Show all your work for full credit!! Reference ODOT
|
|
- David Phillips
- 5 years ago
- Views:
Transcription
1 CIVE=3520 Transportation Engineering 2 Midterrn No. 1 Name: OJÿ_en Book & Notes Show all your work for full credit!! Reference ODOT Fÿures that you use!! Also make sure that you answer theÿtion that is asked!! Don't over complicate the problems!!!!! They are all straight forward applications of what we learned in class. NO CELLPHONES ALLOWED DURING EXAM!!!! Total test time allowed = 1 hour 50 minutes. NO Exceptions! Deductions will be taken from your score for hints that you pry from the instructor including warm fuzzy assurance. Note that clarifications are not the same as hints. Everyone must do problems 1 & 2. You can then work any combination of problems 3 thru 6 (including only parts of #6) so that the total of that group equals 40 points and the overall total equals 100 points. Do them all and I'll take the best scores of the ones that you have done to maximize your score up to 100 points. Problem No. Points Score Required Required Do 40 points worth of problems out of this grouping of # a) 5 b) S c) 5 d) 5 Bonus -Hints (2 points each) Total PAGE 1
2 , REQUIRED PROBLEM Your survey crew is doing a route survey along the centerline of an existing road slated for reconstruction. The crew found monuments for the road at the PC, PT and PI points. They have given you the following information: PT Station = , PC to PI Distance = 500', PC to PT distance = 955' Calculate the PC & Forward PI Stations (30 points) 500' PI < -- ij... F V/'<" W t 2;1> ÿ"... " PAGE 2
3 . REQUIRED PROBLEM A proposed vertical alignment was originally designed for a 40mph design speed creating a 200' long crest vertical curve. The alignment has an entrance grade GI= 2.16%, and an exit grade G2= -1.84% as it proceeds over an 8" natural gas line which is located at Station An increase in the design speed to 50mph is proposed for the road. Will the new ground clearance (road surface to top of pipe) for the revised longer crest vertical curve meet the minimum 4' required? (Remember to round up to the next even +00 or +50 for curve length.) (30 points) PV] STA ELEV = 244,16 dÿ ''jÿ P,, o 01VE-3520 ÿ;:;::iij PAGE 3
4 , A road is being design with a large retaining wall on the inside edge. For the curve shown below, do the curve and offsets provide adequate stopping sight distance for a 40 MPH design speed? (10 points) - ÿ P'/ C? / 3ÿS ' --I,d'_ I.TJ J PAGE 4
5 , Calculate the total superelevation transition length (L) from the normal section to the fully superelevated section for the following conditions for a simple circular horizontal curve. (10 points) en = Do= 1 30' v= 70 MPH 4 lanes 12' each (2 each way) Urban Location 5. Determine the Length of Need (X) of a guardrail system for the following warranting feature and roadway characteristics: (10 points) Barrier Setback = 8' ADT = 1700 Clear Zone = 30' Back of Warranting Feature = 27' Design Speed = 70 MPH No Taper (b/a = 0).,dÿÿ',ÿ ÿ 9 PAGE 5
6 6. Five (5) points each. Explain answers for credit. a. Determine the required shoulder widths (graded & treated) for a rural arterial road with 3000 ADT and 8:1 roadside foreslopes. b. Is a 24' width (two 12' lanes) roadway that is widened through a 6 curve to 27' total satisfactory for a 65 mph design ÿeed? Explain. C, Is a trapezoidal ditch with a 8' bottom, a 5:1 foreslope and a 2.5:1 backslope traversable? Explain. d. Is a large pole in the clear zone of a highway that sits 24' from the edge of pavement on a 7:1 foreslope? The highway has an ADT=600 and a 65 mph design speed. Explain. Oid Bonus Point Questions (1 pt Each) What is the height of a dead cow lying in the road? ÿsÿ... What did the ODOT road supervisor make us put in front of the big orange drilling rig in the clear zone so no one would hit it? CLVE-3520 PAGE 6
7 CLVE-3520 Transportation Engineering 2 Midterm No. 1 Name: Open Book & Notes Show all your work for full credit!! Reference ODOT Fiqures that you use!! Also make sure that you answer uestion that is asked!! Don't over complicate the problemst!ff! They are all straight forward applications of what we learned in class. NO CELLPHONES ALLOWED DURING EXAM!!!! Total test time allowed = 1 hour 50 minutes. NO Exceptions! Deductions will be taken from your score for hints that you pry from the instructor including warm fuzzy assurance. Note that clarifications are not the same as hints. Everyone must do problems 1 & 2. You can then work any combination of problems 3 thru 6 (including only parts of #6) so that the total of that group equals 40 points and the overall total equals 100 points. Do them all and I'll take the best scores of the ones that you have done to maximize your score up to 100 points. Problem No. Points Score i l 3 i0 4 t0 Required Required Do 40 points worth of problems out of this grouping of # a) 5 b) 5 c) 5 d) 5 Bonus -Hints (2 points each) Total PAGE 1
8 , REQUIRED PROBLEM Your survey crew is doing a route survey along the centerline of an existing road slated for reconstruction. The crew found monuments for the road at the PC, PT and PI points. They have given you the following information: PT Station = , PC to PI Distance = 400', PC to PT distance = 760' Calculate the PC & Forward PI Stations (30 points) " 400' PI A, o... PAGE 2
