1 SECURITY CLASS: UNCLASSIFIED COML. CLASS: UNCLASSIFIED DOCUMENT IDENTIFIER SUBJECT: IDENTIFICATION, MARKING, HANDLING, PROCESSING AND INSPECTION OF CRITICAL PARTS MATERIAL ENGINEERING & TECHNOLOGY DEVELOPMENT ENGINEERING DIVISION / COMMERCIAL AIRCRAFT GROUP DATE: 31/7/06 This document contains proprietary information of Israel Aircraft Industries Ltd., and may not be reproduced, copied, disclosed or utilized in any way, in whole or in part, without the prior written consent of Israel Aircraft Industries Ltd. PS doc PAGE: 0.1 REVISION: E2

2 SECURITY CLASS: UNCLASSIFIED COML. CLASS: UNCLASSIFIED DOCUMENT NO. REVISION STATUS REV -- A B C D D1 E E1 E2 DATE 9/84 8/87 11/92 7/95 12/98 1/00 6/00 9/00 7/06 PAGE PAGE PAGE PAGE NO. REV SIZE NO. REV SIZE NO. REV SIZE NO. REV SIZE 0.1 E2 A E2 1 E2 2 E 3 E 4 E1 5 E 6 E 7 E A40 ADDED PAGE ADDED PAGE ADDED PAGE ADDED PAGE NO. REV SIZE NO. REV SIZE NO. REV SIZE NO. REV SIZE PAGE: 0.2 REVISION: E2

3 1. APPLICABILITY Applicable to all projects. 2. SCOPE 2.1. This Process Specification (PS) establishes requirements and procedures for the identification, marking, handling, processing and inspection of Critical Parts or areas of Critical Parts as identified on IAI Engineering drawings Definitions Critical Part: aircraft part wherein a defect may result in fatigue or fracture failure and could either endanger the crew or cause the loss of the aircraft. Note: Structural Significant Items (SSI) are not defined as critical parts and need not be treated as such per requirements of this PS IAI Quality Assurance (IAI QA): the IAI Quality Assurance organization which has been assigned overall responsibility for the end product, on which the critical part is used Quality Assurance (QA): any quality assurance organization which has been authorized, by IAI QA, to verify the implementation of the requirements for critical parts, as given in this PS. 3. APPLICABLE DOCUMENTS 3.1. IAI Ltd. 2 Except where a specific issue is indicated, the current issue of the following specifications shall be considered an integral part of this PS. PS PS PS PS PS PS Application of Epoxy Paint System Application of Fluid Resistant Epoxy Paint System Application of Polyurethane Camouflage Paint System on Aircraft Exterior Polyurethane Corrosion Preventive Coating for Aircraft Integral Fuel Tanks Identification (Name) Plates NDT Personnel Qualification and Certification PS Traceability Procedure for Critical Parts - Engineering Requirements 3.2. U.S. Military MIL-P Primer Coatings; Epoxy High - Solids 3.3. U.S. Federal FED-STD-595 Colors Used in Government Procurement. 31 July 2006 P R O C E S S S P E C I F I C A T I O N Page 1 of 7

4 4. ENGINEERING DRAWING CALL-OUT The applicable Engineering document (drawing, E.O., route card, repair tag etc.) shall reference this PS by number as detailed in para TABLE OF CONTENTS Para. Title Page 1. APPLICABILITY 1 2. SCOPE 1 3. APPLICABLE DOCUMENTS 1 4. ENGINEERING DRAWING CALL-OUT 2 5. TABLE OF CONTENTS 2 6. MATERIALS 2 7. EQUIPMENT AND TOOLS 2 8. REQUIREMENTS Call-Out Procedures Marking of Critical Parts Handling Traceability Manufacturing Route Card 5 9. PROCEDURES Inspection Procedure Material Review QUALITY ASSURANCE Responsibility for Inspection Inspection ENVIRONMENTAL REQUIREMENTS 7 6. MATERIALS Not applicable. 7. EQUIPMENT AND TOOLS Not applicable. Page 2 of 7 P R O C E S S S P E C I F I C A T I O N 30 June 2000

5 8. REQUIREMENTS 8.1. Call-Out Procedures Call-Out on Engineering Drawings Item Identification Critical parts shall be identified on their defining drawings by means of a flag note linked to the part and recorded in the drawing parts list. a. The flag note to be used must be the unchanged standard note MA03 which reads as follows: MA03: CRITICAL PART - PROCESSING, HANDLING AND INSPECTION PER IAI PS b. Add note specifying NDT requirements. c. When applicable, add note specifying special raw material testing requirements (fracture toughness, etc.). d. The initial release and all changes to drawings defining Structural Critical Parts must be approved by the responsible Stress Department Particular characteristics of metallic critical parts, e.g., dimensions, areas, and surface finish of complete parts, shall be flagged on the drawing with the symbol <C>. Note: Characteristics of composite parts should not be flagged Critical metallic parts shall be color identified by special paint (refer to para ). Areas which must not be painted shall be noted on the drawing. These areas include external surfaces and areas where painting may interfere with the functioning of the parts Assembly Drawings When a critical part (per para ) is called out in the parts list of an assembly drawing it shall be identified by an appropriate flag note (refer to para a) linked to the part record in the assembly drawing parts list Call-Out on Manufacturing Documents and Tags Documents and tags relevant to critical parts shall be prominently identified by the following notation: <C> CRITICAL PART HANDLE WITH CARE Documents and tags shall also include Part Number (PN) and Serial Number (SN) as outlined in PS Documents and tags shall assure traceability, by inclusion or reference, to manufacturing records (e.g. route cards), quality assurance records, MRB records, certification, test reports, NDT reports and any other documentation related to the fabrication, processing, inspection, handling or assembly of a critical part. 30 June 2000 P R O C E S S S P E C I F I C A T I O N Page 3 of 7

