1 Supplier Quality Requirements for First Article Inspection SQR-011 Revision Date: 30 November 2016 Approved Frank Mariot Supply Chain Quality Manager Suppliers may view this document via the Internet at: To obtain a hard copy, please notify Triumph Aerostructures, LLC or Triumph Aerostructures Tulsa, LLC Procurement Representative Supplier Quality Requirements for First Article Inspection Revision E Page 1 of 12

2 REVISION RECORD The latest issue of this manual may be confirmed by viewing the Suppliers web site (address shown on the cover). Revision Date Revision Date Revision Date Rev. NC 16 Mar 2011 Rev. A 26 Oct 2011 Rev. B 20 Sep 2013 Rev. C 28 Sep 2014 Rev. D 13 Mar 2015 Rev. E 30 Nov 2016 The following is for Triumph Aerostructures, LLC and Triumph Aerostructures Tulsa, LLC internal use only: The information contained in SQR-011 is controlled by the owner listed in the signature sign-off block and is linked to applicable command media. The owner is responsible for the integrity and maintenance of the SQR. PROPRIETARY RIGHTS Triumph Aerostructures, LLC and Triumph Aerostructures Tulsa, LLC proprietary rights are retained for the information contained herein. The recipient, by acceptance of this document, agrees that neither this document nor the information contained herein, nor any part thereof shall be reproduced or transferred to any other document, used or disclosed to others for any purpose, except as specifically authorized in writing by Triumph Aerostructures, LLC and Triumph Aerostructures Tulsa, LLC. Employees of Triumph Aerostructures, LLC or Triumph Aerostructures Tulsa, LLC may reproduce information contained in this document for internal purposes as necessary. All such copies must be prominently identified as REFERENCE ONLY and/or UNCONTROLLED COPY. Supplier Quality Requirements for First Article Inspection Revision E Page 2 of 12

3 Rev NC Summary of Changes New Document Rev A Summary of Changes Section 4.3 added to clarify the -FP Suffix Rev B Summary of Changes Section 2.1 clarification for mandatory fields and link updates Rev C Summary of Changes Section 1.5 at the discretion of Triumph, suppliers may be subjected to charges for recovery of costs associated with any/ all supplier responsible costs or damages which Buyer incurs due to failure of FAI review first time yield (FTY). Amendment Date November 13, 2014 Section 2.7 clarification on requirement - Copy of COMPLETED shop traveler that represents the manufacturing process Rev D Summary of Changes Adding Section The FAI requirement can be satisfied by either a dimensional report of the part or a dimensional report of the Check Fixture tool being used as a means of product acceptance. This dimensional report of the Check Fixture tool will ensure that all critical features of the part are being validated. Rev E Summary of Changes Logos information updated Triumph Aerostructures, LLC and Triumph Aerostructures Tulsa, LLC Approvals (Authorizing Signature on File) Frank Mariot -Supply Chain Quality Manager Introduction Section This Document is effective for the following Triumph Aerostructures Companies: Triumph Aerostructures, LLC and Triumph Aerostructures Tulsa, LLC from here on inclusively refer to as Triumph. Supplier Quality Requirements for First Article Inspection Revision E Page 3 of 12

4 TABLE OF CONTENTS Section Title Page Cover sheet 1 Revision Record 2 Summary of Changes 3 Table of Contents 4 Introduction 5 General First Article Inspection Requirements Net-Inspect Digital Product Definition First Article Inspection Review Definitions Acronyms 12 Attachments Attachment Title 1 FAIR Check Sheet Supplier Quality Requirements for First Article Inspection Revision E Page 4 of 12

5 Introduction This Document is effective for the following Triumph Aerostructures Companies: Triumph Aerostructures, LLC and Triumph Aerostructures Tulsa, LLC from here on inclusively refer to as Triumph. This document outlines the FAI requirements for Triumph suppliers to ensure that all design features of a deliverable product are captured and that its sub components meet all applicable levels of design drawing, material and process specification requirements. This document is a supplement to Triumph s Supplier Quality Assurance Requirements (SQAR) and intended to provide a consistent documentation requirement on FAI s submitted from Triumph supplier. General FAI is a process imposed on assemblies, sub-assemblies and detail parts (including castings, forgings, machined, composite, raw material cut to an engineering shape/part number, etc.). An acceptable first article product is a representation of those planned, capable and repetitive manufacturing processes and proven tooling which produced it. A complete FAI must be submitted prior to shipment of product. The supplier must be able to demonstrate to Triumph, upon Triumph s request that the intent of FAI was successfully accomplished, and show objective evidence thereof. The supplier will ensure FAI s submitted on behalf of sub-tier suppliers have been reviewed and are compliant with the requirements of this document. Sister companies and/or divisions of the same company are considered as sub-tier suppliers and are subject to the requirements of this document. All Triumph procurements require an acceptable FAI. All line items on a purchase order must be accounted for in Net-Inspect. 1.0 First Article Inspection Requirements 1.1 The FAI should be performed on a representative item from the first production run of a new part using the planned build package unless otherwise negotiated with Triumph. 1.2 The supplier shall perform and document FAI in accordance with SAE Aerospace Standard AS9102. This document can be found and purchased at: The FAI will not be considered complete until all build package issues are resolved. Build package consists of: Engineering Specifications Planning Tooling NC Data (as applicable) Supplier Quality Requirements for First Article Inspection Revision E Page 5 of 12