9 , REQUIRED PROBLEM A proposed vertical alignment was originally designed for a 40mph design speed creating a 200' long crest vertical curve. The alignment has an entrance grade GI= 1.84%, and an exit grade G2= -2.16% as it proceeds over an 8" natural gas line which is located at Station An increase in the design speed to 50mph is proposed for the road. Will the new ground clearance (road surface to top of pipe) for the revised longer crest vertical curve meet the minimum 4' required? (Remember to round up to the next even +00 or +50 for curve length.) (30 points) P PAGE 3
10 3. A road is being design with a large retaining wall on the inside edge. For the curve shown below, do the curve and offsets provide adequate stopping sight distance for a 40 MPH design speed? (10 points) PROPOSED RETAINING WALL +... P ' ÿ+<'-' ÿ C. i >;ÿx.9... ; 6 S6 d d... /9,, o... I < ÿ;:f' <... Uÿ.A+.ÿ.,+.,-z"-'---,.- ÿ -ÿ ;-ÿ , CLVE-3520 PAGE 4
11 , Determine the total superelevation transition length (L) from the normal section to the fully superelevated section for the following conditions for a simple circular horizontal curve. (10 points) en = Do= 1 30' 4 lanes 12' each (2 each way) v= 65 MPH Urban Location 5. Determine the Length of Need (X) of a guardrail system for the following warranting feature and roadway characteristics: (10 points) Barrier Setback = 10' Back of Warranting Feature = 22' ADT = 5500 Design Speed = 70 MPH No Taper (b/a = 0) Clear Zone = 30' A ÿ ;' $4s CLVE-3520 PAGE 5
12 6. Five (5) points each. Explain answers for credit. a. Determine the required shoulder widths (graded & treated) for a rural collector road with 800 ADT and 8:1 roadside foreslopes. 7 +.ÿ. b, Is a 24' width (two 12' lanes) roadway that is widened through a 6 curve to 27'Fÿ+totaIHÿ,c:satisfactoryÿ forÿ a,ÿ;o35ÿ ÿmph designÿ (ÿ ÿ Of '*tÿ c. Is a trapezoidal ditch with a 3' bottom, a 5:1 foreslope and a 10:1 backslope traversable? Explain. I d. Is"dlarge pole in the clear zone of a highway that sits 10' from the edge of pavement on a 5:1 foreslope? The highway has an ADT=1000 and a 40 mph design speed. Explain. Bonus Point Questions (1 pt Each) What is the height of a dead cow lying in the road? ÿ What did the ODOT road supervisor make us put in front of the big orange drilling rig in the clear zone so no one would hit it? CLVE-3520 PAGE 6
Maintenance of Traffic sequence of operations including any phasing and detour maps;
All Local-let projects are required to have a Stage 2 submittal to the LPA Manager for review. The only exceptions are 2-lane resurfacing, striping, guardrail, and raised pavement markers, unless otherwise
More informationREVIEW TOPICS CEEN 2320 FINAL EXAM
REVIEW TOPICS CEEN 2320 FINAL EXAM Be familiar with all materials covered in class, your class handouts and the notes you took in class, your homework assignments, test questions, formulas, tables, figures.
More informationTRAFFIC ENGINEERING SAB3843. CHE ROS BIN ISMAIL and OTHMAN BIN CHE PUAN
TRAFFIC ENGINEERING SAB3843 GEOMETRIC DESIGN OF ROADS CHE ROS BIN ISMAIL and OTHMAN BIN CHE PUAN SOME MAJOR ELEMENTS OF ROAD GEOMETRY: Horizontal alignment, Vertical alignment, Sight distances, Crosssection,
More informationFlorida's Turnpike Enterprise Roadway Phase III (90%) & Phase IV (100%) Check List Per FDM and TDH Part 3
Notes to Reviewers Section 301 Design Exceptions, Variation, and Technical Memorandums Special directives date and source Key Sheet Section 302 Location Map w/ location of project on map All applicable
More information50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges
50.24 Culverts, Bridges and Culvert Bridges Type, Size and Location (T, S & L) Plans shall be required for all Bridges, Culvert Bridges and Culverts of eight-foot (8') clear span or greater as follows:
More informationDEVELOPMENT PLAN CHECKLIST
Project Identification Information: DEVELOPMENT PLAN CHECKLIST 1.0 GENERAL 1.1 Additional information as required by specific Land Use 1.2 All sheets to include sheet number ( of ) 1.3 Seal and signature
More informationSurvey Data and TOPO Checklist
Checklists Survey Data and TOPO Preliminary Plan Field Review Plans o Field Review Erosion Control Right-of-Way and Utility Meeting Plans Final Plan Field Review Plans Methods of Plan Markups Plan-in-Hand
More informationCHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN
N/A Waiver (1) Four (4) copies of application form. (2) Fifteen (15) copies of plan (3) Subdivision/site plan application fee & professional review escrow deposit (4) Variance application fee & professional
More informationSection 4-02 Typical Sections TABLE OF CONTENTS. INTRODUCTION...2 General...2
Section 4-02 Typical Sections TABLE OF CONTENTS INTRODUCTION...2 General...2 DRAFTING GUIDELINES...3 General...3 Drawing Typical Sections...3 Attaching a Sheet...3 Text Size and Spacing...4 Labeling of
More informationCONTRACT PLANS READING
CONTRACT PLANS READING A training course developed by the FLORIDA DEPARTMENT OF TRANSPORTATION This 2009 revision was carried out under the direction of Ralph Ellis, P. E., Associate Professor of Civil
More informationWe will study all three methods, but first let's review a few basic points about units of measurement.
