Ohio Department of Transportation Office of Traffic Engineering July 17, 2009
|
|
- Coleen Richardson
- 5 years ago
- Views:
Transcription
1 Ohio Department of Transportation Office of Traffic Engineering July 17, 2009 To Holders of the OTE Standard Construction Drawings (SCDs) and Plan Insert Sheets (PISs): As of July 17, 2009, fifteen SCDs are changed. One new PIS is issued and two PIS are changed. The updated publications and the separate revision packages are available from the links below, the ODOT Design Reference Resource Center ( or from the Office of Traffic Engineerings Home Page ( using the Publications link. The revision packages include a detailed Revision Log. Per ODOT policy, paper copies of the publications are no longer distributed to all holders. Revisions will only be available via the web pages noted above. For questions, comments, or concerns please contact either: Juanita Elliott, P.E., Traffic Standards Engineer or Lisa McConnell, Traffic Standards Technician ( or Juanita.Elliott@dot.state.oh.us) ( or Lisa.McConnell@dot.state.oh.us)
2 OTE Plan Insert Sheet Revision Log OTE Standard Construction Drawing Revision Log July 17, 2009 Revision The following is a detailed list of the changes made to the OTE Plan Insert Sheet and Standard Construction Drawing (SCD) as of July 17, Drawing Number Revision Involves: Title Revision Type * Revision Description *Change - adding new information or revising existing information, more than an editorial change; New - adding a new drawing; Deletion - deleting a drawing; Editorial - revising text to provide clarification, updating references, correcting a typing or drawing mistake, simple editorial changes such as rephrasing a statement or making a format change. Plan Insert Sheets Bikeway Pavement Marking Details Median Crossover of Passing Lane Short Distance Median Crossover of Express Lane Long Distance New Editorial Editorial Standard Construction Drawing [top of page]. Index MT MT MT MT MT MT MT Closing Right or Left Lane of a Multi-Lane Divided Highway With Drums Closing Right Lane of a Multi-Lane Undivided Highway with Drums Closing Left Lane of a Multi-Lane Undivided Highway with Drums Closing Right or Left Lane of a Multi-Lane Divided Highway with Portable Concrete Barrier Editorial Editorial Editorial New Standard Drawing for bikeway pavement markings. Corrected the CMS number in 5D, expanding acronyms into full words for 7A and 7B as well as miscellaneous spelling corrections. Deletion of 6P. Corrected the CMS number in 5D, the page numbers in 5F, expanding acronyms into full words for 7A and 7B, miscellaneous spelling corrections and correction of the text for 4H and 4J to match the publication. (4H and 4J were changed in error for the publication.) Deletion of 6P. Revised to reflect changes. Corrected the CMS number in 8E Corrected the CMS number in 8E and a spelling correction in 13Bc. Corrected the CMS number in 8E and a format correction in the units for 13Bb and 13Bc. Editorial Corrected the CMS number in 8E. Median Crossover Single Lane Editorial Corrected the CMS number in 5D. Deleted the last line in 4F; it was a duplicate of part of the previous sentence. Median Crossover Multi-Lane Editorial Corrected the CMS number in 5D, and corrected the spelling of minimum in 4C. Lane Closure at Entrance Ramp Editorial Revised Table II, added Table III, added note 7G, corrected CMS references in 4B and 4E and made other minor editorial changes. 1
3 Drawing Number MT MT MT MT MT MT MT TC Revision Involves: Title Lane Closure at Entrance Ramp Acceleration Lane Lane Closure at Exit Ramp Using Drums Lane Closure at Exit Ramp Using PCB Revision Type * Editorial Editorial Editorial Lane Closure in Deceleration Lane Editorial Revision Description Revised Table II, added Table III, added note 8G, corrected CMS references in 4B and 4E, and made other minor editorial changes. Added table III, corrected CMS references in notes 4B and 4D, and made other minor editorial changes. Corrected the CMS number in 4D and aligned the rows in the table under 2A. Revised Table II, added Table III, added note 7G, corrected CMS references in 4B and 4D, and made other minor editorial changes. Lane Closure Within Exit Ramp Editorial Revised Table II, added Table III, added note 8G, corrected CMS references in 4B and 4D, and made other minor editorial changes. Exit Ramp Closure Editorial Revised table II and made minor changes in the notes. Lane Shift on a Multi-Lane Highway Using Portable Concrete Barrier Single Arm Overhead Signal Support Editorial Editorial Corrected the CMS number in 8E, the note references in 3C, and made spelling corrections in 10E and 10H. Added note in drawing to clarify that the vertical maximum and minimum dimensions apply to all the signal heads. 2
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Ohio Department of Transportation Office of Roadway Engineering January 18, 2013
Ohio Department of Transportation Office of Roadway Engineering January 18, 2013 To: Holders of the Traffic Standard Construction Drawings (SCDs) and Plan Insert Sheets (PISs) As of January 18, 2013, eighteen
More informationREVISIONS INDEX 2016 ROAD & BRIDGE STANDARDS. September 2017 Revision Letter August 2017 Revision Letter February 2017 Revision Letter
REVISIONS INDEX 2016 ROAD & BRIDGE STANDARDS September 2017 Revision Letter August 2017 Revision Letter February 2017 Revision Letter 506.08 ADDED DETAIL FOR TRANSITION FROM GR-MGS1 TO WEAK POST GUARDRAIL.
