SECTION III INSTRUMENT DELIVERABLES

Size: px
Start display at page:

Download "SECTION III INSTRUMENT DELIVERABLES"

Transcription

1 SECTION III INSTRUMENT DELIVERABLES Page 1 of 22

2 INDEX SR. NO. TOPIC PAGE 1 SCOPE 4 2 CLARIFICATIONS OF THE INSTRUMENT DELIVERABLES 4 3 INSTRUMENTATION INTERFACES WITH OTHER DESCIPLINES 13 4 INSTRUMENTS DELIVERABLES OVERVIEW LIST 18 5 SUMMARY OF DOCUMENTS IN OWNER SCOPE OF APPROVAL 21 Page 2 of 22

3 Abbreviations used in the document PAC PROJECT BDP = Basic Design Package BDEP = Basic Design and Engineering Package DCS = Distributed Control System EBDEP = Extended Basic Design and Engineering Package EPC = Engineering, Procurement and Construction ESD = Emergency Shutdown System (Safety PLC) FAR = Instrumentation Field Auxiliary Room FAT = Factory Acceptance Test FGS = Fire, Gas and Smoke Detection System I/O = Input/Output ITB = Invitation To Bid JB = Junction Box MDF = Main Distribution Frame MIC = Main Instrument Contractor for Plant Automation Systems MOV = Motor Operated Valve MTO = Material Take-Off PCD = Process Control Diagram P&ID = Piping and Instrument Diagram PMC = Project Management Contractor RATTS = Range, Alarm, Timer and Trip Setting SAT = Site Acceptance Test SHS = Sample Handling system for analysers SIL = Safety Integrity Level SIS = Safety Instrumented System PNS = Plant Naming/Numbering Systems Page 3 of 22

4 1.0 SCOPE This specification contains the minimum requirements, with respect to control, of the instrument engineering and design deliverables. This specification contains the defined scope of instrument deliverables for engineering and design to be generated for this project. All the documents/drawings specified in this section shall be in English Language and shall be either in Microsoft word, Microsoft Excel or in Auto CAD software format only in addition to required numbers of set of hard copies. PDF formats are not acceptable. 2.0 CLARIFICATION OF THE INSTRUMENT DELIVERABLES 2.1 INSTRUMENT PROJECT EXECUTION PLAN The Instrument Project Execution Plan describes for instrumentation the objectives, goals, responsibility split, scope of work, engineering and design basis, risk and opportunities, execution strategy, HSE, design control and resources and tools. At the start of the Detailed Design Phase the BIDDER Instrumentation lead engineer will prepare a discipline execution plan. 2.2 ENGINEERING SPECIFICATIONS Engineering specifications determine the basic engineering and design procedures. These cover the criteria for the execution of the detailed engineering and design specifications applicable for the project. The instrumentation specification to be provided by the BIDDER is as a minimum but not limited to: a. General specification for Instrumentation b. General instrument specification for package units c. Plant automation systems specification d. Fire Gas and Smoke Detection System specification e. Analyzer and analyzer systems specification f. Instrument design specification g. Instrument deliverables 2.3 BIDDER shall provide at the start of the project the design/drafting specification applicable for the project, i.e. Instrumentation Design Basis Document. OWNER or his representative will review these specifications. The specifications are as a minimum but not limited to: a. Instrument symbology and identification specification as per ISA b. Instrument indices and nomenclature specification as per ISA c. Instrument Tag naming philosophy as per PNS or equivalent systems of standards d. Intools application specification and formats e. Unit of Measures f. Instrument utility specifications Page 4 of 22

5 g. Basis of instrument design and broad guide line of instrumentation design philosophy h. Instrument installation requirements in line with guide line provided by OWNER i. Instrumentation-electrical design interface specification as per guide lines provided by OWNER j. Instrumentation-piping design interface specification k. Instrument cable specification with minimum guide lines provided by OWNER l. Instrument drafting specification m. 3-D standard set-up n. CAD standard set-up 2.4 INSTRUMENT CALCULATIONS BIDDER shall provide the following calculations as a minimum using process data for instruments; calculations provide the information for sizing, selection or verification of instruments or materials. Following calculations shall be documented: a. Control valve calculation for sizing and noise b. d/p Type flow measurement calculation for sizing/selection orifice/range. c. d/p Type level measurement calculation for selection range. d. Rota meter sizing calculation e. Analyzer sample loop calculation for determination of lead-time between sample take-off and analysis result. f. Ex i loop calculation for determination of the capacitance and inductance of the loop g. Voltage drop calculation for determination of the allowed voltage drop/conductor size h. Anti surge calculations and transmitter scaling i. Level sketches for all vessels /equipments level measurement j. Instrument air consumption of all instrumentation k. Programming sheets of all micro processor based instruments l. Complex loop algorithms, all constants & Variables, with sample calculations and all tuning parameters Notes: 1. Preliminary calculations are by the BIDDER Process/Instrument department. Final calculations for control valves and safety/relief devices may be replaced by seller calculations. 2. BIDDER Instrumentation shall provide BIDDER Process with the selected CV values of control valves for final relief valve load calculations. 2.5 INSTRUMENT INDEX Page 5 of 22

6 The instrument index lists instruments and/or functions that are required for control, monitoring and safeguarding of a process plant. As such, it functions as instrumentation "scope of plant" and is the basic document next to the P&ID s, from which the instrumentation work is executed. No instrument tag numbers (including hard and soft tags) shall exist those are not listed in the instrument index. It includes as a minimum the following, but not limited to the following - Tag - Description - Service - Line No - P& I No - Loop Number - Location - Type of instrument - Make and model of instrument - Range of instrument - JB schedule - Cable schedule - Alarms/Trip setting - Control valve action - Interlock Number - Loop sheet no. etc There shall be a common instrument index for the whole plant/entire project, including those of any package units. All package unit vendors have to provide information in the same format in Instrument index required and approved by OWNER in a common instrument index document. 2.6 INSTRUMENT CONFIGURATION INDEX The configuration index contains the basic information required for configuration of the monitoring, control and input/output functions of a control system. This index is used to manage and transfer the configuration information to the party responsible for the system configuration. However, if this purpose can be met with by some rearrangement of existing instrument index, IO list, individual instrument system configuration sheets, etc. than this document is not required. 2.7 RANGE, ALARM, TIMER AND TRIP SETTING (RATTS) LIST The range, alarm, timers (for trip on-delay and off-delays both) and trip setting (RATTS) list is a listing of all loops that interface with a control ( all types of controls i.e. continuous, sequential, on-off, etc.) and indication system, an interlock/logic system and/or with an alarm system. This listing shall contain all settings that are required for safe and reliable operation Page 6 of 22

7 2.8 REQUISITION PAC PROJECT of the plant. Data is provided by the BIDDER Process department to BIDDER Instrument department. Note: timer settings are either provided in the narratives by the BIDDER Process department by default The requisition covers the requirements for purchasing of equipment (i.e. the Indent or MR), materials and related services. The requisition shall consist of the following attachments, but not limited to the a. Purchase specification, containing a technical description and specification including b. Instrument data sheets c. Purchase specifications d. Technical descriptions e. Requirements for documents f. Requirements for inspection g. Related technical documents h. Inquiry requisitions i. Technical bid evaluations and recommendation j. Purchase requisitions k. Seller documents review Requisition subjects are as a minimum but not limited to: a. Plant automation system inclusive DCS, SIS, FGS, etc. b. Fire, Gas and Smoke (FGS) detection system c. Fire, Smoke and Gas detectors (along with above system) d. Public address system e. Beacons and sirens (along with FGS system) f. Analyzer Houses, Analyzer Systems, Gas Chromatographs and Local Analyzers g. Field Instruments (Flow/ Level/ Pressure/ Temperature) h. Tank gauging system and product handling/storage control system i. Custody transfer flow metering j. Machine monitoring/control/trip system k. Control Valves (all types) l. Self-Regulating Valves m. On/Off Valves (all types) n. Instrument Cable (Single/ Multi core) o. Junction Boxes p. Push Buttons (Field) q. All erection hardware items like cables trays, ducts, instrument tubes/fittings, and all sundry items. Notes: 1. The data sheets will be prepared in Database. The format of the instrument data sheets shall be approved by the OWNER or his Page 7 of 22