6 1.4 The FAI will not be considered complete until nonconformance s affecting the part or assemblies have been closed and corrective action implemented. Partial FAI s will be performed for those affected characteristics and the results recorded. 1.5 At the discretion of Triumph, suppliers may be subjected to charges for recovery of costs associated with any/ all supplier responsible costs or damages which Buyer incurs due to failure of FAI review first time yield (FTY). 1.6 The FAI requirement shall continue to apply even after initial compliance. Partial or complete re-accomplishment of the FAI for affected characteristics is required for the following events: A change in the design affecting the form, fit or function of part. A change in manufacturing source(s), processes, processors, inspection method(s), location, tooling or material with the potential of affecting form, fit or function. When required as part of a corrective action for a part number with repetitive rejection history (typically a part with three repeated rejections or as required by the customer). A change in numerical control program or translation to another media. A natural or man-made occurrence, which may adversely affect the manufacturing process. A lapse in production for two years or as specified by Triumph. 1.7 All suppliers FAI s shall meet or exceed the requirements of this document and AS When the supplier chooses to procure subassemblies and parts, these FAI requirements shall be imposed by the supplier upon the sub-tier supplier. These requirements in no way limit, supersede, or abrogate any contractual obligations specified in Triumph s procurement document. 1.9 If the supplier is furnishing kits to Triumph, a FAI must be performed and documented by the supplier for each item in the kit, as well as the kit level part number For product procured in support of Airbus UK programs, Airbus UK FAI validation is required prior to shipment. Supplier shall contact Triumph procurement to schedule appropriate FAI review by Triumph / Airbus UK personnel. NOTE: SUPPLIER SHALL NOT CONTACT AIRBUS UK REPRESENTATIVE DIRECTLY. TRIUMPH SOURCE INSPECTION SHALL PRECEED AIRBUS UK FAI INSPECTION UNLESS OTHER WISE DIRECTED The FAI requirement can be satisfied by either a dimensional report of the part or a dimensional report of the Check Fixture tool being used as a means of product acceptance. This dimensional report of the Check Fixture tool will ensure that all critical features of the part are being validated. The following are required to use the tool to satisfy the dimensional verification of the part and/or assembly: Supplier Quality Requirements for First Article Inspection Revision E Page 6 of 12

7 2.0 Net-Inspect The tool will be identified The tool will be validated by dimensional report to ensure that all critical features of the part and/ or assembly will be validated The tool will be called out in the supplier s planning The tool will be periodically re-valuated to assure it still complies with engineering requirements 2.1 All suppliers are required to utilize the Triumph web based Net-Inspect FAI process, which is AS9102 based and compliant. Triumph identifies AS9102 Customer Specific Use fields in the Net-Inspect Training located under: Quality Requirements/ Business Unit Quality Requirements / Triumph / Net Inspect Utilization. Field 11, Field 12 and Field 18 (As Required) are considered mandatory. Access to view the training syllabus from the following URL: All fields are required to be populated with the respective data and should not be left blank. Any field that does not require data should be identified as N/A. 2.3 Access Net-Inspect website from the following URL: If the supplier is currently utilizing an electronic AS9102 based FAI process or is still utilizing a paper AS9102 form (either of which must include customer directed options), then you may include these as attachments after initiating and completing Form 1 in Net-Inspect in lieu of completing the Net-Inspect Form 2 and Form See Attachment 1 for FAIR check sheet that describes the most common elements of review. Review may not be limited to these elements. Each deliverable site has the option to activate a mandatory FAIR check sheet within Net-Inspect. Once activated, supplier delivering product to that site will be required to complete check sheet prior to final FAI submission. 2.6 This requirement shall apply to the line item deliverable part number only; unless the deliverable is a kit then it applies to the details that comprise the kit (this requirement does not apply to FAI s for details contained within an assembly). 2.7 The following items/documents (as applicable) shall become a part of the electronic record and shall be referenced and attached to the electronic FAI file for the applicable part number: Material Certifications Process Certifications Test Reports/ Results CMM Reports point maps and set-up instructions are mandatory. Supplier Quality Requirements for First Article Inspection Revision E Page 7 of 12

8 Copy of COMPLETED shop traveler that represents the manufacturing process Copy of all rework travelers Copy of the Triumph furnished TSSP Unique Characteristic Accountability must correspond with unique identifier on bubbled drawing/sketch Photos (as applicable) Casting / Forging approvals (as applicable) Weld maps (as applicable) NDI/NDT techniques Manufacturing plan approvals (as applicable) Withholding Tags (as applicable) Supplier Information Request (SIR) (as applicable) 3.0 Digital Product Definition (DPD) 3.1 When the engineering is based on Digital Product Definition the following guidelines shall be taken into account: All features that are defined by the 3-D model must be included in the product acceptance plan and accounted for as part of the FAI documentation. When the dimensional characteristics are not defined by either a standard linear tolerance or GDT feature control frame on the face of the model, these features are defined in the parts list and/or notes on the drawing. o Examples of un-dimensioned part characteristics include but not limited to, gage thickness, surface locations, and part periphery. The FAI shall account for the entire engineering dataset (i.e., the general/flag notes, parts list, all features/characteristics per defined tolerances.) 4.0 First Article Inspection Review 4.1 Triumph s first article review shall be performed on all parts. The Triumph FAI validation is required at the purchase order line item level. A Triumph quality representative shall validate that the supplier has performed the FAI s on all detail components below the line item level where applicable. The supplier shall make available any detail FAI as requested by the quality assurance representative. 4.2 Supplier shall notify Triumph in advance of the need for first article review. It is the responsibility of the Supplier to coordinate and schedule Triumph s first article review as early during PO execution as practical. In addition to Triumph s first article review, Triumph s engineering drawing or Triumph s written instruction may require an engineering first article evaluation. When required, supplier shall schedule and support this requirement similar to first article review. 4.3 Supplier shall mark all deliverable products and documents in accordance with the purchase order, manufacturing planning, or engineering drawing in that order of precedence. It is not the intent of Triumph to require two separate FAI s that fall under the _FP transition period. The first production lot shall require an FAI. An FAI requirement shall not be generated due to the addition of or deletion of -FP. Supplier Quality Requirements for First Article Inspection Revision E Page 8 of 12