WELCOME Many pay items are computed on the basis of area measurements, items such as base, surfacing, sidewalks, ditch pavement, slope pavement, and Performance turf. This chapter will describe methods
More informationPlan Preparation Checklist
Appendix D Plan Preparation Checklist It is the responsibility of the Designer to complete and submit this checklist along with all required drawings for OUC (EFP) Review. All drawings submitted for OUC
More informationExit 61 I-90 Interchange Modification Justification Study
Exit 61 I-90 Interchange Modification Justification Study Introduction Exit 61 is a diamond interchange providing the connection between Elk Vale Road and I-90. Figure 1 shows the location of Exit 61.
More informationSymmetrical Parabolic Curve In highway practice, abrupt change in the vertical direction of moving vehicles should be avoided. In order to provide
Symmetrical Parabolic Curve In highway practice, abrupt change in the vertical direction of moving vehicles should be avoided. In order to provide gradual change in its vertical direction, a parabolic
More informationP.E. Civil Exam Review:
P.E. Civil Exam Review: Geometric Design J.P. Mohsen Email: jpm@louisville.edu Horizontal Curves Slide 2 Back tangent Forward tangent T T Slide 3 Back tangent Forward tangent T T P.C. or T.C. P.T. Slide
More informationConstruction Plan Reading Basics & Applications
Construction Plan Reading Basics & Applications July 12 th, 2016 / 4 p.m. Richland County Transportation Penny Office Instructor Ben W. Lewis, PE Welcome & Introductions Instructor Ben W. Lewis, PE Project
More informationTABLE OF CONTENTS 1200 PLAN PREPARATION
1200 PLAN PREPARATION TABLE OF CONTENTS PAGE 1201 General Plan Sheet Information... 12-1 1201.1 Introduction... 12-1 1201.2 Unit of Measure... 12-1 1201.3 Plan Sheet Materials and File Format... 12-1 1201.4
More informationAppendix E-4. City of Fort Collins. Requirements for Utility Plans
Appendix E-4 City of Fort Collins Requirements for Utility Plans Project Name: Project Planner: Design Engineering Firm: Developer: All applications for final development plans must include final development
More informationSurvCADDR. Section - Profile Module. File Modify Display Draw Inq-Set Pnts Profiles Design Sections Misc PRODUCT DESCRIPTION BENEFITS & ADVANTAGES
File Modify Display Draw Inq-Set Pnts Profiles Design Sections Misc SurvCADDR Section - Profile Module PRODUCT DESCRIPTION engineeringsoftwareforanexpandinguniverse The Section - Profile Module creates
More informationRadius Return Select this option to annotate the elevations along the radius return of the intersection.