8 representative. The completed instrument data sheets will be reviewed by OWNER or his representative prior to inquiry issue and prior to purchase order placement and/or call-off. 2.9 PROCESS ANALYZER SPECIFICATION The specification for process analyzers & Gas Chromatographs details scope split, technical requirements and authority coordination. Specified are as minimum, if and when applicable: a. Applicable standards, codes and regulations b. Environmental conditions c. Enclosure (house/shelter/shed/cabinet) d. Air handling e. Utilities (electrical power, instrument air, plant air, nitrogen, carrier gas, potable water, effluent handling, lighting, earthing, etc) f. Sampling (probe, sample handling, tube routing, supporting, etc.) g. Interfaces with civil, piping, electrical h. Fire and gas detection i. Installation details j. Analyzer maintenance systems communication k. Certification l. Inspection (FAT, SAT, test reports) m. Documentation BIDDER Instrumentation shall design the process analyzer systems. OWNER or his representative will review the documents prepared by Instrumentation BIDDER. Also BIDDER shall provide overall coordination with the Analyzer System Integrator SYSTEM FUNCTIONAL DESIGN SPECIFICATION The system functional design specification provides the basic design specification for the plant automation & FGS systems and shall be approved by OWNER. The specification covers requirements for as minimum but not limited to: a. System hardware inclusive interfaces with other systems b. Console design c. Displays (manufacturer s standard, graphics, navigation, etc.) d. Alarm management e. Software implementation conventions (process control loop strategies, equipment f. Control strategies, safeguarding, etc g. It is assumed that the BIDDER develops the system functional design specification. Instrumentation will review the specification INSTRUMENT SYSTEM BLOCK DIAGRAM Page 8 of 22

9 The instrument system block diagram provides the schematic representation of the major hardware architecture of the control, safeguarding and related systems like fire and gas detection, machine monitoring, anti surge control system GPS and integration of all systems, etc. The related systems shall include all other subsystems interfaced to the instrumentation/ automation system e.g. computer/mis (Management Information System), etc. This drawing will show the physical location and their interrelation on the signal type/carrier level of above mentioned hardware. It is assumed that the BIDDER shall develop the instrument system block diagram TYPICAL PROCESS CONTROL DIAGRAMS (PCD'S) The PCD elaborates the functionality as shown on the P&ID's and gives a graphical overview of the functions of a loop or a combination of related loops, their physical location and their interrelation. It is assumed that for consistency purposes the BIDDER shall develop the loop type templates listing that are used to populate the instrument data base Intools. For all complex loops, PCD shall include control narratives for individual loop also INSTRUMENTATION CAUSE AND EFFECT AND LOGIC DIAGRAMS Instrumentation cause and effect diagrams are elaborated cause and effect diagrams prepared by BIDDER Process. The information is supplemented with : a. Study and evaluation of plant RISK as per DIN19250/AK-1 to AK6 or SIL-1 to 4 as per IEC61508 b. Classifying interlock and safety shutdown interlock/logic c. Operational functionality (e.g. start-up overrides, maintenance overrides, resets, Auto change- over of pumps) d. Sub-system interconnections (e.g. between safety instrumented systems located in different buildings) e. Logic/Interlock description in narrative form with the help of process group f. Logic/Interlock diagram in Function Block Diagram Form as per IEC61131 The logic/sequence diagram elaborates the functionality even further than the Instrumentation cause and effect diagrams and/or sequence flow chart. BIDDER Instrumentation shall prepare the instrument logic diagram from the cause and effect diagrams, in FBD format for all interlocks and logic. It is assumed that the BIDDER together with the Plant Automation System Vendor shall prepare the final and detailed interlock/logic diagrams and sequential diagrams and implement these into the selected systems as per requirement of OWNER. Page 9 of 22

10 2.14 DCS GRAPHIC DISPLAY INFORMATION DCS graphic display information shall be provided with highlighted P&ID's showing the main process equipment to be implemented in the DCS displays. Implementation shall be based on the DCS configuration and man machine interface convention by DCS supplier. It is assumed that the BIDDER together with the Plant Automation System Vendor shall develop the graphics based on the graphic design philosophy developed by the BIDDER and approved by OWNER INSTRUMENT INSTALLATION SCHEDULE The instrument installation schedule shall contain all tag numbers of fieldmounted instruments with relevant P&ID number, location of instrument, installation drawings and purchase requisition number, which may be extracted from the instrument index (index data base). BIDDER Instrumentation shall prepare the Instrument Installation Index INSTRUMENT FIELD LOCATION LAYOUT The instrument field location layout drawing shall be based on the plot plan. The plot plan shall be divided in logical parts with preferable a scale of 1:50 and a drawing size of A1. The layouts shall show the location of instruments, local panels, cabinets, junction boxes, PA system field call station and air header systems. Each instrument will be indicated by means of a dot, instrument tag number with letter code for type of instrument and its elevation in addition to X-Y co-ordinates. A legend drawing shall show all general notes, symbols and reference drawing numbers of instrument field layouts and with a listing of all relevant installation drawings. The instruments shall be placed in the 3-D PDS model. All in-line instruments as well as off line instruments like Stanchion mounted JB, transmitters, etc. and all main cable ducts, perforated aluminum cable trays up to size 300 mm and above will be modeled by Piping using dimensional information supplied by Instrumentation. Similarly Piping will also model displacer instruments, capacitive probes, tuning forks, servo level instruments, level gauges, thermowells, analyzer probes and orifice flanges. For all in-line instrumentation initially when the seller/manufacturer and model are not yet selected Instrumentation will provide dimensional data based on generic catalogue data and/or preliminary sizing calculations. The quality of the dimensional data will be improved by BIDDER Instrumentation once the seller/manufacturer and model are selected. Finally BIDDER Instrumentation will provide dimensional data based on the approved seller data. BIDDER Instrumentation shall provide dimensional data based on approved seller data for the other on-line instruments; BIDDER shall model these instruments in the 3-D model. BIDDER Instrumentation shall model local panels and junction boxes using an equipment model. Page 10 of 22

11 BIDDER Instrumentation shall prepare the Instrument Field Location Layout in AUTO CAD INSTRUMENT FIELD CABLING LAYOUT The instrument field cabling layout shall be based on the plot plan. The plot plan shall be divided into logical parts, with a preferable scale of 1:100. The layout shall show the location of local panels, cabinets, junction boxes, cable main ducts/trays, sub-trays, cables, etc. Local panels, cabinets and junction boxes shall be indicated by means of an identification number. BIDDER Instrumentation shall use Intergraph s Raceway module to support PDS areas in modeling all main ducts of instrumentation cables and perforated aluminum trays of size 300 mm and above. BIDDER Instrumentation shall prepare the Instrument Field Cabling Layout in AUTO CAD. Conduit/ tray installation details and drawings are by BIDDER. Trenches are not foreseen INSTRUMENT PROCESS PIPING DETAILS Instrument process piping details shall show a schematic installation of the piping between the instrument and the related process take-off point and a listing and specification of the materials required for this installation. BIDDER Instrumentation shall prepare the Instrument Process Piping Details inclusive MTO INSTRUMENT AIR PIPING DETAILS Instrument air piping details shall show a schematic installation of all pneumatic instruments concerning air supply and air signals and a listing and specification of the materials required for this installation. BIDDER Instrumentation shall prepare the Instrument Air Piping Details inclusive MTO INSTRUMENT STEAM TRACING DETAILS Instrument steam tracing details shall show a schematic installation of the steam tracing between the instrument and the related process take-off point and a listing and specification of the materials required for this installation. BIDDER Instrumentation shall prepare the Instrument Steam Tracing Details inclusive MTO. Instrument electrical tracing is by Electrical INSTRUMENT INSTALLATION DETAILS/HOOK UP DRAWINGS In addition to instrument installation details with primary and secondary sketches for instrumentation hook up drawings, the Instrument installation details shall show a typical mechanical supporting and typical electrical installation of indoor and outdoor instruments, junction boxes, panels, cabinets, cable tray/ladders, etc. Details shall be provided for supports on the paved/unpaved ground, concrete floors, walls/concrete beams, steel Page 11 of 22

12 structures, etc. BIDDER Instrumentation shall prepare the Instrument Installation Details /Hook up drawings inclusive MTO INSTRUMENT NAMEPLATE SCHEDULE The instrument nameplate schedule is a listing of identification numbers for instrument, cabinets, local panels, junction boxes, marshalling racks, detection equipment, etc. BIDDER Instrumentation shall prepare the Instrument Nameplate Schedule inclusive of MTO INSTRUMENT LOCAL PANEL LAYOUT The instrument local panel layout shall show the arrangement of local panel mounted equipment such as push buttons, alarms, indicating, lights, gauges, including approximate sizes and location of local panels. Local panels are designed and supplied with the equipment package unit. No additional local panels are foreseen. Design documents of seller / BIDDER Instrumentation shall be approved by OWNER INSTRUMENT ROOMS EQUIPMENT LAYOUT The control room and instrument field auxiliary building equipment layouts shall show the location and main dimensions of control panels and/or consoles, telecommunications equipment, and, if applicable, computer room equipment, fire alarm panel, semi graphics, etc. Consoles will show monitors, keyboards, trend recorders, radio and communication systems, etc. In case other rooms are shown on the layout, the related equipments will be shown too. The basis is the hardware, as shown on the instrument system block diagram, and the sizing, based on the hard I/O count. BIDDER shall prepare the Instrument Control Building and Instrumentation Field Auxiliary Building Layouts. BIDDER Instrumentation provides preliminary dimension information for any instrumentation in the control building. BIDDER Instrumentation shall provide approved for design AFD and approved for construction AFC data on this instrumentation items INSTRUMENT ROOMS CABLE LAYOUT The cable layout for control rooms, technical/auxiliary/rack rooms shall show the route of the cables between cabinets, racks, panels, consoles, and various cable entries/exit in control room/rack room, etc. Also the route of the incoming field cables will be shown. BIDDER shall prepare the Instrument Control Building and Instrumentation Field Auxiliary Building Cable Layout INSTRUMENT ROOMS EARTHING LAYOUT On the earthing layout the several earthing systems shall be shown, for safety earth, instrument earth, IS and NON-IS earth for instruments, computer earth, etc. All earthing systems will be connected to a bus bar; each system will have its own bar. The connection between the bus bar and the earthing electrode will be the responsibility of the electrical discipline. BIDDER shall prepare the Instrument Control Building and Page 12 of 22