9 5.0 Definitions The FAI shall be identified to the PO part number without the -FP suffix In the event there is a conflict between the requirements defined and the engineering drawing and/or specification, the drawing/specification takes precedence Initial Purchase Order (PO) Part Number may contain a -FP suffix utilized internally at Triumph to control work orders issued during the Make to Buy transition. The related Triumph Planning instructions will direct the supplier to disregard the FP suffix when identifying the part or assembly Example: PO Part Number: 65B FP Planning ID Operation Text: Supplier shall omit the FP suffix when performing part marking activity. For example: 65B FP shall be part marked as 65B NOTE: Production of deliverable items prior to Triumph s acceptance of FAI will be at supplier s own risk. ATTRIBUTE DATA CAM CMS DESIGN CHARACTERISTICS A result from a characteristic or property that is appraised only as to whether it does or does not conform to a given requirement. (For example, go/no-go, accept/reject, pass/fail, etc.) Computer Aided Manufacturing Also known as numerical control (NC). The use of computers and computer data in the development and production of all part types (products) including fabrication, assembly and installation. Coordinate Measurement Systems - Also known as Computer Aided Inspection (CAI) and Computer Aided Measurement Systems (CAMS). Measurement equipment such as Coordinate Measuring Machines (CMM), Laser Tracker, and numerical controlled machinery with inspection probe capability, which are used to support inspection activity. Those dimensional, visual, functional, mechanical, and material features or properties, which describe and constitute the design of the article as specified by Drawing Requirements. These characteristics can be measured, inspected, tested, or verified to determine conformance to the design requirements. Dimensional features include in-process locating features such as target-machined (or forged/cast) dimensions on forgings and castings, and weld/braze joint preparation necessary for acceptance of finished joint. Material features or properties may include processing variables and sequences, which are Supplier Quality Requirements for First Article Inspection Revision E Page 9 of 12

10 specified by the drawings (e.g., heat treat temperature, fluorescent Penetrant class, ultrasonic scans, and sequence of welding and heat treat). These provide assurance of intended characteristics that could not be otherwise defined. DESIGN TOOLING DRAWING REQUIREMENTS DATASET DPD FEATURE FIRST ARTICLE INSPECTION (FAI) FIRST ARTICLE INSPECTION REPORT (FAIR) INSPECTION PLAN (CRITERIA) Specially designed tooling (includes NC Programming) that is controlled by serialization and is used as a media of inspection. Requirements of the drawing (including parts lists), specification, or purchasing document to which the article is to be made. These include any notes, specifications, and lowerlevel drawings invoked. Information prepared and maintained by electronic means (CAD/CAM), and provided by electronic data access, interchange transfer or on electronic media. Digital Product Definition- The electronic data elements that specify the 3-D Computer Aided Design (CAD) geometry and all design requirements for a product (including notation and parts lists), and the use of this data throughout an integrated CAC/Computer Aided Manufacturing (CAM) and Coordinate Measurement Systems (CMS). Any hardware design attribute or characteristic. This includes physical portion of hardware such as a surface, face, edge, radius, hole, tab, slot, pin, etc., and requirements such as nondestructive inspection (NDI) and interchangeability and replaceability (I&R). All features require validation to conform the product to the design authority. All features have associated notes and/or Geometric Dimensioning and Tolerance Feature Control Frames (FCF) and one note or FCF may refer to several features. A complete, independent, and documented physical and functional inspection process to verify that prescribed production methods have produced and acceptable item as specified by released engineering product definition, planning, purchase order, engineering specifications, and/or other applicable design documents. The forms and package of documentation for a part number or assembly, including FAI results. A description of 2-D and/or 3-D computer generated inspection media/methods derived from authority DPD datasets and used to communicate inspection requirements and media usage to manufacturing and inspection area. Typical plans include engineering and plan configuration/traceability, overlay/setup Supplier Quality Requirements for First Article Inspection Revision E Page 10 of 12

11 instructions and a list and/or graphic representation of the features to be inspected. MBD MDI Model Based Definition A Triumph dataset containing the exact solid, it s associated 3-D geometry and 3-D annotation of the product s dimensions and tolerances (and may include parts/notes list/ to specify a complete product definition. This dataset does not contain a conventional 2-D drawing. MBD is on possible format of DPD. Master Dimensions Identifier A number identifying an array of coordinate data used by Design, Manufacturing and Inspection to describe an element of a surface or product configuration. The data may be an extraction from an MDD or any CATIA/APT designed surface. MDS Master Dimension Surface A computer generated, mathematically controlled CATIA 3-D surface definition. Each surface is uniquely identified by number. MEDIA OF INSPECTION PARTIAL FAI REFERENCE ONLY (REF) SUPPLIER VARIABLE DATA A tool used by Inspection to verify the acceptance of specific physical characteristics of a component, part or assembly. (e.g., physical tool, paper, Mylar, electronic data) A Partial FAI addresses differences between the current configuration and prior approved configurations, and/or addresses features that failed the original FAI. When a partial FAI is performed, the Organization shall complete only the impacted fields in the original or partial FAI form(s). The partial FAI will inspect 100% only those features that have been addressed for the current configuration and/or that failed the original/partial FAI. The characteristics that are used for information only or to show relationship. These are dimensions without tolerances and refer to other dimensions on the drawing. An entity working under supplier contract(s) and providing products or services on Triumph programs. Quantitative measurements taken on a continuous scale. For example, the diameter of a cylinder or the gap between mating parts. Supplier Quality Requirements for First Article Inspection Revision E Page 11 of 12

12 6.0 Acronyms CMM FAI GDT NC PO TSSP UK Coordinate Measuring Machine First Article Inspection Geometric Dimensions and Tolerance Numerical Control Purchase Order Triumph Supplier Specification Plan United Kingdom 3-D Three Dimensional Supplier Quality Requirements for First Article Inspection Revision E Page 12 of 12

Supplier Quality Requirements for First Article Inspection SQR-011. Revision Date: 16 March 2011

Supplier Quality Requirements for First Article Inspection SQR-011. Revision Date: 16 March 2011 Supplier Quality Requirements for First Article Inspection SQR-011 Revision Date: 16 March 2011 Approved David Copeland, Manager Supply Chain Quality Suppliers may view this document via the Internet at:

More information

(R) Aerospace First Article Inspection Requirement FOREWORD

(R) Aerospace First Article Inspection Requirement FOREWORD AEROSPACE STANDARD AS9102 Technically equivalent to AECMA pren 9102 Issued 2000-08 Revised 2004-01 REV. A Supersedes AS9012 (R) Aerospace First Article Inspection Requirement FOREWORD In December 1998,