6 8.2. Marking of Critical Parts Raw Material Page 4 of 7 The IAI batch number of the raw stock, intended for the manufacture of critical parts, shall be recorded on the route card to maintain raw material traceability per PS Parts in Fabrication Each critical part shall be marked with an SN designation per PS , para Parts for Assembly All critical parts, regardless of what method is used to identify them as critical parts, shall be traceable after assembly by part serial number (SN) in the aircraft serial parts list Metallic Parts All critical metallic parts shall be identified by name-plates as specified in para Whenever the geometry, size, or location of the part does not permit the use of a name-plate the critical part shall be identified as follows: a. Critical parts not exposed to fuel or hydraulic fluid shall be painted with a darkgreen (color per FED-STD-595) topcoat per PS b. Critical parts requiring resistance to hydraulic fluid (e.g. Skydrol) shall be painted with fluid resistant epoxy primer per PS and a dark-green (color per FED-STD-595) polyurethance top coat per PS c. Critical parts located in areas exposed to fuel shall be painted with a green polyurethane fuel resistant coating coating (Courtaulds Aerospace Coating 825x309/ ) per PS Color identifications shall be applied only on areas which do not affect the function of the part (i.e., delete in areas of sliding, tight fit, etc.) For external parts that require special coloring, the required color may be painted over the identification primer on external visible areas only Parts which cannot be identified by a dark green color, and tagging is impracticable, shall be packaged in a plastic bag with an attached tag until assembly Composite Materials Parts Parts of composite materials shall be identified by name-plates per para Optionally riveting may be used as the method of their attachment when specified on the Engineering drawing Name-Plates Name-plates shall conform to PS (paint systems not applicable) The location of the name-plates shall be specified on the Engineering drawing Bond name-plate to part per PS , Class II, Type F adhesive Name-plate shall include the PN and SN, refer to para , of the primary detail part. P R O C E S S S P E C I F I C A T I O N 1 15 Sept. 2000

7 8.3. Handling Extra care must be taken so that noted critical parts or areas are kept free of nicks, gouges, scratches, etc Traceability Critical parts shall be processed as necessary to maintain complete traceability, as specified in PS Manufacturing Route Card Fabricators of critical parts shall be responsible for preparing the manufacturing route card related to the fabrication of the critical part. A copy of the route card shall be submitted to IAI QA prior to processing, for review and concurrence The route card shall contain sequential fabrication, handling, processing, testing, inspection and marking steps in the correct order as required. All specifications and applicable classes shall be listed on the route card in the proper sequence. The route card shall include identification of fabricators who are to accomplish any of the processing steps Changes or revisions to an approved manufacturing route card, which alter the processing sequence or change fabricators, shall be resubmitted for review and concurrence by IAI QA prior to implementation of the change. Each revised, approved route card shall be assigned a revision letter or a revision number The route cards for critical parts shall contain steps for preserving the serial number throughout the production process (i.e. - (1) start of machining, (2) before and after operations that would remove the number, and (3) after completion of processing) Acceptable "first article" examination, required by IAI Quality Assurance (IAI-QA), is mandatory prior to routine manufacturing of critical parts. 9. PROCEDURE 9.1. Inspection Procedure Non-destructive Testing (NDT) Written Procedure Approval a. For metallic raw material, the procurement specification shall cover all necessary NDT requirement. b. For metallic parts, a written NDT procedure is required for critical parts. c. For composites, the NDT procedure is required only for critical parts (not for the raw materials) In both cases the written procedure shall be submitted to IAI QA for Conditional Approval prior to testing. IAI QA shall validate the NDT procedures on-site when those procedures that require validation are part of Conditional Approval. IAI QA retains the option to waive on-site validation requirements, but procedure approval is mandatory. When validation is required, suppliers shall notify the IAI QA prior to first part inspection and the validation by IAI QA of the NDT procedure. All revisions to approved NDT written procedures shall be identified by a revision letter and shall be submitted to IAI QA for approval prior to implementation. 30 June 2000 P R O C E S S S P E C I F I C A T I O N Page 5 of 7

8 Complete NDT written procedures for penetrant inspection need not be submitted for each part. A general penetrant inspection procedure may be approved and supplemented with individual procedures for each part. Note: NDT personnel qualification and certification shall be per PS First Article Inspection After the first article of a critical part is completely manufactured in accordance with the Engineering drawing, IAI QA shall be contacted to perform the First Article Examination Each new supplier of critical parts, or each major change in production equipment or manufacturing practice, shall be the subject of another First Article Examination An Engineering drawing change that requires a new First Article Examination shall note the requirement on the change EO IAI QA shall conduct the examination after receipt of the request Routine Inspection of Critical Characteristics Critical parts and critical assemblies shall be 100% inspected for surface finish to ensure that parts are free of nicks, scratches, sharp edges, sharp inside corners, etc., that are visible to the naked eye Where particular part characteristics are flagged with the symbol <C>, the part shall receive 100% inspection of these characteristics on 100% of the parts unless the manufacturing process is automatic (such as numerically controlled [NC] machining and NC drilling and riveting) or unless the tooling guarantees repeatability of characteristics within tolerance as specified on the Engineering drawing Deviation from the 100% dimensional inspection requirement because of process automation or tooling that guarantees repeatability shall require initial inspection of the tools, tool prove-out after installation and inspection of first piece manufactured and subsequently the periodic inspection of tools and sampling inspection of parts machined. These parts shall still receive a 100% visual inspection per para above. Note: 9.2. Material Review Periodic shall be defined as before beginning production of every batch. Material Review Board (MRB) actions for critical parts shall be approved by the relevant responsible Engineering Department. Page 6 of 7 P R O C E S S S P E C I F I C A T I O N 30 June 2000