ODOT_IntersectionDetail.mvba Application Name: Current version: Required MicroStation Version: Required GEOPAK Version: Video Documentation ODOT_IntersectionDetail.mvba V11.07.15 MicroStation XM or V8i
More informationPlan Submittal Checklist for Permit Projects Compliance Required Information. (Answer Yes or Not Applicable (NA)) Yes NA
Note: This Checklist has been created to assist in and maintain a uniform review of Construction Design Documents for projects done under permit with the County. This document has been created by the Permit
More informationE:\Wilmot\DGN\14018pp.dgn 3/11/2015 6:49:16 AM
600-06 SHOULDER WIDENING FOR TYPE (SPECIAL) GUARDRAIL TERMINALS E:\Wilmot\DGN\08pp.dgn //05 6:9:6 AM E:\DGN\08SUP.dgn //05 ::55 PM E:\DGN\08SUP.dgn //05 :8:0 PM E:\DGN\08-WRG.dgn //05 :8:5 PM E:\DGN\08SM.dgn
More information580 - NOISE BARRIERS OPSS 580 INDEX
580 - OPSS 580 INDEX 580.1 GENERAL 580.1.1 Noise Barrier Design Elements 580.1.1.1 Wind-Load Designs 580.1.1.2 Sound-Absorptive Barriers 580.1.1.3 Noise Barrier Colour, Pattern and Texture 580.1.2 Grading
More informationTURNPIKE DESIGN HANDBOOK (TDH) DESIGN CRITERIA PART 2
TURNPIKE DESIGN HANDBOOK (TDH) DESIGN CRITERIA PART 2 FLORIDA S TURNPIKE ENTERPRISE PRODUCTION DESIGN DEPARTMENT OCOEE, FL January 2018 May 2, 2018 Addendum #1 Introduction As part of the Turnpike s continuing
More informationMICHIGAN DESIGN MANUAL ROAD DESIGN CHAPTER
1.01 DEVELOPMENT METHODS 1.01.01 References 1.01.02 General 1.01.03 Survey and Mapping Methods 1.02 PLAN SHEETS MICHIGAN DESIGN MANUAL 1.02.01 Title Sheet A. Project Location B. Traffic Data C. Project
More informationSECTION 3 IMPROVEMENT PLAN REQUIREMENTS
SECTION 3 IMPROVEMENT PLAN REQUIREMENTS CONTENTS Page 3-1 Digital Submittals 3-2 3-2 Paper Size and Scale 3-2 3-3 Drafting Standard 3-2 3-4 Title Sheet 3-2 3-5 Title Block 3-3 3-6 Drainage, Sewer, Water,
More informationCITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS
CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE E-10 ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS The City of Lompoc has determined that the Engineering Division should administer and issue Encroachment
More informationOhio Department of Transportation Office of Roadway Engineering January 18, 2013
Ohio Department of Transportation Office of Roadway Engineering January 18, 2013 To: Holders of the Traffic Standard Construction Drawings (SCDs) and Plan Insert Sheets (PISs) As of January 18, 2013, eighteen
More informationBASIC TERMS OF ROAD GEOMETRY
BASIC TERMS OF ROAD GEOMETRY Contour line = a line, which connects terrain points of the same elevation Contour line interval (equidistance) = elevation difference between contour lines Line of maximum
More information10010 RECORD DRAWING INFORMATION
SECTION 10000 RECORD DRAWING CHECK LIST All entities who construct public infrastructure, private streets, private storm drain collection systems and travel lanes, shall submit to the Town of Cary Engineering
More informationOhio Department of Transportation Office of Traffic Engineering July 17, 2009
Ohio Department of Transportation Office of Traffic Engineering July 17, 2009 To Holders of the OTE Standard Construction Drawings (SCDs) and Plan Insert Sheets (PISs): As of July 17, 2009, fifteen SCDs
More informationDESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA
DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA 94544-1395 PUBLIC WORKS DESIGN GUIDELINES TABLE OF CONTENTS SD-100 SERIES SPECIAL DRAWINGS SD-100 8/1991 SILT
More informationCity of Beaumont. Public Works Engineering. Street Improvement Plan Checklist REV 4/18/16
City of Beaumont Public Works Engineering Project Name: TR: Project No.: Date: Street Improvement Plan Checklist Chk A. All Sheets 1. 24" x 36" 2. Signed by the engineer-of-work 3. Marked with the contact
More informationCHAPTER 11 SURVEY CADD
CHAPTER 11 SURVEY CADD Chapter Contents Sec. 11.01 Sec. 11.02 Sec. 11.03 Sec. 11.04 Sec. 11.05 Sec. 11.06 Sec. 11.07 Sec. 11.08 Sec. 11.09 Sec. 11.10 General Description of Survey File Contents of Survey
More informationTo apply proposed roadway data (vertical alignments, cross section template data, cut/fill slopes, etc.)
That CAD Girl J ennifer dib ona Website: www.thatcadgirl.com Email: thatcadgirl@aol.com Phone: (919) 417-8351 Fax: (919) 573-0351 Roadway Design Extracting Existing Ground Cross Sections This document
More informationJames P. Erb, CPA Auditor-Controller Treasurer-Tax Collector James W. Hamilton, CPA Assistant Auditor-Controller Treasurer-Tax Collector