More information

TOOLING ADDENDUM TO PPG QC Control and Use of Digital Datasets for the Purpose of Tool Fabrication and Inspection

TOOLING ADDENDUM TO PPG QC Control and Use of Digital Datasets for the Purpose of Tool Fabrication and Inspection TOOLING ADDENDUM TO PPG QC 22-001 (SUPPLIER QUALITY CONTROL REQUIREMENTS) Control and Use of Digital Datasets for the Purpose of Tool Fabrication and Inspection Approved By Charles T. Morris Tooling Manager

More information

AS9102 Training. First Article Inspection Guide. Rev A

AS9102 Training. First Article Inspection Guide. Rev A AS9102 Training First Article Inspection Guide Rev A What We Will Cover Challenge Approach AS9102 Rev B FAI Requirements AS9102 Rev B Embedded Guidelines Forms Used Questions/Answers Examples of FAI Problems

More information

BAE Systems Combat Vehicles Supplier Quality Assurance AS9102 Requirement

BAE Systems Combat Vehicles Supplier Quality Assurance AS9102 Requirement 1 BAE Systems Combat Vehicles Supplier Quality Assurance AS9102 Requirement February 27, 2019 2 Scope The intent of this document is to provide an understanding, and clarification as to what BAE Systems

More information

Overview of Textron Systems Supplier First Article Inspection (FAI) expectations

Overview of Textron Systems Supplier First Article Inspection (FAI) expectations Overview of Textron Systems Supplier First Article Inspection (FAI) expectations See your Supplier Quality Engineer with questions PURPOSE Ensure the product being delivered meets drawing requirements

More information

CIRRUS AIRCRAFT FAI INSTRUCTION

CIRRUS AIRCRAFT FAI INSTRUCTION CIRRUS AIRCRAFT FAI INSTRUCTION 1. PURPOSE The purpose of the first article inspection is to provide objective evidence that all purchase order, engineering, and specification requirements are correctly

More information

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia BULLETIN NO. 6 TO THE PLANS AND SPECIFICATIONS FOR JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia EwingCole Architects.Engineers.Interior Designers.Planners

More information

PS901500E IDENTIFICATION, MARKING, HANDLING, PROCESSING AND INSPECTION OF CRITICAL PARTS

PS901500E IDENTIFICATION, MARKING, HANDLING, PROCESSING AND INSPECTION OF CRITICAL PARTS SECURITY CLASS: UNCLASSIFIED COML. CLASS: UNCLASSIFIED DOCUMENT IDENTIFIER SUBJECT: IDENTIFICATION, MARKING, HANDLING, PROCESSING AND INSPECTION OF CRITICAL PARTS MATERIAL ENGINEERING & TECHNOLOGY DEVELOPMENT

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

2017 EDITION. CLEARED FOR PUBLIC RELEASE Copyright 2017 Lockheed Martin Corporation. All Rights Reserved

2017 EDITION. CLEARED FOR PUBLIC RELEASE Copyright 2017 Lockheed Martin Corporation. All Rights Reserved 2017 EDITION Copyright 2017 Lockheed Martin Corporation. All Rights Reserved Applicability This document applies to Lockheed Martin Missiles and Fire Control (LMMFC) Dallas and Orlando Procured material.

More information

AAI CORPORATION D/B/A TEXTRON SYSTEMS

AAI CORPORATION D/B/A TEXTRON SYSTEMS AAI SUPPLIER QUALITY ASSURANCE REQUIREMENTS (SQAR) AAI CORPORATION D/B/A TEXTRON SYSTEMS SUPPLIER QUALITY ASSURANCE REQUIREMENTS (SQAR) QA-SP47 (Rev. K) 1 of 14 QA-SP47 AAI D/B/A TEXTRON SYSTEMS SUPPLIER

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.1 DESCRIPTION A. This specification defines the general requirements and procedures for submittals. A submittal is information

More information

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration SECTION 01 340 - SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

CESSNA QUALITY REQUIREMENTS. For SUPPLIERS (CQRS)

CESSNA QUALITY REQUIREMENTS. For SUPPLIERS (CQRS) CESSNA QUALITY REQUIREMENTS For SUPPLIERS (CQRS) Textron Aviation Page i Export Compliance Revision Export Control Classification N/C-L - M EAR99 N EAR99 O EAR99 P EAR99 Restrictions: None. Textron Aviation

More information

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 01 33 00 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 013300 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 General

More information

East Central College

East Central College SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

Section Meetings Section Material and Equipment. None Required

Section Meetings Section Material and Equipment. None Required January 2000 Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK PART 2 PRODUCTS The General Conditions of the Contract, General Requirements and Supplemental

More information

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014) DRAFT UFGS- 01 XX XX (FEB 2014) ------------------------ Drafting Activity: USACE UNIFIED FACILITIES GUIDE SPECIFICATION SECTION TABLE OF CONTENTS DIVISION 01 GENERAL REQUIREMENTS SECTION 01 XX XX (FEB

More information

HAMILTON SUNDSTRAND CORPORATION FAI REQUIREMENTS

HAMILTON SUNDSTRAND CORPORATION FAI REQUIREMENTS HAMILTON SUNDSTRAND CORPORATION FAI REQUIREMENTS DATE: 6/13/16 PREPARED BY: C. FOLEY DATE: 6/20/16 SUPPLIER QUALITY MANAGER: M. CICERO DATE: 6/21/16 SUPPLIER QUALITY DIRECTOR: K. DUZAN DATE: 6/28/16 SUPPLY

More information

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES DIVISION 1 GENERAL REQUIREMENTS SECTION 01 33 00 PART 1 - GENERAL 1.1 SUMMARY A. This section includes administrative and procedural requirements for submittals required for performance of the work, including

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 01 3300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

A. Action Submittals: Written and graphic information that requires Architect's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

A. Action Submittals: Written and graphic information that requires Engineer's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

GPSC Academy Leaders Teach & Leaders Learn. Supplier Technical Review Training Revision 1.0

GPSC Academy Leaders Teach & Leaders Learn. Supplier Technical Review Training Revision 1.0 Leaders Teach & Leaders Learn Supplier Technical Review Training Revision 1.0 Technical Reviews Agenda Agenda 1. Introduction 2. Technical Review Process 3. Technical Review Format 4. Technical Review