13 Instrumentation Field Auxiliary Building, Analyser house, local panel, JB/Instruments Earthing Layout FIRE SMOKE AND GAS DETECTION LAYOUT The fire smoke and gas detection layout is based on the plot plan. The plot plan shall be divided in logical parts with preferably a scale of 1:50 and a drawing size of A1. The layout shall show the location of detectors, manual call points installation, status lamps, alarm siren, junction boxes, panels, etc. Each instrument will be indicated by means of a symbol. Fire smoke and gas panels, cabinets and junction boxes will be indicated by means of a rectangle and an identification number. A layout with general notes, symbols and reference drawing numbers shall show all general notes and symbols of fire, smoke and gas detection layouts and further a listing of all relevant installation drawings. BIDDER Instrumentation will prepare the fire smoke and gas detection layouts FIRE SMOKE AND GAS DETECTION INSTALLATION DETAILS FIRE, SMOKE and GAS detection installation detailed drawings shall show typical mounting and electrical installations, such as detector installations, horn/beacons installations, manual call points installation, wiring diagram, Junction box schedule, etc. BIDDER Instrumentation will prepare the FIRE, SMOKE and gas detection installation details INSTRUMENT CABLE LIST The instrument cable list shall show all instrument cables, with the exception of the single cables between instrument and junction box, which is part of JB schedule drawings. Furthermore, the cable list shall show the cable number, type, length and size of cable, type of signal, color of outer sheathing, description of run (from - to), requisition and item number, drum number and a remarks column. BIDDER Instrumentation shall prepare the Instrument cable list CONNECTION LIST INSTRUMENT FIELD SIDE Junction box connection listing shall show the termination of all instruments connected with single wiring/cabling to a junction box and the signal transmission via a multi core/pair cable to the marshalling rack/cabinet in technical (auxiliary) room. It will also indicate main cable number, type and details with destinations. BIDDER Instrumentation shall prepare the connection list instrument field side CONNECTION LIST INSTRUMENT ROOM SIDE Marshalling rack/cabinet connection listings shall show the termination of all field cables at one (1) side (field side) and all control/rack room cables at the other side (control building side) and the interface connections of electrical signals. Cross wiring shall be shown on the same list. BIDDER Instrumentation shall prepare the connection list instrument control building side Page 13 of 22

14 2.32 ELECTRICAL INSTRUMENTATION INTERFACE The electrical-instrumentation interface describes the method of signal transmission from control and safeguarding systems to the motor control units, low and high voltage switchgear and variable speed drive systems. The signals are directly hardwired, hardwired via interposing relays or communicated via a serial link. The signals concern control, trip and status information. BIDDER provides the electrical instrumentation interface specification. BIDDER Instrumentation shall incorporate in the instrumentation database Intools external power requirements for field instruments. BIDDER Instrumentation shall prepare an Excel extract from Intools showing instruments, which require electrical supplied, external power indicating tag number, location, voltage type and voltage level. BIDDER to follow the minimum guide lines as provided in Electrical Instrument Interface specification portion of this documents INSTRUMENT LOOP DIAGRAMS Instrument loop diagrams shall be prepared for each electronic loop on the project on the basis of one (1) loop per drawing sheet. A loop shall contain each component from field device to DCS and/or other system cabinet, including physical location, equipment number/location, terminal row/number and cable pair number/polarity. DCS and/or other system functions of the loop shall be shown in a simplified manner, without all configuration details. More than one drawing may be necessary for more complex loops. Intools smart loop will be used for conventional hardwired loops. BIDDER Instrumentation/System vendors shall prepare the instrument loop diagram from field instruments up to including the terminals of the field cables at the field side of the marshalling rack/cabinet (main distribution frames MDF) along with further nest loading information, software in-out blocks, etc. The field instruments include package unit supplied instrumentation. The BIDDER shall complete the instrument loop diagrams with the systems side. The format of the loop diagrams shall be approved by OWNER INSTRUMENT SUBCONTRACTS The objective of the instrument subcontract is to define the instrument subcontractor's scope of work, services and supply for the instrumentation part of the installation work of a project. The instrument subcontract shall contain necessary design and engineering documents, developed during the detailed design phase of the project. OWNER or his representative shall review these documents. The applicable specifications will be attached to the subcontract, e.g.: a. Instrument engineering and design specification. b. Instrumentation scope split matrix multi office execution. c. Instrument installation specification. Page 14 of 22

15 d. Instrument cable pulling installation specification. e. Test and pre-commissioning specification. f. Instrumentation shall provide the scope descriptions for and technical attachments to the Instrument Subcontracts. 3.0 INSTRUMENTATION INTERFACES WITH OTHER DISCIPLINES 3.1 PROCESS DESIGN Process Definitions/Philosophies a. Technology selection (Comparison of processes) b. Dynamic simulations of instrumentation of process c. Process control and operating philosophy, Instrumentation reviews the philosophy. d. Emergency shutdown philosophy, Instrumentation reviews the philosophy. e. Fire protection philosophy and Fire, Gas & Smoke system, Instrumentation reviews the philosophy Process flow diagrams Instrumentation reviews the process flow diagrams Process description No instrument involvement Safety and Environment a. Plant effluent data: Instrumentation provides the data of the analyzer system effluents to Process during detailed engineering. b. HAZOP & SIL study and report : Instrumentation representative is available for questions and answers during the HAZOP Meetings. Resolutions from the HAZOP / SIL study report are to be reviewed by Instrumentation wherever applicable. c. Noise study : BIDDER Instrumentation provides predicted noise data for control valves based on Instrumentation preliminary sizing (30% probability) or on selected seller supplied data (70% probability). 3.2 PROCESS ENGINEERING P & I Diagrams a. Symbol P&ID s : BIDDER Instrumentation reviews the symbology (legend) for P&ID s prepared by Process. b. Process P&ID s : BIDDER Instrumentation provides tag numbers for instruments, instrument loops, safeguarding blocks, safety valves, gauges and actuated valves. An Instrumentation representative is available for questions and answers during the screening meetings. Page 15 of 22

16 Instrumentation shall review and comment the P&ID s. BIDDER Instrumentation shall advise BIDDER Process of the modifications due to the detailed design. c. Fire Smoke and Gas Detection P&I Dia: See Process P&ID s. d. Utility P&ID s : See Process P&ID s Inter-connection and tie-in diagrams No input from Instrumentation Package unit P&ID s Same as main Plant s P&I Dia Process control and safety instrumented system functional specifications (narrative) : The process control functional specification PC-FS (narrative) contains functional descriptions of complex regulatory loops, automated sequence/ batch controls, all interlocks and logic, etc.. If required, additionally sequential function charts or structured text can be provided for the sequence/ batch type controls along with control and interlock/logic narratives. The safety instrumented system functional specification SIS-FS involves all instrument actions for unscheduled process conditions and these are designed to set the process in a safe mode if it tends to move outside its operating parameters towards unsafe conditions. The reliability levels of the safeguarding functions will be classified into SIL levels (see also SIL definition). For each SIS block cause and effect diagrams and interlock / Logic diagrams will be attached, being a graphical representation of the main instrumented safeguarding functions. The documents are generated by Process. BIDDER Instrumentation will review & comment these documents. The implementation is by BIDDER with the help of automation system vendors SIL Definition Instrumentation provides input to the Safety Instrument Level as determined by Process. Instrumentation together with Process will adjust the P&ID s according the requirements set by the SIL classification Sequential re-start sequence Instrumentation reviews the sequential restart sequence as prepared by Process in close cooperation with Electrical In-line instrument process datasheets: BIDDER Process provides process data sheets for in-line instruments, relief valves and actuated valves. BIDDER instrument ensures inclusion/reference to the latest process data in all material requisition of all instrumentation item as well as purchase requisition of all instrument items On-line and off-line instrument process datasheets: BIDDER Process provides process data sheets for instruments for on-line instruments and off-line instruments. Rest is same as above. 3.3 MECHANICAL Specification for package unit instrumentation Page 16 of 22