More informationREVISIONS INDEX 2016 ROAD & BRIDGE STANDARDS
REVISIONS INDEX 2016 ROAD & BRIDGE STANDARDS December 2018 Revision Letter September 2018 Revision Letter September 2017 Revision Letter August 2017 Revision Letter February 2017 Revision Letter Signature
More informationDELINEATOR REFERENCE POINT 200' TYPICAL SPACING (YELLOW DELINEATORS) END OF MERGE LANE TAPER DELINEATOR REFERENCE POINT
200' TYP. 600' < EACH SIDE BOTH ROADWAYS END OF MERGE LANE TAPER TYPICAL FOR ALL 2-LANE MERGES EXCEPT WHERE THERE IS A MERGE FROM THE RIGHT AND NO OFFSET IN THE THROUGH LANES END OF MERGE LANE TAPER 200'
More informationJoint with Bent Dowels. David Cronin, P.E. City Engineer. Jason Hoskinson, P.E., PTOE BG Consultants, Inc. DATE: January 23, 2014
1405 Wakarusa Drive Lawrence, KS 66049 P : 785 749 4474 F : 785 749 7340 TO: FROM: David Cronin, P.E. City Engineer Jason Hoskinson, P.E., PTOE BG Consultants, Inc. DATE: January 23, 2014 RE: Rock Chalk
More informationStandard Plate 7036 is discontinued. It is replaced by Standard Plan Pedestrian Curb Ramp Details.
DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management & Technical Support, Design Support Section TRANSMITTAL LETTER NO. (12-02) MANUAL: Standard Plates DATED: May 11, 2012 SUBJECT: Standard
More informationSeptember 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO.
Department of Public Works Transportation Division September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO. 17-11090-C ADDENDUM NO. 3 Dear Bidder: The
More informationINSTRUCTIONS: 1. Record the transmittal letter number, date, and subject on the transmittal record sheet located in the front of the manual.
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Technical Support Design Services Section TRANSMITTAL LETTER NO. (0-03) MANUAL: Standard Plates DATED: September
More informationChapter 23. Signing and Pavement Marking Plans
Chapter 23 Signing and Pavement Marking Plans 23.1 General... 23-3 23.2 Key Sheet... 23-4 23.3 Signature Sheet... 23-4 23.4 Tabulation of Quantities and Pay Item Notes... 23-4 23.4.1 Standard Notes...
More informationPUBLIC WORKS DEPARTMENT. File: E-2000 July 11, Town of Whitby Design Criteria and Engineering Standard Drawing Revisions
PUBLIC WORKS DEPARTMENT File: E-2000 July 11, 2011 To: All Manual Holders and Engineering Standard Drawing Revisions Please find attached a list of the revisions to the and the Engineering Standard Drawings.