More information

2017 CDM Smith All Rights Reserved November 2016 SECTION PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS)

2017 CDM Smith All Rights Reserved November 2016 SECTION PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS) ATTACHMENT 5, CONTRACT 13, ADDENDUM 3 2017 CDM Smith 14955-109447 SECTION 01725 PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS) PART 1 GENERAL 1.01 DESCRIPTION A. The Owner and Contractor shall utilize the

More information

DEPARTMENT OF DEFENSE HANDBOOK STANDARD MICROCIRCUIT DRAWINGS

DEPARTMENT OF DEFENSE HANDBOOK STANDARD MICROCIRCUIT DRAWINGS NOT MEASUREMENT SENSITIVE MIL-HDBK-780D 28 May 2004 SUPERSEDING MIL-HDBK-780C 15 August 1997 DEPARTMENT OF DEFENSE HANDBOOK STANDARD MICROCIRCUIT DRAWINGS This handbook is for guidance only. Do not cite

More information

NAVAIR Non Contact In-Process Inspection. Gabe Draguicevich N42 FRC-SW NAVAIR NI Aug 25th, 2015

NAVAIR Non Contact In-Process Inspection. Gabe Draguicevich N42 FRC-SW NAVAIR NI Aug 25th, 2015 NAVAIR Non Contact In-Process Inspection Gabe Draguicevich N42 FRC-SW NAVAIR NI Aug 25th, 2015 Overview Background on Navy 3D Model Status (3MS / MBD) Proposed System Examples Definition of Digital Product

More information

Engineering Drawing System

Engineering Drawing System LPR 7320.1 Effective Date: February 2, 2010 Expiration Date: February 2, 2015 Langley Research Center Engineering Drawing System National Aeronautics and Space Administration Responsible Office: Systems

More information

J O I N T I N D U S T R Y S T A N D A R D. Requirements for Soldering Pastes J Standard 005A. December 2011

J O I N T I N D U S T R Y S T A N D A R D. Requirements for Soldering Pastes J Standard 005A. December 2011 J O I N T I N D U S T R Y S T A N D A R D Requirements for Soldering Pastes J Standard 005A December 2011 Requirements for Soldering Pastes 1.0 SCOPE 1.1 Scope This standard prescribes general requirements

More information

SUBMITTAL PROCEDURES

SUBMITTAL PROCEDURES SUBMITTAL PROCEDURES PART 1 GENERAL The ASPA Project Engineer (APE) may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective

More information

Screw-Thread Standards for Federal Services, Inspection Methods for Acceptability of UN, UNR, UNJ, M and MJ Screw Threads

Screw-Thread Standards for Federal Services, Inspection Methods for Acceptability of UN, UNR, UNJ, M and MJ Screw Threads Procedures and Guidelines (PG) DIRECTIVE NO. 541-PG-8072.1.2B APPROVED BY Signature: Original signed by: NAME: Michael Viens TITLE: Branch Head COMPLIANCE IS MANDATORY Responsible Office: 541 / Materials

More information

SEI Certification Program Manual

SEI Certification Program Manual Safety Equipment Institute SEI Certification Program Manual Section 29: Industrial Protective Clothing and Equipment Program 0 of 6 SEI Certification Program Manual Section 29: Industrial Protective Clothing

More information

REVISION RECORD REV DESCRIPTION DATE 0 INITIAL RELEASE 06/24/03

REVISION RECORD REV DESCRIPTION DATE 0 INITIAL RELEASE 06/24/03 REVISION RECORD REV DESCRIPTION DATE 0 INITIAL RELEASE 06/24/03 A PAGE 3, CHANGED INITIAL RATE OF RADS TO 240 RADS/SEC. 03/15/05 B PAGE 4, CHANGED IN BOTH PARAGRAPHS 4.2, 4.3 IN CONJUNCTION TO 3.3 CHANGED

More information

DRAFTING MANUAL. Dimensioning and Tolerancing Rules

DRAFTING MANUAL. Dimensioning and Tolerancing Rules Page 1 1.0 General This section is in accordance with ASME Y14.5-2009 Dimensioning and Tolerancing. Note that Rule #1 is the only rule that is numbered in the 2009 standard. All of the other rules fall

More information

SECTION STRUCTURAL STEEL. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION STRUCTURAL STEEL. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 051200 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

Engineering Drawing System

Engineering Drawing System LPR 7320.1 Effective Date: July 18, 2004 Expiration Date: July 18, 2008 Langley Research Center Engineering Drawing System National Aeronautics and Space Administration Responsible Office: Systems Engineering

More information

Jacksonville District Master

Jacksonville District Master -01 33 00 (April 2006) From USACE / NAVFAC / AFCESA UFGS UNIFIED FACILITIES GUIDE SPECIFICATIONS Revised thoughout - changes not indicated by CHG tags SECTION TABLE OF CONTENTS DIVISION 01 - GENERAL REQUIREMENTS

More information

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals. SECTION 01300 PART 1 GENERAL 1.1 SECTION INCLUDES A. Description of Requirements B. Submittal Procedures C. Specific Submittal Requirements D. Action on Submittals E. Repetitive Review 1.2 DESCRIPTION

More information

Manufacturing Workmanship Standards. KSO Rev 1

Manufacturing Workmanship Standards. KSO Rev 1 Manufacturing Workmanship Standards KSO Rev 1 This document is a statement to the quality and workmanship by Kso Metalfab, Inc. The definitions, procedures, and responsibilities contained in this Workmanship

More information

Production Part Approval Process (PPAP) Marion Body Works, Inc.