COUNTY OF SAN LUIS OBISPO AUDITOR - CONTROLLER TREASURER - TAX COLLECTOR James P. Erb, CPA Auditor-Controller Treasurer-Ta Collector James W. Hamilton, CPA Assistant Auditor-Controller Treasurer-Ta Collector
More informationSuveying Lectures for CE 498
Suveying Lectures for CE 498 SURVEYING CLASSIFICATIONS Surveying work can be classified as follows: 1- Preliminary Surveying In this surveying the detailed data are collected by determining its locations
More informationSECTION 6A ROADWAY PLAN PREPARATION
SECTION 6A ROADWAY PLAN PREPARATION Table of Contents Page No 6A.1 GENERAL...1 6A.2 PRELIMINARY PLANS...3 6A.2.1 PRELIMINARY PLAN SHEETS...3 6A.2.2 PRELIMINARY PROFILE SHEETS...4 6A.3 PHASE A PLANS...4
More informationRevised BRIDGE REPORT AND LAYOUT PAVEMENT STRUCTURE DESIGN CHAPTER VII UTILITIES CHAPTER VIII TRAFFIC CONTROL DEVICES
CHAPTER I CHAPTER II CHAPTER III CHAPTER IV CHAPTER V CHAPTER VI GENERAL INFORMATION PRELIMINARY DESIGN SURVEYS DETAIL DESIGN BRIDGE REPORT AND LAYOUT PAVEMENT STRUCTURE DESIGN CHAPTER VII UTILITIES Revised
More informationTitle: Oct 9 8:27 AM (1 of 30)
Applied Max and Min (Optimization) 1. If you have 100 feet of fencing and you want to enclose a rectangular area up against a long, straight wall, what is the largest area you can enclose? Title: Oct 9
More informationExisting and Design Profiles
NOTES Module 09 Existing and Design Profiles In this module, you learn how to work with profiles in AutoCAD Civil 3D. You create and modify profiles and profile views, edit profile geometry, and use styles
More informationCHAPTER 2C - PRELIMINARY DESIGN. General... 2C-1. Review of Work Load... 2C-2 Establishing Priorities... 2C-2
SECTION 2C - 1 - PROJECT REVIEW CHAPTER 2C - PRELIMINARY DESIGN General... 2C-1 SECTION 2C - 2 - COORDINATING TIME SCHEDULES Review of Work Load... 2C-2 Establishing Priorities... 2C-2 SECTION 2C 3 - REVIEW
More informationHIGHWAY WORK ZONE DATA COLLECTION INSTRUMENT
HIGHWAY WORK ZONE DATA COLLECTION INSTRUMENT Case ID: MI Date of Investigation Respondent Employer Information 1. Is the employer the primary contractor or a subcontractor working at the site? Victim Information
More informationENGR 1182 Midterm Exam 1: Study Guide and Practice Problems
ENGR 1182 Midterm Exam 1: Study Guide and Practice Problems Disclaimer Problems seen in this study guide may resemble problems relating mainly to the pertinent homework assignments. Reading this study
More informationTYPICAL SECTION OF IMPROVEMENT
TYPICAL CTION OF IMOVEMENT STATE COUNTY FILE OJECT ROUTE DIV. SC MARION 7.0658A I-7 NORTHBOUND I7 SOUTHBOUND I7 WHERE CLEARZONE IS UNATTAINABLE OR END TREATMENT IS REQUIRED FOR 8 8 BRIDGE APOACH, ADD.5
More informationSection 101. Street Design
Section 101 Street Design This section establishes the uniform policies and procedures for the preparation of street design plans and construction requirements in the City of Irvine. It is not intended
More informationExisting and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards.
PLAN REQUIREMENTS The plans for street design shall conform to the requirements of Sections 3 and 4. The following requirements shall also be shown on the plans where applicable. Road and Storm Plans:
More informationCity of Massillon Site Plan Checklist
City of Massillon Site Plan Checklist The following information MUST be included with all Site Plans submitted for review and processing in order to constitute a complete Site Plan Package. Incomplete
More informationAutoCAD Civil 3D 2013 South African Country Kit
AutoCAD Civil 3D 2013 South African Country Kit Contents 1 General... 3 1.1 Introduction from the author and creator... 3 1.2 Overview... 4 2 Drawing Settings... 8 2.1 Edit Drawing Settings... 8 3 Layers...
More informationCITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS
CITY OF LA MARQUE CHAPTER 2 -------------------------------------------- GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS CHAPTER 2 ------------------------------------------------
More informationDELINEATOR REFERENCE POINT 200' TYPICAL SPACING (YELLOW DELINEATORS) END OF MERGE LANE TAPER DELINEATOR REFERENCE POINT
200' TYP. 600' < EACH SIDE BOTH ROADWAYS END OF MERGE LANE TAPER TYPICAL FOR ALL 2-LANE MERGES EXCEPT WHERE THERE IS A MERGE FROM THE RIGHT AND NO OFFSET IN THE THROUGH LANES END OF MERGE LANE TAPER 200'
More informationCITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION:
CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION: LOG NO.: LEGEND REVIEW REVIEWED BY DATE / - Requirement satisfied 1 O Requirement not satisfied 2?
