1 Commissioning and Cold Test Operation of the German HLLW Vitrification Plant VEK W. Grünewald, G. Roth, W. Tobie, S. Weisenburger Forschungszentrum Karlsruhe GmbH Hermann-von-Helmholtz-Platz 1, Eggenstein-Leopoldshafen, Germany J. Fleisch, M. Weishaupt Wiederaufarbeitungsanlage Karlsruhe, Rückbau- und Entsorgungs-GmbH Hermann-von-Helmholtz-Platz 1, Eggenstein-Leopoldshafen, Germany ABSTRACT In 2007 the German High Level Liquid Waste (HLLW) vitrification plant VEK (Verglasungseinrichtung Karlsruhe) located at the site of Forschungszentrum Karlsruhe (FZK) will be put into radioactive operation. The purpose of VEK is to immobilize in borosilicate glass approximately Bq of radioactivity contained in about 60 m 3 of HLLW. The process technique used is based on the liquid fed ceramic-lined electric waste glass melter (LFCM) designed for processing of highly noble metals (Ru, Rh, Pd) containing HLLW. By mid of 2006 the melter has been heated up to idling temperature of about 950 C. All major systems of the plant have been tested in 2005/2006. The next steps in the commissioning of the facility before hot operation include the cold test operation of the entire plant while vitrifying about 15 m 3 of HLLW simulant. The paper presents a short description of the VEK vitrification technology, steps of functional testing of process equipment, preparation and performance the cold test operation and an outlook for the forthcoming hot operation of the facility. INTRODUCTION Since the year 2000 the German HLLW vitrification VEK plant has been constructed on the site of Forschungszentrum Karlsruhe (FZK) with the objective to immobilize about 60 m 3 of HLLW. The waste solution with a total activity of Bq is the remnant of a 20 years reprocessing operation performed by the former pilot reprocessing plant WAK (Wiederaufarbeitungsanlage Karlsruhe) which is currently in an advanced stage of dismantling. Final goal of the dismantling activities is its complete conversion to green field. Vitrification of the HLLW constitutes a precondition to continue the dismantling of the waste storage area. VEK is scheduled to start hot operation in 2007 [1]. The HLLW will be vitrified to about kg of borosilicate glass and filled into 125 stainless steel canisters (~400 kg in each). The vitrification technology used by VEK is based on a liquid-fed ceramic melter (LFCM) which converts the waste liquor into glass by a single-stage process. The technology has been developed during the last three decades by the Institut fuer Nukleare Entsorgung (INE) of FZK [2, 3]. It was first time applied by the hot PAMELA plant in Mol/Belgium at the former EUROCHEMIC site [4]. One of the major design features of the waste glass melter is its suitability to process highly noble metalscontaining waste solutions as generated by WAK reprocessing operation. After a five years construction phase VEK has been completed in 2005 by final installation of the process equipment. Functional testing of single components and of single process systems (e. g. HLLW receipt system) as well as successful demonstration of all remote handling operations including cask loading were completed in Since the end of 2006 the VEK plant is ready for the integral test of the overall plant operation. This integral test using an HLLW simulant is considered as final check of all systems and their interaction prior to processing of radioactive material. Preceding to the hot production operation a short

2 pre-test with a radioactively doped waste simulant will be carried out to ensure the safe function of the radiation measurement devices. VITRIFICATION TECHNOLOGY The core technology used in VEK comprehends the following systems: HLLW receipt, glass melting, wet off-gas treatment, dry off-gas treatment, secondary liquid waste (effluents from wet off-gas cleaning) and canister handling. Figure 1 shows a simplified flow diagram of the vitrification process. The receipt area comprises two HLLW receipt tanks (3 m 3 ) each equipped with a double-stage, vacuum-supported airlift systems to transfer the waste solution to the melting area. The melting area consists of the LFCM, a small HLLW feeding vessel (300 l) along with a feeding airlift connected to the melter, and a glass frit feeding system. Control of the glass composition is accomplished by HLLW flow rate measurement based on level variation in the feeding vessel and by adjusting glass batches according the HLLW flow rate. The wet off-gas treatment system includes a dust removal wet scrubber used for precleaning, a subsequent condenser which is followed by a jet scrubber and a NO x absorption column (valve plate type). Final dry cleaning uses four filters, consisting of a high-efficiency mist eliminator (HEME), two HEPA-filters, and in between an Iodine filter. The scrub solutions arising from wet cleaning are recycled to avoid intermediate-level liquid waste to be transferred from the plant. Whereas the scrub solution of the dust scrubber is periodically directly fed back to the feeding vessel, the other liquids are collected and treated in a twostage evaporator system. The resulting concentrate is recycled to one of the receipt tanks and the distillate leaves the plant as low-level waste for cementation. COMMISSIONING OF THE PLANT After termination of installation in 2005, the functional testing of the process equipment was mainly carried out in At the end of 2006, all single components as well as process systems like glass melting or off-gas treatment were commissioned. Table 1 gives an overview about the complete systems of VEK. The systems directly related to the vitrification core process are indicated on the right column of this table. They cover the HLLW receipt system, the vitrification system (including HLLW and glass frit feeding), the melter off-gas and secondary liquid waste treatment systems as well as the can handling system. Other process systems comprise the plant ventilation, the tank ventilation, electric equipment, water supplies, as well as the system for pressurized air, steam and supply of chemicals. Commissioning of the process systems The commissioning of the process systems as indicated in Table 1 comprises the following main steps for each system: - Function tests of its single items (mechanical valves, control valves, air pressure reducer etc.) - Function tests of its components (e.g. for the vitrification system the function tests of the feeding vessel, the glass frit feeding device, the melter, and the mean frequency generator used for inductionheating of the bottom drain) - Start up programs for selected systems (e. g. HLLW receipt system, vitrification system, off-gas system wet/dry) - Final test during cold test operation (while VEK is vitrifying HLLW simulant) Function tests of single items of a system In 2005 function tests of the single items of each of the process systems were performed. As for example for the vitrification system the tests of single items included hand- and pneumatically operated valves,

3 Fig. 1: Simplified diagram of the VEK vitrification process including the HLLW storage facility Table 1: Systems of the VEK facility. Core process systems are marked. System Core process System Core process Vitrification plant Fresh water supply Outdoor facilities Cooling-/Cold water supply Process building Pressurized air system Process systems Steam/Condensate system HAWC receipt system Supply of chemicals Vitrification system Sampling system Can handling system Mobile radiation protection Can buffer store Fixed radiation protection MLLW evaporation Fire protection Tank ventilation system Process control system Melter off-gas treatment wet Plant security equipment Melter off-gas treatment dry Collection of secondary Auxiliary systems liquid waste Plant ventilation Solid waste management Electric equipment Glass can lock and transport