9 10. QUALITY ASSURANCE Responsibility for Inspection Inspection IAI QA shall be responsible for ascertaining compliance with the requirements of this Specification. IAI QA shall verify that: a. Documents and tags are properly marked with critical part notation. b. Manufacturing plans and NDT written procedures have been approved, reviewed, and concurred with, in accordance with this PS. c. Operations and inspections are performed in accordance with the approved route card. d. The required documents are referenced on the route card. e. The manufactured part First Article Examination by IAI QA is accomplished prior to acceptance of additional units. f. Complete traceability per PS for critical parts is observed. g. Parts bearing the <C> symbol are 100% inspected. 11. ENVIRONMENTAL REQUIREMENTS Cleaning and painting processes may cause unfavorable impacts on the environment. Refer to the relevant cleaning or painting process specification to minimize these effects. 30 June 2000 P R O C E S S S P E C I F I C A T I O N Page 7 of 7

(R) Aerospace First Article Inspection Requirement FOREWORD

(R) Aerospace First Article Inspection Requirement FOREWORD AEROSPACE STANDARD AS9102 Technically equivalent to AECMA pren 9102 Issued 2000-08 Revised 2004-01 REV. A Supersedes AS9012 (R) Aerospace First Article Inspection Requirement FOREWORD In December 1998,

More information

Supplier Quality Requirements for First Article Inspection SQR-011. Revision Date: 16 March 2011

Supplier Quality Requirements for First Article Inspection SQR-011. Revision Date: 16 March 2011 Supplier Quality Requirements for First Article Inspection SQR-011 Revision Date: 16 March 2011 Approved David Copeland, Manager Supply Chain Quality Suppliers may view this document via the Internet at:

More information

BAE Systems Combat Vehicles Supplier Quality Assurance AS9102 Requirement

BAE Systems Combat Vehicles Supplier Quality Assurance AS9102 Requirement 1 BAE Systems Combat Vehicles Supplier Quality Assurance AS9102 Requirement February 27, 2019 2 Scope The intent of this document is to provide an understanding, and clarification as to what BAE Systems

More information

TOOLING ADDENDUM TO PPG QC Control and Use of Digital Datasets for the Purpose of Tool Fabrication and Inspection

TOOLING ADDENDUM TO PPG QC Control and Use of Digital Datasets for the Purpose of Tool Fabrication and Inspection TOOLING ADDENDUM TO PPG QC 22-001 (SUPPLIER QUALITY CONTROL REQUIREMENTS) Control and Use of Digital Datasets for the Purpose of Tool Fabrication and Inspection Approved By Charles T. Morris Tooling Manager

More information

CIRRUS AIRCRAFT FAI INSTRUCTION

CIRRUS AIRCRAFT FAI INSTRUCTION CIRRUS AIRCRAFT FAI INSTRUCTION 1. PURPOSE The purpose of the first article inspection is to provide objective evidence that all purchase order, engineering, and specification requirements are correctly

More information

Section Meetings Section Material and Equipment. None Required

Section Meetings Section Material and Equipment. None Required January 2000 Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK PART 2 PRODUCTS The General Conditions of the Contract, General Requirements and Supplemental

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide submittals in accordance with the General Conditions as modified by the Supplementary Conditions,

More information

East Central College

East Central College SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal City of Winnipeg Brady Road Landfill Site Section 01300 New Entrance and Scale Facility Page 1 of 4 SUBMITTALS 1. SHOP DRAWINGS 1.1 General.1 Arrange for the preparation of clearly identified Shop Drawings

More information

FAA APPROVED AIRPLANE MAINTENANCE MANUAL SUPPLEMENT. Eyebrow Window Replacement

FAA APPROVED AIRPLANE MAINTENANCE MANUAL SUPPLEMENT. Eyebrow Window Replacement FAA APPROVED AIRPLANE MAINTENANCE MANUAL SUPPLEMENT AIRPLANE MAKE: Boeing AIRPLANE MODEL: 737-100, -200, -200C, -300, -400, -500, -600, -700, -700C, -800, -900 TO BE ADDED TO AMM CHAPTER 56-11-XX This

More information

QUALITY CONTROL INSTRUCTIONS

QUALITY CONTROL INSTRUCTIONS QUALITY CONTROL INSTRUCTIONS QCI NO. 100 REVISION E SPC PROCEDURE WRITTEN BY: R. Zielinski DATE: 2/3/92 APPROVED BY: APPROVED BY: Department Manager Quality Assurance Manager DATE: DATE: SF 118 1 CHANGE

More information

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

A. Action Submittals: Written and graphic information that requires Engineer's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

Supplier Quality Requirements for First Article Inspection SQR-011. Revision Date: 30 November Approved. Frank Mariot

Supplier Quality Requirements for First Article Inspection SQR-011. Revision Date: 30 November Approved. Frank Mariot Supplier Quality Requirements for First Article Inspection SQR-011 Revision Date: 30 November 2016 Approved Frank Mariot Supply Chain Quality Manager Suppliers may view this document via the Internet at:

More information

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia BULLETIN NO. 6 TO THE PLANS AND SPECIFICATIONS FOR JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia EwingCole Architects.Engineers.Interior Designers.Planners

More information

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018 STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018 1073.01 Program Overview 1073.02 Qualification 1073.03 Documentation Phase 1073.04 Documentation

More information

MIL- B Rev NAVSEA 0900-LP

MIL- B Rev NAVSEA 0900-LP I: REQUIREMENTS 1. Identify the standard the supplier uses for performing brazing. MIL- B-007883B OTHER (IF Other, Specify :) MIL- B-007883 Rev NAVSEA 0900-LP-001-7000 II: ATTRIBUTES: YES NO 2a. Does a

More information

1.2 Application. The Metalphoto and photo-etch processes covered by this specification shall be used as specified in the following subparagraphs.

1.2 Application. The Metalphoto and photo-etch processes covered by this specification shall be used as specified in the following subparagraphs. 1. SCOPE 1.1 Scope. This specification covers the requirements and procedures for producing identification plates, information plates, parts and panels using the photo-etch process or the Metalphoto process.