Production Part Approval Process (PPAP) Marion Body Works, Inc. Production Part Approval Process (PPAP) Marion Body Works, Inc. Training Guide Production Part Approval Process (PPAP) The purpose of PPAP is to determine if all customer engineering design record and

More information

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Record Documents. B. Operation and Maintenance Manuals. C. Warranties and bonds. 1.02 RELATED REQUIREMENTS SECTION 01 78 00 A. Section 01 30 00 - Administrative

More information

Report Number B0622. Requirements for Sellers of Special Tooling to the Boeing St. Louis Tooling Center

Report Number B0622. Requirements for Sellers of Special Tooling to the Boeing St. Louis Tooling Center Report Number B0622 Requirements for Sellers of Special Tooling to the Boeing St. Louis Tooling Center 1 Index Title Page....1 Index....2 Index of Page Changes.. 3 1.0 Scope....4 1.1 Relations to other

More information

This specification is intended to provide guidance to the Engineer (Internal or Consultant) in regards to Vendor Information Requirements.

This specification is intended to provide guidance to the Engineer (Internal or Consultant) in regards to Vendor Information Requirements. 1/5 1.0 PURPOSE This specification is intended to provide guidance to the Engineer (Internal or Consultant) in regards to Vendor Information Requirements. It outlines the expectations for requesting Vendor

More information

SECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents.

SECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents. SECTION 01 3000 PART 1 GENERAL 1.1 SECTION INCLUDES A. Electronic document submittal service. B. Preconstruction meeting. C. Submittals for review, information, and project closeout. D. Submittal procedures.

More information

QUALITY CONTROL INSTRUCTIONS

QUALITY CONTROL INSTRUCTIONS QUALITY CONTROL INSTRUCTIONS QCI NO. 100 REVISION E SPC PROCEDURE WRITTEN BY: R. Zielinski DATE: 2/3/92 APPROVED BY: APPROVED BY: Department Manager Quality Assurance Manager DATE: DATE: SF 118 1 CHANGE

More information

Kryptonite Authorized Seller Program

Kryptonite Authorized Seller Program Kryptonite Authorized Seller Program Program Effective Date: January 1, 2018 until discontinued or suspended A Kryptonite Authorized Seller is one that purchases Kryptonite offered products directly from

More information

A. Section includes administrative and procedural requirements for project record documents, including the following:

A. Section includes administrative and procedural requirements for project record documents, including the following: SECTION 017839 - PROJECT RECORD DOCUMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01

More information

Answer: Qualification statement should be provided with the bid.

Answer: Qualification statement should be provided with the bid. Little Diversified Architectural Consulting, Inc. 5815 Westpark Drive Charlotte, North Carolina 28217 Phone: 704-525-6350 Fax: 704-561-8700 Lincoln County Probation Renovation 208 N. Government Street

More information

DEPARTMENT OF DEFENSE HANDBOOK STANDARD MICROCIRCUIT DRAWINGS

DEPARTMENT OF DEFENSE HANDBOOK STANDARD MICROCIRCUIT DRAWINGS NOT MEASUREMENT SENSITIVE w/change 2 28 March 2017 SUPERSEDING w/change 1 6 January 2012 DEPARTMENT OF DEFENSE HANDBOOK STANDARD MICROCIRCUIT DRAWINGS This handbook is for guidance only. Do not cite this

More information

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018 STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018 1073.01 Program Overview 1073.02 Qualification 1073.03 Documentation Phase 1073.04 Documentation

More information

Working Drawing Manual

Working Drawing Manual Working Drawing Manual 2012 Table of Contents Section 1 Working Drawing Types... 1 1.1 General... 1 Section 2 Processing Steps... 1 2.1 Project Manager... 1 2.2 Engineering Document Unit... 2 2.3 Contractor...

More information

STANDARD SPECIFICATIONS SECTION SUBMITTAL PROCEDURES

STANDARD SPECIFICATIONS SECTION SUBMITTAL PROCEDURES STANDARD SPECIFICATIONS SECTION 01330 SUBMITTAL PROCEDURES PART 1 GENERAL 1.1 DESCRIPTION A. Section includes general requirements and procedures related to preparation and transmittal of Submittals to

More information

MINUTES OF MEETING. The following Questions were asked and answers were provided accordingly:

MINUTES OF MEETING. The following Questions were asked and answers were provided accordingly: MINUTES OF MEETING Meeting Date : July 15, 2014 Place : Greenwood Shop Main Conference Room Contract Title : Supply of Reworked T1 Trip Switch Brackets Proposal No. : T31BG14139 Present : TTC - A. Mckay

More information

DRAWINGREQUIREMENTS FOR DEVICE CONNECTOR DRAWINGS

DRAWINGREQUIREMENTS FOR DEVICE CONNECTOR DRAWINGS DRAWINGREQUIREMENTS FOR DEVICE CONNECTOR DRAWINGS HOW TO USE EWCAP DRAWING/DRAFTING REQUIREMENTS This document is to be used to check newly-released drawings for use by EWCAP. Confirm compliance by confirming

More information

MIL- B B. MIL- B Rev NAVSEA 0900-LP II: ATTRIBUTES: YES NO N/A

MIL- B B. MIL- B Rev NAVSEA 0900-LP II: ATTRIBUTES: YES NO N/A XXVIII BRAZE/BRAZING PROCESS I: REQUIREMENTS 1. Identify the standard the supplier uses for performing brazing. MIL- B-007883B MIL- B-007883 Rev OTHER (IF Other, Specify :) NAVSEA 0900-LP-001-7000 II:

More information

CONTINUED ON NEXT PAGE..

CONTINUED ON NEXT PAGE.. REVISION RECORD REV DESCRIPTION DATE 0 INITIAL RELEASE 07/23/96 A PAGE 2: ADDED PARAGRAPHS 3.2.1, 3.2.2, AND 3.2.3. PARAGRAPH 3.3.b, ADDED SEE PARAGRAPH 3.2. 12/11/97 PAGE 3: ADDED PARAGRAPHS 3.8.1, 3.8.2,

More information

For the purposes of this document, the Engineering Consultant shall be referred to as the Engineer.