More informationCHAPTER 3 INFORMATION REQUIRED FOR PUBLIC IMPROVEMENT CONSTRUCTION PLANS TABLE OF CONTENTS
CHAPTER 3 INFORMATION REQUIRED FOR PUBLIC IMPROVEMENT CONSTRUCTION PLANS TABLE OF CONTENTS Section Title Page 3.1 General... 3-1 3.1.1 Plan Set...3-1 A. Loveland (City Limits Only)...3-1 3.1.2 Final Mylars...3-1
More informationTURNPIKE PLANS PREPARATION AND PRACTICES HANDBOOK (TPPPH) VOLUME 1
TURNPIKE PLANS PREPARATION AND PRACTICES HANDBOOK (TPPPH) VOLUME 1 FLORIDA S TURNPIKE ENTERPRISE PRODUCTION DESIGN DEPARTMENT OCOEE, FL June October 18, Addendum #1 Turnpike Plans Preparation and Practices
More informationSKT-SP Tangent Terminal
Assembly Instructions for metric SKT-SP Tangent Terminal & FLEAT-SP Flared Terminal SP Standard Post System Guardrail Terminals ROAD SYSTEMS, INC. P. O. Box 2163 Big Spring, Texas 79721 Phone: (432) 263-2435
More informationChapter 13 Plan Submittals
Chapter 13 Plan Submittals U30013.DOC 02/01/07 Chapter 13 Plan Submittals Section Topic Page 13.1 General 13.1 13.2 Subdivision Plans 13.1 13.3 Capital Improvement Project Plans 13.12 U30013.DOC 02/01/07
More informationFINAL REPORT. On Project Supplemental Guidance on the Application of FHWA s Traffic Noise Model (TNM) APPENDIX K Parallel Barriers
FINAL REPORT On Project - Supplemental Guidance on the Application of FHWA s Traffic Noise Model (TNM) APPENDIX K Parallel Barriers Prepared for: National Cooperative Highway Research Program (NCHRP) Transportation
More informationWashington County Road Engineering Plan Submittal/Review Checklist
Washington County Road Engineering Plan Submittal/Review Checklist Washington County Land Use Case File Number: Parcel(s): Developer/Owner Name(s): Developer/Owner E-mail(s): The following elements should
More informationUpdate: July 20, 2012
Location and Design Manual, Volume 3 ODOT Office of CADD and Mapping Services Update: July 20, 2012 ** NOTE: All metric references have been removed from this manual. ** PREFACE REVISIONS Glossary of Terms
More informationMINIMUM C/L RADII OF CURVATURE OF LOCAL ROADS IN SUBDIVISIONS
75m 70m 65m 60m DEFLECTION ANGLE C/L RADII OF CURVATURE 55m 50m 45m 40m 35m 30m 25m 20m 15m 90 80 70 60 50 40 30 20 10 0 DEFLECTION ANGLE - MINIMUM C/L RADII OF CURVATURE OF LOCAL ROADS IN SUBDIVISIONS
More informationManhole or Catch Basin Type A & B Cone Sections Precast - Design F Manhole or Catch Basin Cover (Reducer Cone Section Precast) Design D
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (14-02) MANUAL: Standard
More informationSECTION SITE SURVEYS
SECTION 02 21 13 SITE SURVEYS SPEC WRITER NOTE: 1. Delete text between // // not applicable to project. Edit remaining text to suit project. 2. Use this section to specify survey required before design
More informationTURNPIKE DESIGN HANDBOOK (TDH) PLANS PRODUCTION PART 3
TURNPIKE DESIGN HANDBOOK (TDH) PLANS PRODUCTION PART 3 FLORIDA S TURNPIKE ENTERPRISE PRODUCTION DESIGN DEPARTMENT OCOEE, FL January 2018 May 2, 2018 Addendum #1 Introduction As part of the Turnpike s continuing
More information3. The PAC (Permit Application Center) will notify the design professional of plan review results.
Planning and Development Dept. Infrastructure Division P.O. Box 11706, or 155 Johnston Street Rock Hill, South Carolina 29731-1706 Phone: 803-329-5515 FAX: 803-329-7228 www.cityofrockhill.com AS-BUILT
More informationClarifications in italics added July 2018
SECTION 10000 RECORD DRAWING CHECKLIST Clarifications in italics added July 2018 All entities who construct public infrastructure, private streets, private storm drain collection systems and travel lanes,
More informationAutomated Machine Guidance
Design Manual Chapter 5 - Roadway Design 5H - Automated Machine Guidance 5H-1 Automated Machine Guidance A. Concept Automated machine guidance (AMG) for grading is a process in which grading equipment,
More informationNSPS SURVEY TECHNICIAN CERTIFICATION PROGRAM LEVEL III SAMPLE EXAMINATION QUESTIONS
NSPS SURVEY TECHNICIAN CERTIFICATION PROGRAM LEVEL III SAMPLE EXAMINATION QUESTIONS NATIONAL SOCIETY OF PROFESSIONAL SURVEYORS July 2018 This booklet has been prepared to provide an example of what an
More informationSTANDARD DRAWINGS INDEX MODIFIED FOR CENTRAL REGION Revised August 6, 2018
SYMBOLS STANDARD DRAWINGS INDEX No Statewide Standard - Use Regional A3 Legend Detail Sheet BRIDGE AND STRUCTURES B-08.00 Bin Walls 1 CONSTRUCTION-BARRICADES AND SIGNING C-04.12 Location of Double Traffic