More information

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 01 33 00 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

MIL- B B. MIL- B Rev NAVSEA 0900-LP II: ATTRIBUTES: YES NO N/A

MIL- B B. MIL- B Rev NAVSEA 0900-LP II: ATTRIBUTES: YES NO N/A XXVIII BRAZE/BRAZING PROCESS I: REQUIREMENTS 1. Identify the standard the supplier uses for performing brazing. MIL- B-007883B MIL- B-007883 Rev OTHER (IF Other, Specify :) NAVSEA 0900-LP-001-7000 II:

More information

Engineering Drawing System

Engineering Drawing System LPR 7320.1 Effective Date: February 2, 2010 Expiration Date: February 2, 2015 Langley Research Center Engineering Drawing System National Aeronautics and Space Administration Responsible Office: Systems

More information

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration SECTION 01 340 - SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

A. Action Submittals: Written and graphic information that requires Architect's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

TABLE OF CONTENTS. 1.0 Scope. 2.0 References. 3.0 Definitions. 4.0 Submission and Design Requirements. 5.0 Materials 5.1 General 5.

TABLE OF CONTENTS. 1.0 Scope. 2.0 References. 3.0 Definitions. 4.0 Submission and Design Requirements. 5.0 Materials 5.1 General 5. 1.0 Scope 2.0 References 3.0 Definitions 4.0 Submission and Design Requirements 5.0 Materials 5.1 General 5.2 Marking 6.0 Equipment 7.0 Production 7.1 Steel Octagonal Poles 7.2 Base Plate 7.3 Top Cap 7.4

More information

Weldment Visual Inspection Requirements

Weldment Visual Inspection Requirements Table of Contents 1.0 Purpose / Scope / Timing... 2 1.1 Purpose / Scope... 2 1.2 Compliance Date... 2 2.0 Procedure / Quality Recd Requirements... 2 2.1 General Requirements... 2 2.2 Acceptance Criteria...

More information

Screw-Thread Standards for Federal Services, Inspection Methods for Acceptability of UN, UNR, UNJ, M and MJ Screw Threads

Screw-Thread Standards for Federal Services, Inspection Methods for Acceptability of UN, UNR, UNJ, M and MJ Screw Threads Procedures and Guidelines (PG) DIRECTIVE NO. 541-PG-8072.1.2B APPROVED BY Signature: Original signed by: NAME: Michael Viens TITLE: Branch Head COMPLIANCE IS MANDATORY Responsible Office: 541 / Materials

More information

CESSNA QUALITY REQUIREMENTS. For SUPPLIERS (CQRS)

CESSNA QUALITY REQUIREMENTS. For SUPPLIERS (CQRS) CESSNA QUALITY REQUIREMENTS For SUPPLIERS (CQRS) Textron Aviation Page i Export Compliance Revision Export Control Classification N/C-L - M EAR99 N EAR99 O EAR99 P EAR99 Restrictions: None. Textron Aviation

More information

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA SECTION 01 78 00 CLOSE-OUT SUBMITTALS PART 1 - GENERAL 1.1 GUARANTEES A. Compile and submit guarantees, bonds, and service and maintenance contracts specified in the individual B. Guarantees from Subcontractors

More information

Engineering Drawing System

Engineering Drawing System LPR 7320.1 Effective Date: July 18, 2004 Expiration Date: July 18, 2008 Langley Research Center Engineering Drawing System National Aeronautics and Space Administration Responsible Office: Systems Engineering

More information

Fasteners. Massachusetts Institute of Technology Kavli Institute for Astrophysics and Space Research (MKI) Dwg. No Revision D March 24, 2015

Fasteners. Massachusetts Institute of Technology Kavli Institute for Astrophysics and Space Research (MKI) Dwg. No Revision D March 24, 2015 Rev. ECO Description Author Approved Date A Initial Release B. Klatt R. Goeke 04/16/91 B General Revision 01/20/06 C General Editorial Update B. Klatt M. Bautz 07/16/14 D Incorporate GSFC 541- PG- 8072.1.2Rev

More information

STANDARD IDENTIFICATION MARKING. Prepared by. UTC Aerospace Systems Interiors Fairfield, CA CAGE Code ORIGINAL DATE: UNKNOWN

STANDARD IDENTIFICATION MARKING. Prepared by. UTC Aerospace Systems Interiors Fairfield, CA CAGE Code ORIGINAL DATE: UNKNOWN STANDARD 4.2.1-1 IDENTIFICATION MARKING Prepared by UTC Aerospace Systems Interiors Fairfield, CA 94533 CAGE Code 17610 ORIGINAL DATE: UNKNOWN THIS DOCUMENT IS THE PROPERTY OF UTC AEROSPACE SYSTEMS. YOU

More information

Special Provision No. 904S14 October OPSS 904, January 1995, Construction Specification for Concrete Structures, is amended as follows:

Special Provision No. 904S14 October OPSS 904, January 1995, Construction Specification for Concrete Structures, is amended as follows: DOWELS INTO CONCRETE Item No. Special Provision No. 904S14 October 2005 OPSS 904, January 1995, Construction Specification for Concrete Structures, is amended as follows: 904.02 REFERENCES Section 904.02

More information

PROCESS SPECIFICATION SURFACE FINISH REQUIREMENTS

PROCESS SPECIFICATION SURFACE FINISH REQUIREMENTS 3260 East Universal Way Tucson, Arizona 85756 PROCESS SPECIFICATION SURFACE FINISH REQUIREMENTS PS00000020 DATE OF ISSUE 08/14/2015 REVISION 02 PROPRIETARY NOTICE This document is not to be distributed

More information

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES DIVISION 1 GENERAL REQUIREMENTS SECTION 01 33 00 PART 1 - GENERAL 1.1 SUMMARY A. This section includes administrative and procedural requirements for submittals required for performance of the work, including

More information

RF, COAXIAL. HYBRID COUPLERS POWER DIVIDERS and DIRECTIONAL COUPLERS GENERIC SPECIFICATION

RF, COAXIAL. HYBRID COUPLERS POWER DIVIDERS and DIRECTIONAL COUPLERS GENERIC SPECIFICATION 1/ 23 Titre / Title RF, COAXIAL HYBRID COUPLERS POWER DIVIDERS and DIRECTIONAL COUPLERS GENERIC SPECIFICATION Written by Responsibility Date Signature P. THIBAUD Space Project manager 29/01/10 Verified

More information

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS DIVISION 1 - GENERAL REQUIREMENTS SECTION 01300 - SUBMITTALS PART 1 - GENERAL 1.1 STIPULATIONS A. The section "Special Requirements" forms a part of this section by this reference thereto and shall have

More information

The surveillance test is a physical inspection of the product and a comparison with the specifications of the original type tested sample.