More informationCurrent Standard Plates including Transmittal Letters are available on the web at:
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (17-04) MANUAL: Standard
More informationShow all your work for full credit!! Reference ODOT
CIVE=3520 Transportation Engineering 2 Midterrn No. 1 Name: OJÿ_en Book & Notes Show all your work for full credit!! Reference ODOT Fÿures that you use!! Also make sure that you answer theÿtion that is
More informationManhole or Catch Basin Type A & B Cone Sections Precast - Design F Manhole or Catch Basin Cover (Reducer Cone Section Precast) Design D
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (14-02) MANUAL: Standard
More information2. Remove from the Standard Plate manual: Standard Plate Index, Sheets 1-4 of 4, Numerical Index of Standard Plates (August 31, 2012)
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management & Technical Support, Design Support Section TRANSMITTAL LETTER NO. (12-04) MANUAL: Standard
More informationUpdated: April 7, 2016
Updated: April 7, 2016 Hwy 36 to Lexington Ave. Add a lane in each direction Recommend a MNPASS Lane Several spot improvements to roadway included Concrete pavement Noise walls will be evaluated Replace
More informationTo: All Holders of the Virginia Department of Transportation s 2001 Road and Bridge Standards
DEPARTMENT OF TRANSPORTATION 1401 EAST BROAD STREET RICHMOND, VIRGINIA 23219-2000 PHILIP A. SHUCET COMMISSIONER July 21, 2004 MOHAMMAD MIRSHAHI, P.E. STATE LOCATION AND DESIGN ENGINEER MEMORANDUM To: All
More informationREVISION INFORMATION SHEET ONTARIO PROVINCIAL STANDARDS FOR ROADS AND PUBLIC WORKS
Ontario Provincial Standards 301 St. Paul St., 2 nd Floor North St. Catharines, ON L2R 7R4 REVISION INFORMATION SHEET ONTARIO PROVINCIAL STANDARDS FOR ROADS AND PUBLIC WORKS VOLUME 4 MUNICIPAL AND PROVINCIAL
More informationSUBJECT: Standard Plate 9102 Turf Establishment Areas At Pipe Culvert Ends
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (17-03) MANUAL: Standard
More informationStep-by-Step Guide for Employees How to set your goals and development plan in Success Factors:
Step-by-Step Guide for Employees How to set your goals and development plan in Success Factors: 1. Login to Success Factors using your email ID and password; you land on the Home Page of Success Factors.
More informationThe Shoppes at Forney Crossings
F M 548 U.S. HWY 80 U.S. HWY 80 F M 688 F M 548 COOL SPRINGS F M 1641 F M 548 TROPHY BUGLE CALL PHESANT WHITE PORCH SPINAKER The Shoppes at Forney Crossings 18' 14'-8" 18' 15'-8 1 2 " 14' 7' 23'-0" 21'-0"
More informationM E M O R A N D U M. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.
National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Lightning Protection
More informationNoise Mitigation Study Pilot Program Summary Report Contract No
Ohio Turnpike Commission Noise Mitigation Study Pilot Program Summary Report Contract No. 71-08-02 Prepared For: Ohio Turnpike Commission 682 Prospect Street Berea, Ohio 44017 Prepared By: November 2009
More information24" B B Joint X501 Joint See MARKINGS Note PCB-RXX-350-TL3 " X501 Y301 (Typ.) " A PLAN (reinforced casting option shown) A " dia. Hinge Bar (Typ.) NOT
B B Joint Joint See MARKINGS Note PCB-RXX-350-TL3 " Y301 (Typ.) " A PLAN (reinforced casting option shown) A " dia. Hinge Bar (Typ.) NOTES GENERAL: This barrier may be manufactured with reinforcing steel
More informationSUBJECT: Standard Plate Turf Establishment Areas (at Pipe Culvert Ends)
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (14-01) MANUAL: Standard
More informationOhio Department of Transportation Office of Traffic Engineering October 20, 2006
Ohio Department of Transportation Office of Traffic Engineering October 20, 2006 To Holders of the ODOT Traffic Engineering Manual (TEM), the Sign Design Manual (SDM) and the OTE Standard Construction
More informationCITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST
CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for preparation
More informationDESIGN PUBLIC HEARING
DESIGN PUBLIC HEARING JUNE 22, 2016 AT TOWN HALL AUDITORIUM 11 TOWN HOUSE ROAD WESTON, MASSACHUSETTS 7:00 PM FOR THE PROPOSED DEMOLITION OF LEGACY TOLL PLAZAS ALONG I-90 DISTRICT 6 PLAZAS 14, 15 AND 55
