East Anglia TWO & ONE North. Broom Covert, Sizewell Visualisations
|
|
- Edwina Booth
- 5 years ago
- Views:
Transcription
1 East Anglia TWO & ONE North Broom Covert, Sizewell Visualisations
2 VIEWPOINT LOCATIONS Viewpoint 1: Sizewell Gap Road Viewpoint 2: Broom Covert Viewpoint 3: Sandy Lane Viewpoint 4: King George s Avenue Photomontage Visualisations are produced for viewpoints 1-4. Please note the following: a. No mitigation has been included, such as substation lowering. b. No additional landscape mitigation has been included. c. No national grid overhead line realignment works have been included (details to be confirmed) Indicative East Anglia ONE North and East Anglia TWO Substation Layout EA1N EA2 GA NG Legend 5 Viewpoint Sizewell Gap Road Broom Covert Sandy Lane King George s Avenue Note: The substation arrangement shown is indicative only and subject to further changes through the design and assessment process. This layout has allowed the most representative viewpoints to be identified and the generation of the enclosed illustrative photomontages. Galloper Substation Location Location East Anglia Substation Locations: East Anglia ONE North Substation East Anglia TWO Substation 3 17/09/2018 LA Third Issue (OPEN) 2 14/09/2018 LA Second Issue (OPEN) 1 27/08/2018 LA First Issue (OPEN) Rev Date By Comment Prepared: Checked: Approved: 1:10,000 LA A3 SM SM Km This map has been produced to the latest known information at the time of issue, and has been produced for your information only. Please consult with the SPR Offshore GIS team to ensure the content is still current before using the information contained on this map. To the fullest extent permitted by law, we accept no responsibility or liability (whether in contract, tort (including negligence) or otherwise in respect of any errors or omissions in the information contained in the map and shall not be liable for any loss, damage or expense caused by such errors or omissions. Contains Ordnance Survey digital data Crown copyright, All rights reserved 2018 Licence number East Anglia TWO & ONE North Broom Covert, Sizewell Viewpoint Locations Rev Date 3 17/09/18 Coordinate System: BNG Datum: OSGB36 P:\2015\150887_EA1N&2\GIS\ArcGIS\ArcMap\ONSHORE\LVIA\VIEWPOINTS\150887_EA1N&2_Sizewell_VPs_v3.mxd
3 Baseline photograph Viewpoint 1: Sizewell Gap Road OS reference: E N Horizontal field of view: 90 (cylindrical projection) Direction of view: 8.4 m AOD 293 Principal viewing distance: 522 mm Distance to proposal: 510 m Date and time: 08/08/2018, 11:04:07
4 Baseline photograph Viewpoint 2: Broom Covert OS reference: E N 6.5 m AOD Direction of view: 240 Distance to proposal: 226 m Horizontal field of view: Principal viewing distance: 90 (cylindrical projection) 522 mm Date and time: 08/08/2018, 11:38:55
5 Baseline photograph Viewpoint 3: Sandy Lane OS reference: E N Horizontal field of view: 90 (cylindrical projection) Direction of view: 15 m AOD 131 Principal viewing distance: 522 mm Distance to proposal: 470 m Date and time: 08/08/2018, 12:22:55
6 Baseline photograph Viewpoint 4: King George s Avenue Please note that a white dotted line has been used to represent the extent of the proposed development that is hidden behind foreground features, such as trees and woodland. OS reference: Direction of view: Distance to proposal: E N 16 m AOD m Horizontal field of view: Principal viewing distance: 90 (cylindrical projection) 522 mm Date and time: 08/08/2018, 12:12:02
7
Zone 7 (W1) Visualisations
Zone 7 (W1) Visualisations East Anglia TWO & ONE NORTH Developer: Scottish Power Renewables Date: June 2018 This page is intentionally blank VIEWPOINT LOCATIONS 5 10 Viewpoint 1: Grove Road Viewpoint 2:
More informationEast Anglia TWO and East Anglia ONE North. Summary and Approach to Site Selection
East Anglia TWO and East Anglia ONE North Summary and Approach to Site Selection 1 Introduction ScottishPower Renewables (SPR) has recently concluded work in order to inform our onshore site selection
More informationView flat at a comfortable arm s length Enoch Hill Wind Farm Environmental Statement
Photomontage View flat at a comfortable arm s length E255 385, N601 853 Horizontal field of view: 53.5º (planar projection) Eye level: 336.5m AOD Principal distance: 812.5mm Direction of view: 29º Paper
More informationExtent of central 50mm frame used to construct panorama. Extent of 53.5 planar panorama ~6km High ~4km. South ~19km
Baseline photograph This image provides landscape and visual context only Extent of central 50mm frame used to construct panorama Extent of 53.5 planar panorama Garleffan @ ~6km High Glenmuir @ ~4km 18
More informationBAY OF SKAILL SUBSTATION - ORKNEY CAITHNESS CONNECTION