The surveillance test is a physical inspection of the product and a comparison with the specifications of the original type tested sample. SOLAR KEYMARK SPECIFIC SCHEME RULES ANNEX A2. SOLAR KEYMARK SURVEILLANCE TEST Normative annex. Version of 2012-09-09. 1 Introduction This document gives a brief description of the procedure of the so called

More information

MILITARY SPECIFICATION LIGHTING, INSTRUMENT, INTEGRAL, WHITE GENERAL SPECIFICATION FOR

MILITARY SPECIFICATION LIGHTING, INSTRUMENT, INTEGRAL, WHITE GENERAL SPECIFICATION FOR MIL-L-27160C(USAF) 3 March 1972 Superseding MIL-L-7160B(USAF) 16 Jul 1963 MILITARY SPECIFICATION LIGHTING, INSTRUMENT, INTEGRAL, WHITE GENERAL SPECIFICATION FOR 1. SCOPE 1.1 This specification covers the

More information

AS9102 Training. First Article Inspection Guide. Rev A

AS9102 Training. First Article Inspection Guide. Rev A AS9102 Training First Article Inspection Guide Rev A What We Will Cover Challenge Approach AS9102 Rev B FAI Requirements AS9102 Rev B Embedded Guidelines Forms Used Questions/Answers Examples of FAI Problems

More information

UNSIGNED HARDCOPY NOT CONTROLLED

UNSIGNED HARDCOPY NOT CONTROLLED SUBJECT: APPROVED BY STATUS PURPOSE AFFECTED FUNCTIONS REFERENCES DEFINITIONS Painting Manager, Hardware Engineering Maintenance Revision Establish painting and inspection requirements for organic finishes

More information

Service Bulletin No: Ref No: 136 Modification No: INSPECTION ATA Chapter: 57

Service Bulletin No: Ref No: 136 Modification No: INSPECTION ATA Chapter: 57 PILATUS AIRCRAFT LTD. STANS, SWITZERLAND Service Bulletin No: 57-015 Ref No: 136 Modification No: INSPECTION ATA Chapter: 57 WING - AILERON INSTALLATION INSPECTION OF THE AILERON OUTBOARD-BEARING SUPPORT

More information

MINUTES OF MEETING. The following Questions were asked and answers were provided accordingly:

MINUTES OF MEETING. The following Questions were asked and answers were provided accordingly: MINUTES OF MEETING Meeting Date : July 15, 2014 Place : Greenwood Shop Main Conference Room Contract Title : Supply of Reworked T1 Trip Switch Brackets Proposal No. : T31BG14139 Present : TTC - A. Mckay

More information

MILITARY SPECIFICATION

MILITARY SPECIFICATION MIL-R-47196A(MI) 6 September 1977 SUPERSEDING MIL-R-46196(MI) 12 July 1974 MILITARY SPECIFICATION RIVETS, BUCK TYPE, PREPARATION FOR AND INSTALLATION OF This specification is approved for use by US Army

More information

VISUAL INSPECTION GUIDE FOR ALL-RUBBER GLOVES EXCEPT SURGICAL

VISUAL INSPECTION GUIDE FOR ALL-RUBBER GLOVES EXCEPT SURGICAL SUPERSEDING MIL-STD-168A 31 December 1957 MILITARY STANDARD VISUAL INSPECTION GUIDE FOR ALL-RUBBER GLOVES EXCEPT SURGICAL FSC 8415 DEPARTMENT OF DEFENSE WASHINGTON, D. C. 20301 VISUAL INSPECTION GUIDE

More information

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals. SECTION 01300 PART 1 GENERAL 1.1 SECTION INCLUDES A. Description of Requirements B. Submittal Procedures C. Specific Submittal Requirements D. Action on Submittals E. Repetitive Review 1.2 DESCRIPTION

More information

SERVICE BULLETIN. No. SB-AG-45 Rev. B JUNE 1, 2007 FIN SPAR & ATTACH FITTINGS INSPECTION AND UPGRADE IMPORTANT:

SERVICE BULLETIN. No. SB-AG-45 Rev. B JUNE 1, 2007 FIN SPAR & ATTACH FITTINGS INSPECTION AND UPGRADE IMPORTANT: THRUSH AIRCRAFT, INC. P.O. Box 3149 300 Old Pretoria Rd. Albany, GA 31706-3149 Product Support 229-883-1440 ext. 341 FAX 229-436-4856 jbays@thrushaircraft.com SERVICE BULLETIN No. SB-AG-45 Rev. B JUNE

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

Guideline for initial sample deliveries including initial sample test report to. Pankl Systems Austria GmbH. Systems

Guideline for initial sample deliveries including initial sample test report to. Pankl Systems Austria GmbH. Systems Guideline for initial sample deliveries including initial sample test report to, Drivetrain Systems A member of Pankl Racing Systems Copies are only valid on printing date. Page 1 of 15 1. Purpose... 2

More information

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 01 3300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01340 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Shop drawings, manufacturer's catalog cuts, product data, samples, and attached Shop Drawing/ Catalog

