Disclaimer NGG and NGET or their agents, servants or contractors do not accept

More information

REPORT ITU-R M

REPORT ITU-R M Rep. ITU-R M.2113-1 1 REPORT ITU-R M.2113-1 Sharing studies in the 2 500-2 690 band between IMT-2000 and fixed broadband wireless access systems including nomadic applications in the same geographical

More information

Transformer Thermal Impact Assessment White Paper TPL Transmission System Planned Performance for Geomagnetic Disturbance Events

Transformer Thermal Impact Assessment White Paper TPL Transmission System Planned Performance for Geomagnetic Disturbance Events Transformer Thermal Impact Assessment White Paper TPL-007-2 Transmission System Planned Performance for Geomagnetic Disturbance Events Background Proposed TPL-007-2 includes requirements for entities to

More information

Higher National Unit specification. General information for centres. Photography: Darkroom Techniques. Unit code: DW81 34

Higher National Unit specification. General information for centres. Photography: Darkroom Techniques. Unit code: DW81 34 Higher National Unit specification General information for centres Unit title: Photography: Darkroom Techniques Unit code: DW81 34 Unit purpose: This Unit is designed to enable the candidate to research,

More information

POWER TRANSFORMER. Failure Analysis & Troubleshooting. H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E

POWER TRANSFORMER. Failure Analysis & Troubleshooting. H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E POWER TRANSFORMER Failure Analysis & Troubleshooting H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E www.ictd.ae ictd@ictd.ae Course Introduction: Electricity is high-grade energy. Working

More information

System Operating Limit Definition and Exceedance Clarification

System Operating Limit Definition and Exceedance Clarification System Operating Limit Definition and Exceedance Clarification The NERC-defined term System Operating Limit (SOL) is used extensively in the NERC Reliability Standards; however, there is much confusion

More information

NATS Swanwick. Interface Agreement. Owners: General Manager Swanwick. General Manager XXX

NATS Swanwick. Interface Agreement. Owners: General Manager Swanwick. General Manager XXX NATS Swanwick Interface Agreement between Swanwick And XXX Airport Owners: General Manager Swanwick General Manager XXX APPROVED BY Title Name Signature Date General Manager LTC Swanwick General Manager

More information

1 Guidance to protect MoD systems using the 2.3 GHz band

1 Guidance to protect MoD systems using the 2.3 GHz band 1 Guidance to protect MoD systems using the 2.3 GHz band A1.1 Amateurs are required to operate in such a way as to not cause interference to other lawful uses of the spectrum. This includes MoD uses. However

More information

Environmental Noise Assessment Cambourne to Cambridge options

Environmental Noise Assessment Cambourne to Cambridge options Environmental Noise Assessment Cambourne to Cambridge options CLIENT: Cambridgeshire County Council Major Infrastructure Delivery Box No SH1311 Shire Hall Cambridge CB3 0AP CONTACT: Tim Watkins REPORTED

More information

TECHNICAL REPORT 2016 IEL ENVIRONMENTAL NOISE SURVEY OF THE DAIRYGOLD CASTLEFARM FACILITY, MITCHELSTOWN, CO. CORK.

TECHNICAL REPORT 2016 IEL ENVIRONMENTAL NOISE SURVEY OF THE DAIRYGOLD CASTLEFARM FACILITY, MITCHELSTOWN, CO. CORK. TECHNICAL REPORT 16 IEL ENVIRONMENTAL NOISE SURVEY OF THE DAIRYGOLD CASTLEFARM FACILITY, MITCHELSTOWN, CO. CORK. FOR Gabriel Kelly Group Environmental Manager Dairygold Food ingredients Castlefarm Mitchelstown

More information

WIRELESS TELECOMMUNICATION FACILITIES. Chapter 15

WIRELESS TELECOMMUNICATION FACILITIES. Chapter 15 Title 9 Land Management Code WIRELESS TELECOMMUNICATION FACILITIES Chapter 15 9-15-1: PURPOSE: 9-15-2: DEFINITIONS: 9-15-3: APPLICABILITY: 9-15-4: MASTER PLAN REQUIRED: 9-15-5: ALLOWABLE USES: 9-15-6:

More information

APPENDIX K.1 TELECOMMUNICATIONS AND AVIATION IMPACT STUDY

APPENDIX K.1 TELECOMMUNICATIONS AND AVIATION IMPACT STUDY Grousemount Wind Farm, Co. Kerry Environmental Impact Statement - Volume 2 of 3 August 2015 APPENDIX K.1 TELECOMMUNICATIONS AND AVIATION IMPACT STUDY Appendix K: Material Assets LTD Wind farm developments

More information

Home CSP Inc. Trackers and electronics for home solar energy

Home CSP Inc. Trackers and electronics for home solar energy Home CSP Inc. Trackers and electronics for home solar energy www.homecsp.com csp@homecsp.com TinyTracker version 1.06 reve Thanks for purchasing your TinyTracker from Home CSP Inc. The TinyTracker provides

More information

MidAmerican Energy Company 69 kv Facility Ratings Methodology

MidAmerican Energy Company 69 kv Facility Ratings Methodology MidAmerican Energy Company 69 kv Facility Ratings Methodology Version 1.0 Issued by: Luke Erichsen Reviewed by: Tom Mielnik Last Reviewed: 8/29/2012 1 1.0 Scope: This document provides MidAmerican Energy

More information

Conceptual, Preliminary and Final Site Plan Review in Holladay City

Conceptual, Preliminary and Final Site Plan Review in Holladay City Conceptual, Preliminary and Final Site Plan Review in Holladay City The City of Holladay incorporated in December, 1999 and adopted its own zoning ordinance in May, 2000. All land use decisions are made

More information

INFCIRC/57. 72/Rev.6. under. Safetyy. read in. Convention. involve. National Reports. on Nuclear 2015.

INFCIRC/57. 72/Rev.6. under. Safetyy. read in. Convention. involve. National Reports. on Nuclear 2015. Atoms for Peace and Development Information Circular INFCIRC/57 72/Rev.6 Date: 19 January 2018 General Distribution Original: English Guidelines regarding Convention National Reports under the on Nuclear

More information

17 Telecommunication Interference

17 Telecommunication Interference 17 Telecommunication Interference 17.1 Introduction This Chapter of the ES assesses the potential impacts and likely effects of the Proposed Development on local television (TV) broadcast reception during

More information

Graphic Communication Assignment General assessment information

Graphic Communication Assignment General assessment information Graphic Communication Assignment General assessment information This pack contains general assessment information for centres preparing candidates for the assignment Component of Higher Graphic Communication

More information

Transformer Thermal Impact Assessment White Paper Project (Geomagnetic Disturbance Mitigation)

Transformer Thermal Impact Assessment White Paper Project (Geomagnetic Disturbance Mitigation) Transformer Thermal Impact Assessment White Paper Project 2013-03 (Geomagnetic Disturbance Mitigation) TPL-007-1 Transmission System Planned Performance for Geomagnetic Disturbance Events Background On

More information

Government of Karnataka Department of Technical Education Board of Technical Examinations, Bengaluru

Government of Karnataka Department of Technical Education Board of Technical Examinations, Bengaluru Government of Karnataka Department of Technical Education Board of Technical Examinations, Bengaluru Course Title :COMPUTER AIDED Course Code : 15EE47P ELECTRICAL DRAFTING Semester : IV Course Group :

More information

ADDAM (Atmospheric Dispersion and Dose Analysis Method)

ADDAM (Atmospheric Dispersion and Dose Analysis Method) ADDAM (Atmospheric Dispersion and Dose Analysis Method) Presentation for IAEA Environmental Modelling for Radiation Safety (EMRAS-II), Technical Meeting, Vienna Urban Areas Working Group Nuclear Power

More information

Application for Site Plan Review

Application for Site Plan Review Application for Site Plan Review 3275 Central Blvd., Hudsonville, Michigan 49426-1450, 616.669.0200 fax 616.669.2330 It is STRONGLY recommended that any application that must go before the Planning Commission

More information

Liddell Coal Operations

Liddell Coal Operations Liddell Coal Operations Environmental Noise Monitoring April 2016 Prepared for Liddell Coal Operations Pty Ltd Page i Liddell Coal Operations Environmental Noise Monitoring April 2016 Reference: Report