4 magnetic valves, hand- and pneumatically operated control valves, and reducers for pressurized air. All systems of the VEK vitrification plant together amount to nearly 2000 of such single items. Most of them are installed in the valve galleries. Function tests of system components For the function test of each system an approved functional test instruction program has been used. Within these programs the steps of the tests to be carried out are described in detail for each component. It describes the aims of the tests, the preconditions, the test basis, the test means and finally the detailed instructions for performing the test. Function tests of components of the systems belonged to the major activities in They included components of the core systems of the VEK plant (e.g. receipt tanks, feeding vessel, dust scrubber, condenser, jet scrubber, NO X -column), but not yet the melter. The HLLW feeding vessel of the vitrification system is representative of these types of components which had been tested in Its function test can be taken as typical for others. The functional test instruction of the feeding vessel covered the following in detail: - Establishing the volume vs. level curve of the feeding vessel - Testing of the homogenisation equipment of the vessel - Testing of devices for level/density measurements including tests of the limits (e.g. warnings high/low) - Checking of the procedure to empty the vessel - Measurement of feed rate curve of feeding air lift - Testing of temperature measurement devices - Testing of deco-equipment of the vessel (circular tube with holes placed in the upper part of the vessel through which pressurized deco liquid can be sprayed ) - Testing of the sampling device The tests were carried out using water as the liquid and the results were documented in check protocols. The function tests of the HLLW receipt tanks included additionally the test of the two-stage airlift systems (performing batch transfers of HLLW into the feeding vessel), and the test of the water cooling system of each receipt tank. The function tests of components of the off-gas line additionally included the tests of pump-driven circulation of the scrub solutions. One of the most extensive functional tests refers to the waste glass melter carried out in It requires a special program starting with the heat up of the internal melter structure by external heat sources. The melter, which is schematically shown in Figure 2, needs a special function test program because most key functions require the presence of molten glass in the glass tank. As glass does not provide electrical conductivity at ambient temperature, the empty melt tank must be first heated to temperatures of approximately 1000 C. A typical heating up vs. time curve of the melter is shown in Fig. 3. Then a suitable start glass must be filled into the melter. At increasing temperatures above 800 C the start glass becomes gradually electrically conductive and thus suitable for Joule-heating. Heating up is done by 5 SiCheating elements encased in INCONEL 690 protecting tubes. They are placed inside the melter as illustrated in Fig. 2. Heating up is performed slowly in order to avoid thermally induced stresses inside the thick-walled ceramic refractories of the glass tank. When the temperatures of the melter interior have reached about 1000 C, the heating devices are removed from the melter and start glass is batchwise put into the glass tank via the glass frit feeding system, about kg every hour. When the Joule heating can be applied the temperature in the melter is adjusted to about 900 C by power control. Key functions of the melter include, besides glass heating by releasing Joule-heat between the power electrodes, also glass pouring, glass level detection, multiple temperature control and underpressure control in the melter at a limited air-inleakage rate of about Nm 3 /h (referring to standardized conditions). These last three functions are tested during the starting up program of VEK for selected systems.

5 Fig. 2: Heating up of the internal melter structure by an external heat source (five SiC-heating elements encased in INCONEL 690 protection tubes including a thermocouple) Fig. 3: Temperature vs. time curve for heating up of the inner melter structure

6 Starting up program of selected systems Whereas the majority of the process systems require successful functional tests only to be ready for cold test operation, the core process systems need another additional step of commissioning, i.e. a starting up program. Within the starting up program all components of a system are operated simultaneously. Thus the correct operational interactions between components are checked. In particular the correct communication with the central VEK process control system must be demonstrated. The starting up programs have been carried out in The systems which are to pass a starting up program are the HLLW receipt system, the vitrification system, and the melter off-gas cleaning systems (wet/dry). HLLW receipt system The starting up program for the HLLW receipt system includes: - Filling of the receipt tanks with demineralised water - Start up of the water cooling circuit, the agitation air, and the level measurement devices - Testing of overtaking evaporator concentrate from evaporator system (i.e. demineralized water from concentrate tank of the evaporator system) - Sampling tests using sampling system - Finally functional coupling of the receipt system (i.e. the two-stage airlift system) with the vitrification system (i.e. to the feeding vessel and to the glass frit feeding device) Vitrification system The starting up program for the vitrification system includes particularly demonstration of key functions of the melter as described before. Regarding glass heating, the electrical power data are monitored and compared with the design data. For testing the glass pouring the glass pool must be heated to approximately 1150 C under the condition of continuous water feeding and batchwise feeding of start glass into the melter via the water-cooled feed- and glass frit inlet tube. These pouring tests are carried out in connection with phase 3 of the start up program for the melter off-gas system (see below). By feeding of water and start glass into the melter and adjustment of the water flow rate a cold cap of evaporating water and melting start glass is formed across the major surface of the glass pool. It keeps the temperature of the melter plenum and thus the upper melter structure below the desired range of about 500 C. Feeding of start glass into the melter via the glass frit feeding system serves for replacing the glass mass poured for testing. Tests of the glass pouring system uses start glass melt because its viscosity vs. temperature curve has been tailored to be similar to that of the waste glass product and thus suitable for this purpose. The normal glass frit is not suitable because in absence of the waste oxides its viscosity level is too high. Melter off-gas system The starting up program to be carried out for the melter off-gas system wet/dry is divided into three phases. Before, all components of the off-gas system are first prepared to be ready for operation. This includes for the wet off-gas line filling of the components with demineralised water, set up the valves associated with the components to the right position, and filling of the circulation pumps of the jet scrubber and NO X -Absorber with demineralised water. Additionally the dust scrubber entrance has been prepared with a variable shutter to simulate proper pressure conditions along the off-gas line. For the dry off-gas line the preparation includes selection of one of the parallel filter lines to be used, selection of the off-gas blower to be used (1 of 3), set up of valves to the right position and preparation of the electric circuits for the off-gas heaters. Afterwards the three phases of the start up program were carried out. - Phase 1 In phase 1 the off-gas blower is put into operation and the air flow rate through the off-gas system is adjusted to approximately 40 Nm 3 /h. The further steps include to put the off-gas heaters in the dry offgas line as well as the gas cooler before the blower into operation. The scrub solution circuits of the

7 dust scrubber, jet scrubber and NO X -columns are started up followed by adjustment to the parameters gained as preliminary values from former functional test program. Further tests in phase 1 include the switch from the dry filter line to the parallel one. Also switch of the circulation pumps in the wet offgas system to the redundant ones are carried out. - Phase 2 In phase 2 the off-gas system is connected to the melter via the off-gas pipe melter-dust scrubber. In this phase the glass melter is kept at idling conditions, i.e. the glass pool is at about 900 C. Adjustment of the off-gas blower to an underpressure in the melter of 2±1 mbars is done followed by monitoring and documentation of the operational parameters of each component and the pressure drop across the entire off-gas line. Furthermore switching of the circulation pumps for the jet scrubber and NO X - absorber scrub solution circuits and of the dry filter line to the parallel one are performed again under particular monitoring of the melter underpressure. - Phase 3 In phase 3 the off-gas system will be operated under conditions of melter feeding with demineralised water and start glass to allow the key function tests of the melter as outlined above. Under these conditions and heating up the glass pool to 1150 C all tests of phase 2 are repeated under particular observation of the underpressure in the melter. The complete data set will be documented and used as preliminary operation parameters for the later cold test operation. Cold test operation Objective of cold test operation starting early 2007 is to show the correct function of the entire plant and its systems under normal operation conditions. This includes the demonstration of the procedure to produce glass canisters according to the qualification program. The canister lid welding and the entire canister handling will also be demonstrated. Single function tests of the lid welding were already performed before as shown in Figure 4. During cold test operation, 15 m 3 of HLLW simulant will be vitrified and the resulting simulated waste glass poured into 27 stainless steel canisters each having a glass capacity of 400 kg. The chemical composition of the HLLW simulant is given in table 2 compared with the reference composition of the radioactive HLLW. During cold test operation sampling will be applied according to the analytical sampling plan worked out for the hot operation. Figure 4: Demonstration of the canister lid welding in the canister handling cell of VEK The chemical composition of the HLLW simulant will be as similar as possible to that of the radioactive HLLW. Radioactive samples have recently been taken from the HLLW storage tanks and analysed. Only