More information

Manufacturing and Cosmetic Inspection Specification

Manufacturing and Cosmetic Inspection Specification Document Reference: MISB-MACIS-Rev (1) Page 1 of 13 Manufacturing and Cosmetic Inspection Specification Revision Change History Rev No. Effective Date Affected Page Change Descriptions Prepared by Reviewed

More information

SECTION STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 05 12 00 - STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

DEPARTMENT OF TRANSPORTATION

DEPARTMENT OF TRANSPORTATION DEPARTMENT OF TRANSPORTATION Federal Aviation Administration 14 CFR Part 39 [61 FR 625 No. 6; 01/09/96][SN] [Docket No. 94-ANE-63; Amendment 39-9458; AD 95-03-10] Textron Lycoming AD 95-03-10 Amendment

More information

MIL-STD-1580B REQUIREMENT 11 DETAILED REQUIREMENTS FOR CONNECTORS

MIL-STD-1580B REQUIREMENT 11 DETAILED REQUIREMENTS FOR CONNECTORS DETAILED REQUIREMENTS FOR CONNECTORS 11. General. This section describes detailed requirements for a DPA of commonly used connectors. These requirements supplement the general requirements in section 4.

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01 33 23 - SHOP DRAWINGS, PRODUCT DATA, AND PART 1 - GENERAL 1.1 SUMMARY A. Products include, but are not limited to, the following construction submittals: 1. Shop Drawings. 2. Product Data. 3.

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.1 DESCRIPTION A. This specification defines the general requirements and procedures for submittals. A submittal is information

More information

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 013300 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

SECTION PANELBOARDS

SECTION PANELBOARDS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 24 16 PANELBOARDS SPEC WRITER NOTE: Delete between // --- // if not applicable to project. Also, delete any other item or paragraph not applicable in the section

More information

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 General

More information

AWS C3.9M/C3.9:2009 An American National Standard. Specification for Resistance Brazing

AWS C3.9M/C3.9:2009 An American National Standard. Specification for Resistance Brazing An American National Standard Specification for Resistance Brazing An American National Standard Approved by the American National Standards Institute July 30, 2008 Specification for Resistance Brazing

More information

JED Specification

JED Specification JED Specification 2008-08 Class: Engineering guidelines Class No.:07 Marking of WABCO products JED 341 Previous Edition Abbreviated Title 1988-12 Marking of WABCO products 852 003 410 4 1 Scope...3 2 Types

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 013300 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply

More information

SECTION OPERATION AND MAINTENANCE DATA

SECTION OPERATION AND MAINTENANCE DATA SECTION 01787 OPERATION AND MAINTENANCE DATA PART 1 GENERAL 1.01 SUMMARY A. Compile product data and related information appropriate for OWNER's maintenance and operation of products furnished under Contract.

More information

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Record Documents. B. Operation and Maintenance Manuals. C. Warranties and bonds. 1.02 RELATED REQUIREMENTS SECTION 01 78 00 A. Section 01 30 00 - Administrative

More information

(AMMA) American Maritime Modernization Association

(AMMA) American Maritime Modernization Association (AMMA) American Maritime Modernization Association AUDIT GUIDE FOR THE EVALUATION OF AMMA MEMBER WELDING, BRAZING, AND NON-DESTRUCTIVE TESTING (NDT) PROGRAMS Revised By: Joe Frith, AMMA Welding/Brazing/NDT

More information

COS NCM2 Mirror Substrate Specification

COS NCM2 Mirror Substrate Specification Date: Document Number: Revision: Contract No.: NAS5-98043 CDRL No.: N/A Prepared By: E. Wilkinson 2-18-99 E. Wilkinson, COS Instrument Scientist, CU/CASA Date Reviewed By: R. Cahill 2-18-99 R. Cahill,

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

THERMISTORS (THERMALLY SENSITIVE RESISTORS), NTC, RANGE 2000 TO OHMS AT +25 O C WITH A TEMPERATURE RANGE OF -60 O C TO +160 O C

THERMISTORS (THERMALLY SENSITIVE RESISTORS), NTC, RANGE 2000 TO OHMS AT +25 O C WITH A TEMPERATURE RANGE OF -60 O C TO +160 O C Page 1 of 13 THERMISTORS (THERMALLY SENSITIVE RESISTORS), NTC, RANGE 2000 TO 100000 OHMS AT +25 O C WITH A TEMPERATURE RANGE OF -60 O C TO +160 O C BASED ON TYPE G2K7D411, G4K7D421, G10K4D451, G10K4D453,

More information

SECTION BULLET- RESISTANT DOORS

SECTION BULLET- RESISTANT DOORS 1 SECTION 08 3950 BULLET- RESISTANT DOORS PART 1- GENERAL 1.01 SUMMARY A. This Section Includes: 1. Bullet- resistant steel door and frame systems. 2. Door hardware for bullet- resistant steel door and

More information

SECTION STRUCTURAL STEEL. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION STRUCTURAL STEEL. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 051200 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

Inspection and Test Plan for Battery Charger

Inspection and Test Plan for Battery Charger Inspection and Test Plan for Battery Charger No. Inspection and Test Plan Reference Document Acceptance Criteria Verifying Document Activity By Remark Manuf. TPI Client 1 Pre Inspection Meeting Spec. Spec.

More information

POLYIMIDE INSULATED WIRES AND CABLES, LOW FREQUENCY, 600V, -200 TO +200 C BASED ON TYPE SPL. ESCC Detail Specification No.