More information

ENGINEERING REPORT CONCERNING THE EFFECTS UPON FCC LICENSED RF FACILITIES DUE TO CONSTRUCTION OF THE (Name of Project) WIND PROJECT Near (City, State)

ENGINEERING REPORT CONCERNING THE EFFECTS UPON FCC LICENSED RF FACILITIES DUE TO CONSTRUCTION OF THE (Name of Project) WIND PROJECT Near (City, State) ENGINEERING REPORT CONCERNING THE EFFECTS UPON FCC LICENSED RF FACILITIES DUE TO CONSTRUCTION OF THE (Name of Project) WIND PROJECT Near (City, State) for (Name of Company) January 3, 2011 By: B. Benjamin

More information

ABERDEEN HARBOUR EXPANSION PROJECT November Volume 2: Environmental Statement

ABERDEEN HARBOUR EXPANSION PROJECT November Volume 2: Environmental Statement ABERDEEN HARBOUR EXPANSION PROJECT November 2015 Volume 2: Environmental Statement Chapter 23: OTHER USERS 23. OTHER USERS 23.1 Introduction This chapter assesses the potential effects on other users

More information

Petroleum Safety Levy Methodology. Decision Paper

Petroleum Safety Levy Methodology. Decision Paper Petroleum Safety Levy Methodology Decision Paper DOCUMENT TYPE: REFERENCE: Decision Paper CER/14/429 DATE PUBLISHED: 7 th August 2014 VERSION 3.0 The Commission for Energy Regulation, The Exchange, Belgard

More information

Clair Creek Meadows 30T Blocks 47, 48 & 49 Zone Change Functional Servicing and Stormwater Management Brief

Clair Creek Meadows 30T Blocks 47, 48 & 49 Zone Change Functional Servicing and Stormwater Management Brief Stantec Consulting Ltd. 49 Frederick Street Kitchener ON N2H 6M7 November 11, 2011 File: 603-10620/29 Stantec Consulting 49 Frederick Street Kitchener ON N2H 6M7 Attention: Mr. Douglas Stewart, MCIP, RPP

More information

Herts Valleys Clinical Commissioning Group. Review of NHS Herts Valleys CCG Constitution

Herts Valleys Clinical Commissioning Group. Review of NHS Herts Valleys CCG Constitution Herts Valleys Clinical Commissioning Group Review of NHS Herts Valleys CCG s constitution Agenda Item: 14 REPORT TO: HVCCG Board DATE of MEETING: 30 January 2014 SUBJECT: Review of NHS Herts Valleys CCG

More information

Radiowave Propagation Prediction in a Wind Farm Environment and Wind Turbine Scattering Model

Radiowave Propagation Prediction in a Wind Farm Environment and Wind Turbine Scattering Model International Renewable Energy Congress November 5-7, 21 Sousse, Tunisia Radiowave Propagation Prediction in a Wind Farm Environment and Wind Turbine Scattering Model A. Calo 1, M. Calvo 1, L. de Haro

More information

Transformer Thermal Impact Assessment White Paper (Draft) Project (Geomagnetic Disturbance Mitigation)

Transformer Thermal Impact Assessment White Paper (Draft) Project (Geomagnetic Disturbance Mitigation) Transformer Thermal Impact Assessment White Paper (Draft) Project 2013-03 (Geomagnetic Disturbance Mitigation) TPL-007-1 Transmission System Planned Performance during Geomagnetic Disturbances Background

More information

Verizon Wireless Proposed Base Station (Site No South Goleta ) 4500 Hollister Avenue Santa Barbara, California

Verizon Wireless Proposed Base Station (Site No South Goleta ) 4500 Hollister Avenue Santa Barbara, California Statement of Hammett & Edison, Inc., Consulting Engineers The firm of Hammett & Edison, Inc., Consulting Engineers, has been retained on behalf of Verizon Wireless, a personal wireless telecommunications

More information

Pfizer Ireland Pharmaceuticals

Pfizer Ireland Pharmaceuticals Allegro Acoustics Limited, Unit 2A Riverside, Tallaght Business Park, Tallaght, Dublin 24 Tel/Fax: +33 () 1 4148 Pfizer Ireland Pharmaceuticals Pfizer Grange Castle, Grange Castle Business Park, Clondalkin,