More informationGuide Sign Policy for Secondary State Highways Edition
Massachusetts Highway Department, Ten Park Plaza, Boston, MA 02116-3973 ` Guide Sign Policy for Secondary State Highways 2005 Edition Revised September 2005 1. PURPOSE The Massachusetts Highway Department
More informationSYMBOL DESCRIPTION TRAFFIC CONTROL SIGN TYPE III BARRICADE = IMPACT ATTENUATOR STRIPING KEY TRIANGLE - PAINT PLASTIC MARKING 1ST DIGIT WIDTH 4" OR 8"
TES & GUIDELINES TRAIC CONTROL DEVICES & SYMBOLS LEGEND INDEX 2. GENERAL IRMATION: THE CONTRACTOR SHALL URNISH, INSTALL AND MAINTAIN THE DEVICES IN THIS TRAIC CONTROL PLAN UNLESS OTHERWISE TED. IELD CONDITIONS
More informationSUBJECT: Standard Plates 4132, 4155, Drainage Structures and Castings Info
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (18-01) MANUAL: Standard
More information580 - NOISE BARRIERS OPSS 580 INDEX
580 - OPSS 580 INDEX 580.1 GENERAL 580.1.1 Noise Barrier Design Elements 580.1.1.1 Wind-Load Designs 580.1.1.2 Sound-Absorptive Barriers 580.1.1.3 Noise Barrier Colour, Pattern and Texture 580.1.2 Grading
More informationCity of Vaughan Engineering Department DESIGN STANDARD DRAWINGS
City of Vaughan Engineering Department DESIGN STANDARD DRAWINGS March 2004 STANDARD DRAWINGS Partners With The Environment March 2004 FORWARD The March 2004 version of the City of Vaughan Design Standard
More informationDemolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway)
I-90/94 (Kennedy Expressway) at Ohio Street Structure Replacement and Rehabilitation Section Number 0303-474HB-R D-91-177-09 Contract 60F63 Cook County, Region One, District One City of Chicago Project
More informationI-20 East Texas Corridor Implementation Plan DALLAS DISTRICT Updated May Install cable barrier system in median
I-20 East Texas Corridor Implementation Plan DALLAS DISTRICT Updated May 2016 AE-1 Median Barrier I-635 to Kaufman County Line AF-1 Lawson Road to Kaufman County Line Install cable barrier system in median
More informationHIGHWAY WORK ZONE DATA COLLECTION INSTRUMENT
HIGHWAY WORK ZONE DATA COLLECTION INSTRUMENT Case ID: MI Date of Investigation Respondent Employer Information 1. Is the employer the primary contractor or a subcontractor working at the site? Victim Information
More informationTURNPIKE DESIGN HANDBOOK (TDH) DESIGN CRITERIA PART 2
TURNPIKE DESIGN HANDBOOK (TDH) DESIGN CRITERIA PART 2 FLORIDA S TURNPIKE ENTERPRISE PRODUCTION DESIGN DEPARTMENT OCOEE, FL January 2018 May 2, 2018 Addendum #1 Introduction As part of the Turnpike s continuing
More informationProposed Watertown Plan Road Interchange Evaluation Using Full Scale Driving Simulator
0 0 0 0 Proposed Watertown Plan Road Interchange Evaluation Using Full Scale Driving Simulator Kelvin R. Santiago-Chaparro*, M.S., P.E. Assistant Researcher Traffic Operations and Safety (TOPS) Laboratory
More informationPlease remove and replace the entire Table of Contents, Section A to Section J and all Appendices.
Please remove and replace the entire Table of Contents, Section A to Section J and all Appendices. The following is a list of changes to the Design Criteria: 1. A2.01 General Note 4 Utility Coordination
More informationMICHIGAN DESIGN MANUAL ROAD DESIGN CHAPTER
1.01 DEVELOPMENT METHODS 1.01.01 References 1.01.02 General 1.01.03 Survey and Mapping Methods 1.02 PLAN SHEETS MICHIGAN DESIGN MANUAL 1.02.01 Title Sheet A. Project Location B. Traffic Data C. Project
More informationChapter 4a GUIDE SIGNS
Sign Designs and Markings Manual (TEM 295-2) Chapter 4a GUIDE SIGNS DIRECTIONAL ( D sign code numbers) Revised January 20, 2012 Guide Signs Directional Page 4a-2 Sign Designs and Markings Manual (TEM 295-2)
More informationCurrent Standard Plates including Transmittal Letters are available on the web at:
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (15-03) MANUAL: Standard
More informationCITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION:
CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION: LOG NO.: LEGEND REVIEW REVIEWED BY DATE / - Requirement satisfied 1 O Requirement not satisfied 2?