BAY OF SKAILL SUBSTATION - ORKNEY CAITHNESS CONNECTION Helping to secure a Renewable Future: Orkney Caithness Connection Scottish Hydro Electric Transmission Plc Scottish Hydro Electric Transmission Plc
More informationVISUALISATION STANDARDS
VISUALISATION STANDARDS INTRODUCTION These standards have been produced to enable the Council to verify that photomontages submitted in support of planning applications and contained with Environmental
More informationFebruary Prepared for
Energy from Waste Combined Heat and Power Facility, Tree Inspection for the Potential to Support Roosting Bats February 2011 Prepared for Revision Schedule Tree Inspection for the Potential to Support
More informationOffice use only: Application Date: UT No.: EA No.: Property Address: ENGINEERING APPROVAL - SUBDIVISION OR STAND-ALONE ENGINEERING WORK
Office use only: Application Date: UT No.: EA No.: Development Title: Property Address: Application for ENGINEERING APPROVAL - SUBDIVISION OR STAND-ALONE ENGINEERING WORK The following to be completed
More informationSheet Metal Design Guidelines
Sheet Metal Design Guidelines Issue XIV, Aug 2015 2 Copyright Notice Geometric Limited. All rights reserved. No part of this document (whether in hardcopy or electronic form) may be reproduced, stored
More informationAppendix 8.2 Information to be Read in Conjunction with Visualisations
Shepherds Rig Wind Farm EIA Report Appendix 8.2 Information to be Read in Conjunction with Visualisations Contents Contents i Introduction 1 Viewpoint Photography 1 Stitching of Panoramas and Post-Photographic
More informationSheet Metal Design Guidelines
Sheet Metal Design Guidelines Hem Design Guidelines Issue XII, June 2015 2 Copyright Notice Geometric Limited. All rights reserved. No part of this document (whether in hardcopy or electronic form) may
More informationUK experience of converting mapping data from national grid to EU grid
UK experience of converting mapping data from national grid to EU grid Stephen Grady and Graham French, JNCC stephen.grady@jncc.gov.uk graham.french@jncc.gov.uk Mapping baseline grids used in the UK There
More informationDrawing Standard for Plans Showing Horizontal Alignment
Discipline: Engineering (Track & Civil) Category: Standard Drawing Standard for Plans Showing Horizontal Alignment ETD-00-01 Applicability New South Wales CRIA (NSW CRN) Primary Source ARTC NSW Standard
More informationSite location. savills planning & regeneration. savills.com/urbandesign
ote:- Reproduced from the Ordnance Survey Map with the permission of the Controller of H.M. Stationary Offi ce Crown copyright license number 100024244 Savills (L&P) Limited. \\Southampton03\data\URBA
More informationSummerset Boulcott Retirement Village. Visual Simulations Index. 1. Visual simulations methodology. (3 pages) 3. Spencer Holmes survey data (3 pages)
Summerset Boulcott Retirement Village Visual Simulations Index 1. Visual simulations methodology. (3 pages) 2. Index & Site Plan + Photomontage collection of 9 viewpoints. Drawings VS 01 VS 37 3. Spencer
More informationBASELINE SURVEY, VISUAL - STANDARD
BASELINE SURVEY, VISUAL - STANDARD Introduction As stated in SEPA s policy and in the Fish Farm Manual (1998), scientific data are required by SEPA in order to assess the existing condition on the site
More informationSheet Metal Design Guidelines
Sheet Metal Design Guidelines Curl and Lance Design Guidelines Issue X, May 2015 2 Copyright Notice Geometric Limited. All rights reserved. No part of this document (whether in hardcopy or electronic form)
More informationCONCEPT REVIEW GUIDELINES
Department of Planning & Community Development @ Jefferson Station 1526 E. Forrest Avenue Suite 100 East Point, GA 30344 404.270.7212 (Phone) 404.765.2784 (Fax) www.eastpointcity.org CONCEPT REVIEW GUIDELINES
More informationMachining Design Guidelines
Machining Design Guidelines Milling Rules Issue IV, Jan 2015 2 Copyright Notice Geometric Limited. All rights reserved. No part of this document (whether in hardcopy or electronic form) may be reproduced,
More informationTS RES - OUTSTANDING ISSUES
TS RES - OUTSTANDING ISSUES This document has been officially issued as DRAFT until the following outstanding issues have been resolved. At that time the document will be officially reissued as the next
More informationThe EDR Aerial Photo Decade Package
Wickenburg/Forepaugh W. US Highway 60/N. 436th Ave Wickenburg, AZ 85390 Inquiry Number: April 22, 2011 The Aerial Photo Decade Package Aerial Photo Decade Package Environmental Data Resources, Inc. ()
More informationRAF DRAFT. Viewpoint 11: Taken from a road within Burlescombe, looking oking south-west towards the site.