8 Table 2: Chemical composition of the HLLW-simulant in terms of oxide residue compared to the genuine HLLW solution Oxide residue Radioactive HLLW HLLW-Simulant Element Oxide Element Oxide g/l g/l Wt.% g/l g/l Wt.% SeO2 0,09 0,13 0,11 0,09 0,13 0,11 Rb2O 0,42 0,46 0,38 0,42 0,46 0,38 SrO 1,11 1,32 1,09 1,11 1,32 1,09 Y2O3 0,82 1,04 0,86 0,82 1,04 0,86 ZrO2 4,01 5,41 4,48 4,01 5,42 4,48 MoO3 4,38 6,57 5,44 4,38 6,57 5,44 TcO2 1,11 1,65 1,36 1) 1) RuO2 3,82 5,03 4,16 2) 2) Rh2O3 0,89 1,09 0,90 3) 3) PdO 2,00 2,30 1,91 4) 4) Ag2O 0,20 0,21 0,17 0,20 0,21 0,17 CdO 0,12 0,14 0,11 0,12 0,14 0,11 SnO2 0,09 0,12 0,10 0,09 0,12 0,10 Sb2O3 0,02 0,02 0,02 0,02 0,02 0,02 TeO2 0,80 1,00 0,82 0,80 1,00 0,82 Cs2O 3,57 3,79 3,13 3,57 3,79 3,13 BaO 3,41 3,80 3,15 3,41 3,81 3,15 La2O3 2,32 2,72 2,25 11,88 13,93 11,52 CeO2 4,38 5,38 4,45 4,38 5,38 4,45 Pr2O3 2,04 2,38 1,97 2,04 2,38 1,97 Nd2O3 7,23 8,44 6,98 7,24 8,44 6,98 Pm2O3 0,00 0,01 0,00 0,00 0,01 0,00 Sm2O3 1,58 1,83 1,52 1,58 1,83 1,52 Eu2O3 0,20 0,23 0,19 0,20 0,23 0,19 Gd2O3 0,61 0,70 0,58 0,61 0,70 0,58 UO2 8,21 9,68 8,01 5) 5) Np2O3 0,54 0,60 0,49 6) 6) PuO2 0,25 0,29 0,24 7) 7) Am2O3 0,56 0,61 0,51 8) 8) CmO2 0,02 0,03 0,02 9) 9) Cr2O3 2,03 2,96 2,45 2,03 2,96 2,45 MnO2 0,32 0,50 0,42 4,54 7,18 5,94 Fe2O3 7,63 10,90 9,02 7,63 10,91 9,02 CoO 0,86 1,09 0,90 NiO 1,58 2,02 1,67 3,39 4,32 3,57 CuO 0,03 0,04 0,03 0,03 0,04 0,03 ZnO 0,02 0,03 0,02 0,02 0,03 0,02 PbO 0,01 0,01 0,01 0,01 0,01 0,01 Na2O 24,08 32,45 26,85 24,08 32,46 26,85 MgO 0,59 0,98 0,81 0,59 0,98 0,81 Al2O3 0,08 0,16 0,13 0,08 0,16 0,13 K2O 0,31 0,38 0,31 0,31 0,38 0,31 CaO 0,51 0,71 0,59 0,51 0,71 0,59 F 0,07 0,07 0,06 0,07 0,07 0,06 Cl 0,05 0,05 0,04 P2O5 1,15 2,63 2,17 1,15 2,63 2,17 Sum 120,85 100,0 120,89 100,0 Density g/cm HNO 3 mol/l 2.5 L:\HAWC-Simulat\Kalttestbetrieb VEK\_DaSa(LÜA050801)INE1.xls\Tabelle7(3) 1) TcO 2 replaced by MnO 2 2) RuO 2 replaced by MnO 2 3) Rh2O3 replaced by CoO 4) PdO replaced by NiO 5) UO 2 replaced by La 2 O 3 6) Np 2 O 3 replaced by La 2 O 3 7) PuO 2 replaced by La 2 O 3 8) Am 2 O 3 replaced by La 2 O 3 9) CmO 2 replaced by La 2 O 3

9 the noble metals ruthenium, rhodium and palladium as well as the actinides and technetium will be replaced by other elements. The HLLW simulant will be delivered in batches of several m 3 by tank truck. A first batch of 4.5 m 3 has already been received and stored nearby VEK, waiting for vitrification by VEK in early By special tanks with a capacity of about 1 m 3 the HLLW-simulant will be transferred into the receipt tanks of the HLLW receipt system. The continuous cold test operation will last about 70 days. Operation will take place in a manner similar to the later hot operation. It includes the establishment of a control area and operation of the plant according to the operation manual for each system. Major goals of the cold test operation are: - Demonstration of the overall plant operability - Final adjustment of operational database - Test of sampling and analytical procedures - Finalization of the process/product qualification - Training of operational staff OUTLOOK Subsequently to demonstration of the process systems by cold test operation commissioning of the process systems will be continued within the final step, i.e. the hot test. During the hot test approximately 2 m 3 diluted HLLW will be vitrified consisting of a mix of HLLW simulant as used in the cold test operation, and about 1 Vol.% of genuine HLLW. The hot test operation of the process systems will be of particular importance before the plant will be put into active operation. It serves for final check of the transfer systems from the HLLW storage and of all devices related to radiation measurement. During active operation the plant will vitrify the HLLW stored on site, producing approximately 130 glass canisters (430 mm in diameter, 1335 mm high, appr. 400 kg glass each) for intermediate storage and later final disposal. The operation time is anticipated to be about 1.5 years. REFERENCES [1] G. Roth, S. Weisenburger, J. Fleisch, M. Weishaupt, Process Technique and Safety Features of the German VEK Vitrification Plant Currently under Commissioning, Proceeding of GLOBAL 2005, Tsukuba, Japan, Oct 9-13, 2005, Paper No. 296 [2] S. Weisenburger, Nuclear Waste Vitrification in a Ceramic-lined Electric Glass Melter, IEEE Transaction on Industry Application, Vol. IA-18, No. 1, Jan/Febr. 1982, [3] G. Roth, S. Weisenburger, Verglasungstechnologie des Forschungszentrums Karlsruhe für hochradioaktive flüssige Abfälle, in Radioaktivität und Kernenergie, Forschungszentrum Karlsruhe, (2001), ISBN [4] G. Höhlein, E. Tittmann, S. Weisenburger, H. Wiese, Vitrification of high-level radioactive wasteoperating experience with the PAMELA plant, Waste Management 86, Vol. 2, Tucson AZ (USA), University of Arizona, 1986,

WM 00 Conference, February 27 March 2, 2000, Tucson, AZ EVALUATION OF GLASS MELTER OPERATION IN TOKAI VITRIFICATION FACILITY

WM 00 Conference, February 27 March 2, 2000, Tucson, AZ EVALUATION OF GLASS MELTER OPERATION IN TOKAI VITRIFICATION FACILITY EVALUATION OF GLASS MELTER OPERATION IN TOKAI VITRIFICATION FACILITY Masahiro Yoshioka and Noboru Endo Japan Nuclear Cycle Development Institute Tokai-Works 4-33 Muramatsu, Tokai-mura Ibaraki 319-1194

More information

WM2011 Conference, February 27 March 3, 2011, Phoenix, AZ

WM2011 Conference, February 27 March 3, 2011, Phoenix, AZ Installation of Bubblers in the Savannah River Site Defense Waste Processing Facility Melter - 11136 Michael E. Smith, Daniel C. Iverson Defense Waste Processing Facility Savannah River Remediation LLC

More information

WM 04 Conference, February 29-March 4, 2004, Tucson, AZ

WM 04 Conference, February 29-March 4, 2004, Tucson, AZ MOSAIK 20 YEARS OF EXPERIENCE WITH A CASK SYSTEM FOR TRANSPORTATION, CONDITIONING AND STORAGE OF RADIOACTIVE WASTE G. Gestermann GNS Gesellschaft für Nuklear-Service mbh Hollestraße 7 A, Germany 45127

More information

A paper proposed for publication in Nuclear Technology.