For the purposes of this document, the Engineering Consultant shall be referred to as the Engineer. SPEC-0002 1/8 1.0 PURPOSE This specification describes the requirements and procedure for requesting new drawing numbers, requesting drawing files for revision, and submitting drawings for archiving. This

More information

Electroimpact Supplier Inspection Documentation

Electroimpact Supplier Inspection Documentation AN AS9100 REGISTERED COMPANY Electroimpact Supplier Inspection Documentation 1. Inspection documentation may be submitted using one of two methods: a. Preferred method - Electronic - Submitting a complete

More information

MIL- B Rev NAVSEA 0900-LP

MIL- B Rev NAVSEA 0900-LP I: REQUIREMENTS 1. Identify the standard the supplier uses for performing brazing. MIL- B-007883B OTHER (IF Other, Specify :) MIL- B-007883 Rev NAVSEA 0900-LP-001-7000 II: ATTRIBUTES: YES NO 2a. Does a

More information

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER.

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER. SECTION 01300 - PART 1 - GENERAL 1.1 GENERAL A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER. B. Unless otherwise noted, within 14 days after the date of commencement as stated in

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01 33 23 - SHOP DRAWINGS, PRODUCT DATA, AND PART 1 - GENERAL 1.1 SUMMARY A. Products include, but are not limited to, the following construction submittals: 1. Shop Drawings. 2. Product Data. 3.

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018 SECTION 01 7839 - PROJECT RECORD DOCUMENTS GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

SECTION SCHEDULE OF VALUES PART 1 - GENERAL 1.1 THE REQUIREMENT A. This Section defines the process whereby the Schedule of Values (Lump Sum

SECTION SCHEDULE OF VALUES PART 1 - GENERAL 1.1 THE REQUIREMENT A. This Section defines the process whereby the Schedule of Values (Lump Sum SECTION 013201 - SCHEDULE OF VALUES PART 1 - GENERAL 1.1 THE REQUIREMENT A. This Section defines the process whereby the Schedule of Values (Lump Sum Pay Unit price breakdown) shall be developed and ultimately

More information

Research on aircraft components assembly tolerance design and simulation technology

Research on aircraft components assembly tolerance design and simulation technology 3rd International Conference on Material, Mechanical and Manufacturing Engineering (IC3ME 2015) Research on aircraft components assembly tolerance design and simulation technology Wei Wang 1,a HongJun

More information

4-bit bidirectional universal shift register

4-bit bidirectional universal shift register Rev. 3 29 November 2016 Product data sheet 1. General description The is a. The synchronous operation of the device is determined by the mode select inputs (S0, S1). In parallel load mode (S0 and S1 HIGH)

More information

PPAP REQUIREMENTS. Revision: March Methode Electronics, Inc. G-MB of 12 Printed copies are not controlled.

PPAP REQUIREMENTS. Revision: March Methode Electronics, Inc. G-MB of 12 Printed copies are not controlled. PPAP REQUIREMENTS Revision: March 2018 G-MB-1023 1 of 12 Printed copies are not controlled. Production Part Approval Process (PPAP) A) Introduction: 1) This document explains Methode s PPAP requirements.

More information

4-bit bidirectional universal shift register

4-bit bidirectional universal shift register Rev. 3 29 November 2016 Product data sheet 1. General description The is a. The synchronous operation of the device is determined by the mode select inputs (S0, S1). In parallel load mode (S0 and S1 HIGH)

More information

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal City of Winnipeg Brady Road Landfill Site Section 01300 New Entrance and Scale Facility Page 1 of 4 SUBMITTALS 1. SHOP DRAWINGS 1.1 General.1 Arrange for the preparation of clearly identified Shop Drawings

More information

Lockheed Martin Aeronautics Company. Supplier Tooling Manual (Tool Manufacturing Specification - Material Control - 015) TMS-MC-015 REVISION 29

Lockheed Martin Aeronautics Company. Supplier Tooling Manual (Tool Manufacturing Specification - Material Control - 015) TMS-MC-015 REVISION 29 Lockheed Martin Aeronautics Company Supplier Tooling Manual (Tool Manufacturing Specification - Material Control - 015) TMS-MC-015 Applicable to FORT WORTH MARIETTA - PALMDALE Sites To the extent specified

More information

Manufacturing Workmanship Standards Implemented November 2011

Manufacturing Workmanship Standards Implemented November 2011 Manufacturing Implemented November 2011 ~ 1 ~ This document is a statement to the quality and workmanship by York Haven Fabricators, Inc., henceforth referred to as YHF. The definitions, procedures, and

More information

STATEMENT OF WORK Environmental Assessment for the Red Cliffs/Long Valley Land Exchange in Washington County, Utah

STATEMENT OF WORK Environmental Assessment for the Red Cliffs/Long Valley Land Exchange in Washington County, Utah I. Introduction STATEMENT OF WORK Environmental Assessment for the Red Cliffs/Long Valley Land Exchange in Washington County, Utah The Bureau of Land Management s (BLM) St. George Field Office (SGFO) requires

More information

Hex non-inverting HIGH-to-LOW level shifter

Hex non-inverting HIGH-to-LOW level shifter Rev. 4 5 February 2016 Product data sheet 1. General description The is a hex buffer with over-voltage tolerant inputs. Inputs are overvoltage tolerant to 15 V which enables the device to be used in HIGH-to-LOW

More information

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS SECTION 01300 SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and other Division-1 Specification Sections,

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01334 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.01 SUMMARY A. Submit to the ENGINEER for review, such working drawings, shop drawings, test reports and data on materials and equipment

More information

This specification describes the general requirements for Engineering Services provided to Vale.

This specification describes the general requirements for Engineering Services provided to Vale. 1/9 1.0 PURPOSE This specification describes the general requirements for Engineering Services provided to Vale. 2.0 GENERAL For the purposes of this document, the Engineering Consultant shall be referred

More information

INS Process Outline Requirements

INS Process Outline Requirements Specification Date: 20/3/17 INS Process Outline Requirements UNCONTROLLED WHEN PRINTED Author: J Cooch AUTHORISATION Date: 20/3/17 A Brown Owner: J Cooch (Signature) N.B. only required for hard copy If

More information

Technical Standard Order

Technical Standard Order Department of Transportation Federal Aviation Administration Aircraft Certification Service Washington, D.C. TSO-C23f Effective Date: 09/21/2012 Technical Standard Order Subject: Personnel Parachute Assemblies

More information

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 013300 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

Four planar PIN diode array in SOT363 small SMD plastic package.