17 BIDDER Instrumentation prepares a general specification for package unit instrumentation based on the general instrument specifications provided in this complete contract document. This specification covers the minimum requirements for the engineering, design, supply and installation of instrumentation equipment and commodities forming part of package units. Electrical instrument installations shall also follow the requirements set forth in the specification Electrical requirements for package units Complex packages BIDDER Instrumentation prepares for each inquiry requisition for complex package units a specific, technical description and specification including instrument data sheets. The instrument data sheets shall be completed by the selected seller later on along with selected model of instrument. Note: scope split for filling-in the instrument datasheet shall be agreed upon in co-operation with the seller STATIC EQUIPMENT Vessel sketches Columns, reactors, vessels, tanks, shell & tube heat exchangers, air coolers, filters, heaters, boilers, indicating level, level trip/alarm points, interface level, etc ROTATING EQUIPMENT Pumps, steam turbines, air compressors & fans & blowers, turbines, process gas compressors, diesel & gas engines, extruder units, refrigeration units, vacuum units, providing various speed/vibration monitoring details on control and interlock/logic as well as complex controls like anti-surge and performance controls of the systems SPECIAL EQUIPMENT Package units, fire fighting equipments, HVAC equipment, mechanical handling equipment, solid handling equipment. 3.4 PLANT DESIGN CIVIL AND STRUCTURAL a. Control building and instrument field auxiliary room building BIDDER Instrumentation provides to BIDDER Civil the internal room dimension of control rooms, instrument rack rooms and instrument field auxiliary buildings, analyser houses, cable entry, doors/windows locations, etc. Location of rain water drains are to be indicated. b. In addition to the building information, BIDDER Instrumentation provides to BIDDER Civil/Structural location, size and weight of instrumentation supplied, pre-fabricated structures, sheds and freestanding local panels. c. BIDDER Instrumentation provides to Civil the routing and sizing of trenches within control room building and main cable duct route on main pipe racks in the field. However, in this complete project, no underground cable trenches, etc. are involved, except control room/cabinet room. No under ground instrument cables shall be acceptable in the field area. Page 17 of 22

18 3.4.2 PIPING DESIGN PAC PROJECT a. Plot plan: The plot plan is prepared by Piping. BIDDER Instrumentation provides the routing and dimensions of main cable ducts, main and sub cable trays, and the locations and dimensions of analyser houses/sheds, local panels, local control skids, JBs, control rooms and instrument field auxiliary buildings. b. Critical isometrics: BIDDER Instrument shall provide necessary information on dimension of all in-line instruments, straight run requirement of all flow instruments, ground and top clearance for al in line instruments required, etc. c. Plant model: BIDDER instrument shall review 3-D plant model including all on-line and off-line instrument locations, approach, main cable duct lay out, cable tray layout of up to 300 mm perforated aluminum cable trays, etc. in the 3-D model. d. Line schedule / Line List: No input from Instrumentation. The line schedule is used by Instrumentation during detailed engineering as reference document PIPING ENGINEERING 3.5 ELECTRICAL a. Valve selection: Actuated piping valves requisitioned by Instrumentation follow the valve selection as per Piping valve criteria and other guide lines /requirements given in this complete contract document. Instrumentation does not provide input to the valve selection specification ELECTRICAL ENGINEERING a. Electrical load list: BIDDER Instrumentation shall provide BIDDER Electrical with the required loads of Instrument Equipments. b. Electrical Interface: BIDDER Instrumentation shall inform BIDDER Electrical of the required interface signals in line with Volume-3, Section-9, Chapter- VI and various annexure of the same. 3.6 SUBCONTRACTING Subcontracting project execution plan : Review of instrumentation part of the subcontracting project execution plan. 3.7 OPERATIONS Construction project execution plan: Review strategy of Seller representatives for Instrumentation and Packaged instrumentation to Page 18 of 22

19 3.8 SCHEDULES PAC PROJECT support construction and (pre-) commissioning activities. Constructability review with aspects like pre-assembly, vessel pre-dressing, heavy lift requirements of valves, maximum dimensions of cabinets and analyzer houses shall be reviewed by BIDDER Instrumentation. Review of Mechanical completion procedure. Review of Strategy and Procedures for (pre-) commissioning, unit performance test, initial start-up and operation BIDDER Instrumentation reviews the level two schedules as prepared by BIDDER Scheduling. Special focus is on the interface data with other disciplines and required-on-site dates. BIDDER Instrumentation level three schedules will be prepared based on the milestones from the level 1 and 2 schedules prepared by Project Control department. Instrumentation shall provide input to, review and maintain the schedule during the course of the project. Instrumentation shall take corrective action to meet the level 1 and 2 schedules for their own part of the work, if and when required. 4.0 INSTRUMENT DELIVERABLE OVERVIEW LIST (BY BIDDER) In general, BIDDER to submit the following deliverables for OWNER s REVIEW/approval and incorporates OWNER s comments on the same. Also BIDDER has to prepare a schedule for progressive monitoring of the below mentioned deliverables. 4.1 Instrument project execution plan 4.2 Work schedule level 3 preparation 4.3 Status reports 4.4 Instrument Design Basis for the entire project 4.5 Instrument Sizing calculations including, but not limited to Control valve calculation Safety/relief device calculation D/p type flow measurement calculation, incl Restriction Orifices. D/p type level measurement calculation 4.6 Analyzer sample loop calculation 4.7 Ex i loop calculation 4.8 Voltage drop calculation for all instrument signal and power cables 4.9 Segment calculation for various FF devices 4.10 Power and Heat Dissipation Calculations 4.11 Instrument air consumption 4.12 Instrument index, IO point data base for DCS/ESD and FGS 4.13 Instrument Configuration Index, programming sheets 4.14 Range, alarm, timer and trip setting (RATTS) list 4.15 Requisition (MR and PR) Plant automation system (DCS/ESD) Fire Smoke and Gas detectors Analyzer houses, analyzer systems and local analyzers Page 19 of 22

20 Field instruments (flow/ level/ pressure/ temperature) Tank gauging system, Storage and product handling systems Custody transfer flow metering system Machine monitoring /control / trip system Control valves globe type / butterfly type / contoured ball type Self-regulating valves On/off valves - ball type / butterfly /globe / gate type Instrument cable (single/ multi pair) Junction boxes, Duct, Cable trays, Cable glands Push buttons (Local field mounted and control room aux console) 4.16 Process analyzer, Gas Chromatographs specification Control System functional design specification (DCS/ESD/FGS, Package unit control systems, etc.) 4.18 Instrument systems block diagram and system architectures 4.19 Process control diagrams (PCD s) or Functional Loop schematics with control narratives/explanation for all complex loops; to be given to System vendor for implementation in DCS 4.20 Instrument Interlock/logic diagrams in FBD format, which will be given to System vendor for implementation of detail logic/interlock 4.21 Instrument cause and effect diagrams with control, interlock/logic narratives 4.22 Detailed Logic diagrams in ESD systems (as built in ESD by vendor) 4.23 Sequential diagrams for any process control sequence with narratives 4.24 DCS graphic display information and philosophy 4.25 Instrument installation/erection schedule with bulk MTO of erection hardware 4.26 Instrument field location layout (including all field instruments, JB, Instrument air manifold, analyzers, PA system field call stations, etc.) 4.27 Instrument location layout for field ESD-switches in field and AUX consoles located at control room/aux room 4.28 Analyzer GA/IA drawings, panel wiring drawings and SHS drawings 4.29 Instrument field cabling layout 4.30 Instrument process piping details 4.31 Instrument air piping details 4.32 Instrument steam tracing details 4.33 Instrument installation details with primary/secondary sketches, instrument hook up drawings 4.34 Instrument nameplate schedule 4.35 Instrument local panel/skid layout 4.36 Instrument rooms equipment layout 4.37 Instrument rooms cable layout within control room/cabinet room 4.38 Instrument rooms earthing layout 4.39 Fire, Gas and Smoke mimic layout/graphics 4.40 Fire, Gas and Smoke detection layout along with Manual Call Point location, lay outs 4.41 Fire, Gas and Smoke and gas detection installation details along with Manual call point Page 20 of 22

21 4.42 Instrument cable list 4.43 Connection list instrument field side including JB schedule/local panels 4.44 Connection list instrument field auxiliary room (FAR) side for all DCS/ESD and all third party control system ( i.e. Unit Control Panels) 4.45 Electrical instrumentation interface 4.46 Instrument loop diagrams 4.47 Instrument subcontracts 4.48 SIL/HAZOP reports (with HSE) 5.0 THE DETAILED SUMMARY OF VARIOUS INSTRUMENTAITON DOCUMENTS WHICH REQUIRES OWNER REVIEW/APPROVAL. The table mentioned below summarizes various categories of instrumentation related documents which are to be submitted by BIDDER for OWNER information/ review and comments / approval, etc. However, it may please be noted by BIDDER that format of all deliverables shall be approved by OWNER. List of Instrumentation Documents requiring OWNER's review/approval Ammonia Synthesis Gas Generation (Feedstock conversion to LNG) Project Sr. No. Document Information Review / Comment Approval 1 DCS Documents a Enquiry Specifications b Final Technical Purchase order c System architecture, Inst. Block Diagrams for various 3 rd party control systems architecture and it s interface with DCS d DCS I/O List e System sizing and loading (both in terms of hardware and software load) f Nest Loading & Channel Allocation g All Panels' GA/IA and wiring details h Wiring Diagram and marshalling philosophy i Cabinet room and control room GA/IA j Power consumption and Heat Dissipation Calculation k System FAT/SAT procedure General Engineering Specification / 2 Engg. Design Basis 3 Instrument Index (Format and tag Page 21 of 22