St. Mary s Church (Grade I listed) Viewpoint 11: Taken from a road within Burlescombe, looking oking south-west towards the site. RAF Approximate location of the site obscured by existing conifers FT Viewpoint
More informationINTRODUCTION Revolution-X... 2 INSTALLATION... 4 IMPORTANT Installing the Download software Technical Support...
Revolution-X User Guide Contents INTRODUCTION... 2 Revolution-X... 2 INSTALLATION... 4 IMPORTANT... 4 Installing the Download software... 4 Technical Support... 4 Regular News... 4 REVOLUTION-X... 5 Landclass
More informationDRAFT LEGEND EDEN WESTWOOD LOCAL LANDSCAPE CONTEXT. Great Western Canal Towpath. Site boundary (Note 3)
04641.00001.29.006-Local Landscape Context Imagery supplied by Bluesky International Limited Geoperspectives Jersey Cottages Great Western Canal Towpath A361(T) Tiverton Parkway Train Station Mountstephen
More informationGUIDANCE NOTES FOR GNSS NETWORK RTK SURVEYING IN GREAT BRITAIN
GUIDANCE NOTES FOR GNSS NETWORK RTK SURVEYING IN GREAT BRITAIN ISSUE 4 MAY 2015 TSA Collaboration between: This leaflet has been produced to provide surveyors, engineers and their clients with guidelines
More informationREPORT OF DIRECTOR OF CITY OPERATIONS AGENDA ITEM: 7 PORTFOLIO: TRANSPORT, PLANNING & SUSTAINABILITY (COUNCILLOR RAMESH PATEL)
CITY OF CARDIFF COUNCIL CYNGOR DINAS CAERDYDD CABINET MEETING: 14 JULY 2016 CARDIFF STATUE AND MONUMENT PROTOCOL REPORT OF DIRECTOR OF CITY OPERATIONS AGENDA ITEM: 7 PORTFOLIO: TRANSPORT, PLANNING & SUSTAINABILITY
More informationUser Guide Mining Hazard (not including coal) in Great Britain v1.