POLYIMIDE INSULATED WIRES AND CABLES, LOW FREQUENCY, 600V, -200 TO +200 C BASED ON TYPE SPL. ESCC Detail Specification No. Page 1 of 23 POLYIMIDE INSULATED WIRES AND CABLES, LOW FREQUENCY, 600V, -200 TO +200 C BASED ON TYPE SPL ESCC Detail Specification Issue 3 May 2013 Document Custodian: European Space Agency see https://escies.org

More information

GTS 8XX Traffic System Instructions for Continued Airworthiness as installed in

GTS 8XX Traffic System Instructions for Continued Airworthiness as installed in GTS 8XX Traffic System Instructions for Continued Airworthiness as installed in (Make and Model Airplane) Reg. No. S/N Dwg. Number: 190-00993-01 Rev. 1 Garmin Ltd. Or its subsidiaries c/o Garmin International,

More information

TECHNICAL INSTRUCTIONS: FOUNDRY. Page 1 of 8

TECHNICAL INSTRUCTIONS: FOUNDRY. Page 1 of 8 TECHNICAL INSTRUCTIONS: FOUNDRY. Page 1 of 8 SPECIFICATION FOR M.S. FABRICATED MOULDING TIF 717 BOXES ( WITH BUSHES ) Rev: 01 1.0 SCOPE: 1.1. This specification covers the requirements of moulding boxes

More information

WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868)

WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868) WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868) THREE-PHASE SUBSURFACE UNDERGROUND COMMERCIAL DISTRIBUTION (UCD) TRANSFORMER NOTE: This "Guide" summarizes the opinions, recommendations, and practices

More information

SECTION METAL FABRICATIONS

SECTION METAL FABRICATIONS SECTION 05100 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for metal fabrications, including minimum requirements for fabricator, and galvanizing. 1.02 REFERENCE STANDARDS A. ASTM

More information

REVISION RECORD REV DESCRIPTION DATE 0 INITIAL RELEASE 06/24/03

REVISION RECORD REV DESCRIPTION DATE 0 INITIAL RELEASE 06/24/03 REVISION RECORD REV DESCRIPTION DATE 0 INITIAL RELEASE 06/24/03 A PAGE 3, CHANGED INITIAL RATE OF RADS TO 240 RADS/SEC. 03/15/05 B PAGE 4, CHANGED IN BOTH PARAGRAPHS 4.2, 4.3 IN CONJUNCTION TO 3.3 CHANGED

More information

Machine Shop Processes

Machine Shop Processes Machine Shop Processes 100-1122-00 Owner 1 of 6 Approvals: Department Approved. Date Engineering D. Scott Timms 11/7/17 Manufacturing D. Scott Emond 11/7/17 Quality Andrew Ware 11/7/17 Change History Rev

More information

SUBJECT: HORIZONTAL STABILIZER SUPPORTS ALL, INSTALLATION OF.

SUBJECT: HORIZONTAL STABILIZER SUPPORTS ALL, INSTALLATION OF. TECHNICAL BULLETIN 206L-00-203 25 August 2000 Revision B, 27 October 2014 MODEL AFFECTED: 206L, 206L-1, 206L-3 and 206L-4 SUBJECT: HORIZONTAL STABILIZER SUPPORTS 206-023-131-ALL, INSTALLATION OF. HELICOPTERS

More information

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Coordination. B. Preconstruction meeting. C. Progress meetings. D. Preinstallation conferences. E. Requests for information (RFI). F. Coordination drawings.

More information

EXTERNAL FEATURE: Feature on the part being delivered to a Lisk customer which is visible without disassembly.

EXTERNAL FEATURE: Feature on the part being delivered to a Lisk customer which is visible without disassembly. 1.0 Purpose: 1.1 This procedure establishes the Engineering, Manufacturing and Quality definitions, requirements, and inspection criteria for workmanship of machined parts and assemblies. This standard

More information

MIL-STD-883H METHOD ULTRASONIC INSPECTION OF DIE ATTACH

MIL-STD-883H METHOD ULTRASONIC INSPECTION OF DIE ATTACH * ULTRASONIC INSPECTION OF DIE ATTACH 1. PURPOSE. The purpose of this examination is to nondestructively detect unbonded regions, delaminations and/or voids in the die attach material and at interfaces

More information

SPECIFICATION FOR SAFETY POLE SIGNS & ACCESSORIES

SPECIFICATION FOR SAFETY POLE SIGNS & ACCESSORIES KP/3CB/TSP/0/00 04-09-9 Page of 9 TABLE OF CONTENTS 0. Circulation List 0. Amendment Record FOREWORD. SCOPE. REFERENCES 3. TERMS AND DEFINITIONS 4. REQUIREMENTS 5. TESTS AND INSPECTION 6. MARKING, LABELLING

More information

Delmec Engineering Limited

Delmec Engineering Limited Delmec Engineering Limited DEL6 Tower Maintenance Specification Delmec Product Manual 2 Delmec Engineering Ltd. Approvals Name Signature Date Ivan Daly Kealan Delaney Delmec Engineering Ltd. Distribution

More information

SECTION CABLE TRAYS

SECTION CABLE TRAYS SECTION 16139 CABLE TRAYS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

AAI CORPORATION D/B/A TEXTRON SYSTEMS

AAI CORPORATION D/B/A TEXTRON SYSTEMS AAI SUPPLIER QUALITY ASSURANCE REQUIREMENTS (SQAR) AAI CORPORATION D/B/A TEXTRON SYSTEMS SUPPLIER QUALITY ASSURANCE REQUIREMENTS (SQAR) QA-SP47 (Rev. K) 1 of 14 QA-SP47 AAI D/B/A TEXTRON SYSTEMS SUPPLIER

More information

Specification

Specification Specification 2018-04 Class: Test Instruction, Conditions of delivery Class No.:61 Technical conditions of delivery for elastomer parts JED 220 Previous Edition Part name (for databases) 2015-06 Elastomer,

More information

The Evolution & Future of API Coiled Tubing Standards. Ryan Addison Tenaris Coiled Tubes API Co-Chairman Resource Group for Coiled Tubing

The Evolution & Future of API Coiled Tubing Standards. Ryan Addison Tenaris Coiled Tubes API Co-Chairman Resource Group for Coiled Tubing The Evolution & Future of API Coiled Tubing Standards Ryan Addison Tenaris Coiled Tubes API Co-Chairman Resource Group for Coiled Tubing API Overview Presentation Outline Resource Group on Coiled Tubing