22 naming philosophy for all P&I Dia. tags and other hidden tags are to be approved by OWNER) 4 Instrument items' enquiry specifications Category "A" instruments ( Which includes Control/Shutdown valves, DCS,Analyzers, servers and laptop, RADAR, PA system, all 3rd party a Package unit control systems) Category "B" instruments and related items, i.e. all balance Instrument items, b hardware, software All instrument items' Technical Purchase Order as mentioned above in 5 category "A" and "B". 6 Instrument Plot plan Instrument pneumatic and process 7 Hook Up diagram 8 Loop Sheets for DCS Enq. specifications of Third party / 9 Proprietary instrumentation systems 10 Control valve sizing calculation (format only) 11 Orifice sizing calculation Instrument system grounding/earthing 12 schematics 13 Instrument air header schedule 14 Instrumentation cable schedule 15 Instrumentation cable route 16 Electrical / Instrument Interface list Junction Box schedule & Foundation Field bus segment calculation and 17 topology Rest all documents specified in this section, which are not covered in this 18 table. Page 22 of 22

INSTRUMENTATION DESIGN ENGINEERING: Oil & Gas

INSTRUMENTATION DESIGN ENGINEERING: Oil & Gas SmartBrains Engineers & Technologist Pvt. Ltd. DESIGN ENGINEERING: Oil & Gas Building Nation Through SmartBrains Skill Development & Enterpreneurship Website : www.samrtbrains.in To Apply Please contact

More information

1.0 INTRODUCTION DEFINITIONS DRAWING CONTROL PREPARATION OF SPECIFICATIONS AND DATASHEETS... 5

1.0 INTRODUCTION DEFINITIONS DRAWING CONTROL PREPARATION OF SPECIFICATIONS AND DATASHEETS... 5 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 2.0 DEFINITIONS... 4 3.0 DRAWING CONTROL... 4 4.0 PREPARATION OF SPECIFICATIONS AND DATASHEETS... 5 5.0 GUIDELINES FOR PREPARATION OF DRAWINGS... 5 6.0 CONTENTS

More information

Planning Type EPCC Onshore_TEST v1. TYP MIL Typicals milestones 545.3d. PCS Process 525.0d. TYP MIL.Project Main project Milestones 535.

Planning Type EPCC Onshore_TEST v1. TYP MIL Typicals milestones 545.3d. PCS Process 525.0d. TYP MIL.Project Main project Milestones 535. TYP MIL Typicals milestones 545.3d TYP MIL.Project Main project Milestones 535.0d Basic design frozen 0.0d Feed endorsement 0.0d Start Project 0.0d End of engineering 0.0d TYP MIL.P&S Process and Safety

More information

Process & Instrumentation Diagram * (P&ID) Tutorial

Process & Instrumentation Diagram * (P&ID) Tutorial The Kendall Group 2018 Technology Summit Process & Instrumentation Diagram * (P&ID) Tutorial * a.k.a Piping & Instrumentation Diagram Tech Session T44 Presenter: Jon Puskarich Tutorial Overview Common

More information

Plant & Process Electrical Design Introduction to I&W, promis e & BRCM

Plant & Process Electrical Design Introduction to I&W, promis e & BRCM 2014 Bentley Systems, Incorporated Plant & Process Electrical Design Introduction to I&W, promis e & BRCM Rick Black- Industry Sales Director - Electrical Group EMEA 3 WWW.BENTLEY.COM 2014 Bentley Systems,

More information

Stepping ahead in technology & innovation PIPING INSTITUTE OF TECHNOLOGY & ANALYSIS SOLUTIONS

Stepping ahead in technology & innovation PIPING INSTITUTE OF TECHNOLOGY & ANALYSIS SOLUTIONS Stepping ahead in technology & innovation PIPING INSTITUTE OF TECHNOLOGY & ANALYSIS SOLUTIONS PIPING ENGINEERING & PLANT DESIGN Chapter 1. Introduction of Piping Industry & Role of Piping Engineer 1.1.

More information

aspro DESIGN & ENGINEERING SERVICES

aspro DESIGN & ENGINEERING SERVICES aspro DESIGN & ENGINEERING SERVICES ABOUT US ( & ( ) * +, - ). )/ 0 & 0 ' % - - 1 % 0 & 2 3 ' 4 / % " ' & 0 ) 4 % % & 5 '$) 67789:77; '$) 8 3 ( 0 $ ( & (?, % ) &

More information

AVEVA PDMS. Business Benefits. Accurate and clash-free 3D plant design

AVEVA PDMS.  Business Benefits. Accurate and clash-free 3D plant design AVEVA PDMS Accurate and clash-free 3D plant design With ever increasing global demand for products from process and power plants, AVEVA PDMS enables companies to design, construct and maintain high quality

More information

INDIAN INSTITUTE OF TECHNOLOGY DEPARTMENT OF CIVIL ENGINEERING

INDIAN INSTITUTE OF TECHNOLOGY DEPARTMENT OF CIVIL ENGINEERING INDIAN INSTITUTE OF TECHNOLOGY DEPARTMENT OF CIVIL ENGINEERING Enquiry letter for Engineering Services Consultancy for National Aerosol Facility at IIT Kanpur Sub: Quotation for Scope of the work and technical

More information

DETAILED ENGINEERING OF PROCESS PIPING SYSTEMS

DETAILED ENGINEERING OF PROCESS PIPING SYSTEMS LAST UPDATED 25-10-2017 DETAILED ENGINEERING OF PROCESS PIPING SYSTEMS COURSE DURATION: 5 DAYS REACH US Today for Greater Safety, Quality, Reliability, Productivity, Profitability HRD Approved Class A

More information

AVEVA PDMS 12.0 The 3D plant design application for accurate and clash-free plant design

AVEVA PDMS 12.0 The 3D plant design application for accurate and clash-free plant design AVEVA PDMS 12.0 The 3D plant design application for accurate and clash-free plant design The process and power industries seek to commission high-quality plant earlier, and to bring it on line with minimum

More information

INTRODUCTION TO PROCESS ENGINEERING

INTRODUCTION TO PROCESS ENGINEERING Training Title INTRODUCTION TO PROCESS ENGINEERING Training Duration 5 days Training Venue and Dates Introduction to Process Engineering 5 12 16 May $3,750 Abu Dhabi, UAE In any of the 5 star hotel. The

More information

Fieldbus Foundation India Committee & ISA South India Section

Fieldbus Foundation India Committee & ISA South India Section Fieldbus Foundation India Committee & ISA South India Section Fieldbus Foundation FFIC + ISA Fieldbus Foundation Conference-2010 Date Time Venue :6 th February, 2010 ( Saturday) : from 09:00 am to 05:30

More information

Vendor Document Requirement Titles Titles Count: 471

Vendor Document Requirement Titles Titles Count: 471 Vendor Document Requirement s s Count: 471 Sorted: VDR category / VDR Nr VDR Nr Project documents s Count: 28 005 Project plan / handbook 006 Detailled list of drawings and documents with document numbers

More information

Engineering Standard. Saudi Aramco DeskTop Standards

Engineering Standard. Saudi Aramco DeskTop Standards Engineering Standard 29 February, 2004 Instrumentation Standards Committee Members Al-Awami. L.H., Chairman Tuin, R.R., Vice Chairman Al-Dakhil, T.K. Al-Dhafeeri, F.T. Al-Khalifa, A.H. Al-Madhi, F.A. Alqaffas,

More information

Owner Operator Guide to Emerging Smart Technology

Owner Operator Guide to Emerging Smart Technology Owner Operator Guide to Emerging Smart Technology Fluor s SmartPlant Implementation Initiative 2013 Fluor. All Rights Reserved. By: John Dressel Instrument Technological Revolution Process Measurement

More information

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS ADDENDUM NO. TWO To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS Prepared By: ARCHITECT Bhide & Hall Architects, P.A. 1329-C Kingsley

More information

Chemionix Solutions. Outsourcing. Engineering. Drafting

Chemionix Solutions. Outsourcing. Engineering. Drafting Chemionix Solutions. Outsourcing. Engineering. Drafting Chemionix Your Outsourcing Partner Companies have been outsourcing since time began. It is only recently that business processes can be outsourced

More information

Instrumentation and Control Technician A Guide to Course Content Implementation Beginning with Level 1 April 2013

Instrumentation and Control Technician A Guide to Course Content Implementation Beginning with Level 1 April 2013 Instrumentation and Control Technician A Guide to Course Content Implementation Beginning with Level 1 April 2013 Instrumentation and Control Technicians maintain, diagnose, calibrate and repair measurement

More information

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Record Documents. B. Operation and Maintenance Manuals. C. Warranties and bonds. 1.02 RELATED REQUIREMENTS SECTION 01 78 00 A. Section 01 30 00 - Administrative

More information

Green Energy Engineering, Inc.