User Guide Mining Hazard (not including coal) in Great Britain v1. Contents 1 Introductory Information 1.1 Introduction 1.2 Mining Hazard (not including coal) in Great Britain 2 Technical Information &
More informationThe EDR Aerial Photo Decade Package
I-710 Corridor - Segment 5 I-710 Corridor - Segment 5 Los Angeles County, CA 90201 Inquiry Number: March 25, 2009 The EDR Aerial Photo Decade Package EDR Aerial Photo Decade Package Environmental Data
More information1 Guidance to protect MoD systems using the 2.3 GHz band
1 Guidance to protect MoD systems using the 2.3 GHz band A1.1 Amateurs are required to operate in such a way as to not cause interference to other lawful uses of the spectrum. This includes MoD uses. However
More informationExcavation and Watching Brief
12a Friars Entry Oxford Archaeological Excavation and Watching Brief Report January 2013 Client: OISE Holdings Ltd Issue No: 1 OA Job No: 5515 NGR: SP 5114 0643 Excavation and Watching Brief 12A
More informationNotre Dame High Addition/Renovation Addendum 3 Page 1
School Notre Dame High Addition/Renovation Addendum 3 Page 1 PROJECT: Notre Dame High School Addition/ Renovation Calgary. Alberta DATE November 15, 2012 ADDENDUM NO. 3 Attachment pages Addendum: Page(s)
More informationAPPENDIX D: DRAWING SUBMISSION STANDARDS
1.0 FIRST SUBMISSION CONCEPTUAL DESIGN Once the Developer has obtained approval for a Development Application where Park or Open Space improvements are required, a detailed Park or Open Space submission
More informationB (bottom) Package type descriptive code. VFBGA176 Package style descriptive code
VFBGA176, plastic, very thin fine-pitch ball grid array; 176 balls; 0.5 mm pitch; 9 mm x 9 mm x 0.86 mm 30 July 2018 Package information 1 Package summary Terminal position code B (bottom) Package type
More informationAdministration Guide. BBM Enterprise. Version 1.3
Administration Guide BBM Enterprise Version 1.3 Published: 2018-03-27 SWD-20180323113531380 Contents What's new in BBM Enterprise... 5 Signing in to the Enterprise Identity administrator console for the
More informationYOU ARE ADVISED TO SUBMIT THIS CHECKLIST IN CONJUNCTION WITH YOUR PLANNING APPLICATION
A Guide To Lodging Planning Applications Applicant s Checklist YOU ARE ADVISED TO SUBMIT THIS CHECKLIST IN CONJUNCTION WITH YOUR PLANNING APPLICATION It is important to note that this is for information
More informationClassroom-Based Assessment 1: From Process to Realisation
Junior Cycle Visual Art Classroom-Based Assessment 1: From Process to Realisation Example of Student Work 01 Strand: Art Theme: My Viewpoint Learning outcomes: Students should be able to: 1.1 analyse their
More informationGalloper Wind Farm Limited
Galloper Wind Farm Limited Galloper Wind Farm Project Response to Development Consent Order Part 3 Requirement 19 Stages of Authorised Development (Onshore) June 2013 Document Reference GWF/R19/030613
More informationVoltage and Frequency Dependency
Average hourly generation (GW) System Operability Framework Voltage and Frequency Dependency The demand and generation we see on the electricity network has been changing in recent years and is set to
More informationThe EDR Aerial Photo Decade Package
Former Delco Chassis Plant -Site ID 1104 12950 Eckles Road Livonia, MI 48150 Inquiry Number: August 10, 2009 The EDR Aerial Photo Decade Package EDR Aerial Photo Decade Package Environmental Data Resources,
More informationOnslow Water & Sewer Authority
Onslow Water & Sewer Authority REQUIREMENTS FOR SITE PLAN SUBMITTALS THAT DO NOT INCLUDE EXTENSIONS OF WATER/SEWER MAINS BY OWNERS/DEVELOPERS/CONTRACTORS February 28, 2017 (Revised) Required Items for
More informationSite Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)
1. Identification CITY OF FENTON 301 South Leroy Street Fenton, Michigan 48430-2196 (810) 629-2261 FAX (810) 629-2004 Site Plan Review Application Project Name Applicant Name Address City/State/Zip Phone
More informationSPECIAL PUBLIC NOTICE
SPECIAL PUBLIC NOTICE Draft Map and Drawing Standards for the South Pacific Division Regulatory Program August 6, 2012 Corps contacts: Sacramento District: Michael Finan (916) 557-5324 (Michael.C.Finan@usace.army.mil)
More informationDIMENSIONING ENGINEERING DRAWINGS
DIMENSIONING ENGINEERING DRAWINGS An engineering drawing must be properly dimensioned in order to convey the designer s intent to the end user. Dimensions provide the information needed to specify the
More informationIMPORTANT NOTICE: PLEASE READ CAREFULLY BEFORE INSTALLING THE SOFTWARE: THIS LICENCE AGREEMENT (LICENCE) IS A LEGAL AGREEMENT BETWEEN