Four planar PIN diode array in SOT363 small SMD plastic package. Rev. 4 7 March 2014 Product data sheet 1. Product profile 1.1 General description Four planar PIN diode array in SOT363 small SMD plastic package. 1.2 Features and benefits High voltage current controlled

More information

MILITARY SPECIFICATION

MILITARY SPECIFICATION MIL-R-47196A(MI) 6 September 1977 SUPERSEDING MIL-R-46196(MI) 12 July 1974 MILITARY SPECIFICATION RIVETS, BUCK TYPE, PREPARATION FOR AND INSTALLATION OF This specification is approved for use by US Army

More information

HEF4002B. 1. General description. 2. Features and benefits. 3. Ordering information. 4. Functional diagram. Dual 4-input NOR gate

HEF4002B. 1. General description. 2. Features and benefits. 3. Ordering information. 4. Functional diagram. Dual 4-input NOR gate Rev. 4 17 October 2016 Product data sheet 1. General description 2. Features and benefits 3. Ordering information The is a dual 4-input NOR gate. The outputs are fully buffered for highest noise immunity

More information

Manufacturing Workmanship Standards YHF-WS Rev 2

Manufacturing Workmanship Standards YHF-WS Rev 2 Manufacturing YHF-WS Rev 2 Approved by & date: 02/25/16 Approved by & date: 02/25/16 This document is a statement to the quality and workmanship of York Haven Fabricators, Inc., henceforth referred to

More information

Specification D data models

Specification D data models Previous Edition Specification 2017-04 Class: Dimensions, tolerances Class No.:01 Documentation of components by means of 3D data models 516 Part name (for databases) 2009-09 3D data models 852 005 160

More information

Hex inverting HIGH-to-LOW level shifter

Hex inverting HIGH-to-LOW level shifter Rev. 7 5 February 2016 Product data sheet 1. General description The is a hex inverter with over-voltage tolerant inputs. Inputs are overvoltage tolerant to 15 V. This enables the device to be used in

More information

How PMI and Data Modeling Standards Affect Successful Implementation of 3D MBD/MBE

How PMI and Data Modeling Standards Affect Successful Implementation of 3D MBD/MBE How PMI and Data Modeling Standards Affect Successful Implementation of 3D MBD/MBE Understanding and Managing Risk in Implementation and Transition Bryan R. Fischer Advanced Dimensional Management LLC

More information

ENGINEERING DRAWINGS MANAGEMENT POLICY (IFC/AS BUILTS)

ENGINEERING DRAWINGS MANAGEMENT POLICY (IFC/AS BUILTS) Approval Amendment Record Approval Date Version Description 15/10/2015 1 This policy takes precedence over L1-NAM-PRO-003 Infrastructure As Built Drawing Management due to business restructures. New Content

More information

Geometric Dimensioning and Tolerancing

Geometric Dimensioning and Tolerancing Geometric Dimensioning and Tolerancing (Known as GDT) What is GDT Helps ensure interchangeability of parts. Use is dictated by function and relationship of the part feature. It does not take the place

More information

The ASME Y14 Policies

The ASME Y14 Policies ASME Y14 POLICY NUMBER ONE: GROUND RULES FOR PLACEMENT OF NEW OR REVISED ASME DATA ASME Y14 POLICY NUMBER TWO: BOILERPLATE TEXT FOR THE CITATION OF REFERENCES IN Y14 STANDARDS ASME Y14 POLICY NUMBER THREE:

More information

ASME Geometric Dimensioning and Tolerancing Professional Certification Applicant Information Handbook

ASME Geometric Dimensioning and Tolerancing Professional Certification Applicant Information Handbook GO.ASME.ORG/GDTP ASME Geometric Dimensioning and Tolerancing Professional Certification Applicant Information Handbook The American Society of Mechanical Engineers ASME STATEMENT OF POLICY ON THE USE OF

More information

BB Product profile. 2. Pinning information. 3. Ordering information. FM variable capacitance double diode. 1.1 General description

BB Product profile. 2. Pinning information. 3. Ordering information. FM variable capacitance double diode. 1.1 General description SOT23 Rev. 3 7 September 2011 Product data sheet 1. Product profile 1.1 General description The is a variable capacitance double diode with a common cathode, fabricated in silicon planar technology, and

More information

BAP Product profile. 2. Pinning information. 3. Ordering information. Silicon PIN diode. 1.1 General description. 1.2 Features and benefits

BAP Product profile. 2. Pinning information. 3. Ordering information. Silicon PIN diode. 1.1 General description. 1.2 Features and benefits Rev. 5 28 April 2015 Product data sheet 1. Product profile 1.1 General description Two planar PIN diodes in common cathode configuration in a SOT23 small plastic SMD package. 1.2 Features and benefits

More information

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES SECTION 01340 SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES PART 1 - GENERAL 1.1 REQUIREMENTS INCLUDED A. Contractor shall submit to the Architect/Engineer for review and exception, if any, such working

More information

2016 CDM Smith All Rights Reserved July 2016 SECTION PROJECT MEETINGS

2016 CDM Smith All Rights Reserved July 2016 SECTION PROJECT MEETINGS PART 1 GENERAL 1.01 REQUIREMENTS INCLUDED SECTION 01 20 00 PROJECT MEETINGS A. Construction Manager shall schedule and administer pre-construction meeting, periodic progress meetings, and specially called

More information

PNP 5 GHz wideband transistor. Oscilloscopes and spectrum analyzers Radar systems RF wideband amplifiers

PNP 5 GHz wideband transistor. Oscilloscopes and spectrum analyzers Radar systems RF wideband amplifiers Rev. 3 22 January 2016 Product data sheet 1. Product profile 1.1 General description PNP transistor in a plastic SOT23 envelope. It is primarily intended for use in RF wideband amplifiers, such as in aerial

More information

Hex non-inverting precision Schmitt-trigger

Hex non-inverting precision Schmitt-trigger Rev. 4 26 November 2015 Product data sheet 1. General description The is a hex buffer with precision Schmitt-trigger inputs. The precisely defined trigger levels are lying in a window between 0.55 V CC

More information