More informationPortable Signals: INDOT Design Guidance and Specifications
: INDOT Design Guidance and Specifications Joe Bruno, P.E. Traffic Administration, INDOT March 7, 2017 Presentation Overview Background Design Manual 83-5.0 and Design Memo 16-06 Cost and Pay Item Info
More informationP.E. Civil Exam Review:
P.E. Civil Exam Review: Geometric Design J.P. Mohsen Email: jpm@louisville.edu Horizontal Curves Slide 2 Back tangent Forward tangent T T Slide 3 Back tangent Forward tangent T T P.C. or T.C. P.T. Slide
More informationHighway Embankment Contract Specifications
Case Study Highway Embankment Contract Specifications Timothy D. Stark, Ph.D., P.E., F.ASCE 1 ; Timothy P. Ristau 2 ; Perry J. Ricciardi, P.E. 3 ; and Michael J. Ciammaichella, P.E. 4 Downloaded from ascelibrary.org
More informationPlan Preparation Checklist
Appendix D Plan Preparation Checklist It is the responsibility of the Designer to complete and submit this checklist along with all required drawings for OUC (EFP) Review. All drawings submitted for OUC
More information2009 CADD Revision History
Update: January 16, 2009 Manuals: Appendix A - of the CADD Manual updated. Appendix C - of the CADD Manual updated. MicroStation XM Files: CADIG (AutoTable) Files ODOT User Guide for AutoTable XM.pdf,
More informationTRAFFIC ENGINEERING SAB3843. CHE ROS BIN ISMAIL and OTHMAN BIN CHE PUAN
TRAFFIC ENGINEERING SAB3843 GEOMETRIC DESIGN OF ROADS CHE ROS BIN ISMAIL and OTHMAN BIN CHE PUAN SOME MAJOR ELEMENTS OF ROAD GEOMETRY: Horizontal alignment, Vertical alignment, Sight distances, Crosssection,
More informationSTANDARD DRAWINGS INDEX MODIFIED FOR CENTRAL REGION Revised August 6, 2018
SYMBOLS STANDARD DRAWINGS INDEX No Statewide Standard - Use Regional A3 Legend Detail Sheet BRIDGE AND STRUCTURES B-08.00 Bin Walls 1 CONSTRUCTION-BARRICADES AND SIGNING C-04.12 Location of Double Traffic
More informationNoise Impact Analysis. NW Bethany Boulevard Improvement Project NW Bronson Road to NW West Union Road. November Washington County.
Noise Impact Analysis NW Bethany Boulevard Improvement Project NW Bronson Road to NW West Union Road Washington County November 2011 Prepared for: Washington County Department of Land Use and Transportation
More informationOffice of Traffic Operations Signal Design Reference Packet
Office of Traffic Operations Signal Design Reference Packet Rev-3 07/17/2015 Contents The purpose of this packet is to provide guidance on designing and reviewing traffic signal plans. The format, legends,
More informationTABLE OF CONTENTS 1200 PLAN PREPARATION
1200 PLAN PREPARATION TABLE OF CONTENTS PAGE 1201 General Plan Sheet Information... 12-1 1201.1 Introduction... 12-1 1201.2 Unit of Measure... 12-1 1201.3 Plan Sheet Materials and File Format... 12-1 1201.4
More informationMaintenance of Traffic sequence of operations including any phasing and detour maps;
All Local-let projects are required to have a Stage 2 submittal to the LPA Manager for review. The only exceptions are 2-lane resurfacing, striping, guardrail, and raised pavement markers, unless otherwise
More informationTraffic Safety Corporation
Traffic Safety Corporation Pedestrian Detection Photo-Sensor Bollards Installation and Owner s Manual TSC IM BOLLARD Rev. B Released 1/9/17 Table of Contents Introduction.... 3 Section 1 Bollard System
More informationRevised BRIDGE REPORT AND LAYOUT PAVEMENT STRUCTURE DESIGN CHAPTER VII UTILITIES CHAPTER VIII TRAFFIC CONTROL DEVICES
CHAPTER I CHAPTER II CHAPTER III CHAPTER IV CHAPTER V CHAPTER VI GENERAL INFORMATION PRELIMINARY DESIGN SURVEYS DETAIL DESIGN BRIDGE REPORT AND LAYOUT PAVEMENT STRUCTURE DESIGN CHAPTER VII UTILITIES Revised
More informationGovernment Of Newfoundland & Labrador Municipal Water, Sewer And Roads Master Construction Specifications
PAGE NO. : 1 OF 4 Revision Date: July 2009 STANDARD DRAWINGS TABLE OF CONTENTS DRAWING # DESCRIPTION 0030............ Work Adjacent to Roadway 0040............ Work at the Edge of Roadway 0050............
More informationPrecast Concrete Pavement
Precast Concrete Pavement Phillip Sturdivant, P.E. Louisiana Department of Transportation and Development www.dotd.la.gov What is Precast Concrete Pavement? Precast concrete pavement is what it says it
More informationFrequently Asked Questions
The Synchro Studio support site is available for users to submit questions regarding any of our software products. Our goal is to respond to questions (Monday - Friday) within a 24-hour period. Most questions
More informationWELCOME. Open House. meeting is downstairs in the Foot Room RED WING BRIDGE PROJECT. US 63 River Bridge and Approach Roadways.