More informationCurrent Standard Plates including Transmittal Letters are available on the web at:
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (17-04) MANUAL: Standard
More informationSD DEPARTMENT OF TRANSPORTATION OFFICE OF ROAD DESIGN
SD DEPARTMENT OF TRANSPORTATION OFFICE OF ROAD DESIGN CADD Procedures Manual Section B - Design 1 Table of Contents InRoads Master Workflow... 3 Getting Started... 3 Open InRoads Files... 3 Create and
More informationSURVEYOR SURVEYOR + ODOT DESIGN 1 DESIGN 2 RESE T DESIGN 3 DESIGN 4 C/L X MON. CAP DESIGN NAME NAME or COMPANY ODOT o rlpa R/W PS or ODOT o rlpa R/W P
SURVEYOR SURVEYOR + ODOT DESIGN 1 DESIGN 2 RESE T DESIGN 3 DESIGN 4 C/L X MON. CAP DESIGN or COMPANY ODOT o rlpa R/W or ODOT o rlpa R/W NO.00000 NO.00000 or COMPANY NO.00 000 and/or COMPAN Y SURVEYOR SURVEYOR
More informationSTATE OF KANSAS DEPARTMENT OF TRANSPORTATION PLAN AND PROFILE OF PROPOSED STATE HIGHWAY FEDERAL AID PROJECT 1 PAWNEE COUNTY US-56
OF INDEX OF 1 7 FOUNDATION TREATMENT, COMPACTION & SUBGRADING DETAIL 8 SALVAGED TOPSOIL 15 SIDEROAD PLAN-PROFILE 16 RIGHT OF WAY MONUMENT INSTALLATION DETAIL SHEET -23 PAVING DETAILS 24-29 PAVEMENT DETAILS
More informationSTATE UNIVERSITY CONSTRUCTION FUND
DIRECTIVE 1C-12 Issue date: August 2012 1. General SURVEY, MAPPING AND UTILITY LOCATING This Directive has been developed as a general guide for the survey and mapping effort required for Fund projects.
More information2. Remove from the Standard Plate manual: Standard Plate Index, Sheets 1-4 of 4, Numerical Index of Standard Plates (August 31, 2012)
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management & Technical Support, Design Support Section TRANSMITTAL LETTER NO. (12-04) MANUAL: Standard
More informationLONGITUDINAL PROFILE COMPLETION
LONGITUDINAL PROFILE COMPLETION Vertical alignment of the ditch bottom determine using cross-sections plot (refer to fig. 0630) according to the chainage direction: ditch bottom on right side... dotted
More informationCleveland State University
CVE 212 - Surveying Lab #4 LOCATION SURVEY EQUIPMENT Right angle mirror (pentaprism) Surveyor s tape Plumb bobs Range poles INTRODUCTION Many times the surveyor is called upon to catalog details of a project
More informationAPPENDIX 1: CONSTRUCTION PLAN CHECKLIST
APPENDIX 1: CONSTRUCTION PLAN CHECKLIST October 2017 APPENDIX A APPENDIX 1: CONSTRUCTION PLAN CHECKLIST ALL PLANS Plans on 24-inch by 36-inch paper (Originals shall be transmitted on a CD as an electronic
More informationPublic Projects Plan Submittal Guidelines Revised August 4, 2017 Plan submittal Process: 10% Plans 25% Plans 30% Plans 60% Plans 90% Plans
Plan submittal Process: 10% Plans - Based on survey and include detailed horizontal geometry per Public Project Checklist. 25% Plans - Plans include profiles, typical sections, phasing & cross sections
More informationPorter County Plan Commission
Plan Type: Development Plan Administrative DRC PC Primary Plan Administrative DRC PC Secondary Plat/Replat Administrative DRC PC PUD Conceptual Detailed Final Project Information Project Name: Developer
More informationInstructors Manual for Construction Surveying and Layout Third Edition Part Three - Applications Chapters Prepared by Wesley G.
Instructors Manual for Construction Surveying and Layout Third Edition Part Three - Applications Chapters 19-22 Prepared by Wesley G. Crawford TABLE OF CONTENTS Chapter 19 - Layout Techniques... 3 Chapter
More informationCharlton/Oxford Route 20 Reconstruction Project
Public Informational Meeting February 1, 2017 Oxford High School Charlton/Oxford Route 20 Reconstruction Project Project File No. 602659 2014 HDR, Inc., all rights reserved. Public Informational Meeting
More informationInstallation Instructions
Installation Instructions SRT-350 8 POST Guardrail End Treatment Revised July 2005 TRINITY HIGHWAY SAFETY PRODUCTS, INC. BUILDING TOMORROW S HIGHWAY SAFETY SOLUTIONS TODAY 2 SRT TM 8-POST SYSTEM FOR SPECIFIC
More informationPROJECT NAME: TRACT, PARCEL MAP PROJECT ID NO. PLAN CHECKED BY: 1ST CHECK 3RD CHECK 2ND CHECK COMMENTS FINAL MYLAR DATE CHECKED:
CITY OF COLTON PUBLIC WORKS/ENGINEERING DEPARTMENT STREET IMPROVEMENT PLAN REVIEW LIST (PROVIDE SEPARATE ON-SITE & OFF-SITE STREET IMPROVEMENT PLAN SETS) PROJECT NAME: TRACT, PARCEL MAP PROJECT ID NO.