A paper proposed for publication in Nuclear Technology. .... DF -MS-79-103 (Re; :4/80) VITRIFICATION OF SRP ifasteby A SLURRY-FED CERAMIC MELTER by G. G. Wicks E. I. du Pent de Nemours G Co. Savannah River Laboratory Aiken, South Carolina 29808 A paper proposed

More information

WM2012 Conference, February 26 March 1, 2012, Phoenix, Arizona, USA

WM2012 Conference, February 26 March 1, 2012, Phoenix, Arizona, USA Operation of Bubblers in the Savannah River Site Defense Waste Processing Facility Melter - 12166 Brandon C. Hodges, Defense Waste Processing Facility, Savannah River Remediation LLC, Savanah River Site,

More information

WM 07 Conference, February 25 March 1, 2007, Tucson, AZ

WM 07 Conference, February 25 March 1, 2007, Tucson, AZ Generalization of Experience in Radioactive Waste Melting with Application of Induction Melting Technology, Gained at Moscow Sia "Radon" During The Period from 1992 to 2006 ABSTRACT. S.A. Dmitriev, F.A.

More information

dismantling > Cutting techniques for decommissioning nuclear facilities and conditioning of nuclear waste Innovation Our solutions for

dismantling > Cutting techniques for decommissioning nuclear facilities and conditioning of nuclear waste Innovation Our solutions for Cutting techniques for decommissioning nuclear facilities and conditioning of nuclear waste Innovation Nuclear facilities consist of a variety of different components that are made of different materials

More information

Eccentric vibrating mill

Eccentric vibrating mill Eccentric vibrating mill Mechanical-chemical activation and finest reduction of all brittle materials Application Vibrating mills are suitable for the reduction of all brittle material. Depending on the

More information

OPERATION SKILLS ENHANCEMENT-MEASUREMENT & INSTRUMENT FOR PROCESS VARIABLES

OPERATION SKILLS ENHANCEMENT-MEASUREMENT & INSTRUMENT FOR PROCESS VARIABLES Training Title OPERATION SKILLS ENHANCEMENT-MEASUREMENT & INSTRUMENT FOR PROCESS VARIABLES Training Duration 5 days Training Venue and Dates Operation Skills Enhancement - Measurement & Instrument For

More information

IGR Institut für Glas- und Rohstofftechnologie. Presentation. by Dirk Diederich, IGR. on in Brussels FERVER

IGR Institut für Glas- und Rohstofftechnologie. Presentation. by Dirk Diederich, IGR. on in Brussels FERVER Presentation by Dirk Diederich, IGR on 26.11.2010 in Brussels FERVER IGR - Institut für Glas- und Rohstofftechnologie GmbH Rudolf-Wissell-Str. 28 a, 37079 Göttingen Tel.: 0551 / 2052804; EMail: d.diederich@igrgmbh.de

More information

Development of Remote Hanford Connector Gasket Replacement Tooling for the Savannah River Site s Defense Waste Processing Facility

Development of Remote Hanford Connector Gasket Replacement Tooling for the Savannah River Site s Defense Waste Processing Facility Development of Remote Hanford Connector Gasket Replacement Tooling for the Savannah River Site s Defense Waste Processing Facility - 9457 B. Metzger, J. Gee Defense Waste Processing Facility Savannah River

More information

RF STATUS OF SUPERCONDUCTING MODULE DEVELOPMENT SUITABLE FOR CW OPERATION: ELBE CRYOSTATS

RF STATUS OF SUPERCONDUCTING MODULE DEVELOPMENT SUITABLE FOR CW OPERATION: ELBE CRYOSTATS RF STATUS OF SUPERCONDUCTING MODULE DEVELOPMENT SUITABLE FOR CW OPERATION: ELBE CRYOSTATS J. Teichert, A. Büchner, H. Büttig, F. Gabriel, P. Michel, K. Möller, U. Lehnert, Ch. Schneider, J. Stephan, A.

More information

Advanced Machining Processes Professor Vijay K. Jain Department of Mechanical Engineering Indian Institute of Technology, Kanpur Lecture 06

Advanced Machining Processes Professor Vijay K. Jain Department of Mechanical Engineering Indian Institute of Technology, Kanpur Lecture 06 Advanced Machining Processes Professor Vijay K. Jain Department of Mechanical Engineering Indian Institute of Technology, Kanpur Lecture 06 (Refer Slide Time: 00:17) Today we are going to discuss about

More information

CUPRON NEXT TECHNICAL DATA SHEET

CUPRON NEXT TECHNICAL DATA SHEET Product description New hard matrix antifouling paint free of copper and organostannic compounds. It provides good seasonal protection for boats that work even in particularly hot and aggressive waters.

More information

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL SECTION 23 00 10 - MECHANICAL SCOPE OF WORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01

More information

THE CRYOGENIC SYSTEM OF TESLA

THE CRYOGENIC SYSTEM OF TESLA THE CRYOGENIC SYSTEM OF TESLA S. Wolff, DESY, Notkestr. 85, 22607 Hamburg, Germany for the TESLA collaboration Abstract TESLA, a 33 km long 500 GeV centre-of-mass energy superconducting linear collider

More information

TABLE OF CONTENTS. SI No Contents Page No.

TABLE OF CONTENTS. SI No Contents Page No. TABLE OF CONTENTS SI No Contents Page No. 1 Basic Textile wet Processing Terms 1 2 Sequence of operations in Wet processing of Knitted fabric 2 3 Brief Note on soft flow dyeing 3 4 Details of soft flow

More information

NON-TRADITIONAL MACHINING PROCESSES ULTRASONIC, ELECTRO-DISCHARGE MACHINING (EDM), ELECTRO-CHEMICAL MACHINING (ECM)

NON-TRADITIONAL MACHINING PROCESSES ULTRASONIC, ELECTRO-DISCHARGE MACHINING (EDM), ELECTRO-CHEMICAL MACHINING (ECM) NON-TRADITIONAL MACHINING PROCESSES ULTRASONIC, ELECTRO-DISCHARGE MACHINING (EDM), ELECTRO-CHEMICAL MACHINING (ECM) A machining process is called non-traditional if its material removal mechanism is basically

More information

OPTIFLUX 5000 Technical Datasheet

OPTIFLUX 5000 Technical Datasheet OPTIFLUX 5000 Technical Datasheet Electromagnetic flowmeter in flanged version Exceptional long-term stability and accuracy For highly aggressive and abrasive fluids Fully vacuum-resistant with high-tech

More information

Development of Explosion-proof Autonomous Plant Operation Robot for Petrochemical Plants

Development of Explosion-proof Autonomous Plant Operation Robot for Petrochemical Plants 1 Development of Explosion-proof Autonomous Plant Operation Robot for Petrochemical Plants KOJI SHUKUTANI *1 KEN ONISHI *2 NORIKO ONISHI *1 HIROYOSHI OKAZAKI *3 HIROYOSHI KOJIMA *3 SYUHEI KOBORI *3 For

More information

OPTIFLUX 1000 Technical Datasheet

OPTIFLUX 1000 Technical Datasheet OPTIFLUX 1000 Technical Datasheet Electromagnetic flow sensor in sandwich design Lightweight and compact Excellent price performance ratio Quick and easy to install The documentation is only complete when

More information

TABLE OF CONTENTS. SI No Contents Page No.