More information

FTM2 Series HCMOS/TTL OSCILLATORS FOR SPACE APPLICATIONS 0.5MHz to 160 MHz. ( 5 x 3.2 mm, SMD, 2.5 V )

FTM2 Series HCMOS/TTL OSCILLATORS FOR SPACE APPLICATIONS 0.5MHz to 160 MHz. ( 5 x 3.2 mm, SMD, 2.5 V ) REV LTR DESCRIPTION DATE APPVD. - Orig. Release 6/22/09 RBT A Corrected P/N on Pages 1 and 2 5/08/14 RBT B Revised per ECN 2015-1 9/12/15 RBT C Revised per ECN 2016-1 9/18/16 RBT FTM2 Series HCMOS/TTL

More information

Stop Gates & Stop Logs. Series 500. ine. Manufacturing high quality gates since 1977

Stop Gates & Stop Logs. Series 500. ine. Manufacturing high quality gates since 1977 Stop Gates & Stop Logs Series 500 Manufacturing high quality gates since 1977 ine Stop Gates & Stop Logs Series 500 Contents Stop Gate Introduction 3 Model 501 3 Model 503 4 Model 503-C 4 Stop Gate Specification

More information

Answer: Qualification statement should be provided with the bid.

Answer: Qualification statement should be provided with the bid. Little Diversified Architectural Consulting, Inc. 5815 Westpark Drive Charlotte, North Carolina 28217 Phone: 704-525-6350 Fax: 704-561-8700 Lincoln County Probation Renovation 208 N. Government Street

More information

DETAIL SPECIFICATION SHEET FITTINGS - INSTALLATION OF FLARED TUBE, STRAIGHT, THREADED CONNECTORS, DESIGN STANDARD FOR

DETAIL SPECIFICATION SHEET FITTINGS - INSTALLATION OF FLARED TUBE, STRAIGHT, THREADED CONNECTORS, DESIGN STANDARD FOR INCH-POUND MS21344A 4 October 2016 SUPERSEDING MS21344 17 August 1971 DETAIL SPECIFICATION SHEET FITTINGS - INSTALLATION OF FLARED TUBE, STRAIGHT, THREADED CONNECTORS, DESIGN STANDARD FOR This specification

More information

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA If project is not administered in PRISM, coordinate use of Exhibit 6 submittal schedule with this section. SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 REQUIREMENTS INCLUDED

More information

I INCH-POUND I. MIL-sTD-47187(MI) 10 August 1993 SUPERSEDING MIL-N-47187B (MI) 31 Auqust 1990 NUTS, BLIND, PRESS, AND BLIND RIVET, INSTALLATION OF

I INCH-POUND I. MIL-sTD-47187(MI) 10 August 1993 SUPERSEDING MIL-N-47187B (MI) 31 Auqust 1990 NUTS, BLIND, PRESS, AND BLIND RIVET, INSTALLATION OF I INCH-POUND I MIL-sTD-47187(MI) 10 August 1993 SUPERSEDING MIL-N-47187B (MI) 31 Auqust 1990,. MILITARY STANDARD NUTS, BLIND, PRESS, AND BLIND RIVET, INSTALLATION OF AC4SC N/A AREA 14GP DISTRIBUTION STATEMENT

More information

A. Extent of structural precast concrete work is shown on drawings and in schedules.

A. Extent of structural precast concrete work is shown on drawings and in schedules. SECTION 03 41 00 - STRUCTURAL PRECAST CONCRETE PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 specification

More information

REVISIONS LTR DESCRIPTION DATE (YR-MO-DA) APPROVED. A Drawing updated to reflect current requirements. gt R. Monnin

REVISIONS LTR DESCRIPTION DATE (YR-MO-DA) APPROVED. A Drawing updated to reflect current requirements. gt R. Monnin REVISIONS LTR DESCRIPTION DATE (YR-MO-DA) APPROVED A Drawing updated to reflect current requirements. gt 03-04-04 R. Monnin Drawing updated to reflect current MIL-PRF-38535 requirements. - ro 12-03-15

More information

J O I N T I N D U S T R Y S T A N D A R D. Requirements for Soldering Pastes J Standard 005A. December 2011

J O I N T I N D U S T R Y S T A N D A R D. Requirements for Soldering Pastes J Standard 005A. December 2011 J O I N T I N D U S T R Y S T A N D A R D Requirements for Soldering Pastes J Standard 005A December 2011 Requirements for Soldering Pastes 1.0 SCOPE 1.1 Scope This standard prescribes general requirements

More information

FORMAT: TO BE PREPARED ON VENDOR S FORMAT IN ACCORDANCE WITH VENDOR S PDDS SYSTEM.

FORMAT: TO BE PREPARED ON VENDOR S FORMAT IN ACCORDANCE WITH VENDOR S PDDS SYSTEM. QUALITY REMARK: MED STANDARD REMARK F04 GUIDE FOR PREPARATION OF MASTER ENVELOPE DEFINITION (MED) BY DESIGN VENDORS. MED INCLUDES PRODUCT DEFINITION DATA SETS (PDDS) (FORMALLY KNOWN AS DRAWINGS) AND MODELS.

More information

Flight Control Sandwich Structures and Inspections

Flight Control Sandwich Structures and Inspections Presented by Dr Roland Thévenin Senior Expert Composite Structure Conformance FAA Workshop for Composite Damage Tolerance and Maintenance June 4-5, 2009 Tokyo Flight Control Sandwich Structures and Inspections

More information

FES PROPELLER MANUAL

FES PROPELLER MANUAL FES PROPELLER MANUAL Version 1.0 Type: FES-SIL-P15-100 LZ design d.o.o., Brod 3D, 1370 Logatec, Slovenia tel +386 59 948 898 info@lzdesign.si www.front-electric-sustainer.com Table of Content 1. Important

More information