Date: 1st April 2016 (1) Licensee (2) ICG Visual Imaging Limited Licence Agreement IMPORTANT NOTICE: PLEASE READ CAREFULLY BEFORE INSTALLING THE SOFTWARE: THIS LICENCE AGREEMENT (LICENCE) IS A LEGAL AGREEMENT
More informationPTN5100 PCB layout guidelines
Rev. 1 24 September 2015 Application note Document information Info Content Keywords PTN5100, USB PD, Type C, Power Delivery, PD Controller, PD PHY Abstract This document provides a practical guideline
More informationplastic ball grid array package; 426 balls B (bottom) Package type descriptive code BGA426 Package type industry code
8 February 2016 Package information 1. Package summary Terminal position code B (bottom) Package type descriptive code BG426 Package type industry code BG426 Package style descriptive code BG (ball grid
More informationCITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS
CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE E-10 ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS The City of Lompoc has determined that the Engineering Division should administer and issue Encroachment
More informationMaps and map interpretation An introduction for geoscientists
Maps and map interpretation An introduction for geoscientists Produced by the University of Derby in conjunction with UKOGL Aims This teaching package provides an introduction to maps and how to identify
More informationArchitectural Design Process
Architectural Design Process Custom Residential A. Schematic Design Phase Pre-Design Meeting Site Analysis Site Survey Conceptual Design & Project Scope Design Program Guideline Project Team Formation
More informationUM TEA1721 universal mains white goods flyback SMPS demo board. Document information
TEA1721 universal mains white goods flyback SMPS demo board Rev. 1 27 January 2012 User manual Document information Info Keywords Abstract Content TEA1721XT, flyback, non-isolated, dual output, white goods,
More informationELECTRONIC DRAFTING GUIDELINES
ELECTRONIC DRAFTING GUIDELINES Edition No. 6 Updated November 2016 TABLE OF CONTENTS Section Title Page 1 Definitions 3 2 Drawing Format 3 2.1 Standards & Guidelines 3 2.2 Survey Plans 4 2.3 Underground
More informationB (bottom) Package type descriptive code. VFBGA144 Package type industry code. VFBGA144 Package style descriptive code
8 February 2016 Package information 1. Package summary Terminal position code (bottom) Package type descriptive code VFG144 Package type industry code VFG144 Package style descriptive code VFG (very thin
More informationBeach monitoring with GPS William F Price Department of Civil Engineering, University of Brighton, BRIGHTON, BN1 4GJ, UK
Beach monitoring with GPS William F Price Department of Civil Engineering, University of Brighton, BRIGHTON, BN1 4GJ, UK Abstract In common with many other countries that have an extended coastline, sea
More informationAppendix B: Historic Aerial Photographs
Yolo County - Solar Ground Tracker Project Phase I Environmental Site Assessment Appendix B: Historic Aerial Photographs Michael Brandman Associates H:\Client (PN-JN)\1759\17590008\Phase I ESA\17590008
More informationProvisional Atlas of Nottinghamshire Mammals. September 2014
Provisional Atlas of Nottinghamshire Mammals September 21 Diversity 1-2 (11) - (2) - (1) - () - 1 () 11-12 (1) 1-1 (11) 1-1 () 1-22 () All mammal records excluding bats Mammal Recording in Nottinghamshire
More informationTECHNICAL APPENDIX A7.2 BEINNEUN WINDFARM BADGER, BAT, OTTER AND RED SQUIRREL SURVEY METHODS AND RESULTS
TECHNICAL APPENDIX A7.2 BEINNEUN WINDFARM BADGER, BAT, OTTER AND RED SQUIRREL SURVEY METHODS AND RESULTS Beinneun Windfarm Appendix A7.2 Environmental Statement Technical Appendix Protected Species Survey
More informationTechnical aspects of Offshore Wind Farms
Consultations of the Guide to OWF Michał Gronert DNV - Independent foundation since 1864 offices countries employees, out of which 76% have academic degree Offshore Wind Energy - compilation of DNV competencies
More informationGeometric dimensioning & tolerancing (Part 1) KCEC 1101
Geometric dimensioning & tolerancing (Part 1) KCEC 1101 Introduction Before an object can be built, complete information about both the size and shape of the object must be available. The exact shape of
More informationR_ Driving LPC1500 with EPSON Crystals. Rev October Document information. Keywords Abstract
Rev. 1.0 06 October 2015 Report Document information Info Keywords Abstract Content LPC15xx, RTC, Crystal, Oscillator Characterization results of EPSON crystals with LPC15xx MHz and (RTC) 32.768 khz Oscillator.