WELCOME RED WING BRIDGE PROJECT US 63 River Bridge and Approach Roadways Open House meeting is downstairs in the Foot Room November 2016 Plum/3rd Street Traffic Control Change Signal to All-Way Stop Plum
More informationPrecast Concrete Pavement Background Concepts. Project 1517 FHWA, CTR & TxDOT Gary Graham November 15, 2001
Precast Concrete Pavement Background Concepts Project 1517 FHWA, CTR & TxDOT Gary Graham November 15, 2001 Project Background CTR contracted by FHWA/TxDOT to investigate the feasibility of using precast
More informationMAINTENANCE OF TRAFFIC &
2/28/2015 5:05:15 PM d106136001k(01).dgn MANAGER Dave Covington, P.E. (540) 292-3802 VA. 29 1K(1) TRANSPORTATION OPERATIONS (TO) PLAN A). THE CONTRACTOR IS RESPONSIBLE FOR THE FOLLOWING: 1. POST A LIST
More informationAuthor Tutorial for OPTE Editorial Manager System
CONTENTS Registration/Login/Password... 2 Edit Account Information... 5 Track Manuscript Status... 15 Submit Revised Manuscript... 16 View Manuscript Decision... 21 Registration/Login/Password In order
More informationSTATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018
STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018 1073.01 Program Overview 1073.02 Qualification 1073.03 Documentation Phase 1073.04 Documentation
More informationHwy 36 to Lexington Ave. Add a lane in each direction Recommend a MNPASS Lane Several spot improvements to roadway included Concrete pavement Noise
Hwy 36 to Lexington Ave. Add a lane in each direction Recommend a MNPASS Lane Several spot improvements to roadway included Concrete pavement Noise walls will be evaluated 2 Approximate $200 million construction
More informationExpressway Authority Standards for Preparation of Signing and Pavement Marking Plans
Expressway Authority Standards for Preparation of Signing and Pavement Marking Plans Expressway Authority Standards for Preparation of Signing and Pavement Marking Plans 408 414 417 429 451 528 CENTRAL
More informationJointing Rural Intersections
Design Manual Chapter 5 - Roadway Design 5G - PCC Pavement Joints 5G-4 Jointing Rural Intersections This section describes how to joint rural intersections by following the guidelines outlined in Iowa
More informationCurrently 2 vacant engineer positions (1 Engineer level, 1 Managing Engineer level)
INDOT Agency Factoids (System/Comm.) Number of signalized intersections- 2570 200 connected by fiber 300 connected by radio 0 connected by twisted pair 225 connected by cellular 1500 not connected to communication
More informationMove In Directions for First-year and Transfer Students Douglass Campus Gibbons Residence Hall A & B
Move In Directions for First-year and Transfer Students Douglass Campus Gibbons Residence Hall A & B General Instructions: Print directions and name of assigned building. Place the name of your residence
More informationDocuments: Response letter and attachments, Prepared by: AMEC Massachusetts, Inc., Dated February 17, 2016.
GCG ASSOCIATES, INC. CIVIL ENGINEERING AND LAND SURVEYING 84 Main Street Wilmington, Massachusetts 01887 Phone: (978) 657-9714 Fax: (978) 657-7915 February 23, 2016 Mr. Nathaniel Strosberg, Town Planner
More informationCHAPTER 2C - PRELIMINARY DESIGN. General... 2C-1. Review of Work Load... 2C-2 Establishing Priorities... 2C-2
SECTION 2C - 1 - PROJECT REVIEW CHAPTER 2C - PRELIMINARY DESIGN General... 2C-1 SECTION 2C - 2 - COORDINATING TIME SCHEDULES Review of Work Load... 2C-2 Establishing Priorities... 2C-2 SECTION 2C 3 - REVIEW
More informationLesson 21: If-Then Moves with Integer Number Cards
Student Outcomes Students understand that if a number sentence is true and we make any of the following changes to the number sentence, the resulting number sentence will be true: i. Adding the same number
More informationCITY OF REEDLEY NEW DEVELOPMENT PLAN REVIEW CHECK LIST
CITY OF REEDLEY NEW DEVELOPMENT PLAN REVIEW CHECK LIST Tract Number and Subdivision Name: Engineering Firm: Contact Person: Address: City: State: Zip: Phone No. Fax No. Assessor s Parcel Number(s) Tentative
More information112" 72" 40" BIKE LANE MARKING SHARED LANE MARKING PAVEMENT MARKING DETAILS N.T.S. GENERAL NOTES