TABLE OF CONTENTS. SI No Contents Page No. TABLE OF CONTENTS SI No Contents Page No. 1 Basic Textile Wet Processing Terms 1 2 Sequence of operations in Wet processing 2 3 Brief Note on jigger machine 3 4 Details of jigger machine 4 5 Operating

More information

2. All work and materials shall be in full accordance with Local and State ordinance and with any prevailing rules and regulations.

2. All work and materials shall be in full accordance with Local and State ordinance and with any prevailing rules and regulations. General Conditions: 1. Deliver all food service equipment as specified herein, including that which is reasonably inferred, with all related items necessary to complete work shown on contract drawings

More information

Shattered: Forensic Glass Analysis

Shattered: Forensic Glass Analysis Shattered: Forensic Glass Analysis What is Glass? An inorganic product of fusion which has cooled to a rigid condition without crystallizing Uniform amorphous solid No specific m.p. Softens over a temperature

More information

DUOLINE. Rotary vane pumps for all applications in the low and medium vacuum range

DUOLINE. Rotary vane pumps for all applications in the low and medium vacuum range DUOLINE Rotary vane pumps for all applications in the low and medium vacuum range DUOLINE Rotary vane pumps for all applications in the low and medium vacuum range The two-stage high-performance rotary

More information

Basic Principles and Operation of Transformer

Basic Principles and Operation of Transformer Basic Principles and Operation of Transformer CONSTRUCTIONAL ASPECTS Cores In order to enhance core s magnetic properties, it is constructed from an iron and silicon mixture (alloy). The magnetic core

More information

Comparison that shows the differences between a PFD and P&ID :

Comparison that shows the differences between a PFD and P&ID : Comparison that shows the differences between a PFD and P&ID : PFD P&ID Used during construction? No Yes* Shows all process and service piping? No Yes Indicates presence of all controls? No Yes Shows all

More information

years of experience in induction technology celebrating Customized Induction Heating Systems Patented Technology

years of experience in induction technology celebrating Customized Induction Heating Systems Patented Technology Norax Canada celebrating years of experience in induction technology Customized Induction Heating Systems Patented Technology Designed for Best Performance Enhanced Efficiency www.noraxinduction.com Norax

More information

Over-voltage Trigger Device for Marx Generators

Over-voltage Trigger Device for Marx Generators Journal of the Korean Physical Society, Vol. 59, No. 6, December 2011, pp. 3602 3607 Over-voltage Trigger Device for Marx Generators M. Sack, R. Stängle and G. Müller Karlsruhe Institute of Technology

More information

Cryogenics for Large Accelerators

Cryogenics for Large Accelerators Cryogenics for Large Accelerators Dr. Sergiy Putselyk Deutsches Elektronen-Synchrotron (DESY) MKS Division Notkestrasse 85 22607 Hamburg (Germany) Phone: +49 40 89983492 Fax: +49 40 89982858 E-Mail: Sergiy.Putselyk@desy.de

More information

TruLaser Tube: Optimal tube. and. profile cutting. Machine Tools / Power Tools Laser Technology / Electronics Medical Technology

TruLaser Tube: Optimal tube. and. profile cutting. Machine Tools / Power Tools Laser Technology / Electronics Medical Technology TruLaser Tube: Optimal tube and profile cutting Machine Tools / Power Tools Laser Technology / Electronics Medical Technology Giving you the edge in laser tube processing. The TRUMPF Group ranks among

More information

WM2016 Conference, March 6 10, 2016, Phoenix, Arizona, USA. Dewatering Innovations Bill Boggia, ORNL-UCOR/ATL International

WM2016 Conference, March 6 10, 2016, Phoenix, Arizona, USA. Dewatering Innovations Bill Boggia, ORNL-UCOR/ATL International Dewatering Innovations 16381 Bill Boggia, ORNL-UCOR/ATL International ABSTRACT The Liquid and Gaseous Waste Operations (LGWO) project, located at the Oak Ridge National Laboratory, handles wastewater from

More information

RESULTS OF FULL SCALE TESTING OF THE REMOTE DISMANTLING IN GREIFSWALD NPP. Ralf Borchardt Energiewerke Nord GmbH

RESULTS OF FULL SCALE TESTING OF THE REMOTE DISMANTLING IN GREIFSWALD NPP. Ralf Borchardt Energiewerke Nord GmbH RESULTS OF FULL SCALE TESTING OF THE REMOTE DISMANTLING IN GREIFSWALD NPP Ralf Borchardt Energiewerke Nord GmbH Verify suitability for operation Prooftesting of technology Performance data of each cutting

More information

Kittec -CBG Gas. U s e r s M a n u a l

Kittec -CBG Gas. U s e r s M a n u a l Kittec -CBG Gas U s e r s M a n u a l Contents Page Table of contents 1 About this Users Manual 2 Use of the kiln 2 Safety 2 Safety tips 3 Installation and Operation 4 Storage and transport 4 Installation

More information

Tests of the Spoke Cavity RF Source and Cryomodules in Uppsala

Tests of the Spoke Cavity RF Source and Cryomodules in Uppsala FREIA Report 2012/03 October 2012 DEPARTMENT OF PHYSICS AND ASTRONOMY UPPSALA UNIVERSITY Tests of the Spoke Cavity RF Source and Cryomodules in Uppsala ESS TDR Contribution R. Ruber, T. Ekelöf, R.A. Yogi.

More information

OPTIFLUX 5000 Technical Datasheet

OPTIFLUX 5000 Technical Datasheet OPTIFLUX 5000 Technical Datasheet Electromagnetic flowmeter in flanged version Exceptional long-term stability and accuracy For highly aggressive and abrasive fluids Fully vacuum-resistant with high-tech

More information

Attention is drawn to the following places, which may be of interest for search:

Attention is drawn to the following places, which may be of interest for search: CPC - B22D - 2017.08 B22D CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES (shaping of plastics or substances in a plastic state B29C; metallurgical processing, selection

More information

Particulate Control O&M Training. APC/PCUG Conference July 12-16, 2009 The Woodlands, TX

Particulate Control O&M Training. APC/PCUG Conference July 12-16, 2009 The Woodlands, TX Particulate Control O&M Training APC/PCUG Conference July 12-16, 2009 The Woodlands, TX WPCA Particulate Training Seminar July 11, 2009 ESP Power Supply Choices Slide No 1 Precipitator Power Supplies Conventional

More information

All rights reserved by Wuxi Xinda Dyeing Machine Factroy

All rights reserved by Wuxi Xinda Dyeing Machine Factroy 1 All rights reserved by Wuxi Xinda Dyeing Machine Factroy SUNTEX XDWG Airflow Dyeing Machine This is our SUNTEX special design have got national patent production. We are OEM manufacture. Machine Brief

More information

Assessment of the Recyclability of Printed Paper Products

Assessment of the Recyclability of Printed Paper Products January 2013 11 Pages Assessment of the Recyclability of Printed Paper Products Testing of the fragmentation behaviour of adhesive Introduction A good recyclability of printed products is a crucial feature

More information

Sight glass window Sight flow indicator

Sight glass window Sight flow indicator SIGHT GLASS Sight glass components allow operators to safely observe processes inside tanks, pipes, reactors and vessels. When it comes to selecting a sight glass, a wide variety of factors should be considered

More information

Welding Engineering Dr. D. K. Dwivedi Department of Mechanical & Industrial Engineering Indian Institute of Technology, Roorkee

Welding Engineering Dr. D. K. Dwivedi Department of Mechanical & Industrial Engineering Indian Institute of Technology, Roorkee Welding Engineering Dr. D. K. Dwivedi Department of Mechanical & Industrial Engineering Indian Institute of Technology, Roorkee Module - 4 Arc Welding Processes Lecture - 8 Brazing, Soldering & Braze Welding

More information

Expansion vessels for solar systems

Expansion vessels for solar systems Expansion vessels for solar systems 14 solar plus The Zilmet group Zilmet, an interationally operating company, has with 45 years experience grown to be the biggest European producer of expansion vessels.