More informationPARKING IMPROVEMENT AIRPORT CAMPUS AMENDED SITE PLAN APPROVAL DRAWINGS 113 KING STREET TOWN OF NORTH CASTLE, NEW YORK AIRPORT CAMPUS I-V LLC
AMENDED SITE PLAN APPROVAL DRAWINGS PARKING IMPROVEMENT AIRPORT CAMPUS CLIENT: AIRPORT CAMPUS I-V LLC 113 KING STREET TOWN OF NORTH CASTLE, NEW YORK JMC DRAWINGS SITE PLANNER, CIVIL ENGINEER, SURVEYOR
More informationAN UCODE I2C PCB antenna reference designs. Application note COMPANY PUBLIC. Rev October Document information
Document information Info Content Keywords UCODE EPC Gen2, inter-integrated circuit, I²C, Antenna Reference Design, PCB Antenna Design Abstract This application note describes five antenna reference designs
More informationVattenfall Wind Power Ltd. Thanet Extension Offshore Wind Farm Preliminary Environmental Information Report Volume 1 Chapter 1: Introduction
Vattenfall Wind Power Ltd Thanet Extension Offshore Wind Farm Preliminary Environmental Information Report Volume 1 Chapter 1: Introduction Vattenfall Wind Power Ltd Thanet Extension Offshore Wind Farm
More informationAG934-07E AAT101 Full-Bridge Angle Sensor Evaluation Kit
AG934-07E AAT101 Full-Bridge Angle Sensor Evaluation Kit SB-00-065 NVE Corporation (800) 467-7141 sensor-apps@nve.com www.nve.com Kit Overview Evaluation Kit Features AAT101-10E full-bridge angle sensor
More informationThis image provides landscape and visual context only. Baseline photograph. Wireline drawing B
Wireline drawing B Figure 9.51c Cumulative Viewpoint 3: Shalloch on Minnoch 32965-GLA313.indd irvic02 Shennanton @ ~26km Airies @ ~26km Annabaglish @ ~35km Gass @ ~28km Arecleoch @ ~25km Kilgalioch @ ~21km
More informationAN High-performance PCB antennas for ZigBee networks. Document information. Keywords
Rev. 1.0 22 May 2015 Application note Document information Info Content Keywords Meander antenna, Inverted-F antenna, Dipole antenna, JN516x, ZigBee Abstract This application note describes three designs
More informationBonnie and Clyde s Pools and Spas Back Yard Design Kit
and Spas Www.bncpools.com Back Yard Design Kit The backyard is usually the most underutilized space in your home. Right now, you may have the occasional backyard BBQ or your children may play in the yard,
More informationCity of Surrey Adaptive Signal Control Pilot Project
City of Surrey Adaptive Signal Control Pilot Project ITS Canada Annual Conference and General Meeting May 29 th, 2013 1 2 ASCT Pilot Project Background ASCT Pilot Project Background 25 Major Traffic Corridors
More informationSPECIAL PUBLIC NOTICE
SPECIAL PUBLIC NOTICE Draft Map and Drawing Standards for the South Pacific Division Regulatory Program March 5, 2012 Comment period: ends April 5, 2012 Corps contact: Thomas Cavanaugh (415) 503-6574 (Thomas.J.Cavanaugh@usace.army.mil)
More informationVisual Representation of Wind Farms
Scottish Natural Heritage f Visual Representation of Wind Farms Guidance Version 2.2 February 2017 1 CONTENTS Page 1 Introduction 3 2 Zone of Theoretical Visibility maps 7 3 Viewpoints 16 4 Visualisations
More informationPhotography Composition Basics
Photography Composition Basics The Rule of Thirds The Rule of Thirds The rule of thirds involves mentally dividing up your image using 2 horizontal lines and 2 vertical lines, as shown below. You then
More informationSPECIFICATION FOR TOPOGRAPHIC AND HYDROGRAPHIC SURVEYS OF RECLAMATION AND DREDGING WORKS
23 August 2001 SPECIFICATION FOR TOPOGRAPHIC AND HYDROGRAPHIC SURVEYS OF RECLAMATION AND DREDGING WORKS 1.0 EXTENT OF WORKS The main survey works shall comprise of the following : a. Carry out topographic
More informationOrdering Information. Stepping Relay Unit G9B. Model Number Legend
Stepping Relay Unit CSM DS_E_4_1 Ideal for Controlling Pumps and Production Lines with Six or Twelve Stepping Circuits Built-in relays switch 2 A at 250 VAC or 30 VDC. Initialization of stepping with reset