More informationBentleyuser.dk Årsmøde 2010 Nordic Civil 2010
Bentleyuser.dk Årsmøde 2010 Nordic Civil 2010 8.-10. November 2010, Munkebjerg Hotel, Vejle Workshop - X9 Resurfacing and Overlay Tools InRoads V8i Presenter: Joe Waxmonsky, P.E., Bentley Systems USA Bentley
More informationHEADS Pro: The Simplest & Versatile software for Highway engg.&
HEADS Pro: The Simplest & Versatile software for Highway engg.& design with special features for low cost rual & hill roads, tunnels, road widening, strengthening, profile correction, pavement design,
More informationGovernment Of Newfoundland & Labrador Municipal Water, Sewer And Roads Master Construction Specifications
PAGE NO. : 1 OF 4 Revision Date: July 2009 STANDARD DRAWINGS TABLE OF CONTENTS DRAWING # DESCRIPTION 0030............ Work Adjacent to Roadway 0040............ Work at the Edge of Roadway 0050............
More informationREQUEST FOR PROPOSAL
REQUEST FOR PROPOSAL Engineering Design Services for the Preliminary Engineering of Lake Nepessing/Davison/Genesee Intersection Improvements Sections 1, 2, 11 and 12 of Elba Township Lapeer County, Michigan
More informationFull Contents. Essentials, Workbook
Section 1: Overview Essentials 1.1 Introduction... 3 Learning InRoads... 3 Basic Rules... 3 How to Use This Guide... 4 Section Breakdown... 5 Section 1: Overview Essentials... 5 Section 2: Production Essentials...
More informationDRAFTING STANDARDS 9.00 DRAFTING STANDARDS
DRAFTING STANDARDS 9.00 DRAFTING STANDARDS Final plans shall conform in appearance, format, accuracy, and quality to the standards used in the Springfield Engineering Division. Additional standards shall
More informationTriangle Triumph Game Elements. Table of Contents
CAppendix JR. Triangle Triumph Game Elements Table of Contents Appendix C Triangle Triumph Playing Field...2 C.1 Description...2 C.2 Bill of Materials...2 C.3 Rack Bases...3 C.4 Rack System...4 C.5 Central
More informationSewer Line Extension Permit Design Checklist
CHECKLIST C1 Revised 4/7/2017 Sewer Line Extension Permit Design Checklist DISCLAIMER - This checklist is provided to Consulting Engineers for the express purpose of assisting them in compiling sewer line
More informationBestall Collaborative Limited Planning Environment Construction Management Development
November 18, 2017 Bestall Collaborative Limited Lori Hight, AICP, Senior Planner City Development Department City of Thornton City Hall 9500 Civic Center Drive Thornton, Colorado 80229-4326 RE: River Valley
More informationPlanarization & Routing Guide
Metro Regional Centerlines Collaborative Planarization & Routing Guide Document: Version. Published: July 8, 25 Prepared and edited by: Matt Koukol, MRCC Project Technical Lead Ramsey County GIS Manager
More informationAuthorized Agent: City of Manassas Check List Attached: Contact: Address: Phone Number: Fax Number: Developer s Name: Phone Number:
CITY OF MANASSAS DEPARTMENT OF COMMUNITY DEVELOPMENT DEVELOPMENT SERVICES DIVISION 9027 Center Street Room 201 Manassas, Virginia, 20110 Phone: 703-257-8278 Fax: 703-257-5831 Application Date: APPLICANT
More information5/16" Flange nut. Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector zinc plated bolt w/ washers and nut. Anchor 3" sq. 7 Ga.
2 1/2" x 2 1/2" x 10 Ga. 6" 5" 4" Variable Slipbase (8" Sq. SYS.) 5/16 Corner Bolt W/ nut 5/16" Flange nut Stub Insert (8" Sq. SYS.) Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector zinc
More informationJointing Rural Intersections
Design Manual Chapter 5 - Roadway Design 5G - PCC Pavement Joints 5G-4 Jointing Rural Intersections This section describes how to joint rural intersections by following the guidelines outlined in Iowa
More informationCHAPTER 11. Plan Standards
CHAPTER 11 Plan Standards A. Introduction The city requires uniform public improvement plans for ease of record keeping and understanding. The following standards govern most plan submittals to the city.
More informationSUBJECT: Standard Plate 9102 Turf Establishment Areas At Pipe Culvert Ends
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (17-03) MANUAL: Standard
More informationAssembly Instructions for. for 31" MGS (Midwest Guardrail System) ROAD SYSTEMS, INC.
MSKT Assembly Instructions for MASH Tangent Terminal for 31" MGS (Midwest Guardrail System) ROAD SYSTEMS, INC. P. O. Box 2163 Big Spring, Texas 79721 Phone: (432) 263-2435 FAX: (432) 267-4039 Technical
More informationGeneral Guide to RoadPlus Editor
20 30 40 50 GPS System 500 General Guide to RoadPlus Editor Version 4.0 English System GPS500 Congratulations on your purchase of a new Leica System GPS500. 2 View of chapters Introduction Design Elements
More information