More information

TYPE SE and TSE, SILICON CARBIDE SPIRAL HEATING ELEMENTS

TYPE SE and TSE, SILICON CARBIDE SPIRAL HEATING ELEMENTS TYPE SE and TSE, SILICON CARBIDE SPIRAL HEATING ELEMENTS GENERAL DESCRIPTION The spiral Starbars are made of special high-density reaction-bonded silicon carbide. A spiral slot in the hot zone reduces

More information

+Oak Ridge K-25Site Oak Ridge, Tennessee Abstract

+Oak Ridge K-25Site Oak Ridge, Tennessee Abstract '7he submined manuscript has been authond by a contractor of the US. Govermnmt under contract No. DEAC05-84OR21400. Accordingly, the US. Govermnent retains a nonexclusive, royalty-fire l i a n s c to publish

More information

Injection moulding BUDAPEST UNIVERSITY OF TECHNOLOGY AND ECONOMICS FACULTY OF MECHANICAL ENGINEERING DEPARTMENT OF POLYMER ENGINEERING

Injection moulding BUDAPEST UNIVERSITY OF TECHNOLOGY AND ECONOMICS FACULTY OF MECHANICAL ENGINEERING DEPARTMENT OF POLYMER ENGINEERING B3 BUDAPEST UNIVERSITY OF TECHNOLOGY AND ECONOMICS FACULTY OF MECHANICAL ENGINEERING DEPARTMENT OF POLYMER ENGINEERING Injection moulding INJECTION MOULDING OF THERMOPLASTICS WWW.PT.BME.HU LOCATION OF

More information

Problem-free economical and safe use of bulk materials

Problem-free economical and safe use of bulk materials Screw Conveyor Problem-free economical and safe use of bulk materials SAXLUND screw conveyors have long been employed in demanding environments for problem-free, economical and secure transport of a wide

More information

WATERFLUX 3000 Quick Start

WATERFLUX 3000 Quick Start WATERFLUX 3000 Quick Start Electromagnetic flow sensor The documentation is only complete when used in combination with the relevant documentation for the signal converter. KROHNE CONTENTS WATERFLUX 3000

More information

Types of Glass by Composition

Types of Glass by Composition What is Glass? An amorphous fusion of mineral compounds that produces a transparent solid when cooled. A 3D network of atoms which lacks the repeated, orderly arrangement typical of crystalline materials.

More information

Liquid ring vacuum pumps in compact design

Liquid ring vacuum pumps in compact design Liquid ring vacuum pumps in compact design SIHI extruvac LEME 13, LEME 155 Pressure range: Suction volume flow: 1 to 113 mbar 3 to 17 m³/h CONSTRUCTION TYPE SIHI liquid ring vacuum pumps are displacement

More information

Recent Process and Equipment Improvements to Increase High Level Waste Throughput at The Defense Waste Processing Facility (DWPF) 8366

Recent Process and Equipment Improvements to Increase High Level Waste Throughput at The Defense Waste Processing Facility (DWPF) 8366 ABSTRACT Recent Process and Equipment Improvements to Increase High Level Waste Throughput at The Defense Waste Processing Facility (DWPF) 8366 Richard J. O Driscoll, Allan B. Barnes, James R. Coleman,

More information

Product data sheet Palas Fidas 200 E

Product data sheet Palas Fidas 200 E Product data sheet Palas Fidas 200 E Applications Regulatory environmental monitoring in measuring networks Ambient air measurement campaigns Long-term studies Emission source classification Distribution

More information

Ultrasonic Cleaning: How to select the best option

Ultrasonic Cleaning: How to select the best option Ultrasonic Cleaning: How to select the best option Marais 36 Phone/Fax: +41- (0)-32-9314045 2400, Le Locle email: mpi@mpi-ultrasonics.com Switzerland http://www.mpi-ultrasonics.com mpi@bluewin.ch http://mastersonic.com

More information

Module 4 Design for Assembly IIT BOMBAY

Module 4 Design for Assembly IIT BOMBAY Module 4 Design for Assembly Lecture 8 Case Studies - IV Instructional objectives The objective of this lecture is to exhibit how real components are designed in industry following some of the principles

More information

Emil Barta Lampart Vegyipari Gépgyár Zrt, Budapest, Hungary. XXI International Enamellers Congress May 2008 Shanghai - China

Emil Barta Lampart Vegyipari Gépgyár Zrt, Budapest, Hungary. XXI International Enamellers Congress May 2008 Shanghai - China LAMPART ENAMELLING TECHNOLOGY IN CHINA Emil Barta Lampart Vegyipari Gépgyár Zrt, Budapest, Hungary XXI International Enamellers Congress 18-22 May 2008 Shanghai - China LAMPART ENAMELLING TECHNOLOGY IN

More information

Think About Control Fundamentals Training. Terminology Control. Eko Harsono Control Fundamental

Think About Control Fundamentals Training. Terminology Control. Eko Harsono Control Fundamental Think About Control Fundamentals Training Terminology Control Eko Harsono eko.harsononus@gmail.com; 1 Contents Topics: Slide No: Process Control Terminology 3-10 Control Principles 11-18 Basic Control

More information

Development of A Novel Powder Cluster Wick Structure for LTCC Embedded Heat Pipes

Development of A Novel Powder Cluster Wick Structure for LTCC Embedded Heat Pipes Development of A Novel Powder Cluster Wick Structure for LTCC Embedded Heat Pipes Guangnan Deng, W. Kinzy Jones Hybrid lab, Department of Mechanical Engineering Florida International University, University

More information

WATER MADE EASY MARINE ENERGY MUNICIPAL INDUSTRIAL

WATER MADE EASY MARINE ENERGY MUNICIPAL INDUSTRIAL MicroChem Water Analysis System The MicroChem is a versatile multi-parameter instrument capable of being configured as a transmitter or PID controller. Specifically designed for drinking and wastewater

More information

Excess Heat Production During D 2 Diffusion Through Palladium

Excess Heat Production During D 2 Diffusion Through Palladium Excess Heat Production During D 2 Diffusion Through Palladium Attempts to replicate Arata s experiments : Work in progress Jean-Paul Biberian Nicolas Armanet Faculté des Sciences de Luminy 163 Avenue de

More information

New Multi-Technology In-Line Inspection Tool For The Quantitative Wall Thickness Measurement Of Gas Pipelines

New Multi-Technology In-Line Inspection Tool For The Quantitative Wall Thickness Measurement Of Gas Pipelines New Multi-Technology In-Line Inspection Tool For The Quantitative Wall Thickness Measurement Of Gas Pipelines A. Barbian 1, M. Beller 1, F. Niese 2, N. Thielager 1, H. Willems 1 1 NDT Systems & Services

More information

Coating of the fibre during the drawing process C03C 25/10 Optical fibres per se with polarisation maintaining properties in light guides