More information

Re. Invitation to Comment on a Proposed Small Cell Telecommunications Installation Near (Road reserve) Coogee Bay Road COOGEE NSW 2034

Re. Invitation to Comment on a Proposed Small Cell Telecommunications Installation Near (Road reserve) Coogee Bay Road COOGEE NSW 2034 The Occupier 22 nd February 2018 Dear Sir/Madam Re. Invitation to Comment on a Proposed Small Cell Telecommunications Installation Near (Road reserve) 146-148 Coogee Bay Road COOGEE NSW 2034 Urbis is writing

More information

CHAPTER 26 SITE PLAN REVIEW

CHAPTER 26 SITE PLAN REVIEW CHAPTER 26 SITE PLAN REVIEW Section 26.1. Committee. The Planning Commission shall appoint three members of the Planning Commission to the site plan review committee which shall be responsible for site

More information

Innogy Renewables UK Ltd i Harryburn Wind Farm: ES Technical Appendix 8.6: Bird Collision Modelling April 2017

Innogy Renewables UK Ltd i Harryburn Wind Farm: ES Technical Appendix 8.6: Bird Collision Modelling April 2017 Harryburn Wind Farm Technical Appendix 8.6 Bird Collision Modelling Ref: 405-06525-00001 April 2017 Ref: 405.06525.00001 Version No: Final April 2017 Innogy Renewables UK Ltd i 405.06525.00001 CONTENTS

More information

AGN 022 Conditions for Parallel Operation

AGN 022 Conditions for Parallel Operation Application Guidance Notes: Technical Information from Cummins Generator Technologies AGN 022 Conditions for Parallel Operation SYNCHRONISATION The parallel operation of Generating Sets is common, to share

More information

Migration of Birds MARC

Migration of Birds MARC Migration of Birds MARC TABLE OF CONTENTS Migration of birds 1. Abstract....3 2. Description of a domain......3 3. Block diagram....... 4 4. Description of the program that is wanted. 4 5. Detailed requirements....

More information

AT&T Mobility Proposed Base Station (Site No. CN4779A) 1101 Keaveny Court Walnut Creek, California

AT&T Mobility Proposed Base Station (Site No. CN4779A) 1101 Keaveny Court Walnut Creek, California Statement of Hammett & Edison, Inc., Consulting Engineers The firm of Hammett & Edison, Inc., Consulting Engineers, has been retained on behalf of AT&T Mobility, a personal wireless telecommunications

More information

See Benchmark Geomagnetic Disturbance Event Description white paper, May 12, Filed by NERC in Docket No. RM15 11 on June 28, 2016.

See Benchmark Geomagnetic Disturbance Event Description white paper, May 12, Filed by NERC in Docket No. RM15 11 on June 28, 2016. Screening Criterion for Transformer Thermal Impact Assessment White Paper TPL-007-2 Transmission System Planned Performance for Geomagnetic Disturbance Events Summary Proposed TPL 007 2 includes requirements

More information

The following is the summary of Keane Acoustics community mechanical noise study for the City of St. Petersburg.

The following is the summary of Keane Acoustics community mechanical noise study for the City of St. Petersburg. August 11, 2017 David Goodwin Director Planning & Economic Development Department City of St. Petersburg Re: City of St. Petersburg Dear Mr. Goodwin, The following is the summary of Keane Acoustics community

More information

Verizon Wireless Proposed Base Station (Site No Lake Cachuma ) 2680 Highway 154 Santa Barbara County, California

Verizon Wireless Proposed Base Station (Site No Lake Cachuma ) 2680 Highway 154 Santa Barbara County, California Statement of Hammett & Edison, Inc., Consulting Engineers The firm of Hammett & Edison, Inc., Consulting Engineers, has been retained on behalf of Verizon Wireless, a personal wireless telecommunications

More information

Memorandum 1.0 Highway Traffic Noise

Memorandum 1.0 Highway Traffic Noise Memorandum Date: September 18, 2009 To: Chris Hiniker, SEH From: Stephen B. Platisha, P.E. Re: Updated CSAH 14 Noise Analysis The purpose of this memorandum is to provide the results of the revised traffic

More information