Green Energy Engineering, Inc. Green Energy Engineering, Inc. Pay less for Energy and save the Earth 4737 Dolphin Cay Lane South Unit B108 St. Petersburg, FL 33711-4671 Phone (727) 742-7276 www.geeintl.com SAMA Symbols A Process Control

More information

ADDENDUM #2 September 12, 2018

ADDENDUM #2 September 12, 2018 Physical Plant Services Project Management 1000 Rim Drive Phone: (970) 247-7523 Fax: (970) 247-7555 Project No. 2007-130P18 Whalen Gymnasium Expansion and Renovation for Exercise Science Request for Qualifications

More information

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL SECTION 23 00 10 - MECHANICAL SCOPE OF WORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01

More information

OPERATION SKILLS ENHANCEMENT-MEASUREMENT & INSTRUMENT FOR PROCESS VARIABLES

OPERATION SKILLS ENHANCEMENT-MEASUREMENT & INSTRUMENT FOR PROCESS VARIABLES Training Title OPERATION SKILLS ENHANCEMENT-MEASUREMENT & INSTRUMENT FOR PROCESS VARIABLES Training Duration 5 days Training Venue and Dates Operation Skills Enhancement - Measurement & Instrument For

More information

Scope of work of Architect (as per the agreement signed by the Architect)

Scope of work of Architect (as per the agreement signed by the Architect) Annexure I Scope of work of Architect (as per the agreement signed by the Architect) 3. DETAILED SCOPE OF WORK The detailed scope of works for Architect/ Consultant shall comprise of the following for

More information

NATIONAL UNIVERSITY OF SINGAPORE. EE3302/EE3302E Industrial Control Systems. E2: PLC Programming for Sequence Control

NATIONAL UNIVERSITY OF SINGAPORE. EE3302/EE3302E Industrial Control Systems. E2: PLC Programming for Sequence Control NATIONAL UNIVERSITY OF SINGAPORE EE3302/EE3302E Industrial Control Systems E2: 1. Objectives The experiment is designed to provide experience in programming a modern IECcompliant PLC system for sequence

More information

Educational Courses 2016

Educational Courses 2016 Educational Courses 2016 Course 1106 : Gas Regulator Troubleshooting Prerequisite : Course 1100 or 2 years experience This course is intended for technicians responsible for installing, maintaining and

More information

Comparison that shows the differences between a PFD and P&ID :

Comparison that shows the differences between a PFD and P&ID : Comparison that shows the differences between a PFD and P&ID : PFD P&ID Used during construction? No Yes* Shows all process and service piping? No Yes Indicates presence of all controls? No Yes Shows all

More information

SECTION PROJECT COORDINATION VIA BIM

SECTION PROJECT COORDINATION VIA BIM SECTION 01 31 13 PROJECT COORDINATION VIA BIM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

BIM Introduction. Building Information Management Definitions, Applications and general information. Betty Bezos

BIM Introduction. Building Information Management Definitions, Applications and general information. Betty Bezos BIM Introduction Building Information Management Definitions, Applications and general information Betty Bezos betty@bezos.com 9/1/2017 1 9/1/2017 2 Innovations in BIM 3D Design: 3D visualizations allow

More information

Addendum to Description of Services for Building and Planning, Digital Design. The Association of of Consulting Engineers

Addendum to Description of Services for Building and Planning, Digital Design. The Association of of Consulting Engineers Addendum to Description of Services for Building and Planning, 2012 8.4 Digital Design 2016 The Association of of Consulting Engineers FRI and DANSKE ARK Addendum to Description of Services for Building

More information

This specification describes the minimum technical requirements for drawings, as applicable to all disciplines.

This specification describes the minimum technical requirements for drawings, as applicable to all disciplines. SPEC-0800 1/5 1.0 PURPOSE This specification describes the minimum technical requirements for drawings, as applicable to all disciplines. 2.0 VALE DRAWING TYPE DEFINITIONS Engineering Drawings Engineering

More information

Software Services, Section 16748, Add as an attachment to this section Attachment A enclosed with this addendum.

Software Services, Section 16748, Add as an attachment to this section Attachment A enclosed with this addendum. This addendum is hereby made part of the Request for Bid for the above-named project and shall be taken into consideration by all firms preparing a submittal on this project. Acknowledge receipt of this

More information

CURRICULAM VITAE. Personal Information : P. Gunasekaran

CURRICULAM VITAE. Personal Information : P. Gunasekaran CURRICULAM VITAE Objective A challenging position in an organization where my technical and analytical skills would be applied for the betterment of the organization. Personal Information Name : P. Gunasekaran

More information

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed

More information

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible.

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible. PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed

More information

Facility Services Subgroup Preface for Divisions 21` through 28

Facility Services Subgroup Preface for Divisions 21` through 28 Facility Services Subgroup Preface for Divisions 21` through 28 1.1 EXECUTIVE SUMMARY A. This document provides standards for the Consultants and Contractors producing mechanical and electrical design

More information

CM 3310 Process Control, Spring Lecture 17

CM 3310 Process Control, Spring Lecture 17 CM 3310 Process Control, Spring 2017 Instructor: Dr. Tom Co Lecture 17 Charts and Diagrams used in Automation a) Plant/Process Description P & ID (Piping and Instrumentation Diagram) PFD (Process Flow

More information

TABLE OF CONTENT

TABLE OF CONTENT Page : 1 of 34 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 3 REFERENCES

More information

NSP/007/019 - Guidance on Substation Design: EHV Substation Drawing Policy

NSP/007/019 - Guidance on Substation Design: EHV Substation Drawing Policy Version:- 1.1 Date of Issue:- Feb 2015 Page 1 of 13 NSP/007/019 - Guidance on Substation Design: EHV Substation Drawing Policy 1. Purpose The purpose of this document is to outline the Northern Powergrid

More information

TECHNICAL SPECIFICATIONS for 300KV CONSTANT POTENTIAL X RAY EQUIPMENT (for industrial applications) S. No. PARTICULARS BHEL SPECIFICATIONS

TECHNICAL SPECIFICATIONS for 300KV CONSTANT POTENTIAL X RAY EQUIPMENT (for industrial applications) S. No. PARTICULARS BHEL SPECIFICATIONS TECHNICAL SPECIFICATIONS for 300KV CONSTANT POTENTIAL X RAY EQUIPMENT (for industrial applications) BIDDER s OFFER S. No. PARTICULARS BHEL SPECIFICATIONS 1.0 Area of Application The 300kV Constant potential

More information

Design Deliverables. Summary. A. Expectations for Design Deliverables:

Design Deliverables. Summary. A. Expectations for Design Deliverables: Design Deliverables Summary A. Expectations for Design Deliverables: The Design Team is obligated to advance and deliver the project with a professional manner and standard of care that meets the expectations

More information

Canadian Technology Accreditation Criteria (CTAC) INSTRUMENTATION ENGINEERING TECHNOLOGY - TECHNOLOGIST Technology Accreditation Canada (TAC)

Canadian Technology Accreditation Criteria (CTAC) INSTRUMENTATION ENGINEERING TECHNOLOGY - TECHNOLOGIST Technology Accreditation Canada (TAC) Canadian Technology Accreditation Criteria (CTAC) INSTRUMENTATION ENGINEERING TECHNOLOGY - TECHNOLOGIST Technology Accreditation Canada (TAC) Preamble These CTAC are applicable to programs having titles

More information

Autotransformer Condition Monitoring Systems

Autotransformer Condition Monitoring Systems Autotransformer Condition Monitoring Systems The Bidders shall offer separately the following systems of par.1 Integrated Condition Monitoring System and par.2 UHF PD Monitoring System. Two systems following

More information

03/7/12 Issuance UTD Section Page 1 of 5 Electrical General

03/7/12 Issuance UTD Section Page 1 of 5 Electrical General SECTION 26 01 00 ELECTRICAL GENERAL PART 1: GENERAL 1.1 Electrical/Telecommunications Design 1.1.1 This section of the design and construction standard outlines general requirements for electrical and

More information

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA MATERIALS MANAGEMENT / CAPITAL EQUIPMENT

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA MATERIALS MANAGEMENT / CAPITAL EQUIPMENT An ISO 9001 Company Bharat Heavy Electricals Limited (High Pressure Boiler Plant), TAMIL NADU, INDIA MATERIALS MANAGEMENT / CAPITAL EQUIPMENT ENQUIRY NOTICE INVITING TENDER Phone: +91 431 257 7653 Fax

More information

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic GENERAL SITE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS Scope of work narrative Building code review Description of construction Documentation on drawings as List of applicable

More information

Residential Construction Checklist Single and Two Family Construction

Residential Construction Checklist Single and Two Family Construction DATE: _ Building Inspection Submittal Requirements Residential Construction Checklist Single and Two Family Construction Submit a City of Big Spring Permit Application, checklist, and 3 complete hard copy

More information

WELCOME TO CHEMIONIX. Chemionix e-solutions Pvt Ltd Mumbai India

WELCOME TO CHEMIONIX. Chemionix e-solutions Pvt Ltd Mumbai India WELCOME TO CHEMIONIX Mumbai CHEMIONIX: YOUR OUTSOURCING PATNER Companies have been outsourcing since time began. It is only recently that business processes can be outsourced across countries and continents.