More informationDigital Photography by Mark Gillan
Digital Photography by Mark Gillan Leading lines can draw the eye to certain points within an image Lines can add interest Carefully positioned with other lines can take the eye into and around an image
More informationNetwork Standard NS
Network Standard NS 21-2006 Artwork on Western Power Assets Technical Requirements for application to South West Interconnected System (SWIS) DMS #1049174 NS 21-2006 Artwork on Western Power Assets REVISION
More informationBGU8007/BGU7005 Matching Options for Improved LTE Jammer Immunity
BGU87/BGU75 Matching Options for Improved LTE Jammer Immunity Rev. 2 3 May 212 Application Note Document information Info Keywords Abstract Content LNA, GNSS, GPS, BGU87, BGU75 This document describes
More informationRFTX-1 Installation Manual
RFTX-1 Installation Manual complete control Universal Remote Control RFTX-1 Installation Manual 2009-2014 Universal Remote Control, Inc. The information in this Owner s Manual is copyright protected. No
More informationTelecommunication Application Form
Page 1 of 5 Fees Total Fee $1130.00 Processing Fee $330.00 *Advertising Deposit $800.00 *Where costs differ from the deposit, the balance will be charged or refunded to the applicant. Description of proposed
More informationSupporting Guidance Note
Supporting Guidance Note Supporting Guidance Note: SGN 2 Geomorphology photosurveys for hydropower developments We require a geomorphology photosurvey to be submitted with applications for abstraction
More informationDFTG-1305 Technical Drafting Prof. Francis Ha
DFTG-1305 Technical Drafting Prof. Francis Ha Session 4 Orthographic Projection (or Multiview Projection) Reading: Geisecke s textbook: 14 th Ed. Chapter 5 p.162 15 th Ed. Chapter 6 p.232 Update: 18-0205
More information1.1 Architectural Drawing No Title Rev
1.0 Drawings 1.1 Architectural Drawing No Title Rev BA2129 PL-001 Site Location Plan - BA2129 PL-002 Existing Site Plan - BA2129 PL-003 Proposed Site Plan - BA2129 PL-004 Proposed Unit Type A - BA2129
More informationPROJECT PEGASUS TEMPORARY BUILDINGS EXHIBITION
INTRODUCTION Planning permission was granted by the City of London on th February 0 for a scheme by Hugh Broughton Architects to refurbish and extend the Treasury Building in the Inner Temple. The project
More informationSite Plan/Building Permit Review
Part 6 Site Plan/Building Permit Review 1.6.01 When Site Plan Review Applies 1.6.02 Optional Pre- Application Site Plan/Building Permit Review (hereafter referred to as Site Plan Review) shall be required
More informationAL803 MagnetoResistive FixPitch Sensor (1 mm)
MagnetoResistive FixPitch Sensor (1 mm) The is an Anisotropic MagnetoResistive (AMR) position sensor. The sensor contains two Wheatstone bridges shifted against each other. The output signals are proportional
More informationGEORGE M. JANES & ASSOCIATES. July 12, Sabrina Charney-Hull Planning Director Town of New Castle 200 South Greeley Avenue Chappaqua, NY 10514
GEORGE M. JANES & ASSOCIATES PLANNING with TECHNOLOGY 250 EAST 87TH STREET NEW YORK, NY 10128 www.georgejanes.com T: 646.652.6498 F: 801.457.7154 E: george@georgejanes.com July 12, 2012 Sabrina Charney-Hull
More informationTN ADC design guidelines. Document information
Rev. 1 8 May 2014 Technical note Document information Info Content Keywords Abstract This technical note provides common best practices for board layout required when Analog circuits (which are sensitive
More informationFinal Environmental Assessment
Final Environmental Assessment For the National Foreign Affairs Training Center (NFATC) 2017 Master Plan Update Prepared by: The U.S. General Services Administration April 2017 65 NFATC 2017 Master Plan
More informationMAYOR/COUNCIL WORKSESSION SSP City Hall rd Avenue North. Monday, March 28, :00 p.m.