Coating of the fibre during the drawing process C03C 25/10 Optical fibres per se with polarisation maintaining properties in light guides CPC - C03B - 2017.08 C03B MANUFACTURE, SHAPING, OR SUPPLEMENTARY PROCESSES Relationships with other classification places C03B concerns all aspects of glass manufacture processes, apparatus and C03C relates

More information

EPS Foam Plant. Paul Russell

EPS Foam Plant. Paul Russell EPS Foam Plant Paul ussell EPS Processing Pre-expansion The Pre-expansion phase of manufacturing is simply the swelling of the small bead to almost 50 times its original size through heating and rapid

More information

Technical data sheet. Encapsulator B-390 / B-395 Pro

Technical data sheet. Encapsulator B-390 / B-395 Pro Encapsulator B-390 / B-395 Pro Technical data sheet Production of functionalized beads and core-shell capsules with narrow size distribution are the key benefits of this system. BUCHI offers the Encapsulator

More information

Waterless dyeing process for DryDye fabrics

Waterless dyeing process for DryDye fabrics Waterless dyeing process for DryDye fabrics This process is used in producing functional knitted fabrics with the brand name DryDye fabrics, this method uses an exclusive waterless dyeing process that

More information

AATC PRESENTATION INVESTMENT CASTING PROCESS (2 OF 3 PRESENTATIONS REVISION 2014_0429) AATC, Inc W. Catalina Dr. Phoenix, AZ USA

AATC PRESENTATION INVESTMENT CASTING PROCESS (2 OF 3 PRESENTATIONS REVISION 2014_0429) AATC, Inc W. Catalina Dr. Phoenix, AZ USA AATC PRESENTATION INVESTMENT CASTING PROCESS (2 OF 3 PRESENTATIONS REVISION 2014_0429) 1 Wax Injection & Pattern Assembly Wax Injection: A wax pattern is made by injecting liquid wax into an aluminum mold.

More information

Injection moulding BUDAPEST UNIVERSITY OF TECHNOLOGY AND ECONOMICS FACULTY OF MECHANICAL ENGINEERING DEPARTMENT OF POLYMER ENGINEERING

Injection moulding BUDAPEST UNIVERSITY OF TECHNOLOGY AND ECONOMICS FACULTY OF MECHANICAL ENGINEERING DEPARTMENT OF POLYMER ENGINEERING B3 BUDAPEST UNIVERSITY OF TECHNOLOGY AND ECONOMICS FACULTY OF MECHANICAL ENGINEERING DEPARTMENT OF POLYMER ENGINEERING Injection moulding INJECTION MOULDING OF THERMOPLASTICS WWW.PT.BME.HU LOCATION OF

More information

SECTION MECHANICAL IDENTIFICATION

SECTION MECHANICAL IDENTIFICATION Buebtel/Perlcins Community Learning Center GPD - 2001271.15 SECTION 15075 MECHANICAL IDENTIFICATION PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General

More information

IMPORTANCE OF INSULATION RESISTANCE

IMPORTANCE OF INSULATION RESISTANCE IMPORTANCE OF INSULATION RESISTANCE What is Good Insulation? Every electric wire in your plant whether it s in a motor, generator, cable, switch, transformer, etc., is carefully covered with some form

More information

The Discussion of this exercise covers the following points: Introduction How a tuning fork works Industrial applications. How a tuning fork works

The Discussion of this exercise covers the following points: Introduction How a tuning fork works Industrial applications. How a tuning fork works Exercise 3 Vibrating Level Switch EXERCISE OBJECTIVE Learn the working principle of vibrating level switches and learn how to use the vibrating level switch, Model 46933. DISCUSSION OUTLINE The Discussion

More information

The Production of Natural Waxes Based Candles on Halfautomatic, Automatic and Continuously Working Molding Machines

The Production of Natural Waxes Based Candles on Halfautomatic, Automatic and Continuously Working Molding Machines Spezial-Maschinenfabrik Hans Kürschner GmbH & Co. KG Postfach 22 20 D-41309 Nettetal (Kaldenkirchen) Federal Republic of Germany Telefon: (+ 49) (0)2157 1215-0 Fax: (+ 49) (0)2157 1215-99 e-mail: service@kuerschner.de

More information

The end-to-end joining of coils of strip has grown in

The end-to-end joining of coils of strip has grown in Coil-to-coil joining with laser welding The combination of steel strip edge preparation via laser cutting, accurate strip positioning systems, and laser welding in a single unit provides the optimum coil-to-coil

More information

WATERFLUX 3000 Quick Start

WATERFLUX 3000 Quick Start WATERFLUX 3000 Quick Start Electromagnetic flowmeter The documentation is only complete when used in combination with the relevant documentation for the signal converter. KROHNE CONTENTS WATERFLUX 3000

More information

SAFETY DATA SHEET VILLAS BITUMEN

SAFETY DATA SHEET VILLAS BITUMEN Villas Austria GmbH Industriestraße 18 A9586 Fürnitz Tel.: +43 / 4257 / 22410 Fax: +43 / 4257 / 22412390 office@villas.at www.villas.at SAFETY DATA SHEET VILLAS BITUMEN Edition: 25.08.2011 Villas Bitumen

More information

COOLANT WASTE MINIMIZATION USING A COALESCING PLATE SEPARATOR

COOLANT WASTE MINIMIZATION USING A COALESCING PLATE SEPARATOR COOLANT WASTE MINIMIZATION USING A COALESCING PLATE SEPARATOR Kirby S. Mohr, P.E. Mohr Separations Research, Inc. 1278 FM 407 Suite 109 Lewisville, TX 75077 Phone: 918-299-9290 Cell: 918-269-8710 Dennis

More information

BATCHFLUX 5500 C Technical Datasheet

BATCHFLUX 5500 C Technical Datasheet BATCHFLUX 5500 C Technical Datasheet Electromagnetic flowmeter for volumetric filling machines High-stability ceramic measuring tube, therefore extremely long-term stability Optimum hygienic design Only

More information

The Pörner Bitumen Packing System Invented and patented by Pörner

The Pörner Bitumen Packing System Invented and patented by Pörner The Pörner Bitumen Packing System Invented and patented by Pörner Vienna, January 2014 Pörner Ingenieurgesellschaft mbh WORLD BITUMEN DEMAND Bitumen demand is expected to increase substantially by 2015-2020

More information

Operating Manual * * Differential pressure transmitter. Table of Contents. 1 Safety guidelines. 1.1 General Information

Operating Manual * * Differential pressure transmitter. Table of Contents. 1 Safety guidelines. 1.1 General Information *09005137* BA_EN_DE50 Rev.A 11/12 *09005137* d e v e l o p i n g s o l u t i o n s DE50 Operating Manual Differential pressure transmitter Table of Contents 1 Safety guidelines 2 Application purpose 3

More information

Profile Wrapping. TKH-Technical Briefing Note 6. Industrieverband Klebstoffe e.v. Version: March 2009

Profile Wrapping. TKH-Technical Briefing Note 6. Industrieverband Klebstoffe e.v. Version: March 2009 TKH-Technical Briefing Note 6 Profile Wrapping Version: March 2009 Published by Technische Kommission Holzklebstoffe (TKH) (Technical Committee on Wood Adhesives) of Industrieverband Klebstoffe e.v. (German

More information

House Wall Paint: two types of paints and a manufacturing process of latex paint

House Wall Paint: two types of paints and a manufacturing process of latex paint House Wall Paint: two types of paints and a manufacturing process of latex paint (image from www.bidsbypros.com) Table of Contents History and background knowledge of paint manufacturing... 2 Paint components...