8 SB RTE ON RAMP " 0" GENERAL NOTES 7" SHARED LANE MARKING ' ' ' BIKE LANE MARKING PAVEMENT MARKING DETAILS N.T.S. YIELD LINE. ALL SIGNS SHALL HAVE A MINIMUM CLEARANCE BETWEEN THE EDGE OF SIGN AND THE
More informationSign Design Manual (TEM 295-2) APPENDIX A. SYMBOLS for TRAFFIC CONTROL SIGNS
APPENDIX A SYMBOLS for TRAFFIC CONTROL SIGNS April 16, 2004 A-1 Appendix A Intentionally blank. April 16, 2004 A-2 Appendix A Symbols for Traffic Control Signs Index Arrows Standard Arrow Arrow Details
More informationThe Go Write! Pre-writing pack for level 1-2
The Go Write! Pre-writing pack for level 1-2 Level 1-2 pre-writing organizers are appropriate for younger elementary students or upper grade students who are writing one paragraph essays. It is also appropriate
More informationZoning District: R-1, R-2, and R-4 Applicant: Exeter Rose Farm, LLC, 953 Islington Street #23D Portsmouth, NH 03801
2220.00, Town Planner Town Planning Office, Town of Exeter 10 Front Street Exeter, NH 03833 Re: Exeter Rose Farm Subdivision Design Review Engineering Services Exeter, New Hampshire Site Information: Tax
More informationUTAH S EXPERIENCE WITH AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES
Louisiana Transportation Conference Traffic Engineering Session 2 February 27, 2018, Baton Rouge, Louisiana UTAH S EXPERIENCE WITH AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES Mark Taylor, P.E., PTOE
More informationDATE: April 22, 2016 (CPR Details Revised & Dated April 22, 2016)
Minnesota Department of Transportation Office of Materials & Road Research 1400 Gervais Avenue, MS 645 Maplewood, MN 55109 Memo TO: FROM: Design Engineers Maintenance Engineers Materials Engineers Resident
More informationAppendix B: Noise Study
Appendix B: Noise Study creating remarkable solutions for a higher quality of life NOISE STUDY Interstate 55 Route PP to County Road 311 Prepared for: MoDOT PROJECT NO. J010956 November 2014 Prepared
More information400 TRAFFIC SIGNALS Traffic Engineering Manual
TABLE OF CONTENTS Part 4 - SIGNALS 400 GENERAL... 4-9 400-1 Introduction... 4-9 400-2 Construction Projects... 4-9 400-3 Force Account (ODOT Operations) Work... 4-9 401 TRAFFIC CONTROL SIGNALS - GENERAL...
More informationGuidelines on the Use of Portable Traffic Signals (PTS)
Technical Circular T-04/07 Date: August 3, 2007 To: All HQ Directors: Operations, Planning and Major Projects All Regional Directors All Regional Traffic Engineers All District Managers, Transportation
More informationSection 3 Correlation and Regression - Worksheet
The data are from the paper: Exploring Relationships in Body Dimensions Grete Heinz and Louis J. Peterson San José State University Roger W. Johnson and Carter J. Kerk South Dakota School of Mines and
More informationMPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA
MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA RESPONSES TO QUESTIONS and/or RFI s Date: 12/7/2017 The attention of Contractors submitting
More informationSearch Results for Civil Engineering Reference Manual for the PE Exam, Edition 12 Printing 1. Description
3/7/2 Errata Search Results Home PPI Review Courses Continuing Education Products Forums Support Search Results for Civil Engineering Reference Manual for the PE Exam, Edition 2 Printing I Didn't Find
More informationCITY OF DANA POINT DEVELOPMENT REVIEW
Section I EARTHWORK CITY OF DANA POINT DEVELOPMENT REVIEW COST ESTIMATE UNIT PRICE LIST May 2002 Page 1 of 12 Section I EARTHWORK TABLE OF CONTENTS SECTION AND TOPICS...PAGE INTRODUCTION... i I EARTHWORK...
More informationTYPE 4-C TYPE 6 TYPE 7 TYPE 8
````` Face of ase rad. 42 TYPE rad. " T T T 22.5 2'- unless otherwise shown on plans 5" 5" 5" Slope 2: TYPE 2 rad. Concrete TYPE 2-A rad. Wearing Course Concrete ase Course TYPE 2-0" rad. TYPE 3 As Shown
More informationCHAPTER 7: ALIGNMENT
QUALITY MANAGEMENT 7.1 Description CHAPTER 7: ALIGNMENT Creation of an additional alignment file and a summary of the total lane miles per lift (rounded to the nearest hundredth) for the given material
More informationIFPAA Field Directions
Blueberry Hill Park, Borough of Franklin Park From the North: Take I79 South to the Wexford Exit (Route 910, Wexford Bayne Road). Turn right at the stop sign at the end of the exit ramp (onto Route 910).