South St. Paul MAYOR/COUNCIL WORKSESSION SSP City Hall 125 3 rd Avenue North Monday, March 28, 2016 7:00 p.m. AGENDA: 1. Discuss request from Derek Burington for relief from utility bill 2. McMorrow Field
More informationMeasurement of Signalling Distances
Division / Business Unit: Function: Document Type: Enterprise Services Signalling Standard Measurement of Signalling Distances Applicability ARTC Network Wide SMS Publication Requirement Internal / External
More informationMultiview Projection
DFTG-1305 Technical Drafting Prof. Francis Ha Session 4 Multiview Projection (or Orthographic Projection) Reading: Geisecke s textbook: 14 th Ed. Chapter 5 p.162 15 th Ed. Chapter 6 p.232 Update: 17-0510
More informationRecreational Disturbance Study in relation to roosting and breeding wildfowl, waders and seabirds
Consultants Brief Recreational Disturbance Study in relation to roosting and breeding wildfowl, waders and seabirds for 700 Days Scheme - Morecambe Bay s Coastal Communities Scheme. 1. Aim 1.1. Morecambe
More informationB (bottom) Package type descriptive code Package type industry code. VFBGA Package style descriptive code
VFG64 20 ecember 2016 Package information 1. Package summary Terminal position code (bottom) Package type descriptive code VFG64 Package type industry code VFG Package style descriptive code VFG (very
More informationNo TfL Rail service between Brentwood and Shenfield
TfL Rail TFL Rail No TfL Rail service between and Shenfield Tuesday 3 January until late May 2017 Slightly reduced peak service between Gidea Park and Trains on the rest of the line may be busier than
More informationThe potential for windpower in the Baltic Sea
4th September 2013 Stanisław Paszkowski/Michał Gronert DNV An Independent Foundation 300 offices 100 countries 10,500 employees 2 Offshore Wind - Combining DNV competences + = 25+ years of hands-on experience
More informationIn data sheets and application notes which still contain NXP or Philips Semiconductors references, use the references to Nexperia, as shown below.
Important notice Dear Customer, On 7 February 2017 the former NXP Standard Product business became a new company with the tradename Nexperia. Nexperia is an industry leading supplier of Discrete, Logic
More informationAPPLICATION DESIGN REVIEW Please Print or Type
www.srcity.org ZONING ADMINISTRATOR (ZA) APPLICATION DESIGN REVIEW Please Print or Type DESIGN REVIEW BOARD File # Related Files: LOCATION OF PROJECT (ADDRESS) ASSESSOR S PARCEL NUMBER(S) EXISTING ZONING
More informationSYNCHRONISING AND VOLTAGE SELECTION
SYNCHRONISING AND VOLTAGE SELECTION This document is for Relevant Electrical Standards document only. Disclaimer NGG and NGET or their agents, servants or contractors do not accept any liability for any
More informationENVIRONMENTAL ASSESSMENT (EA) PROCESS
ENVIRONMENTAL ASSESSMENT (EA) PROCESS THE PROJECT Emera Newfoundland & Labrador (ENL) is seeking environmental regulatory approvals to construct and operate the Maritime Link Transmission Project between
More informationMaxLite LED Self-Driven LiteBars
Accessories Length: 4, 12, 40 Connector Box Straight Joiner Wire Joiner Mounting Clip Distribution Box Left Joiner Wire Joiner with Plug length: 40 Magnet Bracket Right Joiner End Cap Rotation Bracket
More informationBIRD ISLAND FLATS SUBSTATION (BUILDING 67) ONE LINE DIAGRAM SET# 23 LEGEND DRAW-OUT CIRCUIT BREAKER DRAW-OUT CIRCUIT BREAKER, DRAW-OUT FUSES DRAW-OUT FUSES AND POTENTIAL TRANSFORMERS CABLE CONNECTION POTENTIAL
More informationSingle Flex and Double Flex Couplings (i)
Single Flex and Double Flex Couplings (i) FORM NO. L00G00 In accordance with Nexen s established policy of constant product improvement, the specifications contained in this manual are subject to change
More information