More information

FOUNDATION Fieldbus: the Diagnostics Difference Fieldbus Foundation

FOUNDATION Fieldbus: the Diagnostics Difference Fieldbus Foundation FOUNDATION Fieldbus: the Diagnostics Difference There s Diagnostics and There s Diagnostics. The Value of Fieldbus Diagnostics Physical Layer Diagnostics Managing the Diagnostics Storm PAM and IDM Software,

More information

PDMS INFORMATION BOOKLET. Date: 15/08/2013 SEPC

PDMS INFORMATION BOOKLET. Date: 15/08/2013 SEPC PDMS INFORMATION BOOKLET Date: 15/08/2013 OTHER SERVICES ON OFFER BY PIPING STRESS ANALYSIS USING CEASER II EQUIPMENT DESIGN USING PV ELITE ISOMETRIC & P&ID IN AUTOCAD version 2012 MATERIAL INSPECTION

More information

Construction Phase Project Management and Documentation

Construction Phase Project Management and Documentation Construction Phase Project Management and Documentation Bill Mason CDM Smith Outline Design Bidding Construction Start-up & Closeout 2 DESIGN Design Preliminary Engineering Report Plans Specifications

More information

Industrial Pipe Marking

Industrial Pipe Marking Industrial Pipe Marking Pipe and Valve Identification Specialists SPECIFICATIONS ASME (ANSI) Standard A13.1-2007 The ASME (ANSI) Standard for pipe identification is a widely used guideline in determining

More information

Industrial Automation

Industrial Automation Software Development & Education Center Industrial Automation (HMI Drives Instrumentation Networking) Industrial Automation Automation is the use of machines, control systems and information technologies

More information

DOE-HDBK-1016/1-93 ENGINEERING SYMBOLOGY, PRINTS, AND DRAWINGS ABSTRACT

DOE-HDBK-1016/1-93 ENGINEERING SYMBOLOGY, PRINTS, AND DRAWINGS ABSTRACT DOE-HDBK-1016/1-93 ENGINEERING SYMBOLOGY, PRINTS, AND DRAWINGS ABSTRACT The Engineering Symbology, Prints, and Drawings Handbook was developed to assist nuclear facility operating contractors in providing

More information

State College Area School District

State College Area School District State College Area School District The following is a guideline for project design submittals to the Facility Committee of the State College Area School District. During the design process the committee

More information

2.14 Main Cable Type HO7RN-F4G10-15 Metres each Chiller Tank Capacity- 75 Litres Compressor- 3.5 Tons Refrigeration type

2.14 Main Cable Type HO7RN-F4G10-15 Metres each Chiller Tank Capacity- 75 Litres Compressor- 3.5 Tons Refrigeration type PAGE 2 of 6 2.14 Main Cable Type HO7RN-F4G10-15 Metres each 2.15 (a) O/P Voltage-350V(Max.) (b) O/P Current 150A(Max.) 2.16 Chiller Tank Capacity- 75 Litres Compressor- 3.5 Tons Refrigeration type 2.17

More information

Utility and Energy Systems Program

Utility and Energy Systems Program Utility and Energy Systems Program Electrical Technology Associate in Applied Science Degree Electrical Technology, Construction Electrical Utility/Lineworker Electrical Tech. Control/Maintenance Electrical

More information

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 01 33 00 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

ENGINEERING STANDARD FOR PROCESS FLOW DIAGRAM ORIGINAL EDITION JAN. 1996

ENGINEERING STANDARD FOR PROCESS FLOW DIAGRAM ORIGINAL EDITION JAN. 1996 ENGINEERING STANDARD FOR PROCESS FLOW DIAGRAM ORIGINAL EDITION JAN. 1996 This standard specification is reviewed and updated by the relevant technical committee on Dec. 2000(1) and Dec. 2011(2). The approved

More information

SECTION D BIM COORDINATION DRAWINGS - CONTRACTORS

SECTION D BIM COORDINATION DRAWINGS - CONTRACTORS END OF SECTION 01 30 00 SECTION 01 31 21-3D BIM COORDINATION DRAWINGS - CONTRACTORS PART 1 - GENERAL 1.01 RELATED DOCUMENTS Attention is directed to Bidding and Contract Requirements, and to Division 1,

More information

NSP/ 007 / 006 Guidance on Substation Design: Transformer Transport, Delivery and Installation

NSP/ 007 / 006 Guidance on Substation Design: Transformer Transport, Delivery and Installation Version:- 1.0 of Issue:- March 2016 Page 1 of 7 NSP/ 007 / 006 Guidance on Substation Design: Transformer Transport, Delivery and Installation 1. Purpose The purpose of this document is to provide guidance

More information

4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118

4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118 PART 1: GENERAL This section of the design standard outlines general requirements for electrical and telecommunications designs to be performed for the University of Texas at Austin. This standard is intended

More information

[Note to PSC: Include these sections in the Contract Documents, even though some are not included in the U of I Facilities Standards]

[Note to PSC: Include these sections in the Contract Documents, even though some are not included in the U of I Facilities Standards] SECTION 01 78 23 - OPERATION AND MAINTENANCE DATA PART I - GENERAL 1.1 SUMMARY A. Operation and Maintenance Data shall be submitted in appropriately-sized binders, with dividers, and organized by each

More information

NEO TELE-TRONIX PVT. LTD. 6/7 Bijoygarh, Kolkata , Tel : ; Fax :

NEO TELE-TRONIX PVT. LTD. 6/7 Bijoygarh, Kolkata , Tel : ; Fax : NEO TELE-TRONIX PVT. LTD. 6/7 Bijoygarh, Kolkata - 700 032, Tel : 033 2477 3126; Fax : 033 2477 2403 www.ntplindia.com SPECIFICATION NTPL MAKE MICRO-CONTROLLER BASED AUTOMATIC 50KV/10A AC HIGH VOLTAGE

More information

SmartBrains. Process Plant Layout & Piping Design engineering. Institute of Oil and Energy. What You Will Learn...

SmartBrains. Process Plant Layout & Piping Design engineering. Institute of Oil and Energy. What You Will Learn... SmartBrains Institute of Oil and Energy Oil & Energy Process Plant Layout & Piping Design engineering What You Will Learn... Introduction to Industry. Role of a Piping Engineer in various fields of industry.

More information

ENGINEERING SOLUTIONS FOR THE OIL & GAS INDUSTRY

ENGINEERING SOLUTIONS FOR THE OIL & GAS INDUSTRY ENGINEERING SOLUTIONS FOR THE OIL & GAS INDUSTRY BACK GROUND BASIS ENGINEERING IS A PROVIDER OF FACILITIES SOLUTION DESIGN TO THE OIL & GAS UPSTREAM MIDSTREAM MARKETS Founded in 1981, Basis Engineering

More information

UDS OVERVIEW Uniform Drawing System

UDS OVERVIEW Uniform Drawing System UDS OVERVIEW Uniform Drawing System The Construction Specifications Institute 601 Madison Street Alexandria, VA 1994 CSI began development of UDS Organization and presentation of drawing sets Organization

More information

PMA ONLINE TRAINING. Commercial Drawings. One Hour Continuing Education

PMA ONLINE TRAINING. Commercial Drawings. One Hour Continuing Education PMA ONLINE TRAINING Commercial Drawings One Hour Continuing Education PMA training disclaimer The information provided in this document is intended for use as a guideline and is not intended as, nor does

More information

Vietnamese-German Development Cooperation. Module

Vietnamese-German Development Cooperation. Module Promotion Mechatronics of TVET Viet Nam Vietnamese-German Development Cooperation Module Production Programming of of mechanical mechatronic subassemblies systems by with manual microcontroller production

More information

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following: SECTION 01 31 00 PROJECT MANAGEMENT AND COORDINATION PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

COMPLETE REVISION April Process Industry Practices P&ID. PIP PIC001 Piping and Instrumentation Diagram Documentation Criteria

COMPLETE REVISION April Process Industry Practices P&ID. PIP PIC001 Piping and Instrumentation Diagram Documentation Criteria COMPLETE REVISION April 2008 Process Industry Practices P&ID PIP PIC001 Piping and Instrumentation Diagram Documentation Criteria PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize

More information

SECTION PROJECT MANAGEMENT AND COORDINATION

SECTION PROJECT MANAGEMENT AND COORDINATION SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

SECTION MECHANICAL IDENTIFICATION

SECTION MECHANICAL IDENTIFICATION PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions Specification Sections, apply to this Section. B. Related Sections:

More information

LOCOMOTIVE ENGINEERING DEPTT.