More information

Droplet separators from Lechler Made-to-measure solutions

Droplet separators from Lechler Made-to-measure solutions Droplet Separators Droplet separators from Lechler Made-to-measure solutions Lechler droplet separators. Vital elements in many processing operations. Droplet separators have long played a vital role in

More information

Chapter 3. Experimental set up. 3.1 General

Chapter 3. Experimental set up. 3.1 General Chapter 3 Experimental set up 3.1 General Experimental set up and various swirl flow generators such as full length twisted tapes, increasing and decreasing order of twist ratio sets and full length screw

More information

(( Manufacturing )) Fig. (1): Some casting with large or complicated shape manufactured by sand casting.

(( Manufacturing )) Fig. (1): Some casting with large or complicated shape manufactured by sand casting. (( Manufacturing )) Expendable Mold Casting Processes: Types of expendable mold casting are: 1 ) Sand casting. 2 ) Shell molding. 3 ) Vacuum molding. 4 ) Investment casting. 5 ) Expanded polystyrene process.

More information

Flow Technologies Overview. For internal use only / Siemens AG All Rights Reserved.

Flow Technologies Overview. For internal use only / Siemens AG All Rights Reserved. Flow Technologies Overview Mag Flow MAGFLO Program Siemens offers a comprehensive selection of electromagnetic flow meters Water & waste water Chemical Food & beverage Mining Aggregates Cement Pharmaceutical

More information

Syncore Analyst Technical data sheet

Syncore Analyst Technical data sheet STOP PROGRAMM SET DOWN UP DOWN UP Syncore Analyst Technical data sheet With the Syncore Analyst, BUCHI is offering a solution for a fast, gentle and environmentfriendly multiple sample concentration to

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 230553 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Provisions of the Contract and of the Contract Documents apply to this Section. 1.2 SUBMITTALS A.

More information

Subsea Processing and Cold Flow Technology for Extended Oil and Gas Developments

Subsea Processing and Cold Flow Technology for Extended Oil and Gas Developments Subsea Processing and Cold Flow Technology for Extended Oil and Gas Developments Samuel Paul Flow Assurance Engineer Ratnam Sathananthan Global Flow Assurance Manager / Technical Authority 20 th June 2018

More information

Multivacuum and Dynamic Profiling

Multivacuum and Dynamic Profiling Multivacuum and Dynamic Profiling the new reference for efficient voidfree SMD vacuum soldering process Worldwide leading in vapor phase soldering technology Formation of Voids What are Voids? Crystalline

More information

HANDLING THE WAX FROM HONEY COMBS*

HANDLING THE WAX FROM HONEY COMBS* HANDLING THE WAX FROM HONEY COMBS* G.F. TOWNSEND, CANADA Cappings Cappings are obtained when the waxen surface is removed from honeycombs prior to extracting the honey. Where eight or nine frames are used

More information

The most versatile Laboratory Reactor: THE IKA MAGIC PLANT.

The most versatile Laboratory Reactor: THE IKA MAGIC PLANT. EN The most versatile Laboratory Reactor: THE IKA MAGIC PLANT. magic PLANT /// The innovative laboratory-scale process plant, ideal for any industry The magic PLANT gives you a competitive edge by bringing

More information

Two Categories of Metal Casting Processes

Two Categories of Metal Casting Processes Two Categories of Metal Casting Processes 1. Expendable mold processes - mold is sacrificed to remove part Advantage: more complex shapes possible Disadvantage: production rates often limited by time to

More information

INSTRUMENTATION AND CONTROL SYSTEM FOR THE INTERNATIONAL ERL CRYOMODULE

INSTRUMENTATION AND CONTROL SYSTEM FOR THE INTERNATIONAL ERL CRYOMODULE INSTRUMENTATION AND CONTROL SYSTEM FOR THE INTERNATIONAL ERL CRYOMODULE S. M. Pattalwar, R. Bate, G. Cox, P.A. McIntosh and A. Oates, STFC, Daresbury Laboratory, Warrington, UK Abstract ALICE is a prototype

More information

VOCATIONAL EDUCATION AND TRAINING STANDARD FOR AN OPERATOR OF TECHNOLOGICAL OIL - REFINING EQUIPMENT

VOCATIONAL EDUCATION AND TRAINING STANDARD FOR AN OPERATOR OF TECHNOLOGICAL OIL - REFINING EQUIPMENT THE REPUBLIC OF LITHUANIA MINISTRY OF EDUCATION AND SCIENCE MINISTRY OF SOCIAL SECURITY AND LABOUR VOCATIONAL EDUCATION AND TRAINING STANDARD FOR AN OPERATOR OF TECHNOLOGICAL OIL - REFINING EQUIPMENT Vocational

More information

Measuring and Controlling Unit Multronic OC

Measuring and Controlling Unit Multronic OC Measuring and Controlling Unit Multronic OC One channel measuring and controlling unit for ph / conductivity / Chlorine measuring Automatic temperature compensation Measuring and control behaviour simultaneously

More information

BGN. All Metal Variable Area Flowmeter and Counter. for liquids and gases

BGN. All Metal Variable Area Flowmeter and Counter. for liquids and gases All Metal Variable Area Flowmeter and Counter for liquids and gases monitoring analysing BGN Measuring range: 0.5-5.0... 13000-130000 l/h water 0.015-0.15... 240-2400 m³/h air (20 C, 1.013 bar) Accuracy

More information

GOOD REASONS FOR WALTHER PILOT. Successful bonding with our material transfer and application technology

GOOD REASONS FOR WALTHER PILOT. Successful bonding with our material transfer and application technology 6 GOOD REASONS FOR WALTHER PILOT Successful bonding with our material transfer and application technology 1 PROBLEM SOLVER We provide a complete range for surface coating and the application of adhesives.

More information

U, W, and Y -- MULTIPLE LEG STARBARS, SILICON CARBIDE HEATING ELEMENTS

U, W, and Y -- MULTIPLE LEG STARBARS, SILICON CARBIDE HEATING ELEMENTS U, W, and Y -- MULTIPLE LEG STARBARS, SILICON CARBIDE HEATING ELEMENTS GENERAL DESCRIPTION Made of high density recrystallized silicon carbide, these multiple leg Starbars use the same hot zone and cold

More information

Stepping ahead in technology & innovation PIPING INSTITUTE OF TECHNOLOGY & ANALYSIS SOLUTIONS

Stepping ahead in technology & innovation PIPING INSTITUTE OF TECHNOLOGY & ANALYSIS SOLUTIONS Stepping ahead in technology & innovation PIPING INSTITUTE OF TECHNOLOGY & ANALYSIS SOLUTIONS PIPING ENGINEERING & PLANT DESIGN Chapter 1. Introduction of Piping Industry & Role of Piping Engineer 1.1.

More information

Manufacturing: Chapter 3 Casting

Manufacturing: Chapter 3 Casting CHAPTER THREE Metal Casting Casting, shown in Fig. 3.1, is the process of pouring molten metal into a mould containing a cavity, which represents the required product shape. It is one of the most commonly

More information

Distillation Plant Type SUR

Distillation Plant Type SUR Distillation Plant Type SUR 01 Distillation plant with 60 liters reactor made in borosilicate glass 3.3 Distillation plant with 60 liters reactor made in Aisi 316L Distillation Plant Type SUR SOFFIERIA

More information

INSTRUCTIONS FOR USE SHERATITAN-EASY

INSTRUCTIONS FOR USE SHERATITAN-EASY GB INSTRUCTIONS FOR USE SHERATITAN-EASY Investment material for model casting, crowns or bridges as well as implants made of titanium for conventional heating or speed casting method Dear customers! You

More information