More informationAppendix Traffic Engineering Checklist - How to Complete. (Refer to Template Section for Word Format Document)
Appendix 400.1 Traffic Engineering Checklist - How to Complete (Refer to Template Section for Word Format Document) Traffic Engineering Checksheet How to Complete the Form June 2003 Version 3 Maintained
More information² TL Beton-StB 07 = German technical conditions for construction materials for concrete road pavements
Introduction A transverse joint frequently crossed by heavy goods traffic tends to form steps if it not perfectly doweled. This is associated with negative effects on ride comfort and driving safety as
More informationDeep Creek Canyon US Highway 12
Deep Creek Canyon US Highway 12 ABC Techniques in Rural Montana Jim Scoles Morrison-Maierle 1 Location Deep Creek Canyon US Highway 12 Helena National Forest Great Falls Map of mid MT showing Location
More informationSECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS
9. STANDARD DETAILS SECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS j:\clerical\royse city\1-4086 general services\168-tech const standards review\tcss manual\2018 tcss manual\sec-9a
More informationSURVEYOR SURVEYOR + ODOT DESIGN 1 DESIGN 2 RESE T DESIGN 3 DESIGN 4 C/L X MON. CAP DESIGN NAME NAME or COMPANY ODOT o rlpa R/W PS or ODOT o rlpa R/W P
SURVEYOR SURVEYOR + ODOT DESIGN 1 DESIGN 2 RESE T DESIGN 3 DESIGN 4 C/L X MON. CAP DESIGN or COMPANY ODOT o rlpa R/W or ODOT o rlpa R/W NO.00000 NO.00000 or COMPANY NO.00 000 and/or COMPAN Y SURVEYOR SURVEYOR
More information2018 District 1 Highway Construction Program
District 1 Highway Construction Program For additional information contact: Stephanie Christensen MnDOT District 1, Public Affairs Office: 218-725-2700 Email: Stephanie.smith-christensen@state.mn.us Last
More information8th Floor, 125 London Wall, London EC2Y 5AS Tel: +44 (0) Fax: +44 (0)
Mr Jean-Paul Gauzès President of the EFRAG Board European Financial Reporting Advisory Group 35 Square de Meeûs B-1000 Brussels Belgium E-mail: commentletters@efrag.org 10 January 2018 Dear Jean-Paul Thank
More informationS-UHF-R10. Vehicle Identification. Sensor UHF Reader. Sensor UHF RFID Readers. +44 (0)
Vehicle Identification Sensor UHF RFID Readers Introduction The purpose of this document is to describe the approach to be used when developing a vehicle identification project using S-UHF-WSTKPAP-U technology,
More informationSCOPE OF WORK AND DELIVERABLES T.H.
Exhibit A SCOPE OF WORK AND DELIVERABLES T.H. s 27, 73 and 289 in Moose Lake S.P. 8821-200 PROJECT OVERVIEW The project is located in Moose Lake, Carlton County s on TH 27, 73, and 289. TH 27 RP 245.044
More informationThis specification describes the minimum requirements for structural steel drawings.
1/7 1.0 PURPOSE This specification describes the minimum requirements for structural steel drawings. 2.0 GENERAL As stated in specification SPEC-0800, drawings are intended to be Design drawings. Sufficient
More informationFINAL REPORT. On Project Supplemental Guidance on the Application of FHWA s Traffic Noise Model (TNM) APPENDIX K Parallel Barriers
FINAL REPORT On Project - Supplemental Guidance on the Application of FHWA s Traffic Noise Model (TNM) APPENDIX K Parallel Barriers Prepared for: National Cooperative Highway Research Program (NCHRP) Transportation
More informationPLEASE NOTE THAT THIS ENTIRE PROJECT WAS A COMPLETELY ACADEMIC EXERCISE. THIS PROJECT IN NO WAY REPRESENTS THE OPINIONS OF ITRANS OR THE MTO
PREAMBLE 1 PLEASE NOTE THAT THIS ENTIRE PROJECT WAS A COMPLETELY ACADEMIC EXERCISE. THIS PROJECT IN NO WAY REPRESENTS THE OPINIONS OF ITRANS OR THE MTO HIGHWAY 404 AND 16 TH AVENUE INTERCHANGE RECONSTRUCTION
More information