LOCOMOTIVE ENGINEERING DEPTT. SHEET 1 OF 9 SUBJECT: FOR DESIGN MANUFACTURING INSTALLATION OF FIXTURES FOR MANUFACTURING OF SHELL ASSEMBLY OF WAG7 LOCOMOTIVE Enclosures: Rev Date Prepared Rev Date Prepared Rev Date Prepared Approved

More information

PDS V8 SE Training Course Highlights

PDS V8 SE Training Course Highlights PDS V8 SE Training Course Highlights Course Number Title Est. No of Days Per Enrollment (US $) On-Site Excl. Travel (US $) TPDS3113 PDS 3D Theory 4 2000 10000 TPDS3100 PDS Project Administration 4 2000

More information

Greenlining and Bluelining of Ergon Energy Substation Drawings

Greenlining and Bluelining of Ergon Energy Substation Drawings Greenlining and Bluelining of Ergon Energy Table of Contents Purpose and Scope... 1 Responsibilities... 1 Definitions, Abbreviations and Acronyms... 1 References... 1 General... 1 Requirements... 3 Testing

More information

Plant Design work flow Using Autodesk Plant Design Suite Ultimate. Carlos Caminos CAD Manager - Venture Engineering & Construction, Inc.

Plant Design work flow Using Autodesk Plant Design Suite Ultimate. Carlos Caminos CAD Manager - Venture Engineering & Construction, Inc. Plant Design work flow Using Autodesk Plant Design Suite Ultimate Carlos Caminos CAD Manager - Venture Engineering & Construction, Inc. Class Summary In this class, you will learn about a proven oil and

More information

DOE FUNDAMENTALS HANDBOOK ENGINEERING SYMBOLOGY, PRINTS, AND DRAWINGS Volume 1 of 2

DOE FUNDAMENTALS HANDBOOK ENGINEERING SYMBOLOGY, PRINTS, AND DRAWINGS Volume 1 of 2 DOE-HDBK-1016/1-93 JANUARY 1993 DOE FUNDAMENTALS HANDBOOK ENGINEERING SYMBOLOGY, PRINTS, AND DRAWINGS Volume 1 of 2 U.S. Department of Energy Washington, D.C. 20585 FSC-6910 DISTRIBUTION STATEMENT A. Approved

More information

SECTION LOW VOLTAGE ACTIVE HARMONIC FILTER SYSTEM NEMA 1 ENCLOSED

SECTION LOW VOLTAGE ACTIVE HARMONIC FILTER SYSTEM NEMA 1 ENCLOSED SECTION 16280 LOW VOLTAGE ACTIVE HARMONIC FILTER SYSTEM NEMA 1 ENCLOSED PART 1 - GENERAL 1.1 SUMMARY This specification defines the requirements for active harmonic filter systems in order to meet IEEE-519-2014

More information

GE018: Interpretation of Engineering Drawings

GE018: Interpretation of Engineering Drawings GE018: Interpretation of Engineering Drawings GE018 Rev.001 CMCT COURSE OUTLINE Page 1 of 5 Training Description: This course, developed out of best practice recommendations and extensive industry experience,

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018 SECTION 01 7839 - PROJECT RECORD DOCUMENTS GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

This specification describes the general requirements for Engineering Services provided to Vale.

This specification describes the general requirements for Engineering Services provided to Vale. 1/9 1.0 PURPOSE This specification describes the general requirements for Engineering Services provided to Vale. 2.0 GENERAL For the purposes of this document, the Engineering Consultant shall be referred

More information

Mechanical Design. Brian Brinson Mechanical Design Manager.

Mechanical Design. Brian Brinson Mechanical Design Manager. Mechanical Design Brian Brinson Mechanical Design Manager brian.brinson@spx.com September 26, 2018 Agenda 1. Design Process 2. Pre-Approval Drawings Bid Drawings Preliminary Drawings 3. Approval Package

More information

CAD PIPING INTRODUCTION Course Syllabus

CAD PIPING INTRODUCTION Course Syllabus 6111 E. Skelly Drive P. O. Box 477200 Tulsa, OK 74147-7200 CAD PIPING INTRODUCTION Course Syllabus Course Number: TTC-0327 OHLAP Credit: No OCAS Code: None Course Length: 60 Hours Career Cluster: Architecture

More information

Process Control Drawings

Process Control Drawings Process Control Drawings Drawings provide a simple visual representation of process designs and automa tion approaches. Since so many people are involved in the design, building, and operation of a process

More information

Master VDR List 9/15/2017. Page 1

Master VDR List 9/15/2017. Page 1 AA01 AA02 Vendor Document Requirement Schedule List of Applicable Procedures CONTROL DOCUMENTS Listing of all and sub-suppliers documentation to be produced for this order. Will show standard and new drawings

More information

Autodesk Revit MEP Learning Essentials Training Course Outline

Autodesk Revit MEP Learning Essentials Training Course Outline Module 00 Revit in a Nutshell Interactive exercise on creating and documenting a basic building Module 01 Introduction to the Principles of BIM Simple Truths Behind the hype The benefits of BIM What will

More information

DESIGN PRACTICE NOTE GENERAL OCS SPECIFICATION UPDATE

DESIGN PRACTICE NOTE GENERAL OCS SPECIFICATION UPDATE Approval Amendment Record Approval Date Version Description 22/03/2017 1 Initial Issue PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 1 of 11 Table of Contents 1. Purpose...

More information

KENYA ELECTRICITY GENERATING COMPANY LTD

KENYA ELECTRICITY GENERATING COMPANY LTD KENYA ELECTRICITY GENERATING COMPANY LTD TENDER No. KGN-HYD-014-2016 TENDER FOR REHABILITATION OF PROTECTION EQUIPMENT FOR MASINGA HYDRO POWER STATION 20/06/2016 ADDENDUM NO. 1 In accordance with the tender

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 013300 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply

More information

Solutions, Standards and Software Kolmetz Handbook of Process Equipment Design PROCESS FLOW SHEET (ENGINEERING DESIGN GUIDELINE)

Solutions, Standards and Software Kolmetz Handbook of Process Equipment Design PROCESS FLOW SHEET (ENGINEERING DESIGN GUIDELINE) Page : 1 of 94 KLM Technology Processing Plant www.klmtechgroup.com, Standards and Software Rev 01 March 2015 Rev 02 KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor

More information

Piping & Equipment Identification

Piping & Equipment Identification Piping & Equipment Identification Part 1 General 1.01 Description of Work A. Work in this section includes: Identification materials, including necessary accessories indicated on Contract Documents and

More information

NCCER Progress Blvd, Alachua, Florida Phone: (888)

NCCER Progress Blvd, Alachua, Florida Phone: (888) NCCER 13614 Progress Blvd, Alachua, Florida 32615 Phone: (888) 622-3720 E-mail: info@nccer.org PIPEFITTING Competencies / Objectives Level One MODULE 08101-06 - ORIENTATION TO THE TRADE 1. Describe the

More information

Engineering and Technical Procurement Services

Engineering and Technical Procurement Services Engineering and Technical Procurement Services Corporate Profile Petroconsult Energy (UK) Ltd is the UK based oil Service Company. Our Engineering Procurement Division is engaged in the provision of engineering

More information

TROUBLESHOOTING A TECHNICIAN S GUIDE 2ND EDITION. William L. Mostia, Jr., P. E. ISA TECHNICIAN SERIES

TROUBLESHOOTING A TECHNICIAN S GUIDE 2ND EDITION. William L. Mostia, Jr., P. E. ISA TECHNICIAN SERIES TROUBLESHOOTING A TECHNICIAN S GUIDE 2ND EDITION William L. Mostia, Jr., P. E. ISA TECHNICIAN SERIES TABLE OF CONTENTS Chapter 1 Learning to Troubleshoot........................ 1 1.1 Experience..............................

More information

Challenges and Lessons Learned for the Design and Implementation of Large PROFIBUS Network

Challenges and Lessons Learned for the Design and Implementation of Large PROFIBUS Network Challenges and Lessons Learned for the Design and Implementation of Large PROFIBUS Network Standards Certification Education & Training Publishing Conferences & Exhibits Speakers: Francisco Alcalá, PE

More information

Employability Enhancement Program for Engineers. Transformation of an engineering degree holder to a real Engineer, who can do more at work.

Employability Enhancement Program for Engineers. Transformation of an engineering degree holder to a real Engineer, who can do more at work. TRACEZ Training Services Oman www.tracezglobal.com Employability Enhancement Program for Engineers Transformation of an engineering degree holder to a real Engineer, who can do more at work. EEP- Introduction

More information